Page 1: Dodoea hale kula es jvef_march 2013_final

DoD Office of Economic Adjustment Facilities Grant

Hawaii State Department of EducationHale Kula Elementary School

Schofield Barracks

Page 2: Dodoea hale kula es jvef_march 2013_final

BackgroundDoD Report – Public Schools on Military

Installations Priority List (157 schools assessed in Spring 2011)

Review based on DoDEA standards on school facilities and capacity

Review did not include schools located off-base and surrounded by federal property (i.e. Nimitz, Pearl Harbor Kai, Pearl Harbor Elementary Schools)

Congressional Appropriations: FY11 $250M (#1-12)FY12 $250M (#13-22)

Page 3: Dodoea hale kula es jvef_march 2013_final

Hawaii On-Base Schools#9 Hale Kula ES Wheeler/Schofield (funded in

1st grant round 2011/12)#28 Solomon ES Wheeler/Schofield#33 Mokapu ES Kaneohe Marine Corps Base

Hawaii#36 Shafter ESFort Shafter#48 Wheeler ES Wheeler/Schofield#54 Wheeler MS Wheeler/Schofield#59 Hickam ES Joint Base Pearl Harbor-Hickam#63 Mokulele ES Joint Base Pearl Harbor-Hickam

Page 4: Dodoea hale kula es jvef_march 2013_final

Grant Requirements and TimelineSchool district/school

invitation and grant awards are based on rank order

Submittals are based on state and LEA standards and regulations

20% Non-federal (local school district) contribution

Sept 11: Hale Kula Elementary Invite

Jan 12: Proposal Submitted

Mar 12: OEA Team VisitDec 12: Grant InviteFeb 13: eGrant

Application SubmittedMarch 7, 2013 – Official

announcement of the grant award of $26.6 million by DoD

Page 5: Dodoea hale kula es jvef_march 2013_final

Renovation of Existing ClassroomsRemoval of tiles and asbestos; replace with new flooring

Interior and exterior paintingInstallation of ceiling fansReplacement furniture (shelves and cabinets)

Page 6: Dodoea hale kula es jvef_march 2013_final

Hale Kula Grant $33.2M Project Cost

Federal $26.6M Grant

State $6.6M (20% Match)

Timeline : June 2013 through August 2016

Design will blend with current school architecture and design elements

Page 7: Dodoea hale kula es jvef_march 2013_final

Design Highlights

New Admin Center

New Library - Media Center & Student Support Center

New Classroom Building

NewCoveredPlaycourt

Renovations & Upgrades to all Existing Classrooms

Page 8: Dodoea hale kula es jvef_march 2013_final

Design Highlights

New Administration Center on left,New Library-Media Center & Student Support Center (2 stories)

Page 9: Dodoea hale kula es jvef_march 2013_final

Design Highlights

View with New Classroom Building in foreground (2 stories)8 General Classrooms, 2 Supplemental Classrms., 1 SPED Classrm. (FSC), 1 Computer Lab

Page 10: Dodoea hale kula es jvef_march 2013_final

Mahalo Hale Kula Grant Team!Dept of Defense

Hawaii Dept of Education

DOD-OEA: Gary Willis, Project Manager

US Army Garrison Hawaii: COL Daniel Whitney, Mr. Jim Duttweiler, and Mr. Michael Amarosa

Department of Public Works: Dale Kanehisa

CYS-SSS, School Liaison Officers: Wendy Nakasone, Tamsin Keone, Wayne Yoshino, and Byron Nagasako

Complex Area Superintendent: CAS John Brummel

School Administration and Staff

Facilities and School Support Branch: AS Ray L’Heureux, Nick Nichols and Brenda Lowrey

Military Liaison: Cherise Imai

Page 11: Dodoea hale kula es jvef_march 2013_final

Questions?