draft - san diego association of governments · 2020. 7. 3. · • integrated multimodal...
TRANSCRIPT
![Page 1: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/1.jpg)
Comprehensive Multimodal Corridor PlansBoard of Directors | July 10, 2020
DRAFT
![Page 2: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/2.jpg)
2
• July 12 - Board direction to develop a Regional Plan that meets federal and state laws/targets, assumes realistic and transparent revenues, utilizes the 5 Big Moves and Complete Corridors model, and prioritizes corridors previously scheduled for investment such as SR 78, 52, 67, and 94/125.
• September 27 - Board approves $40 million for Comprehensive Multimodal Corridor Plans/Advanced Planning over the next 5 years.
Previous Actions
DRAFT
![Page 3: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/3.jpg)
3
• Integrated multimodal transportation corridor planning, aligned with state goals and funding.
• Details Complete Corridors included in the Regional Plan
• CMCPs suggested by California Transportation Commission to be competitive for SB1 and other state and federal funding
Why Comprehensive Multimodal Corridor Plans (CMCPs)?
DRAFT
![Page 4: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/4.jpg)
4
North Coast Corridor Plan –First Generation CMCP
DRAFT
![Page 5: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/5.jpg)
5
Fully Integrated CMCP
DRAFT
![Page 6: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/6.jpg)
6
CMCPs - Phase One
– Purple Line/I-805– Blue Line/I-5 South– High Speed Transit/SR 52/SR 67– SPRINTER/Palomar Airport Road/SR 78– Central Mobility Hub and Connections
DRAFT
![Page 7: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/7.jpg)
7
• Workshop held with Caltrans District 11• Teams formed and work plans established• Geographical areas defined• Issues and opportunities statements drafted
for discussion
CMCP Work Underway
DRAFT
![Page 8: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/8.jpg)
8
CMCP Draft Study Area Boundaries1. Purple Line/I-805/
Blue Line/I-5 South2. Sea to Santee
(SR 52)3. San Vicente
Corridor (SR 67)4. North County
Corridor (SR 78)5. Central Mobility Hub
and ConnectionsDRAFT
![Page 9: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/9.jpg)
9
1. Public safety and security2. Preserve existing transportation infrastructure3. Multimodal focus4. Economic development and goods movement5. System operations and congestion relief6. Low income and disadvantaged communities7. Reduce greenhouse gas emissions/vehicle miles traveled8. Improve air quality and public health9. Active transportation and micromobility10.Prevent residential and small business displacement11. Increase supply of affordable housing 12. Improve jobs-housing balance
Policy Considerations
DRAFT
![Page 10: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/10.jpg)
10
Implementation Schedule
Develop Work Plans
Data Analysis
Community Outreach
Draft and Final Plans
Spring 2020
Summer/Fall 2020
Fall/Winter 2020/2021
Spring/Summer 2021
Planned Check-ins• Summer/Fall 2020
Present data analysis and stakeholder engagement findings for review and discussion
• Fall/Winter 2020/2021Conduct community outreach
• Spring/Summer 2021Present draft and final CMCPsDRAFT
![Page 11: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/11.jpg)
11
1. North Coast Corridor/I-5 North2. High Speed Transit/I-83. High Speed Transit/I-154. High Speed Transit/SR 565. High Speed Transit/SR 946. High Speed Transit/SR1257. Airport to Airport
(Cross Border Xpress to San Diego Airport)
Phase 2 CMCPs
DRAFT
![Page 12: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/12.jpg)
Board of DirectorsJuly 10, 2020
SB 743 IMPLEMENTATION:Panel Discussion
DRAFT
![Page 13: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/13.jpg)
2
Presentation Outline
• Introduction and Background(Keith Greer, SANDAG)
• Regional Implementation Guidelines(Erik Ruehr, Institute of Transportation Engineers)
• Implementation Land Use(Alyssa Muto, City of San Diego)
• Implementation Transportation(Chris Schmidt, Caltrans)
• Resources and Tools(Mike Calandra, SANDAG)
DRAFT
![Page 14: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/14.jpg)
3
What is SB 743?
