DISTRICT IRRIGATION PLAN UNDER PMKSY (Pradhan Mantri Krishi Sinchayee Yojna) OF DISTRICT KUPWARA DISTRICT IRRGATION PLAN UNDER PMKSY OF DISTRICT KUPWARA

Upload: others

Post on 18-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

DISTRICT IRRIGATION PLAN

UNDER

PMKSY (Pradhan Mantri Krishi Sinchayee Yojna)

OF

DISTRICT KUPWARA

DISTRICT IRRGATION PLAN

UNDER PMKSY OF DISTRICT KUPWARA

Page 2: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

ii

FOREWORD

As a sequel to the address of Hon’ble President of India to the joint session of the 16th Lok Sabha the sanctity of each drop of water was emphasized and accordingly to ensure “Har Khet Ko Pani” and “Per Drop More Crop” a new scheme namely, Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) was launched and accordingly operational guidelines were issued by the Ministry of Agriculture, Govt. of India.

Every district was assigned the job of formulation of District Irrigation Plan (DIP) under PMKSY and accordingly the job was taken on warfooting basis by the DILC Kupwara constituted vide Govt. Order No. :- 1486-GAD of 2015 Dtd. 27-01-2015 & the five year plan under DIP for the district came into being as a result of joint exercise by the Department of Agriculture, Horticulture, I&FC, CAD and Forest Department.

The hardwork put in by Mr. Mohd. Qasim Gani, Chief Agriculture Officer Kupwara in formulation of DIP Kupwara is duely acknowledged and hope that the DIP formulated shall help in the implementation of PMKSY in the district Kupwara in true letter and spirit for ensuring scientific utilisation of every drop of water in the district to ensure enhanced crop production & other utilities. Place: - Kupwara

Dated: 17-03-2016 Kumar Rajeev Ranjan (IAS)

District Development Commissioner, Kupwara

(Chairman DLIC District Kupwara)

Page 3: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

iii

PREFACE

It gives me an immense pleasure to present the district irrigation plan under Pradhan Mantri Krishi Sinchayee yojna of district Kupwara as a joint exercise and cooperation of all the participating departments. PMKSY is aimed at developing the irrigation potential for the purpose of deriving maximum potential benefit. There is an urgent need to provide assured irrigation in Kupwara District as more than 50% of the cultivable land is rainfed. It is presumed that this scheme will benefit both land owners and landless people as it has been envisioned in the scheme to mitigate the risk to the farmers since bulk of the land is rainfed.

By integration of MGNREGS like schemes with PMKSY, it will ensure round the year employability to the rural folk and will also help in the creation of long term assets in the country which will prove beneficial in the long run.

I hope that the proposed district irrigation plan will prove to be a success in the years to come by providing assured irrigation to the crops at critical stages of growth and in providing livelihood support to landless people and job opportunities to unemployed people which in turn help in alleviating overall poverty. In this connection an exercise was taken up by the department of agriculture district Kupwara for the formulation of district irrigation plan under PMKSY with the help and support of all the participating departments viz; Deptt. of Agriculture , Horticulture, Animal and sheep husbandry, Command Area Development department, Irrigation and Flood control (Kupwara, Handwara, Tangdhar ) Division. I appreciate the role of these departments in formulation of this plan. I also express my sincere gratitude towards Forest Department Kupwara, Agro Metrology station Kupwara, Industries Department for providing valuable information in the preparation of this plan. I want to place on record my sincere thanks to Mr. Kumar Rajeev Ranjan (IAS) Distt. Development Commissioner Kupwara for his guidance and cooperation and Mr. Abdul Ahad Shah, Chief Planning Officer Kupwara for his every possible help and support in preparation of this plan. My sincere thanks are to Mr. Ishtiaq Ahmad Shawl, SCA CAD, Mr. Javid Ahmad Wani, (Jr. Agriculture Extension Officer), Mr. Javid Ahmad Tantry, Rehbar-i-Zirat, Mr. Abdul Razzaq Ahanger I/C NeGPA and Mr. Gulzar Ahmad Mir, Computer Operator for the hard work and labour they have put in preparing this plan. Lastly, I hope that this plan will prove a vision document and milestone in increasing the production and productivity of Agriculture and Horticulture crops.

(Mohd Qasim Gani) Chief Agriculture Officer,

Kupwara (Member Secretary,

District Level Committee PMKSY)

Page 4: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

iv

KUPWARA DISTRICT IRRIGATION PLAN 2016 – 2021(PMKSY)

Kumar Rajeev Ranjan (IAS) District Development Commissioner

Kupwara

Preparation and Compilation 1. Mohd Qasim Gaani, Chief Agriculture Officer 2. Mr. Ishtiaq Ahmad Shawl, (CAD) 3. Mr. Javed Ahmad Wani, (Jr. Agriculture Extension Officer) 4. Mr. Javed Ahmad Tantry, (Rehbar-i-Zirat) 5. Mr. Ab Razak Ahangar, (I/C NeGPA) 6. Mr. Gulzar Ahmad Mir, (Computer Operator)

Page 5: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

v

LIST OF OFFICERS/ OFFICIAL REPRESENTATIVES

WHO PARTICIPATED IN FORMATION OF

DISTRICT IRRIGATION PLAN (DIP) IN KUPWARA

S No. Name of Officers/Official

Representatives Designation

1. Mr. Mohd Qasim Gani Chief Agriculture Officer Distt. Kupwara

2. Mr. Mir Liyaqat Ahmad Khan

Distt. SMS Deptt. Of Horticulture Kupwara

3. Mr. Amir-u-din Andrabi Distt. Agriculture Officer(Extension)

4. Mr. Syed Bashir Ahmad Andrabi

Nodal Officer IWMP

5. Mr. Muneer Ahmad Shah Assistant Executive Engineer Irrigation & Flood Control Division Handwara

6. Mr. Gh Mohidin Pir Assistant Executive Engineer Special Division Tangdar

7. Mr. Gh Nabi Bhat Representative of Irrigation & Flood Control Kupwara Division

8. Mr. Ishtiaq Ahmad Shawl SCA, CAD Kupwara

9. Mr. Javid Ahmad Wani Jr. Agriculture Extension Officer Kupwara

10. Mr. Javid Ahmad Tantry Rehbar-i-Zirat

11. Mr. Ab. Razaq Ahangar I/C NeGPA

12. Mr. Gulzar Ahmad Mir Computer Operator

13. Mr.Mukhtar Ahmad Pir Progressive Farmer

14. Mr. Aashiq Hussain Wani Progressive Farmer

15. Non-Governmental Organisation

Human Welfare Voluntarily Organisation

Page 6: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

vi

LIST OF ABBERVATIONS

BCM Billion Cubic Metre

CWC Central Water Commission

DIP District Irrigation Plan

DRDA District Rural Development Agency

GD Ground Water Department

GWL Ground Water Level

GP Gram Panchayat

Ha Hectare

IWRM Integrated Water Resources Management

INRM Integrated Natural Resources Management

ITDA Integrated Tribal Development Agency

m Metre

mm Millimetre

MCM Million Cubic Metre

PMKSY Pradhan Mantri Krishi Sanchayee Yojana

Sq.km Square Kilometre

CCA Cultivated Command Area

AIBP Accelerated Irrigation Benefit Programme

RRR Renovation Repairs & Restoration

Page 7: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

vii

Chapter Contents Page No.

Chapter-I Introduction 1-5

LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6

SOIL FERTILITY INDICES 7

Fig.1 (Land use Particulars of District Kupwara) 8

GENERAL INFORMATION OF DISTRICT 9

DEMOGRAPHY 10

BIOMASS AND LIVESTOCK 11

AGRO ECOLOGY, CLIMATE, HYDROLOGY AND TOPOGRAPHY 12

SOIL PROFILE 13

LAND USE PATTERN 14

Chapter-II WATER PROFILE IN DISTRICT KUPWARA 15

Rainfall Data (2005-2015) at Kupwara Station 16

Fig. 2 (Annual Rainfall Pattern of District Kupwara -- 2005-2015) 17

Fig. 3 (Month-wise Rainfall Pattern of District Kupwara -- 2005-2015) 18

AREA WISE, CROP WISE IRRIGATION STATUS 19

PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS 20

IRRIGATION BASED CLASSIFICATION 21

Chapter-III STATUS OF WATER AVAILIBITY 22

STATUS OF COMMAND AREA 23

EXISTING TYPE OF IRRIGATION 24 - 25

Chapter-IV WATER REQUIREMENT/DEMAND 26

DOMESTIC WATER DEMAND 27

CROP WATER REQUIREMENT 28 - 31

LIVESTOCK WATER DEMAND 32

INDUSTRIAL WATER DEMAND 3

WATER DEMAND FOR POWER GENERATION 34

TOTAL WATER DEMAND OF THE DISTRICT FOR VARIOUS SECTORS 35

WATER BUDGET 36

Chapter-V BLOCK-WISE TABLES 37

Demography – (All Blocks) 38 - 48

BIOMASS AND LIVESTOCK 49

AREA-WISE, CROP-WISE IRRIGATION STATUS --- (All Blocks) 50 - 60

LAND USE PATTERN 61

LAND UTILIZATION STATISTS 62

PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS 63

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE DEPARTMENT

(All Blocks)

64 - 74

STATUS OF COMMAND AREA 75

Page 8: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

viii

Chapter-VI BLOCK-WISE ACTION PLANS 76

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UNDER PMKSY

DISTRICT KUPWARA --- (All Blocks)

77 - 98

COMMAND AREA DEVELOPMENT DEPARTMENT -----Block wise Action Plan -

- PHYSICAL AND FINANCIAL TARGETS --- (All Blocks)

99 – 109

BLOCK WISE ACTION PLAN OF SOIL AND WATER CONSERVATION

(FOREST) 110 – 112

BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT

UNDER PMKSY DISTRICT KUPWARA

(Kehmil Division/ Zangli Division/ Langate Division)

113 – 122

BLOCWISE ACTION PLAN IRRRIGATION SECTOR

UNDER PMKSY I & F DIVISION KUPWARA FOR PROPOSED SCHEMES --- (All

Blocks)

123 – 137

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DISTRICT

KUPWARA UNDER

PMKSY (Per Drop More Crop) --- (All Blocks)

138 – 148

BLOCK-WISE ACTION PLAN OF DEPARTMENT OF RURAL DEVELOPMENT

DISTRICT KUPWARA UNDER PMKSY “MGNREGA” --- (All Blocks)

149 – 159

BLOCWISE ACTION PLAN OF IWMP OF DISTRICT KUPWARA UNDER PMKSY --

- (All Blocks)

160 – 170

KUPWARA DISTRICT MAPS

Chapter-VII COMPONENTS OF PMKSY 171 – 176

A) ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) 171

B) PER DROP MORE CROP: 172

C) HAR KHET KO PANI 173

D) PMKSY WATERSHED 174

ACTIVITIES: 175

PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT

PMKSY “Watershed”

175

E) CONVERGENCE WITH MGNREGS 176

PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT OF

PMKSY “Convergence with MGNREGS”

176

Chapter-VIII OUTCOME OF PMKSY IN DISTRICT KUPWARA 177 – 179

SUMMARY OF COST OF VARIOUS COMPONENTS OF PMKSY 180

ABSTRACT OF DISTRICT ACTION PLAN OF VARIOUS DEPARTMENT 181

PROJECTED OUTLAY OF DISTRICT IRRIGATION PLAN (DIP) 182 - 187

Page 9: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

1

CHAPTER – I

INTRODUCTION

As a prelude to the address of Hon’ble President of India to the Joint

session of Parliament of 16thLok Sabha Govt. Committed itself to giving high

priority to water security and accordingly “Pradhan

MantriKrishiSinchayeeYojana (PMKSY) with the motto of “HarKhetkoPani”

was launched. As per the operational guidelines District Irrigation Plan shall be

formulated which will serve as a base for planning and implementation of

PMKSY. Accordingly as conveyed in the guidelines, District Level

Implementation Committee (DLIC) of DistrictKupwara was constituted vide

Govt. Order No. 1486-GAD of 2015 dated: 27/1/2015. District Irrigation Plan

(DIP) will identify the gaps in irrigation infrastructure after taking into

consideration the District Agriculture Plans(DAPs) already prepared for

RashtriyaKrishiVikasYojana (RKVY) visa vis irrigation infrastructure currently

available and resources that would be added during XII plan from other ongoing

schemes (both state and central) likes Mahatma Gandhi National Rural

Employment Guarantee Scheme (MGNREGS),

RashtriyaKrishiVikasYoujna(RKVY), Member of Parliament Local Area

Development (MPLAD) scheme and various other such central & state

schemes.

DIP will present a holistic irrigation development perspective plan of the

district outlying provision of long term development plan integrating.

Page 10: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

2

a) Formulation of new irrigation schemes under PMKSY (HarKhetKoPani)

b) Stabilisation of existing schemes under PMKSY (Per Drop More Crop).

c) Water use applications incorporating all usage of water like drinking &

domestic use, irrigation and industry.

In this connection various meetings were held in the district under the

chairmanship of District Development Commissioner with other concerned

departments to provide the required data under profile making part and

respective action plans.

Subsequently, based on the data and action plans received from various

departments, the DIP of the district has been prepared.

STRATEGY

In the backdrop of these formulated objectives and to

strategiseformulation of DIP Kupwara for seeking funds under PMKSY by

focussing on end to end solution in irrigation supply chain viz water sources,

distribution network, efficient farm level applications, extension services on

new technologies a detailed depiction of basic socio-economic status of the

district was studied and the resources were designed so as to give focus in the

formulated DIP under PMKSY in following schemes.

1. Study of existing water sources, repair, renovation and maintenance on

sustainable basis.

2. Groundwater development by augmenting water harvesting structures.

Page 11: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

3

3. Rejuvenation of traditional water bodies at source and in villages such as

storage tanks (Sur) in Sogam.

4. Stabilization / Creation of distribution network for precision usage of

available water.

5. Scientific measures forwater conservation and runoff control measures.

6. Identification of location specific traditional untapped water resources

and their usage for irrigation.

7. Intensive participatry consultation process with PRI’s and local

representatives.

8. Cropping system in consonance with local agro-ecology and available

quantity of water.

9. Command area development for precision irrigation by effective

distribution system.

10. Treatment of urban waste water for usage in pre-urban areas.

GENERAL CHARACTERISTICS OF THE DISTRICT

Kupwara district was initially part of the erstwhile Baramulla District and

in July 1979, it was carved out as a separate district. The district is situated at an

altitude of 5300ft. (above sea level) with varied topography. Global location of

the district is 75o, 45 o, North latitude and 73 o, 45 o to 76 o, 36 o East longitude,

the climatic conditions of the district are mostly temperate with some patches of

block Tangdar, Teethwal having sub tropical climate. Kupwara District is one

Page 12: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

4

of the backward districts of the country with a sizeable population of schedule

tribes (8.1%).

The major food crops grown in the district are paddy, maize pulses and

fodder. In case of horticulture crops, apple cultivation is dominant followed by

walnut in Kandirainfed area of the district.

The District is known for some famous passes like Tootmar-Gali,

Nastichum-Gali, Furkhan-Gali and Z-Gali connecting Leepa valley in Pakistan

occupied Kashmir, Karnah, Keran and Machil areas with Kupwara district.

The hilly areas of Karnah, Machil&Keran are situated on the line of the

control. These areas generally remain cut off from the rest of the district during

winter for about five months.

Kupwara district is surrounded by thick forests, mountain slopes and

snow clad peaks from three sides. The district is famous for the beautiful Lolab

valley, Bungas valley and other health resorts and has an inherent potential for

development of tourism. Bungas, Chandigam, Reshawari, Lolab valley are

some of the famous spots of tourism.

ADMINISTRATIVE SETUP

The total geographical area of the district is 2,379 sqkms and the density of

population is 366 persons per sq. km. It is located about 90kms from Srinagar in

the north east.

Page 13: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

5

The district had 3 tehsils namely Kupwara, Handwara and Karnah and

now reorganized in 15 Tehsils (Census 2011). It comprises of 362 villages, out

of which 9 villages are uninhabited and 8 outgrowths. The district comprises of

5 legislative assembly constituencies i.e. Karnah, Kupwara, Lolab, Handwara

and Langate. Kupwara has two municipal committeesvizKupwara and

Handwara.

DEMOGRAPHY

The total population of the district as per 2011 censes is 870354 persons

with 474190 males and 396164 females. The district is about 88% rural

habitated with a total household number of113929. The district has about 8.1%

ST population and an overall literacy percentage of 64%. The decadal growth

rate of population is 33.82% with the population density of 366 persons/ Sq.km.

The sex ratio is 835 females per 1000 males.

CLIMATE

The climate of the District is characterised by pleasant summer and

generally cold winters with snow clad mountains, the year may be divided into

two seasonsvizKharif& Rabi season.

The normal annual rainfall of the district in general is 1090mm with monthly avg. rainfall of 90.83mm. The cold weather commences from the month of November with the onset of western disturbances. December & February are the coldest months of the year with the mean daily temperature varying from 5oc to – 10oc. April & August are the pleasant months of the year having mean daily minimum & maximum temperature of 9.4oc&21.8oc.

Page 14: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

6

Table 1.1 LAND CAPABILITY CLASSIFICATION (AREA in Ha)

S. No

Particular

Lang

ate

Raj

war

Ram

hal

Kra

lpor

a

Tre

hgam

Kup

war

a

Sog

am

Wav

oora

Kal

aroo

se

Tan

gdar

Tee

thw

al

Total

1 Very good cultivated land 8370 5118 4318 3628 3294 4522 2985 3080 1935 1560 1090 39900 2 Good cultivated land -- -- -- -- -- -- -- -- -- -- -- -- 3 Moderate good cultivated

land classes -- -- -- -- -- -- -- -- -- -- -- --

4 Early good land suited for occasional cultivatable class

-- -- -- -- -- -- -- -- -- -- -- --

5 Nearly level land suitable for cultivated because...

-- -- -- -- -- -- -- -- -- -- -- --

6 Steep slope / highly erosion prone with shallow soils class vi

689 621 397 372 301 568 255 306 318 253 294 4374

7 Steep slope with server soil erosion recurring in erode stony & shallow soil deptt. Class vii.

896 823 527 518 403 747 378 407 416 331 296 5742

Total 9955 6562 5242 4518 3998 5837 3618 3793 2669 2144 1682 50016

Page 15: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

7

Table 1.2 SOIL FERTILITY INDICES

S No

Blocks Available Phosphors EC Organic carbon % Available Nitrogen (kg/Ha)

Available Phosphorus kg/Ha

Available Potash (Kg/Ha)

Acidic Neutral Alkaline Med Nor High Low Med High Low Med High Low Med High Low Med High

1 Langate 6.5 - - - 0.9 - - 0.65 - - 480 - - 22 - - - 290

2 Rajwar 6.5 - - - 0.8 - - 0.51 - - 490 - - 21 - - - 2802

3 Ramhal 6.2 - - - 0.9 - - 0.59 - - 510 - - 16 - - - 260

4 Kralpora 7 - - - 0.8 - - 0.70 - - 520 - - 18 - - - 290

5 Trehgam 7 - - - 0.8 - - 0.70 - - 540 - - 25 - - - 280

6 Kupwara 7 - - - 0.8 - - 0.72 - - 530 - - 21 - - - 300

7 Sogam 6.5 - - - 0.8 - - 0.74 - - 510 - - 20 - - - 310

8 Wavoora 6.2 - - - 0.9 - - 0.75 - - 530 - - 18 - - - 310

9 Kalaroose 6.5 - - - 0.9 - - 0.73 - - 540 - - 19 - - - 308

10 Tangdar 6.8 - - - 0.9 - - 0.69 - - 510 - - 18 - - - 307

11 Teethwal 6.9 - - - 0.9 - - 0.71 - - 480 - - 18 - - - 310

Source : DAP

Page 16: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

Cultivation Waste

2%

Land Put to Non-Agri- Use

2%

Permanent Fallow & waste land

2%

Net area sown

17%

Area Sown More than once

Land use Particulars of District Kupwara

8

Fig. 1

Forest

74%

Area Sown More than once

3%

Land use Particulars of District Kupwara

Forest

Cultivation Waste

Land Put to Non

Permanent Fallow & waste land

Net area sown

Area Sown More than once

Forest

Cultivation Waste

Land Put to Non-Agri- Use

Permanent Fallow & waste land

Net area sown

Area Sown More than once

Page 17: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

9

Table 1.3 GENERAL INFORMATION OF DISTRICT

District Profile

S. NO. Name of the District District Code Latitude Longitude

1 Kupwara 001 35.5◦ N 74.9◦ E

Page 18: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

10

Table 1.4

DEMOGRAPHY

Name of the State Jammu and Kashmir

Name of the District Kupwara

Name of the Block All Blocks

Number of the Blocks

Number of the

Villages covered

Number of the Gram

Panchayats

Population S.C S. T General Total

M F CH Total No. of

Households No. of

Members No. of

Households No. of

Members No. of

Households No. of

Members No. of

Households No. of

Members

11 363 359 373731 307825 188798 870354 189 1048 10987 70352 102753 798954 113929 870354

Source: (Directorate of census operation 2011)

Page 19: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

11

Table 1.5

BIOMASS AND LIVESTOCK

Name of the Block

Small Animals Large Animals

Any other Milch Or

Meat animals (No’s)

Draft Animals (Buffalo/yak/bulls

/ Any other equine)

(No.s) Poultry (no’s)

Ducks (No’s)

Pigs (No’s)

Sheep (No’s)

Goats (No’s)

Indigenous Cows (No’s)

Hybrid Cow

(No’s)

In descriptive Buffalos (No’s)

Hybrid Buffalo (No’s)

All Blocks

519477 19180 - 190889 79228 79694 60574 1747 - - 68501

Source: (Department of Animal Husbandry and Sheep Husbandry)

Page 20: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

12

Table 1.6

AGRO ECOLOGY, CLIMATE, HYDROLOGY AND TOPOGRAPHY

Source: Metrological Department Kupwara

S. No.

Agro Ecological Zone type

Type of

terrain

District Area (ha)

Normal Annual Rainfall (mm)

Average Monthly rainfall (mm)

No. Of

rainy Days

Maximum Rainfall intensity

(mm)

Average weekly TemperatureoC

Period

Beyond 15 up to 30 min

Beyond 30 up to 30 min

Summer (April – May)

Winter (Oct – Mar)

Rainy (June – Sept.)

Mean Max

Mean Min

Mean Max

Mean Min

Mean Max

Mean Min

01

Western Himalayan Region Valley (Temperate)

Plain / Sloppy

237900 1090 90.83 125 - - 21.8 9.4 13.18 1.1 27.6 14

Potential evapo transpiration (PET) (mm) Elevation m (msl)

Period Min Max Mean

Summer Winter Rainy Cumulative Total

1.34 0.69 1.06 3.09 1615.44 3505.2 2560.32

Page 21: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

13

Table 1.7

SOIL PROFILE

Soil Types Land Slope

Major Soil Types Area in (Ha) 0-3%(ha)` 3-8%(ha) 8-25%(ha) Above 25% (ha)

Clay loom 31949 3195 4792 12780 11182

Sandy Loom 7951 3976 3975 - -

Source:- (Directorate of Economic and Stastical J & K & SKUAST- Kashmir

Soil Profile Name of the State: Jammu and Kashmir

Name of the District Kupwara

Name of Blocks: All Blocks

Page 22: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

14

Table 1.8

LAND USE PATTERN

Name of the State: Jammu and Kashmir

Name of the District Kupwara

Name of Blocks: All Blocks

S. No No of Gram Panchayat

No. Of the villages covered

Total Geographical Area (ha)

Area under Agriculture Area under forest (ha)

Area under waste land (ha)

Area under Other uses (ha)

Gross Cropped Area (ha)

Net Sown Area (ha)

Area Sown More than ones (ha)

Cropping Intensity (%)

1 359 363 237900 45755.54 39900 5855 112% 170300 10116 33765.856

Page 23: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

15

Chapter –II

WATER PROFILE IN DISTRICT KUPWARA

Water availability and its quality is a primary factor which determines

socio-economic status and development of habitates has always remained

associated with water resources. Water is essential for domestic consumption/

industrial usage beside irrigation for crop growth. Nature and kind of flora and

fauna of the area is determined by the water availability. Kupwara being a

border district is surrounded by hills which accumulate snow during winters and

the extent of snowfall determines the ground recharge and summer availability

of water. Kehmil, Pohru, Farkin, Lolab, Kalaroos, Hyhama, Talri, Mawar are

main Nallah’s available in the district which cater to the water availability of the

district. This chapter depicts map of existing water resources, water risk status,

and water distribution infrastructure of district Kupwara. This water profile

shall be of use to projectise water use efficiency methods and plan for

economical water distribution methods for its better utility.

Water availability in relation to cropping pattern, livestock status, industrial usage, power generation and its present scenario is depicted in the following tables.

