district irrigation plan - pmksy.gov.in · vii chapter contents page no. chapter-i introduction 1-5...
TRANSCRIPT
DISTRICT IRRIGATION PLAN
UNDER
PMKSY (Pradhan Mantri Krishi Sinchayee Yojna)
OF
DISTRICT KUPWARA
DISTRICT IRRGATION PLAN
UNDER PMKSY OF DISTRICT KUPWARA
ii
FOREWORD
As a sequel to the address of Hon’ble President of India to the joint session of the 16th Lok Sabha the sanctity of each drop of water was emphasized and accordingly to ensure “Har Khet Ko Pani” and “Per Drop More Crop” a new scheme namely, Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) was launched and accordingly operational guidelines were issued by the Ministry of Agriculture, Govt. of India.
Every district was assigned the job of formulation of District Irrigation Plan (DIP) under PMKSY and accordingly the job was taken on warfooting basis by the DILC Kupwara constituted vide Govt. Order No. :- 1486-GAD of 2015 Dtd. 27-01-2015 & the five year plan under DIP for the district came into being as a result of joint exercise by the Department of Agriculture, Horticulture, I&FC, CAD and Forest Department.
The hardwork put in by Mr. Mohd. Qasim Gani, Chief Agriculture Officer Kupwara in formulation of DIP Kupwara is duely acknowledged and hope that the DIP formulated shall help in the implementation of PMKSY in the district Kupwara in true letter and spirit for ensuring scientific utilisation of every drop of water in the district to ensure enhanced crop production & other utilities. Place: - Kupwara
Dated: 17-03-2016 Kumar Rajeev Ranjan (IAS)
District Development Commissioner, Kupwara
(Chairman DLIC District Kupwara)
iii
PREFACE
It gives me an immense pleasure to present the district irrigation plan under Pradhan Mantri Krishi Sinchayee yojna of district Kupwara as a joint exercise and cooperation of all the participating departments. PMKSY is aimed at developing the irrigation potential for the purpose of deriving maximum potential benefit. There is an urgent need to provide assured irrigation in Kupwara District as more than 50% of the cultivable land is rainfed. It is presumed that this scheme will benefit both land owners and landless people as it has been envisioned in the scheme to mitigate the risk to the farmers since bulk of the land is rainfed.
By integration of MGNREGS like schemes with PMKSY, it will ensure round the year employability to the rural folk and will also help in the creation of long term assets in the country which will prove beneficial in the long run.
I hope that the proposed district irrigation plan will prove to be a success in the years to come by providing assured irrigation to the crops at critical stages of growth and in providing livelihood support to landless people and job opportunities to unemployed people which in turn help in alleviating overall poverty. In this connection an exercise was taken up by the department of agriculture district Kupwara for the formulation of district irrigation plan under PMKSY with the help and support of all the participating departments viz; Deptt. of Agriculture , Horticulture, Animal and sheep husbandry, Command Area Development department, Irrigation and Flood control (Kupwara, Handwara, Tangdhar ) Division. I appreciate the role of these departments in formulation of this plan. I also express my sincere gratitude towards Forest Department Kupwara, Agro Metrology station Kupwara, Industries Department for providing valuable information in the preparation of this plan. I want to place on record my sincere thanks to Mr. Kumar Rajeev Ranjan (IAS) Distt. Development Commissioner Kupwara for his guidance and cooperation and Mr. Abdul Ahad Shah, Chief Planning Officer Kupwara for his every possible help and support in preparation of this plan. My sincere thanks are to Mr. Ishtiaq Ahmad Shawl, SCA CAD, Mr. Javid Ahmad Wani, (Jr. Agriculture Extension Officer), Mr. Javid Ahmad Tantry, Rehbar-i-Zirat, Mr. Abdul Razzaq Ahanger I/C NeGPA and Mr. Gulzar Ahmad Mir, Computer Operator for the hard work and labour they have put in preparing this plan. Lastly, I hope that this plan will prove a vision document and milestone in increasing the production and productivity of Agriculture and Horticulture crops.
(Mohd Qasim Gani) Chief Agriculture Officer,
Kupwara (Member Secretary,
District Level Committee PMKSY)
iv
KUPWARA DISTRICT IRRIGATION PLAN 2016 – 2021(PMKSY)
Kumar Rajeev Ranjan (IAS) District Development Commissioner
Kupwara
Preparation and Compilation 1. Mohd Qasim Gaani, Chief Agriculture Officer 2. Mr. Ishtiaq Ahmad Shawl, (CAD) 3. Mr. Javed Ahmad Wani, (Jr. Agriculture Extension Officer) 4. Mr. Javed Ahmad Tantry, (Rehbar-i-Zirat) 5. Mr. Ab Razak Ahangar, (I/C NeGPA) 6. Mr. Gulzar Ahmad Mir, (Computer Operator)
v
LIST OF OFFICERS/ OFFICIAL REPRESENTATIVES
WHO PARTICIPATED IN FORMATION OF
DISTRICT IRRIGATION PLAN (DIP) IN KUPWARA
S No. Name of Officers/Official
Representatives Designation
1. Mr. Mohd Qasim Gani Chief Agriculture Officer Distt. Kupwara
2. Mr. Mir Liyaqat Ahmad Khan
Distt. SMS Deptt. Of Horticulture Kupwara
3. Mr. Amir-u-din Andrabi Distt. Agriculture Officer(Extension)
4. Mr. Syed Bashir Ahmad Andrabi
Nodal Officer IWMP
5. Mr. Muneer Ahmad Shah Assistant Executive Engineer Irrigation & Flood Control Division Handwara
6. Mr. Gh Mohidin Pir Assistant Executive Engineer Special Division Tangdar
7. Mr. Gh Nabi Bhat Representative of Irrigation & Flood Control Kupwara Division
8. Mr. Ishtiaq Ahmad Shawl SCA, CAD Kupwara
9. Mr. Javid Ahmad Wani Jr. Agriculture Extension Officer Kupwara
10. Mr. Javid Ahmad Tantry Rehbar-i-Zirat
11. Mr. Ab. Razaq Ahangar I/C NeGPA
12. Mr. Gulzar Ahmad Mir Computer Operator
13. Mr.Mukhtar Ahmad Pir Progressive Farmer
14. Mr. Aashiq Hussain Wani Progressive Farmer
15. Non-Governmental Organisation
Human Welfare Voluntarily Organisation
vi
LIST OF ABBERVATIONS
BCM Billion Cubic Metre
CWC Central Water Commission
DIP District Irrigation Plan
DRDA District Rural Development Agency
GD Ground Water Department
GWL Ground Water Level
GP Gram Panchayat
Ha Hectare
IWRM Integrated Water Resources Management
INRM Integrated Natural Resources Management
ITDA Integrated Tribal Development Agency
m Metre
mm Millimetre
MCM Million Cubic Metre
PMKSY Pradhan Mantri Krishi Sanchayee Yojana
Sq.km Square Kilometre
CCA Cultivated Command Area
AIBP Accelerated Irrigation Benefit Programme
RRR Renovation Repairs & Restoration
vii
Chapter Contents Page No.
Chapter-I Introduction 1-5
LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6
SOIL FERTILITY INDICES 7
Fig.1 (Land use Particulars of District Kupwara) 8
GENERAL INFORMATION OF DISTRICT 9
DEMOGRAPHY 10
BIOMASS AND LIVESTOCK 11
AGRO ECOLOGY, CLIMATE, HYDROLOGY AND TOPOGRAPHY 12
SOIL PROFILE 13
LAND USE PATTERN 14
Chapter-II WATER PROFILE IN DISTRICT KUPWARA 15
Rainfall Data (2005-2015) at Kupwara Station 16
Fig. 2 (Annual Rainfall Pattern of District Kupwara -- 2005-2015) 17
Fig. 3 (Month-wise Rainfall Pattern of District Kupwara -- 2005-2015) 18
AREA WISE, CROP WISE IRRIGATION STATUS 19
PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS 20
IRRIGATION BASED CLASSIFICATION 21
Chapter-III STATUS OF WATER AVAILIBITY 22
STATUS OF COMMAND AREA 23
EXISTING TYPE OF IRRIGATION 24 - 25
Chapter-IV WATER REQUIREMENT/DEMAND 26
DOMESTIC WATER DEMAND 27
CROP WATER REQUIREMENT 28 - 31
LIVESTOCK WATER DEMAND 32
INDUSTRIAL WATER DEMAND 3
WATER DEMAND FOR POWER GENERATION 34
TOTAL WATER DEMAND OF THE DISTRICT FOR VARIOUS SECTORS 35
WATER BUDGET 36
Chapter-V BLOCK-WISE TABLES 37
Demography – (All Blocks) 38 - 48
BIOMASS AND LIVESTOCK 49
AREA-WISE, CROP-WISE IRRIGATION STATUS --- (All Blocks) 50 - 60
LAND USE PATTERN 61
LAND UTILIZATION STATISTS 62
PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS 63
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE DEPARTMENT
(All Blocks)
64 - 74
STATUS OF COMMAND AREA 75
viii
Chapter-VI BLOCK-WISE ACTION PLANS 76
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UNDER PMKSY
DISTRICT KUPWARA --- (All Blocks)
77 - 98
COMMAND AREA DEVELOPMENT DEPARTMENT -----Block wise Action Plan -
- PHYSICAL AND FINANCIAL TARGETS --- (All Blocks)
99 – 109
BLOCK WISE ACTION PLAN OF SOIL AND WATER CONSERVATION
(FOREST) 110 – 112
BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT
UNDER PMKSY DISTRICT KUPWARA
(Kehmil Division/ Zangli Division/ Langate Division)
113 – 122
BLOCWISE ACTION PLAN IRRRIGATION SECTOR
UNDER PMKSY I & F DIVISION KUPWARA FOR PROPOSED SCHEMES --- (All
Blocks)
123 – 137
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DISTRICT
KUPWARA UNDER
PMKSY (Per Drop More Crop) --- (All Blocks)
138 – 148
BLOCK-WISE ACTION PLAN OF DEPARTMENT OF RURAL DEVELOPMENT
DISTRICT KUPWARA UNDER PMKSY “MGNREGA” --- (All Blocks)
149 – 159
BLOCWISE ACTION PLAN OF IWMP OF DISTRICT KUPWARA UNDER PMKSY --
- (All Blocks)
160 – 170
KUPWARA DISTRICT MAPS
Chapter-VII COMPONENTS OF PMKSY 171 – 176
A) ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) 171
B) PER DROP MORE CROP: 172
C) HAR KHET KO PANI 173
D) PMKSY WATERSHED 174
ACTIVITIES: 175
PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT
PMKSY “Watershed”
175
E) CONVERGENCE WITH MGNREGS 176
PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT OF
PMKSY “Convergence with MGNREGS”
176
Chapter-VIII OUTCOME OF PMKSY IN DISTRICT KUPWARA 177 – 179
SUMMARY OF COST OF VARIOUS COMPONENTS OF PMKSY 180
ABSTRACT OF DISTRICT ACTION PLAN OF VARIOUS DEPARTMENT 181
PROJECTED OUTLAY OF DISTRICT IRRIGATION PLAN (DIP) 182 - 187
1
CHAPTER – I
INTRODUCTION
As a prelude to the address of Hon’ble President of India to the Joint
session of Parliament of 16thLok Sabha Govt. Committed itself to giving high
priority to water security and accordingly “Pradhan
MantriKrishiSinchayeeYojana (PMKSY) with the motto of “HarKhetkoPani”
was launched. As per the operational guidelines District Irrigation Plan shall be
formulated which will serve as a base for planning and implementation of
PMKSY. Accordingly as conveyed in the guidelines, District Level
Implementation Committee (DLIC) of DistrictKupwara was constituted vide
Govt. Order No. 1486-GAD of 2015 dated: 27/1/2015. District Irrigation Plan
(DIP) will identify the gaps in irrigation infrastructure after taking into
consideration the District Agriculture Plans(DAPs) already prepared for
RashtriyaKrishiVikasYojana (RKVY) visa vis irrigation infrastructure currently
available and resources that would be added during XII plan from other ongoing
schemes (both state and central) likes Mahatma Gandhi National Rural
Employment Guarantee Scheme (MGNREGS),
RashtriyaKrishiVikasYoujna(RKVY), Member of Parliament Local Area
Development (MPLAD) scheme and various other such central & state
schemes.
DIP will present a holistic irrigation development perspective plan of the
district outlying provision of long term development plan integrating.
2
a) Formulation of new irrigation schemes under PMKSY (HarKhetKoPani)
b) Stabilisation of existing schemes under PMKSY (Per Drop More Crop).
c) Water use applications incorporating all usage of water like drinking &
domestic use, irrigation and industry.
In this connection various meetings were held in the district under the
chairmanship of District Development Commissioner with other concerned
departments to provide the required data under profile making part and
respective action plans.
Subsequently, based on the data and action plans received from various
departments, the DIP of the district has been prepared.
STRATEGY
In the backdrop of these formulated objectives and to
strategiseformulation of DIP Kupwara for seeking funds under PMKSY by
focussing on end to end solution in irrigation supply chain viz water sources,
distribution network, efficient farm level applications, extension services on
new technologies a detailed depiction of basic socio-economic status of the
district was studied and the resources were designed so as to give focus in the
formulated DIP under PMKSY in following schemes.
1. Study of existing water sources, repair, renovation and maintenance on
sustainable basis.
2. Groundwater development by augmenting water harvesting structures.
3
3. Rejuvenation of traditional water bodies at source and in villages such as
storage tanks (Sur) in Sogam.
4. Stabilization / Creation of distribution network for precision usage of
available water.
5. Scientific measures forwater conservation and runoff control measures.
6. Identification of location specific traditional untapped water resources
and their usage for irrigation.
7. Intensive participatry consultation process with PRI’s and local
representatives.
8. Cropping system in consonance with local agro-ecology and available
quantity of water.
9. Command area development for precision irrigation by effective
distribution system.
10. Treatment of urban waste water for usage in pre-urban areas.
GENERAL CHARACTERISTICS OF THE DISTRICT
Kupwara district was initially part of the erstwhile Baramulla District and
in July 1979, it was carved out as a separate district. The district is situated at an
altitude of 5300ft. (above sea level) with varied topography. Global location of
the district is 75o, 45 o, North latitude and 73 o, 45 o to 76 o, 36 o East longitude,
the climatic conditions of the district are mostly temperate with some patches of
block Tangdar, Teethwal having sub tropical climate. Kupwara District is one
4
of the backward districts of the country with a sizeable population of schedule
tribes (8.1%).
The major food crops grown in the district are paddy, maize pulses and
fodder. In case of horticulture crops, apple cultivation is dominant followed by
walnut in Kandirainfed area of the district.
The District is known for some famous passes like Tootmar-Gali,
Nastichum-Gali, Furkhan-Gali and Z-Gali connecting Leepa valley in Pakistan
occupied Kashmir, Karnah, Keran and Machil areas with Kupwara district.
The hilly areas of Karnah, Machil&Keran are situated on the line of the
control. These areas generally remain cut off from the rest of the district during
winter for about five months.
Kupwara district is surrounded by thick forests, mountain slopes and
snow clad peaks from three sides. The district is famous for the beautiful Lolab
valley, Bungas valley and other health resorts and has an inherent potential for
development of tourism. Bungas, Chandigam, Reshawari, Lolab valley are
some of the famous spots of tourism.
ADMINISTRATIVE SETUP
The total geographical area of the district is 2,379 sqkms and the density of
population is 366 persons per sq. km. It is located about 90kms from Srinagar in
the north east.
5
The district had 3 tehsils namely Kupwara, Handwara and Karnah and
now reorganized in 15 Tehsils (Census 2011). It comprises of 362 villages, out
of which 9 villages are uninhabited and 8 outgrowths. The district comprises of
5 legislative assembly constituencies i.e. Karnah, Kupwara, Lolab, Handwara
and Langate. Kupwara has two municipal committeesvizKupwara and
Handwara.
DEMOGRAPHY
The total population of the district as per 2011 censes is 870354 persons
with 474190 males and 396164 females. The district is about 88% rural
habitated with a total household number of113929. The district has about 8.1%
ST population and an overall literacy percentage of 64%. The decadal growth
rate of population is 33.82% with the population density of 366 persons/ Sq.km.
The sex ratio is 835 females per 1000 males.
CLIMATE
The climate of the District is characterised by pleasant summer and
generally cold winters with snow clad mountains, the year may be divided into
two seasonsvizKharif& Rabi season.
The normal annual rainfall of the district in general is 1090mm with monthly avg. rainfall of 90.83mm. The cold weather commences from the month of November with the onset of western disturbances. December & February are the coldest months of the year with the mean daily temperature varying from 5oc to – 10oc. April & August are the pleasant months of the year having mean daily minimum & maximum temperature of 9.4oc&21.8oc.
6
Table 1.1 LAND CAPABILITY CLASSIFICATION (AREA in Ha)
S. No
Particular
Lang
ate
Raj
war
Ram
hal
Kra
lpor
a
Tre
hgam
Kup
war
a
Sog
am
Wav
oora
Kal
aroo
se
Tan
gdar
Tee
thw
al
Total
1 Very good cultivated land 8370 5118 4318 3628 3294 4522 2985 3080 1935 1560 1090 39900 2 Good cultivated land -- -- -- -- -- -- -- -- -- -- -- -- 3 Moderate good cultivated
land classes -- -- -- -- -- -- -- -- -- -- -- --
4 Early good land suited for occasional cultivatable class
-- -- -- -- -- -- -- -- -- -- -- --
5 Nearly level land suitable for cultivated because...
-- -- -- -- -- -- -- -- -- -- -- --
6 Steep slope / highly erosion prone with shallow soils class vi
689 621 397 372 301 568 255 306 318 253 294 4374
7 Steep slope with server soil erosion recurring in erode stony & shallow soil deptt. Class vii.
896 823 527 518 403 747 378 407 416 331 296 5742
Total 9955 6562 5242 4518 3998 5837 3618 3793 2669 2144 1682 50016
7
Table 1.2 SOIL FERTILITY INDICES
S No
Blocks Available Phosphors EC Organic carbon % Available Nitrogen (kg/Ha)
Available Phosphorus kg/Ha
Available Potash (Kg/Ha)
Acidic Neutral Alkaline Med Nor High Low Med High Low Med High Low Med High Low Med High
1 Langate 6.5 - - - 0.9 - - 0.65 - - 480 - - 22 - - - 290
2 Rajwar 6.5 - - - 0.8 - - 0.51 - - 490 - - 21 - - - 2802
3 Ramhal 6.2 - - - 0.9 - - 0.59 - - 510 - - 16 - - - 260
4 Kralpora 7 - - - 0.8 - - 0.70 - - 520 - - 18 - - - 290
5 Trehgam 7 - - - 0.8 - - 0.70 - - 540 - - 25 - - - 280
6 Kupwara 7 - - - 0.8 - - 0.72 - - 530 - - 21 - - - 300
7 Sogam 6.5 - - - 0.8 - - 0.74 - - 510 - - 20 - - - 310
8 Wavoora 6.2 - - - 0.9 - - 0.75 - - 530 - - 18 - - - 310
9 Kalaroose 6.5 - - - 0.9 - - 0.73 - - 540 - - 19 - - - 308
10 Tangdar 6.8 - - - 0.9 - - 0.69 - - 510 - - 18 - - - 307
11 Teethwal 6.9 - - - 0.9 - - 0.71 - - 480 - - 18 - - - 310
Source : DAP
Cultivation Waste
2%
Land Put to Non-Agri- Use
2%
Permanent Fallow & waste land
2%
Net area sown
17%
Area Sown More than once
Land use Particulars of District Kupwara
8
Fig. 1
Forest
74%
Area Sown More than once
3%
Land use Particulars of District Kupwara
Forest
Cultivation Waste
Land Put to Non
Permanent Fallow & waste land
Net area sown
Area Sown More than once
Forest
Cultivation Waste
Land Put to Non-Agri- Use
Permanent Fallow & waste land
Net area sown
Area Sown More than once
9
Table 1.3 GENERAL INFORMATION OF DISTRICT
District Profile
S. NO. Name of the District District Code Latitude Longitude
1 Kupwara 001 35.5◦ N 74.9◦ E
10
Table 1.4
DEMOGRAPHY
Name of the State Jammu and Kashmir
Name of the District Kupwara
Name of the Block All Blocks
Number of the Blocks
Number of the
Villages covered
Number of the Gram
Panchayats
Population S.C S. T General Total
M F CH Total No. of
Households No. of
Members No. of
Households No. of
Members No. of
Households No. of
Members No. of
Households No. of
Members
11 363 359 373731 307825 188798 870354 189 1048 10987 70352 102753 798954 113929 870354
Source: (Directorate of census operation 2011)
11
Table 1.5
BIOMASS AND LIVESTOCK
Name of the Block
Small Animals Large Animals
Any other Milch Or
Meat animals (No’s)
Draft Animals (Buffalo/yak/bulls
/ Any other equine)
(No.s) Poultry (no’s)
Ducks (No’s)
Pigs (No’s)
Sheep (No’s)
Goats (No’s)
Indigenous Cows (No’s)
Hybrid Cow
(No’s)
In descriptive Buffalos (No’s)
Hybrid Buffalo (No’s)
All Blocks
519477 19180 - 190889 79228 79694 60574 1747 - - 68501
Source: (Department of Animal Husbandry and Sheep Husbandry)
12
Table 1.6
AGRO ECOLOGY, CLIMATE, HYDROLOGY AND TOPOGRAPHY
Source: Metrological Department Kupwara
S. No.
Agro Ecological Zone type
Type of
terrain
District Area (ha)
Normal Annual Rainfall (mm)
Average Monthly rainfall (mm)
No. Of
rainy Days
Maximum Rainfall intensity
(mm)
Average weekly TemperatureoC
Period
Beyond 15 up to 30 min
Beyond 30 up to 30 min
Summer (April – May)
Winter (Oct – Mar)
Rainy (June – Sept.)
Mean Max
Mean Min
Mean Max
Mean Min
Mean Max
Mean Min
01
Western Himalayan Region Valley (Temperate)
Plain / Sloppy
237900 1090 90.83 125 - - 21.8 9.4 13.18 1.1 27.6 14
Potential evapo transpiration (PET) (mm) Elevation m (msl)
Period Min Max Mean
Summer Winter Rainy Cumulative Total
1.34 0.69 1.06 3.09 1615.44 3505.2 2560.32
13
Table 1.7
SOIL PROFILE
Soil Types Land Slope
Major Soil Types Area in (Ha) 0-3%(ha)` 3-8%(ha) 8-25%(ha) Above 25% (ha)
Clay loom 31949 3195 4792 12780 11182
Sandy Loom 7951 3976 3975 - -
Source:- (Directorate of Economic and Stastical J & K & SKUAST- Kashmir
Soil Profile Name of the State: Jammu and Kashmir
Name of the District Kupwara
Name of Blocks: All Blocks
14
Table 1.8
LAND USE PATTERN
Name of the State: Jammu and Kashmir
Name of the District Kupwara
Name of Blocks: All Blocks
S. No No of Gram Panchayat
No. Of the villages covered
Total Geographical Area (ha)
Area under Agriculture Area under forest (ha)
Area under waste land (ha)
Area under Other uses (ha)
Gross Cropped Area (ha)
Net Sown Area (ha)
Area Sown More than ones (ha)
Cropping Intensity (%)
1 359 363 237900 45755.54 39900 5855 112% 170300 10116 33765.856
15
Chapter –II
WATER PROFILE IN DISTRICT KUPWARA
Water availability and its quality is a primary factor which determines
socio-economic status and development of habitates has always remained
associated with water resources. Water is essential for domestic consumption/
industrial usage beside irrigation for crop growth. Nature and kind of flora and
fauna of the area is determined by the water availability. Kupwara being a
border district is surrounded by hills which accumulate snow during winters and
the extent of snowfall determines the ground recharge and summer availability
of water. Kehmil, Pohru, Farkin, Lolab, Kalaroos, Hyhama, Talri, Mawar are
main Nallah’s available in the district which cater to the water availability of the
district. This chapter depicts map of existing water resources, water risk status,
and water distribution infrastructure of district Kupwara. This water profile
shall be of use to projectise water use efficiency methods and plan for
economical water distribution methods for its better utility.
Water availability in relation to cropping pattern, livestock status, industrial usage, power generation and its present scenario is depicted in the following tables.