• Signed into law in 2013• Legislative intent:
• New methodologies evaluating transportation impacts under CEQA
• Promote statewide goals “reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land.”
• OPR to amend the CEQA Guidelines
July 1, 2020 statewide implementationDRAFT
![Page 15: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/15.jpg)
4
What did it do?
“Automobile delay shall not be considered a significant impact on the environment” (PRC § 21099(b)(2))
Level of Service (LOS) Vehicle Mile Traveled (VMT)
Source: Orange County RegisterDRAFT
![Page 16: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/16.jpg)
5
Why?
Good Grade in LOS ≠ Success in Transportation Planning
Good LOSLow Accessibility
Bad LOSHigh AccessibilityDRAFT
![Page 17: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/17.jpg)
6
Why?
“ During the last 10 years, the Legislature has charted a course of long-term sustainability based on denser infill development, reduced reliance on individual vehicles and improved mass transit, all with the goal of reducing greenhouse gas emissions.”
Promote InfillDevelopment
Increase Mobility Options
+ =Reduce GHG and
traffic-related air pollutionDRAFT
![Page 18: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/18.jpg)
7
How?
“OPR recommends that a per capita or per employee VMT that is fifteen percent below that of existing development may be a
reasonable (CEQA) threshold.”
Significant Impact
Vehicle Mile Traveled (VMT)
Not Significant
15% BelowAverage VMT
DRAFT
![Page 19: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/19.jpg)
8
(Erik Ruehr, Institute ofTransportation Engineers)
Regional ImplementationGuidelines
DRAFT
![Page 20: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/20.jpg)
9
March 2000 Dec 2018 May 2019
Guidelines and More Guidelines
ITE/SANTECLOS-Based
Traffic Impact Study Guidelines for the San Diego
Region
OPRStatewide SB 743
Technical Advisory
ITESB 743
Guidelinesfor the San Diego
RegionDRAFT
![Page 21: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/21.jpg)
10
ITE SB 743 Guidelines for the San Diego Region
DRAFT
![Page 22: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/22.jpg)
11
Key Aspects of Regional Guidelines
VMTAnalysis
Methodology
Minimum Project Size for
Land DevelopmentProjects
VMT MethodologyFor
TransportationProjects
DRAFT
![Page 23: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/23.jpg)
12
Key Aspects of Regional Guidelines (Continued)
Recommended VMT
Thresholds
Additional DetailNot SpecifiedIn Statewide
Guidance
VMT ThresholdFor CEQASignificant Impact
ProjectVMT
DRAFT
![Page 24: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/24.jpg)
13
Agency – Specific SB 743 Guidelines
DRAFT
![Page 25: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/25.jpg)
14
(Alyssa Muto, City of San Diego)
Implementation Land Use
DRAFT
![Page 26: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/26.jpg)
Planning Blueprint
ImplementationPlanningPolicy
City of Villages CAP
CompleteCommunities
CommunityPlan Updates
Zoning
15
Planning Department
DRAFT
![Page 27: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/27.jpg)
PlanningDepartment
Development Process Aligned with Climate Goals
1616
Planning Department
DRAFT
![Page 28: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/28.jpg)
Planning DepartmentHow do we make it happen?
Planning Department
17
DRAFT
![Page 29: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/29.jpg)
PlanningDepartmentComplete Communities!
18
Planning Department
DRAFT
![Page 30: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/30.jpg)
Mobility ChoicesStrategic investments in biking,walking,and transit
Equitable investments
Safe and convenient mobilityoptions
Reduce GHG emissions
Cleaner air
Streamlined development neartransit
19
Planning Department
DRAFT
![Page 31: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/31.jpg)
Mobility Choices includes:
20
Planning Department
Mobility Choices Regulations
Guidelines & CEQA threshold
Active Transportation
In Lieu Fee
ActiveTransportation
In Lieu Fee CalculatorDRAFT
![Page 32: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/32.jpg)
Planning Department
Why Mobility Choices?