Page 24: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

16

Table 2.1

Rainfall Data (2005-2015) at Kupwara Station (Unit in mm)

Month Year

2005

Year

2006

Year

2007

Year

2008

Year

2009

Year

2010

Year

2011

Year

2012

Year

2013

Year

2014

Year

2015

January 110.40 205.50 9.70 220.80 131.30 26.40 34.30 132.10 68.60 52.20 42.00

February 337.70 161.10 96.00 78.40 168.90 193.30 268.70 170.90 211.70 142.70 235.20

March 176.40 109.70 206.80 26.60 115.20 79.70 196.30 105.00 84.60 403.70 269.60

April 80.20 145.00 26.10 142.50 181.40 178.50 185.60 175.60 101.00 152.70 253.60

May 74.10 44.70 51.00 58.90 74.50 249.90 42.40 99.50 91.40 145.60 116.40

June 5.80 30.70 100.10 18.20 44.50 58.30 52.10 47.30 92.50 38.40 92.40

July 67.90 54.30 79.10 54.90 59.60 223.60 16.60 41.20 19.40 45.60 171.30

August 29.90 104.20 41.50 75.10 13.90 142.30 45.00 74.50 153.40 43.70 63.60

September 16.90 56.20 10.50 26.10 45.60 15.90 66.50 144.10 27.70 157.20 65.50

October 23.60 41.80 1.80 43.50 18.30 29.50 68.70 47.50 26.40 37.00 171.50

November 50.10 150.70 0.00 82.40 38.20 1.30 49.50 10.80 12.60 63.70 101.10

December 0.00 92.90 31.60 162.10 22.10 17.60 48.80 114.80 17.50 1.60 44.30

Total 973.00 1196.80 654.20 989.50 913.50 1216.30 1074.50 1163.30 906.80 1284.10 1626.50

Source: Indian Metrological Department (Kupwara Station)

Page 25: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

17

Fig. 2

Year 2005 Year 2006 Year 2007 Year 2008 Year 2009 Year 2010 Year 2011 Year 2012 Year 2013 Year 2014 Year 2015

Series1 973.00 1196.80 654.20 989.50 913.50 1216.30 1074.50 1163.30 906.80 1284.10 1626.50

973.00

1196.80

654.20

989.50913.50

1216.301074.50

1163.30

906.80

1284.10

1626.50

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

1400.00

1600.00

1800.00

Axi

s T

itle

Axis Title

Annual Rainfall Pattern of District Kupwara (2005-2015)

Page 26: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

18

Fig. 3

January February March April May June Jully August September October November December

Series1 86.11 172.05 147.80 135.18 87.37 48.36 69.46 65.59 52.68 42.47 46.70 46.11

86.11

172.05

147.80

135.18

87.37

48.36

69.46 65.59

52.6842.47 46.70 46.11

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

160.00

180.00

200.00

Month-wise Rainfall Pattern of District Kupwara (2005-2015)

Series1

Page 27: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

19

Table 2.2

AREA WISE, CROP WISE IRRIGATION STATUS Name of the state: Jammu and Kashmir

Name of the District: Kupwara

Crop Type

Kharief (Area in ha) Rabi (Area in ha) Summer Crops (Area in ha)

Total (Area in ha) Horticulture & Plantations crops (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

Cereals 17006 16000 33006 400 2000 2400 0.0 0.0 0.0 17406 18000 35406 - - -

Coarse Cereals

0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 - - -

Pulses 0.00 2070 2070 0.00 285 285 0.0 0.0 0.0 0.0 2355 2355 - - -

Oil Seeds

0.00 0.00 0 0.0 1500 1500 0.0 0.0 0.0 0.0 1500 1500 - - -

Fiber 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 - - -

Any Other Crop

2200 0.00 2200 1850 0.00 1850 0.00 0.00 0 4050 0.00 4050 8579.96 20019.89 28599.856

Total 19206 18070 37276 2250 3785 6035 0.00 0.00 0 21456 21855 43311 8579.96 20019.89 28599.856

Source: Department of Agriculture and Horticulture

Page 28: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

20

Table 2.3

PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS Name of the state : Jammu and Kashmir Name of the district : Kupwara

Source: DAP and Department of Horticulture

Sea

son

Crop sown Rainfed Irrigated Total

Cer

eals

Coa

rse

cere

als

Pul

ses

Oils

eeds

Fib

er c

rops

Any

oth

er c

rop

Are

a (h

a)

Pro

duct

ion

Qtls

./yr

Pro

duct

ion

yiel

d (Q

tls./h

a)

Cos

t of

culti

vatio

n R

s.

Per

Ha

Pro

duct

ion

Qtls

./yr

Pro

duct

ion

or

yiel

d (K

gs./h

a)

Cos

t of

culti

vatio

n R

s.

Per

Ha

Pro

duct

ion

Q

tls./y

r

Avg

.Pro

duct

ivity

or

yie

ld (

Qtls

/ha)

Cos

t of

Cul

tivat

ion

Rs.

P

er h

a

Kharief Paddy, Maize

-- Beans -- -- -- 32360 1314450 6350 56000 1630375 7884 56000 1472412.5 7884 56000

Rabi Wheat,

-- Peas Oil Seeds

-- -- 5855 157063 2383 26000 222000 12000 26000 189531.5 12000 26000

Summer -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

Horticulture & Plantation

Apple, Walnut

-- -- -- -- -- 28599.856 2627041.86 9000 1.5 lac -- -- -- 2627041.86 9000 1.5lac

Total -- -- -- -- -- -- 66814.856 4098554.86 17733 232000 1852375 19884 82000 4288985.86 28884 232000

Page 29: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

21

Table 2.4

IRRIGATION BASED CLASSIFICATION

Name of the state: Jammu and Kashmir

Name of the District: Kupwara

Name of the Blocks: All Blocks

Irrigated (Area in Ha) Rainfed (Area in Ha)

Gross Irrigated Area Net Irrigated Area Partially irrigated/Protective Irrigation

Un irrigated or Totally Rainfed

19200 1700 2200 39900

Source: (D A P Kupwara)

Page 30: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

22

CHAPTER – III

Table 3.1

STATUS OF WATER AVAILIBITY (Unit in BCM)

S. No. Sources Kharief Rabi Summer Total

1. Surface Water

i) Canal (Minor & medium Irrigation) 0.33346705 0.103751125 -- 0.437218175

ii) Major irrigation -- -- -- --

iii) Minor irrigation Tanks 0.08601745 0.03234525 -- 0.1183627

iv) Lift irrigation/Diversion 0.01381799 0.005921 -- 0.01973899

v) Various water Bodies including rain water harvesting

0.025372675 0.00683125 -- 0.032203925

vi) Treated effluent received from STP -- -- -- --

vi) Untreated Effluent -- -- -- --

vii) Perennial Sources water -- -- -- --

2. Ground water

0.458675165 0.148848625 0.60752379

i) Open well

ii) Deep Tube well

iii) Medium tube well

iv) Shallow tube well

Page 31: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

23

Table 3.2

STATUS OF COMMAND AREA

Source:- CAD Kupwara

(Unit in Ha)

Name of the state: Jammu and Kashmir

Name of the District: Kupwara

Name of the Blocks:All Blocks

S. NO

Name of the district

Information of canal Command Information on the other service

command Total Area

Total Area

Developed command

Undeveloped Command

Total Area

Developed command

Undeveloped Command

Total Area

Developed command

Undeveloped Command

1 2 3 4 5 6 7 8

1 Kupwara 41290.19 8365.19 32025 -- -- -- -- 8365.19 32025

Page 32: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

24

Table 3.3

EXISTING TYPE OF IRRIGATION (Unit in Ha)

Name of the state: Jammu and Kashmir

Name of the District: Kupwara

Name of the Blocks: All Blocks

Nam

e of

Blo

cks

Sou

rce

of ir

rigat

ion

Surface Irrigation Ground Water Other

Sources includin

g traditional WHS

(3)

Water Extraction devices / lift

Total

Canal Based Tanks/

Ponds/Reservoirs Tube wells

Open Wells

Bore Wells

Ele

ctric

ity

Pum

ps(4

)

Die

sel P

umps

(5)

Oth

ers(

6)

Irrig

atio

n so

urce

s(1+

2+3)

W

ater

ex

trac

ting

un

its(4

+5+

6)

Gov

t C

anal

Com

mun

ity P

vt.

Can

al

Com

mun

ity P

ond

Incl

udin

g S

mal

l In

divi

dual

/ P

rivat

e po

nds

Gov

t. R

eser

voi

r/D

ams

Gov

t.

Pvt

.

Com

mun

ity/G

ovt.

Pvt

.

Gov

t.

1.2.

Tangdar

No’s 8 2 -- -- -- -- -- -- -- -- -- -- -- -- -- -- Command 493.7 317 -- -- -- -- -- -- -- -- -- -- -- -- 810.7 --

Teethwal No’s 6 2 -- -- -- -- -- -- -- -- -- -- -- -- -- Command 479.3 50.24 -- -- -- -- -- -- -- -- -- -- -- -- 529.54 --

Kralpora No’s 3 18 -- -- 9 -- -- -- -- -- -- -- -- -- --

Command 890 530 -- -- 350 -- -- -- -- -- -- -- -- -- 1770 --

Trehgam No’s. 3 20 -- -- 3 -- -- -- -- -- -- -- -- -- -- Command 740 390 -- -- 192 -- -- -- -- -- -- -- -- -- 1322 --

Kupwara No’s 3 8 -- -- 3 -- -- -- -- -- -- -- -- -- --

Page 33: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

25

Nam

e of

Blo

cks

Sou

rce

of ir

rigat

ion

Surface Irrigation Ground Water Other

Sources includin

g traditional WHS

(3)

Water Extraction devices / lift

Total

Canal Based Tanks/

Ponds/Reservoirs Tube wells

Open Wells

Bore Wells

Ele

ctric

ity

Pum

ps(4

)

Die

sel P

umps

(5)

Oth

ers(

6)

Irrig

atio

n so

urce

s(1+

2+3)

W

ater

ex

trac

ting

un

its(4

+5+

6)

Gov

t C

anal

Com

mun

ity P

vt.

Can

al

Com

mun

ity P

ond

Incl

udin

g S

mal

l In

divi

dual

/ P

rivat

e po

nds

Gov

t. R

eser

voi

r/D

ams

Gov

t.

Pvt

.

Com

mun

ity/G

ovt.

Pvt

.

Gov

t.

1.2.

Command 1330 1848 -- -- 792 -- -- -- -- -- -- -- -- -- 3970 --

Sogam No’s. 2 43 -- -- 40 -- -- -- -- -- -- -- -- -- -- -- Command 1044 174 -- -- 522 -- -- -- -- -- -- -- -- -- 1740 --

Wavoora No’s 3 4 -- -- 9 -- -- -- -- -- -- -- -- -- -- Command 660 450 -- -- 290 -- -- -- -- -- -- -- -- -- 1400 --

Kalarooch No’s. - 12 -- -- - -- -- -- -- -- -- -- -- -- -- Command - 660 -- -- - -- -- -- -- -- -- -- -- -- 660 --

Langate No’s. -- -- -- -- -- -- -- -- -- -- -- -- Command 4335 3635 -- -- 400 -- -- -- -- -- -- -- -- -- 8370 --

Ramhal No’s -- -- -- -- -- -- -- -- -- -- -- -- Command 1939 2248 -- -- 131 -- -- -- -- -- -- -- -- -- 4318 --

Rajwar No’s -- -- -- -- -- -- -- -- -- -- -- -- -- -- Command 550 2900 528 -- 2040 -- -- -- -- -- -- -- -- -- 6018 --

Table 3.3 Continue..

Page 34: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

26

CHAPTER – IV

WATER REQUIREMENT/DEMAND

Water supply is an essential requirement of all people throughout globe.

Providing water is never free; the water needs to be collected, stored treated and

distributed. People use water for a wide variety of activities, some of which are

important than others e.g drinking water is more essential than washing clothes.

The need of people for water is not predictable. Different populations have

different needs of water. Water requirement differs from location to location. It

is preferable to provide separate water supplies for bathing, washing or animals

as well as for hospitals, feeding centers and school. All people should have safe

access to sufficient quantity of water for drinking, cooking and personal and

domestic hygiene.

Water requirement of a crop means the total quantity of all water and the way in

which a crop requires water from the time it is sown to a time it is harvested.

The water requirement of a crop varies with the crop as well as with place. The

same crop may have different requirements at different places, depending upon

climate, type of soil, method of cultivation and useful rainfall.

Page 35: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

27

Table 4.1

DOMESTIC WATER DEMAND

(Unit in BCM) DOMESTIC WATER DEMAND

S No. Name of Block Population 2015 Present water demand

Projected population in 2020

Gross water demand

1 Langate 128157 0.0032744113 150328 0.0038408804

2 Rajwar 98246 0.0025101853 115243 0.002944455

3 Ramhal 58984 0.0015070412 69188 0.001767695

4 Sogam 89545 0.0022878747 105036 0.0026836698

5 Wavoora 72172 0.0018439946 84658 0.0021630119

6 Kalaroose 64627 0.0016512198 75807 0.00193686885

7 Kupwara 189486 0.0048413673 222267 0.00567892185

8 Trehgam 88595 0.0022633022 103922 0.0026551925

9 Kralpora 132548 0.0033866014 155479 0.00397248845

10 Tangdhar 34860 0.000890673 38120 0.000973966

11 Teethwal 27260 0.000696493 31170 0.0007963935

Total 984480 0.025153464 1151218 0.0291354325

Source: PHE Kupwara

Page 36: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

28

Table 4.2

CROP WATER REQUIREMENT

Block Crop Area Sown Ha Irrigated Area(Ha)

Crop Water Demand (mm)

Water Potential Required (BCM)

Existential Water

Potential (BCM)

Water Potential to be

created(BCM)

Paddy 4345 4345 1500 0.065175 0.065175 0

Maize 2880 280 600 0.01728 0.00168 0.0156 Pulses 480 0 550 0.00264 0 0.00264

Langate

Vegetables 780 500 700 0.00546 0.0035 0.00196

Oil Seed 830 200 500 0.00415 0.001 0.00315 Wheat 10 0 550 0.000055 0 0.000055 Fodder 735 50 550 0.0040425 0.000275 0.0037675

Orchard 7474.98 2242.2 800 0.05979984 0.0179376 0.04186224

Ramhall

Paddy 1925 1925 1500 0.028875 0.028875 0 Maize 1700 135 600 0.0102 0.00081 0.00939 Pulses 245 31 550 0.0013475 0.0001705 0.001177

Vegetables 300 200 700 0.0021 0.0014 0.0007

Oil Seed 65 10 500 0.00035 0.00005 0.0003 Wheat 10 0 550 0.000055 0 0.000055 Fodder 448 40 550 0.002464 0.00022 0.002244

Orchard 2185 555.5 800 0.01744 0.004444 0.012996

Table 4.2 Continued

Page 37: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

29

Block Crop Area Sown Ha Irrigated Area(Ha)

Crop Water Demand (mm)

Water Potential Required (BCM)

Existential Water

Potential (BCM)

Water Potential to be

created(BCM)

Paddy 1730 1260 1500 0.02595 0.0189 0.00705 Maize 2420 0 600 0.01452 0 0.01452

Rajwar

Pulses 335 0 550 0.0018425 0 0.0018425 Vegetables 720 425 700 0.00504 0.002975 0.002065 Oil Seed 365 0 500 0.001825 0 0.001825 Wheat 10 0 550 0.000055 0 0.000055 Fodder 812 130 550 0.004466 0.000715 0.003751 Orchard 4556.338 1386.8 800 0.036450 0.011094 0.02535

Paddy 1260 950 1500 0.0189 0.01425 0.00465

Maize 1140 0 600 0.00684 0 0.00684 Pulses 195 20 550 0.0010725 0.00011 0.0009625

Sogam

Vegetables 300 250 700 0.0021 0.00175 0.00035 Oil Seed 25 0 500 0.000125 0 0.000125 Wheat 0 0 550 0 0 0 Fodder 230 0 550 0.001265 0 0.001265 Orchard 1399.41 419 800 0.011195 0.003352 0.007843

Paddy 1230 1150 1500 0.01845 0.01725 0.0012

Wavoora

Maize 1340 75 600 0.00804 0.00045 0.00759 Pulses 205 0 550 0.001127 0 0.001127 Vegetables 420 270 700 0.00294 0.00189 0.00105 Oil Seed 10 0 500 0.00005 0 0.00005 Wheat 0 0 550 0 0 0 Fodder 150 60 550 0.000825 0.00033 0.000495 Orchard 1400.84 420.25 800 0.01120 0.00336 0.00785

Table 4.2 Continued

Page 38: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

30

Block Crop Area Sown Ha Irrigated Area(Ha)

Crop Water Demand (mm)

Water Potential Required (BCM)

Existential Water

Potential (BCM)

Water Potential to be

created(BCM)

Paddy 510 480 1500 0.00765 0.0072 0.00045

Maize 1020 0 600 0.00612 0 0.00612

Kalaroose

Pulses 135 0 550 0.0007425 0 0.0007425 Vegetables 190 170 700 0.00133 0.00119 0.00014 Oil Seed 0 0 500 0 0 0 Wheat 40 0 550 0.00022 0 0.00022 Fodder 120 20 550 0.00066 0.00011 0.00055 Orchard 1398 419.4 800 0.011184 0.0033552 0.0078288

Paddy 1580 1420 1500 0.0237 0.0213 0.0024 Maize 1400 452 600 0.0084 0.002712 0.005688

Kralpora

Pulses 245 0 550 0.0013475 0 0.0013475 Vegetables 380 350 700 0.00266 0.00245 0.00021 Oil Seed 20 0 500 0.00004 0 0.00004 Wheat 0 0 550 0 0 0 Fodder 290 135 550 0.001595 0.0007425 0.0008525 Orchard 2069.7 621 800 0.0165576 0.004968 0.0115896

Paddy 600 545 1500 0.009 0.0081 0.0009

Tangdhar

Maize 600 65 600 0.0036 0.00039 0.00321 Pulses 150 0 550 0.000825 0 0.000825 Vegetables 90 80 700 0.00063 0.00056 0.00007 Oil Seed 55 0 500 0.000275 0 0.000275 Wheat 50 0 550 0.000275 0 0.000275 Fodder 170 45 550 0.000935 0.0002475 0.0006875 Orchard 778 233.4 800 0.006224 0.001867 0.004357

Table 4.2 Continued

Page 39: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

31

Block Crop Area Sown Ha Irrigated Area(Ha)

Crop Water Demand (mm)

Water Potential Required (BCM)

Existential Water

Potential (BCM)

Water Potential to be

created(BCM)

Kupwara

Paddy 2210 1950 1500 0.03315 0.02925 0.0039 Maize 1600 330 600 0.0096 0.00198 0.00762 Pulses 220 0 550 0.00121 0 0.00121 Vegetables 460 300 700 0.00322 0.0021 0.00112 Oil Seed 35 0 500 0.000175 0 0.000175 Wheat 0 0 550 0 0 0 Fodder 347 120 550 0.00190 0.00066 0.00124 Orchard 4985.136 1485.5 800 0.0398 0.01188 0.02792

Trehgam

Paddy 1210 850 1500 0.01815 0.01275 0.0054 Maize 1500 0 600 0.009 0 0.009 Pulses 215 0 550 0.0011825 0 0.0011825 Vegetables 400 350 700 0.0028 0.00245 0.00035 Oil Seed 55 15 500 0.000275 0.0000825 0.0001925 Wheat 0 0 550 0 0 0 Fodder 248 120 550 0.001364 0.00066 0.000704 Orchard 2235.25 670.57 800 0.017882 0.00536456 0.01251744

Teethwal

Paddy 400 385 1500 0.006 0.005775 0.000225 Maize 400 35 600 0.0024 0.00021 0.00219 Pulses 80 0 550 0.00044 0 0.00044 Vegetables 160 142 700 0.0012 0.000994 0.000206 Oil Seed 40 0 500 0.0002 0 0.0002 Wheat 80 0 550 0.00044 0 0.00044 Fodder 210 67 550 0.001155 0.0003685 0.0007865 Orchard 606.5 182 800 0.004852 0.001456 0.003396

Table 4.2 Continued

Page 40: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

32

Table 4.3

LIVESTOCK WATER DEMAND

Source: Department of Animal & Sheep Husbandry

Block Total Number of livestock

Present Water Demand (BCM)

Water Demand in 2020 (BCM)

Existing Water Potential (BCM)

Water Potential to be created (BCM)

Langate 82571 0.00090415 0.00113018235 0.14134 0

Rajwar 65575 0.00071804625 0.0089756055 0.092868 0

Ramhal 35977 0.00039394815 0.0004924434 0.09859 0

Sogam 156690 0.0017157555 0.0021446889 0.07919068 0

Wavoora 158476 0.0017353122 0.00216914025 0.07919068 0

Kalaroose 153014 0.0016775503 0.0020945817 0.0763 0

Kupwara 69530 0.0007613535 0.00095169735 0.8417852 0

Trehgam 115626 0.00012661047 0.00158263635 0.0548706 0

Kralpora 97299 0.00106542405 0.0013317828 0.14272024 0

Tangdhar 37593 0.00041164335 0.0005145624 0.0079044 0

Teethwal 60409 0.00066147855 0.00066147855 0.0049140 0

Total 1032760 0.01017127232 0.02204879955 1.6196738 0

Page 41: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

33

Table 4.4

INDUSTRIAL WATER DEMAND

Block Total Number of industry Present Water Demand (BCM)

Water Demand in 2020 (BCM)

Existing Water Potential (BCM)

Water Potential to be created (BCM)

-- Stone Crushers 5 Cement Hallow Blocks 4

0.00003 0.00004 0.14134 0

-- Industrial Estate Chotipora cement hallow block unit 4

0.00003 0.000045 0.092868 0

-- Cement Hallow Block unit 4 0.000006 0.00001 0.09859 0 -- Cement Hallow Block unit 4 0.00000045 0.000012 0.07919068 0 -- Cement Hallow Block unit 4 0.000006 0.000008 0.07919068 0 -- Stone Crusher 1 0.000001 0.000006 0.0763 0 -- Industrial Estate Kupwara.

Industrial Estate Redbug. Cement Hallow Block unit 4 Stone Crushers 2

0.0000015 0.000045 0.8417852 0

-- Marble Cutting unit 6 Cement Hallow Blocks unit 4 Stone Crushers 2

0.00002 0.00003 0.0548706 0

-- Cement Hallow Block unit 4 0.000003 0.000011 0.14272024 0 -- Stone Crusher 1

Cement Hallow Block Unit1 0.000002 0.000005 0.0079044 0

-- Cement Hallow Block Unit 1 0.000001 0.000003 0.0049140 0

Total 0.00010095 0.000215 1.6196738 0

Page 42: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

34

Table 4.5

WATER DEMAND FOR POWER GENERATION

WATER DEMAND FOR POWER GENERATION

Block Power

Requirement MW Water Demand (BCM)

Water Demand in 2020 (BCM)

Existing Water Potential (BCM)

Water Potential to be created (BCM)

All Blocks Note:- 2 MW Capacity power house located at Karnah requires 0.176052073 BCM per annum water for generating 2 MW of power. However presently only 1 MW is available requiring 0.0880260365 BCM of water. So future demand is another 0.0880260365 BCM per annum of water to operate the power house to its full potential.

Page 43: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

35

Table 4.6

TOTAL WATER DEMAND OF THE DISTRICT FOR VARIOUS SECT ORS

S No. Block Components Total (BCM)

Domestic Crop Livestock Industrial Power Generation

1 Langate 0.0032744113 0.0895676 0.00090415 0.00003

N.A.

0.012429

2 Rajwar 0.0025101853 0.033684 0.00071804625 0.00003 0.010058

3 Ramhal 0.0015070412 0.0359695 0.00039394815 0.000006 0.005559

4 Sogam 0.0022878747 0.019462 0.0017157555 0.00000045 0.008523

5 Wavoora 0.0018439946 0.02328 0.0017353122 0.000006 0.008095

6 Kalaroose 0.0016512198 0.0118522 0.0016775503 0.000001 0.00783

7 Kupwara 0.0048413673 0.04587 0.0007613535 0.0000015 0.018809

8 Trehgam 0.0022636022 0.02130706 0.00012661047 0.000003 0.007306

9 Kralpora 0.0033866014 0.0321725 0.00106542405 0.00002 0.010358

10 Tangdhar 0.00089.673 0.111645 0.00041164335 0.000002 0.005964

11 Teethwal 0.000696493 0.0073475 0.00066147855 0.000001 0.176052073 0.181611

0.024262791 0.43215736 0.01017127232 0.00010095 0.176052073 0.276542

Page 44: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

36

Table 4.7

WATER BUDGET S. No.