16
Table 2.1
Rainfall Data (2005-2015) at Kupwara Station (Unit in mm)
Month Year
2005
Year
2006
Year
2007
Year
2008
Year
2009
Year
2010
Year
2011
Year
2012
Year
2013
Year
2014
Year
2015
January 110.40 205.50 9.70 220.80 131.30 26.40 34.30 132.10 68.60 52.20 42.00
February 337.70 161.10 96.00 78.40 168.90 193.30 268.70 170.90 211.70 142.70 235.20
March 176.40 109.70 206.80 26.60 115.20 79.70 196.30 105.00 84.60 403.70 269.60
April 80.20 145.00 26.10 142.50 181.40 178.50 185.60 175.60 101.00 152.70 253.60
May 74.10 44.70 51.00 58.90 74.50 249.90 42.40 99.50 91.40 145.60 116.40
June 5.80 30.70 100.10 18.20 44.50 58.30 52.10 47.30 92.50 38.40 92.40
July 67.90 54.30 79.10 54.90 59.60 223.60 16.60 41.20 19.40 45.60 171.30
August 29.90 104.20 41.50 75.10 13.90 142.30 45.00 74.50 153.40 43.70 63.60
September 16.90 56.20 10.50 26.10 45.60 15.90 66.50 144.10 27.70 157.20 65.50
October 23.60 41.80 1.80 43.50 18.30 29.50 68.70 47.50 26.40 37.00 171.50
November 50.10 150.70 0.00 82.40 38.20 1.30 49.50 10.80 12.60 63.70 101.10
December 0.00 92.90 31.60 162.10 22.10 17.60 48.80 114.80 17.50 1.60 44.30
Total 973.00 1196.80 654.20 989.50 913.50 1216.30 1074.50 1163.30 906.80 1284.10 1626.50
Source: Indian Metrological Department (Kupwara Station)
17
Fig. 2
Year 2005 Year 2006 Year 2007 Year 2008 Year 2009 Year 2010 Year 2011 Year 2012 Year 2013 Year 2014 Year 2015
Series1 973.00 1196.80 654.20 989.50 913.50 1216.30 1074.50 1163.30 906.80 1284.10 1626.50
973.00
1196.80
654.20
989.50913.50
1216.301074.50
1163.30
906.80
1284.10
1626.50
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
1400.00
1600.00
1800.00
Axi
s T
itle
Axis Title
Annual Rainfall Pattern of District Kupwara (2005-2015)
18
Fig. 3
January February March April May June Jully August September October November December
Series1 86.11 172.05 147.80 135.18 87.37 48.36 69.46 65.59 52.68 42.47 46.70 46.11
86.11
172.05
147.80
135.18
87.37
48.36
69.46 65.59
52.6842.47 46.70 46.11
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
200.00
Month-wise Rainfall Pattern of District Kupwara (2005-2015)
Series1
19
Table 2.2
AREA WISE, CROP WISE IRRIGATION STATUS Name of the state: Jammu and Kashmir
Name of the District: Kupwara
Crop Type
Kharief (Area in ha) Rabi (Area in ha) Summer Crops (Area in ha)
Total (Area in ha) Horticulture & Plantations crops (Area in ha)
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
Cereals 17006 16000 33006 400 2000 2400 0.0 0.0 0.0 17406 18000 35406 - - -
Coarse Cereals
0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 - - -
Pulses 0.00 2070 2070 0.00 285 285 0.0 0.0 0.0 0.0 2355 2355 - - -
Oil Seeds
0.00 0.00 0 0.0 1500 1500 0.0 0.0 0.0 0.0 1500 1500 - - -
Fiber 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 - - -
Any Other Crop
2200 0.00 2200 1850 0.00 1850 0.00 0.00 0 4050 0.00 4050 8579.96 20019.89 28599.856
Total 19206 18070 37276 2250 3785 6035 0.00 0.00 0 21456 21855 43311 8579.96 20019.89 28599.856
Source: Department of Agriculture and Horticulture
20
Table 2.3
PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS Name of the state : Jammu and Kashmir Name of the district : Kupwara
Source: DAP and Department of Horticulture
Sea
son
Crop sown Rainfed Irrigated Total
Cer
eals
Coa
rse
cere
als
Pul
ses
Oils
eeds
Fib
er c
rops
Any
oth
er c
rop
Are
a (h
a)
Pro
duct
ion
Qtls
./yr
Pro
duct
ion
yiel
d (Q
tls./h
a)
Cos
t of
culti
vatio
n R
s.
Per
Ha
Pro
duct
ion
Qtls
./yr
Pro
duct
ion
or
yiel
d (K
gs./h
a)
Cos
t of
culti
vatio
n R
s.
Per
Ha
Pro
duct
ion
Q
tls./y
r
Avg
.Pro
duct
ivity
or
yie
ld (
Qtls
/ha)
Cos
t of
Cul
tivat
ion
Rs.
P
er h
a
Kharief Paddy, Maize
-- Beans -- -- -- 32360 1314450 6350 56000 1630375 7884 56000 1472412.5 7884 56000
Rabi Wheat,
-- Peas Oil Seeds
-- -- 5855 157063 2383 26000 222000 12000 26000 189531.5 12000 26000
Summer -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
Horticulture & Plantation
Apple, Walnut
-- -- -- -- -- 28599.856 2627041.86 9000 1.5 lac -- -- -- 2627041.86 9000 1.5lac
Total -- -- -- -- -- -- 66814.856 4098554.86 17733 232000 1852375 19884 82000 4288985.86 28884 232000
21
Table 2.4
IRRIGATION BASED CLASSIFICATION
Name of the state: Jammu and Kashmir
Name of the District: Kupwara
Name of the Blocks: All Blocks
Irrigated (Area in Ha) Rainfed (Area in Ha)
Gross Irrigated Area Net Irrigated Area Partially irrigated/Protective Irrigation
Un irrigated or Totally Rainfed
19200 1700 2200 39900
Source: (D A P Kupwara)
22
CHAPTER – III
Table 3.1
STATUS OF WATER AVAILIBITY (Unit in BCM)
S. No. Sources Kharief Rabi Summer Total
1. Surface Water
i) Canal (Minor & medium Irrigation) 0.33346705 0.103751125 -- 0.437218175
ii) Major irrigation -- -- -- --
iii) Minor irrigation Tanks 0.08601745 0.03234525 -- 0.1183627
iv) Lift irrigation/Diversion 0.01381799 0.005921 -- 0.01973899
v) Various water Bodies including rain water harvesting
0.025372675 0.00683125 -- 0.032203925
vi) Treated effluent received from STP -- -- -- --
vi) Untreated Effluent -- -- -- --
vii) Perennial Sources water -- -- -- --
2. Ground water
0.458675165 0.148848625 0.60752379
i) Open well
ii) Deep Tube well
iii) Medium tube well
iv) Shallow tube well
23
Table 3.2
STATUS OF COMMAND AREA
Source:- CAD Kupwara
(Unit in Ha)
Name of the state: Jammu and Kashmir
Name of the District: Kupwara
Name of the Blocks:All Blocks
S. NO
Name of the district
Information of canal Command Information on the other service
command Total Area
Total Area
Developed command
Undeveloped Command
Total Area
Developed command
Undeveloped Command
Total Area
Developed command
Undeveloped Command
1 2 3 4 5 6 7 8
1 Kupwara 41290.19 8365.19 32025 -- -- -- -- 8365.19 32025
24
Table 3.3
EXISTING TYPE OF IRRIGATION (Unit in Ha)
Name of the state: Jammu and Kashmir
Name of the District: Kupwara
Name of the Blocks: All Blocks
Nam
e of
Blo
cks
Sou
rce
of ir
rigat
ion
Surface Irrigation Ground Water Other
Sources includin
g traditional WHS
(3)
Water Extraction devices / lift
Total
Canal Based Tanks/
Ponds/Reservoirs Tube wells
Open Wells
Bore Wells
Ele
ctric
ity
Pum
ps(4
)
Die
sel P
umps
(5)
Oth
ers(
6)
Irrig
atio
n so
urce
s(1+
2+3)
W
ater
ex
trac
ting
un
its(4
+5+
6)
Gov
t C
anal
Com
mun
ity P
vt.
Can
al
Com
mun
ity P
ond
Incl
udin
g S
mal
l In
divi
dual
/ P
rivat
e po
nds
Gov
t. R
eser
voi
r/D
ams
Gov
t.
Pvt
.
Com
mun
ity/G
ovt.
Pvt
.
Gov
t.
1.2.
Tangdar
No’s 8 2 -- -- -- -- -- -- -- -- -- -- -- -- -- -- Command 493.7 317 -- -- -- -- -- -- -- -- -- -- -- -- 810.7 --
Teethwal No’s 6 2 -- -- -- -- -- -- -- -- -- -- -- -- -- Command 479.3 50.24 -- -- -- -- -- -- -- -- -- -- -- -- 529.54 --
Kralpora No’s 3 18 -- -- 9 -- -- -- -- -- -- -- -- -- --
Command 890 530 -- -- 350 -- -- -- -- -- -- -- -- -- 1770 --
Trehgam No’s. 3 20 -- -- 3 -- -- -- -- -- -- -- -- -- -- Command 740 390 -- -- 192 -- -- -- -- -- -- -- -- -- 1322 --
Kupwara No’s 3 8 -- -- 3 -- -- -- -- -- -- -- -- -- --
25
Nam
e of
Blo
cks
Sou
rce
of ir
rigat
ion
Surface Irrigation Ground Water Other
Sources includin
g traditional WHS
(3)
Water Extraction devices / lift
Total
Canal Based Tanks/
Ponds/Reservoirs Tube wells
Open Wells
Bore Wells
Ele
ctric
ity
Pum
ps(4
)
Die
sel P
umps
(5)
Oth
ers(
6)
Irrig
atio
n so
urce
s(1+
2+3)
W
ater
ex
trac
ting
un
its(4
+5+
6)
Gov
t C
anal
Com
mun
ity P
vt.
Can
al
Com
mun
ity P
ond
Incl
udin
g S
mal
l In
divi
dual
/ P
rivat
e po
nds
Gov
t. R
eser
voi
r/D
ams
Gov
t.
Pvt
.
Com
mun
ity/G
ovt.
Pvt
.
Gov
t.
1.2.
Command 1330 1848 -- -- 792 -- -- -- -- -- -- -- -- -- 3970 --
Sogam No’s. 2 43 -- -- 40 -- -- -- -- -- -- -- -- -- -- -- Command 1044 174 -- -- 522 -- -- -- -- -- -- -- -- -- 1740 --
Wavoora No’s 3 4 -- -- 9 -- -- -- -- -- -- -- -- -- -- Command 660 450 -- -- 290 -- -- -- -- -- -- -- -- -- 1400 --
Kalarooch No’s. - 12 -- -- - -- -- -- -- -- -- -- -- -- -- Command - 660 -- -- - -- -- -- -- -- -- -- -- -- 660 --
Langate No’s. -- -- -- -- -- -- -- -- -- -- -- -- Command 4335 3635 -- -- 400 -- -- -- -- -- -- -- -- -- 8370 --
Ramhal No’s -- -- -- -- -- -- -- -- -- -- -- -- Command 1939 2248 -- -- 131 -- -- -- -- -- -- -- -- -- 4318 --
Rajwar No’s -- -- -- -- -- -- -- -- -- -- -- -- -- -- Command 550 2900 528 -- 2040 -- -- -- -- -- -- -- -- -- 6018 --
Table 3.3 Continue..
26
CHAPTER – IV
WATER REQUIREMENT/DEMAND
Water supply is an essential requirement of all people throughout globe.
Providing water is never free; the water needs to be collected, stored treated and
distributed. People use water for a wide variety of activities, some of which are
important than others e.g drinking water is more essential than washing clothes.
The need of people for water is not predictable. Different populations have
different needs of water. Water requirement differs from location to location. It
is preferable to provide separate water supplies for bathing, washing or animals
as well as for hospitals, feeding centers and school. All people should have safe
access to sufficient quantity of water for drinking, cooking and personal and
domestic hygiene.
Water requirement of a crop means the total quantity of all water and the way in
which a crop requires water from the time it is sown to a time it is harvested.
The water requirement of a crop varies with the crop as well as with place. The
same crop may have different requirements at different places, depending upon
climate, type of soil, method of cultivation and useful rainfall.
27
Table 4.1
DOMESTIC WATER DEMAND
(Unit in BCM) DOMESTIC WATER DEMAND
S No. Name of Block Population 2015 Present water demand
Projected population in 2020
Gross water demand
1 Langate 128157 0.0032744113 150328 0.0038408804
2 Rajwar 98246 0.0025101853 115243 0.002944455
3 Ramhal 58984 0.0015070412 69188 0.001767695
4 Sogam 89545 0.0022878747 105036 0.0026836698
5 Wavoora 72172 0.0018439946 84658 0.0021630119
6 Kalaroose 64627 0.0016512198 75807 0.00193686885
7 Kupwara 189486 0.0048413673 222267 0.00567892185
8 Trehgam 88595 0.0022633022 103922 0.0026551925
9 Kralpora 132548 0.0033866014 155479 0.00397248845
10 Tangdhar 34860 0.000890673 38120 0.000973966
11 Teethwal 27260 0.000696493 31170 0.0007963935
Total 984480 0.025153464 1151218 0.0291354325
Source: PHE Kupwara
28
Table 4.2
CROP WATER REQUIREMENT
Block Crop Area Sown Ha Irrigated Area(Ha)
Crop Water Demand (mm)
Water Potential Required (BCM)
Existential Water
Potential (BCM)
Water Potential to be
created(BCM)
Paddy 4345 4345 1500 0.065175 0.065175 0
Maize 2880 280 600 0.01728 0.00168 0.0156 Pulses 480 0 550 0.00264 0 0.00264
Langate
Vegetables 780 500 700 0.00546 0.0035 0.00196
Oil Seed 830 200 500 0.00415 0.001 0.00315 Wheat 10 0 550 0.000055 0 0.000055 Fodder 735 50 550 0.0040425 0.000275 0.0037675
Orchard 7474.98 2242.2 800 0.05979984 0.0179376 0.04186224
Ramhall
Paddy 1925 1925 1500 0.028875 0.028875 0 Maize 1700 135 600 0.0102 0.00081 0.00939 Pulses 245 31 550 0.0013475 0.0001705 0.001177
Vegetables 300 200 700 0.0021 0.0014 0.0007
Oil Seed 65 10 500 0.00035 0.00005 0.0003 Wheat 10 0 550 0.000055 0 0.000055 Fodder 448 40 550 0.002464 0.00022 0.002244
Orchard 2185 555.5 800 0.01744 0.004444 0.012996
Table 4.2 Continued
29
Block Crop Area Sown Ha Irrigated Area(Ha)
Crop Water Demand (mm)
Water Potential Required (BCM)
Existential Water
Potential (BCM)
Water Potential to be
created(BCM)
Paddy 1730 1260 1500 0.02595 0.0189 0.00705 Maize 2420 0 600 0.01452 0 0.01452
Rajwar
Pulses 335 0 550 0.0018425 0 0.0018425 Vegetables 720 425 700 0.00504 0.002975 0.002065 Oil Seed 365 0 500 0.001825 0 0.001825 Wheat 10 0 550 0.000055 0 0.000055 Fodder 812 130 550 0.004466 0.000715 0.003751 Orchard 4556.338 1386.8 800 0.036450 0.011094 0.02535
Paddy 1260 950 1500 0.0189 0.01425 0.00465
Maize 1140 0 600 0.00684 0 0.00684 Pulses 195 20 550 0.0010725 0.00011 0.0009625
Sogam
Vegetables 300 250 700 0.0021 0.00175 0.00035 Oil Seed 25 0 500 0.000125 0 0.000125 Wheat 0 0 550 0 0 0 Fodder 230 0 550 0.001265 0 0.001265 Orchard 1399.41 419 800 0.011195 0.003352 0.007843
Paddy 1230 1150 1500 0.01845 0.01725 0.0012
Wavoora
Maize 1340 75 600 0.00804 0.00045 0.00759 Pulses 205 0 550 0.001127 0 0.001127 Vegetables 420 270 700 0.00294 0.00189 0.00105 Oil Seed 10 0 500 0.00005 0 0.00005 Wheat 0 0 550 0 0 0 Fodder 150 60 550 0.000825 0.00033 0.000495 Orchard 1400.84 420.25 800 0.01120 0.00336 0.00785
Table 4.2 Continued
30
Block Crop Area Sown Ha Irrigated Area(Ha)
Crop Water Demand (mm)
Water Potential Required (BCM)
Existential Water
Potential (BCM)
Water Potential to be
created(BCM)
Paddy 510 480 1500 0.00765 0.0072 0.00045
Maize 1020 0 600 0.00612 0 0.00612
Kalaroose
Pulses 135 0 550 0.0007425 0 0.0007425 Vegetables 190 170 700 0.00133 0.00119 0.00014 Oil Seed 0 0 500 0 0 0 Wheat 40 0 550 0.00022 0 0.00022 Fodder 120 20 550 0.00066 0.00011 0.00055 Orchard 1398 419.4 800 0.011184 0.0033552 0.0078288
Paddy 1580 1420 1500 0.0237 0.0213 0.0024 Maize 1400 452 600 0.0084 0.002712 0.005688
Kralpora
Pulses 245 0 550 0.0013475 0 0.0013475 Vegetables 380 350 700 0.00266 0.00245 0.00021 Oil Seed 20 0 500 0.00004 0 0.00004 Wheat 0 0 550 0 0 0 Fodder 290 135 550 0.001595 0.0007425 0.0008525 Orchard 2069.7 621 800 0.0165576 0.004968 0.0115896
Paddy 600 545 1500 0.009 0.0081 0.0009
Tangdhar
Maize 600 65 600 0.0036 0.00039 0.00321 Pulses 150 0 550 0.000825 0 0.000825 Vegetables 90 80 700 0.00063 0.00056 0.00007 Oil Seed 55 0 500 0.000275 0 0.000275 Wheat 50 0 550 0.000275 0 0.000275 Fodder 170 45 550 0.000935 0.0002475 0.0006875 Orchard 778 233.4 800 0.006224 0.001867 0.004357
Table 4.2 Continued
31
Block Crop Area Sown Ha Irrigated Area(Ha)
Crop Water Demand (mm)
Water Potential Required (BCM)
Existential Water
Potential (BCM)
Water Potential to be
created(BCM)
Kupwara
Paddy 2210 1950 1500 0.03315 0.02925 0.0039 Maize 1600 330 600 0.0096 0.00198 0.00762 Pulses 220 0 550 0.00121 0 0.00121 Vegetables 460 300 700 0.00322 0.0021 0.00112 Oil Seed 35 0 500 0.000175 0 0.000175 Wheat 0 0 550 0 0 0 Fodder 347 120 550 0.00190 0.00066 0.00124 Orchard 4985.136 1485.5 800 0.0398 0.01188 0.02792
Trehgam
Paddy 1210 850 1500 0.01815 0.01275 0.0054 Maize 1500 0 600 0.009 0 0.009 Pulses 215 0 550 0.0011825 0 0.0011825 Vegetables 400 350 700 0.0028 0.00245 0.00035 Oil Seed 55 15 500 0.000275 0.0000825 0.0001925 Wheat 0 0 550 0 0 0 Fodder 248 120 550 0.001364 0.00066 0.000704 Orchard 2235.25 670.57 800 0.017882 0.00536456 0.01251744
Teethwal
Paddy 400 385 1500 0.006 0.005775 0.000225 Maize 400 35 600 0.0024 0.00021 0.00219 Pulses 80 0 550 0.00044 0 0.00044 Vegetables 160 142 700 0.0012 0.000994 0.000206 Oil Seed 40 0 500 0.0002 0 0.0002 Wheat 80 0 550 0.00044 0 0.00044 Fodder 210 67 550 0.001155 0.0003685 0.0007865 Orchard 606.5 182 800 0.004852 0.001456 0.003396
Table 4.2 Continued
32
Table 4.3
LIVESTOCK WATER DEMAND
Source: Department of Animal & Sheep Husbandry
Block Total Number of livestock
Present Water Demand (BCM)
Water Demand in 2020 (BCM)
Existing Water Potential (BCM)
Water Potential to be created (BCM)
Langate 82571 0.00090415 0.00113018235 0.14134 0
Rajwar 65575 0.00071804625 0.0089756055 0.092868 0
Ramhal 35977 0.00039394815 0.0004924434 0.09859 0
Sogam 156690 0.0017157555 0.0021446889 0.07919068 0
Wavoora 158476 0.0017353122 0.00216914025 0.07919068 0
Kalaroose 153014 0.0016775503 0.0020945817 0.0763 0
Kupwara 69530 0.0007613535 0.00095169735 0.8417852 0
Trehgam 115626 0.00012661047 0.00158263635 0.0548706 0
Kralpora 97299 0.00106542405 0.0013317828 0.14272024 0
Tangdhar 37593 0.00041164335 0.0005145624 0.0079044 0
Teethwal 60409 0.00066147855 0.00066147855 0.0049140 0
Total 1032760 0.01017127232 0.02204879955 1.6196738 0
33
Table 4.4
INDUSTRIAL WATER DEMAND
Block Total Number of industry Present Water Demand (BCM)
Water Demand in 2020 (BCM)
Existing Water Potential (BCM)
Water Potential to be created (BCM)
-- Stone Crushers 5 Cement Hallow Blocks 4
0.00003 0.00004 0.14134 0
-- Industrial Estate Chotipora cement hallow block unit 4
0.00003 0.000045 0.092868 0
-- Cement Hallow Block unit 4 0.000006 0.00001 0.09859 0 -- Cement Hallow Block unit 4 0.00000045 0.000012 0.07919068 0 -- Cement Hallow Block unit 4 0.000006 0.000008 0.07919068 0 -- Stone Crusher 1 0.000001 0.000006 0.0763 0 -- Industrial Estate Kupwara.
Industrial Estate Redbug. Cement Hallow Block unit 4 Stone Crushers 2
0.0000015 0.000045 0.8417852 0
-- Marble Cutting unit 6 Cement Hallow Blocks unit 4 Stone Crushers 2
0.00002 0.00003 0.0548706 0
-- Cement Hallow Block unit 4 0.000003 0.000011 0.14272024 0 -- Stone Crusher 1
Cement Hallow Block Unit1 0.000002 0.000005 0.0079044 0
-- Cement Hallow Block Unit 1 0.000001 0.000003 0.0049140 0
Total 0.00010095 0.000215 1.6196738 0
34
Table 4.5
WATER DEMAND FOR POWER GENERATION
WATER DEMAND FOR POWER GENERATION
Block Power
Requirement MW Water Demand (BCM)
Water Demand in 2020 (BCM)
Existing Water Potential (BCM)
Water Potential to be created (BCM)
All Blocks Note:- 2 MW Capacity power house located at Karnah requires 0.176052073 BCM per annum water for generating 2 MW of power. However presently only 1 MW is available requiring 0.0880260365 BCM of water. So future demand is another 0.0880260365 BCM per annum of water to operate the power house to its full potential.
35
Table 4.6
TOTAL WATER DEMAND OF THE DISTRICT FOR VARIOUS SECT ORS
S No. Block Components Total (BCM)
Domestic Crop Livestock Industrial Power Generation
1 Langate 0.0032744113 0.0895676 0.00090415 0.00003
N.A.
0.012429
2 Rajwar 0.0025101853 0.033684 0.00071804625 0.00003 0.010058
3 Ramhal 0.0015070412 0.0359695 0.00039394815 0.000006 0.005559
4 Sogam 0.0022878747 0.019462 0.0017157555 0.00000045 0.008523
5 Wavoora 0.0018439946 0.02328 0.0017353122 0.000006 0.008095
6 Kalaroose 0.0016512198 0.0118522 0.0016775503 0.000001 0.00783
7 Kupwara 0.0048413673 0.04587 0.0007613535 0.0000015 0.018809
8 Trehgam 0.0022636022 0.02130706 0.00012661047 0.000003 0.007306
9 Kralpora 0.0033866014 0.0321725 0.00106542405 0.00002 0.010358
10 Tangdhar 0.00089.673 0.111645 0.00041164335 0.000002 0.005964
11 Teethwal 0.000696493 0.0073475 0.00066147855 0.000001 0.176052073 0.181611
0.024262791 0.43215736 0.01017127232 0.00010095 0.176052073 0.276542
36
Table 4.7
WATER BUDGET S. No.
