Page 1: Project Management Class ( based on PMBOK) - Day 5

{

Project Management

Joe DiFalcoPMP, PMI-ACP, CSPO, Systems Engineer

Owner CVShout™

Profile: CVShout.com/joedifalcoContact: [email protected]

Review of the Project Management Body of Knowledge (PMBOK) 5th edition

Page 2: Project Management Class ( based on PMBOK) - Day 5

Day 4 review Budget Earned value management Follow the Lifecycle – build a schedule

Knowledge Areas Ethics topics Stakeholder topics

Day 5 Agenda

Page 3: Project Management Class ( based on PMBOK) - Day 5

From PMBOK 5th Edition

Note: the numbers in the chart refer to the chapter in the PMBOK

Page 4: Project Management Class ( based on PMBOK) - Day 5

Review Cost Management Plan

• Responsibilities• Approach• Measurement• Reporting• Variance response• Change control

Example

Page 5: Project Management Class ( based on PMBOK) - Day 5

Estimate Costs

Reserve analysis:• Account for cost uncertainty• Could be a fixed %, fixed number or some other calculation• CONTINGENCY reserve

• Allocated for identified risks or “known-unknowns”• Clearly documented• Part of the cost baseline

• MANAGEMENT reserve• Reserved for unforeseen work or “unknown-unknowns”• NOT part of the cost baseline but ARE part of the budget and funding requirements• Management reserves are added to cost baseline as they are approved/used

Page 6: Project Management Class ( based on PMBOK) - Day 5

Determine Budget

• Aggregation of the estimated costs of individual activities (work packages)• Authorized cost baseline• Use this baseline to monitor and control project performance• Project budget includes ALL of the funds authorized to execute the project

• Cost baseline is the time-phased budget excluding MANAGEMENT reserves

Page 7: Project Management Class ( based on PMBOK) - Day 5

Project Budget ComponentsKnown un-Knowns

un-Known un-Knowns

This is the level of granularity to track measurement

Page 8: Project Management Class ( based on PMBOK) - Day 5

Project Budget Components

Reserves

Contingency vs Management reserves

Page 9: Project Management Class ( based on PMBOK) - Day 5

Project Budget ComponentsAnticipated

Funds required to start

Projected disbursement points

Page 10: Project Management Class ( based on PMBOK) - Day 5

From PMBOK 5th Edition

Note: the numbers in the chart refer to the chapter in the PMBOK

Page 11: Project Management Class ( based on PMBOK) - Day 5

Control Costs

From PMBOK 5th Edition

• Monitor project status• In relation to the value of work accomplished

• Update project costs• Manage cost baseline• Recognize variance – take corrective action

Page 12: Project Management Class ( based on PMBOK) - Day 5

Control Costs

From PMBOK 5th Edition

Page 13: Project Management Class ( based on PMBOK) - Day 5

Control Costs

From PMBOK 5th Edition

Question: what actions would you expect to take to manage costs?

• Follow the management plan• Utilize OPAs that are available• Manage change –

• Prevent unnecessary change• Influence factors that cause cost to rise• Communicate approved change requests

Exam tips:• Control means measure• Measurement reveals variance – variance is analyzed • Cost management plan tells you what to do to control cost

Page 14: Project Management Class ( based on PMBOK) - Day 5

Earned Value Management (EVM)

From PMBOK 5th Edition

• Assess project performance and progress• Scope• Schedule• Resource measurements• Progress rules• 50/50 – activity is 50% when started• 20/80 – activity is 20% when started• 0/100 – activity is 100% when completed

• Integrates• Scope baseline• Cost baseline• Schedule baseline• Note: the Performance Measurement

Baseline (PMB) is the combination of these

Page 15: Project Management Class ( based on PMBOK) - Day 5

Planned Value (PV)

From PMBOK 5th Edition

The approved budget for the work scheduled to be completed by a specified date.

