don b. kerl - zenith construction...don b. kerl don b. kerl, r.a. j:\_design services projects...

4
Harris County Engineering Department Supplemental Instructions HCED – ASI#003 – Additional Network Items Page 1 of 4 2/20/2018 PROJECT: Environmental Education Center at John Paul’s Landing ARCHITECTURAL SUPPLEMENTAL INSTRUCTION NO: #00 3 OWNER: Harris County 10555 Northwest Frwy., SUITE 213 Houston, TX. 77092 DATE OF ISSUANCE: 02/20/2018 CONTRACT FOR: General Construction FROM ARCHITECT: Harris County Engineering Dept. Design Services CONTRACT DATE: 01/22/2018 TO CONTRACTOR: Desert Eagle, LLC DBA PANORAMA CONSTRUCTION 9219 Katy Fwy, Ste 264 Houston, TX 77024 HARRIS COUNTY UPIN NUMBER: 171033020806 The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents. If there is any change in Contract Sum or Contract Time the Contractor will submit a Change Proposal subject to approval prior to performance of the work. Proceeding w i t h t h e W ork without submittal of a Change proposal i n accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. DESCRIPTION: 1) Provide & install additional: a. conduit, pull strings, boxes and blank cover plates for additional data/phone jacks b. wiring, conduit, pull strings, boxes and cover plates for additional duplex outlets c. 4’ x 8’ x ¾” FR plywood d. Any additional items as shown on attached drawings ATTACHMENTS: A) Sheet A-1.01, E-1.01 and E-0.01 ISSUED BY THE ARCHITECT/ENGINEER: Don B. Kerl Don B. Kerl, R.A.

Upload: others

Post on 07-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Harris County Engineering Department Supplemental Instructions

HCED – ASI#003 – Additional Network Items Page 1 of 4 2/20/2018

PROJECT: Environmental Education Center at John Paul’s Landing

ARCHITECTURAL SUPPLEMENTAL INSTRUCTION NO:

#00 3

OWNER: Harris County 10555 Northwest Frwy., SUITE 213 Houston, TX. 77092

DATE OF ISSUANCE: 0 2 / 2 0 / 2 0 1 8 CONTRACT FOR: G e n e r a l Construction

FROM ARCHITECT: Harris County Engineering Dept. Design Services

CONTRACT DATE: 01/22/2018

TO CONTRACTOR: Desert Eagle, LLC DBA PANORAMA CONSTRUCTION 9219 Katy Fwy, Ste 264 Houston, TX 77024

HARRIS COUNTY UPIN NUMBER: 171033020806

The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents. If there is any change in Contract Sum or Contract Time the Contractor will submit a Change Proposal subject to approval prior to performance of the work. Proceeding w i t h t he W ork without submittal of a Change proposal i n accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time.

DESCRIPTION:

1) Provide & install additional: a. conduit, pull strings, boxes and blank cover plates for additional data/phone jacks b. wiring, conduit, pull strings, boxes and cover plates for additional duplex outlets c. 4’ x 8’ x ¾” FR plywood d. Any additional items as shown on attached drawings

ATTACHMENTS:

A) Sheet A-1.01, E-1.01 and E-0.01 ISSUED BY THE ARCHITECT/ENGINEER:

Don B. Kerl Don B. Kerl, R.A.