Name of the Blocks
Existing Water Availability (BCM)
Total (BCM) Water Demand (BCM) Water Gap (BCM)
Surface water
Ground Water
Present Projected (2020)
Present Projected (2020)
1 Langate 0.14134 0.0035 0.14484 0.09810 0.132350 nil nil
2 Rajwar 0.092868 0.00218 0.095048 0.053 0.08905 nil nil
3 Ramhal 0.09859 0.001682 0.1002725 0.045320 0.066950 nil nil
4 Kralpora 0.14272024 0.0015139 0.14423414 0.037742 0.0493075 nil nil
5 Trehgam 0.0548706 0.0015139 0.0563845 0.0327765 0.0427875 nil nil
6 Kupwara 0.08417852 0.002523 0.08670152 0.0490885 0.06014 nil nil
7 Sogam 0.07919068 0.00185 0.08104068 0.03030025 0.0802025 nil nil
8 Wavoora 0.0763 0.001177 0.077477 0.0303825 0.0354575 nil nil
9 Kalaroose 0.054992 0.00504 0.060032 0.0167225 0.050955 nil nil
10 Tangdar 0.0079044 0.000836 0.0087404 0.0010799 0.0023885 nil nil
11 Teethwal 0.0049140 0.0001682159 0.00508 0.001906475 0.003906475 nil nil
Total 0.83786844 0.0219840159 0.85985074 0.396418625 0.613494975 nil nil
37
CHAPTER – V
BLOCK -WISE TABLES
38
Table 5.1.1 Table 1.2 Demography Name of the state: - Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Langate
Name of the Gram Panchayat Name of the Villages Covered
Cod
e of
th
e B
lock
Population S.C S.T General Total
M
F
To
tal
No
. O
f h
ou
se
ho
lds
No
. O
f m
emb
ers
No
. O
f h
ou
se
ho
lds
No
. O
f m
emb
ers
No
. O
f h
ou
se
ho
lds
No
. O
f m
emb
ers
No
. O
f h
ou
se
ho
lds
No
. O
f m
emb
ers
GUloora, Kultoora, Pohrupeth, Wahipora, Unisoo Khanoo BAbagund, Kasloo, Sohipora, Khahipora, Mandigam, Udhipora, Yaroo, Lalbugh, LOkipora, Deedarpora, Renan, Ringpath A, B Walrahama A,B Gundkamal, Ashpora, Harveth, Rawalpora, A,B Hajin, Kralgund, Supernaghama, Pandithpora, Shanoo, Shartgund Bala, Teerna, Haril, Moonbal, Banday, Hanga, Mawer, LAch, Nowgam A, B Yahama A, B, KAlamchalka, Batagund, Maratgam, Audoora, Jehama, Pringroo, Shahnagri, Khudi, Kargam, Bicherwara.
Galoora, Khoroo, Kultoora, Hanjishart, Phorupeth, Bungam, Wahipora, Haripora, Unisoo, Ujroo, Khanbabagund, Kachiri, Kasloo, Wanigam, Sohipora, Sonwani, Khaipora, Palapora, Mundigam, Thokerpora, Respora, Udipora, Yaroo, Span Yaroo, LAlabugh, Ganapra, Lukipora, Malbagh, Deedarpora, Shalalpora, Badderpora, Reshpora, Renan, Safalpora, Khowerpora, Pazipora, Ring Path, Kunil, Kralpora, Walrama, Bijhama, Gundkamal, Doger, Chekipuran, Ashpora, Harwat, Budbugh, Utingoo, Rawalpora, Muqam, Handwanpora, Gundchobotra, Mongwalpora, Hajan, Ananwan, Kralgund, Nahama, Super Nagam, Khangund, Pandithpora, Hamporfa, Shanoo, Shartgund bala, GundRazak, Teerna, Darbal Payeen, Haril, Dudikul, Monabal, Lohikote, Banday, Sheltera, Hanga, Sudergund, Mawer, Sanzipora, Lach, Gamandar, Banjer, Khuri, Bagdegi, Putwari, Rishwari, Pringwari, Inderdeji, Yahama Mankal, Madwa,Kalamchakla, batagund, Shartgund payeen, Marathgam Adoora, Warpora, Jahama, Sheikhpora Pringroo, Chontipora, Shahnagri, Kutlari, khudi, Hydermari, Kargam, Chontipora, Bicharwari, Badrah Payeen
0009
5883
2
5160
4
1104
36
12
53
680
4274
1494
9
1061
09
1564
1
1104
36
39
Table 5.1.2 Table 1.2 Demography Name of the state :- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Rajwar
Name of the Gram Panchayat Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
of
hous
e ho
lds
No.
of
mem
bers
N
o. o
f ho
use
hold
s N
o. o
f m
embe
rs
No.
of
hous
e ho
lds
No.
of
mem
bers
No.
of
hous
e ho
lds
No.
of
mem
bers
Bakihukar, Khaipora, Turkpora, Rajpora, Behnipora, Satkoji, Wader payeen, Changmullah, Shalal, Batkoot, Machipora, Neelipora, Chogul, Maidan Chogal I, II, PAzalpora, Sodal, Bawan Watsar, Yamier, Kulangam A,B, Zachaldara A,B, Wadipora, A,B, Opezwani, Shogpora, Ahgam, Magam, A,B C, Baderkal, Goniporta, Baderkhah.
Bakhihakar, Dudipora, Khaipora, Kramhoora, Trukipora, Lachipora, Rajwar, Behnipora, Satkoji, Wader Bala, Nich Hama, Wader Payeen, Chanjimullah, Laribal, Shartigam, Shahlal, Rek Shalal, Waripora, Badkote, Washkroo, Machipora, Neelipora, Babagund, Batapora Khanpotra, Chogul, Maidan Chogul, I, II, Pazalpora, Palpora, Sodal, Bown Watsar, Yamier, Kulangam A, B, Zachaldara, A B Wadipora, A, B , Opezwani, Shogpora, Ahgam, Magam, A, B,C , Baderkhal, Gonipora, Baderhar.
0008
4724
7
4382
6
9107
3
- 59
1070
5883
1095
1
7160
6
1403
2
9107
3
40
Table 5.1.3 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Ramhall
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
VIllagham, A,B, Hafrada, Phalmarg,Hachmarg,Taratpora, A,B Waisa Kawanard, Hangnikoot, Cheerkoot, Padergund, Pachkoot, Kalmoona, champora, Manzgam, PUnzwa, A,B Lilum, Dolipora, A,B, Kukroosa, Dahama A, B, Lachamapora, Sarmarg, Zaferkahani, Kenyal, Sharkoot, Tumina
VIllagam A,B Hafartad, Phelmarg, Natchmarg, Balinard, TArathora, Daril, Waisa Kawanard, hangnikoot, Cheerakot, Checkbakshi, Gondmomin, Padehgund, Bundergund, Pachkoot, Kalmoona, Champora, Voreripora, Menzgam, Voreripora, Manzgam, Punzwa, A,B, LIlum, Kalipora, Cherpora, Dolipora, Sunmulla, Kukroosa, Dahama, Lachamporta, Dogerpora, Sarmarg, Zafarkhani, KEnyal, Haradora, Sharkoot, Amarghad, Tumina
0007
2754
0
2427
3
5181
3
02
05
941
5461
6538
4634
7
7481
5181
3
41
Table 5.1.4 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Sogam
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
Diver A,B, C,D, Dorus Wani, Walkul, Tekipora A, B Hayatpora, Dardpora, Muqam Dardpora, Rednag, Lalpora, Shalgund, Lalpora B Rangwar Lalpora, Darpora A, B , Krusan, Saiwan, Tangchek, Sogam A, B, C D, Chandigam, Gundimancher
Diver Anderbug, Diver, Diver Anderbug, Dorusa Wani, Walkula, Tekipora, tekipora Partly , Hayatpora Partly, thandoosa, Daradpora, Muqam Dradpora, Rednag, Charligund, Lalpora, Shalgund, Lalpora, Darapora, Sonnar, Darapora, Krusun, Saiwan, tengchek, Dramwari, Sogam A, Sogam Partly, Gundbug, Chandigam, Gundmancher, Rak- Gundmancher
0004
4383
7
3933
2
8316
9
52
263
529
2840
9391
8006
6
9972
8316
9
42
Table 5.1.5 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Wavoora
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
Of h
ouse
ho
lds
No.
Of
mem
bers
No.
Of h
ouse
ho
lds
No.
Of
mem
bers
No.
Of h
ouse
ho
lds
No.
Of
mem
bers
No.
Of h
ouse
ho
lds
No.
Of
mem
bers
Wavoora ,Wavoora, A,B, Warnow,A,B,C Sever, Kawari, Khurhuma,A,B C, Kuligam A, B, C Maidanpora Cheerkote, Gagal A A,Cherkote, Shumriyal, Surigam, Khodi, Putshai, Kanthpora, Doniwari
Wavoora, Warnow,A,B Ophan, Siver, Thandipora, Kawari, Khurhama, Takiya, Khurhama, Batanad, Chakla, Tankipora, Shrant, payeen, Kuligam, Nad Kuligam, Margund, Branth, Shalgund, Kandhar, Changdi, Puthkah, Maidanpora, Cheepora, Gagal, Gagal,Ckerkote, Shumriyal, Gundjahangr, Surigam, Khodi, Putushai, Kanthpora, Dooniwari
0005
3325
5
2910
8
6236
3
21
107
1469
1069
5
6439
5156
1
7929
6236
3
43
Table 5.1.6 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Kalaroose
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
Kalaroose, Dogerpora, Madmadow, Lastiyal, Sarkuli, Nunwani, Payeerpora, Kanipora, Moori, Ladha, Nagsari, Narikoot, Thayan A, Thayan Gujran, Khumriyal A,B,C, Machil, Puswari, Chountwari Payeen, Chountwari Payeen, Ring Payeen, Ring Bala, Dapal.
Kalaroose, Boninard, Dogerpora, Madmadow, Dal, Badimaidian, Lastiyal, Surkoli, Jakadnada, Nunwani, Damni, Payerpora, Hajibal, Konipora, Narizeb, Moori, Ladha, Nagseri, Bedibehak, Narikoot, Thayan, Thayan, GUjran, Khumriyal, Machil, Pushwari, Chountiwari, Harding, Malik bela, Danah, Hardring Bala, Dudi, Dapal, Misribehak.
0006
3096
6
2620
3
5816
9
13
73
1835
1282
3
5863
4527
3
7711
5816
9
44
Table 5.1.7 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Kupwara
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
Of
hous
e ho
lds
No.
Of
mem
bers
N
o. O
f ho
use
hold
s N
o. O
f m
embe
rs
No.
Of
hous
e ho
lds
No.
Of
mem
bers
N
o. O
f ho
use
hold
s N
o. O
f m
embe
rs
Nutnoosa A B, Kandi A,B Trich, Keegam, Waterkhani, Redbug, Anderhama, Muqam Shahwali, Drugmulla A, B C, Nagri, Bugernagh, Bramri A, B, Arampora, Jaggerpora, BUmhuma, Vodhpora., Kawari, Gushi, A, B , Karihuma, A, B, Batergam, Bohipora TIkker, Mogalpora, Hatmulla, Deedikoot, Pazipora, Halmatyhpora, A ,B , C, Payerpora Batpora A, B, C, D, Gundsauna, JUgtiyal, Gonipora, MAnzhar, humander, baba POra, Monigah, A,B,C, zangli, Shortpora, Sulkoot, Sohipora, Qasba Hyhama, Gutlipora
Nutnoosa, Kandi Khass, Sadu Gana, Tirch, Keegam, Waterkhani, Shadiporta, Redbug, Anderhuma, MUqam Shahwali, DRugmullah, CHal Pati, Drugmullah, Nagri Malpora, Huckerpora, BUbernag, Vobgal, Nagri Bala, BRamri, Arampora, Jagerpora, Bumhuhma, Vodhpora, Kawari, Gushi, Karihuma, Beliporta, PUshwari, Batergam, Bohipora,, Tikker Mogalpora, Gung Gushi, Hatmulla, Payerpora, Warpora, Deedikoot, Gotango, PAzipora, Halmathpora, A,B, Halmathpora Partly, Payerpora, Batapora, Balhama, Balkoot, Behramdari, Bela, Kanjbehak, Chat, Pathra, Kundnard, Kamkudi, Safawali, Thumbnard, Lashdat, Bonagam, MIryan, Guchipora, Gundsana, Chaligund, Jugtiyal, Gionipora, Khanpora, Manxhar, Mirnag, Babapora, Manigah, Glass Deji, Hajinaka, ZAngli, Kashera, Shartpora, Sulkoot, Sohipora, qasba Hayhama, Gutlipora.
0003
9367
5
7014
3
1638
18
57
330
1249
9128
1579
9
1334
17
1139
29
1638
18
45
Table 5.1.8 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Trehgam
7043 689+Name of the Gram
Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
Of
hous
e ho
lds
No.
Of
mem
bers
N
o. O
f ho
use
hold
s N
o. O
f m
embe
rs
No.
Of
hous
e ho
lds
No.
Of
mem
bers
N
o. O
f ho
use
hold
s N
o. O
f m
embe
rs
Trehgam A, B, C, D,E, F, Gugloosa A, B, Shumnug, Hayan A.B Poshpora A,B Harri A,B Hundi, Alachizab, Gulgam A,B,C,D Zurhama A,B Laderwan Kawari Jumgand Marhama,Awoora A,B,C,D, Kunan Hanjipora, Harri Payeen
Trehgam, Dolipora, Trehgam,Gughloosa, Shumnag,Solina, Gofabal, Hayan, Poshpora, Harri, Hundi, ALachizab, Gulgam, Zurhama, Gujerpati, Laderwan, Kawari, Jumagand Marhama, Awoora Kunan, Hanjipora, Herri Payeen
0002
4140
9
3691
2
7832
1
01
04
437
2885
8550
7543
2
8988
7832
1
46
Table 5.1.9 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Kralpora
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M F Total N
o. O
f ho
use
hold
s
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
Kralpora A, Kralpora B , Kralpora C, Meelyal , Kachhama A,Kachama B, Keran, Mandyan,Panzgam A Panzgam B Panzgam C, Rawathpora, Gund Zonrewshi, Chowkibal, Budnambal Bala, Budnamal Payeen, Shuloora, Aloosa, Reddi,Manzpather, Manchatar,Batpora A, BatporaB, Warsun A, Warsun B, Dard Harie, Rashan Pora A, Rashan Pora B, Dardsun A, Dardsun B, Gazreyal A, Gazreyal B, Dardpora A, Dardpora B, Dardpora C, Dardpora D,Dardpora E, Reshigund, Lone Harie A, Lone Harie B, Farkin, Pathran
Kralpora(Partly,Kralpora(partly),Kralpora(partly),Meelyal Kachama bala, Asthan Mohallah, Kachama Payeen Duban, Karen,Bore,Mundiyan,Panzgam (partly) Panzgam (Partly),Panzgam(Partly),Rawathpora, Gund zunreshi, Chowkibal,Marseri,rangwar,budnambal bala,budnamal payeen,shaloora,slamatwari,aloosa,redi,manzpathra,Manchatra, Khanbal,Batpora (partly),Sonthipora,Warsun(partly),Warsun(Partly),Dardsun (partly),Dardsun(Partly),Gazriyal(Partly),Gazriyal(Partly), gujran(Partly),Gujran (Partly),Kashmiri (Partly),kashmiri(partly),Thendipora Muqam ReshiGund Lone Harie(Partly),Wakoora, Lone Harie(Partly), Karkin, Pathran,Bichwal,Bogna
0001
6195
8
4910
5
1110
63
113
43
1363
8640
1034
6
1023
80
1172
0
1110
63
47
Table 5.1.10 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Tangdar
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population S.C S.T General Total
M
F
Tot
al
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
No.
Of
hous
e ho
lds
No.
Of
mem
bers
Tangdhar,A,B , hajinard, Bagibela, Gomal, Kandi Bala,Payeen, Gabra 1 , 11, 111 Dildar A,B, Kona-Gabra Nichyan, Khowerpora A,B
Tanghdar A,B Hajinar,Begibela, Hapthnar Gumal, Budwan, Kandjbala, kandi payeen, Nowgabra, A,B,C Dildar A,B , Koni Gabra, Nachiyan ,Handwal, KHoverora (patly), Khaverpora (partly)
0011
2071
9
1362
9
3434
8
20
111
598
3611
5772
3062
6
6390
3434
8
48
Table 5.1.11 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Teethwal
Name of the Gram Panchayat
Name of the Villages Covered
Cod
e of
the
Blo
ck
Population
S.C S.T General Total
M
F
Tot
al
No.
Of
hous
e ho
lds
No.
Of
mem
bers
N
o. O
f ho
use
hold
s N
o. O
f m
embe
rs
No.
Of
hous
e ho
lds
No.
Of
mem
bers
N
o. O
f ho
use
hold
s N
o. O
f m
embe
rs
Teethwal, Seemari, Khamkote A,B, Gundgujran, Pradda, Amrohi, Haji terah, Jabdi, Bhaderkote, Ibkote, Tadd , Sudipora, Chanipora,A,B ,
Tethwal, Drangla, Triboni, Seemari, Parni, Kadhama, Chamkote A, Chiterkote, Pur Pungla, Gund Saidan, Gundgujran, gundShart, Dragged, Parada, Chatkadi, Amroohi, Hajitra, Jabdi, Bijaldara, Bahadurkoot, Pringla Haridal, Idkoot, Tad, Panjtaran, Saidpora, Danih, Gasla, Chinipora Bala, Tribooni, Chinipora payeen
0010
1375
2
1202
9
2578
1
- -
816
4112
4216
2166
9
5032
2578
1
49
Table: 5.2
BIOMASS AND LIVESTOCK
S. No.
Name of the Block
Small Animals (in No’s)
Large Animals (in No’s)
Another Milk or Meat
Animal (in No’s)
Draft Animals (Buffalo/ Yak/
Bulls/ any other (in No’s)
Poultry Ducks Sheep Goats Indigenous Cow
Hybrid In
Descriptive Buffalo
Hybrid Buffalo
1. Sogam 110660 6257 20212 4313 5369 3212 137 0 0 6530
2. Wavoora 113000 3923 16925 4903 8560 2910 105 0 0 8150
3. Kalaroose 88340 3540 31266 7152 9210 1808 338 0 0 11360
4. Kralpora 48208 1215 14921 7176 12797 5311 26 0 0 7645
5. Tangdar 9045 0 13037 9232 3385 853 33 0 0 2008
6. Teetwal 18085 0 15463 14662 6770 1340 74 0 0 4015
7. Trehgam 69995 4160 12671 5549 8552 9401 22 0 0 5276
8. Langate 24560 0 21642 7758 7554 12268 243 0 0 8546
9. Rajwar 19365 0 17053 6823 5543 9248 280 0 0 7263
10. Ramhall 11638 0 8484 3852 3567 4710 465 0 0 3261
11. Kupwara 6581 85 19215 7808 8387 9513 24 0 0 19127
Total 519477 19180 190889 79228 79694 60574 1747 0 0 83181
Source: Animal Husbandry & Sheep Husbandry
50
Table: 5.3.1
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Langate
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 4345 2880 7225 10 1140 1150 0 0 0 4355 4020 8375 2242.2 5232.78 7474.98
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 420 420 0 60 60 0 0 0 0 480 480 0 0 0
d) Oil Seed 0 0 0 0 830 830 0 0 0 0 830 830 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
390 0 390 390 0 390 0 0 0 780 0 780 0 0 0
Total 4735 3300 8035 400 2030 2430 0 0 0 5135 5330 10465 2242.2 5232.78 7474.98
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
51
Table: 5.3.2
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Rajwar
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 1730 2420 4150 10 484 494 0 0 0 1740 2904 4644 1386.8 3259.54 4646.34
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 280 280 0 55 55 0 0 0 0 335 335 0 0 0
d) Oil Seed 0 0 0 0 365 365 0 0 0 0 365 365 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
360 0 360 360 0 360 0 0 0 720 0 720 0 0 0
Total 2090 2700 4790 370 904 1274 0 0 0 2460 3604 6064 1386.8 3259.54 4646.34
Source: District Agriculture Plan (DAP) & Department of Horticulture
52
Table: 5.3.3
AREA-WISE, CROP-WISE IRRIGATION STATUS
CD Block: Ramhall (Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 1925 1700 3625 10 105 115 0 0 0 1935 1805 3740 555.5 1532.2 2087.7
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 200 200 0 45 45 0 0 0 0 245 245 0 0 0
d) Oil Seed 0 0 0 0 65 65 0 0 0 0 65 65 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
150 0 150 150 0 150 0 0 0 300 0 300 0 0 0
Total 2075 1900 3975 160 215 375 0 0 0 2235 2115 4350 555.5 1532.2 2087.7
Source: District Agriculture Plan (DAP) & Department of Horticulture
53
Table: 5.3.4
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Teethwal
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 400 400 800 80 80 160 0 0 0 480 480 960 182 424.5 606.5
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 70 70 0 10 10 0 0 0 0 80 80 0 0 0
d) Oil Seed 0 0 0 0 40 40 0 0 0 0 40 40 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
90 0 90 70 0 70 0 0 0 160 0 160 0 0 0
Total 490 470 960 150 130 280 0 0 0 640 600 1240 182 424.5 606.5
Source: District Agriculture Plan (DAP) & Department of Horticulture
54
Table: 5.3.5
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Tangdar
(Unit in Hac.)
Crop Type
Kharif Rabi Summer Gross Total Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 600 600 1200 50 0 50 0 0 0 650 600 1250 233.4 554.6 788
b) Coarse Cereals
0 130 130 0 20 20 0 0 0 0 150 150 0 0 0
c) Pulses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
d) Oil Seed 0 0 0 0 55 55 0 0 0 0 55 55 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
60 0 60 30 0 30 0 0 0 90 0 90 0 0 0
Total 660 730 1390 80 75 155 0 0 0 740 805 1545 233.4 554.6 788
Source: District Agriculture Plan (DAP) & Department of Horticulture
55
Table: 5.3.6
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Kralpora
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 1580 1400 2980 0 52 52 0 0 0 1580 1452 3032 621 1448.7 2069.7
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 220 220 0 25 25 0 0 0 0 245 245 0 0 0
d) Oil Seed 0 0 0 0 20 20 0 0 0 0 20 20 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
190 0 190 190 0 190 0 0 0 380 0 380 0 0 0
Total 1770 1620 3390 190 97 287 0 0 0 1960 1717 3677 621 1448.7 2069.7
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
56
Table: 5.3.7
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Wavoora
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 1230 1340 2570 0 0 0 0 0 0 1230 1340 2570 420.25 980.59 1400.84
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 190 190 0 15 15 0 0 0 0 205 205 0 0 0
d) Oil Seed 0 0 0 0 10 10 0 0 0 0 10 10 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
170 0 170 100 0 100 0 0 0 270 0 270 0 0 0
Total 1400 1530 2930 100 25 125 0 0 0 1500 1555 3055 420.25 980.59 1400.84
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
57
Table: 5.3.8
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Kaloroose
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 510 1020 1530 40 0 40 0 0 0 550 1020 1570 419.4 978.6 1398
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 135 135 0 0 0 0 0 0 0 135 135 0 0 0
d) Oil Seed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
150 0 150 40 0 40 0 0 0 190 0 190 0 0 0
Total 660 1155 1815 80 0 80 0 0 0 740 1155 1895 419.4 978.6 1398
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
58
Table: 5.3.9
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Kupwara
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 2210 1600 3810 0 95 95 0 0 0 2210 1695 3905 1485.5 3489.96 4975.46
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 200 200 0 20 20 0 0 0 0 220 220 0 0 0
d) Oil Seed 0 0 0 0 35 35 0 0 0 0 35 35 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
260 0 260 200 0 200 0 0 0 460 0 460 0 0 0
Total 2470 1800 4270 200 150 350 0 0 0 2670 1950 4620 1485.5 3489.96 4975.46
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
59
Table: 5.3.10
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Sogam
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 1260 1140 2400 0 0 0 0 0 0 1260 1140 2400 419.82 779.59 1199.41
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 175 175 0 20 20 0 0 0 0 195 195 0 0 0
d) Oil Seed 0 0 0 0 25 25 0 0 0 0 25 25 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
180 0 180 120 0 120 0 0 0 300 0 300 0 0 0
Total 1440 1315 2755 120 45 165 0 0 0 1560 1360 2920 419.82 779.59 1199.41
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
60
Table: 5.3.11
AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Trehgam
(Unit in Hac.)
Crop Type Kharif Rabi Summer Gross Total
Horticulture and Plantation Crops
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
a) Cereals 1210 1500 2710 0 44 44 0 0 0 1210 1544 2754 670.57 1564.68 2235.25
b) Coarse Cereals
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c) Pulses 0 180 180 0 35 35 0 0 0 0 215 215 0 0 0
d) Oil Seed 0 0 0 0 55 55 0 0 0 0 55 55 0 0 0
e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
f) Any other Crops
200 0 200 200 0 200 0 0 0 400 0 400 0 0 0
Total 1410 1680 3090 200 134 334 0 0 0 1610 1814 3424 670.57 1564.68 2235.25
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
61
Table 5.4
LAND USE PATTERN 1.3 Land use Pattern Name of the State : Jammu and Kashmir Name of the District : Kupwara Name of the Block : All Blocks
(Unit in Hac.)
