Download - Parkes ATUC Report May 2008
Stats• Scheduled observing time , Oct07-Sep08
– 83%
• Downtime (last 12 months): – 1.1% system faults– 2.8% high wind
Observer feedback
• 25 reports last 12 months9.7 (9.7) after-hours support
9.4 (9.4) quarters
9.7 (9.3) Admin support
9.4 (9.2) Overall rating
-7.9 (7.4) for RFI (immunity from)
Receivers
• With new 16-26GHz receiver, can cover most of the spectrum from 1.2 - 26GHz
Delivery of this receiver delayed
• Methanol Multibeam problems
In hand, but some lost time
Pulsar/transient backends
• Pulsar timing– DFB2 operational (1GHz x 2IF)– DFB3 delivered Feb 2008 (1GHz x 4IF)
• Search mode– APSR currently in shakedown (~8Gb/s BBR)– Search mode for DFB3– MB-DFB (new 13 beam search engine)
Spectral line
• Multibeam correlator still the workhorse– 2048 or 4096 channels max for nb > 2– Up to 16384 channels for single beam
• DFB3: – 2 freq x 256MHz BW / 8192ch (time-binned)
• s/w correlators possible (using CPSR,PAMELA)
MB-DFB
• Collaboration between Swinburne, Berkeley, Manchester, Cagliari, ATNF, Effelsburg
• 13-beam filterbank search engine with higher spectral resolution.
• Targets; MSPs, transients, relativistic binaries