Name of the Blocks

Existing Water Availability (BCM)

Total (BCM) Water Demand (BCM) Water Gap (BCM)

Surface water

Ground Water

Present Projected (2020)

Present Projected (2020)

1 Langate 0.14134 0.0035 0.14484 0.09810 0.132350 nil nil

2 Rajwar 0.092868 0.00218 0.095048 0.053 0.08905 nil nil

3 Ramhal 0.09859 0.001682 0.1002725 0.045320 0.066950 nil nil

4 Kralpora 0.14272024 0.0015139 0.14423414 0.037742 0.0493075 nil nil

5 Trehgam 0.0548706 0.0015139 0.0563845 0.0327765 0.0427875 nil nil

6 Kupwara 0.08417852 0.002523 0.08670152 0.0490885 0.06014 nil nil

7 Sogam 0.07919068 0.00185 0.08104068 0.03030025 0.0802025 nil nil

8 Wavoora 0.0763 0.001177 0.077477 0.0303825 0.0354575 nil nil

9 Kalaroose 0.054992 0.00504 0.060032 0.0167225 0.050955 nil nil

10 Tangdar 0.0079044 0.000836 0.0087404 0.0010799 0.0023885 nil nil

11 Teethwal 0.0049140 0.0001682159 0.00508 0.001906475 0.003906475 nil nil

Total 0.83786844 0.0219840159 0.85985074 0.396418625 0.613494975 nil nil

Page 45: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

37

CHAPTER – V

BLOCK -WISE TABLES

Page 46: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

38

Table 5.1.1 Table 1.2 Demography Name of the state: - Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Langate

Name of the Gram Panchayat Name of the Villages Covered

Cod

e of

th

e B

lock

Population S.C S.T General Total

M

F

To

tal

No

. O

f h

ou

se

ho

lds

No

. O

f m

emb

ers

No

. O

f h

ou

se

ho

lds

No

. O

f m

emb

ers

No

. O

f h

ou

se

ho

lds

No

. O

f m

emb

ers

No

. O

f h

ou

se

ho

lds

No

. O

f m

emb

ers

GUloora, Kultoora, Pohrupeth, Wahipora, Unisoo Khanoo BAbagund, Kasloo, Sohipora, Khahipora, Mandigam, Udhipora, Yaroo, Lalbugh, LOkipora, Deedarpora, Renan, Ringpath A, B Walrahama A,B Gundkamal, Ashpora, Harveth, Rawalpora, A,B Hajin, Kralgund, Supernaghama, Pandithpora, Shanoo, Shartgund Bala, Teerna, Haril, Moonbal, Banday, Hanga, Mawer, LAch, Nowgam A, B Yahama A, B, KAlamchalka, Batagund, Maratgam, Audoora, Jehama, Pringroo, Shahnagri, Khudi, Kargam, Bicherwara.

Galoora, Khoroo, Kultoora, Hanjishart, Phorupeth, Bungam, Wahipora, Haripora, Unisoo, Ujroo, Khanbabagund, Kachiri, Kasloo, Wanigam, Sohipora, Sonwani, Khaipora, Palapora, Mundigam, Thokerpora, Respora, Udipora, Yaroo, Span Yaroo, LAlabugh, Ganapra, Lukipora, Malbagh, Deedarpora, Shalalpora, Badderpora, Reshpora, Renan, Safalpora, Khowerpora, Pazipora, Ring Path, Kunil, Kralpora, Walrama, Bijhama, Gundkamal, Doger, Chekipuran, Ashpora, Harwat, Budbugh, Utingoo, Rawalpora, Muqam, Handwanpora, Gundchobotra, Mongwalpora, Hajan, Ananwan, Kralgund, Nahama, Super Nagam, Khangund, Pandithpora, Hamporfa, Shanoo, Shartgund bala, GundRazak, Teerna, Darbal Payeen, Haril, Dudikul, Monabal, Lohikote, Banday, Sheltera, Hanga, Sudergund, Mawer, Sanzipora, Lach, Gamandar, Banjer, Khuri, Bagdegi, Putwari, Rishwari, Pringwari, Inderdeji, Yahama Mankal, Madwa,Kalamchakla, batagund, Shartgund payeen, Marathgam Adoora, Warpora, Jahama, Sheikhpora Pringroo, Chontipora, Shahnagri, Kutlari, khudi, Hydermari, Kargam, Chontipora, Bicharwari, Badrah Payeen

0009

5883

2

5160

4

1104

36

12

53

680

4274

1494

9

1061

09

1564

1

1104

36

Page 47: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

39

Table 5.1.2 Table 1.2 Demography Name of the state :- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Rajwar

Name of the Gram Panchayat Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

of

hous

e ho

lds

No.

of

mem

bers

N

o. o

f ho

use

hold

s N

o. o

f m

embe

rs

No.

of

hous

e ho

lds

No.

of

mem

bers

No.

of

hous

e ho

lds

No.

of

mem

bers

Bakihukar, Khaipora, Turkpora, Rajpora, Behnipora, Satkoji, Wader payeen, Changmullah, Shalal, Batkoot, Machipora, Neelipora, Chogul, Maidan Chogal I, II, PAzalpora, Sodal, Bawan Watsar, Yamier, Kulangam A,B, Zachaldara A,B, Wadipora, A,B, Opezwani, Shogpora, Ahgam, Magam, A,B C, Baderkal, Goniporta, Baderkhah.

Bakhihakar, Dudipora, Khaipora, Kramhoora, Trukipora, Lachipora, Rajwar, Behnipora, Satkoji, Wader Bala, Nich Hama, Wader Payeen, Chanjimullah, Laribal, Shartigam, Shahlal, Rek Shalal, Waripora, Badkote, Washkroo, Machipora, Neelipora, Babagund, Batapora Khanpotra, Chogul, Maidan Chogul, I, II, Pazalpora, Palpora, Sodal, Bown Watsar, Yamier, Kulangam A, B, Zachaldara, A B Wadipora, A, B , Opezwani, Shogpora, Ahgam, Magam, A, B,C , Baderkhal, Gonipora, Baderhar.

0008

4724

7

4382

6

9107

3

- 59

1070

5883

1095

1

7160

6

1403

2

9107

3

Page 48: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

40

Table 5.1.3 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Ramhall

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

VIllagham, A,B, Hafrada, Phalmarg,Hachmarg,Taratpora, A,B Waisa Kawanard, Hangnikoot, Cheerkoot, Padergund, Pachkoot, Kalmoona, champora, Manzgam, PUnzwa, A,B Lilum, Dolipora, A,B, Kukroosa, Dahama A, B, Lachamapora, Sarmarg, Zaferkahani, Kenyal, Sharkoot, Tumina

VIllagam A,B Hafartad, Phelmarg, Natchmarg, Balinard, TArathora, Daril, Waisa Kawanard, hangnikoot, Cheerakot, Checkbakshi, Gondmomin, Padehgund, Bundergund, Pachkoot, Kalmoona, Champora, Voreripora, Menzgam, Voreripora, Manzgam, Punzwa, A,B, LIlum, Kalipora, Cherpora, Dolipora, Sunmulla, Kukroosa, Dahama, Lachamporta, Dogerpora, Sarmarg, Zafarkhani, KEnyal, Haradora, Sharkoot, Amarghad, Tumina

0007

2754

0

2427

3

5181

3

02

05

941

5461

6538

4634

7

7481

5181

3

Page 49: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

41

Table 5.1.4 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Sogam

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

Diver A,B, C,D, Dorus Wani, Walkul, Tekipora A, B Hayatpora, Dardpora, Muqam Dardpora, Rednag, Lalpora, Shalgund, Lalpora B Rangwar Lalpora, Darpora A, B , Krusan, Saiwan, Tangchek, Sogam A, B, C D, Chandigam, Gundimancher

Diver Anderbug, Diver, Diver Anderbug, Dorusa Wani, Walkula, Tekipora, tekipora Partly , Hayatpora Partly, thandoosa, Daradpora, Muqam Dradpora, Rednag, Charligund, Lalpora, Shalgund, Lalpora, Darapora, Sonnar, Darapora, Krusun, Saiwan, tengchek, Dramwari, Sogam A, Sogam Partly, Gundbug, Chandigam, Gundmancher, Rak- Gundmancher

0004

4383

7

3933

2

8316

9

52

263

529

2840

9391

8006

6

9972

8316

9

Page 50: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

42

Table 5.1.5 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Wavoora

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

Of h

ouse

ho

lds

No.

Of

mem

bers

No.

Of h

ouse

ho

lds

No.

Of

mem

bers

No.

Of h

ouse

ho

lds

No.

Of

mem

bers

No.

Of h

ouse

ho

lds

No.

Of

mem

bers

Wavoora ,Wavoora, A,B, Warnow,A,B,C Sever, Kawari, Khurhuma,A,B C, Kuligam A, B, C Maidanpora Cheerkote, Gagal A A,Cherkote, Shumriyal, Surigam, Khodi, Putshai, Kanthpora, Doniwari

Wavoora, Warnow,A,B Ophan, Siver, Thandipora, Kawari, Khurhama, Takiya, Khurhama, Batanad, Chakla, Tankipora, Shrant, payeen, Kuligam, Nad Kuligam, Margund, Branth, Shalgund, Kandhar, Changdi, Puthkah, Maidanpora, Cheepora, Gagal, Gagal,Ckerkote, Shumriyal, Gundjahangr, Surigam, Khodi, Putushai, Kanthpora, Dooniwari

0005

3325

5

2910

8

6236

3

21

107

1469

1069

5

6439

5156

1

7929

6236

3

Page 51: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

43

Table 5.1.6 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Kalaroose

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

Kalaroose, Dogerpora, Madmadow, Lastiyal, Sarkuli, Nunwani, Payeerpora, Kanipora, Moori, Ladha, Nagsari, Narikoot, Thayan A, Thayan Gujran, Khumriyal A,B,C, Machil, Puswari, Chountwari Payeen, Chountwari Payeen, Ring Payeen, Ring Bala, Dapal.

Kalaroose, Boninard, Dogerpora, Madmadow, Dal, Badimaidian, Lastiyal, Surkoli, Jakadnada, Nunwani, Damni, Payerpora, Hajibal, Konipora, Narizeb, Moori, Ladha, Nagseri, Bedibehak, Narikoot, Thayan, Thayan, GUjran, Khumriyal, Machil, Pushwari, Chountiwari, Harding, Malik bela, Danah, Hardring Bala, Dudi, Dapal, Misribehak.

0006

3096

6

2620

3

5816

9

13

73

1835

1282

3

5863

4527

3

7711

5816

9

Page 52: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

44

Table 5.1.7 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Kupwara

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

Of

hous

e ho

lds

No.

Of

mem

bers

N

o. O

f ho

use

hold

s N

o. O

f m

embe

rs

No.

Of

hous

e ho

lds

No.

Of

mem

bers

N

o. O

f ho

use

hold

s N

o. O

f m

embe

rs

Nutnoosa A B, Kandi A,B Trich, Keegam, Waterkhani, Redbug, Anderhama, Muqam Shahwali, Drugmulla A, B C, Nagri, Bugernagh, Bramri A, B, Arampora, Jaggerpora, BUmhuma, Vodhpora., Kawari, Gushi, A, B , Karihuma, A, B, Batergam, Bohipora TIkker, Mogalpora, Hatmulla, Deedikoot, Pazipora, Halmatyhpora, A ,B , C, Payerpora Batpora A, B, C, D, Gundsauna, JUgtiyal, Gonipora, MAnzhar, humander, baba POra, Monigah, A,B,C, zangli, Shortpora, Sulkoot, Sohipora, Qasba Hyhama, Gutlipora

Nutnoosa, Kandi Khass, Sadu Gana, Tirch, Keegam, Waterkhani, Shadiporta, Redbug, Anderhuma, MUqam Shahwali, DRugmullah, CHal Pati, Drugmullah, Nagri Malpora, Huckerpora, BUbernag, Vobgal, Nagri Bala, BRamri, Arampora, Jagerpora, Bumhuhma, Vodhpora, Kawari, Gushi, Karihuma, Beliporta, PUshwari, Batergam, Bohipora,, Tikker Mogalpora, Gung Gushi, Hatmulla, Payerpora, Warpora, Deedikoot, Gotango, PAzipora, Halmathpora, A,B, Halmathpora Partly, Payerpora, Batapora, Balhama, Balkoot, Behramdari, Bela, Kanjbehak, Chat, Pathra, Kundnard, Kamkudi, Safawali, Thumbnard, Lashdat, Bonagam, MIryan, Guchipora, Gundsana, Chaligund, Jugtiyal, Gionipora, Khanpora, Manxhar, Mirnag, Babapora, Manigah, Glass Deji, Hajinaka, ZAngli, Kashera, Shartpora, Sulkoot, Sohipora, qasba Hayhama, Gutlipora.

0003

9367

5

7014

3

1638

18

57

330

1249

9128

1579

9

1334

17

1139

29

1638

18

Page 53: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

45

Table 5.1.8 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Trehgam

7043 689+Name of the Gram

Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

Of

hous

e ho

lds

No.

Of

mem

bers

N

o. O

f ho

use

hold

s N

o. O

f m

embe

rs

No.

Of

hous

e ho

lds

No.

Of

mem

bers

N

o. O

f ho

use

hold

s N

o. O

f m

embe

rs

Trehgam A, B, C, D,E, F, Gugloosa A, B, Shumnug, Hayan A.B Poshpora A,B Harri A,B Hundi, Alachizab, Gulgam A,B,C,D Zurhama A,B Laderwan Kawari Jumgand Marhama,Awoora A,B,C,D, Kunan Hanjipora, Harri Payeen

Trehgam, Dolipora, Trehgam,Gughloosa, Shumnag,Solina, Gofabal, Hayan, Poshpora, Harri, Hundi, ALachizab, Gulgam, Zurhama, Gujerpati, Laderwan, Kawari, Jumagand Marhama, Awoora Kunan, Hanjipora, Herri Payeen

0002

4140

9

3691

2

7832

1

01

04

437

2885

8550

7543

2

8988

7832

1

Page 54: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

46

Table 5.1.9 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Kralpora

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M F Total N

o. O

f ho

use

hold

s

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

Kralpora A, Kralpora B , Kralpora C, Meelyal , Kachhama A,Kachama B, Keran, Mandyan,Panzgam A Panzgam B Panzgam C, Rawathpora, Gund Zonrewshi, Chowkibal, Budnambal Bala, Budnamal Payeen, Shuloora, Aloosa, Reddi,Manzpather, Manchatar,Batpora A, BatporaB, Warsun A, Warsun B, Dard Harie, Rashan Pora A, Rashan Pora B, Dardsun A, Dardsun B, Gazreyal A, Gazreyal B, Dardpora A, Dardpora B, Dardpora C, Dardpora D,Dardpora E, Reshigund, Lone Harie A, Lone Harie B, Farkin, Pathran

Kralpora(Partly,Kralpora(partly),Kralpora(partly),Meelyal Kachama bala, Asthan Mohallah, Kachama Payeen Duban, Karen,Bore,Mundiyan,Panzgam (partly) Panzgam (Partly),Panzgam(Partly),Rawathpora, Gund zunreshi, Chowkibal,Marseri,rangwar,budnambal bala,budnamal payeen,shaloora,slamatwari,aloosa,redi,manzpathra,Manchatra, Khanbal,Batpora (partly),Sonthipora,Warsun(partly),Warsun(Partly),Dardsun (partly),Dardsun(Partly),Gazriyal(Partly),Gazriyal(Partly), gujran(Partly),Gujran (Partly),Kashmiri (Partly),kashmiri(partly),Thendipora Muqam ReshiGund Lone Harie(Partly),Wakoora, Lone Harie(Partly), Karkin, Pathran,Bichwal,Bogna

0001

6195

8

4910

5

1110

63

113

43

1363

8640

1034

6

1023

80

1172

0

1110

63

Page 55: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

47

Table 5.1.10 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Tangdar

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population S.C S.T General Total

M

F

Tot

al

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

No.

Of

hous

e ho

lds

No.

Of

mem

bers

Tangdhar,A,B , hajinard, Bagibela, Gomal, Kandi Bala,Payeen, Gabra 1 , 11, 111 Dildar A,B, Kona-Gabra Nichyan, Khowerpora A,B

Tanghdar A,B Hajinar,Begibela, Hapthnar Gumal, Budwan, Kandjbala, kandi payeen, Nowgabra, A,B,C Dildar A,B , Koni Gabra, Nachiyan ,Handwal, KHoverora (patly), Khaverpora (partly)

0011

2071

9

1362

9

3434

8

20

111

598

3611

5772

3062

6

6390

3434

8

Page 56: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

48

Table 5.1.11 Table 1.2 Demography Name of the state:- Jammu and Kashmir Name of the District:- Kupwara Name of the Block:- Teethwal

Name of the Gram Panchayat

Name of the Villages Covered

Cod

e of

the

Blo

ck

Population

S.C S.T General Total

M

F

Tot

al

No.

Of

hous

e ho

lds

No.

Of

mem

bers

N

o. O

f ho

use

hold

s N

o. O

f m

embe

rs

No.

Of

hous

e ho

lds

No.

Of

mem

bers

N

o. O

f ho

use

hold

s N

o. O

f m

embe

rs

Teethwal, Seemari, Khamkote A,B, Gundgujran, Pradda, Amrohi, Haji terah, Jabdi, Bhaderkote, Ibkote, Tadd , Sudipora, Chanipora,A,B ,

Tethwal, Drangla, Triboni, Seemari, Parni, Kadhama, Chamkote A, Chiterkote, Pur Pungla, Gund Saidan, Gundgujran, gundShart, Dragged, Parada, Chatkadi, Amroohi, Hajitra, Jabdi, Bijaldara, Bahadurkoot, Pringla Haridal, Idkoot, Tad, Panjtaran, Saidpora, Danih, Gasla, Chinipora Bala, Tribooni, Chinipora payeen

0010

1375

2

1202

9

2578

1

- -

816

4112

4216

2166

9

5032

2578

1

Page 57: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

49

Table: 5.2

BIOMASS AND LIVESTOCK

S. No.

Name of the Block

Small Animals (in No’s)

Large Animals (in No’s)

Another Milk or Meat

Animal (in No’s)

Draft Animals (Buffalo/ Yak/

Bulls/ any other (in No’s)

Poultry Ducks Sheep Goats Indigenous Cow

Hybrid In

Descriptive Buffalo

Hybrid Buffalo

1. Sogam 110660 6257 20212 4313 5369 3212 137 0 0 6530

2. Wavoora 113000 3923 16925 4903 8560 2910 105 0 0 8150

3. Kalaroose 88340 3540 31266 7152 9210 1808 338 0 0 11360

4. Kralpora 48208 1215 14921 7176 12797 5311 26 0 0 7645

5. Tangdar 9045 0 13037 9232 3385 853 33 0 0 2008

6. Teetwal 18085 0 15463 14662 6770 1340 74 0 0 4015

7. Trehgam 69995 4160 12671 5549 8552 9401 22 0 0 5276

8. Langate 24560 0 21642 7758 7554 12268 243 0 0 8546

9. Rajwar 19365 0 17053 6823 5543 9248 280 0 0 7263

10. Ramhall 11638 0 8484 3852 3567 4710 465 0 0 3261

11. Kupwara 6581 85 19215 7808 8387 9513 24 0 0 19127

Total 519477 19180 190889 79228 79694 60574 1747 0 0 83181

Source: Animal Husbandry & Sheep Husbandry

Page 58: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

50

Table: 5.3.1

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Langate

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 4345 2880 7225 10 1140 1150 0 0 0 4355 4020 8375 2242.2 5232.78 7474.98

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 420 420 0 60 60 0 0 0 0 480 480 0 0 0

d) Oil Seed 0 0 0 0 830 830 0 0 0 0 830 830 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

390 0 390 390 0 390 0 0 0 780 0 780 0 0 0

Total 4735 3300 8035 400 2030 2430 0 0 0 5135 5330 10465 2242.2 5232.78 7474.98

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 59: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

51

Table: 5.3.2

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Rajwar

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 1730 2420 4150 10 484 494 0 0 0 1740 2904 4644 1386.8 3259.54 4646.34

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 280 280 0 55 55 0 0 0 0 335 335 0 0 0

d) Oil Seed 0 0 0 0 365 365 0 0 0 0 365 365 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

360 0 360 360 0 360 0 0 0 720 0 720 0 0 0

Total 2090 2700 4790 370 904 1274 0 0 0 2460 3604 6064 1386.8 3259.54 4646.34

Source: District Agriculture Plan (DAP) & Department of Horticulture

Page 60: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

52

Table: 5.3.3

AREA-WISE, CROP-WISE IRRIGATION STATUS

CD Block: Ramhall (Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 1925 1700 3625 10 105 115 0 0 0 1935 1805 3740 555.5 1532.2 2087.7

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 200 200 0 45 45 0 0 0 0 245 245 0 0 0

d) Oil Seed 0 0 0 0 65 65 0 0 0 0 65 65 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

150 0 150 150 0 150 0 0 0 300 0 300 0 0 0

Total 2075 1900 3975 160 215 375 0 0 0 2235 2115 4350 555.5 1532.2 2087.7

Source: District Agriculture Plan (DAP) & Department of Horticulture

Page 61: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

53

Table: 5.3.4

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Teethwal

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 400 400 800 80 80 160 0 0 0 480 480 960 182 424.5 606.5

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 70 70 0 10 10 0 0 0 0 80 80 0 0 0

d) Oil Seed 0 0 0 0 40 40 0 0 0 0 40 40 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

90 0 90 70 0 70 0 0 0 160 0 160 0 0 0

Total 490 470 960 150 130 280 0 0 0 640 600 1240 182 424.5 606.5

Source: District Agriculture Plan (DAP) & Department of Horticulture

Page 62: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

54

Table: 5.3.5

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Tangdar

(Unit in Hac.)

Crop Type

Kharif Rabi Summer Gross Total Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 600 600 1200 50 0 50 0 0 0 650 600 1250 233.4 554.6 788

b) Coarse Cereals

0 130 130 0 20 20 0 0 0 0 150 150 0 0 0

c) Pulses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

d) Oil Seed 0 0 0 0 55 55 0 0 0 0 55 55 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

60 0 60 30 0 30 0 0 0 90 0 90 0 0 0

Total 660 730 1390 80 75 155 0 0 0 740 805 1545 233.4 554.6 788

Source: District Agriculture Plan (DAP) & Department of Horticulture

Page 63: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

55

Table: 5.3.6

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Kralpora

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 1580 1400 2980 0 52 52 0 0 0 1580 1452 3032 621 1448.7 2069.7

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 220 220 0 25 25 0 0 0 0 245 245 0 0 0

d) Oil Seed 0 0 0 0 20 20 0 0 0 0 20 20 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

190 0 190 190 0 190 0 0 0 380 0 380 0 0 0

Total 1770 1620 3390 190 97 287 0 0 0 1960 1717 3677 621 1448.7 2069.7

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 64: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

56

Table: 5.3.7

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Wavoora

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 1230 1340 2570 0 0 0 0 0 0 1230 1340 2570 420.25 980.59 1400.84

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 190 190 0 15 15 0 0 0 0 205 205 0 0 0

d) Oil Seed 0 0 0 0 10 10 0 0 0 0 10 10 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

170 0 170 100 0 100 0 0 0 270 0 270 0 0 0

Total 1400 1530 2930 100 25 125 0 0 0 1500 1555 3055 420.25 980.59 1400.84

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 65: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

57

Table: 5.3.8

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Kaloroose

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 510 1020 1530 40 0 40 0 0 0 550 1020 1570 419.4 978.6 1398

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 135 135 0 0 0 0 0 0 0 135 135 0 0 0

d) Oil Seed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

150 0 150 40 0 40 0 0 0 190 0 190 0 0 0

Total 660 1155 1815 80 0 80 0 0 0 740 1155 1895 419.4 978.6 1398

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 66: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

58

Table: 5.3.9

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Kupwara

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 2210 1600 3810 0 95 95 0 0 0 2210 1695 3905 1485.5 3489.96 4975.46

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 200 200 0 20 20 0 0 0 0 220 220 0 0 0

d) Oil Seed 0 0 0 0 35 35 0 0 0 0 35 35 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

260 0 260 200 0 200 0 0 0 460 0 460 0 0 0

Total 2470 1800 4270 200 150 350 0 0 0 2670 1950 4620 1485.5 3489.96 4975.46

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 67: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

59

Table: 5.3.10

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Sogam

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 1260 1140 2400 0 0 0 0 0 0 1260 1140 2400 419.82 779.59 1199.41

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 175 175 0 20 20 0 0 0 0 195 195 0 0 0

d) Oil Seed 0 0 0 0 25 25 0 0 0 0 25 25 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

180 0 180 120 0 120 0 0 0 300 0 300 0 0 0

Total 1440 1315 2755 120 45 165 0 0 0 1560 1360 2920 419.82 779.59 1199.41

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 68: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

60

Table: 5.3.11

AREA-WISE, CROP-WISE IRRIGATION STATUS CD Block: Trehgam

(Unit in Hac.)

Crop Type Kharif Rabi Summer Gross Total

Horticulture and Plantation Crops

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

a) Cereals 1210 1500 2710 0 44 44 0 0 0 1210 1544 2754 670.57 1564.68 2235.25

b) Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

c) Pulses 0 180 180 0 35 35 0 0 0 0 215 215 0 0 0

d) Oil Seed 0 0 0 0 55 55 0 0 0 0 55 55 0 0 0

e) Fibre 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

f) Any other Crops

200 0 200 200 0 200 0 0 0 400 0 400 0 0 0

Total 1410 1680 3090 200 134 334 0 0 0 1610 1814 3424 670.57 1564.68 2235.25

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 69: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

61

Table 5.4

LAND USE PATTERN 1.3 Land use Pattern Name of the State : Jammu and Kashmir Name of the District : Kupwara Name of the Block : All Blocks

(Unit in Hac.)