S. No.
Name of Block Total
Geographical Area
Area under Agriculture Area under Forest
Area under
Wasteland
Area under
other uses Gross
Cropped Area
Net Sown Area
Area Sown more than
once
Cropping intensity
(%) 1. Sogam 59416 7975.15 8370 2430 129 18225 1585 827
2. Wavoora 20973 3319.25 4318 375 109 17424 924 465
3. Kalaroose 36246 8284.01 5118 1274 125 12014 1444 721
4. Kralpora 11985 3024.58 2985 165 105 16213 633 317
5. Tangdar 18988 2803.00 3080 125 104 15728 713 361
6. Teetwal 10299 2194.45 1935 80 104 15703 734 366
7. Trehgam 26062 7160.00 4522 350 108 16322 1315 670
8. Langate 12584 3231.00 3294 334 110 10918 704 362
9. Rajwar 16179 5147.00 3628 287 108 31187 890 457
10. Ramhall 7790 1555.85 1560 155 110 11073 584 327
11. Kupwara 17378 1061.25 1090 280 126 5493 590 239
Total 237900 45755.54 39900 5855 112.54% 170300 10116 5112
Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics
62
Table 5.5
LAND UTILTIZATION STATISTICS DISTRICT KUPWARA
DAP Kupwara
S.No. Name of Block
Geographical Area excluding Forests & Horticulture area
Forest Area
Area under Non Agri. Use
Cultivable waste
Permanent Pasture
Land under miscellaneous Tree crop & Groves
Current Fallows
Other Fallows
Net Sown Areas
Gross Cropped Area
Cropping Intensity %
1 Langate 11384 18225 827 689 1136 6722.4 362 - 8370 10800 129
2 Rajwar 7840 12014 721 621 994 4233.3 386 - 5118 6392 125
3 Ramhall 6038 17424 465 397 631 1941.4 227 - 4318 4693 109
4 Kralpora 5309 31187 457 372 631 2100.9 221 - 3628 3915 108
5 Trehgam 4579 10918 362 301 497 1419.2 125 - 3294 3628 110
6 Kupwara 6996 16322 670 568 923 4536.5 313 - 4522 4872 107
7 Sogam 4127 16213 317 255 426 2127.4 144 - 2985 3150 105
8 Vavoora 4420 15728 361 306 497 610.1 176 - 3080 3205 104
9 Kalaroose 3287 15703 366 318 489 801.6 179 - 1935 2015 104
10 Tangdar 2713 11073 327 253 429 896.3 144 - 1560 1715 109
11 Teethwal 2230 5493 293 294 440 768.3 113 - 1090 1370 125
Total 58923 170300 5166 4374 7093 26156.5 2390 - 39900 45755 112
63
Table 5.6
PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS NAME OF THE STATE : JAMMU AND KASHMIR Name of the District : Kupwara Name of the Block : All Blocks
Sea
son
Crop sown Rainfed Irrigated Total
Ce
rea
ls
Co
ars
e c
erea
ls
Pu
lse
s
Oils
ee
ds
Fib
er
cro
ps
An
y o
the
r cr
op
Are
a (
ha)
Pro
du
ctio
n
Qtls
./yr
Pro
du
ctio
n y
ield
(Q
tls./h
a)
Co
st o
f cu
ltiva
tion
Rs.
P
er
Ha
Pro
du
ctio
n
Qtls
./yr
Pro
du
ctio
n o
r yi
eld
(K
gs.
/ha
)
Co
st o
f cu
ltiva
tion
Rs.
P
er
Ha
Pro
du
ctio
n
Qtls
./yr
Avg
. P
rod
uct
ivity
or
yie
ld (
Qtls
/ha)
Co
st o
f
Cu
ltiva
tion
Rs.
P
er
ha
Kharief Paddy, Maize -
Bea
ns
- - - 32360 1314450 6350 56000 1630375 7884 56000 1472412.5 7884 56000
Rabi Wheat, -
Peas
Mus
ard
- - 5855 157063 2383 26000 222000 12000 26000 189531.5 12000 26000
Summer - - - - - - - - - - - - - - -
Horticulture & Plantation
Apple, Walnut etc
- - - - - 28599.856 2627041.86 9000 1.5 lac - - 2627041.86 9000 1.5lac
Total - - - - -
66814.856 4098554.86 17733 232000 1852375 19884 82000 4288985.86 28884 232000
Source: DAP and Department of horticulture
64
Table 5.7.1
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Langate
(Unit in Ha.)
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 1844 4302 6146 36880 55640 925228 20 12.93
Apple HD (4th Year Age) 5.65 - 5.65 28.10 - 28.10 05 -
Pear 52.8 123 176 1003 938 1941 19 7.62
Cherry & other Stone Fruits 6.0 40 46 90 343 432 15 7.44
Walnut & other Nuts 107 1600 1007 535 3853 4388 05 3.82
Total 2015.45 6065 7380.65 38536.1 60774 932017.1 -- --
Source:- Department of Horticulture
65
Table 5.7.2
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Rajwar
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 1085 2531 3616 21700 33305 55005 20 13.92
Apple HD (4th Year Age) 3.06 - 3.06 15.3 - 15.3 5.0 -
Pear 24.6 57.4 82 467 674 1141 18.98 11.74
Cherry & other Stone Fruits 7.8 18.2 26 117 136 253 15.0 7.44
Walnut & other Nuts 89 804 893 445 3167 3612 15.0 7.44
Total 1209.46 3410.6 4620.06 22744.3 37282 60026.3 -- --
Source:- Department of Horticulture
66
Table 5.7.3
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Ramhall
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 481 1124 1605 9620 13652 20.0 12.14 --
Apple HD (4th Year Age) 2.0 - 2.00 10.00 -- 10 5.0 --
Pear 19 50 69 361 -- -- 19.0 7.96
Cherry & other Stone Fruits 6.0 16 22 93 105 198 15.5 6.56
Walnut & other Nuts 48 439 487 240 1708 1948 05 3.51
Total 556 1629 2185 10324 15465 2176 -- --
Source:- Department of Horticulture
67
Table 5.7.4
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Kupwara
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 946 2209 3155 18542 27205 45747 19.6 12.31
Apple HD (4th Year Age) 4.0 - 4.0 20 -- 20.0 5.0 ---
Pear 8.4 19.6 28 126 182 308 15.0 9.28
Cherry & other Stone Fruits 11.4 26.6 38 154 98 252 13.5 3.65
Walnut & other Nuts 527 1231 1758 1336 5699 7035 5.20 4.62
Total 1496.8 3486.2 4983 20178 33184 53362 -- --
Source:- Department of Horticulture
68
Table 5.7.5
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT
Name of the District:- Kupwara Name of the Block:- Trehgam
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 288 672 960 5270 8170 13440 18.30 12.16
Apple HD (4th Year Age) 1.0 - 1.0 5.0 --- 5.0 5.0 ---
Pear 3.2 12.8 16 48 128 176 15.0 10.0
Cherry & other Stone Fruits 2.8 11.2 14 38 88 126 13.6 7.85
Walnut & other Nuts 131 524 655 694 1926 2620 5.30 3.67
Total 426 1220 1646 6055 10312 16367 -- --
Source:- Department of Horticulture
69
Table 5.7.6
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT
Name of the District:- Kupwara Name of the Block:- Kralpora
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 369 861 1230 5609 11611 17220 15.20 13.48
Apple HD (4th Year Age)
5.1 --- 5.10 25.0 --- 25.0 5.0 ---
Pear 6 24 30 93 237 330 15.5 9.87
Cherry & other Stone Fruits
4 16 20 55 125 180 13.8 7.81
Walnut & other Nuts 157 627 784 863 2776 3139 5.5 3.63
Total 541.1 1528 2069.1 6645 14749 20894 -- --
Source:- Department of Horticulture
70
Table 5.7.7
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Kalaroose
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 87 345 432 1322 4733 6055 15.20 13.71
Apple HD (4th Year Age) 1.0 - 1.0 5.0 - 5.0 5.0 -
Pear 1.2 4.8 6 18 47 66 15.2 8.70
Cherry & other Stone Fruits 1.2 4.8 6 16 46 54 13.8 8.5
Walnut & other Nuts 81 321 402 445 1163 1608 5.5 3.62
Total 171.4 675.6 847 1806 5989 7788 -- --
Source:- Department of Horticulture
71
Table 5.7.8
AREA PRODUCTION AND PRODUCTIVE OF HORTICULTURE DEPA RTMENT Name of the District:- Kupwara Name of the Block:- Wavoora
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 87 345 432 1322 4733 6055 15.20 13.71
Apple HD (4th Year Age) 1.0 - 1.0 5.0 - 5.0 5.0 -
Pear 1.2 4.8 6 18 47 66 15.2 8.70
Cherry & other Stone Fruits 1.2 4.8 6 16 46 54 13.8 8.5
Walnut & other Nuts 81 321 402 445 1163 1608 5.5 3.62
Total 171.4 675.6 847 1806 5989 7788 -- --
Source:- Department of Horticulture
72
Table 5.7.9
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Sogam
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 293 1172 1465 4454 16056 20510 15.20 13.69
Apple HD (4th Year Age) 2.0 - 2.0 10.0 10.0 505
Pear 4.4 17.6 22 67 175 242 15.2 9.94
Cherry & other Stone Fruits 3.2 12.8 16 44 100 144 13.8 7.81
Walnut & other Nuts 200 798 998 1100 2892 3992 5.5 3.62
Total 502.6 2000.4 2503 5675 19223 24898 -- --
73
Source:- Department of Horticulture
Table 5.7.10
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Tangdhar
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 3.1 12.4 15.50 41 130 171 13.5 10.45
Apple HD (4th Year Age) - -- -- -- -- -- -- --
Pear 1.08 4.32 5.4 16 44 60 15.0 10.18
Cherry & other Stone Fruits 3.4 13.6 17 41 112 153 12.2 8.23
Walnut & other Nuts 148 592 740 740 2220 296 5.0 3.0
Total 155.58 622.32 777.9 838 2506 680 -- --
Source:- Department of Horticulture
74
Table 5.7.11
AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Teethwal
Crop Type Area in Ha
Total Production MT
Total Productivity MT
Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed
Apple 4.4 17.6 22 57 185 242 13.0 10.51
Apple HD (4th Year Age)
-- -- -- -- -- -- -- --
Pear 3.2 12.8 16 48 122 170 15.0 9.53
Cherry & other Stone Fruits 1.8 7.2 9 22 59 81 12.5 8.19
Walnut & other Nuts 112 448 560 560 1680 2240 5.0 3.75
Total 121.4 485.6 607 687 2046 2733 -- --
Source:- Department of Horticulture
75
Table 5.8 STATUS OF COMMAND AREA
3.3 STATUS OF COMMAND AREA
Name of the State Jammu & Kashmir
Name of the District Kupwara
Name of the Block Kupwara, Sogam, Wavoora, Kralpora, Trehgam, Kalaroose, Rajwara, Ramhal, langate,
Tangdar, Teetwal
(Unit in Ha.)
S. No. Name of Irrigation
Scheme
Information of Canal command Information on other service
Command Total Area
Total Area Developed
Command
Un
Developed
Command
Total
Area
Developed
Command
Un
Developed
Command
Developed
Command
Un
Developed
Command
1. Kupwara 6022 1370 4652 0 0 0 1370 4652
2. Sogam 3285 1270 2015 0 0 0 1270 2015
3. Wavoora 3080 0070 3010 0 0 0 0070 3010
4. Kalaroose 1935 0275 1660 0 0 0 0275 1660
5. Trehgam 3294 1225 2069 0 0 0 1225 2069
6. Kralpora 3628 0340 3288 0 0 0 340 3288
7. Rajwara 6018 0054 5064 0 0 0 0054 5064
8. Ramhal 4318 1630 2688 0 0 0 1630 2688
9. Langate 8370 2050 6320 0 0 0 2050 6320
10. Tangdar 810.7 60.70 750 0 0 0 60.70 750
11. Teetwal 529.49 20.49 509 0 0 0 20.49 504.
41290.19 8365.19 32025 0 0 0 8365.19 32020
76
CHAPTER - VI
BLOCK -WISE ACTION PLANS
• Agriculture • Command Area Development • Forest Deptt. & Soil Conservation Deptt. • Horticulture Department • Irrigation and Flood Control • Rural Development
• Watershed (IWMP) Note:- The costs calculated are as per existing state / CSS schemes
77
Table 6.1.1
BLOCKWISE ACTION PLAN OF AGRICULTURE DEPARTMENT UND ER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Langate
Table 6.1.1 Continue…
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 60 60 140000 84.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 150 150 130000 195.00 Bore Well No’s 15 1300000 195.5 Rejuvenation of existing water body No’s -- -- -- 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 2 2 220000 4.40 B) Drip Irrigation No’s 10 10 210000 21.00 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 100 640 27000 27.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 20 15 100000 20.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness
No’s 50 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s 10 38000 3.8
Agronomic measures including cropping alignment
No’s 0
78
Table 6.1.1 Continue…
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 70 300 100000 70.00 3 (PMKSY)
Water Shed Check Dams Mtrs 1000 250 25000 25.00 Diversion Drains Mtrs 2000 20 3000 60.00 Gully Plug Mtrs 0 Contour Bund Mtrs 5000 50 13000 6.50 Terracing/Land Levelling Ha 20 20 300000 60.00 Gabbion Structure No’s 2000 1000 10500 210.00
NBEC Mtrs. 3500 280 5000 175.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 3000 150 65 1.95 On farm Distribution pipe restoring Ha -- -- -- 0 Livelihood activities for the asset less persons
-- -- -- -- 0
A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 10 30000 3.00
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 210 690 50000 105.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 670 87.10 0.272
TOTAL 18328 3647 1397.072
79
Table 6.1.2
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Rajwar
Table 6.1.2 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 60 60 140000 84.00 Farm Ponds No’s -- -- -- 0 Rain Water harvest Structure No’s 150 150 130000 195.00 Bore Well No’s 15 -- 130000 195.00 Rejuvenation of existing water body No’s -- -- -- 0
Micro Irrigation -- -- -- 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 2 220000 4.40 B) Drip Irrigation No’s 05 05 210000 10.50 C) Rain Guns No’s -- -- Diesel/Power Operated Pump Sets No’s 50 -- 23000 11.50 Piped Water Conveyance system No’s -- 0 Percolation Tanks No’s 50 320 27000 13.50 Dug wells No’s 50 40000 20.00 Tube Wells No’s 20 15 100000 2.00 Capacity building No’s 10 -- 50000 5.00 Training on water conservation awareness
No’s 50 -- 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s -- 10 38000 3.80
Agronomic measures including cropping alignment
No’s -- -- -- 0
80
Table 6.1.2 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 35 150 100000 35.00 3 (PMKSY)
Water Shed Check Dams Mtrs 1000 250 25000 25.00 Diversion Drains Mtrs 1000 10 3000 30.00 Gully Plug Mtrs 0 Contour Bund Mtrs 5000 50 13000 6.50 Terracing/Land Levelling Ha 08 08 300000 24.00 Gabbion Structure No’s 1000 1000 10500 45.00
NBEC Mtrs. 2500 200 5000 125.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 3000 150 65 2.00 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 10 30000 3.00
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 200 660 50000 100.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 650 87.10 0.566
TOTAL 15196 3038 1924652 545.016
81
Table 6.1.3
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Ramhal Table 6.1.3 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 30 30 140000 42.00 Farm Ponds No’s -- -- 0 Rain Water harvest Structure No’s 100 100 130000 130.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s -- -- 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 02 -- 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.1 C) Rain Guns No’s -- 0 Diesel/Power Operated Pump Sets No’s 50 -- 23000 11.50 Piped Water Conveyance system No’s -- 0 Percolation Tanks No’s 100 740 27000 27.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 07 07 100000 7.5 Capacity building No’s 10 -- 50000 5.00 Training on water conservation awareness
No’s 50 -- 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s -- 20 38000 7.60
82
Table 6.1.3 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 25 207 100000 25.00 3 (PMKSY)
Water Shed Check Dams Mtrs 500 125 2500 12.50 Diversion Drains Mtrs 400 4 3000 12.00 Gully Plug Mtrs -- -- -- 0 Contour Bund Mtrs 1000 10 130 1.30 Terracing/Land Levelling Ha 04 04 300000 12.00 Gabbion Structure No’s 300 300 10500 31.50
NBEC Mtrs. 700 56 5000 35.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0.975 On farm Distribution pipe restoring Ha -- -- 0 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 60 -- 65000 39.00 B ) Poultry No’s 200 -- 1000 2.00 C) Sheep No’s 80 -- 71500 57.20 d) Apiculture No’s 15 -- 32500 3.25 e) Mushroom No’s 10 -- 30000 3.00
4 MGNREGS Argumentation of springs No’s -- -- 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 55 170 50000 27.50
A ) Up gradation/desalting of traditional water bodies
Mtrs. 300 87.10 0.261
TOTAL 5565 2099 3059282 720.586
83
Table 6.1.4
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Trehgam
Table 6.1.4 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 60 60 130000 78.00 Bore Well No’s 15 130000 195.00 Rejuvenation of existing water body No’s -- 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 200 998 27000 54.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 10 42 100000 5.00 Capacity building No’s 15 50000 7.5 Training on water conservation awareness
No’s 50 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s 20 38000 7.6
84
Table 6.1.4 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 06 24 100000 6.00 3
(PMKSY) Water Shed
Check Dams Mtrs 500 125 25000 12.50 Diversion Drains Mtrs 300 03 3000 9.00 Gully Plug Mtrs 0 0 Contour Bund Mtrs 200 02 13000 0.26 Terracing/Land Levelling Ha 10 10 300000 30.00 Gabbion Structure No’s 150 169 10200 15.75
NBEC Mtrs. 2000 200 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 165 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 20 30000 6.00
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 50 70 50000 25.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 300 87.10 0.26
TOTAL 5835 1904 1924352 704.995
85
Table 6.1.5
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Kralpora
Table 6.1.5 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 60 60 130000 78.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 200 989 27000 54.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 10 42 100000 10.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness
No’s 50 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s 20 20 38000 7.60
86
Table 6.1.5 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 05 21 100000 05.00 3
(PMKSY) Water Shed
Check Dams Mtrs 500 125 25000 12.50 Diversion Drains Mtrs 500 05 3000 15.00 Gully Plug Mtrs 0 0 Contour Bund Mtrs 200 02 13000 15.00 Terracing/Land Levelling Ha 10 10 300000 30.00 Gabbion Structure No’s 150 150 10500 15.75
NBEC Mtrs. 2000 200 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 155 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 50 65000 32.500 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 10 30000 3.00
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 50 70 50000 25.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 1000 87.10 0.87
TOTAL 6729 1865 3094652 718.345
87
Table 6.1.6
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Sogam
Table 6.1.6 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 60 60 130000 78.00 Bore Well No’s 15 130000 195.00 Rejuvenation of existing water body No’s -- -- -- 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 50 370 27000 13.50 Dug wells No’s 50 40000 20.00 Tube Wells No’s 15 15 100000 15.00 Capacity building No’s 50 10000 5.00 Training on water conservation awareness
No’s 15 50000 7.5
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s 20 38000 7.6
88
Table 6.1.6 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 15 63 100000 15.00 3
(PMKSY) Water Shed
Check Dams Mtrs 500 125 2500 12.50 Diversion Drains Mtrs 300 03 3000 9.00 Gully Plug Mtrs -- -- -- 0 Contour Bund Mtrs 1000 10 13000 1.30 Terracing/Land Levelling Ha 04 04 300000 12.00 Gabbion Structure No’s 50 50 10500 5.25
NBEC Mtrs. 2000 360 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons
-- -- -- -- 0
A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 2.00 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 15 30000 4.5
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 100 140 50000 50.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 300 87.10 0.261
TOTAL 6418 1561 1902152 637.661
89
Table 6.1.7
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Wavoora
Table 6.1.7 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 40 40 130000 52.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s -- -- -- 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 130 800 27000 35.10 Dug wells No’s 50 40000 20.00 Tube Wells No’s 10 42 100000 10.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness
No’s 50 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s 20 38000 7.60
90
Table 6.1.7 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 50 50 100000 50.00 3
(PMKSY) Water Shed
Check Dams Mtrs 500 125 25000 12.50 Diversion Drains Mtrs 300 03 3000 9.00 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 500 05 13000 0.65 Terracing/Land Levelling Ha 04 04 300000 0.65 Gabbion Structure No’s 50 50 10500 5.25
NBEC Mtrs. 500 130 5000 25.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 15 30000 4.5
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 100 140 50000 50.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 300 87.10 0.261
TOTAL 4523 1750 3094652 615.636
91
Table 6.1.8
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Kalaroose
Table 6.1.8 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 10 10 140000 14.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 30 30 130000 39.00 Bore Well No’s 05 1300000 65.00 Rejuvenation of existing water body No’s -- -- -- 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 35 217 27000 9.45 Dug wells No’s 50 40000 20.00 Tube Wells No’s 15 15 100000 15.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness
No’s 50 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s 5 38000 1.90
92
Table 6.1.8 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 0 3
(PMKSY) Water Shed
Check Dams Mtrs 05 21 100000 5.00 Diversion Drains Mtrs 500 125 25000 12.50 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 300 03 3000 9.00 Terracing/Land Levelling Ha 04 04 300000 12.00 Gabbion Structure No’s 500 05 1300 0.65
NBEC Mtrs. 100 100 100500 10.50 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 0 On farm Distribution pipe restoring Ha 2000 360 5000 100.00 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 28.60 d) Apiculture No’s 20 32500 6.50 e) Mushroom No’s 10 3000 3.00
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 100 140 0.50 50.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 350 87.10 0.304
TOTAL 4448 1036 3095888 472.404
93
Table 6.1.9
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Kupwara
Table 6.1.9 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 20 20 140000 28.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 70 70 130000 91.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 03 22000 6.60 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 100 740 27000 27.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 07 07 100000 7.00 Capacity building No’s 15 50000 7.5 Training on water conservation awareness
No’s 50 10000 5.00
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s 20 38000 7.6
94
Table 6.1.9 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 20 85 100000 2.00 3
(PMKSY) Water Shed
Check Dams Mtrs 500 12.5 25000 12.50 Diversion Drains Mtrs 400 04 3000 12.00 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 1000 10 13000 1.30 Terracing/Land Levelling Ha 1500 325 65 0.975 Gabbion Structure No’s 150 150 10500 15.75
NBEC Mtrs. 2000 370 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 25 32500 8.125 e) Mushroom No’s 10 30000 3.00
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 100 140 50000 50.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 300 87.10 0.261
TOTAL 8207 2279.5 2596717 700.086
95
Table 6.1.10
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Tangdar
Table 6.1.10 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 0 Farm Ponds No’s 0 Rain Water harvest Structure No’s 40 40 130000 52.00 Bore Well No’s 05 1300000 65.00 Rejuvenation of existing water body No’s -- -- -- 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 01 220000 2.20 B) Drip Irrigation No’s 0 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 0 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 10 62 27000 2.70 Dug wells No’s 50 23000 20.00 Tube Wells No’s 05 05 100000 5.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness
No’s 25 10000 2.5
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including cropping alignment
No’s 05 38000 1.90
96
Table 6.1.10 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
Secondary storage structure No’s 0 3
(PMKSY) Water Shed
Check Dams Mtrs 2500 150 2500 62.50 Diversion Drains Mtrs 400 05 3000 12.00 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 0 Terracing/Land Levelling Ha 02 02 300000 6.00 Gabbion Structure No’s 300 150 10500 31.50
NBEC Mtrs. 1000 200 5000 50.00 Entry Point activity No’s 0 Staggered trenches No’s 01 100000 1.00 On farm Distribution pipe restoring Ha 500 120 65 0.325 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 45 65000 29.25 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 28.60 d) Apiculture No’s 05 32500 1.625 e) Mushroom No’s 10 30000 3.00
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 50 164 50000 25.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 200 87.10 0.174
TOTAL 5399 903 2569152 409.274
97
Table 6.1.11
BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara
Name of Block : Teethwal
Table 6.1.11 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
1 (PMKSY) Har Khet Ko Pani
Community Tanks No’s 02 02 140000 2.80 Farm Ponds No’s 0 Rain Water harvest Structure No’s 20 20 13000 26.00 Bore Well No’s -- -- -- 0 Rejuvenation of existing water body No’s 0
Micro Irrigation 0 2 (PMKSY)
Per drop more crop
A ) Sprinkle sets No’s 01 22000 2.2 B) Drip Irrigation No’s 0 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 0 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 10 63 27000 2.70 Dug wells No’s 50 40000 20.00 Tube Wells No’s 05 05 100000 5.00 Capacity building No’s 50 50000 0.25 Training on water conservation awareness
No’s 25 10000 2.5
Extension activities for promotion of scientific moisture conservation
No’s
Agronomic measures including No’s 05 38000 1.90
98
Table 6.1.11 Continue …
S. No.
Programme Component Proposed Activities Unit
Target in (No’s)
Proposed Area Coverage (ha)
Unit cost (per Hact.)