21
Planning Department
DRAFT
![Page 33: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/33.jpg)
PlanningDepartmentA Safer, Healthier City
Safer roads means
more spacefor
recreation &exerciseSafer roads
means more connected
neighborhoods
Fewer cars means safer roads
22
Planning Department
DRAFT
![Page 34: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/34.jpg)
PlanningDepartment
Strategic Transportation Investments
Funding facilities where will be used the most
Focused investments where need is greatest
23
Planning Department
DRAFT
![Page 35: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/35.jpg)
Mobility Zone 2 (TPA)
Mobility Zone 1
Mobility Choices Regulations
Mobility Zone 4
Mobility Zone 3
24
Planning Department
DRAFT
![Page 36: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/36.jpg)
PlanningDepartmentAligning with Equity Goals
50% of the funds collected will be
spentwithin Community
of Concern
25
Planning Department
DRAFT
![Page 37: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/37.jpg)
26
(Chris Schmidt, Caltrans)
Implementation Transportation
DRAFT
![Page 38: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/38.jpg)
27
TRANSPORTATION PROJECTS –What is a Capacity Increasing Project?
THIS
NOT THIS
North Coast CorridorI-5 Widening
Mid Coast Trolley ExtensionDRAFT
![Page 39: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/39.jpg)
28
TRANSPORTATION PROJECTS –What is a Capacity Increasing Project?
THIS
NOT THIS
SR-76 Widening
Roundabouts and Traffic CalmingDRAFT
![Page 40: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/40.jpg)
29
NON-CAPACITY INCREASING PROJECTS(No VMT Analysis Required)
SB 1 Projects
SHOPP
Reconfigurations, Traffic Calming
Safety Improvements
Pedestrian, Bicycling and Transit Enhancements
Rehabilitation/Maintenance
DRAFT
![Page 41: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/41.jpg)
30
CAPACITY INCREASING –ON STATE HIGHWAY SYSTEM
2019 Federal RegionalTransportation Plan:Additional General Purpose Lanes
DRAFT
![Page 42: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/42.jpg)
31
CAPACITY INCREASING TRANSPORTATION PROJECTS: ANALYSIS PROCESSGuidance Documents:• Transportation Analysis Framework (TAF)
─ Induced Travel Analysis (OPR Technical Advisory)─ Two Methodologies (Expert Panel Input)
• Transportation Analysis under CEQA (TAC) ─ Process Includes: Screening, Establishing Baseline, Direct VMT
Impact (including Induced Travel), Determining Significance, VMT Mitigation & Statement of Overriding Considerations
Informal comment period ended in June
DRAFT
![Page 43: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/43.jpg)
32
PROJECT-LEVEL MEASURES TO REDUCE VMT ON THE STATE HIGHWAY SYSTEM• Facilities for bicycles and pedestrians• Incorporation of Complete Streets elements • Support multi-modal transportation: Park & Ride lots • Marketing and incentives: transit, carpooling, improved driving habits• Electrification in project design (electric charging for cars and bikes) • Intelligent Transportation Systems and Transporation Demand Management• Traffic Management Strategies:
─ Bus operation, bus lanes and signal priority ─ Coordinate improvements on the SHS with arterials roadways
• Interconnected system: from passenger vehicles to alternate modes • VMT Mitigation resources: TAC Appendix 3 and SANDAG Toolbox• DRAFT
![Page 44: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/44.jpg)
33
(Mike Calandra, SANDAG)
Resources and Tools
DRAFT
![Page 45: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/45.jpg)
34
Travel Demand Modeling
Model Runs
GrowthForecast
Geography
Surveys
PoliciesNew
TransportationFacilities
Economics
Land Use
DemographicsTransportation
System
ExistingTransportationFacilities