S. No.

Name of Block Total

Geographical Area

Area under Agriculture Area under Forest

Area under

Wasteland

Area under

other uses Gross

Cropped Area

Net Sown Area

Area Sown more than

once

Cropping intensity

(%) 1. Sogam 59416 7975.15 8370 2430 129 18225 1585 827

2. Wavoora 20973 3319.25 4318 375 109 17424 924 465

3. Kalaroose 36246 8284.01 5118 1274 125 12014 1444 721

4. Kralpora 11985 3024.58 2985 165 105 16213 633 317

5. Tangdar 18988 2803.00 3080 125 104 15728 713 361

6. Teetwal 10299 2194.45 1935 80 104 15703 734 366

7. Trehgam 26062 7160.00 4522 350 108 16322 1315 670

8. Langate 12584 3231.00 3294 334 110 10918 704 362

9. Rajwar 16179 5147.00 3628 287 108 31187 890 457

10. Ramhall 7790 1555.85 1560 155 110 11073 584 327

11. Kupwara 17378 1061.25 1090 280 126 5493 590 239

Total 237900 45755.54 39900 5855 112.54% 170300 10116 5112

Source: District Agriculture Plan (DAP) & Directorate of Economics and Statics

Page 70: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

62

Table 5.5

LAND UTILTIZATION STATISTICS DISTRICT KUPWARA

DAP Kupwara

S.No. Name of Block

Geographical Area excluding Forests & Horticulture area

Forest Area

Area under Non Agri. Use

Cultivable waste

Permanent Pasture

Land under miscellaneous Tree crop & Groves

Current Fallows

Other Fallows

Net Sown Areas

Gross Cropped Area

Cropping Intensity %

1 Langate 11384 18225 827 689 1136 6722.4 362 - 8370 10800 129

2 Rajwar 7840 12014 721 621 994 4233.3 386 - 5118 6392 125

3 Ramhall 6038 17424 465 397 631 1941.4 227 - 4318 4693 109

4 Kralpora 5309 31187 457 372 631 2100.9 221 - 3628 3915 108

5 Trehgam 4579 10918 362 301 497 1419.2 125 - 3294 3628 110

6 Kupwara 6996 16322 670 568 923 4536.5 313 - 4522 4872 107

7 Sogam 4127 16213 317 255 426 2127.4 144 - 2985 3150 105

8 Vavoora 4420 15728 361 306 497 610.1 176 - 3080 3205 104

9 Kalaroose 3287 15703 366 318 489 801.6 179 - 1935 2015 104

10 Tangdar 2713 11073 327 253 429 896.3 144 - 1560 1715 109

11 Teethwal 2230 5493 293 294 440 768.3 113 - 1090 1370 125

Total 58923 170300 5166 4374 7093 26156.5 2390 - 39900 45755 112

Page 71: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

63

Table 5.6

PRODUCTION AND PRODUCTIVITY OF MAJOR CROPS NAME OF THE STATE : JAMMU AND KASHMIR Name of the District : Kupwara Name of the Block : All Blocks

Sea

son

Crop sown Rainfed Irrigated Total

Ce

rea

ls

Co

ars

e c

erea

ls

Pu

lse

s

Oils

ee

ds

Fib

er

cro

ps

An

y o

the

r cr

op

Are

a (

ha)

Pro

du

ctio

n

Qtls

./yr

Pro

du

ctio

n y

ield

(Q

tls./h

a)

Co

st o

f cu

ltiva

tion

Rs.

P

er

Ha

Pro

du

ctio

n

Qtls

./yr

Pro

du

ctio

n o

r yi

eld

(K

gs.

/ha

)

Co

st o

f cu

ltiva

tion

Rs.

P

er

Ha

Pro

du

ctio

n

Qtls

./yr

Avg

. P

rod

uct

ivity

or

yie

ld (

Qtls

/ha)

Co

st o

f

Cu

ltiva

tion

Rs.

P

er

ha

Kharief Paddy, Maize -

Bea

ns

- - - 32360 1314450 6350 56000 1630375 7884 56000 1472412.5 7884 56000

Rabi Wheat, -

Peas

Mus

ard

- - 5855 157063 2383 26000 222000 12000 26000 189531.5 12000 26000

Summer - - - - - - - - - - - - - - -

Horticulture & Plantation

Apple, Walnut etc

- - - - - 28599.856 2627041.86 9000 1.5 lac - - 2627041.86 9000 1.5lac

Total - - - - -

66814.856 4098554.86 17733 232000 1852375 19884 82000 4288985.86 28884 232000

Source: DAP and Department of horticulture

Page 72: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

64

Table 5.7.1

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Langate

(Unit in Ha.)

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 1844 4302 6146 36880 55640 925228 20 12.93

Apple HD (4th Year Age) 5.65 - 5.65 28.10 - 28.10 05 -

Pear 52.8 123 176 1003 938 1941 19 7.62

Cherry & other Stone Fruits 6.0 40 46 90 343 432 15 7.44

Walnut & other Nuts 107 1600 1007 535 3853 4388 05 3.82

Total 2015.45 6065 7380.65 38536.1 60774 932017.1 -- --

Source:- Department of Horticulture

Page 73: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

65

Table 5.7.2

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Rajwar

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 1085 2531 3616 21700 33305 55005 20 13.92

Apple HD (4th Year Age) 3.06 - 3.06 15.3 - 15.3 5.0 -

Pear 24.6 57.4 82 467 674 1141 18.98 11.74

Cherry & other Stone Fruits 7.8 18.2 26 117 136 253 15.0 7.44

Walnut & other Nuts 89 804 893 445 3167 3612 15.0 7.44

Total 1209.46 3410.6 4620.06 22744.3 37282 60026.3 -- --

Source:- Department of Horticulture

Page 74: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

66

Table 5.7.3

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Ramhall

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 481 1124 1605 9620 13652 20.0 12.14 --

Apple HD (4th Year Age) 2.0 - 2.00 10.00 -- 10 5.0 --

Pear 19 50 69 361 -- -- 19.0 7.96

Cherry & other Stone Fruits 6.0 16 22 93 105 198 15.5 6.56

Walnut & other Nuts 48 439 487 240 1708 1948 05 3.51

Total 556 1629 2185 10324 15465 2176 -- --

Source:- Department of Horticulture

Page 75: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

67

Table 5.7.4

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Kupwara

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 946 2209 3155 18542 27205 45747 19.6 12.31

Apple HD (4th Year Age) 4.0 - 4.0 20 -- 20.0 5.0 ---

Pear 8.4 19.6 28 126 182 308 15.0 9.28

Cherry & other Stone Fruits 11.4 26.6 38 154 98 252 13.5 3.65

Walnut & other Nuts 527 1231 1758 1336 5699 7035 5.20 4.62

Total 1496.8 3486.2 4983 20178 33184 53362 -- --

Source:- Department of Horticulture

Page 76: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

68

Table 5.7.5

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT

Name of the District:- Kupwara Name of the Block:- Trehgam

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 288 672 960 5270 8170 13440 18.30 12.16

Apple HD (4th Year Age) 1.0 - 1.0 5.0 --- 5.0 5.0 ---

Pear 3.2 12.8 16 48 128 176 15.0 10.0

Cherry & other Stone Fruits 2.8 11.2 14 38 88 126 13.6 7.85

Walnut & other Nuts 131 524 655 694 1926 2620 5.30 3.67

Total 426 1220 1646 6055 10312 16367 -- --

Source:- Department of Horticulture

Page 77: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

69

Table 5.7.6

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT

Name of the District:- Kupwara Name of the Block:- Kralpora

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 369 861 1230 5609 11611 17220 15.20 13.48

Apple HD (4th Year Age)

5.1 --- 5.10 25.0 --- 25.0 5.0 ---

Pear 6 24 30 93 237 330 15.5 9.87

Cherry & other Stone Fruits

4 16 20 55 125 180 13.8 7.81

Walnut & other Nuts 157 627 784 863 2776 3139 5.5 3.63

Total 541.1 1528 2069.1 6645 14749 20894 -- --

Source:- Department of Horticulture

Page 78: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

70

Table 5.7.7

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Kalaroose

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 87 345 432 1322 4733 6055 15.20 13.71

Apple HD (4th Year Age) 1.0 - 1.0 5.0 - 5.0 5.0 -

Pear 1.2 4.8 6 18 47 66 15.2 8.70

Cherry & other Stone Fruits 1.2 4.8 6 16 46 54 13.8 8.5

Walnut & other Nuts 81 321 402 445 1163 1608 5.5 3.62

Total 171.4 675.6 847 1806 5989 7788 -- --

Source:- Department of Horticulture

Page 79: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

71

Table 5.7.8

AREA PRODUCTION AND PRODUCTIVE OF HORTICULTURE DEPA RTMENT Name of the District:- Kupwara Name of the Block:- Wavoora

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 87 345 432 1322 4733 6055 15.20 13.71

Apple HD (4th Year Age) 1.0 - 1.0 5.0 - 5.0 5.0 -

Pear 1.2 4.8 6 18 47 66 15.2 8.70

Cherry & other Stone Fruits 1.2 4.8 6 16 46 54 13.8 8.5

Walnut & other Nuts 81 321 402 445 1163 1608 5.5 3.62

Total 171.4 675.6 847 1806 5989 7788 -- --

Source:- Department of Horticulture

Page 80: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

72

Table 5.7.9

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Sogam

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 293 1172 1465 4454 16056 20510 15.20 13.69

Apple HD (4th Year Age) 2.0 - 2.0 10.0 10.0 505

Pear 4.4 17.6 22 67 175 242 15.2 9.94

Cherry & other Stone Fruits 3.2 12.8 16 44 100 144 13.8 7.81

Walnut & other Nuts 200 798 998 1100 2892 3992 5.5 3.62

Total 502.6 2000.4 2503 5675 19223 24898 -- --

Page 81: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

73

Source:- Department of Horticulture

Table 5.7.10

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Tangdhar

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 3.1 12.4 15.50 41 130 171 13.5 10.45

Apple HD (4th Year Age) - -- -- -- -- -- -- --

Pear 1.08 4.32 5.4 16 44 60 15.0 10.18

Cherry & other Stone Fruits 3.4 13.6 17 41 112 153 12.2 8.23

Walnut & other Nuts 148 592 740 740 2220 296 5.0 3.0

Total 155.58 622.32 777.9 838 2506 680 -- --

Source:- Department of Horticulture

Page 82: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

74

Table 5.7.11

AREA, PRODUCTION AND PRODUCTIVITY OF HORTICULTURE D EPARTMENT Name of the District:- Kupwara Name of the Block:- Teethwal

Crop Type Area in Ha

Total Production MT

Total Productivity MT

Irrigated Rainfed Irrigated Rainfed Irrigated Rainf ed

Apple 4.4 17.6 22 57 185 242 13.0 10.51

Apple HD (4th Year Age)

-- -- -- -- -- -- -- --

Pear 3.2 12.8 16 48 122 170 15.0 9.53

Cherry & other Stone Fruits 1.8 7.2 9 22 59 81 12.5 8.19

Walnut & other Nuts 112 448 560 560 1680 2240 5.0 3.75

Total 121.4 485.6 607 687 2046 2733 -- --

Source:- Department of Horticulture

Page 83: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

75

Table 5.8 STATUS OF COMMAND AREA

3.3 STATUS OF COMMAND AREA

Name of the State Jammu & Kashmir

Name of the District Kupwara

Name of the Block Kupwara, Sogam, Wavoora, Kralpora, Trehgam, Kalaroose, Rajwara, Ramhal, langate,

Tangdar, Teetwal

(Unit in Ha.)

S. No. Name of Irrigation

Scheme

Information of Canal command Information on other service

Command Total Area

Total Area Developed

Command

Un

Developed

Command

Total

Area

Developed

Command

Un

Developed

Command

Developed

Command

Un

Developed

Command

1. Kupwara 6022 1370 4652 0 0 0 1370 4652

2. Sogam 3285 1270 2015 0 0 0 1270 2015

3. Wavoora 3080 0070 3010 0 0 0 0070 3010

4. Kalaroose 1935 0275 1660 0 0 0 0275 1660

5. Trehgam 3294 1225 2069 0 0 0 1225 2069

6. Kralpora 3628 0340 3288 0 0 0 340 3288

7. Rajwara 6018 0054 5064 0 0 0 0054 5064

8. Ramhal 4318 1630 2688 0 0 0 1630 2688

9. Langate 8370 2050 6320 0 0 0 2050 6320

10. Tangdar 810.7 60.70 750 0 0 0 60.70 750

11. Teetwal 529.49 20.49 509 0 0 0 20.49 504.

41290.19 8365.19 32025 0 0 0 8365.19 32020

Page 84: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

76

CHAPTER - VI

BLOCK -WISE ACTION PLANS

• Agriculture • Command Area Development • Forest Deptt. & Soil Conservation Deptt. • Horticulture Department • Irrigation and Flood Control • Rural Development

• Watershed (IWMP) Note:- The costs calculated are as per existing state / CSS schemes

Page 85: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

77

Table 6.1.1

BLOCKWISE ACTION PLAN OF AGRICULTURE DEPARTMENT UND ER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Langate

Table 6.1.1 Continue…

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 60 60 140000 84.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 150 150 130000 195.00 Bore Well No’s 15 1300000 195.5 Rejuvenation of existing water body No’s -- -- -- 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 2 2 220000 4.40 B) Drip Irrigation No’s 10 10 210000 21.00 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 100 640 27000 27.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 20 15 100000 20.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness

No’s 50 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s 10 38000 3.8

Agronomic measures including cropping alignment

No’s 0

Page 86: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

78

Table 6.1.1 Continue…

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 70 300 100000 70.00 3 (PMKSY)

Water Shed Check Dams Mtrs 1000 250 25000 25.00 Diversion Drains Mtrs 2000 20 3000 60.00 Gully Plug Mtrs 0 Contour Bund Mtrs 5000 50 13000 6.50 Terracing/Land Levelling Ha 20 20 300000 60.00 Gabbion Structure No’s 2000 1000 10500 210.00

NBEC Mtrs. 3500 280 5000 175.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 3000 150 65 1.95 On farm Distribution pipe restoring Ha -- -- -- 0 Livelihood activities for the asset less persons

-- -- -- -- 0

A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 10 30000 3.00

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 210 690 50000 105.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 670 87.10 0.272

TOTAL 18328 3647 1397.072

Page 87: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

79

Table 6.1.2

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Rajwar

Table 6.1.2 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 60 60 140000 84.00 Farm Ponds No’s -- -- -- 0 Rain Water harvest Structure No’s 150 150 130000 195.00 Bore Well No’s 15 -- 130000 195.00 Rejuvenation of existing water body No’s -- -- -- 0

Micro Irrigation -- -- -- 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 2 220000 4.40 B) Drip Irrigation No’s 05 05 210000 10.50 C) Rain Guns No’s -- -- Diesel/Power Operated Pump Sets No’s 50 -- 23000 11.50 Piped Water Conveyance system No’s -- 0 Percolation Tanks No’s 50 320 27000 13.50 Dug wells No’s 50 40000 20.00 Tube Wells No’s 20 15 100000 2.00 Capacity building No’s 10 -- 50000 5.00 Training on water conservation awareness

No’s 50 -- 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s -- 10 38000 3.80

Agronomic measures including cropping alignment

No’s -- -- -- 0

Page 88: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

80

Table 6.1.2 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 35 150 100000 35.00 3 (PMKSY)

Water Shed Check Dams Mtrs 1000 250 25000 25.00 Diversion Drains Mtrs 1000 10 3000 30.00 Gully Plug Mtrs 0 Contour Bund Mtrs 5000 50 13000 6.50 Terracing/Land Levelling Ha 08 08 300000 24.00 Gabbion Structure No’s 1000 1000 10500 45.00

NBEC Mtrs. 2500 200 5000 125.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 3000 150 65 2.00 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 10 30000 3.00

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 200 660 50000 100.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 650 87.10 0.566

TOTAL 15196 3038 1924652 545.016

Page 89: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

81

Table 6.1.3

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Ramhal Table 6.1.3 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 30 30 140000 42.00 Farm Ponds No’s -- -- 0 Rain Water harvest Structure No’s 100 100 130000 130.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s -- -- 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 02 -- 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.1 C) Rain Guns No’s -- 0 Diesel/Power Operated Pump Sets No’s 50 -- 23000 11.50 Piped Water Conveyance system No’s -- 0 Percolation Tanks No’s 100 740 27000 27.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 07 07 100000 7.5 Capacity building No’s 10 -- 50000 5.00 Training on water conservation awareness

No’s 50 -- 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s -- 20 38000 7.60

Page 90: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

82

Table 6.1.3 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 25 207 100000 25.00 3 (PMKSY)

Water Shed Check Dams Mtrs 500 125 2500 12.50 Diversion Drains Mtrs 400 4 3000 12.00 Gully Plug Mtrs -- -- -- 0 Contour Bund Mtrs 1000 10 130 1.30 Terracing/Land Levelling Ha 04 04 300000 12.00 Gabbion Structure No’s 300 300 10500 31.50

NBEC Mtrs. 700 56 5000 35.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0.975 On farm Distribution pipe restoring Ha -- -- 0 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 60 -- 65000 39.00 B ) Poultry No’s 200 -- 1000 2.00 C) Sheep No’s 80 -- 71500 57.20 d) Apiculture No’s 15 -- 32500 3.25 e) Mushroom No’s 10 -- 30000 3.00

4 MGNREGS Argumentation of springs No’s -- -- 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 55 170 50000 27.50

A ) Up gradation/desalting of traditional water bodies

Mtrs. 300 87.10 0.261

TOTAL 5565 2099 3059282 720.586

Page 91: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

83

Table 6.1.4

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Trehgam

Table 6.1.4 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 60 60 130000 78.00 Bore Well No’s 15 130000 195.00 Rejuvenation of existing water body No’s -- 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 200 998 27000 54.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 10 42 100000 5.00 Capacity building No’s 15 50000 7.5 Training on water conservation awareness

No’s 50 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s 20 38000 7.6

Page 92: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

84

Table 6.1.4 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 06 24 100000 6.00 3

(PMKSY) Water Shed

Check Dams Mtrs 500 125 25000 12.50 Diversion Drains Mtrs 300 03 3000 9.00 Gully Plug Mtrs 0 0 Contour Bund Mtrs 200 02 13000 0.26 Terracing/Land Levelling Ha 10 10 300000 30.00 Gabbion Structure No’s 150 169 10200 15.75

NBEC Mtrs. 2000 200 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 165 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 20 30000 6.00

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 50 70 50000 25.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 300 87.10 0.26

TOTAL 5835 1904 1924352 704.995

Page 93: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

85

Table 6.1.5

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Kralpora

Table 6.1.5 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 60 60 130000 78.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 200 989 27000 54.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 10 42 100000 10.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness

No’s 50 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s 20 20 38000 7.60

Page 94: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

86

Table 6.1.5 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 05 21 100000 05.00 3

(PMKSY) Water Shed

Check Dams Mtrs 500 125 25000 12.50 Diversion Drains Mtrs 500 05 3000 15.00 Gully Plug Mtrs 0 0 Contour Bund Mtrs 200 02 13000 15.00 Terracing/Land Levelling Ha 10 10 300000 30.00 Gabbion Structure No’s 150 150 10500 15.75

NBEC Mtrs. 2000 200 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 155 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 50 65000 32.500 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 10 30000 3.00

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 50 70 50000 25.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 1000 87.10 0.87

TOTAL 6729 1865 3094652 718.345

Page 95: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

87

Table 6.1.6

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Sogam

Table 6.1.6 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 60 60 130000 78.00 Bore Well No’s 15 130000 195.00 Rejuvenation of existing water body No’s -- -- -- 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 50 370 27000 13.50 Dug wells No’s 50 40000 20.00 Tube Wells No’s 15 15 100000 15.00 Capacity building No’s 50 10000 5.00 Training on water conservation awareness

No’s 15 50000 7.5

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s 20 38000 7.6

Page 96: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

88

Table 6.1.6 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 15 63 100000 15.00 3

(PMKSY) Water Shed

Check Dams Mtrs 500 125 2500 12.50 Diversion Drains Mtrs 300 03 3000 9.00 Gully Plug Mtrs -- -- -- 0 Contour Bund Mtrs 1000 10 13000 1.30 Terracing/Land Levelling Ha 04 04 300000 12.00 Gabbion Structure No’s 50 50 10500 5.25

NBEC Mtrs. 2000 360 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons

-- -- -- -- 0

A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 2.00 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 15 30000 4.5

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 100 140 50000 50.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 300 87.10 0.261

TOTAL 6418 1561 1902152 637.661

Page 97: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

89

Table 6.1.7

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Wavoora

Table 6.1.7 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 15 15 140000 21.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 40 40 130000 52.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s -- -- -- 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 130 800 27000 35.10 Dug wells No’s 50 40000 20.00 Tube Wells No’s 10 42 100000 10.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness

No’s 50 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s 20 38000 7.60

Page 98: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

90

Table 6.1.7 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 50 50 100000 50.00 3

(PMKSY) Water Shed

Check Dams Mtrs 500 125 25000 12.50 Diversion Drains Mtrs 300 03 3000 9.00 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 500 05 13000 0.65 Terracing/Land Levelling Ha 04 04 300000 0.65 Gabbion Structure No’s 50 50 10500 5.25

NBEC Mtrs. 500 130 5000 25.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 10 32500 3.25 e) Mushroom No’s 15 30000 4.5

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 100 140 50000 50.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 300 87.10 0.261

TOTAL 4523 1750 3094652 615.636

Page 99: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

91

Table 6.1.8

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Kalaroose

Table 6.1.8 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 10 10 140000 14.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 30 30 130000 39.00 Bore Well No’s 05 1300000 65.00 Rejuvenation of existing water body No’s -- -- -- 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 02 220000 4.40 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 35 217 27000 9.45 Dug wells No’s 50 40000 20.00 Tube Wells No’s 15 15 100000 15.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness

No’s 50 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s 5 38000 1.90

Page 100: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

92

Table 6.1.8 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 0 3

(PMKSY) Water Shed

Check Dams Mtrs 05 21 100000 5.00 Diversion Drains Mtrs 500 125 25000 12.50 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 300 03 3000 9.00 Terracing/Land Levelling Ha 04 04 300000 12.00 Gabbion Structure No’s 500 05 1300 0.65

NBEC Mtrs. 100 100 100500 10.50 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 0 On farm Distribution pipe restoring Ha 2000 360 5000 100.00 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 28.60 d) Apiculture No’s 20 32500 6.50 e) Mushroom No’s 10 3000 3.00

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 100 140 0.50 50.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 350 87.10 0.304

TOTAL 4448 1036 3095888 472.404

Page 101: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

93

Table 6.1.9

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Kupwara

Table 6.1.9 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 20 20 140000 28.00 Farm Ponds No’s 0 Rain Water harvest Structure No’s 70 70 130000 91.00 Bore Well No’s 15 1300000 195.00 Rejuvenation of existing water body No’s 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 03 22000 6.60 B) Drip Irrigation No’s 01 01 210000 2.10 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 50 23000 11.50 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 100 740 27000 27.00 Dug wells No’s 50 40000 20.00 Tube Wells No’s 07 07 100000 7.00 Capacity building No’s 15 50000 7.5 Training on water conservation awareness

No’s 50 10000 5.00

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s 20 38000 7.6

Page 102: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

94

Table 6.1.9 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 20 85 100000 2.00 3

(PMKSY) Water Shed

Check Dams Mtrs 500 12.5 25000 12.50 Diversion Drains Mtrs 400 04 3000 12.00 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 1000 10 13000 1.30 Terracing/Land Levelling Ha 1500 325 65 0.975 Gabbion Structure No’s 150 150 10500 15.75

NBEC Mtrs. 2000 370 5000 100.00 Entry Point activity No’s 01 100000 1.00 Staggered trenches No’s 1500 325 65 0.975 On farm Distribution pipe restoring Ha 0 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 60 65000 39.00 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 60 71500 42.90 d) Apiculture No’s 25 32500 8.125 e) Mushroom No’s 10 30000 3.00

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 100 140 50000 50.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 300 87.10 0.261

TOTAL 8207 2279.5 2596717 700.086

Page 103: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

95

Table 6.1.10

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Tangdar

Table 6.1.10 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 0 Farm Ponds No’s 0 Rain Water harvest Structure No’s 40 40 130000 52.00 Bore Well No’s 05 1300000 65.00 Rejuvenation of existing water body No’s -- -- -- 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 01 220000 2.20 B) Drip Irrigation No’s 0 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 0 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 10 62 27000 2.70 Dug wells No’s 50 23000 20.00 Tube Wells No’s 05 05 100000 5.00 Capacity building No’s 10 50000 5.00 Training on water conservation awareness

No’s 25 10000 2.5

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including cropping alignment

No’s 05 38000 1.90

Page 104: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

96

Table 6.1.10 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

Secondary storage structure No’s 0 3

(PMKSY) Water Shed

Check Dams Mtrs 2500 150 2500 62.50 Diversion Drains Mtrs 400 05 3000 12.00 Gully Plug Mtrs -- -- -- 0 0 Contour Bund Mtrs 0 Terracing/Land Levelling Ha 02 02 300000 6.00 Gabbion Structure No’s 300 150 10500 31.50

NBEC Mtrs. 1000 200 5000 50.00 Entry Point activity No’s 0 Staggered trenches No’s 01 100000 1.00 On farm Distribution pipe restoring Ha 500 120 65 0.325 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 45 65000 29.25 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 28.60 d) Apiculture No’s 05 32500 1.625 e) Mushroom No’s 10 30000 3.00

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 50 164 50000 25.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 200 87.10 0.174

TOTAL 5399 903 2569152 409.274

Page 105: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

97

Table 6.1.11

BLOCK WISE ACTION PLAN OF AGRICULTURE DEPARTMENT UN DER PMKSY DISTRICT KUPWARA Name of District : Kupwara

Name of Block : Teethwal

Table 6.1.11 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

1 (PMKSY) Har Khet Ko Pani

Community Tanks No’s 02 02 140000 2.80 Farm Ponds No’s 0 Rain Water harvest Structure No’s 20 20 13000 26.00 Bore Well No’s -- -- -- 0 Rejuvenation of existing water body No’s 0

Micro Irrigation 0 2 (PMKSY)

Per drop more crop

A ) Sprinkle sets No’s 01 22000 2.2 B) Drip Irrigation No’s 0 C) Rain Guns No’s 0 Diesel/Power Operated Pump Sets No’s 0 Piped Water Conveyance system No’s 0 Percolation Tanks No’s 10 63 27000 2.70 Dug wells No’s 50 40000 20.00 Tube Wells No’s 05 05 100000 5.00 Capacity building No’s 50 50000 0.25 Training on water conservation awareness

No’s 25 10000 2.5

Extension activities for promotion of scientific moisture conservation

No’s

Agronomic measures including No’s 05 38000 1.90

Page 106: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

98

Table 6.1.11 Continue …

S. No.

Programme Component Proposed Activities Unit

Target in (No’s)

Proposed Area Coverage (ha)

Unit cost (per Hact.)