(in Rs.)
Estimated Cost (llacs.)
cropping alignment Secondary storage structure No’s 0
3
(PMKSY) Water Shed
Check Dams Mtrs 2000 150 2500 50.00 Diversion Drains Mtrs 400 05 3000 12.00 Gully Plug Mtrs 0 0 Contour Bund Mtrs 0 Terracing/Land Levelling Ha 05 05 300000 15.00 Gabbion Structure No’s 300 150 300000 15.00
NBEC Mtrs. 1000 100 10500 31.20 Entry Point activity No’s 01 01 100000 1.00 Staggered trenches No’s -- -- -- 0 On farm Distribution pipe restoring Ha -- -- -- 0 Livelihood activities for the asset less persons
0
A )Dairy Unit No’s 10 65000 6.50 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 28.60 d) Apiculture No’s 05 32500 1.625 e) Mushroom No’s 05 30000 1.52
4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section
No’s 50 100 50000 25.00
A ) Up gradation/desalting of traditional water bodies
Mtrs. 200 87.10 0.174
TOTAL 4379 606 1406087 252.969
99
Table 6.2.1
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KUPWARA OF DISTRICT KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
4652 0.012 55.824 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
4186.80 0.350 1465.38 837.36 293.076 837.36 293.076 837.36 293.076 837.36 293.076 837.36 293.076
ii. Micro-irrigation
465.20 0.500 232.60 93.04 46.52 93.04 46.52 93.04 46.52 93.04 46.52 93.04 46.52
3 Field, Intermediate and link Drains
4652 0.060 279.12 930.4 55.824 930.4 55.824 930.4 55.824 930.4 55.824 930.4 55.824
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 4652 0.012 55.824 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648
ii. Infrastructure Grant
Lump Sump
0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00
5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200
ii. Demonstrations 25 0.020 0.50 5 0.100 5 0.100 5 0.100 5 0.100 5 0.100
iii. Monitoring &
Evaluation
Lump
Sump - 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 4652 0.003 13.956 930.4 2.7912 930.4 2.7912 930.4 2.7912 930.4 2.7912 930.4 2.7912
7 Establishment Charges @10% on item NO. 2 & 3
**** ***** 98.855 ** 19.771 ** 19.771 ** 19.771 ** 19.771 ** 19.771
TOTAL 2213.1 442.61 442.612 442.61 442.61 442.61
100
Table 6.2.2
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK SOGAM OF DISTRICT KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs.
In lacs) Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
2015 0.012 24.18 403 4.836 403 4.836 403 4.836 403 4.836 403 4.836
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
1813.50 0.350 634.725 363 126.945 363 126.945 363 126.945 363 126.945 363 126.945
ii. Micro-irrigation
201.50 0.500 100.75 40.3 20.15 40.3 20.15 40.3 20.15 40.3 20.15 40.3 20.15
3 Field, Intermediate
and link Drains 2015 0.060 120.9 403 24.18 403 24.18 403 24.18 403 24.18 403 24.18
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 2015 0.012 24.18 403 4.836 403 4.836 403 4.836 403 4.836 403 4.836
ii. Infrastructure Grant
Lump Sump
0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00
5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/
Seminars 10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200
ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060
iii. Monitoring & Evaluation
Lump Sump
- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 2015 0.003 6.045 403 1.209 403 1.209 403 1.209 403 1.209 403 1.209
7 Establishment Charges @10% on item NO. 2 & 3
**** ***** 42.81875 ** 8.56375 ** 8.56375 ** 8.56375 ** 8.56375 ** 8.56375
TOTAL 964.8988 192.9798 192.9798 192.9798 192.9798 192.98
101
Table 6.2.3
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK WAVOORA OF DISTRICT KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
3010 0.012 36.12 602 7.224 602 7.224 602 7.224 602 7.224 602 7.224
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
2709 0.350 948.15 541.80 189.63 541.80 189.63 541.80 189.63 541.80 189.63 541.80 189.63
ii. Micro-irrigation
301 0.500 150.50 60.20 30.10 60.20 30.10 60.20 30.10 60.20 30.10 60.20 30.10
3 Field, Intermediate and link Drains
3010 0.060 180.6 602 36.12 602 36.12 602 36.12 602 36.12 602 36.12
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 3010 0.012 36.12 602 7.224 602 7.224 602 7.224 602 7.224 602 7.224
ii. Infrastructure Grant
Lump Sump
0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00
5 Software activities
0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200
ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060
iii. Monitoring & Evaluation
Lump Sump
- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 3010 0.003 9.03 602 1.806 602 1.806 602 1.806 602 1.806 602 1.806
7
Establishment Charges @10%
on item NO. 2 & 3
**** ***** 63.9625 ** 12.7925 ** 12.7925 ** 12.7925 ** 12.7925 ** 12.7925
TOTAL 1435.783 287.157 287.157 287.157 287.157 287.157
102
Table 6.2.4
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KALAROOSE OF DISTRICT KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
1660 0.012 19.92 332 3.984 332 3.984 332 3.984 332 3.984 332 3.984
2 OFD works : 0 0 0 0 0 0 0 0 0 0 0
i. Field Channel 1494 0.350 522.90 298.80 104.58 298.80 104.58 298.80 104.58 298.80 104.58 298.80 104.58
ii. Micro-irrigation 166 0.500 83.00 33.20 16.60 33.20 16.60 33.20 16.60 33.20 16.60 33.20 16.60
3 Field, Intermediate and link Drains
1660 0.060 99.60 332 19.92 332 19.92 332 19.92 332 19.92 332 19.92
4 Farmers Participation: 0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 1660 0.012 19.92 332 3.984 332 3.984 332 3.984 332 3.984 332 3.984
ii. Infrastructure Grant
Lump Sump
0.000 3.00 L.S 0.60 L.S 0.60 L.S 0.60 L.S 0.60 L.S 0.60
5 Software activities
0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
5 0.100 0.50 1 0.100 1 0.100 1 0.100 1 0.100 1 0.100
ii. Demonstrations 10 0.020 0.20 2 0.040 2 0.040 2 0.040 2 0.040 2 0.040
iii. Monitoring & Evaluation
Lump Sump
- 3.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 1660 0.003 4.98 332 0.996 332 0.996 332 0.996 332 0.996 332 0.996
7
Establishment Charges @10% on item NO. 2 &
3
**** ***** 35.275 ** 7.055 ** 7.055 ** 7.055 ** 7.055 ** 7.055
TOTAL 792.3 158.86 158.86 158.86 158.86 158.859
103
Table 6.2.5
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK TREHGAM OF DISTRICT KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
2069 0.012 24.828 413.80 4.9656 413.80 4.9656 413.80 4.9656 413.80 4.9656 413.80 4.9656
2 OFD works : 0 0 0 0 0 0 0 0 0 0 0
i. Field Channel 1862.10 0.350 651.735 372.42 130.347 372.42 130.347 372.42 130.347 372.42 130.347 372.42 130.347
ii. Micro-irrigation 206.90 0.500 103.45 41.38 20.69 41.38 20.69 41.38 20.69 41.38 20.69 41.38 20.69
3 Field, Intermediate and link Drains
1660 0.060 99.60 332 19.92 332 19.92 332 19.92 332 19.92 332 19.92
4 Farmers Participation: 0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 1660 0.012 19.92 332 3.984 332 3.984 332 3.984 332 3.984 332 3.984
ii. Infrastructure Grant
Lump Sump
0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00
5 Software activities
0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200
ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060
iii. Monitoring & Evaluation
Lump Sump
- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 2069 0.003 6.207 413.8 1.2414 413.8 1.2414 413.8 1.2414 413.8 1.2414 413.8 1.2414
7
Establishment Charges @10% on item NO. 2 & 3
**** ***** 42.739 ** 8.5478 ** 8.5478 ** 8.5478 ** 8.5478 ** 8.5478
TOTAL 959.78 191.956 191.956 191.956 191.956 191.956
104
Table 6.2.6
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KRALPORA OF DISTT. KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
3288 0.012 39.456 657.60 7.8912 657.60 7.8912 657.60 7.8912 657.60 7.8912 657.60 7.8912
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
2959.20 0.350 1035.72 591.84 207.144 591.84 207.144 591.84 207.144 591.84 207.144 591.84 207.144
ii. Micro-irrigation 328.80 0.500 164.40 65.76 32.88 65.76 32.88 65.76 32.88 65.76 32.88 65.76 32.88
3 Field, Intermediate and link Drains
3288 0.060 197.28 657.6 39.456 657.6 39.456 657.6 39.456 657.6 39.456 657.6 39.456
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 3288 0.012 39.456 657.6 7.8912 657.6 7.8912 657.6 7.8912 657.6 7.8912 657.6 7.8912
ii. Infrastructure Grant
Lump Sump
0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00
5 Software activities
0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200
ii. Demonstrations 20 0.020 0.40 4 0.080 4 0.080 4 0.080 4 0.080 4 0.080
iii. Monitoring & Evaluation
Lump Sump
- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 3288 0.003 9.864 657.6 1.9728 657.6 1.9728 657.6 1.9728 657.6 1.9728 657.6 1.9728
7
Establishment Charges @10% on item NO. 2 & 3
**** ***** 69.87 ** 13.974 ** 13.974 ** 13.974 ** 13.974 ** 13.974
TOTAL 1567.45 313.489 313.489 313.489 313.489 313.489
105
Table 6.2.7
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK RAJWARA OF DISTT. KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
5064 0.012 60.768 1012.80 12.1536 1012.80 12.1536 1012.80 12.1536 1012.80 12.1536 1012.80 12.1536
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
4557.60 0.350 1595.16 911.52 319.032 911.52 319.032 911.52 319.032 911.52 319.032 911.52 319.032
ii. Micro-irrigation
506.40 0.500 253.20 101.28 50.64 101.28 50.64 101.28 50.64 101.28 50.64 101.28 50.64
3 Field, Intermediate and link Drains
5064 0.060 303.84 1012.8 60.768 1012.8 60.768 1012.8 60.768 1012.8 60.768 1012.8 60.768
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant
5064 0.012 60.768 1012.8 12.1536 1012.8 12.1536 1012.8 12.1536 1012.8 12.1536 1012.8 12.1536
ii. Infrastructure Grant
Lump Sump
0.000 10.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00
5 Software activities
0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
20 0.100 2.00 4 0.400 4 0.400 4 0.400 4 0.400 4 0.400
ii. Demonstrations 30 0.020 0.60 6 0.120 6 0.120 6 0.120 6 0.120 6 0.120
iii. Monitoring & Evaluation
Lump Sump
- 10.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 5064 0.003 15.192 1012.8 3.0384 1012.8 3.0384 1012.8 3.0384 1012.8 3.0384 1012.8 3.0384
7
Establishment Charges @10% on item NO. 2 & 3
**** ***** 107.61 ** 21.522 ** 21.522 ** 21.522 ** 21.522 ** 21.522
TOTAL 2419.14 482.828 482.828 482.828 482.828 482.828
106
Table 6.2.8
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK RAMHAL OF DISTT. KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
2688 0.012 32.256 537.60 6.4512 537.60 6.4512 537.60 6.4512 537.60 6.4512 537.60 6.4512
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
2419.20 0.350 846.72 483.84 169.344 483.84 169.344 483.84 169.344 483.84 169.344 483.84 169.344
ii. Micro-irrigation
268.80 0.500 134.40 53.76 26.88 53.76 26.88 53.76 26.88 53.76 26.88 53.76 26.88
3 Field, Intermediate and link Drains
2688 0.060 161.28 537.6 32.256 537.6 32.256 537.6 32.256 537.6 32.256 537.6 32.256
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 2688 0.012 32.256 537.6 6.4512 537.6 6.4512 537.6 6.4512 537.6 6.4512 537.6 6.4512
ii. Infrastructure Grant
Lump Sump
0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00
5 Software activities
0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200
ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060
iii. Monitoring & Evaluation
Lump Sump
- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 2688 0.003 8.064 537.6 1.6128 537.6 1.6128 537.6 1.6128 537.6 1.6128 537.6 1.6128
7
Establishment Charges @10% on item NO. 2 & 3
**** ***** 57.12 ** 11.424 ** 11.424 ** 11.424 ** 11.424 ** 11.424
TOTAL 1283.40 256.679 256.679 256.679 256.679 256.679
107
Table 6.2.9
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK LANGATE OF DISTRICT KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In
lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
6320 0.012 75.84 1264.00 15.168 1264.00 15.168 1264.00 15.168 1264.00 15.168 1264.00 15.168
2 OFD works : 0 0 0 0 0 0 0 0 0 0 0
i. Field Channel 5688 0.350 1990.8 1137.60 398.16 1137.60 398.16 1137.60 398.16 1137.60 398.16 1137.60 398.16
ii. Micro-irrigation 632 0.500 316.00 126.40 63.20 126.40 63.20 126.40 63.20 126.40 63.20 126.40 63.20
3 Field, Intermediate and link Drains
6320 0.060 379.20 1264 75.84 1264 75.84 1264 75.84 1264 75.84 1264 75.84
4 Farmers Participation: 0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 6320 0.012 75.84 1264 15.168 1264 15.168 1264 15.168 1264 15.168 1264 15.168
ii. Infrastructure Grant
Lump Sump
0.000 10.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00
5 Software activities
0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
25 0.100 2.50 5 0.500 5 0.500 5 0.500 5 0.500 5 0.500
ii. Demonstrations 35 0.020 0.70 7 0.140 7 0.140 7 0.140 7 0.140 7 0.140
iii. Monitoring & Evaluation
Lump Sump
- 10.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 6320 0.003 18.96 1264 3.792 1264 3.792 1264 3.792 1264 3.792 1264 3.792
7
Establishment Charges @10% on item NO. 2 & 3
**** ***** 134.30 ** 26.86 ** 26.86 ** 26.86 ** 26.86 ** 26.86
TOTAL 3014.1 601.83 601.83 601.83 601.83 601.828
108
Table 6.2.10
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK TANGDAR OF DISTRICT KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs. In lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
750 0.012 9 150.00 1.80 150.00 1.80 150.00 1.80 150.00 1.80 150.00 1.80
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
675 0.350 236.25 135.00 47.25 135.00 47.25 135.00 47.25 135.00 47.25 135.00 47.25
ii. Micro-irrigation
75 0.500 37.50 15.00 7.50 15.00 7.50 15.00 7.50 15.00 7.50 15.00 7.50
3 Field, Intermediate and link Drains
750 0.060 45.00 150 9.00 150 9.00 150 9.00 150 9.00 150 9.00
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 750 0.012 9.00 150 1.80 150 1.80 150 1.80 150 1.80 150 1.80
ii. Infrastructure Grant
Lump Sump
0.000 2.00 L.S 0.40 L.S 0.40 L.S 0.40 L.S 0.40 L.S 0.40
5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
5 0.100 0.50 1 0.100 1 0.100 1 0.100 1 0.100 1 0.100
ii. Demonstrations 10 0.020 0.20 2 0.040 2 0.040 2 0.040 2 0.040 2 0.040
iii. Monitoring & Evaluation
Lump Sump
- 2.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 750 0.003 2.25 150 0.45 150 0.45 150 0.45 150 0.45 150 0.45
7 Establishment Charges @10% on item NO. 2 & 3
**** ***** 15.937 ** 3.1874 ** 3.1874 ** 3.1874 ** 3.1874 ** 3.1874
TOTAL 359.64 72.53 72.53 72.53 72.53 72.53
109
Table 6.2.11
COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan
PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KUPWARA OF TEETWAL OF DISTRICT
KUPWARA
S. No
Activities Proposed Targets
Unit Cost (Rs.
In lacs)
Total Cost
Targets for 2016-17
Targets for 2016-17
Targets for 2017-18
Targets for 2018-19
Targets for 2019-20
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Survey, Planning, Design
504 0.012 6.048 100.80 1.21 100.80 1.21 100.80 1.21 100.80 1.21 100.80 1.21
2 OFD works :
0 0 0 0 0 0 0 0 0 0 0
i. Field Channel
453.60 0.350 158.76 90.72 31.752 90.72 31.752 90.72 31.752 90.72 31.752 90.72 31.752
ii. Micro-irrigation
50.40 0.500 25.20 10.08 5.04 10.08 5.04 10.08 5.04 10.08 5.04 10.08 5.04
3 Field, Intermediate and link Drains
504 0.060 30.24 100.8 6.05 100.8 6.05 100.8 6.05 100.8 6.05 100.8 6.05
4 Farmers Participation:
0 0 0 0 0 0 0 0 0 0 0
i. Functional grant 504 0.012 6.05 100.8 1.21 100.8 1.21 100.8 1.21 100.8 1.21 100.8 1.21
ii. Infrastructure Grant
Lump Sump
0.000 1.50 L.S 0.30 L.S 0.30 L.S 0.30 L.S 0.30 L.S 0.30
5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0
i. Trainings/ Seminars
3 0.100 0.30 0.6 0.060 0.6 0.060 0.6 0.060 0.6 0.060 0.6 0.060
ii. Demonstrations 5 0.020 0.10 1 0.020 1 0.020 1 0.020 1 0.020 1 0.020
iii. Monitoring & Evaluation
Lump Sump
- 1.50 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000
6 Warabandi 504 0.003 1.512 100.8 0.3024 100.8 0.3024 100.8 0.3024 100.8 0.3024 100.8 0.3024
7 Establishment Charges @10% on item NO. 2 & 3
**** ***** 10.71 ** 2.142 ** 2.142 ** 2.142 ** 2.142 ** 2.142
TOTAL 241.92 49.08 49.08 49.08 49.08 49.08
110
Table 6.3
BLOCK-WISE ACTION PLAN OF SOIL AND WATER CONSERVATI ON DEPARTMENT
Table 6.3 Continue …
S No Name of
Block Concerned
Ministry/Deptt. Components Activity Capacity
Command Area
Period of Implementation
Estimated Cost
1 Kupwara DOLR MOHR PMKSY Watershed
Fencing/Plantation 90000 Rft 300 5 90.75
DRSM Structures 2000 cum 200 3 10.00
Create Work 1000 Nos. 500 5 50.00
Water Harvesting Structures 3 Nos. 04 3 8.25
Total 1004 159.00
2 Trehgam DOLR MOHR PMKSY Watershed
Fencing/Plantation 72000 rft 240 6 72.60
DRSM Structures 3900 cum 130 5 19.50 Create Work 1240 Nos 620 5 124.00 Water Harvesting Structures 5 Nos. 06 4 12.50 Total 996 228.60
3 Kralpora DOLR MOHR PMKSY Watershed
Fencing/Plantation 350 4 105.87 DRSM Structures 5500 cum 550 5 27.50 Create Work 1750 Nos. 900 6 175.00 Water Harvesting Structures 10 Nos 09 6 27.50 Total 1809 335.87
111
Table 6.3 Continue …
S No Name of Block
Concerned Ministry/Deptt.
Components Activity Capacity Command Area
Period of Implementation
Estimated Cost
4 Tangdhar DOLR MOHR PMKSY Watershed
Fencing/Plantation 210000 rft 700 3 21.17 DRSM Structures 3000 cum 100 3 15.00 Create Work 1750 Nos. 875 3 175.00 Water Harvesting Structures 02 Nos. 03 1 5.50 Upgradation of Natural Resources 05 Nos. 0 4 5.00
Total 1678 221.67
5 Sogam DOLR MOHR PMKSY Watershed
Fencing/Plantation 30000 rft 100 3 30.25 DRSM Structures 1600 cum 180 3 8.00 Create Work 600 Nos. 300 4 60.00 Water Harvesting Structures 5 Nos. 6 3 13.75 Upgradation of Natural Resources 7 Nos. 0 4 4.90
Total 586 116.90
6 Wavoora DOLR MOHR PMKSY Watershed
Fencing/Plantation 60000 200 2 60.50 DRSM Structures 2250 cum 75 3 11.25 Create Work 950 Nos. 475 2 95.00 Water Harvesting Structures 3 Nos. 4 2 8.25 Upgradation of Natural Resources 5 Nos 0 2 3.50 Total 754 178.50
7 Kalaroose DOLR MOHR PMKSY Watershed
Fencing/Plantation 75000 250 2 75.63 DRSM Structures 2550 cum 85 2 12.75 Create Work 1750 Nos. 900 3 175.00 Water Harvesting Structures 02 Nos 03 2 5.50 Upgradation of Natural Resources 10 Nos 0 3 7.00 Total 1238 275.88
112
Table 6.3 Continue …
S No Name of Block
Concerned Ministry/Deptt.
Components Activity Capacity Command Area
Period of Implementation
Estimated Cost
8 Langate DOLR MOHR PMKSY Watershed
Fencing/Plantation 30000 rft 100 5 30.25 DRSM Structures 1500 cum 50 4 7.50 Create Work 2700 Nos 1350 4 270.00 Water Harvesting Structures 5 Nos 7 3 13.75 Upgradation of Natural Resources 12 Nos 0 4 7.00 Total 1507 328.50
9 Rajwar DOLR MOHR PMKSY Watershed
Fencing/Plantation 45000 rft 150 5 45.37 DRSM Structures 700 cum 23 2 3.50 Create Work 1550 Nos 775 3 155.00 Water Harvesting Structures 5 Nos. 07 3 13.75 Upgradation of Natural Resources 12 Nos 0 4 8.40 Total 955 226.02
10 Ramhall DOLR MOHR PMKSY Watershed
Fencing/Plantation 27000 rft 90 5 27.22 DRSM Structures 500 cum 23 2 2.50 Create Work 2250 Nos 1125 4 225.00 Water Harvesting Structures 03 Nos. 04 3 8.25 Upgradation of Natural Resources 03 Nos. 0 3 2.10 Total 1242 265.07
Grand Total 11769 2336.01
113
Table 6.4
BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT UNDER PMKSY DISTRICT KUPWARA
(Kehmil Division)
Table 6.4 Continue
S. No.
Pro
gra
mm
e
Co
mp
on
en
t
Co
nst
itu
en
t C
D
Blo
ck
Forest
Range Activities
Nu
mb
er
Un
it C
ost
Are
a C
ov
ere
d
Am
ou
nt
Rs.
in
Lacs
1st yr 2nd yr 3rd yr 4th yr 5th yr
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1.
PMKSY
Water
Shed
Kralpora
Kralpora Water Harvesting
storage tanks
2 2.75 02 Ha 5.5
1 2.75 1. 2.75 - - - - - -
Plantation/Fencing/
Pasture Dev.
40 Hac 0.8 12000
Rft
32
8 6.4 8 6.4 8 6.4 8 6.4 8 6.4
DRSM Works 200
Cms
499/ 1
40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
2
PMKSY
Water
Shed
Kralpora
Rashanpora Plantation/Fencing/
Pasture Dev.
40 cms 0.8 12000
rft
32
1 2.75 1. 2.75 - - - - - -
DRSM Works 200
cms
499 1 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4
Dug Well 1 5 5 1 5 - - - - - - - -
114
Table 6.4 Continue
S. No. P
rog
ram
me
Co
mp
on
en
t
Co
nst
itu
en
t C
D
Blo
ck
Forest
Range Activities
Nu
mb
er
Un
it C
ost
Are
a C
ov
ere
d
Am
ou
nt
Rs.
in
Lacs
1st yr 2nd yr 3rd yr 4th yr 5th yr
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
3
PMKSY
Water
Shed
Kralpora
Panzgam Water Harvesting
storage tanks
2 2.75 02 ha 5 1 2.75 1. 2.75 - - - - - -
Plantation/Fencing/
Pasture Dev.