• Scheduled work• Work for an activity (work breakdown component)• Defines the physical work that SHOULD have been

accomplished• Total of all PV can be referred to as:

• Total PV is also: budget at completion (BAC)

Page 16: Project Management Class ( based on PMBOK) - Day 5

Earned Value (EV)

From PMBOK 5th Edition

The approved budget for the work actually completed by the specified date

• Measure of work performed• Based on PV (authorized budget)• Percent complete of a project• EV cannot be greater than PV• Monitored:

• Incrementally – for current status• Cumulatively – performance trends

Page 17: Project Management Class ( based on PMBOK) - Day 5

Actual Cost (AC)

From PMBOK 5th Edition

• Realized cost incurred• Cost of work performed during a time period• Specific to the work that the EV measured• Corresponds to what was planned – PV• Has no upper limit – it is what it is

Page 18: Project Management Class ( based on PMBOK) - Day 5

Earned Value

From PMBOK 5th Edition

Page 19: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeSchedule Variance (SV)

From PMBOK 5th Edition

Page 20: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeCost Variance (CV)

From PMBOK 5th Edition

Page 21: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeSchedule Performance Index(SPI)

From PMBOK 5th Edition

Page 22: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeCost Performance Index(CPI)

From PMBOK 5th Edition

Page 23: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeEstimate at Completion(EAC)

From PMBOK 5th Edition

Page 24: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeEstimate to Complete (ETC)

From PMBOK 5th Edition

Page 25: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeTo Complete Performance Index(TCPI)

From PMBOK 5th Edition

Page 26: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeTo Complete Performance Index(TCPI)

From PMBOK 5th Edition

Page 27: Project Management Class ( based on PMBOK) - Day 5

Formulas to memorizeVariance at Completion(VAC)

From PMBOK 5th Edition

Page 28: Project Management Class ( based on PMBOK) - Day 5

Earned Value Measurement

From PMBOK 5th Edition

Examples

Page 29: Project Management Class ( based on PMBOK) - Day 5

Earned Value Measurement

From PMBOK 5th Edition

Exercise

Page 30: Project Management Class ( based on PMBOK) - Day 5

Earned Value Measurement

From PMBOK 5th Edition

Status after 1 hour

Page 31: Project Management Class ( based on PMBOK) - Day 5

Earned Value Measurement

From PMBOK 5th Edition

Use EVM to forecast

Page 32: Project Management Class ( based on PMBOK) - Day 5

Develop Schedule

From PMBOK 5th Edition

Construct a House

Page 33: Project Management Class ( based on PMBOK) - Day 5

Ethics

From PMBOK 5th Edition

Code of Ethics andProfessional Conduct

Page 34: Project Management Class ( based on PMBOK) - Day 5

Stakeholder Management

From PMBOK 5th Edition

Page 35: Project Management Class ( based on PMBOK) - Day 5

Stakeholder Management

From PMBOK 5th Edition

Page 36: Project Management Class ( based on PMBOK) - Day 5

Stakeholder Management

From PMBOK 5th Edition

Page 37: Project Management Class ( based on PMBOK) - Day 5

Identify Stakeholders

From PMBOK 5th Edition

Inputs

Page 38: Project Management Class ( based on PMBOK) - Day 5

Identify StakeholdersTools & Techniques

Page 39: Project Management Class ( based on PMBOK) - Day 5

Stakeholder AnalysisTools & Techniques

From PMBOK 5th Edition

Page 40: Project Management Class ( based on PMBOK) - Day 5

Identify Stakeholders

From PMBOK 5th Edition

Outputs

Page 41: Project Management Class ( based on PMBOK) - Day 5

Plan Stakeholder Management

From PMBOK 5th Edition

Inputs

Page 42: Project Management Class ( based on PMBOK) - Day 5

Plan Stakeholder Management

From PMBOK 5th Edition

Tools & Techniques

Page 43: Project Management Class ( based on PMBOK) - Day 5

Plan Stakeholder Management

From PMBOK 5th Edition

Outputs

Page 44: Project Management Class ( based on PMBOK) - Day 5

Manage Stakeholder Engagement

From PMBOK 5th Edition

Page 45: Project Management Class ( based on PMBOK) - Day 5

Manage Stakeholder EngagementInputs Comm Mgmt

Stake Mgmt

Page 46: Project Management Class ( based on PMBOK) - Day 5

Manage Stakeholder Engagement

From PMBOK 5th Edition

Tools & Techniques

Page 47: Project Management Class ( based on PMBOK) - Day 5

Manage Stakeholder Engagement

Outputs

Page 48: Project Management Class ( based on PMBOK) - Day 5

Control Stakeholder Engagement

From PMBOK 5th Edition

Inputs

Tools & TechniquesOutputs