(in Rs.)

Estimated Cost (llacs.)

cropping alignment Secondary storage structure No’s 0

3

(PMKSY) Water Shed

Check Dams Mtrs 2000 150 2500 50.00 Diversion Drains Mtrs 400 05 3000 12.00 Gully Plug Mtrs 0 0 Contour Bund Mtrs 0 Terracing/Land Levelling Ha 05 05 300000 15.00 Gabbion Structure No’s 300 150 300000 15.00

NBEC Mtrs. 1000 100 10500 31.20 Entry Point activity No’s 01 01 100000 1.00 Staggered trenches No’s -- -- -- 0 On farm Distribution pipe restoring Ha -- -- -- 0 Livelihood activities for the asset less persons

0

A )Dairy Unit No’s 10 65000 6.50 B ) Poultry No’s 200 1000 2.00 C) Sheep No’s 40 71500 28.60 d) Apiculture No’s 05 32500 1.625 e) Mushroom No’s 05 30000 1.52

4 MGNREGS Argumentation of springs No’s 0 A ) Water harvesting structure on individual land of vulnerable section

No’s 50 100 50000 25.00

A ) Up gradation/desalting of traditional water bodies

Mtrs. 200 87.10 0.174

TOTAL 4379 606 1406087 252.969

Page 107: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

99

Table 6.2.1

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KUPWARA OF DISTRICT KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

4652 0.012 55.824 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

4186.80 0.350 1465.38 837.36 293.076 837.36 293.076 837.36 293.076 837.36 293.076 837.36 293.076

ii. Micro-irrigation

465.20 0.500 232.60 93.04 46.52 93.04 46.52 93.04 46.52 93.04 46.52 93.04 46.52

3 Field, Intermediate and link Drains

4652 0.060 279.12 930.4 55.824 930.4 55.824 930.4 55.824 930.4 55.824 930.4 55.824

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 4652 0.012 55.824 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648 930.4 11.1648

ii. Infrastructure Grant

Lump Sump

0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00

5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200

ii. Demonstrations 25 0.020 0.50 5 0.100 5 0.100 5 0.100 5 0.100 5 0.100

iii. Monitoring &

Evaluation

Lump

Sump - 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 4652 0.003 13.956 930.4 2.7912 930.4 2.7912 930.4 2.7912 930.4 2.7912 930.4 2.7912

7 Establishment Charges @10% on item NO. 2 & 3

**** ***** 98.855 ** 19.771 ** 19.771 ** 19.771 ** 19.771 ** 19.771

TOTAL 2213.1 442.61 442.612 442.61 442.61 442.61

Page 108: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

100

Table 6.2.2

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK SOGAM OF DISTRICT KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs.

In lacs) Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

2015 0.012 24.18 403 4.836 403 4.836 403 4.836 403 4.836 403 4.836

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

1813.50 0.350 634.725 363 126.945 363 126.945 363 126.945 363 126.945 363 126.945

ii. Micro-irrigation

201.50 0.500 100.75 40.3 20.15 40.3 20.15 40.3 20.15 40.3 20.15 40.3 20.15

3 Field, Intermediate

and link Drains 2015 0.060 120.9 403 24.18 403 24.18 403 24.18 403 24.18 403 24.18

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 2015 0.012 24.18 403 4.836 403 4.836 403 4.836 403 4.836 403 4.836

ii. Infrastructure Grant

Lump Sump

0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00

5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/

Seminars 10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200

ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060

iii. Monitoring & Evaluation

Lump Sump

- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 2015 0.003 6.045 403 1.209 403 1.209 403 1.209 403 1.209 403 1.209

7 Establishment Charges @10% on item NO. 2 & 3

**** ***** 42.81875 ** 8.56375 ** 8.56375 ** 8.56375 ** 8.56375 ** 8.56375

TOTAL 964.8988 192.9798 192.9798 192.9798 192.9798 192.98

Page 109: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

101

Table 6.2.3

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK WAVOORA OF DISTRICT KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

3010 0.012 36.12 602 7.224 602 7.224 602 7.224 602 7.224 602 7.224

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

2709 0.350 948.15 541.80 189.63 541.80 189.63 541.80 189.63 541.80 189.63 541.80 189.63

ii. Micro-irrigation

301 0.500 150.50 60.20 30.10 60.20 30.10 60.20 30.10 60.20 30.10 60.20 30.10

3 Field, Intermediate and link Drains

3010 0.060 180.6 602 36.12 602 36.12 602 36.12 602 36.12 602 36.12

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 3010 0.012 36.12 602 7.224 602 7.224 602 7.224 602 7.224 602 7.224

ii. Infrastructure Grant

Lump Sump

0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00

5 Software activities

0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200

ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060

iii. Monitoring & Evaluation

Lump Sump

- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 3010 0.003 9.03 602 1.806 602 1.806 602 1.806 602 1.806 602 1.806

7

Establishment Charges @10%

on item NO. 2 & 3

**** ***** 63.9625 ** 12.7925 ** 12.7925 ** 12.7925 ** 12.7925 ** 12.7925

TOTAL 1435.783 287.157 287.157 287.157 287.157 287.157

Page 110: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

102

Table 6.2.4

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KALAROOSE OF DISTRICT KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

1660 0.012 19.92 332 3.984 332 3.984 332 3.984 332 3.984 332 3.984

2 OFD works : 0 0 0 0 0 0 0 0 0 0 0

i. Field Channel 1494 0.350 522.90 298.80 104.58 298.80 104.58 298.80 104.58 298.80 104.58 298.80 104.58

ii. Micro-irrigation 166 0.500 83.00 33.20 16.60 33.20 16.60 33.20 16.60 33.20 16.60 33.20 16.60

3 Field, Intermediate and link Drains

1660 0.060 99.60 332 19.92 332 19.92 332 19.92 332 19.92 332 19.92

4 Farmers Participation: 0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 1660 0.012 19.92 332 3.984 332 3.984 332 3.984 332 3.984 332 3.984

ii. Infrastructure Grant

Lump Sump

0.000 3.00 L.S 0.60 L.S 0.60 L.S 0.60 L.S 0.60 L.S 0.60

5 Software activities

0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

5 0.100 0.50 1 0.100 1 0.100 1 0.100 1 0.100 1 0.100

ii. Demonstrations 10 0.020 0.20 2 0.040 2 0.040 2 0.040 2 0.040 2 0.040

iii. Monitoring & Evaluation

Lump Sump

- 3.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 1660 0.003 4.98 332 0.996 332 0.996 332 0.996 332 0.996 332 0.996

7

Establishment Charges @10% on item NO. 2 &

3

**** ***** 35.275 ** 7.055 ** 7.055 ** 7.055 ** 7.055 ** 7.055

TOTAL 792.3 158.86 158.86 158.86 158.86 158.859

Page 111: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

103

Table 6.2.5

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK TREHGAM OF DISTRICT KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

2069 0.012 24.828 413.80 4.9656 413.80 4.9656 413.80 4.9656 413.80 4.9656 413.80 4.9656

2 OFD works : 0 0 0 0 0 0 0 0 0 0 0

i. Field Channel 1862.10 0.350 651.735 372.42 130.347 372.42 130.347 372.42 130.347 372.42 130.347 372.42 130.347

ii. Micro-irrigation 206.90 0.500 103.45 41.38 20.69 41.38 20.69 41.38 20.69 41.38 20.69 41.38 20.69

3 Field, Intermediate and link Drains

1660 0.060 99.60 332 19.92 332 19.92 332 19.92 332 19.92 332 19.92

4 Farmers Participation: 0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 1660 0.012 19.92 332 3.984 332 3.984 332 3.984 332 3.984 332 3.984

ii. Infrastructure Grant

Lump Sump

0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00

5 Software activities

0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200

ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060

iii. Monitoring & Evaluation

Lump Sump

- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 2069 0.003 6.207 413.8 1.2414 413.8 1.2414 413.8 1.2414 413.8 1.2414 413.8 1.2414

7

Establishment Charges @10% on item NO. 2 & 3

**** ***** 42.739 ** 8.5478 ** 8.5478 ** 8.5478 ** 8.5478 ** 8.5478

TOTAL 959.78 191.956 191.956 191.956 191.956 191.956

Page 112: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

104

Table 6.2.6

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KRALPORA OF DISTT. KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

3288 0.012 39.456 657.60 7.8912 657.60 7.8912 657.60 7.8912 657.60 7.8912 657.60 7.8912

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

2959.20 0.350 1035.72 591.84 207.144 591.84 207.144 591.84 207.144 591.84 207.144 591.84 207.144

ii. Micro-irrigation 328.80 0.500 164.40 65.76 32.88 65.76 32.88 65.76 32.88 65.76 32.88 65.76 32.88

3 Field, Intermediate and link Drains

3288 0.060 197.28 657.6 39.456 657.6 39.456 657.6 39.456 657.6 39.456 657.6 39.456

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 3288 0.012 39.456 657.6 7.8912 657.6 7.8912 657.6 7.8912 657.6 7.8912 657.6 7.8912

ii. Infrastructure Grant

Lump Sump

0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00

5 Software activities

0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200

ii. Demonstrations 20 0.020 0.40 4 0.080 4 0.080 4 0.080 4 0.080 4 0.080

iii. Monitoring & Evaluation

Lump Sump

- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 3288 0.003 9.864 657.6 1.9728 657.6 1.9728 657.6 1.9728 657.6 1.9728 657.6 1.9728

7

Establishment Charges @10% on item NO. 2 & 3

**** ***** 69.87 ** 13.974 ** 13.974 ** 13.974 ** 13.974 ** 13.974

TOTAL 1567.45 313.489 313.489 313.489 313.489 313.489

Page 113: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

105

Table 6.2.7

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK RAJWARA OF DISTT. KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

5064 0.012 60.768 1012.80 12.1536 1012.80 12.1536 1012.80 12.1536 1012.80 12.1536 1012.80 12.1536

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

4557.60 0.350 1595.16 911.52 319.032 911.52 319.032 911.52 319.032 911.52 319.032 911.52 319.032

ii. Micro-irrigation

506.40 0.500 253.20 101.28 50.64 101.28 50.64 101.28 50.64 101.28 50.64 101.28 50.64

3 Field, Intermediate and link Drains

5064 0.060 303.84 1012.8 60.768 1012.8 60.768 1012.8 60.768 1012.8 60.768 1012.8 60.768

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant

5064 0.012 60.768 1012.8 12.1536 1012.8 12.1536 1012.8 12.1536 1012.8 12.1536 1012.8 12.1536

ii. Infrastructure Grant

Lump Sump

0.000 10.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00

5 Software activities

0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

20 0.100 2.00 4 0.400 4 0.400 4 0.400 4 0.400 4 0.400

ii. Demonstrations 30 0.020 0.60 6 0.120 6 0.120 6 0.120 6 0.120 6 0.120

iii. Monitoring & Evaluation

Lump Sump

- 10.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 5064 0.003 15.192 1012.8 3.0384 1012.8 3.0384 1012.8 3.0384 1012.8 3.0384 1012.8 3.0384

7

Establishment Charges @10% on item NO. 2 & 3

**** ***** 107.61 ** 21.522 ** 21.522 ** 21.522 ** 21.522 ** 21.522

TOTAL 2419.14 482.828 482.828 482.828 482.828 482.828

Page 114: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

106

Table 6.2.8

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK RAMHAL OF DISTT. KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

2688 0.012 32.256 537.60 6.4512 537.60 6.4512 537.60 6.4512 537.60 6.4512 537.60 6.4512

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

2419.20 0.350 846.72 483.84 169.344 483.84 169.344 483.84 169.344 483.84 169.344 483.84 169.344

ii. Micro-irrigation

268.80 0.500 134.40 53.76 26.88 53.76 26.88 53.76 26.88 53.76 26.88 53.76 26.88

3 Field, Intermediate and link Drains

2688 0.060 161.28 537.6 32.256 537.6 32.256 537.6 32.256 537.6 32.256 537.6 32.256

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 2688 0.012 32.256 537.6 6.4512 537.6 6.4512 537.6 6.4512 537.6 6.4512 537.6 6.4512

ii. Infrastructure Grant

Lump Sump

0.000 5.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00 L.S 1.00

5 Software activities

0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

10 0.100 1.00 2 0.200 2 0.200 2 0.200 2 0.200 2 0.200

ii. Demonstrations 15 0.020 0.30 3 0.060 3 0.060 3 0.060 3 0.060 3 0.060

iii. Monitoring & Evaluation

Lump Sump

- 5.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 2688 0.003 8.064 537.6 1.6128 537.6 1.6128 537.6 1.6128 537.6 1.6128 537.6 1.6128

7

Establishment Charges @10% on item NO. 2 & 3

**** ***** 57.12 ** 11.424 ** 11.424 ** 11.424 ** 11.424 ** 11.424

TOTAL 1283.40 256.679 256.679 256.679 256.679 256.679

Page 115: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

107

Table 6.2.9

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK LANGATE OF DISTRICT KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In

lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

6320 0.012 75.84 1264.00 15.168 1264.00 15.168 1264.00 15.168 1264.00 15.168 1264.00 15.168

2 OFD works : 0 0 0 0 0 0 0 0 0 0 0

i. Field Channel 5688 0.350 1990.8 1137.60 398.16 1137.60 398.16 1137.60 398.16 1137.60 398.16 1137.60 398.16

ii. Micro-irrigation 632 0.500 316.00 126.40 63.20 126.40 63.20 126.40 63.20 126.40 63.20 126.40 63.20

3 Field, Intermediate and link Drains

6320 0.060 379.20 1264 75.84 1264 75.84 1264 75.84 1264 75.84 1264 75.84

4 Farmers Participation: 0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 6320 0.012 75.84 1264 15.168 1264 15.168 1264 15.168 1264 15.168 1264 15.168

ii. Infrastructure Grant

Lump Sump

0.000 10.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00 L.S 2.00

5 Software activities

0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

25 0.100 2.50 5 0.500 5 0.500 5 0.500 5 0.500 5 0.500

ii. Demonstrations 35 0.020 0.70 7 0.140 7 0.140 7 0.140 7 0.140 7 0.140

iii. Monitoring & Evaluation

Lump Sump

- 10.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 6320 0.003 18.96 1264 3.792 1264 3.792 1264 3.792 1264 3.792 1264 3.792

7

Establishment Charges @10% on item NO. 2 & 3

**** ***** 134.30 ** 26.86 ** 26.86 ** 26.86 ** 26.86 ** 26.86

TOTAL 3014.1 601.83 601.83 601.83 601.83 601.828

Page 116: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

108

Table 6.2.10

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK TANGDAR OF DISTRICT KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs. In lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

750 0.012 9 150.00 1.80 150.00 1.80 150.00 1.80 150.00 1.80 150.00 1.80

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

675 0.350 236.25 135.00 47.25 135.00 47.25 135.00 47.25 135.00 47.25 135.00 47.25

ii. Micro-irrigation

75 0.500 37.50 15.00 7.50 15.00 7.50 15.00 7.50 15.00 7.50 15.00 7.50

3 Field, Intermediate and link Drains

750 0.060 45.00 150 9.00 150 9.00 150 9.00 150 9.00 150 9.00

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 750 0.012 9.00 150 1.80 150 1.80 150 1.80 150 1.80 150 1.80

ii. Infrastructure Grant

Lump Sump

0.000 2.00 L.S 0.40 L.S 0.40 L.S 0.40 L.S 0.40 L.S 0.40

5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

5 0.100 0.50 1 0.100 1 0.100 1 0.100 1 0.100 1 0.100

ii. Demonstrations 10 0.020 0.20 2 0.040 2 0.040 2 0.040 2 0.040 2 0.040

iii. Monitoring & Evaluation

Lump Sump

- 2.00 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 750 0.003 2.25 150 0.45 150 0.45 150 0.45 150 0.45 150 0.45

7 Establishment Charges @10% on item NO. 2 & 3

**** ***** 15.937 ** 3.1874 ** 3.1874 ** 3.1874 ** 3.1874 ** 3.1874

TOTAL 359.64 72.53 72.53 72.53 72.53 72.53

Page 117: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

109

Table 6.2.11

COMMAND AREA DEVELOPMENT DEPARTMENT -----Blockwise Action Plan

PHYSICAL AND FINANCIAL TARGETS UNDER PMKSY IN BLOCK KUPWARA OF TEETWAL OF DISTRICT

KUPWARA

S. No

Activities Proposed Targets

Unit Cost (Rs.

In lacs)

Total Cost

Targets for 2016-17

Targets for 2016-17

Targets for 2017-18

Targets for 2018-19

Targets for 2019-20

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Survey, Planning, Design

504 0.012 6.048 100.80 1.21 100.80 1.21 100.80 1.21 100.80 1.21 100.80 1.21

2 OFD works :

0 0 0 0 0 0 0 0 0 0 0

i. Field Channel

453.60 0.350 158.76 90.72 31.752 90.72 31.752 90.72 31.752 90.72 31.752 90.72 31.752

ii. Micro-irrigation

50.40 0.500 25.20 10.08 5.04 10.08 5.04 10.08 5.04 10.08 5.04 10.08 5.04

3 Field, Intermediate and link Drains

504 0.060 30.24 100.8 6.05 100.8 6.05 100.8 6.05 100.8 6.05 100.8 6.05

4 Farmers Participation:

0 0 0 0 0 0 0 0 0 0 0

i. Functional grant 504 0.012 6.05 100.8 1.21 100.8 1.21 100.8 1.21 100.8 1.21 100.8 1.21

ii. Infrastructure Grant

Lump Sump

0.000 1.50 L.S 0.30 L.S 0.30 L.S 0.30 L.S 0.30 L.S 0.30

5 Software activities 0 0 0 0 0 0 0 0 0 0 0 0

i. Trainings/ Seminars

3 0.100 0.30 0.6 0.060 0.6 0.060 0.6 0.060 0.6 0.060 0.6 0.060

ii. Demonstrations 5 0.020 0.10 1 0.020 1 0.020 1 0.020 1 0.020 1 0.020

iii. Monitoring & Evaluation

Lump Sump

- 1.50 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000 L.S 1.000

6 Warabandi 504 0.003 1.512 100.8 0.3024 100.8 0.3024 100.8 0.3024 100.8 0.3024 100.8 0.3024

7 Establishment Charges @10% on item NO. 2 & 3

**** ***** 10.71 ** 2.142 ** 2.142 ** 2.142 ** 2.142 ** 2.142

TOTAL 241.92 49.08 49.08 49.08 49.08 49.08

Page 118: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

110

Table 6.3

BLOCK-WISE ACTION PLAN OF SOIL AND WATER CONSERVATI ON DEPARTMENT

Table 6.3 Continue …

S No Name of

Block Concerned

Ministry/Deptt. Components Activity Capacity

Command Area

Period of Implementation

Estimated Cost

1 Kupwara DOLR MOHR PMKSY Watershed

Fencing/Plantation 90000 Rft 300 5 90.75

DRSM Structures 2000 cum 200 3 10.00

Create Work 1000 Nos. 500 5 50.00

Water Harvesting Structures 3 Nos. 04 3 8.25

Total 1004 159.00

2 Trehgam DOLR MOHR PMKSY Watershed

Fencing/Plantation 72000 rft 240 6 72.60

DRSM Structures 3900 cum 130 5 19.50 Create Work 1240 Nos 620 5 124.00 Water Harvesting Structures 5 Nos. 06 4 12.50 Total 996 228.60

3 Kralpora DOLR MOHR PMKSY Watershed

Fencing/Plantation 350 4 105.87 DRSM Structures 5500 cum 550 5 27.50 Create Work 1750 Nos. 900 6 175.00 Water Harvesting Structures 10 Nos 09 6 27.50 Total 1809 335.87

Page 119: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

111

Table 6.3 Continue …

S No Name of Block

Concerned Ministry/Deptt.

Components Activity Capacity Command Area

Period of Implementation

Estimated Cost

4 Tangdhar DOLR MOHR PMKSY Watershed

Fencing/Plantation 210000 rft 700 3 21.17 DRSM Structures 3000 cum 100 3 15.00 Create Work 1750 Nos. 875 3 175.00 Water Harvesting Structures 02 Nos. 03 1 5.50 Upgradation of Natural Resources 05 Nos. 0 4 5.00

Total 1678 221.67

5 Sogam DOLR MOHR PMKSY Watershed

Fencing/Plantation 30000 rft 100 3 30.25 DRSM Structures 1600 cum 180 3 8.00 Create Work 600 Nos. 300 4 60.00 Water Harvesting Structures 5 Nos. 6 3 13.75 Upgradation of Natural Resources 7 Nos. 0 4 4.90

Total 586 116.90

6 Wavoora DOLR MOHR PMKSY Watershed

Fencing/Plantation 60000 200 2 60.50 DRSM Structures 2250 cum 75 3 11.25 Create Work 950 Nos. 475 2 95.00 Water Harvesting Structures 3 Nos. 4 2 8.25 Upgradation of Natural Resources 5 Nos 0 2 3.50 Total 754 178.50

7 Kalaroose DOLR MOHR PMKSY Watershed

Fencing/Plantation 75000 250 2 75.63 DRSM Structures 2550 cum 85 2 12.75 Create Work 1750 Nos. 900 3 175.00 Water Harvesting Structures 02 Nos 03 2 5.50 Upgradation of Natural Resources 10 Nos 0 3 7.00 Total 1238 275.88

Page 120: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

112

Table 6.3 Continue …

S No Name of Block

Concerned Ministry/Deptt.

Components Activity Capacity Command Area

Period of Implementation

Estimated Cost

8 Langate DOLR MOHR PMKSY Watershed

Fencing/Plantation 30000 rft 100 5 30.25 DRSM Structures 1500 cum 50 4 7.50 Create Work 2700 Nos 1350 4 270.00 Water Harvesting Structures 5 Nos 7 3 13.75 Upgradation of Natural Resources 12 Nos 0 4 7.00 Total 1507 328.50

9 Rajwar DOLR MOHR PMKSY Watershed

Fencing/Plantation 45000 rft 150 5 45.37 DRSM Structures 700 cum 23 2 3.50 Create Work 1550 Nos 775 3 155.00 Water Harvesting Structures 5 Nos. 07 3 13.75 Upgradation of Natural Resources 12 Nos 0 4 8.40 Total 955 226.02

10 Ramhall DOLR MOHR PMKSY Watershed

Fencing/Plantation 27000 rft 90 5 27.22 DRSM Structures 500 cum 23 2 2.50 Create Work 2250 Nos 1125 4 225.00 Water Harvesting Structures 03 Nos. 04 3 8.25 Upgradation of Natural Resources 03 Nos. 0 3 2.10 Total 1242 265.07

Grand Total 11769 2336.01

Page 121: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

113

Table 6.4

BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT UNDER PMKSY DISTRICT KUPWARA

(Kehmil Division)

Table 6.4 Continue

S. No.

Pro

gra

mm

e

Co

mp

on

en

t

Co

nst

itu

en

t C

D

Blo

ck

Forest

Range Activities

Nu

mb

er

Un

it C

ost

Are

a C

ov

ere

d

Am

ou

nt

Rs.

in

Lacs

1st yr 2nd yr 3rd yr 4th yr 5th yr

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1.

PMKSY

Water

Shed

Kralpora

Kralpora Water Harvesting

storage tanks

2 2.75 02 Ha 5.5

1 2.75 1. 2.75 - - - - - -

Plantation/Fencing/

Pasture Dev.

40 Hac 0.8 12000

Rft

32

8 6.4 8 6.4 8 6.4 8 6.4 8 6.4

DRSM Works 200

Cms

499/ 1

40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

2

PMKSY

Water

Shed

Kralpora

Rashanpora Plantation/Fencing/

Pasture Dev.