J:\_

DESIG

N S

ER

VIC

ES P

RO

JECTS (

AR

CH)\

PCT3\P

AR

K-J

OHN P

AUL

S L

AND

ING

ENV

NATUR

E C

ENTER

-20

16\0

1 AR

CHIT

ECTUR

E\C

AD

\JPL E

EC-F

LO

OR

PLANS.D

WG

3/3

0/1

7

N

AR

H

RIS UOC

YT

EN

GI NEER I NG DEPARTM

EN

T

J:\_

DESIG

N S

ER

VIC

ES P

RO

JECTS (

AR

CH)\

PCT3\P

AR

K-J

OHN P

AUL

S L

AND

ING

ENV

NATUR

E C

ENTER

-20

16\0

4 E

LECTR

ICAL\C

AD

\29N

OV

20

16-J

PL-E

EC-E

1.0

1.D

WG

3/3

0/1

7

N

AR

H

RIS UOC

YT

EN

GI NEER I NG DEPARTM

EN

T

J:\_D

ESIG

N SER

VIC

ES P

RO

JEC

TS (A

RC

H)\P

CT3\P

AR

K-JO

HN

P

AU

LS LA

ND

IN

G EN

V N

ATU

RE C

EN

TER

-2016\04 Electrical\C

AD

\29N

OV

2016-JP

L-EEC

-E1.01.d

wg

, 3/30/2017 11:38:41 A

M

Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Callout
Add second & Third Data / Phone in this room
Erheppen
Callout
Add Data / Phone in this room
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Oval
Erheppen
Callout
Add Data Port
Erheppen
Callout
Add Data Port
Eric Heppen
Text Box
New Additional Items 2018-0127 1) Add 1" Spare conduit towards the parking lot m 2)Ensure/Confirm there are at lreast 6 outlets outside - 1 on East and West side, and 2 on North and South side 3)Add Phone / Data jack in MDF Room 4) Ensure that there are 4 Outlets in the Hallway 5) Add outlet to Janitor Closet 6) On walls outside bathroom where data ports add; include power as well. 7) In Reception area add second phone and outlet jack 8) Add Ground Electric Outlet on walls in Foyer along closet wall on Foyer wall touch classroom 9) 1 Phone will be mounted in each of the following rooms: Great room (near mechanical); Classroom (near East door); Breakroom (added outlet) Other Comments from CTS Meeting 10) All conduit 1" 11) Make sure that wall between Storage and MDF has 3/4" Fire Rated Plywood Board 12) Panic Button and Keypad for security in Office 13) CTS will not be installing Fire equipment; that is on contractor 14) CTS will pull cable into the conduits after sheet room is installed on 1 side of all the walls and After the AC ducts are installed. Will take one week to install all cabling. Need 1 week notice before when contractor ready for us to start. 15) Add 1" Conduit in 1 wall for both mechanical rooms Owner /GC Coordination Items: 1) How is projector in great room to utilized. Is there a wall slot for projector equipment 2) How is projector in classroom to be utilized. is there a wall slot for projector equipment. 3) We will need 4 speakers hookups in the corners of both the classroom and the great room. Can this be completed (should connect to projector hookups)
Erheppen
Callout
Add Phone/Data Port
Erheppen
Oval
Erheppen
Oval
Erheppen
Callout
Add 4'x8'x3/4" Fire Rated Plywood Board to this wall
Erheppen
Callout
Add 3 duplex outlets in corridor (Location TBD)
Erheppen
Callout
Add one duplex outlet in Jan Closet
Erheppen
Callout
Add second phone & quadplex outlet jack to Reception area
Erheppen
Callout
Add grounded electrical outlet on walls in Foyer along closet wall
Erheppen
Callout
Add grounded electrical outlet on walls in Foyer and Classroom

ELECTRICAL SYMBOLS LEGEND

surface or recessed luminaireA

exit sign, ceiling & wall mount,dark area is sign face

X1X

B surface/recessed luminaire,emergency

Crecessed luminaire

D wall mounted luminaire

3 wall switch, 3 = 3-way

wallbox dimmer switch

wallbox occupancy sensor switch

ceiling occupancy sensor

ceiling occupancy sensor relay

quadraplex receptacle

duplex receptacle' C = controlled

GFCI duplex receptacle,WP = weatherproof

receptacle above countertop

duplex receptacle floor box

multi-outlet surface raceway with20A receptacles 12" o.c.

WP

junction box

conduit above ground & ceiling

conduit underground

circuit homerun to panel HAHA-1,3,5

200/150/3Rsafety (disconnect) switch, 200A,150A fuse, NEMA 3R enclosure

combination motor starter.VFD = VFD

VFD

panelboard, flush or surfaceHA

manual motor starter switch

dry-type transformer75

motor for pump, HVAC, fan

combination data/phone outletwith 1"C to ceilingcombination data/phone outlet with1"C to ceiling, above countertop

TV / video outlet

combination data/phone floor box

C

CONSTRUCTION SPECIFICATIONS

A. CIRCUITING

1. ALL INTERIOR WIRING WILL GENERALLY BE THHN/THWN 90°CSTRANDED COPPER, #8 AND LARGER IN 1/2"C MIN EMT.CONDUCTORS #14 THROUGH #6 WILL BE SOLID COPPER. EXTERIORCONDUIT WILL BE RIGID STEEL OR ALUMINUM.

