2nd Quarter RPMES Report CY2012 PROJECT PROGRESS REPORT As of June 2012 Project Title: Kabugao (Apayao)-Solsona (Ilocos Norte) Road Implementing Agency: Department of Public Works and Highways - CAR Donor: (x) GOP ( ) Loan ( ) Grant Loan/Grant Proceeds: Peso Counterpart: Total Project Cost: P 100 M Location/Area Coverage: Kabugao, Apayao Description: The road is a major component of the Cordillera Roads Improvement Project (CRIP) as lateral road; it connects Ilocos Region and the Northern Cordilleras. It traverses the municipalities of Kabugao and Calanasan in Apayao and turns west to Solsona in Ilocos Norte. The 76.48 km stretch Kabugao-Solsona Road is a segment of the San Nicolas- Solsona-Kabugao-Abbut Road. This starts from Poblacion Kabugao and ends in Solsona. Approximately 10 km. is for opening at the Kabugao side and a bridge construction across Apayao River. The specific project output is road construction of 9.56 kms. Project Duration: Start: End: PROJECT PROGRESS For CY 2012 AO 1 st Quarter AO 2 nd Quarter AO 3 rd Quarter AO 4 th Quarter Target 0.50% Actual 0.50% Slippage Cumulative Status: (Since start of project) Status Physical Financial Target 0.50% Actual (slippage) Current Implementation Issues and/or Problems Encountered (if any): Actions Taken/ Recommendations: Remarks: NTP issued June 22, 2012. Agency Contact Person: DIR. EDILBERTO P. CARABBACAN Regional Director, DPWH CAR Engineer’s Hill 2600 Baguio City Tel. 444-8838

Upload: rdc-cordillera

Post on 24-Jun-2015

321 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: Dpwh kabugao solsona_2nd qtr_f

2nd Quarter RPMES Report CY2012

PROJECT PROGRESS REPORT As of June 2012

Project Title: Kabugao (Apayao)-Solsona (Ilocos Norte) Road

Implementing Agency: Department of Public Works and Highways - CAR

Donor: (x) GOP ( ) Loan ( ) Grant

Loan/Grant Proceeds: Peso Counterpart: Total Project Cost: P 100 M

Location/Area Coverage:

Kabugao, Apayao

Description: The road is a major component of the Cordillera Roads Improvement Project (CRIP) as lateral road; it connects Ilocos Region and the Northern Cordilleras. It traverses the municipalities of Kabugao and Calanasan in Apayao and turns west to Solsona in Ilocos Norte. The 76.48 km stretch Kabugao-Solsona Road is a segment of the San Nicolas-Solsona-Kabugao-Abbut Road. This starts from Poblacion Kabugao and ends in Solsona. Approximately 10 km. is for opening at the Kabugao side and a bridge construction across Apayao River. The specific project output is road construction of 9.56 kms.

Project Duration: Start: End:

PROJECT PROGRESS

For CY 2012 AO 1st Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter

Target 0.50%

Actual 0.50%

Slippage

Cumulative Status: (Since start of project)

Status Physical Financial

Target 0.50%

Actual (slippage)

Current Implementation Issues and/or Problems Encountered (if any):

Actions Taken/ Recommendations:

Remarks: NTP issued June 22, 2012.

Agency Contact Person:

DIR. EDILBERTO P. CARABBACAN Regional Director, DPWH – CAR

Engineer’s Hill 2600 Baguio City Tel. 444-8838

Page 2: Dpwh kabugao solsona_2nd qtr_f

2nd Quarter RPMES Report CY2012

Kabugao-Apayao- Solsona-Ilocos Norte Rd

Project Location

Junction at Poblacion

Kabugao

Page 3: Dpwh kabugao solsona_2nd qtr_f

2nd Quarter RPMES Report CY2012

Kabugao-Apayao-Solsona Ilocos Norte Road

Kabugao (Apayao) Municipal Hall

Landmarks

Junction San Nicolas, Ilocos Norte

Page 4: Dpwh kabugao solsona_2nd qtr_f

2nd Quarter RPMES Report CY2012

Along Solsona (Ilocos Norte ) Section

Near regional boundary