40 cms 0.8 12000

rft

32

1 2.75 1. 2.75 - - - - - -

DRSM Works 200

cms

499 1 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4

Dug Well 1 5 5 1 5 - - - - - - - -

Page 122: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

114

Table 6.4 Continue

S. No. P

rog

ram

me

Co

mp

on

en

t

Co

nst

itu

en

t C

D

Blo

ck

Forest

Range Activities

Nu

mb

er

Un

it C

ost

Are

a C

ov

ere

d

Am

ou

nt

Rs.

in

Lacs

1st yr 2nd yr 3rd yr 4th yr 5th yr

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

3

PMKSY

Water

Shed

Kralpora

Panzgam Water Harvesting

storage tanks

2 2.75 02 ha 5 1 2.75 1. 2.75 - - - - - -

Plantation/Fencing/

Pasture Dev.

40 ha 0.8 12000

rft

32

8 6.4 8 6.4 8 6.4 8 6.4 8 6.4

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well 1 5 5 1 5 - - - - - - - -

4

PMKSY

Water

Shed Kra

lpo

ra

Reddi

Water Harvesting

storage tanks 1 2.75 01 ha 2.75 1 2.75 - - - - - - - -

Plantation/Fencing/

Pasture Dev. 40 ha 0.8 12000

rft 32 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4

DRSM Works

200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well

1 5 5 1 5 - - - - - - - -

Page 123: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

115

Table 6.4 Continue

S. No. P

rog

ram

me

Co

mp

on

en

t

Co

nst

itu

en

t C

D

Blo

ck

Forest

Range Activities

Nu

mb

er

Un

it C

ost

Are

a C

ov

ere

d

Am

ou

nt

Rs.

in

Lacs

1st yr 2nd yr 3rd yr 4th yr 5th yr

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

5

PM

KS

Y W

ate

r S

he

d

Kra

lpo

ra

Drangwari

Plantation/Fencing/

Pasture Dev. 40 ha 0.8 12000

rft 32 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well

1 5 5 1 5 - - - - - - - -

6

PM

KS

Y W

ate

r S

he

d

Kra

lpo

ra

Budnamal

Plantation/Fencing/

Pasture Dev. 20 ha 0.8 6000 rft 16 4 3.2 4 3.2 4 3.2 4 3.2 4 3.2

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well 1 5 5 1 5 - - - - - - - -

7

PM

KS

Y W

ate

r S

he

d

Tre

hg

am

Trehgam

Water Harvesting

storage tanks 2 2.75 02 ha 5.5 1 2.75 1 2.75 - - - - - -

Plantation/Fencing/

Pasture Dev. 60 ha 0.8

18000

rft 48 12 9.6 12 9.6 12 9.6 12 9.6 12 9.6

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well 1 5 5 1 5 - - - - - - - -

Page 124: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

116

Table 6.4 Continue

S. No. P

rog

ram

me

Co

mp

on

en

t

Co

nst

itu

en

t C

D

Blo

ck

Forest

Range Activities

Nu

mb

er

Un

it C

ost

Are

a C

ov

ere

d

Am

ou

nt

Rs.

in

Lacs

1st yr 2nd yr 3rd yr 4th yr 5th yr

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

8

PM

KS

Y W

ate

r S

he

d

Tre

hg

am

Deedkoot

Water Harvesting

storage tanks 2 2.75 02 ha 5.5 1 2.75 1 2.75 - - - - - -

Plantation/Fencing/

Pasture Dev. 45 Ha 0.8 13500

rft 36 9 7.2 9 7.2 9 7.2 9 7.2 9 7.2

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well 1 5 5 1 5 - - - - - - - -

9

PM

KS

Y W

ate

r S

he

d

Tre

hg

am

Gulgam

Water Harvesting

storage tanks 1 2.75 01 ha 2.75 1 2.75 - - - - - - -

Plantation/Fencing/

Pasture Dev. 40 ha 0.8 12000

rft 32 8 6.4 8 6.4 8 6.4 8 6.4 8 6.4

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well 1 5 5 1 5 - - - - - - - -

10

PM

KS

Y W

ate

r S

he

d

Ra

mh

all

Tarathpora

Water Harvesting

storage tanks 1 2.75 01 ha 2.75 1 2.75 - - - - - - - -

Plantation/Fencing/

Pasture Dev. 30 ha 0.8 9000 rft 24 6 4.8 6 4.8 6 4.8 6 4.8 6 4.8

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Dug Well 1 5 5 1 5 - - - - - - - -

Page 125: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

117

Table 6.4 Continue

S. No. P

rog

ram

me

Co

mp

on

en

t

Co

nst

itu

en

t C

D

Blo

ck

Forest

Range Activities

Nu

mb

er

Un

it C

ost

Are

a C

ov

ere

d

Am

ou

nt

Rs.

in

Lacs

1st yr 2nd yr 3rd yr 4th yr 5th yr

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

11

PM

KS

Y W

ate

r S

he

d

Ra

mh

all

Manzgam

Water Harvesting

storage tanks 2 2.75 02 ha 5.5 1 2.75 1. 2.75 - - - - - -

Plantation/Fencing/

Pasture Dev. 45 ha 0.8

13500

rft 36 9 7.2 9 7.2 9 7.2 9 7.2 9 7.2

DRSM Works

200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

12

PM

KS

Y W

ate

r S

he

d T

an

gd

ha

r

Tangdhar

Plantation/Fencing/

Pasture Dev. 45 ha 0.8 13500

rft 36 9 7.2 9 7.2 9 7.2 9 7.2 9 7.2

DRSM Works 300

cms 499 1.5 60 0.3 60 0.3 60 0.3 60 0.3 60 0.3

Water Harvesting

storage tanks

2 2.75 02 hac 5.5 1 2.75 1 2.75 - - - - - -

Page 126: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

118

Table 6.4 Continue

S. No. P

rog

ram

me

Co

mp

on

en

t

Co

nst

itu

en

t C

D

Blo

ck

Forest

Range Activities

Nu

mb

er

Un

it C

ost

Are

a C

ov

ere

d

Am

ou

nt

Rs.

in

Lacs

1st yr 2nd yr 3rd yr 4th yr 5th yr

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

13

PM

KS

Y W

ate

r S

he

d

Te

eth

wa

l

Teethwal

Plantation/Fencing/

Pasture Dev. 20 ha 0.8 6000 rft 16 4 3.2 4 3.2 4 3.2 4 3.2 4 3.2

DRSM Works 200

cms 499 1 40 0.2 40 0.2 40 0.2 40 0.2 40 0.2

Water Harvesting

storage tanks 2 2.75 02 ha 5.5 1 2.75 1 2.75 - - - - - -

14

Ke

ran

Keran

Plantation/Fencing/

Pasture Dev. 15 hac 0.8 4500 rft 12 3 2.4 3 2.4 3 2.4 3 2.4 3 2.4

DRSM Works 600

cms 499 3 120 0.6 120 0.6 120 0.6 120 0.6 120 0.6

Water Harvesting

storage tanks 3 2.75 02 ha 8.25 1 2.75 1 2.75 1 2.75 - - - -

Dug Wells 2 5 10 1 5 1 5 - - - - - -

Total 542

Page 127: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

119

Table 6.5

BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT UNDER PMKSY DISTRICT KUPWARA

(Zangli Division)

Table 6.5 Continue..

S. No.

Pro

gram

me

Com

pone

nt

Con

stitu

ent

CD

Blo

ck

Forest Range Activities

Num

ber

Uni

t Cos

t

Are

a C

over

ed

Am

ount

Rs.

In

Lac

s

1

PM

KS

Y W

ater

She

d

Wav

oora

North Lolab Water Harvesting storage tanks 08 2.75 04 ha 22.00

Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00

DRSM Works 1200 cms 499 6.00

2 Sog

am South Lolab Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00

DRSM Works 800cms 499 4.00

Dug well 02 5.00 10.00

3

Mat

chil Matchill Range Water Harvesting storage tanks 04 2.75 02 ha 11.00

Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00

DRSM Works 600cms 499 3.00

Dug well 02 5.00 10.00

Page 128: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

120

Table 6.5 Continue..

S. No.

Pro

gram

me

Com

pone

nt

Con

stitu

ent

CD

Blo

ck

Forest Range Activities

Num

ber

Uni

t Cos

t

Are

a C

over

ed

Am

ount

Rs.

In

Lac

s

4 Dru

gmul

lah Kupwara Water Harvesting storage tanks 04 2.75 02 ha 11.00

Plantation/Fencing/Pasture Dev. 80 ha 0.80 24000 rfts 64.00

DRSM Works 800cms 499 4.00

Dug well 02 5.00 10.00

5

Han

dwar

a Kandi Plantation/Fencing/Pasture Dev. 20 ha 0.80 6000 rfts 16.00

DRSM Works 200 cms 499 1.00

Dug well 01 5.00 5.00

Total 369.00

Page 129: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

121

Table 6.6

BLCOKWISE ACTION PLAN OF FOREST DEPARTMENT UNDER PMKSY DISTRICT KUPWARA

(Langate Division)

Table 6.6 Continue …

S. No. Programme Component

Con

stitu

ent

CD

Blo

ck

Activities Number Unit Cost Area

Covered(Ha) Amount Rs. In

Lacs

1

PMKSY Watershed

Langate Crates Per crate 1000 300 70.00

Plantation of board leaved plants Nos. 247500 150 35.442

Fencing Rft 45000 150 82.80

Dug Wells Nos. 10 10 27.5

Nursery Formation Ha 01 2 2.74

Page 130: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

122

Table 6.6 Continue …

S. No. Programme Component

Con

stitu

ent

CD

Blo

ck

Activities Number Unit Cost Area

Covered(Ha) Amount Rs. In

Lacs

2

PMKSY Watershed

Rajwar Soil Conservatiobn Works Per cum 1000 500 4.99

Crates Per crateNos.

500 300 35.00

Plantation of board leaved plants Nos. 330000 200 47.256

Plantation Conifer plants Nos. 33000 200 78.893

Fencing Rft 120000 400 220.8

Drianage system Nos, 03 2.35 4.70

Nursery Formation Ha. 01 2.00 2.74

Water lifting pump set Nos. 02 2.35 1.00

613.861

Page 131: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

i

ACTION PLAN OF IRRIGATION SECTOR UNDER AIBP TAC 12 TH ONGOING SCHEMES DISTRICT KUPWARA (I&FC DIVISION, KUPWARA)

S. No.

Name of Block

Programme No. of Schemes

Nature of

Scheme

Balance Cost (Rs. In lacs)

Rs. in Lacs

2016-17 2017-18 2018-19

2019-20

2020-21

1. Trehgam AIBP TAC 12th

1 Gravity 685.5480 342.7740 342.7740 -- -- --

AIBP TAC 12th 1 Storage 10.0420 5.0210 5.0210 -- -- --

2. Kalroose AIBP TAC 12th

1 Gravity 519.9300 259.9650 259.9650 -- -- --

3. Wavoora AIBP TAC 12th 2 Gravity 466.0475 233.0238 233.0238 -- -- --

Total 5 1681.5675 840.7838 840.7838 -- -- --

Page 132: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

123

Table 6.7

BLOCKWISE ACTION PLAN OF IRRRIGATION AND FLOOD CONT ROL

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Kralpora

Construction of Budnamal Khul 180 105 116 128 140.5 154.5 644

AIBP(PMKSY)

Construction of Zunreshi Khul 75 46 50.5 55.6 61 67.18 280.28

Construction of Kha.nabal Khul 70 36 39.6 43.6 48 52.68 219.88

Construction of Manchater Khul 40 23.5 25.85 28.4 31.3 34.07 143.12

1 Construction of Aloosa Khul & Aloosa Babapora Khul

120 75 82 91 100 109.6 457.6

Construction of Dardhari Khul 160 92 101 111 122 134 560

Construction of Kundwari Khul 230 103 113 124 137 149.93 626.93

Construction of Kuliwali Khul Farkin Khul

70 52.5 58 64 70 76 320.5

Construction of Farkin Khul 45 49 54 60 65 72 300

Construction of Murizal Khul 40 43 47 52 57 61 260

Page 133: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

124

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Construction of Puthkah Khul 50 41 45 50 54 60 250

Construction of Gagal Khul 90 71.5 78.7 86.5 95.2 104.3 436.2

AIBP(PMKSY Keeran Bala khul 20 10 11 12 13 9 55

1 Keeran Payeen Khul 21 29 32 35 39 45 180

RRR (Har Khet Ko Pani)

Repair, restoration and reactivation of (1) Thandipora Storage Tank by way of Deeping ,Widening, construction of rock toe, inlet out chamber and spillway

45 19 21 23 25 27 115

RRR of Kumar Mohallah Storage Tank by way of Deepening, Widening, construction of rock toe, inletout chamber and spillway

47 20 22 24 26 28 120

RRR Muqam Storage Tank by way of deepening and construction of rock toe

37 16 17 19 21 23 96

RRR of Dardpora Kashmiri by way of deepening of spillway, rock toe and outlet system

45 20 22 24 26 28 120

Page 134: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

125

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

RRR of Dardpora Storage Tank by way of deepening, construction of spillway rock toe and outlet

40 16 18 20 22 24 100

RRR of Doban Sar Katchama by way of deepening, construction of spillway, rock toe and outlet system

30 13 14.5 16 17.5 19 80

Kralpora

RRR of Singrisar Reshikah, Asthan Sar and Kanmar Storage Tank by way of deepening, Construction of spillway rock toe and outlet system at Reshigund, Kralpora

40 17 19 21 23 25 105

Lift Irrigation Reddi Chowkibal Lift Irrigation scheme

350 156 171 188 207 228 950 (Her Khet Ko Pani)

Total 0

AIBP (PMSKY) Glaster Khul Pushwari 120 57 62 68 75 83 345

Pazipora khul 135 64 70 77 85 94 390

Karihuma Khul 140 61 67 73 81 88 370

Dedikoot Khul 120 540 55 60 66 74 305

Grat Khul Kunan 95 57 63 69 76 85 350

Sangpeer Khul 85 49 54 59 65 73 300

Chakalwari Khul Gushi 120 60 67 73 81 89 370

Page 135: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

126

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Zangli Khul 30 26 29 32 35 38 160

Gamadwari Khul 60 57 63 69 76 85 350

Dagwari Khul 130 57 63 69 76 85 350

Dal Khul 320 156 171 188 207 228 950

Mirnag Kanwal Khul 90 41 45 50 54 60 250

2 Kupwara Manchdar Mirnag Khul 85 36 40 44 48 52 220

Jugtiyal Mirnag Khul 80 34 38 41 46 51 210

Kathianwali Sangpeer Khul 40 25 27 30 33 35 150

Kashmiri Manigah 43 21 23 26 28 32 130

Karehenpora Manzhar 40 20 22 24 26 28 120

Glassdaji Khul 45 24 26 29 32 34 145

Gamadwari Khul Manzhar 35 15 16 18 20 21 90

Authwoth Khul 41 17 19 21 23 25 105

AIBP (PMSKY)

Construction of storage tank at Harden Batergam

60 25 27.5 30 33 34.5 150

Construction of Batrinar Batergam storage tank

45 25 27.5 30 33 34.5 150

AIBP Banda Khul/Dooniwari Khul 0

Constt. Of LIS kegam Kandi 0

Page 136: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

127

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

RRR (Har Khet Ko Pani)

RRR of Branwari Storage Tank Kupwara by way of deepening, widening, construction of spillway and outlet chambers

70 29 32 35 38.5 40.5 175

Kupwara RRR of Sulkoot Storage Tank by way of Deepening, Widening, Construction of spillway and outlet chambers.

82 34 38 42 46 50 210

RRR of Halmathpora Storage tank by way of depening, widening, construction of spillway and outletchambers

65 28 31 34 37 40 170

RRR of Tikkerwari Khul 165 24.5 27.2 30 33 35 150

Her Khet Ko Pani Nagree storage tank 0

MGNREGS

Diselting of canals in distribution system

0

BAPD

Const. Of 12 Nos. St.tanks in Kandi area

0

3 Trehgam AIBP (PMKSY)

Construction of Zamidari Khul Zurthama & Chafran Khul Zurhama

160 118 130 143 157 172 720

Improvement in Pir Khul 160 106 117 129 142 156 650

Nagin Khul Doolipora 50 10 11 12 13 14 60

Brandoger Khul 150 100 110 120 131 139 600

Page 137: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

128

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Chakalwari Khul Laderwan 150 25 27 30 33 35 150

Shalwari Khul Laderwan 70 46 50 55 61 69 281

Grat Khul Laderwan 65 25 28 30 34 37 154

Bagwari Laderwan 45 25 28 30 34 37 154

Chanwari Laderwan 35 14 15 17 19 20 815

Malwari Laderwan 40 32 35 39 42 47 195

Russan Khul Laderwan 60 42 46 51 56 60 255

War Mohallah Awoora Khul 55 25 27 30 33 35 150

Kawari Khul 90 74 81 89 98 108 450

Chadder Khul 70 41 45 50 54 60 250

Now KhulAwoora 65 25 27 30 33 35 150

Allachizab Khul 90 43 47 51 57 62 260

Pushwari Khul 65 26 29 32 35 38 160

Vash Khul Awoora 40 20 22 24 26 28 120

Payerpora Khul Gulgam 40 49 54 59 65 73 300

AIBP (PMKSY)

Construction of Ladewan Mane Mohallah storage tank

320 133.5 147 161.5 178 194 814

Construction of Hayan Dolipora storage tank

80 49 54 59 65 73 300

Page 138: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

129

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Construction of Trehgam Dolipoora storage tank

75 34 38 41 46 51 210

RRR (Har Khet Ko Pani)

RRR of 5 Nos. Storage Tanks in Gulgam area by way of deepening, widening, spillway, and inlet and out chamber/rock toe and feeding channel/distribution system.

140 57 63 69 76 85 350

Trehgam RRR Laderwan Kawari Storage Tank by way of deepening, construction of spillway, rock toe and outlet system

30 12 13.5 15 16.5 18 75

RRR Kabamarg Storage Tank by way of deepening, construction of rock toe, spill way and inlet outlet chambers

25 11 12 13 14 15 65

3 Trehgam Lift Irrigation Hayan Chak Lift Irrigation Scheme 250 115 126 139 153 167 700

(Her Khet Gulgam Lift Irrigation Scheme 400 172 189 208 229 252 1050

4

AIBP (PMKSY)

Mancher Khul 220 113 125 137 151 164.78 690.78

Construction of Pahlihar Storage tank

150 61 67 74 82 91 375

Construction of Jindiyal Storage tank at Dardpora

130 53 58 64 71 79 325

4 RRR (Har Khet Ko RRR of Tangcheck Storage tank 18 8 9 10 11 11.93 49.93

Page 139: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

130

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Pani) RRR of Batasar Storage tank 21 9.5 10.5 11.5 12.6 13.87 57.97

RRR of Kralsat Storage tank 16 7.3 8 8.8 9.7 10.68 44.48

RRR of Tulkhan Storage tank 20 9 10 11 12 13.82 55.82

RRR of Haksar Storage tank 35 16 17.7 19.5 21.5 23.45 98.15

RRR of Ganie Sar (A) Storage tank 35 15.3 16.85 18.5 20.4 22.36 93.41

RRR of Watel Sar Storage tank 21 9.5 10.5 11.5 12.65 13.94 58.09

RRR of Aram Sar Storage Tank 28 12 13 14.5 16 18.39 73.89

Sogam RRR of Nulsar Storage tank 35 15 17 18.7 20.6 23.02 94.32

RRR of Dedwari Storage Tank 25 11.5 12.6 13.9 15.3 16.81 70.11 RRR of Gujar Sar (A) Storage tank

Lassipora 40 18.5 20 22 25 27.37 112.87

RRR of Gujar Sar (A) Storage tank Lassipora

18 8.9 9.8 10.8 11.9 13.12 54.52

RRR of Roopisar Storage Tank 64 28.5 31 34.5 38 41.69 173.69 RRR of Ganisar (B) Storage tank 62 27 29.6 32.6 36 39.09 164.29 RRR of Hayatpora Sar (A) Storage

Tank 70 31 34 37 41.5 46.48 189.98

RRR of Pir Sar Storage tank 27 12 13 14.5 16 17.39 72.89

Page 140: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

131

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

4 Sogam

Lift Irrigation Mirgi Devsar LIS 150 61 68 74 82 90 375

(Her Khet Khan Chak Tekkipora LIS 150 61 68 74 82 90 375

Gundmancher LIS 120 52 58 63 70 77 320

Dardpora LIS 135 57 63 69 76 85 350

AIPB Maidanpora Khul 220 118 130 143 157 172 720

(PMKSY) Gagal Khul (Lolab) 350 170 187 205 226 248 1036

Sewer Harden Khul 320 160 176 194 213 235 978

Warnw Offen Khul 310 165 182 200 220 242.83 1009.83

Construction of Budnar storage tank 90 41 45 50 55 59 250

Construction of single Bagh storage

tank 85 36 39 43 48 54 220

Construction of Maidanpora storage

tank 75 31 34 37 42 46 190

Wavoora Construction of Nagbal storage tank 70 29 32 35 38 41 175

5 RRR(Har Khet Ko

Pani) RRR of Putshahi storage tank 25 12 13 14 15 17.87 71.98

RRR of Sever Dara storage tank 28 12 13 14 16 17.66 72.66

Page 141: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

132

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Lift Irrigation (Har Khet Ko Pani)

Lift Irrigation Scheme Surigam 160 131 144 159 175 191 800

Kanthpora LIS 145 90 99 109 120 132 550

Mujdaji Khul 200 182..00 200 220 242 264 1108

Mooori Khul 190 262 289 318 349 383 1601

Bandi Khul 250 205 225 248 273 299 1250

Nagsari Khul 90 74 81 90 98 107 450

Sarkuli Khul 105 128 141 155 170 186 780

Nunwani Khul 100 64 70 77 85 94 390

AIBP Jhayan Khul 105 85 94 103 113 125 520

Kalaroose (PMKSY) Chalandari Khul 85 82 90 99 109 120 500

6 Thayan Khul 150 89 98 108 118 128 541

Ringbala Khul 30 20 22 24 26 28 120

Khanbasti Khul 25 16 17 19 21 22 95

Urni Khul 15 11 12.5 14 15.5 17 70

Dapal Khul 17 11 12.5 14 15.5 17 70

Pushwari Khul 40 24 27 30 33 34 150

RRR(Har Khet Ko Pani)

Babagaffar Storage tank 20 9 10 11.5 12.5 14.43 57.43

Page 142: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

133

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

AIBP Lontha Kandi Khul 46 15 15 15 15 15 75

(PMKSY) Shamaspora Khul 66 14 14 14 14 14 70

7 Tangdhar Upper Nachiyan Khul 77 40 40 40 40 40 200

Terboni Chanipora Khul 85 13 13 13 13 13 65

Khaitan Khul 44 15.296 15.296 15.296 15.296 15.296 76.48

Shamsporra Gomal khul 80 15.2 15.2 15.2 15.2 15.2 76

Razwar khul 225 15 15 15 15 15 75

Khowarpora Khul 35 6 6 6 6 6 30

0 0 0 0 0 0

7 Tangdhar State Irrigation Deptt.

Gomal Tangdhar Khul 0 0 0 0 0 0

Kandhi Khul 60 0 0 0 0 0 0

8 Teethwal

AIBP Dringla Khul 78 15 15 15 15 15 75

(PMKSY) Qazinag Khul 57 14 14 14 14 14 70

Shazbani Khul 171 40 40 40 40 40 200

Chatkabi Khul 77 13 13 13 13 13 65

Bhaderkote Khul 35 15.296 15.296 15.296 15.296 15.296 76.48

Dhani Khul 61 15.2 15.2 15.2 15.2 15.2 76

Mudhiyan Khul 20 15 15 15 15 15 75

Tadd Kundian Khul 30 6 6 6 6 6 30

Page 143: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

134

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Lift Irrigation (Har Khet Ko Pani)

Lift Irrigation Scheme Sudpora 330 79.8 79.8 79.8 79.8 79.8 399

9 Langate

AIBP Nowgam Shrihama Gama Khul 132 42.238 42.238 42.238 42.238 42.238 211.19

(PMKSY) Kutlari to Kharpora Khul 178 57.106 57.106 57.106 57.106 57.106 285.53

3 Nos. Khuls in middle Qaziabad 183 58.608 58.608 58.608 58.608 58.608 293.04

3 Nos Khuls in Lower Qariabad 178 57.2 57.2 57.2 57.2 57.2 286

Khani Khul Langate 313 100.3 100.3 100.3 100.3 100.3 501.5

3 Nos. Khuls in Upper Qaziabad 393 126 126 126 126 126 630

3 Nos. Khuls Rang path Doggerpora & Gore Khul

183 58.762 58.762 58.762 58.762 58.762 293.81

Wahipora Haripora & Khanoo Khul 218 69.788 69.788 69.788 69.788 69.788 348.94

Grate Khul, Banger Khul & Shartvan Khul

136 43.65 43.65 43.65 43.65 43.65 218.25

Chek Tulwari Khul & Shartgund Bala Khul

156 49.974 49.974 49.974 49.974 49.974 249.87

0 0 0 0 0 0

Loolipora Khul 178 56.956 56.956 56.956 56.956 56.956 284.78

Haril Sheikhpora Khul 151 48.498 48.498 48.498 48.498 48.498 242.49

Juhama Grate Khul 137 43.976 43.976 43.976 43.976 43.976 219.88

Shirhama Bare Khul 167 53.574 53.574 53.574 53.574 53.574 267.87

Page 144: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

135

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Drungsu to Prungu Khul 180 57.89 57.89 57.89 57.89 57.89 289.45