EnvironmentalConstraints
DRAFT
![Page 46: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/46.jpg)
35
Travel Demand Modeling
Regional Travel Demand Model
Regional Plan Sub-regional Analysis
RTIP
Air Quality Conformity
Corridor Studies
General / Community
Plan Updates
Private Developments
Climate Action PlansDRAFT
![Page 47: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/47.jpg)
36
Regional Tools & Resources• SB743 VMT Maps
DRAFT
![Page 48: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/48.jpg)
37
Regional Tools & Resources
• Traffic Forecast Information Center (TFIC)
DRAFT
![Page 49: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/49.jpg)
38
Regional Model Tools & Resources
• Climate Action Plan (CAP) Portal
DRAFT
![Page 50: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/50.jpg)
39
Regional Model Tools & Resources
• Mobility Management Toolbox─Help jurisdictions implement SB743─Support CAP implementation and monitoring─Quantify VMT reductions resulting from TDM and TSM
implementation at project/community level
DRAFT
![Page 51: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/51.jpg)
40
Customized Travel Model Analysis
• Experienced model application staff dedicated to refining the regional model for sub-regional analysis
• SANDAG Service Bureau & TAM team
Finance
Service Bureau
Data Solutions
Contracts General CounselDRAFT
![Page 52: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/52.jpg)
41
SANDAG ABM Clients
Private Developers
DRAFT
![Page 53: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/53.jpg)
42
Customized Travel Model AnalysisModel Products:• Average Daily Traffic (ADT)• Peak Period Traffic• Trip Distribution (Select Link / Zone)• Mode Choice Reports• Transit Ridership• Vehicle Miles of Travel (VMT)
─ SB 743─ Climate Action Plans─ Greenhouse Gas Emissions
• Travel time contoursDRAFT
![Page 54: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/54.jpg)
43
Scenario ID 1156
Scenario ID Residents Total Trips Person Miles of Travel Vehicle Miles of Travel VMT per ResidentRegionwide 1156 4,243,618 15,168,868 88,739,376 61,033,942 14.4Jurisdiction SAN DIEGO 1156 1,917,354 6,880,317 35,596,371 23,598,863 12.3CPA Peninsula 1156 48,889 181,901 906,799 637,036 13.0Site District 1 - Shelter Island 1156 397 1,518 6,933 5,004 12.6
Scenario ID Employees Total Trips Person Miles of Travel Vehicle Miles of Travel VMT per EmployeeRegionwide 1156 1,797,656 5,778,893 44,533,639 38,068,205 21.2Jurisdiction SAN DIEGO 1156 950,209 2,898,736 21,586,988 18,628,173 19.6CPA Peninsula 1156 15,897 49,861 338,177 288,568 18.2Site District 1 - Shelter Island 1156 2,164 6,723 55,677 48,601 22.5
Report Generated: 11/27/19
VMT per Resident
VMT per Employee
Vehicle Miles of Travel ReportPort Master Plan Update - PMPU1 - District 1 - Shelter Island
Customized SB 743 VMT Analysis
Regionwide Jurisdiction SAN DIEGO CPA Peninsula Site District 1 - Shelter Island
Regionwide Jurisdiction SAN DIEGO CPA Peninsula Site District 1 - Shelter Island
Report Generated:
l VMT per Resident 14.4
12.3 13.0
12.6
l VMT per Employee 21.2
19.6 18.2
22.5
DRAFT
![Page 55: DRAFT - San Diego Association of Governments · 2020. 7. 3. · • Integrated multimodal transportation corridor planning, aligned with state goals and funding. • Details Complete](https://reader035.vdocuments.site/reader035/viewer/2022062508/6043a0b995a63654de55c325/html5/thumbnails/55.jpg)
44
QUESTIONS?• Introduction and Background
(Keith Greer, SANDAG)• Regional Implementation Guidelines
(Erik Ruehr, Institute of Transportation Engineers)• Implementation Land Use
(Alyssa Muto, City of San Diego)• Implementation Transportation
(Chris Schmidt, Caltrans)• Resources and Tools
(Mike Calandra, SANDAG)DRAFT