40 ha 0.8 12000
rft
32
8 6.4 8 6.4 8 6.4 8 6.4 8 6.4
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well 1 5 5 1 5 - - - - - - - -
4
PMKSY
Water
Shed Kra
lpo
ra
Reddi
Water Harvesting
storage tanks 1 2.75 01 ha 2.75 1 2.75 - - - - - - - -
Plantation/Fencing/
Pasture Dev. 40 ha 0.8 12000
rft 32 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4
DRSM Works
200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well
1 5 5 1 5 - - - - - - - -
115
Table 6.4 Continue
S. No. P
rog
ram
me
Co
mp
on
en
t
Co
nst
itu
en
t C
D
Blo
ck
Forest
Range Activities
Nu
mb
er
Un
it C
ost
Are
a C
ov
ere
d
Am
ou
nt
Rs.
in
Lacs
1st yr 2nd yr 3rd yr 4th yr 5th yr
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
5
PM
KS
Y W
ate
r S
he
d
Kra
lpo
ra
Drangwari
Plantation/Fencing/
Pasture Dev. 40 ha 0.8 12000
rft 32 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well
1 5 5 1 5 - - - - - - - -
6
PM
KS
Y W
ate
r S
he
d
Kra
lpo
ra
Budnamal
Plantation/Fencing/
Pasture Dev. 20 ha 0.8 6000 rft 16 4 3.2 4 3.2 4 3.2 4 3.2 4 3.2
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well 1 5 5 1 5 - - - - - - - -
7
PM
KS
Y W
ate
r S
he
d
Tre
hg
am
Trehgam
Water Harvesting
storage tanks 2 2.75 02 ha 5.5 1 2.75 1 2.75 - - - - - -
Plantation/Fencing/
Pasture Dev. 60 ha 0.8
18000
rft 48 12 9.6 12 9.6 12 9.6 12 9.6 12 9.6
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well 1 5 5 1 5 - - - - - - - -
116
Table 6.4 Continue
S. No. P
rog
ram
me
Co
mp
on
en
t
Co
nst
itu
en
t C
D
Blo
ck
Forest
Range Activities
Nu
mb
er
Un
it C
ost
Are
a C
ov
ere
d
Am
ou
nt
Rs.
in
Lacs
1st yr 2nd yr 3rd yr 4th yr 5th yr
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
8
PM
KS
Y W
ate
r S
he
d
Tre
hg
am
Deedkoot
Water Harvesting
storage tanks 2 2.75 02 ha 5.5 1 2.75 1 2.75 - - - - - -
Plantation/Fencing/
Pasture Dev. 45 Ha 0.8 13500
rft 36 9 7.2 9 7.2 9 7.2 9 7.2 9 7.2
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well 1 5 5 1 5 - - - - - - - -
9
PM
KS
Y W
ate
r S
he
d
Tre
hg
am
Gulgam
Water Harvesting
storage tanks 1 2.75 01 ha 2.75 1 2.75 - - - - - - -
Plantation/Fencing/
Pasture Dev. 40 ha 0.8 12000
rft 32 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well 1 5 5 1 5 - - - - - - - -
10
PM
KS
Y W
ate
r S
he
d
Ra
mh
all
Tarathpora
Water Harvesting
storage tanks 1 2.75 01 ha 2.75 1 2.75 - - - - - - - -
Plantation/Fencing/
Pasture Dev. 30 ha 0.8 9000 rft 24 6 4.8 6 4.8 6 4.8 6 4.8 6 4.8
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Dug Well 1 5 5 1 5 - - - - - - - -
117
Table 6.4 Continue
S. No. P
rog
ram
me
Co
mp
on
en
t
Co
nst
itu
en
t C
D
Blo
ck
Forest
Range Activities
Nu
mb
er
Un
it C
ost
Are
a C
ov
ere
d
Am
ou
nt
Rs.
in
Lacs
1st yr 2nd yr 3rd yr 4th yr 5th yr
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
11
PM
KS
Y W
ate
r S
he
d
Ra
mh
all
Manzgam
Water Harvesting
storage tanks 2 2.75 02 ha 5.5 1 2.75 1. 2.75 - - - - - -
Plantation/Fencing/
Pasture Dev. 45 ha 0.8
13500
rft 36 9 7.2 9 7.2 9 7.2 9 7.2 9 7.2
DRSM Works
200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
12
PM
KS
Y W
ate
r S
he
d T
an
gd
ha
r
Tangdhar
Plantation/Fencing/
Pasture Dev. 45 ha 0.8 13500
rft 36 9 7.2 9 7.2 9 7.2 9 7.2 9 7.2
DRSM Works 300
cms 499 1.5 60 0.3 60 0.3 60 0.3 60 0.3 60 0.3
Water Harvesting
storage tanks
2 2.75 02 hac 5.5 1 2.75 1 2.75 - - - - - -
118
Table 6.4 Continue
S. No. P
rog
ram
me
Co
mp
on
en
t
Co
nst
itu
en
t C
D
Blo
ck
Forest
Range Activities
Nu
mb
er
Un
it C
ost
Are
a C
ov
ere
d
Am
ou
nt
Rs.
in
Lacs
1st yr 2nd yr 3rd yr 4th yr 5th yr
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
13
PM
KS
Y W
ate
r S
he
d
Te
eth
wa
l
Teethwal
Plantation/Fencing/
Pasture Dev. 20 ha 0.8 6000 rft 16 4 3.2 4 3.2 4 3.2 4 3.2 4 3.2
DRSM Works 200
cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2
Water Harvesting
storage tanks 2 2.75 02 ha 5.5 1 2.75 1 2.75 - - - - - -
14
Ke
ran
Keran
Plantation/Fencing/
Pasture Dev. 15 hac 0.8 4500 rft 12 3 2.4 3 2.4 3 2.4 3 2.4 3 2.4
DRSM Works 600
cms 499 3 120 0.6 120 0.6 120 0.6 120 0.6 120 0.6
Water Harvesting
storage tanks 3 2.75 02 ha 8.25 1 2.75 1 2.75 1 2.75 - - - -
Dug Wells 2 5 10 1 5 1 5 - - - - - -
Total 542
119
Table 6.5
BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT UNDER PMKSY DISTRICT KUPWARA
(Zangli Division)
Table 6.5 Continue..
S. No.
Pro
gram
me
Com
pone
nt
Con
stitu
ent
CD
Blo
ck
Forest Range Activities
Num
ber
Uni
t Cos
t
Are
a C
over
ed
Am
ount
Rs.
In
Lac
s
1
PM
KS
Y W
ater
She
d
Wav
oora
North Lolab Water Harvesting storage tanks 08 2.75 04 ha 22.00
Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00
DRSM Works 1200 cms 499 6.00
2 Sog
am South Lolab Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00
DRSM Works 800cms 499 4.00
Dug well 02 5.00 10.00
3
Mat
chil Matchill Range Water Harvesting storage tanks 04 2.75 02 ha 11.00
Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00
DRSM Works 600cms 499 3.00
Dug well 02 5.00 10.00
120
Table 6.5 Continue..
S. No.
Pro
gram
me
Com
pone
nt
Con
stitu
ent
CD
Blo
ck
Forest Range Activities
Num
ber
Uni
t Cos
t
Are
a C
over
ed
Am
ount
Rs.
In
Lac
s
4 Dru
gmul
lah Kupwara Water Harvesting storage tanks 04 2.75 02 ha 11.00
Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00
DRSM Works 800cms 499 4.00
Dug well 02 5.00 10.00
5
Han
dwar
a Kandi Plantation/Fencing/Pasture Dev. 20 ha 0.80 6000 rfts 16.00
DRSM Works 200 cms 499 1.00
Dug well 01 5.00 5.00
Total 369.00
121
Table 6.6
BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT UNDER PMKSY DISTRICT KUPWARA
(Langate Division)
Table 6.6 Continue …
S. No. Programme Component
Con
stitu
ent
CD
Blo
ck
Activities Number Unit Cost Area
Covered(Ha) Amount Rs. In
Lacs
1
PMKSY Watershed
Langate Crates Per crate 1000 300 70.00
Plantation of board leaved plants Nos. 247500 150 35.442
Fencing Rft 45000 150 82.80
Dug Wells Nos. 10 10 27.5
Nursery Formation Ha 01 2 2.74
122
Table 6.6 Continue …
S. No. Programme Component
Con
stitu
ent
CD
Blo
ck
Activities Number Unit Cost Area
Covered(Ha) Amount Rs. In
Lacs
2
PMKSY Watershed
Rajwar Soil Conservatiobn Works Per cum 1000 500 4.99
Crates Per crateNos.
500 300 35.00
Plantation of board leaved plants Nos. 330000 200 47.256
Plantation Conifer plants Nos. 33000 200 78.893
Fencing Rft 120000 400 220.8
Drianage system Nos, 03 2.35 4.70
Nursery Formation Ha. 01 2.00 2.74
Water lifting pump set Nos. 02 2.35 1.00
613.861
i
ACTION PLAN OF IRRIGATION SECTOR UNDER AIBP TAC 12 TH ONGOING SCHEMES DISTRICT KUPWARA (I&FC DIVISION, KUPWARA)
S. No.
Name of Block
Programme No. of Schemes
Nature of
Scheme
Balance Cost (Rs. In lacs)
Rs. in Lacs
2016-17 2017-18 2018-19
2019-20
2020-21
1. Trehgam AIBP TAC 12th
1 Gravity 685.5480 342.7740 342.7740 -- -- --
AIBP TAC 12th 1 Storage 10.0420 5.0210 5.0210 -- -- --
2. Kalroose AIBP TAC 12th
1 Gravity 519.9300 259.9650 259.9650 -- -- --
3. Wavoora AIBP TAC 12th 2 Gravity 466.0475 233.0238 233.0238 -- -- --
Total 5 1681.5675 840.7838 840.7838 -- -- --
123
Table 6.7
BLOCKWISE ACTION PLAN OF IRRRIGATION AND FLOOD CONT ROL
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Kralpora
Construction of Budnamal Khul 180 105 116 128 140.5 154.5 644
AIBP(PMKSY)
Construction of Zunreshi Khul 75 46 50.5 55.6 61 67.18 280.28
Construction of Kha.nabal Khul 70 36 39.6 43.6 48 52.68 219.88
Construction of Manchater Khul 40 23.5 25.85 28.4 31.3 34.07 143.12
1 Construction of Aloosa Khul & Aloosa Babapora Khul
120 75 82 91 100 109.6 457.6
Construction of Dardhari Khul 160 92 101 111 122 134 560
Construction of Kundwari Khul 230 103 113 124 137 149.93 626.93
Construction of Kuliwali Khul Farkin Khul
70 52.5 58 64 70 76 320.5
Construction of Farkin Khul 45 49 54 60 65 72 300
Construction of Murizal Khul 40 43 47 52 57 61 260
124
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Construction of Puthkah Khul 50 41 45 50 54 60 250
Construction of Gagal Khul 90 71.5 78.7 86.5 95.2 104.3 436.2
AIBP(PMKSY Keeran Bala khul 20 10 11 12 13 9 55
1 Keeran Payeen Khul 21 29 32 35 39 45 180
RRR (Har Khet Ko Pani)
Repair, restoration and reactivation of (1) Thandipora Storage Tank by way of Deeping ,Widening, construction of rock toe, inlet out chamber and spillway
45 19 21 23 25 27 115
RRR of Kumar Mohallah Storage Tank by way of Deepening, Widening, construction of rock toe, inletout chamber and spillway
47 20 22 24 26 28 120
RRR Muqam Storage Tank by way of deepening and construction of rock toe
37 16 17 19 21 23 96
RRR of Dardpora Kashmiri by way of deepening of spillway, rock toe and outlet system
45 20 22 24 26 28 120
125
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
RRR of Dardpora Storage Tank by way of deepening, construction of spillway rock toe and outlet
40 16 18 20 22 24 100
RRR of Doban Sar Katchama by way of deepening, construction of spillway, rock toe and outlet system
30 13 14.5 16 17.5 19 80
Kralpora
RRR of Singrisar Reshikah, Asthan Sar and Kanmar Storage Tank by way of deepening, Construction of spillway rock toe and outlet system at Reshigund, Kralpora
40 17 19 21 23 25 105
Lift Irrigation Reddi Chowkibal Lift Irrigation scheme
350 156 171 188 207 228 950 (Her Khet Ko Pani)
Total 0
AIBP (PMSKY) Glaster Khul Pushwari 120 57 62 68 75 83 345
Pazipora khul 135 64 70 77 85 94 390
Karihuma Khul 140 61 67 73 81 88 370
Dedikoot Khul 120 540 55 60 66 74 305
Grat Khul Kunan 95 57 63 69 76 85 350
Sangpeer Khul 85 49 54 59 65 73 300
Chakalwari Khul Gushi 120 60 67 73 81 89 370
126
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Zangli Khul 30 26 29 32 35 38 160
Gamadwari Khul 60 57 63 69 76 85 350
Dagwari Khul 130 57 63 69 76 85 350
Dal Khul 320 156 171 188 207 228 950
Mirnag Kanwal Khul 90 41 45 50 54 60 250
2 Kupwara Manchdar Mirnag Khul 85 36 40 44 48 52 220
Jugtiyal Mirnag Khul 80 34 38 41 46 51 210
Kathianwali Sangpeer Khul 40 25 27 30 33 35 150
Kashmiri Manigah 43 21 23 26 28 32 130
Karehenpora Manzhar 40 20 22 24 26 28 120
Glassdaji Khul 45 24 26 29 32 34 145
Gamadwari Khul Manzhar 35 15 16 18 20 21 90
Authwoth Khul 41 17 19 21 23 25 105
AIBP (PMSKY)
Construction of storage tank at Harden Batergam
60 25 27.5 30 33 34.5 150
Construction of Batrinar Batergam storage tank
45 25 27.5 30 33 34.5 150
AIBP Banda Khul/Dooniwari Khul 0
Constt. Of LIS kegam Kandi 0
127
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
RRR (Har Khet Ko Pani)
RRR of Branwari Storage Tank Kupwara by way of deepening, widening, construction of spillway and outlet chambers
70 29 32 35 38.5 40.5 175
Kupwara RRR of Sulkoot Storage Tank by way of Deepening, Widening, Construction of spillway and outlet chambers.
82 34 38 42 46 50 210
RRR of Halmathpora Storage tank by way of depening, widening, construction of spillway and outletchambers
65 28 31 34 37 40 170
RRR of Tikkerwari Khul 165 24.5 27.2 30 33 35 150
Her Khet Ko Pani Nagree storage tank 0
MGNREGS
Diselting of canals in distribution system
0
BAPD
Const. Of 12 Nos. St.tanks in Kandi area
0
3 Trehgam AIBP (PMKSY)
Construction of Zamidari Khul Zurthama & Chafran Khul Zurhama
160 118 130 143 157 172 720
Improvement in Pir Khul 160 106 117 129 142 156 650
Nagin Khul Doolipora 50 10 11 12 13 14 60
Brandoger Khul 150 100 110 120 131 139 600
128
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Chakalwari Khul Laderwan 150 25 27 30 33 35 150
Shalwari Khul Laderwan 70 46 50 55 61 69 281
Grat Khul Laderwan 65 25 28 30 34 37 154
Bagwari Laderwan 45 25 28 30 34 37 154
Chanwari Laderwan 35 14 15 17 19 20 815
Malwari Laderwan 40 32 35 39 42 47 195
Russan Khul Laderwan 60 42 46 51 56 60 255
War Mohallah Awoora Khul 55 25 27 30 33 35 150
Kawari Khul 90 74 81 89 98 108 450
Chadder Khul 70 41 45 50 54 60 250
Now KhulAwoora 65 25 27 30 33 35 150
Allachizab Khul 90 43 47 51 57 62 260
Pushwari Khul 65 26 29 32 35 38 160
Vash Khul Awoora 40 20 22 24 26 28 120
Payerpora Khul Gulgam 40 49 54 59 65 73 300
AIBP (PMKSY)
Construction of Ladewan Mane Mohallah storage tank
320 133.5 147 161.5 178 194 814
Construction of Hayan Dolipora storage tank
80 49 54 59 65 73 300
129
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Construction of Trehgam Dolipoora storage tank
75 34 38 41 46 51 210
RRR (Har Khet Ko Pani)
RRR of 5 Nos. Storage Tanks in Gulgam area by way of deepening, widening, spillway, and inlet and out chamber/rock toe and feeding channel/distribution system.
140 57 63 69 76 85 350
Trehgam RRR Laderwan Kawari Storage Tank by way of deepening, construction of spillway, rock toe and outlet system
30 12 13.5 15 16.5 18 75
RRR Kabamarg Storage Tank by way of deepening, construction of rock toe, spill way and inlet outlet chambers
25 11 12 13 14 15 65
3 Trehgam Lift Irrigation Hayan Chak Lift Irrigation Scheme 250 115 126 139 153 167 700
(Her Khet Gulgam Lift Irrigation Scheme 400 172 189 208 229 252 1050
4
AIBP (PMKSY)
Mancher Khul 220 113 125 137 151 164.78 690.78
Construction of Pahlihar Storage tank
150 61 67 74 82 91 375
Construction of Jindiyal Storage tank at Dardpora
130 53 58 64 71 79 325
4 RRR (Har Khet Ko RRR of Tangcheck Storage tank 18 8 9 10 11 11.93 49.93
130
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Pani) RRR of Batasar Storage tank 21 9.5 10.5 11.5 12.6 13.87 57.97
RRR of Kralsat Storage tank 16 7.3 8 8.8 9.7 10.68 44.48
RRR of Tulkhan Storage tank 20 9 10 11 12 13.82 55.82
RRR of Haksar Storage tank 35 16 17.7 19.5 21.5 23.45 98.15
RRR of Ganie Sar (A) Storage tank 35 15.3 16.85 18.5 20.4 22.36 93.41
RRR of Watel Sar Storage tank 21 9.5 10.5 11.5 12.65 13.94 58.09
RRR of Aram Sar Storage Tank 28 12 13 14.5 16 18.39 73.89
Sogam RRR of Nulsar Storage tank 35 15 17 18.7 20.6 23.02 94.32
RRR of Dedwari Storage Tank 25 11.5 12.6 13.9 15.3 16.81 70.11 RRR of Gujar Sar (A) Storage tank
Lassipora 40 18.5 20 22 25 27.37 112.87
RRR of Gujar Sar (A) Storage tank Lassipora
18 8.9 9.8 10.8 11.9 13.12 54.52
RRR of Roopisar Storage Tank 64 28.5 31 34.5 38 41.69 173.69 RRR of Ganisar (B) Storage tank 62 27 29.6 32.6 36 39.09 164.29 RRR of Hayatpora Sar (A) Storage
Tank 70 31 34 37 41.5 46.48 189.98
RRR of Pir Sar Storage tank 27 12 13 14.5 16 17.39 72.89
131
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
4 Sogam
Lift Irrigation Mirgi Devsar LIS 150 61 68 74 82 90 375
(Her Khet Khan Chak Tekkipora LIS 150 61 68 74 82 90 375
Gundmancher LIS 120 52 58 63 70 77 320
Dardpora LIS 135 57 63 69 76 85 350
AIPB Maidanpora Khul 220 118 130 143 157 172 720
(PMKSY) Gagal Khul (Lolab) 350 170 187 205 226 248 1036
Sewer Harden Khul 320 160 176 194 213 235 978
Warnw Offen Khul 310 165 182 200 220 242.83 1009.83
Construction of Budnar storage tank 90 41 45 50 55 59 250
Construction of single Bagh storage
tank 85 36 39 43 48 54 220
Construction of Maidanpora storage
tank 75 31 34 37 42 46 190
Wavoora Construction of Nagbal storage tank 70 29 32 35 38 41 175
5 RRR(Har Khet Ko
Pani) RRR of Putshahi storage tank 25 12 13 14 15 17.87 71.98
RRR of Sever Dara storage tank 28 12 13 14 16 17.66 72.66
132
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Lift Irrigation (Har Khet Ko Pani)
Lift Irrigation Scheme Surigam 160 131 144 159 175 191 800
Kanthpora LIS 145 90 99 109 120 132 550
Mujdaji Khul 200 182..00 200 220 242 264 1108
Mooori Khul 190 262 289 318 349 383 1601
Bandi Khul 250 205 225 248 273 299 1250
Nagsari Khul 90 74 81 90 98 107 450
Sarkuli Khul 105 128 141 155 170 186 780
Nunwani Khul 100 64 70 77 85 94 390
AIBP Jhayan Khul 105 85 94 103 113 125 520
Kalaroose (PMKSY) Chalandari Khul 85 82 90 99 109 120 500
6 Thayan Khul 150 89 98 108 118 128 541
Ringbala Khul 30 20 22 24 26 28 120
Khanbasti Khul 25 16 17 19 21 22 95
Urni Khul 15 11 12.5 14 15.5 17 70
Dapal Khul 17 11 12.5 14 15.5 17 70
Pushwari Khul 40 24 27 30 33 34 150
RRR(Har Khet Ko Pani)
Babagaffar Storage tank 20 9 10 11.5 12.5 14.43 57.43
133
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
AIBP Lontha Kandi Khul 46 15 15 15 15 15 75
(PMKSY) Shamaspora Khul 66 14 14 14 14 14 70
7 Tangdhar Upper Nachiyan Khul 77 40 40 40 40 40 200
Terboni Chanipora Khul 85 13 13 13 13 13 65
Khaitan Khul 44 15.296 15.296 15.296 15.296 15.296 76.48
Shamsporra Gomal khul 80 15.2 15.2 15.2 15.2 15.2 76
Razwar khul 225 15 15 15 15 15 75
Khowarpora Khul 35 6 6 6 6 6 30
0 0 0 0 0 0
7 Tangdhar State Irrigation Deptt.
Gomal Tangdhar Khul 0 0 0 0 0 0
Kandhi Khul 60 0 0 0 0 0 0
8 Teethwal
AIBP Dringla Khul 78 15 15 15 15 15 75
(PMKSY) Qazinag Khul 57 14 14 14 14 14 70
Shazbani Khul 171 40 40 40 40 40 200
Chatkabi Khul 77 13 13 13 13 13 65
Bhaderkote Khul 35 15.296 15.296 15.296 15.296 15.296 76.48
Dhani Khul 61 15.2 15.2 15.2 15.2 15.2 76
Mudhiyan Khul 20 15 15 15 15 15 75
Tadd Kundian Khul 30 6 6 6 6 6 30
134
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Lift Irrigation (Har Khet Ko Pani)
Lift Irrigation Scheme Sudpora 330 79.8 79.8 79.8 79.8 79.8 399
9 Langate
AIBP Nowgam Shrihama Gama Khul 132 42.238 42.238 42.238 42.238 42.238 211.19
(PMKSY) Kutlari to Kharpora Khul 178 57.106 57.106 57.106 57.106 57.106 285.53
3 Nos. Khuls in middle Qaziabad 183 58.608 58.608 58.608 58.608 58.608 293.04
3 Nos Khuls in Lower Qariabad 178 57.2 57.2 57.2 57.2 57.2 286
Khani Khul Langate 313 100.3 100.3 100.3 100.3 100.3 501.5
3 Nos. Khuls in Upper Qaziabad 393 126 126 126 126 126 630
3 Nos. Khuls Rang path Doggerpora & Gore Khul
183 58.762 58.762 58.762 58.762 58.762 293.81
Wahipora Haripora & Khanoo Khul 218 69.788 69.788 69.788 69.788 69.788 348.94
Grate Khul, Banger Khul & Shartvan Khul
136 43.65 43.65 43.65 43.65 43.65 218.25
Chek Tulwari Khul & Shartgund Bala Khul
156 49.974 49.974 49.974 49.974 49.974 249.87
0 0 0 0 0 0
Loolipora Khul 178 56.956 56.956 56.956 56.956 56.956 284.78
Haril Sheikhpora Khul 151 48.498 48.498 48.498 48.498 48.498 242.49
Juhama Grate Khul 137 43.976 43.976 43.976 43.976 43.976 219.88
Shirhama Bare Khul 167 53.574 53.574 53.574 53.574 53.574 267.87
135
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Drungsu to Prungu Khul 180 57.89 57.89 57.89 57.89 57.89 289.45
Langate Const. Of Wahipora Haripora LIS 281 90 90 90 90 90 450
Const. Of Unisoo LIS 326 110 110 110 110 110 550
RRR(Har Khet Ko Pani) Palpora storage tank 63 20.108 20.108 20.108 20.108 20.108 100.54
Mushnar storage tank 82 26.434 26.434 26.434 26.434 26.434 132.17
MGNREGS
Desalting of canals in Distribution system
10.8 10.8 10.8 10.8 10.8 54
AIBP Const. Of LIS Wadipora 50 10.774 10.774 10.774 10.774 10.774 53.87
(PMKSY) Zachaldara Khul 200 51.772 51.772 51.772 51.772 51.772 258.86
Const. Of 4 Nos. Storage tanks in
Bakhiakar area 320 80.112 80.112 80.112 80.112 80.112 400.56
Const. Of 3 Nos. Storage tank in
Khaipora area 320 94.646 94.646 94.646 94.646 94.646 473.23
Batkoot Khul 60 21.04 21.04 21.04 21.04 21.04 105.2
Chalpora Wadipora Khul 150 29.1 29.1 29.1 29.1 29.1 145.5
Rajwar Chandari Khul 150 41.24 41.24 41.24 41.24 41.24 206.2
10
Const. Of LIS Badkoot 60 50 50 50 50 50 250
Const. Of LIS Rutum star 50 90 90 90 90 90 450
136
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
RRR(Har Khet Ko Pani)
Reshinar Storage Tank 149 75 75 75 75 75 375
Gujarnar Storage tank 80 18.1 18.1 18.1 18.1 18.1 90.5
Kathinar storage tank 130 22.1 22.1 22.1 22.1 22.1 110.5
Machiora storage tank 50 16 16 16 16 16 80
Nagranar storage tank 75 15.9 15.9 15.9 15.9 15.9 79.5
0
0 0 0
0 0
0 0
0 0 0
Rajwar
Nowdager storage tank 75 10.06 10.06 10.06 10.06 10.06 50.3
Voghabal storage tank 75 12.1 12.1 12.1 12.1 12.1 60.5
Googi waskoora storage tank 115 20.44 20.44 20.44 20.44 20.44 102.2
Latishat Minor 100 30.04 30.04 30.04 30.04 30.04 150.2
Sagipora Minor 150 42.04 42.04 42.04 42.04 42.04 210.2
Harwon Minor 150 41 41 41 41 41 205
BAPD (Ongoing Schemes)
Const. Of Brinal storage tank 370 80 80 80 80 80 400
Const. Of 13 Nos. Storage tanks in Rajwar area
620 175.4 175.4 175.4 175.4 175.4 877
MGNREGS Diselting of canals in distribution system
10.8 10.8 10.8 10.8 10.8 54
11 Ramhall AIBP (PMSKY) Kanihama Khul 674.4 123.28 123.28 123.28 123.28 123.28 616.4
Kukroosa Khul 390.6 43.04 43.04 43.04 43.04 43.04 215.2
137
Table 6.7 Continue…
S. No
Name of the Block
Programme Component Name of the Scheme/ Activity
Com
man
d A
rea
/ Ir
rigat
ion
Pot
entia
l (H
a.) Period of Implementation
Estt. Cost
(Rs. In Lacs)
2016
- 1
7
2017
- 1
8
2018
– 1
9
2019
- 2
0
2020
- 2
1
Neelpora Khanpora Khul 157.36 36.516 36.516 36.516 36.516 36.516 182.58
Dahama Khul 337.2 64.1 64.1 64.1 64.1 64.1 320.5
Wapazawani Khul 112.4 51.59 51.59 51.59 51.59 51.59 257.95
Chamb Khul 382.16 49.05 49.05 49.05 49.05 49.05 245.25
Her Khet Ko Pani Const. Of Tumpora LIS 134.88 49.56 49.56 49.56 49.56 49.56 247.8
RRR Sherkoot storage tank 59 18 18 18 18 18 90
MGNREGS Diselting of canals in distribution system
5.52 5.52 5.52 5.52 5.52 27.6
55608.47
138
Table 6.8
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
1.