Langate Const. Of Wahipora Haripora LIS 281 90 90 90 90 90 450

Const. Of Unisoo LIS 326 110 110 110 110 110 550

RRR(Har Khet Ko Pani) Palpora storage tank 63 20.108 20.108 20.108 20.108 20.108 100.54

Mushnar storage tank 82 26.434 26.434 26.434 26.434 26.434 132.17

MGNREGS

Desalting of canals in Distribution system

10.8 10.8 10.8 10.8 10.8 54

AIBP Const. Of LIS Wadipora 50 10.774 10.774 10.774 10.774 10.774 53.87

(PMKSY) Zachaldara Khul 200 51.772 51.772 51.772 51.772 51.772 258.86

Const. Of 4 Nos. Storage tanks in

Bakhiakar area 320 80.112 80.112 80.112 80.112 80.112 400.56

Const. Of 3 Nos. Storage tank in

Khaipora area 320 94.646 94.646 94.646 94.646 94.646 473.23

Batkoot Khul 60 21.04 21.04 21.04 21.04 21.04 105.2

Chalpora Wadipora Khul 150 29.1 29.1 29.1 29.1 29.1 145.5

Rajwar Chandari Khul 150 41.24 41.24 41.24 41.24 41.24 206.2

10

Const. Of LIS Badkoot 60 50 50 50 50 50 250

Const. Of LIS Rutum star 50 90 90 90 90 90 450

Page 145: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

136

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

RRR(Har Khet Ko Pani)

Reshinar Storage Tank 149 75 75 75 75 75 375

Gujarnar Storage tank 80 18.1 18.1 18.1 18.1 18.1 90.5

Kathinar storage tank 130 22.1 22.1 22.1 22.1 22.1 110.5

Machiora storage tank 50 16 16 16 16 16 80

Nagranar storage tank 75 15.9 15.9 15.9 15.9 15.9 79.5

0

0 0 0

0 0

0 0

0 0 0

Rajwar

Nowdager storage tank 75 10.06 10.06 10.06 10.06 10.06 50.3

Voghabal storage tank 75 12.1 12.1 12.1 12.1 12.1 60.5

Googi waskoora storage tank 115 20.44 20.44 20.44 20.44 20.44 102.2

Latishat Minor 100 30.04 30.04 30.04 30.04 30.04 150.2

Sagipora Minor 150 42.04 42.04 42.04 42.04 42.04 210.2

Harwon Minor 150 41 41 41 41 41 205

BAPD (Ongoing Schemes)

Const. Of Brinal storage tank 370 80 80 80 80 80 400

Const. Of 13 Nos. Storage tanks in Rajwar area

620 175.4 175.4 175.4 175.4 175.4 877

MGNREGS Diselting of canals in distribution system

10.8 10.8 10.8 10.8 10.8 54

11 Ramhall AIBP (PMSKY) Kanihama Khul 674.4 123.28 123.28 123.28 123.28 123.28 616.4

Kukroosa Khul 390.6 43.04 43.04 43.04 43.04 43.04 215.2

Page 146: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

137

Table 6.7 Continue…

S. No

Name of the Block

Programme Component Name of the Scheme/ Activity

Com

man

d A

rea

/ Ir

rigat

ion

Pot

entia

l (H

a.) Period of Implementation

Estt. Cost

(Rs. In Lacs)

2016

- 1

7

2017

- 1

8

2018

– 1

9

2019

- 2

0

2020

- 2

1

Neelpora Khanpora Khul 157.36 36.516 36.516 36.516 36.516 36.516 182.58

Dahama Khul 337.2 64.1 64.1 64.1 64.1 64.1 320.5

Wapazawani Khul 112.4 51.59 51.59 51.59 51.59 51.59 257.95

Chamb Khul 382.16 49.05 49.05 49.05 49.05 49.05 245.25

Her Khet Ko Pani Const. Of Tumpora LIS 134.88 49.56 49.56 49.56 49.56 49.56 247.8

RRR Sherkoot storage tank 59 18 18 18 18 18 90

MGNREGS Diselting of canals in distribution system

5.52 5.52 5.52 5.52 5.52 27.6

55608.47

Page 147: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

138

Table 6.8

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

1.

Lan

ga

te

Pe

r D

rop

Mo

re C

rop

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore

well)

No’s 85 212.50 340.00 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 85 212.50 340.00 12.14

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 115 46.00 57.50 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 115 46.00 57.50 16.43

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set)

No’s 135 0.00 33.75 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 135 0.00 33.75 19.29

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac)

No’s 120 0.00 180.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 120 0.00 180.00 17.14

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 500 0.00 750.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 500 0.00 750.00 71.43

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s 10 0.00 5.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 10 0.00 5.00 1.43

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s 350 175.00 175.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 350 175.00 175.00 50.00

Total 1315 433.50 1541.25 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 1315 433.50 1541.25 187.86

Page 148: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

139

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

2.

Ra

mh

all

Pe

r D

rop

Mo

re C

rop

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore

well)

No’s 40 100.00 160.00 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 40 100.00 160.00 5.71

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 100 40.00 50.00 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 100 40.00 50.00 14.29

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

300 0.00 75.00 42.86 0.00 42.86 0.00 42.86 0.00 42.86 0.00 42.86 0.00 300 0.00 75.00 42.86

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

75 0.00 112.50 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 75 0.00 112.50 10.71

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 90 0.00 135.00 12.86 0.00 12.86 0.00 12.86 0.00 12.86 0.00 12.86 0.00 90 0.00 135.00 12.86

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

150 0.00 75.00 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 150 0.00 75.00 21.43

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

200 100.00 100.00 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 200 100.00 100.00 28.57

Total 955 240.00 707.50 136.43 34.29 136.43 34.29 136.43 34.29 136.43 34.29 136.43 34.29 955 240.00 707.50 136.43

Page 149: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

140

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

3.

Ku

pw

ara

Pe

r D

rop

Mo

re C

rop

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore

well)

No’s 40 100.00 160.00 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 40 100.00 160.00 5.71

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 100 40.00 50.00 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 14.29 5.71 100 40.00 50.00 14.29

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

150 0.00 37.50 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 21.43 0.00 150 0.00 37.50 21.43

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

50 0.00 75.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 75.00 7.14

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 50 0.00 75.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 75.00 7.14

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

80 0.00 40.00 11.43 0.00 11.43 0.00 11.43 0.00 11.43 0.00 11.43 0.00 80 0.00 40.00 11.43

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

200 100.00 100.00 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 28.57 14.29 200 100.00 100.00 28.57

Total

670 240.00 537.50 95.71 34.29 95.71 34.29 95.71 34.29 95.71 34.29 95.71 34.29 670 240.00 537.50 95.71

Page 150: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

141

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

4.

Tre

hg

am

,

Pe

r D

rop

Mo

re C

rop

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore

well)

No’s 25 62.50 100.00 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 25 62.50 100.00 3.57

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 50 20.00 25.00 7.14 2.86 7.14 2.86 7.14 2.86 7.14 2.86 7.14 2.86 50 20.00 25.00 7.14

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

125 0.00 31.25 17.86 0.00 17.86 0.00 17.86 0.00 17.86 0.00 17.86 0.00 125 0.00 31.25 17.86

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

60 0.00 90.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 90.00 8.57

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 60 0.00 90.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 90.00 8.57

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

65 0.00 32.50 9.29 0.00 9.29 0.00 9.29 0.00 9.29 0.00 9.29 0.00 65 0.00 32.50 9.29

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

180 90.00 90.00 25.71 12.86 25.71 12.86 25.71 12.86 25.71 12.86 25.71 12.86 180 90.00 90.00 25.71

Total

565 172.50 458.75 80.71 24.64 80.71 24.64 80.71 24.64 80.71 24.64 80.71 24.64 565 172.50 458.75 80.71

5.

Kra

l

po

ra

P e Deep Bore well (@ 2.5 (@Rs.4.00

Lacs/Bore No’s 20 50.00 80.00 2.86 7.14 2.86 7.14 2.86 7.14 2.86 7.14 2.86 7.14 20 50.00 80.00 2.86

Page 151: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

142

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

ha/B.W) well)

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 40 16.00 20.00 5.71 2.29 5.71 2.29 5.71 2.29 5.71 2.29 5.71 2.29 40 16.00 20.00 5.71

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

100 0.00 25.00 14.29 0.00 14.29 0.00 14.29 0.00 14.29 0.00 14.29 0.00 100 0.00 25.00 14.29

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

50 0.00 75.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 75.00 7.14

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s

40 0.00 60.00 5.71 0.00 5.71 0.00 5.71 0.00 5.71 0.00 5.71 0.00 40 0.00 60.00 5.71

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

150 75.00 75.00 21.43 10.71 21.43 10.71 21.43 10.71 21.43 10.71 21.43 10.71 150 75.00 75.00 21.43

Total 460 141.00 365.00 65.71 20.14 65.71 20.14 65.71 20.14 65.71 20.14 65.71 20.14 460 141.00 365.00 65.71

6. lar

oo P e Deep Bore well (@ 2.5 (@Rs.4.00 No’s 10 25.00 40.00 1.43 3.57 1.43 3.57 1.43 3.57 1.43 3.57 1.43 3.57 10 25.00 40.00 1.43

Page 152: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

143

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

ha/B.W) Lacs/Bore

well)

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 30 12.00 15.00 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 30 12.00 15.00 4.29

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

50 0.00 12.50 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 7.14 0.00 50 0.00 12.50 7.14

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

10 0.00 15.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 10 0.00 15.00 1.43

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 20 0.00 30.00 2.86 0.00 2.86 0.00 2.86 0.00 2.86 0.00 2.86 0.00 20 0.00 30.00 2.86

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

25 0.00 12.50 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 25 0.00 12.50 3.57

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

60 30.00 30.00 8.57 4.29 8.57 4.29 8.57 4.29 8.57 4.29 8.57 4.29 60 30.00 30.00 8.57

Total 205 67.00 155.00 29.29 9.57 29.29 9.57 29.29 9.57 29.29 9.57 29.29 9.57 205 67.00 155.00 29.29

7.

Wa

v

oo

ra

P e Deep Bore well (@ 2.5 (@Rs.4.00

Lacs/Bore No’s 25 62.50 100.00 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 25 62.50 100.00 3.57

Page 153: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

144

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

ha/B.W) well)

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 30 12.00 15.00 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 30 12.00 15.00 4.29

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

75 0.00 18.75 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 75 0.00 18.75 10.71

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

25 0.00 37.50 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 25 0.00 37.50 3.57

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 30 0.00 45.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 30 0.00 45.00 4.29

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

100 50.00 50.00 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 100 50.00 50.00 14.29

Total 345 124.50 296.25 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 345 124.50 296.25 49.29

8.

So

ga

m

Pe r

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore No’s

25 62.50 100.00 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 3.57 8.93 25 62.50 100.00 3.57

Page 154: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

145

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

well)

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 30 12.00 15.00 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 4.29 1.71 30 12.00 15.00 4.29

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

75 0.00 18.75 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 10.71 0.00 75 0.00 18.75 10.71

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

25 0.00 37.50 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 3.57 0.00 25 0.00 37.50 3.57

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 30 0.00 45.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 4.29 0.00 30 0.00 45.00 4.29

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

100 50.00 50.00 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 14.29 7.14 100 50.00 50.00 14.29

Total 345 124.50 296.25 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 49.29 17.79 345 124.50 296.25 49.29

9.

Ta

ng

d

ar

Pe

r

Dro

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore

well)

No’s 5 12.50 20.00 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 5 12.50 20.00 0.71

Page 155: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

146

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 20 8.00 10.00 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 20 8.00 10.00 2.86

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

60 0.00 15.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 15.00 8.57

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

15 0.00 22.50 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 15 0.00 22.50 2.14

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 18 0.00 27.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 18 0.00 27.00 2.57

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

30 15.00 15.00 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 30 15.00 15.00 4.29

Total 208 35.50 139.50 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 208 35.50 139.50 29.71

10.

Te

eth

wa

l P

er

Dro

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore

well)

No’s 5 12.50 20.00 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 0.71 1.79 5 12.50 20.00 0.71

Page 156: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

147

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 20 8.00 10.00 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 2.86 1.14 20 8.00 10.00 2.86

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

60 0.00 15.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 15.00 8.57

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

15 0.00 22.50 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 2.14 0.00 15 0.00 22.50 2.14

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 18 0.00 27.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 2.57 0.00 18 0.00 27.00 2.57

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

60 0.00 30.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 8.57 0.00 60 0.00 30.00 8.57

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

30 15.00 15.00 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 4.29 2.14 30 15.00 15.00 4.29

Total 208 35.50 139.50 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 29.71 5.07 208 35.50 139.50 29.71

11.

Ra

jwa

r

Pe

r

Dro

Deep Bore well (@ 2.5

ha/B.W)

(@Rs.4.00

Lacs/Bore

well)

No’s 85 212.50 340.00 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 12.14 30.36 85 212.50 340.00 12.14

Page 157: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

148

BLOCKWISE ACTION PLAN OF HORTICULTURE DEPARTMENT DI STRICT KUPWARA UNDER PMKSY (Per Drop More Crop)

S.

No

.

Blo

ck

Co

mp

on

en

t

Activity Rate of

Assistance Unit

To

tal

(No

’s)

Command/

Irrigation

potential

(ha) Est

ima

ted

cost

(R

s. i

n

lacs

) 1st year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

6th

year

2021-22

7th

year

2022-23

Dug well / open wells

ha (@0.4 ha/D.W.)

(@Rs.0.50

Lacs/Dug

well)

No’s 115 46.00 57.50 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 16.43 6.57 115 46.00 57.50 16.43

Portable irrigation

pump sets

(@Rs.0.25

Lacs/ set) No’s

135 0 33.75 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00 19.29 0.00

Non DPAP Drip

(Irrigated)

(@Rs.1.5

Lacs/Hac) No’s

120 0 180 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00 17.14 0.00

DPAP Drip (Rain-fed) (@Rs.1.5

Lacs/hac) No’s 500 0 750 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00 71.43 0.00

Irrigation pump sets

with discharge capacity

of 5 lac litters / hour

including water carriage

/ Distribution pipes

(@Rs.0.50

Lacs/set) No’s

10 0 5 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00 1.43 0.00

Secondary Storage * in

convergence with

MGNREGS 60% material

cost. 3mx 3mx1.5m

Storage Tanks

ha@(0.5/ha

(@Rs.0.50

Lacs/tank) No’s

350 175 175 5.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00 50.00 25.00

Total

1315 433.5 1541.25 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93 187.86 61.93

G. Total

6177.75

Page 158: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

149

Table 6.9 BLOCK-WISE ACTION PLAN OF DEPARTMENT OF RURAL DEVEL OPMENT

DISTRICT KUPWARA UNDER PMKSY “MGNREGS”

Table 6.9 Continue…

S. N

o.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1. Kupwara

PM

KS

Y M

GN

RE

GS

MoRD a) Farm Bunds Cub Mtr. 310 155 0.8 248 62 49.6 62 49.6 62 49.6 62 49.6 62 49.6 b) Nallahs Bunds Cub Mtr. 420 424.2 1 420 84 84 84 84 84 84 84 84 84 84

c) Other ground water recharges Structure

Cub Mtr. 36 5.7 0.1 3.6 7.2 0.72 7.2 0.72 7.2 0.72 7.2 0.72 7.2 0.72

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 21 80.6 1 21 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2

e) Water Conservation

Cub Mtr. 43 1.6 0.7 30.1 8.6 6.02 8.6 6.02 8.6 6.02 8.6 6.02 8.6 6.02

f) Water Harvesting

Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4

g) Creation of irrigation canal and drains

Mtrs. 42 117.6 1.2 50.4 8.4 10.08 8.4 10.08 8.4 10.08 8.4 10.08 8.4 10.08

h) Land Development

HA 70 39.2 1 70 14 14 14 14 14 14 14 14 14 14

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 25 43.8 0.5 12.5 5 2.5 5 2.5 5 2.5 5 2.5 5 2.5

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 23 79.6 0.4 9.2 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84

Total 1015 983.3 884.8 203 176.96 203 176.96 203 176.96 203 176.96 203 176.96

Page 159: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

150

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

2. Kalaroos

PM

KS

Y M

GN

RE

GS

MoRD a) Farm Bunds Cub Mtr. 320 160 0.8 256 64 51.2 64 51.2 64 51.2 64 51.2 64 51.2 b) Nallahs Bunds Cub Mtr. 73 73.7 1 73 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6 14.6

c) Other ground water recharges Structure

Cub Mtr. 80 12.7 0.1 8 16 1.6 16 1.6 16 1.6 16 1.6 16 1.6

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 8 30.7 1 8 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6

e) Water Conservation

Cub Mtr. 65 2.4 0.7 45.5 13 9.1 13 9.1 13 9.1 13 9.1 13 9.1

f) Water Harvesting

Cub Mtr. 37 53.3 0.8 29.6 7.4 5.92 7.4 5.92 7.4 5.92 7.4 5.92 7.4 5.92

g) Creation of irrigation canal and drains

Mtrs. 35 98 1.2 42 7 8.4 7 8.4 7 8.4 7 8.4 7 8.4

h) Land Development

HA 75 42 1 75 15 15 15 15 15 15 15 15 15 15

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 32 56 0.5 16 6.4 3.2 6.4 3.2 6.4 3.2 6.4 3.2 6.4 3.2

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 23 79.6 0.4 9.2 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84 4.6 1.84

Total 748 608.4 562.3

Page 160: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

151

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

3. Trehgam P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 90 45 0.8 72 18 14.4 18 14.4 18 14.4 18 14.4 18 14.4 b) Nallahs Bunds Cub Mtr. 180 181.8 1 180 36 36 36 36 36 36 36 36 36 36

c) Other ground water recharges Structure

Cub Mtr. 22 3.5 0.1 2.2 4.4 0.44 4.4 0.44 4.4 0.44 4.4 0.44 4.4 0.44

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 8 30.7 1 8 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6

e) Water Conservation

Cub Mtr. 44 1.6 0.7 30.8 8.8 6.16 8.8 6.16 8.8 6.16 8.8 6.16 8.8 6.16

f) Water Harvesting

Cub Mtr. 32 46.1 0.8 25.6 6.4 5.12 6.4 5.12 6.4 5.12 6.4 5.12 6.4 5.12

g) Creation of irrigation canal and drains

Mtrs. 22 61.6 1.2 26.4 4.4 5.28 4.4 5.28 4.4 5.28 4.4 5.28 4.4 5.28

h) Land Development

HA 64 35.8 1 64 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 12 21 0.5 6 2.4 1.2 2.4 1.2 2.4 1.2 2.4 1.2 2.4 1.2

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 14 48.4 0.4 5.6 2.8 1.12 2.8 1.12 2.8 1.12 2.8 1.12 2.8 1.12

Total 488 475.5 420.6

Page 161: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

152

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

4. Kralpora P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 210 105 0.8 168 42 33.6 42 33.6 42 33.6 42 33.6 42 33.6 b) Nallahs Bunds Cub Mtr. 150 151.5 1 150 30 30 30 30 30 30 30 30 30 30

c) Other ground water recharges Structure

Cub Mtr. 35 5.6 0.1 3.5 7 0.7 7 0.7 7 0.7 7 0.7 7 0.7

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 20 76.8 1 20 4 4 4 4 4 4 4 4 4 4

e) Water Conservation

Cub Mtr. 30 1.1 0.7 21 6 4.2 6 4.2 6 4.2 6 4.2 6 4.2

f) Water Harvesting

Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4

g) Creation of irrigation canal and drains

Mtrs. 18 50.4 1.2 21.6 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32

h) Land Development

HA 56 31.4 1 56 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 17 58.8 0.4 6.8 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36

Total 582 553.4 477.4

Page 162: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

153

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

5. Ramhal P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 80 40 0.8 64 16 12.8 16 12.8 16 12.8 16 12.8 16 12.8 b) Nallahs Bunds Cub Mtr. 132 133.3 1 132 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4 26.4

c) Other ground water recharges Structure

Cub Mtr. 23 3.7 0.1 2.3 4.6 0.46 4.6 0.46 4.6 0.46 4.6 0.46 4.6 0.46

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 8 30.7 1 8 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6

e) Water Conservation

Cub Mtr. 23 0.9 0.7 16.1 4.6 3.22 4.6 3.22 4.6 3.22 4.6 3.22 4.6 3.22

f) Water Harvesting

Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4

g) Creation of irrigation canal and drains

Mtrs. 21 58.8 1.2 25.2 4.2 5.04 4.2 5.04 4.2 5.04 4.2 5.04 4.2 5.04

h) Land Development

HA 62 34.7 1 62 12.4 12.4 12.4 12.4 12.4 12.4 12.4 12.4 12.4 12.4

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 18 31.5 0.5 9 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 10 34.6 0.4 4 2 0.8 2 0.8 2 0.8 2 0.8 2 0.8

Total 402 404.2 342.6

Page 163: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

154

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

6. Langate P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 85 42.5 0.8 68 17 13.6 17 13.6 17 13.6 17 13.6 17 13.6 b) Nallahs Bunds Cub Mtr. 110 111.1 1 110 22 22 22 22 22 22 22 22 22 22

c) Other ground water recharges Structure

Cub Mtr. 20 3.2 0.1 2 4 0.4 4 0.4 4 0.4 4 0.4 4 0.4

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 10 38.4 1 10 2 2 2 2 2 2 2 2 2 2

e) Water Conservation

Cub Mtr. 18 0.7 0.7 12.6 3.6 2.52 3.6 2.52 3.6 2.52 3.6 2.52 3.6 2.52

f) Water Harvesting

Cub Mtr. 19 27.4 0.8 15.2 3.8 3.04 3.8 3.04 3.8 3.04 3.8 3.04 3.8 3.04

g) Creation of irrigation canal and drains

Mtrs. 15 42 1.2 18 3 3.6 3 3.6 3 3.6 3 3.6 3 3.6

h) Land Development

HA 40 22.4 1 40 8 8 8 8 8 8 8 8 8 8

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 18 31.5 0.5 9 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2

Total 350 371.1 290.8

Page 164: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

155

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

7. Rajwar P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 90 45 0.8 72 18 14.4 18 14.4 18 14.4 18 14.4 18 14.4 b) Nallahs Bunds Cub Mtr. 130 131.3 1 130 26 26 26 26 26 26 26 26 26 26

c) Other ground water recharges Structure

Cub Mtr. 20 3.2 0.1 2 4 0.4 4 0.4 4 0.4 4 0.4 4 0.4

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 10 38.4 1 10 2 2 2 2 2 2 2 2 2 2

e) Water Conservation

Cub Mtr. 32 1.2 0.7 22.4 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48

f) Water Harvesting

Cub Mtr. 28 40.3 0.8 22.4 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48

g) Creation of irrigation canal and drains

Mtrs. 15 42 1.2 18 3 3.6 3 3.6 3 3.6 3 3.6 3 3.6

h) Land Development

HA 55 30.8 1 55 11 11 11 11 11 11 11 11 11 11

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2

Total 416 420.9 348.3

Page 165: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

156

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

8. Sogam P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 90 45 0.8 72 18 14.4 18 14.4 18 14.4 18 14.4 18 14.4 b) Nallahs Bunds Cub Mtr. 130 131.3 1 130 26 26 26 26 26 26 26 26 26 26

c) Other ground water recharges Structure

Cub Mtr. 20 3.2 0.1 2 4 0.4 4 0.4 4 0.4 4 0.4 4 0.4

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 10 38.4 1 10 2 2 2 2 2 2 2 2 2 2

e) Water Conservation

Cub Mtr. 32 1.2 0.7 22.4 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48 6.4 4.48

f) Water Harvesting

Cub Mtr. 28 40.3 0.8 22.4 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48 5.6 4.48

g) Creation of irrigation canal and drains

Mtrs. 15 42 1.2 18 3 3.6 3 3.6 3 3.6 3 3.6 3 3.6

h) Land Development

HA 55 30.8 1 55 11 11 11 11 11 11 11 11 11 11

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2

Total 416 420.9 348.3

Page 166: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

157

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

9. Tangdar P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 82 41 0.8 65.6 16.4 13.12 16.4 13.12 16.4 13.12 16.4 13.12 16.4 13.12 b) Nallahs Bunds Cub Mtr. 120 121.2 1 120 24 24 24 24 24 24 24 24 24 24

c) Other ground water recharges Structure

Cub Mtr. 18 2.9 0.1 1.8 3.6 0.36 3.6 0.36 3.6 0.36 3.6 0.36 3.6 0.36

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 0 0 1 0 0 0 0 0 0 0 0 0 0 0

e) Water Conservation

Cub Mtr. 21 0.8 0.7 14.7 4.2 2.94 4.2 2.94 4.2 2.94 4.2 2.94 4.2 2.94

f) Water Harvesting

Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4

g) Creation of irrigation canal and drains

Mtrs. 12 33.6 1.2 14.4 2.4 2.88 2.4 2.88 2.4 2.88 2.4 2.88 2.4 2.88

h) Land Development

HA 54 30.2 1 54 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 18 31.5 0.5 9 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8 3.6 1.8

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 15 51.9 0.4 6 3 1.2 3 1.2 3 1.2 3 1.2 3 1.2

Total 365 349.1 305.5

Page 167: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

158

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

10. Teetwal P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 30 15 0.8 24 6 4.8 6 4.8 6 4.8 6 4.8 6 4.8 b) Nallahs Bunds Cub Mtr. 14 14.1 1 14 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8

c) Other ground water recharges Structure

Cub Mtr. 15 2.4 0.1 1.5 3 0.3 3 0.3 3 0.3 3 0.3 3 0.3

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 6 23 1 6 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2

e) Water Conservation

Cub Mtr. 15 0.6 0.7 10.5 3 2.1 3 2.1 3 2.1 3 2.1 3 2.1

f) Water Harvesting

Cub Mtr. 21 30.2 0.8 16.8 4.2 3.36 4.2 3.36 4.2 3.36 4.2 3.36 4.2 3.36

g) Creation of irrigation canal and drains

Mtrs. 13 36.4 1.2 15.6 2.6 3.12 2.6 3.12 2.6 3.12 2.6 3.12 2.6 3.12

h) Land Development

HA 30 16.8 1 30 6 6 6 6 6 6 6 6 6 6

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 20 35 0.5 10 4 2 4 2 4 2 4 2 4 2

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 13 45 0.4 5.2 2.6 1.04 2.6 1.04 2.6 1.04 2.6 1.04 2.6 1.04

Total 177 218.5 133.6

Page 168: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

159

Table 6.9 Continue… S

. No.