2. EACH WORK STATION RECEPTACLE HOMERUN MAY CONSIST OF THREEPHASES, THREE NEUTRALS, AND ONE EQUIPMENT GROUNDINGCONDUCTOR IN A 1/2" CONDUIT. LIGHTING CIRCUITS & GENERALRECEPTACLE CIRCUITS MAY SHARE A COMMON NEUTRAL, EXCEPT FORDIMMING CIRCUITS, WHICH WILL HAVE SEPARATE NEUTRALS. THUS, 6#12,2#12N, 1#12G, 1/2"C.

3. UNDERGROUND CIRCUITS WILL BE 75°C THHW, THWN, OR XHHWCONDUCTORS (CU OR AL) IN SCHEDULE 40 PVC CONDUIT ENCASED INCONCRETE OR DIRECTLY BURIED. TYPES A AND EB PVC AND HDPESCHEDULE 40 ENCASED IN CONCRETE MAY USE 90°C CONDUCTORS.90° DEG ELBOWS WILL BE RIGID STEEL & STUB-UPS WILL BEPVC-COATED RIGID STEEL. TYPE HDPE MAY USE 90°C CONDUCTORS,DIRECTLY BURIED WITH A 2" THICK CONCRETE COVER.

4. MAXIMUM HORIZONTAL HOMERUN LENGTH FOR LIGHTING ANDRECEPTACLE CIRCUITS FOR A 3% VOLTAGE DROP:

a. #12 @ 120V= 60 L.F.b. #10 @ 120V= 90 L.F.c. #12 @ 277V= 100 L.F.d. #10 @ 277V= 160 L.F.

B. MOUNTING HEIGHTS IN ACCORDANCE WITH TEXAS ACCESSIBILITYSTANDARDS (TAS):

1. RECEPTACLES: 18" A.F.F. TO CENTERLINE OF OUTLET BOX & 4" ABOVEBACKSPLASH.

2. WALL SWITCHES, FA PULL STATIONS: MAX. 48" A.F.F. TO TOP OFOUTLET BOX.

3. FIRE ALARM AUDIO/VISUAL ALARMS: 80" A.F.F. TO BOTTOM OFDEVICE OR 6" BELOW CEILING, WHICHEVER IS LOWER.

C. EQUIPMENT MOUNTING:

1. FLOOR-MOUNTED SWITCHBOARDS AND TRANSFORMERS WILL BEINSTALLED ON 4" CONCRETE PADS WITH SMOOTH ROUNDED EDGES.

2. DRY-TYPE TRANSFORMERS 30kVA AND SMALLER MAY BE WALLMOUNTED WITH PROPER SUPPORT.

3. LIGHTING TROFFERS WILL BE SECURED TO CEILING GRID WITH A CLIPON EACH SIDE, AS WELL AS FOUR WIRES SECURED TO BUILDINGSTRUCTURE.

4. EMERGENCY EQUIPMENT (PANELBOARDS, ATS, GENERATORS, ETC)WILL BE INSTALLED ON WALLS OR CONCRETE PADS 12" A.F.F INCOMPLIANCE WITH FEMA GUIDELINES. THIS APPLIES TO GROUNDFLOOR INSTALLATIONS ONLY.

D. EMERGENCY RECEPTACLES WILL BE COLORED RED.

E. ALL ELECTRICAL WORK WILL MEET THE LATEST VERSIONS OF THE IBC,NEC & LOCAL CODES.

F. GROUNDING ELECTRODES: TACK-WELD A PIECE OF REBAR BETWEENTHE BUILDING FOOTING REBAR AND ONE COLUMN ANCHOR BOLT. DOTHIS IN EVERY STRUCTURAL FOOTING.

J:\_

DESIG

N S

ER

VIC

ES P

RO

JECTS (

AR

CH)\

PCT3\P

AR

K-J

OHN P

AUL

S L

AND

ING

ENV

NATUR

E C

ENTER

-20

16\0

4 E

LECTR

ICAL\C

AD

\29N

OV

20

16-J

PL-E

EC-E

0.0

1.D

WG

3/3

0/1

7

N

AR

H

RIS UOC

YT

EN

GI NEER I NG DEPARTM

EN

T

J:\_D

ESIG

N SER

VIC

ES P

RO

JEC

TS (A

RC

H)\P

CT3\P

AR

K-JO

HN

P

AU

LS LA

ND

IN

G EN

V N

ATU

RE C

EN

TER

-2016\04 Electrical\C

AD

\29N

OV

2016-JP

L-EEC

-E0.01.d

wg

, 3/30/2017 11:43:01 A

M