Lan
ga
te
Pe
r D
rop
Mo
re C
rop
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore
well)
No’s 85 212.50 340.00 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 85 212.50 340.00 12.14
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 115 46.00 57.50 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 115 46.00 57.50 16.43
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set)
No’s 135 0.00 33.75 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 135 0.00 33.75 19.29
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac)
No’s 120 0.00 180.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 120 0.00 180.00 17.14
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 500 0.00 750.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 500 0.00 750.00 71.43
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s 10 0.00 5.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 10 0.00 5.00 1.43
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s 350 175.00 175.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 350 175.00 175.00 50.00
Total 1315 433.50 1541.25 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 1315 433.50 1541.25 187.86
139
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
2.
Ra
mh
all
Pe
r D
rop
Mo
re C
rop
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore
well)
No’s 40 100.00 160.00 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 40 100.00 160.00 5.71
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 100 40.00 50.00 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 100 40.00 50.00 14.29
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
300 0.00 75.00 42.86 0.00 42.86 0.00 42.86 0.00 42.86 0.00 42.86 0.00 300 0.00 75.00 42.86
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
75 0.00 112.50 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 75 0.00 112.50 10.71
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 90 0.00 135.00 12.86 0.00 12.86 0.00 12.86 0.00 12.86 0.00 12.86 0.00 90 0.00 135.00 12.86
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
150 0.00 75.00 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 150 0.00 75.00 21.43
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
200 100.00 100.00 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 200 100.00 100.00 28.57
Total 955 240.00 707.50 136.43 34.29 136.43 34.29 136.43 34.29 136.43 34.29 136.43 34.29 955 240.00 707.50 136.43
140
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
3.
Ku
pw
ara
Pe
r D
rop
Mo
re C
rop
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore
well)
No’s 40 100.00 160.00 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 40 100.00 160.00 5.71
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 100 40.00 50.00 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 100 40.00 50.00 14.29
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
150 0.00 37.50 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 150 0.00 37.50 21.43
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
50 0.00 75.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 75.00 7.14
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 50 0.00 75.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 75.00 7.14
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
80 0.00 40.00 11.43 0.00 11.43 0.00 11.43 0.00 11.43 0.00 11.43 0.00 80 0.00 40.00 11.43
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
200 100.00 100.00 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 200 100.00 100.00 28.57
Total
670 240.00 537.50 95.71 34.29 95.71 34.29 95.71 34.29 95.71 34.29 95.71 34.29 670 240.00 537.50 95.71
141
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
4.
Tre
hg
am
,
Pe
r D
rop
Mo
re C
rop
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore
well)
No’s 25 62.50 100.00 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 25 62.50 100.00 3.57
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 50 20.00 25.00 7.14 2.86 7.14 2.86 7.14 2.86 7.14 2.86 7.14 2.86 50 20.00 25.00 7.14
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
125 0.00 31.25 17.86 0.00 17.86 0.00 17.86 0.00 17.86 0.00 17.86 0.00 125 0.00 31.25 17.86
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
60 0.00 90.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 90.00 8.57
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 60 0.00 90.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 90.00 8.57
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
65 0.00 32.50 9.29 0.00 9.29 0.00 9.29 0.00 9.29 0.00 9.29 0.00 65 0.00 32.50 9.29
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
180 90.00 90.00 25.71 12.86 25.71 12.86 25.71 12.86 25.71 12.86 25.71 12.86 180 90.00 90.00 25.71
Total
565 172.50 458.75 80.71 24.64 80.71 24.64 80.71 24.64 80.71 24.64 80.71 24.64 565 172.50 458.75 80.71
5.
Kra
l
po
ra
P e Deep Bore well (@ 2.5 (@Rs.4.00
Lacs/Bore No’s 20 50.00 80.00 2.86 7.14 2.86 7.14 2.86 7.14 2.86 7.14 2.86 7.14 20 50.00 80.00 2.86
142
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
ha/B.W) well)
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 40 16.00 20.00 5.71 2.29 5.71 2.29 5.71 2.29 5.71 2.29 5.71 2.29 40 16.00 20.00 5.71
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
100 0.00 25.00 14.29 0.00 14.29 0.00 14.29 0.00 14.29 0.00 14.29 0.00 100 0.00 25.00 14.29
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
50 0.00 75.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 75.00 7.14
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s
40 0.00 60.00 5.71 0.00 5.71 0.00 5.71 0.00 5.71 0.00 5.71 0.00 40 0.00 60.00 5.71
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
150 75.00 75.00 21.43 10.71 21.43 10.71 21.43 10.71 21.43 10.71 21.43 10.71 150 75.00 75.00 21.43
Total 460 141.00 365.00 65.71 20.14 65.71 20.14 65.71 20.14 65.71 20.14 65.71 20.14 460 141.00 365.00 65.71
6. lar
oo P e Deep Bore well (@ 2.5 (@Rs.4.00 No’s 10 25.00 40.00 1.43 3.57 1.43 3.57 1.43 3.57 1.43 3.57 1.43 3.57 10 25.00 40.00 1.43
143
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
ha/B.W) Lacs/Bore
well)
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 30 12.00 15.00 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 30 12.00 15.00 4.29
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
50 0.00 12.50 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 12.50 7.14
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
10 0.00 15.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 10 0.00 15.00 1.43
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 20 0.00 30.00 2.86 0.00 2.86 0.00 2.86 0.00 2.86 0.00 2.86 0.00 20 0.00 30.00 2.86
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
25 0.00 12.50 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 25 0.00 12.50 3.57
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
60 30.00 30.00 8.57 4.29 8.57 4.29 8.57 4.29 8.57 4.29 8.57 4.29 60 30.00 30.00 8.57
Total 205 67.00 155.00 29.29 9.57 29.29 9.57 29.29 9.57 29.29 9.57 29.29 9.57 205 67.00 155.00 29.29
7.
Wa
v
oo
ra
P e Deep Bore well (@ 2.5 (@Rs.4.00
Lacs/Bore No’s 25 62.50 100.00 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 25 62.50 100.00 3.57
144
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
ha/B.W) well)
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 30 12.00 15.00 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 30 12.00 15.00 4.29
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
75 0.00 18.75 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 75 0.00 18.75 10.71
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
25 0.00 37.50 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 25 0.00 37.50 3.57
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 30 0.00 45.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 30 0.00 45.00 4.29
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
100 50.00 50.00 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 100 50.00 50.00 14.29
Total 345 124.50 296.25 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 345 124.50 296.25 49.29
8.
So
ga
m
Pe r
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore No’s
25 62.50 100.00 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 25 62.50 100.00 3.57
145
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
well)
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 30 12.00 15.00 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 30 12.00 15.00 4.29
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
75 0.00 18.75 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 75 0.00 18.75 10.71
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
25 0.00 37.50 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 25 0.00 37.50 3.57
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 30 0.00 45.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 30 0.00 45.00 4.29
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
100 50.00 50.00 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 100 50.00 50.00 14.29
Total 345 124.50 296.25 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 345 124.50 296.25 49.29
9.
Ta
ng
d
ar
Pe
r
Dro
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore
well)
No’s 5 12.50 20.00 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 5 12.50 20.00 0.71
146
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 20 8.00 10.00 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 20 8.00 10.00 2.86
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
60 0.00 15.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 15.00 8.57
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
15 0.00 22.50 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 15 0.00 22.50 2.14
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 18 0.00 27.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 18 0.00 27.00 2.57
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
30 15.00 15.00 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 30 15.00 15.00 4.29
Total 208 35.50 139.50 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 208 35.50 139.50 29.71
10.
Te
eth
wa
l P
er
Dro
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore
well)
No’s 5 12.50 20.00 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 5 12.50 20.00 0.71
147
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 20 8.00 10.00 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 20 8.00 10.00 2.86
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
60 0.00 15.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 15.00 8.57
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
15 0.00 22.50 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 15 0.00 22.50 2.14
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 18 0.00 27.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 18 0.00 27.00 2.57
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
30 15.00 15.00 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 30 15.00 15.00 4.29
Total 208 35.50 139.50 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 208 35.50 139.50 29.71
11.
Ra
jwa
r
Pe
r
Dro
Deep Bore well (@ 2.5
ha/B.W)
(@Rs.4.00
Lacs/Bore
well)
No’s 85 212.50 340.00 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 85 212.50 340.00 12.14
148
BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)
S.
No
.
Blo
ck
Co
mp
on
en
t
Activity Rate of
Assistance Unit
To
tal
(No
’s)
Command/
Irrigation
potential
(ha) Est
ima
ted
cost
(R
s. i
n
lacs
) 1st year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
6th
year
2021-22
7th
year
2022-23
Dug well / open wells
ha (@0.4 ha/D.W.)
(@Rs.0.50
Lacs/Dug
well)
No’s 115 46.00 57.50 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 115 46.00 57.50 16.43
Portable irrigation
pump sets
(@Rs.0.25
Lacs/ set) No’s
135 0 33.75 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00
Non DPAP Drip
(Irrigated)
(@Rs.1.5
Lacs/Hac) No’s
120 0 180 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00
DPAP Drip (Rain-fed) (@Rs.1.5
Lacs/hac) No’s 500 0 750 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00
Irrigation pump sets
with discharge capacity
of 5 lac litters / hour
including water carriage
/ Distribution pipes
(@Rs.0.50
Lacs/set) No’s
10 0 5 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00
Secondary Storage * in
convergence with
MGNREGS 60% material
cost. 3mx 3mx1.5m
Storage Tanks
ha@(0.5/ha
(@Rs.0.50
Lacs/tank) No’s
350 175 175 5.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00
Total
1315 433.5 1541.25 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93
G. Total
6177.75
149
Table 6.9 BLOCK-WISE ACTION PLAN OF DEPARTMENT OF RURAL DEVEL OPMENT
DISTRICT KUPWARA UNDER PMKSY “MGNREGS”
Table 6.9 Continue…
S. N
o.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1. Kupwara
PM
KS
Y M
GN
RE
GS
MoRD a) Farm Bunds Cub Mtr. 310 155 0.8 248 62 49.6 62 49.6 62 49.6 62 49.6 62 49.6 b) Nallahs Bunds Cub Mtr. 420 424.2 1 420 84 84 84 84 84 84 84 84 84 84
c) Other ground water recharges Structure
Cub Mtr. 36 5.7 0.1 3.6 7.2 0.72 7.2 0.72 7.2 0.72 7.2 0.72 7.2 0.72
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 21 80.6 1 21 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2
e) Water Conservation
Cub Mtr. 43 1.6 0.7 30.1 8.6 6.02 8.6 6.02 8.6 6.02 8.6 6.02 8.6 6.02
f) Water Harvesting
Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4
g) Creation of irrigation canal and drains
Mtrs. 42 117.6 1.2 50.4 8.4 10.08 8.4 10.08 8.4 10.08 8.4 10.08 8.4 10.08
h) Land Development
HA 70 39.2 1 70 14 14 14 14 14 14 14 14 14 14
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 25 43.8 0.5 12.5 5 2.5 5 2.5 5 2.5 5 2.5 5 2.5
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 23 79.6 0.4 9.2 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84
Total 1015 983.3 884.8 203 176.96 203 176.96 203 176.96 203 176.96 203 176.96
150
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
2. Kalaroos
PM
KS
Y M
GN
RE
GS
MoRD a) Farm Bunds Cub Mtr. 320 160 0.8 256 64 51.2 64 51.2 64 51.2 64 51.2 64 51.2 b) Nallahs Bunds Cub Mtr. 73 73.7 1 73 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6
c) Other ground water recharges Structure
Cub Mtr. 80 12.7 0.1 8 16 1.6 16 1.6 16 1.6 16 1.6 16 1.6
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 8 30.7 1 8 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
e) Water Conservation
Cub Mtr. 65 2.4 0.7 45.5 13 9.1 13 9.1 13 9.1 13 9.1 13 9.1
f) Water Harvesting
Cub Mtr. 37 53.3 0.8 29.6 7.4 5.92 7.4 5.92 7.4 5.92 7.4 5.92 7.4 5.92
g) Creation of irrigation canal and drains
Mtrs. 35 98 1.2 42 7 8.4 7 8.4 7 8.4 7 8.4 7 8.4
h) Land Development
HA 75 42 1 75 15 15 15 15 15 15 15 15 15 15
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 32 56 0.5 16 6.4 3.2 6.4 3.2 6.4 3.2 6.4 3.2 6.4 3.2
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 23 79.6 0.4 9.2 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84
Total 748 608.4 562.3
151
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
3. Trehgam P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 90 45 0.8 72 18 14.4 18 14.4 18 14.4 18 14.4 18 14.4 b) Nallahs Bunds Cub Mtr. 180 181.8 1 180 36 36 36 36 36 36 36 36 36 36
c) Other ground water recharges Structure
Cub Mtr. 22 3.5 0.1 2.2 4.4 0.44 4.4 0.44 4.4 0.44 4.4 0.44 4.4 0.44
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 8 30.7 1 8 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
e) Water Conservation
Cub Mtr. 44 1.6 0.7 30.8 8.8 6.16 8.8 6.16 8.8 6.16 8.8 6.16 8.8 6.16
f) Water Harvesting
Cub Mtr. 32 46.1 0.8 25.6 6.4 5.12 6.4 5.12 6.4 5.12 6.4 5.12 6.4 5.12
g) Creation of irrigation canal and drains
Mtrs. 22 61.6 1.2 26.4 4.4 5.28 4.4 5.28 4.4 5.28 4.4 5.28 4.4 5.28
h) Land Development
HA 64 35.8 1 64 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 12 21 0.5 6 2.4 1.2 2.4 1.2 2.4 1.2 2.4 1.2 2.4 1.2
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 14 48.4 0.4 5.6 2.8 1.12 2.8 1.12 2.8 1.12 2.8 1.12 2.8 1.12
Total 488 475.5 420.6
152
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
4. Kralpora P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 210 105 0.8 168 42 33.6 42 33.6 42 33.6 42 33.6 42 33.6 b) Nallahs Bunds Cub Mtr. 150 151.5 1 150 30 30 30 30 30 30 30 30 30 30
c) Other ground water recharges Structure
Cub Mtr. 35 5.6 0.1 3.5 7 0.7 7 0.7 7 0.7 7 0.7 7 0.7
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 20 76.8 1 20 4 4 4 4 4 4 4 4 4 4
e) Water Conservation
Cub Mtr. 30 1.1 0.7 21 6 4.2 6 4.2 6 4.2 6 4.2 6 4.2
f) Water Harvesting
Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4
g) Creation of irrigation canal and drains
Mtrs. 18 50.4 1.2 21.6 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32
h) Land Development
HA 56 31.4 1 56 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 17 58.8 0.4 6.8 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36
Total 582 553.4 477.4
153
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
5. Ramhal P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 80 40 0.8 64 16 12.8 16 12.8 16 12.8 16 12.8 16 12.8 b) Nallahs Bunds Cub Mtr. 132 133.3 1 132 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4
c) Other ground water recharges Structure
Cub Mtr. 23 3.7 0.1 2.3 4.6 0.46 4.6 0.46 4.6 0.46 4.6 0.46 4.6 0.46
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 8 30.7 1 8 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
e) Water Conservation
Cub Mtr. 23 0.9 0.7 16.1 4.6 3.22 4.6 3.22 4.6 3.22 4.6 3.22 4.6 3.22
f) Water Harvesting
Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4
g) Creation of irrigation canal and drains
Mtrs. 21 58.8 1.2 25.2 4.2 5.04 4.2 5.04 4.2 5.04 4.2 5.04 4.2 5.04
h) Land Development
HA 62 34.7 1 62 12.4 12.4 12.4 12.4 12.4 12.4 12.4 12.4 12.4 12.4
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 18 31.5 0.5 9 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 10 34.6 0.4 4 2 0.8 2 0.8 2 0.8 2 0.8 2 0.8
Total 402 404.2 342.6
154
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
6. Langate P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 85 42.5 0.8 68 17 13.6 17 13.6 17 13.6 17 13.6 17 13.6 b) Nallahs Bunds Cub Mtr. 110 111.1 1 110 22 22 22 22 22 22 22 22 22 22
c) Other ground water recharges Structure
Cub Mtr. 20 3.2 0.1 2 4 0.4 4 0.4 4 0.4 4 0.4 4 0.4
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 10 38.4 1 10 2 2 2 2 2 2 2 2 2 2
e) Water Conservation
Cub Mtr. 18 0.7 0.7 12.6 3.6 2.52 3.6 2.52 3.6 2.52 3.6 2.52 3.6 2.52
f) Water Harvesting
Cub Mtr. 19 27.4 0.8 15.2 3.8 3.04 3.8 3.04 3.8 3.04 3.8 3.04 3.8 3.04
g) Creation of irrigation canal and drains
Mtrs. 15 42 1.2 18 3 3.6 3 3.6 3 3.6 3 3.6 3 3.6
h) Land Development
HA 40 22.4 1 40 8 8 8 8 8 8 8 8 8 8
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 18 31.5 0.5 9 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2
Total 350 371.1 290.8
155
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
7. Rajwar P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 90 45 0.8 72 18 14.4 18 14.4 18 14.4 18 14.4 18 14.4 b) Nallahs Bunds Cub Mtr. 130 131.3 1 130 26 26 26 26 26 26 26 26 26 26
c) Other ground water recharges Structure
Cub Mtr. 20 3.2 0.1 2 4 0.4 4 0.4 4 0.4 4 0.4 4 0.4
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 10 38.4 1 10 2 2 2 2 2 2 2 2 2 2
e) Water Conservation
Cub Mtr. 32 1.2 0.7 22.4 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48
f) Water Harvesting
Cub Mtr. 28 40.3 0.8 22.4 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48
g) Creation of irrigation canal and drains
Mtrs. 15 42 1.2 18 3 3.6 3 3.6 3 3.6 3 3.6 3 3.6
h) Land Development
HA 55 30.8 1 55 11 11 11 11 11 11 11 11 11 11
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2
Total 416 420.9 348.3
156
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
8. Sogam P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 90 45 0.8 72 18 14.4 18 14.4 18 14.4 18 14.4 18 14.4 b) Nallahs Bunds Cub Mtr. 130 131.3 1 130 26 26 26 26 26 26 26 26 26 26
c) Other ground water recharges Structure
Cub Mtr. 20 3.2 0.1 2 4 0.4 4 0.4 4 0.4 4 0.4 4 0.4
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 10 38.4 1 10 2 2 2 2 2 2 2 2 2 2
e) Water Conservation
Cub Mtr. 32 1.2 0.7 22.4 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48
f) Water Harvesting
Cub Mtr. 28 40.3 0.8 22.4 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48
g) Creation of irrigation canal and drains
Mtrs. 15 42 1.2 18 3 3.6 3 3.6 3 3.6 3 3.6 3 3.6
h) Land Development
HA 55 30.8 1 55 11 11 11 11 11 11 11 11 11 11
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2
Total 416 420.9 348.3
157
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
9. Tangdar P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 82 41 0.8 65.6 16.4 13.12 16.4 13.12 16.4 13.12 16.4 13.12 16.4 13.12 b) Nallahs Bunds Cub Mtr. 120 121.2 1 120 24 24 24 24 24 24 24 24 24 24
c) Other ground water recharges Structure
Cub Mtr. 18 2.9 0.1 1.8 3.6 0.36 3.6 0.36 3.6 0.36 3.6 0.36 3.6 0.36
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 0 0 1 0 0 0 0 0 0 0 0 0 0 0
e) Water Conservation
Cub Mtr. 21 0.8 0.7 14.7 4.2 2.94 4.2 2.94 4.2 2.94 4.2 2.94 4.2 2.94
f) Water Harvesting
Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4
g) Creation of irrigation canal and drains
Mtrs. 12 33.6 1.2 14.4 2.4 2.88 2.4 2.88 2.4 2.88 2.4 2.88 2.4 2.88
h) Land Development
HA 54 30.2 1 54 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 18 31.5 0.5 9 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2
Total 365 349.1 305.5
158
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
10. Teetwal P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 30 15 0.8 24 6 4.8 6 4.8 6 4.8 6 4.8 6 4.8 b) Nallahs Bunds Cub Mtr. 14 14.1 1 14 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8
c) Other ground water recharges Structure
Cub Mtr. 15 2.4 0.1 1.5 3 0.3 3 0.3 3 0.3 3 0.3 3 0.3
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 6 23 1 6 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2
e) Water Conservation
Cub Mtr. 15 0.6 0.7 10.5 3 2.1 3 2.1 3 2.1 3 2.1 3 2.1
f) Water Harvesting
Cub Mtr. 21 30.2 0.8 16.8 4.2 3.36 4.2 3.36 4.2 3.36 4.2 3.36 4.2 3.36
g) Creation of irrigation canal and drains
Mtrs. 13 36.4 1.2 15.6 2.6 3.12 2.6 3.12 2.6 3.12 2.6 3.12 2.6 3.12
h) Land Development
HA 30 16.8 1 30 6 6 6 6 6 6 6 6 6 6
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 20 35 0.5 10 4 2 4 2 4 2 4 2 4 2
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 13 45 0.4 5.2 2.6 1.04 2.6 1.04 2.6 1.04 2.6 1.04 2.6 1.04
Total 177 218.5 133.6
159
Table 6.9 Continue… S
. No.
Name of Block
Pro
gram
me
Com
pone
nt
Con
cern
ed
Min
istr
y
Activities Unit Target
in (No’s)
Proposed Area
Coverage (Ha)
Unit Cost (Per
Ha./ in Lacs) E
stim
ated
C
ost
(in la
cs)
Period of Implantation
1st
year
2016-17
2nd
year
2017-18
3rd
year
2018-19
4th
year
2019-20
5th
year
2020-21
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
11. Wavoora P
MK
SY
MG
NR
EG
S
MoRD a) Farm Bunds Cub Mtr. 210 105 0.8 168 42 33.6 42 33.6 42 33.6 42 33.6 42 33.6 b) Nallahs Bunds Cub Mtr. 150 151.5 1 150 30 30 30 30 30 30 30 30 30 30
c) Other ground water recharges Structure
Cub Mtr. 35 5.6 0.1 3.5 7 0.7 7 0.7 7 0.7 7 0.7 7 0.7
d) Fishery Pondss/ Cattle Ponds
Cub Mtr. 20 76.8 1 20 4 4 4 4 4 4 4 4 4 4
e) Water Conservation
Cub Mtr. 30 1.1 0.7 21 6 4.2 6 4.2 6 4.2 6 4.2 6 4.2
f) Water Harvesting
Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4
g) Creation of irrigation canal and drains
Mtrs. 18 50.4 1.2 21.6 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32
h) Land Development
HA 56 31.4 1 56 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2
i)
Renovation of Water Bodies including desalting.
Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1
j)
Renovation & Maintenance of Irrigation Canals
Cub Mtr. 17 58.8 0.4 6.8 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36
Total 582 553.4 477.4
G. Total 6674.1
160
Table 6.10
BLOCKWISE ACTION PLAN OF IWMP OF DISTRICT KUPWARA U NDER PMKSY
Table 6.10 Continue…
S. No.
Name of the Block Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
1. Langate NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 507 507 28.05 1 Staggered Contour Trenches/ Terracing
404 404 28.05 2
Nalla Bunds RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
268 268 7.28 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
233 233 28.05 3
Irrigation Drains 12 12 1155 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
1351 1351 36.49 2
Construction of harvesting structures
1202 1202 36.49 3
Total 4237 4237 1333.98
161
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
2. Sogam NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 207 207 11.45 1 Staggered Contour Trenches/ Terracing
165 165 11.45 2
Groundwater Recharge Structure
15 15 22.87 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
105 105 2.85 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Soil and water conservation structures
869 869 46.88 2
Water harvesting structures
95 95 11.45 3
RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
519 519 14.03 2
Construction of harvesting structures 462 462 14.03 3
Total
2437 2437 135.01
162
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
3. Ramhall NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 327 327 18.12 1 Staggered Contour Trenches/ Terracing
261 261 18.12 2
Groundwater Recharge Structure
21 21 36.9 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
166 166 4.52 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
203 203 24.41 3
Irrigation Drains 8 8 7.17 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
839 839 22.64 2
Construction of harvesting structures
746 746 22.64 3
Total 2571 2571 154.52
163
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
4. Trehgam NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 260 260 14.38 1 Staggered Contour Trenches/ Terracing
207 207 14.38 2
Groundwater Recharge Structure
18 18 28.72 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
132 132 3.59 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
115 115 13.81 3
Irrigation Drains 6 6 5.69 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
665 665 17.97 3
Construction of harvesting structures
592 592 17.97 3
Total
1995 1995 121.18
164
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
5. Rajwar NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 507 507 28.05 1 Staggered Contour Trenches/ Terracing
404 404 28.05 2
Groundwater Recharge Structure
36 36 58.31 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
268 268 7.28 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
233 233 28.05 3
Irrigation Drains 12 12 11.55 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
1351 1351 36.49 2
Construction of harvesting structures
1202 1202 36.49 3
Total
4013 4013 234.27
165
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
6. Wavoora NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 222 222 1231 1 Staggered Contour Trenches/ Terracing
177 177 12.13 2
Groundwater Recharge Structure
16 16 24.54 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
113 113 3.07 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
98 98 11.83 3
Irrigation Drains 12 12 4.87 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
570 570 15.39 2
Construction of harvesting structures
507 507 15.39 3
Total
1715 1715 1318.22
166
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
7. Tangdar NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 192 192 10.99 1 Staggered Contour Trenches/ Terracing
158 158 10.99 2
Groundwater Recharge Structure
5 5 7.91 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
220 220 5.98 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
587 587 7.05 3
Irrigation Drains 46 46 4.49 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
360 360 9.98 2
Construction of harvesting structures
658 658 19.98 3
Total
2226 2226 77.37
167
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
8. Teetwal NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 352 352 13.99 1 Staggered Contour Trenches/ Terracing
391 391 13.99 2
Groundwater Recharge Structure
5 5 7.91 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
220 220 5.98 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
708 708 38.17 3
Irrigation Drains 46 46 4.49 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
360 360 9.98 2
Construction of harvesting structures
658 658 19.98 3
Total
2740 2740 114.49
168
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
9. Kalaroos NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 350 350 28.05 1 Staggered Contour Trenches/ Terracing
281 281 10.99 2
Groundwater Recharge Structure
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
268 268 7.28 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
410 410 17.55 3
Irrigation Drains 29 29 8.02 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
351 351 36.49 2
Construction of harvesting structures 855 855 28.23 3
Total
2585 2585 169.86
169
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
10.
Kupwara NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 433 433 23.99 1 Staggered Contour Trenches/ Terracing
345 345 23.99 2
Groundwater Recharge Structure
31 31 47.91 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
220 220 5.98 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
192 192 23.05 3
Irrigation Drains 10 10 9.49 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
1106 1106 29.98 2
Construction of harvesting structures
987 987 29.98 3
Total
3324 3324 194.37
170
Table 6.10 Continue…
S. No.
Name of the Block
Concerned Ministry Component Activity
Total number / Capacity
(cum)
Command Area/
Irrigation Potential
(Ha)
Estimate cost in lacs (in
Rs.)
Period of Implementation (5/7 Yrs)
11.
Kralpora NEW CREATION DOLR MOHR PMKSY
Watershed Check Dams 314 314 17.41 1 Staggered Contour Trenches/ Terracing
241 241 16.78 2
Groundwater Recharge Structure 21 21 33.52 3
RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY
Watershed Check Dams
288 288 7.83 1
CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence
with MGNREGS
Water harvesting structures
134 134 16.12 3
Irrigation Drains 7 7 6.64 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence
with MGNREGS
Construction of water conservation structures
774 774 20.9 2
Construction of harvesting structures
688 688 20.9 3
Total 2467 2467 140.1 G. Total 2215.43
171
CHAPTER – VII
COMPONENTS OF PMKSY
A) ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP)
The Accelerated Irrigation Benefit Programme (AIBP) was launched by
Government of India during 1996-97 to provide financial assistance to State
Governments for accelerating the pace of irrigation development in the country.
The main purpose was to ensure timely completion of irrigation projects which
are mostly capital intensive in nature. No major irrigation projects due to non-
feasibility are existing in the district and a number of minor irrigation schemes
have spilled over in previous years due to lack of budgetary support.
OBJECTIVE :
a) To focus on faster completion of ongoing Medium / Minor
IrrigationProjects of the District.
b) To accelerate implementation of irrigation projects which are beyond the
resource capability of state government.
c) Expeditious completion of the projects which are in advanced stage of the
completion.
d) To realize the bulk benefit from the existing minor irrigation project.
Outcome of AIBP under PMKSY:
1) AIBP has not only supplemented the existing irrigation facilities but has
also created assured irrigation by taking up sufficient number of schemes.
2) AIBP has also helped in generating employment to the farmers, thus
helping to improve economic condition by way of providing employment
and better agriculture output.
172
3) AIBP helps to improve the existing channels, up-gradation of channels
and construction of new channels to cover large cultivable command
area.
PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT
PMKSY AIBP
S. No. Name of the Component Total Cost of the Component
1. PMKSY AIBP 45716.76 lacs
B) PER DROP MORE CROP:
Available water can lead to more efficient usage by “Per Drop More
Crop” component of PMKSY. By way of micro-irrigation systems on farm like
sprinkler, drip irrigation systems, water use efficiency can be achieved out of
available water in the district.
PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT PMKSY “ Per Drop More Crop”
S. No. Name of the Component Total Cost of the Component
1. PMKSY “Per Drop More Crop” 13355.86 lacs
173
C) HAR KHET KO PANI
PMKSY shall endure for precision irrigation by scientific access of water
to every farm by way of command area development and other associated
scheme. This shall ensure expansion of cultivable area by assured
irrigation supply and increase farm output. This component of PMKSY
will ensure irrigation facility to every farm land by next 5 to 7 years.
SCOPE:
To ensure access of irrigation facility to every farm during next five years. The irrigation potential created though various schemes both under AIBP and harKhetKoPani will be utilized through command area development activities which will strengthen distribution network and ensure availability of water at every farm. This will also ensure judicious utilization of water through infrastructure development by reducing seepage loses and availability of water at critical periods of crop growth.
SCHEMES FAILING UNDER HAR KHET KO PANI:
1. Minor surface irrigation (Gravity) = 131
2. Lift irrigation = 15
3. RRR water bodies = 61
OUTPUT:
1. Command area of 12321.02 ha.is to be irrigated through minor
surface irrigation schemes.
2. An area of 2500 ha.is to be irrigated under lift irrigation.
3. An area of 1633.98 ha.is covered under RRR water bodies.
PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT PMKSY “ HarKhetKoPani”
S. No. Name of the Component Total Cost of the Component
1. PMKSY “HarKhetKoPani” 32015.11 lacs
174
D) PMKSY WATERSHED
Watershed development Programme aims to restore the ecological
balance by harnessing, conserving and developing degraded natural
resources such as soil, vegetative cover and water. The outcomes are
prevention of soil erosion, regeneration of natural vegetation, rain water
harvesting and recharging of the ground water table. This enables multi-
cropping and the introduction of diverse agro-based activities, which help
to provide sustainable livelihoods to the people residing in the watershed
area.
OBJECTIVES:
The objectives of PMKSY Watershed in District Kupwarashall be:
• Developing wastelands/ degraded lands, drought-prone and desertareas
on watershed basis, keeping in view the capability of land, site-conditions
and local needs.
• Promoting the overall economic development and improving the socio-
economic condition of the resource poor and disadvantaged sections
inhabiting the programme areas by way of livelihood production system.
• Mitigating the adverse effects of extreme climatic conditions such as
drought and desertification on crops, human and livestock population for
their overall improvement.
• Restoring ecological balance by harnessing, conserving and developing
natural resources i.e. land, water, vegetative cover.
SCOPE:
• To improve the soil moisture by doing gully control and thus improve the productivity of land by preventing soil erosion.
• To develop local biomass. • To assist in local livelihood development. • To strengthen community based assets.
175
ACTIVITIES: • The denudation of soil and water as a resource will be treated mainly by
employing environmental engineering and thus the likes of harvesting structures like farm Pondss, nalla bunds, check dams and tanks will be taken into consideration.
• Land Development including in-situ soil and moisture conservation
measures like contour and graded bunds fortified by plantation, bench terracing in hilly terrain, nursery raising for fodder, timber, fuel wood, horticulture & Non Timber Forest Product Species.
• Afforestation including block plantations, agro-forestry and horticultural
development, Shelterbelt plantations, sand dune stabilization, etc.
• Drainage line treatment with a combination of vegetative and engineering structures.
• Development line treatment with a combination of vegetative and
engineering structures.
• Development of small water harvesting structures such as low-cost farm pords, nalla bunds, check-dams and percolation tanks & ground water recharge measures.
• Renovation and augmentation of water resources, Desiltation of tanks for
drinking water/ irrigation.
• Repair, restoration and up-gradation of existing common assets and structures in the watershed to obtain optimum & sustained benefits from existing public investments.
• Effective rainwater management by contour bunding, trenching,
staggered trenching, land levelling, mulching etc.
PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT PMKSY “ Watershed”
S. No. Name of the Component Total Cost of the Component
1. PMKSY “Watershed” 3370.8425 lacs
176
E) CONVERGENCE WITH MGNREGS The scheme and Programmes of Ministry of Rural Development (MoRD)
and the Ministry of Agriculture (MoA) both operate in rural India and the target
beneficiaries are primarily common. Whereas MoRD schemes and Programmes
focus on employment generation/ guarantee, as well as asset creation in rural
areas, both for community benefit and individual livelihood support, MoA
targets basically the agriculture sector with schemes and programme which
typically benefit individual farmers, though there are certain interventions
which are for collective benefit to the farming community. Thus, while both the
Ministries are channelizing their efforts for the benefit of primarily the same
population. Thus it needs to be removed and the operations of MoA and MoRD
needs to be synergised at district level. The material component of projects
including the wages of the skilled and semi-skilled workers taken up under the
scheme shall not exceed forty percent of the total project costs.
The convergence with MGNREGS can be effectively taken up by constructing water harvesting structure, creation of new irrigation sources, up gradation/ desilting of traditional water bodies, water conservation works etc. Soil and water conservation works can also be taken up through convergence in identified backwards blocks and in the upper catchment areas. Further, strengthening of bunds/ embankments, stabilization of grassed water ways, renovation and maintenance of zamindari khuls and other traditional water courses can be taken up through varies departments under Convergence with MGNREGS.
PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT
PMKSY “Convergence with MGNREGS”
S. No. Name of the Component Total Cost of the Component
1. PMKSY Convergence with MGNREGS
4174.44lacs
177
CHAPTER - VIII
OUTCOME OF PMKSY IN DISTRICT KUPWARA
Pradhan MantriKrishiSanchiyeeYojna (PMKSY) action plan proposed for next
five years with an outlay Rs. 101592.56lacs including 3% administrative and
other costs under its components viz AIBP “HarKhetKoPani”,“More Crop per
Drop”,Watershed and Convergence with MGNREGS shall ensure enhanced
irrigation coverage and efficient usage of available water on the farm through
the intervention of PMKSY. The measure outcomes in the District are
elaborated as under:
1. Under AIBP all the existing minor irrigation schemes under execution
shall be completed by ensuring sufficient allocation to existing minor irrigation
schemes besides taking up the new formulated schemes in a time bound minor
and ensure their timely completion.
2. “HarKhetKoPani” shall ensure access of water to every border block of
the district benefiting tribal residents of these blocks near the line of actual
control. Catchment areas under command area development shall be increased
by way of scientific distribution of available water. This will in term increase
crop production and help to bring more areas of district under assured irrigation.
Dry land agriculture shall be brought down in a phased manner and the farm
income of poor peasants in the border blocks shall be increased.
3. “More Crop Per Drop” by introducing micro irrigation activities like drip
and sprinkler irrigation will ensure water efficiency. This shall give boost to the
commercial farming in the horticulture sector especially in high density
mountain orchards and vegetable cultivation in semi-urban areas.
4. “Watershed Development” by construction of water conservation
structures shall ensure that there is no depleation of ground water levels in
Kupwara District. More mountain. New livelihood systems shall ensure assured
increasing returns of rural families by development of agro based industries.
178
5. “MGNREGS Convergence” will be a boosting factor for gap filling in the
District and the labour component available shall make available more number
of mandays in the village under different components of PMKSY in the District.
With the intervention of above mention components of PMKSY it is
hoped that the farm productivity will further increase and rural prosperity will
be achieved by:
• Involving agriculture and allied activities like poultry, apiculture, and
dairy farming systems by integrated farming system approach.
• Raising of vegetables, floriculture, medicinal and aromatic plants.
• Encouraging orchard cultivation (Apple, Walnut, Pear, Cherry).
• Agri-Forestry/ Agri-Horticulture/ Agri-Silvi/ Agri-Pasture/ Agri-Horti
Forestry cropping systems can be encouraged for establishment of agro
based industries and there by employment opportunities will also increase
and shall avoid the migration of rural people to the urban areas.
Since the amount of available water as per study analysis is satisfactory
but the measure problems being faced in the agriculture sector that at the time of
the peak irrigation demand of the crop there is deficit in the water availability,
which adversely effects the crop production as has been observed in many areas
of the district.
District Irrigation Plan (DIP) aims to focus on the conservation of water
usage at peak irrigation season which otherwise remains available abundantly
during the months of March and April. The strategy is to build structures for
conservation of water in those areas, so that it is used when required, for that
purpose various lift stations and mega harvesting structures have been proposed
in the DIP. Moreover emphasis has been laid on bringing about 5000 ha. under
assured irrigation by means of area expansion plan.
The DIP so projected aims to lay emphasis on overall prosperity of the people by providing job opportunities to the rural people by increasing the number of man-days in consonance with MGNREGS by:
179
a) Increasing the production and prductivity of food crops.
b) Livelihood support system to landless families by provision of agri based
assets.
c) Conservation, protection and prevention of soil erosion of fertile
cultivable soils by recommending suitable agronomic practices
d) Preventing deforestation by nursery plantation leading to the availability
of bulk of fodder for cattle and also aquifer recharge and conservation
and augmentation of traditional water bodies leading to a suitable
environmental balance.
DIP aims to provide irrigation to the rain-fed, horticulture by intervention
of sprinkler irrigation system, since apple and walnut industry is the backbone
of the economy of the district. So accordingly the budgetary proposals in DIP
have been projected with a view to bring about a positive and revolutionary
change in the agriculture and allied sectors.
180
Table 8.1 SUMMARY OF COST OF VARIOUS COMPONENTS OF PMKSY
S No.
Name of the Component Total Cost
(Rs. in Lacs)
Proposed year wise Allocation of Funds
2016 – 17 2017 - 18 2018 - 19 2019 – 20 2020 - 21
01 AIBP 45716.76 9143.352 9143.352 9143.352 9143.352 9143.352
02 HarKhetKoPani 32015.11 6403.022 6403.022 6403.022 6403.022 6403.022
03 Per Drop More Crop 13355.86 2671.172 2671.172 2671.172 2671.172 2671.172
04 PMKSY Watershed 3370.8425 674.1685 674.1685 674.1685 674.1685 674.1685
05 Convergence with MGNREGS 4174.44 834.888 834.888 834.888 834.888 834.888
TOTAL 98633.0125 19726.6 19726.6 19726.6 19726.6 19726.6
181
Table 8.2
ABSTRACT OF DEPARRTMENT WISE BUDGETARY PROPOSALS SOUGHT UNDER DISTRICT IRRIGATION PLAN
UNDER PMKSY
S. No. Department Budget Proposed (Amount in Lacs)
1. Agriculture 7174.044
2. Command Area Development 15241.32
3. Irrigation & Flood Control 57290.0375
4. IWMP 2215.43
5. Rural Development Deparrment 6674.1
6. Forest Soil & Water Conservation Department
2336.01
7. Forest Department 1524.861
8. Horticulture Department 6177.75
Total 98633.5525
Add 1% Administrative Cost + 1% Contigency + 1% Monitoring Charges (Totaling 3%)
2959.00657
Total 101592.56
182
Table 8.3
PROJECTED OUTLAY OF DISTRICT IRRIGATION PLAN (DIP)
Table 8.3 Continue
Projected Outlay Of District Irrigation Plan (DIP)
S No. Name
of Blocks
Concerned Ministry/Departm
ent Component Activity
To
tal
No
./Cap
acit
y(cu
m)
Co
mm
and
A
rea/
Irri
ga
tio
n
Po
ten
tial
(H
a)
Per
iod
of
Imp
lem
ent
atio
n(5
/7
yrs)
Est
imat
ed
Co
st(R
s.
in L
acs)
1 MoWR AIBP Major Irrigation
2 MoWR Medium Irrigation
3 MoWR Surface Minor Irrigation
136 15842.31 45716.76
4 MoWR Lift Irrigation 15 3362.88 7219.89
5 MoWR Ground Water Developed
6 MoWR RRR of Water Bodies 61 5490.2
7 MoWR Construction of Field Channels
7.1 MoWR Lined Field Channels/Community Tanks/
1152 32925 18284.12
Her KhetKoPani
Rain W.H.S/
Bore Well
183
Table 8.3 Continue
Projected Outlay Of District Irrigation Plan (DIP)
S No. Name
of Blocks
Concerned Ministry/Departm
ent Component Activity
To
tal
No
./Cap
acit
y(cu
m)
Co
mm
and
A
rea/
Irri
ga
tio
n
Po
ten
tial
(H
a)
Per
iod
of
Imp
lem
ent
atio
n(5
/7
yrs)
Est
imat
ed
Co
st(R
s.
in L
acs)
7.2 MoWR Unlined Field
Channels
8 MoWR Micro- Irrigation
9 MOA & FWDA & FW
DPAP Drip 1763 974.7
10 MOA & FWDA & FW
DPAP Sprinkle 20 46.2
11 MOA & FWDA & FW
Per drop more crop(Micro- Irrigation)
Non-DPAP Drip 565 320
12 MOA & FWDA & FW
Non-DPAP Sprinkle
13 MOA & FWDA & FW
Per drop more crop(Supplementary water management activities)
Topping up of MGNREGS
14 MOA & FWDA & FW
Drought proofing through check Dame/Water
3939 2605.35
184
Table 8.3 Continue
Projected Outlay Of District Irrigation Plan (DIP)
S No. Name
of Blocks
Concerned Ministry/Departm
ent Component Activity
To
tal
No
./Cap
acit
y(cu
m)
Co
mm
and
A
rea/
Irri
ga
tio
n
Po
ten
tial
(H
a)
Per
iod
of
Imp
lem
ent
atio
n(5
/7
yrs)
Est
imat
ed
Co
st(R
s.
in L
acs)
Harvesting Structures/Dug Well/Bore Well
15 MOA & FWDA & FW
Secondary Storage Structures
225 904 225
16 MOA & FWDA & FW
On Farm Development /
755 155 863.9
Training on water conservation awareness/
Agronomic measures
17 DoLR-MoRD
Newly Created WHS
17.1 DoLR-MoRD Terracing 120 3870 446.67
17.2 DoLR-MoRD Check Dams/ DRSM/Crate Work
5271 7062 2743.69
17.3 DoLR-MoRD Nallah Bunds/ 168/14500
12320 1631.09
Contour Bunds
17.4 DoLR-MoRD Percolation Tanks/ NBEC/ Diversion 43/4500 1254.5
185
Table 8.3 Continue
Projected Outlay Of District Irrigation Plan (DIP)
S No. Name
of Blocks
Concerned Ministry/Departm
ent Component Activity
To
tal
No
./Cap
acit
y(cu
m)
Co
mm
and
A
rea/
Irri
ga
tio
n
Po
ten
tial
(H
a)
Per
iod
of
Imp
lem
ent
atio
n(5
/7
yrs)
Est
imat
ed
Co
st(R
s.
in L
acs)
Drains/ Gabbion Structure
17.5 DoLR-MoRD
Other Ground Water Recharge Structure/ Dug Well/Entry Point/ Fencing
30/65655 Rft./11
2480 1981.09
17.6 DoLR-MoRD Fishery ponds/cattle pond/ livelihood Sport System
3635 1284.57
18 DoLR-MoRD Renovated WHS
18.1 DoLR-MoRD Farm Ponds
18.2 DoLR-MoRD PMKSY Watershed Check Dams 2268 2268 55.66
18.3 DoLR-MoRD Nallah Bunds
18.4 DoLR-MoRD Percolation Tanks
18.5 DoLR-MoRD Other Ground Water Recharge Structure
54 37.9
18.6 DoLR-MoRD W.H.S on Individual Land
1065 53.25
19 DoLR-MoRD Newly Created
186
Table 8.3 Continue
Projected Outlay Of District Irrigation Plan (DIP)
S No. Name
of Blocks
Concerned Ministry/Departm
ent Component Activity
To
tal
No
./Cap
acit
y(cu
m)
Co
mm
and
A
rea/
Irri
ga
tio
n
Po
ten
tial
(H
a)
Per
iod
of
Imp
lem
ent
atio
n(5
/7
yrs)
Est
imat
ed
Co
st(R
s.
in L
acs)
19.1 DoLR-MoRD Water & Soil Conservation 1222 882.2 293.9825
19.2 DoLR-MoRD Water Harvesting Structures
4698 7606 2481.89
19.3 DoLR-MoRD Creation of Irrigation canals and Drains
414 820.8 327.16
19.4 DoLR-MoRD
Providing infrastructure for Irrigation/Fishery Ponds/Cattle Pond
121 46405 121
19.5 DoLR-MoRD Convergence with MGNREGS
Land Development/Farm Bunds/Nallah Bunds
2760 3303.6
20 DoLR-MoRD Renovation
20.1 DoLR-MoRD Renovation of Water
Bodies including Desiliting:
388720/3220
8246 /397.5
585.7
20.2 DoLR-MoRD
Renovation & Maintenance of irrigation Canals & Drains/ W.H.S:
8587/177 9199.4 285.68
21
187
Table 8.3 Continue
Projected Outlay Of District Irrigation Plan (DIP)
S No. Name
of Blocks
Concerned Ministry/Departm
ent Component Activity
To
tal
No
./Cap
acit
y(cu
m)
Co
mm
and
A
rea/
Irri
ga
tio
n
Po
ten
tial
(H
a)
Per
iod
of
Imp
lem
ent
atio
n(5
/7
yrs)
Est
imat
ed
Co
st(R
s.
in L
acs)
21.1 State Irrigation Department
Name of the Scheme Major Irrigation
21.2 State Irrigation Department
Name of the Scheme
Medium Irrigation
21.3 State Irrigation Department
Name of the Scheme
Surface Minor Irrigation
22
Irrigation Scheme of State of Agriculture Department
Name of the Scheme
23
Irrigation Scheme of State of Other lines Department of state Govt.
Name of the Scheme
24 Externally Aided Projects
Name of the Scheme
25 Other loan projects like NABARD
Name of the Scheme
Total 98633.5525