Name of Block

Pro

gram

me

Com

pone

nt

Con

cern

ed

Min

istr

y

Activities Unit Target

in (No’s)

Proposed Area

Coverage (Ha)

Unit Cost (Per

Ha./ in Lacs) E

stim

ated

C

ost

(in la

cs)

Period of Implantation

1st

year

2016-17

2nd

year

2017-18

3rd

year

2018-19

4th

year

2019-20

5th

year

2020-21

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

11. Wavoora P

MK

SY

MG

NR

EG

S

MoRD a) Farm Bunds Cub Mtr. 210 105 0.8 168 42 33.6 42 33.6 42 33.6 42 33.6 42 33.6 b) Nallahs Bunds Cub Mtr. 150 151.5 1 150 30 30 30 30 30 30 30 30 30 30

c) Other ground water recharges Structure

Cub Mtr. 35 5.6 0.1 3.5 7 0.7 7 0.7 7 0.7 7 0.7 7 0.7

d) Fishery Pondss/ Cattle Ponds

Cub Mtr. 20 76.8 1 20 4 4 4 4 4 4 4 4 4 4

e) Water Conservation

Cub Mtr. 30 1.1 0.7 21 6 4.2 6 4.2 6 4.2 6 4.2 6 4.2

f) Water Harvesting

Cub Mtr. 25 36 0.8 20 5 4 5 4 5 4 5 4 5 4

g) Creation of irrigation canal and drains

Mtrs. 18 50.4 1.2 21.6 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32 3.6 4.32

h) Land Development

HA 56 31.4 1 56 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2 11.2

i)

Renovation of Water Bodies including desalting.

Cub Mtr. 21 36.8 0.5 10.5 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1 4.2 2.1

j)

Renovation & Maintenance of Irrigation Canals

Cub Mtr. 17 58.8 0.4 6.8 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36 3.4 1.36

Total 582 553.4 477.4

G. Total 6674.1

Page 169: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

160

Table 6.10

BLOCKWISE ACTION PLAN OF IWMP OF DISTRICT KUPWARA U NDER PMKSY

Table 6.10 Continue…

S. No.

Name of the Block Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

1. Langate NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 507 507 28.05 1 Staggered Contour Trenches/ Terracing

404 404 28.05 2

Nalla Bunds RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

268 268 7.28 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

233 233 28.05 3

Irrigation Drains 12 12 1155 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

1351 1351 36.49 2

Construction of harvesting structures

1202 1202 36.49 3

Total 4237 4237 1333.98

Page 170: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

161

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

2. Sogam NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 207 207 11.45 1 Staggered Contour Trenches/ Terracing

165 165 11.45 2

Groundwater Recharge Structure

15 15 22.87 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

105 105 2.85 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Soil and water conservation structures

869 869 46.88 2

Water harvesting structures

95 95 11.45 3

RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

519 519 14.03 2

Construction of harvesting structures 462 462 14.03 3

Total

2437 2437 135.01

Page 171: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

162

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

3. Ramhall NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 327 327 18.12 1 Staggered Contour Trenches/ Terracing

261 261 18.12 2

Groundwater Recharge Structure

21 21 36.9 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

166 166 4.52 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

203 203 24.41 3

Irrigation Drains 8 8 7.17 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

839 839 22.64 2

Construction of harvesting structures

746 746 22.64 3

Total 2571 2571 154.52

Page 172: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

163

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

4. Trehgam NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 260 260 14.38 1 Staggered Contour Trenches/ Terracing

207 207 14.38 2

Groundwater Recharge Structure

18 18 28.72 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

132 132 3.59 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

115 115 13.81 3

Irrigation Drains 6 6 5.69 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

665 665 17.97 3

Construction of harvesting structures

592 592 17.97 3

Total

1995 1995 121.18

Page 173: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

164

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

5. Rajwar NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 507 507 28.05 1 Staggered Contour Trenches/ Terracing

404 404 28.05 2

Groundwater Recharge Structure

36 36 58.31 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

268 268 7.28 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

233 233 28.05 3

Irrigation Drains 12 12 11.55 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

1351 1351 36.49 2

Construction of harvesting structures

1202 1202 36.49 3

Total

4013 4013 234.27

Page 174: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

165

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

6. Wavoora NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 222 222 1231 1 Staggered Contour Trenches/ Terracing

177 177 12.13 2

Groundwater Recharge Structure

16 16 24.54 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

113 113 3.07 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

98 98 11.83 3

Irrigation Drains 12 12 4.87 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

570 570 15.39 2

Construction of harvesting structures

507 507 15.39 3

Total

1715 1715 1318.22

Page 175: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

166

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

7. Tangdar NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 192 192 10.99 1 Staggered Contour Trenches/ Terracing

158 158 10.99 2

Groundwater Recharge Structure

5 5 7.91 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

220 220 5.98 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

587 587 7.05 3

Irrigation Drains 46 46 4.49 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

360 360 9.98 2

Construction of harvesting structures

658 658 19.98 3

Total

2226 2226 77.37

Page 176: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

167

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

8. Teetwal NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 352 352 13.99 1 Staggered Contour Trenches/ Terracing

391 391 13.99 2

Groundwater Recharge Structure

5 5 7.91 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

220 220 5.98 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

708 708 38.17 3

Irrigation Drains 46 46 4.49 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

360 360 9.98 2

Construction of harvesting structures

658 658 19.98 3

Total

2740 2740 114.49

Page 177: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

168

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

9. Kalaroos NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 350 350 28.05 1 Staggered Contour Trenches/ Terracing

281 281 10.99 2

Groundwater Recharge Structure

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

268 268 7.28 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

410 410 17.55 3

Irrigation Drains 29 29 8.02 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

351 351 36.49 2

Construction of harvesting structures 855 855 28.23 3

Total

2585 2585 169.86

Page 178: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

169

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

10.

Kupwara NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 433 433 23.99 1 Staggered Contour Trenches/ Terracing

345 345 23.99 2

Groundwater Recharge Structure

31 31 47.91 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

220 220 5.98 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

192 192 23.05 3

Irrigation Drains 10 10 9.49 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

1106 1106 29.98 2

Construction of harvesting structures

987 987 29.98 3

Total

3324 3324 194.37

Page 179: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

170

Table 6.10 Continue…

S. No.

Name of the Block

Concerned Ministry Component Activity

Total number / Capacity

(cum)

Command Area/

Irrigation Potential

(Ha)

Estimate cost in lacs (in

Rs.)

Period of Implementation (5/7 Yrs)

11.

Kralpora NEW CREATION DOLR MOHR PMKSY

Watershed Check Dams 314 314 17.41 1 Staggered Contour Trenches/ Terracing

241 241 16.78 2

Groundwater Recharge Structure 21 21 33.52 3

RENOVATION OF ALREADY CREATED STRUCTURES DOLR MOHR PMKSY

Watershed Check Dams

288 288 7.83 1

CONVERGENCE WITH MGNREGS (NEW CREATION) DOLR MOHR Convergence

with MGNREGS

Water harvesting structures

134 134 16.12 3

Irrigation Drains 7 7 6.64 3 RENOVATION OF OLD STRUCTURES DOLR MOHR Convergence

with MGNREGS

Construction of water conservation structures

774 774 20.9 2

Construction of harvesting structures

688 688 20.9 3

Total 2467 2467 140.1 G. Total 2215.43

Page 180: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

171

CHAPTER – VII

COMPONENTS OF PMKSY

A) ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP)

The Accelerated Irrigation Benefit Programme (AIBP) was launched by

Government of India during 1996-97 to provide financial assistance to State

Governments for accelerating the pace of irrigation development in the country.

The main purpose was to ensure timely completion of irrigation projects which

are mostly capital intensive in nature. No major irrigation projects due to non-

feasibility are existing in the district and a number of minor irrigation schemes

have spilled over in previous years due to lack of budgetary support.

OBJECTIVE :

a) To focus on faster completion of ongoing Medium / Minor

IrrigationProjects of the District.

b) To accelerate implementation of irrigation projects which are beyond the

resource capability of state government.

c) Expeditious completion of the projects which are in advanced stage of the

completion.

d) To realize the bulk benefit from the existing minor irrigation project.

Outcome of AIBP under PMKSY:

1) AIBP has not only supplemented the existing irrigation facilities but has

also created assured irrigation by taking up sufficient number of schemes.

2) AIBP has also helped in generating employment to the farmers, thus

helping to improve economic condition by way of providing employment

and better agriculture output.

Page 181: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

172

3) AIBP helps to improve the existing channels, up-gradation of channels

and construction of new channels to cover large cultivable command

area.

PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT

PMKSY AIBP

S. No. Name of the Component Total Cost of the Component

1. PMKSY AIBP 45716.76 lacs

B) PER DROP MORE CROP:

Available water can lead to more efficient usage by “Per Drop More

Crop” component of PMKSY. By way of micro-irrigation systems on farm like

sprinkler, drip irrigation systems, water use efficiency can be achieved out of

available water in the district.

PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT PMKSY “ Per Drop More Crop”

S. No. Name of the Component Total Cost of the Component

1. PMKSY “Per Drop More Crop” 13355.86 lacs

Page 182: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

173

C) HAR KHET KO PANI

PMKSY shall endure for precision irrigation by scientific access of water

to every farm by way of command area development and other associated

scheme. This shall ensure expansion of cultivable area by assured

irrigation supply and increase farm output. This component of PMKSY

will ensure irrigation facility to every farm land by next 5 to 7 years.

SCOPE:

To ensure access of irrigation facility to every farm during next five years. The irrigation potential created though various schemes both under AIBP and harKhetKoPani will be utilized through command area development activities which will strengthen distribution network and ensure availability of water at every farm. This will also ensure judicious utilization of water through infrastructure development by reducing seepage loses and availability of water at critical periods of crop growth.

SCHEMES FAILING UNDER HAR KHET KO PANI:

1. Minor surface irrigation (Gravity) = 131

2. Lift irrigation = 15

3. RRR water bodies = 61

OUTPUT:

1. Command area of 12321.02 ha.is to be irrigated through minor

surface irrigation schemes.

2. An area of 2500 ha.is to be irrigated under lift irrigation.

3. An area of 1633.98 ha.is covered under RRR water bodies.

PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT PMKSY “ HarKhetKoPani”

S. No. Name of the Component Total Cost of the Component

1. PMKSY “HarKhetKoPani” 32015.11 lacs

Page 183: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

174

D) PMKSY WATERSHED

Watershed development Programme aims to restore the ecological

balance by harnessing, conserving and developing degraded natural

resources such as soil, vegetative cover and water. The outcomes are

prevention of soil erosion, regeneration of natural vegetation, rain water

harvesting and recharging of the ground water table. This enables multi-

cropping and the introduction of diverse agro-based activities, which help

to provide sustainable livelihoods to the people residing in the watershed

area.

OBJECTIVES:

The objectives of PMKSY Watershed in District Kupwarashall be:

• Developing wastelands/ degraded lands, drought-prone and desertareas

on watershed basis, keeping in view the capability of land, site-conditions

and local needs.

• Promoting the overall economic development and improving the socio-

economic condition of the resource poor and disadvantaged sections

inhabiting the programme areas by way of livelihood production system.

• Mitigating the adverse effects of extreme climatic conditions such as

drought and desertification on crops, human and livestock population for

their overall improvement.

• Restoring ecological balance by harnessing, conserving and developing

natural resources i.e. land, water, vegetative cover.

SCOPE:

• To improve the soil moisture by doing gully control and thus improve the productivity of land by preventing soil erosion.

• To develop local biomass. • To assist in local livelihood development. • To strengthen community based assets.

Page 184: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

175

ACTIVITIES: • The denudation of soil and water as a resource will be treated mainly by

employing environmental engineering and thus the likes of harvesting structures like farm Pondss, nalla bunds, check dams and tanks will be taken into consideration.

• Land Development including in-situ soil and moisture conservation

measures like contour and graded bunds fortified by plantation, bench terracing in hilly terrain, nursery raising for fodder, timber, fuel wood, horticulture & Non Timber Forest Product Species.

• Afforestation including block plantations, agro-forestry and horticultural

development, Shelterbelt plantations, sand dune stabilization, etc.

• Drainage line treatment with a combination of vegetative and engineering structures.

• Development line treatment with a combination of vegetative and

engineering structures.

• Development of small water harvesting structures such as low-cost farm pords, nalla bunds, check-dams and percolation tanks & ground water recharge measures.

• Renovation and augmentation of water resources, Desiltation of tanks for

drinking water/ irrigation.

• Repair, restoration and up-gradation of existing common assets and structures in the watershed to obtain optimum & sustained benefits from existing public investments.

• Effective rainwater management by contour bunding, trenching,

staggered trenching, land levelling, mulching etc.

PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT PMKSY “ Watershed”

S. No. Name of the Component Total Cost of the Component

1. PMKSY “Watershed” 3370.8425 lacs

Page 185: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

176

E) CONVERGENCE WITH MGNREGS The scheme and Programmes of Ministry of Rural Development (MoRD)

and the Ministry of Agriculture (MoA) both operate in rural India and the target

beneficiaries are primarily common. Whereas MoRD schemes and Programmes

focus on employment generation/ guarantee, as well as asset creation in rural

areas, both for community benefit and individual livelihood support, MoA

targets basically the agriculture sector with schemes and programme which

typically benefit individual farmers, though there are certain interventions

which are for collective benefit to the farming community. Thus, while both the

Ministries are channelizing their efforts for the benefit of primarily the same

population. Thus it needs to be removed and the operations of MoA and MoRD

needs to be synergised at district level. The material component of projects

including the wages of the skilled and semi-skilled workers taken up under the

scheme shall not exceed forty percent of the total project costs.

The convergence with MGNREGS can be effectively taken up by constructing water harvesting structure, creation of new irrigation sources, up gradation/ desilting of traditional water bodies, water conservation works etc. Soil and water conservation works can also be taken up through convergence in identified backwards blocks and in the upper catchment areas. Further, strengthening of bunds/ embankments, stabilization of grassed water ways, renovation and maintenance of zamindari khuls and other traditional water courses can be taken up through varies departments under Convergence with MGNREGS.

PROPOSED PROJECTION OF FUNDS UNDER THE COMPONENT

PMKSY “Convergence with MGNREGS”

S. No. Name of the Component Total Cost of the Component

1. PMKSY Convergence with MGNREGS

4174.44lacs

Page 186: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

177

CHAPTER - VIII

OUTCOME OF PMKSY IN DISTRICT KUPWARA

Pradhan MantriKrishiSanchiyeeYojna (PMKSY) action plan proposed for next

five years with an outlay Rs. 101592.56lacs including 3% administrative and

other costs under its components viz AIBP “HarKhetKoPani”,“More Crop per

Drop”,Watershed and Convergence with MGNREGS shall ensure enhanced

irrigation coverage and efficient usage of available water on the farm through

the intervention of PMKSY. The measure outcomes in the District are

elaborated as under:

1. Under AIBP all the existing minor irrigation schemes under execution

shall be completed by ensuring sufficient allocation to existing minor irrigation

schemes besides taking up the new formulated schemes in a time bound minor

and ensure their timely completion.

2. “HarKhetKoPani” shall ensure access of water to every border block of

the district benefiting tribal residents of these blocks near the line of actual

control. Catchment areas under command area development shall be increased

by way of scientific distribution of available water. This will in term increase

crop production and help to bring more areas of district under assured irrigation.

Dry land agriculture shall be brought down in a phased manner and the farm

income of poor peasants in the border blocks shall be increased.

3. “More Crop Per Drop” by introducing micro irrigation activities like drip

and sprinkler irrigation will ensure water efficiency. This shall give boost to the

commercial farming in the horticulture sector especially in high density

mountain orchards and vegetable cultivation in semi-urban areas.

4. “Watershed Development” by construction of water conservation

structures shall ensure that there is no depleation of ground water levels in

Kupwara District. More mountain. New livelihood systems shall ensure assured

increasing returns of rural families by development of agro based industries.

Page 187: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

178

5. “MGNREGS Convergence” will be a boosting factor for gap filling in the

District and the labour component available shall make available more number

of mandays in the village under different components of PMKSY in the District.

With the intervention of above mention components of PMKSY it is

hoped that the farm productivity will further increase and rural prosperity will

be achieved by:

• Involving agriculture and allied activities like poultry, apiculture, and

dairy farming systems by integrated farming system approach.

• Raising of vegetables, floriculture, medicinal and aromatic plants.

• Encouraging orchard cultivation (Apple, Walnut, Pear, Cherry).

• Agri-Forestry/ Agri-Horticulture/ Agri-Silvi/ Agri-Pasture/ Agri-Horti

Forestry cropping systems can be encouraged for establishment of agro

based industries and there by employment opportunities will also increase

and shall avoid the migration of rural people to the urban areas.

Since the amount of available water as per study analysis is satisfactory

but the measure problems being faced in the agriculture sector that at the time of

the peak irrigation demand of the crop there is deficit in the water availability,

which adversely effects the crop production as has been observed in many areas

of the district.

District Irrigation Plan (DIP) aims to focus on the conservation of water

usage at peak irrigation season which otherwise remains available abundantly

during the months of March and April. The strategy is to build structures for

conservation of water in those areas, so that it is used when required, for that

purpose various lift stations and mega harvesting structures have been proposed

in the DIP. Moreover emphasis has been laid on bringing about 5000 ha. under

assured irrigation by means of area expansion plan.

The DIP so projected aims to lay emphasis on overall prosperity of the people by providing job opportunities to the rural people by increasing the number of man-days in consonance with MGNREGS by:

Page 188: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

179

a) Increasing the production and prductivity of food crops.

b) Livelihood support system to landless families by provision of agri based

assets.

c) Conservation, protection and prevention of soil erosion of fertile

cultivable soils by recommending suitable agronomic practices

d) Preventing deforestation by nursery plantation leading to the availability

of bulk of fodder for cattle and also aquifer recharge and conservation

and augmentation of traditional water bodies leading to a suitable

environmental balance.

DIP aims to provide irrigation to the rain-fed, horticulture by intervention

of sprinkler irrigation system, since apple and walnut industry is the backbone

of the economy of the district. So accordingly the budgetary proposals in DIP

have been projected with a view to bring about a positive and revolutionary

change in the agriculture and allied sectors.

Page 189: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

180

Table 8.1 SUMMARY OF COST OF VARIOUS COMPONENTS OF PMKSY

S No.

Name of the Component Total Cost

(Rs. in Lacs)

Proposed year wise Allocation of Funds

2016 – 17 2017 - 18 2018 - 19 2019 – 20 2020 - 21

01 AIBP 45716.76 9143.352 9143.352 9143.352 9143.352 9143.352

02 HarKhetKoPani 32015.11 6403.022 6403.022 6403.022 6403.022 6403.022

03 Per Drop More Crop 13355.86 2671.172 2671.172 2671.172 2671.172 2671.172

04 PMKSY Watershed 3370.8425 674.1685 674.1685 674.1685 674.1685 674.1685

05 Convergence with MGNREGS 4174.44 834.888 834.888 834.888 834.888 834.888

TOTAL 98633.0125 19726.6 19726.6 19726.6 19726.6 19726.6

Page 190: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

181

Table 8.2

ABSTRACT OF DEPARRTMENT WISE BUDGETARY PROPOSALS SOUGHT UNDER DISTRICT IRRIGATION PLAN

UNDER PMKSY

S. No. Department Budget Proposed (Amount in Lacs)

1. Agriculture 7174.044

2. Command Area Development 15241.32

3. Irrigation & Flood Control 57290.0375

4. IWMP 2215.43

5. Rural Development Deparrment 6674.1

6. Forest Soil & Water Conservation Department

2336.01

7. Forest Department 1524.861

8. Horticulture Department 6177.75

Total 98633.5525

Add 1% Administrative Cost + 1% Contigency + 1% Monitoring Charges (Totaling 3%)

2959.00657

Total 101592.56

Page 191: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

182

Table 8.3

PROJECTED OUTLAY OF DISTRICT IRRIGATION PLAN (DIP)

Table 8.3 Continue

Projected Outlay Of District Irrigation Plan (DIP)

S No. Name

of Blocks

Concerned Ministry/Departm

ent Component Activity

To

tal

No

./Cap

acit

y(cu

m)

Co

mm

and

A

rea/

Irri

ga

tio

n

Po

ten

tial

(H

a)

Per

iod

of

Imp

lem

ent

atio

n(5

/7

yrs)

Est

imat

ed

Co

st(R

s.

in L

acs)

1 MoWR AIBP Major Irrigation

2 MoWR Medium Irrigation

3 MoWR Surface Minor Irrigation

136 15842.31 45716.76

4 MoWR Lift Irrigation 15 3362.88 7219.89

5 MoWR Ground Water Developed

6 MoWR RRR of Water Bodies 61 5490.2

7 MoWR Construction of Field Channels

7.1 MoWR Lined Field Channels/Community Tanks/

1152 32925 18284.12

Her KhetKoPani

Rain W.H.S/

Bore Well

Page 192: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

183

Table 8.3 Continue

Projected Outlay Of District Irrigation Plan (DIP)

S No. Name

of Blocks

Concerned Ministry/Departm

ent Component Activity

To

tal

No

./Cap

acit

y(cu

m)

Co

mm

and

A

rea/

Irri

ga

tio

n

Po

ten

tial

(H

a)

Per

iod

of

Imp

lem

ent

atio

n(5

/7

yrs)

Est

imat

ed

Co

st(R

s.

in L

acs)

7.2 MoWR Unlined Field

Channels

8 MoWR Micro- Irrigation

9 MOA & FWDA & FW

DPAP Drip 1763 974.7

10 MOA & FWDA & FW

DPAP Sprinkle 20 46.2

11 MOA & FWDA & FW

Per drop more crop(Micro- Irrigation)

Non-DPAP Drip 565 320

12 MOA & FWDA & FW

Non-DPAP Sprinkle

13 MOA & FWDA & FW

Per drop more crop(Supplementary water management activities)

Topping up of MGNREGS

14 MOA & FWDA & FW

Drought proofing through check Dame/Water

3939 2605.35

Page 193: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

184

Table 8.3 Continue

Projected Outlay Of District Irrigation Plan (DIP)

S No. Name

of Blocks

Concerned Ministry/Departm

ent Component Activity

To

tal

No

./Cap

acit

y(cu

m)

Co

mm

and

A

rea/

Irri

ga

tio

n

Po

ten

tial

(H

a)

Per

iod

of

Imp

lem

ent

atio

n(5

/7

yrs)

Est

imat

ed

Co

st(R

s.

in L

acs)

Harvesting Structures/Dug Well/Bore Well

15 MOA & FWDA & FW

Secondary Storage Structures

225 904 225

16 MOA & FWDA & FW

On Farm Development /

755 155 863.9

Training on water conservation awareness/

Agronomic measures

17 DoLR-MoRD

Newly Created WHS

17.1 DoLR-MoRD Terracing 120 3870 446.67

17.2 DoLR-MoRD Check Dams/ DRSM/Crate Work

5271 7062 2743.69

17.3 DoLR-MoRD Nallah Bunds/ 168/14500

12320 1631.09

Contour Bunds

17.4 DoLR-MoRD Percolation Tanks/ NBEC/ Diversion 43/4500 1254.5

Page 194: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

185

Table 8.3 Continue

Projected Outlay Of District Irrigation Plan (DIP)

S No. Name

of Blocks

Concerned Ministry/Departm

ent Component Activity

To

tal

No

./Cap

acit

y(cu

m)

Co

mm

and

A

rea/

Irri

ga

tio

n

Po

ten

tial

(H

a)

Per

iod

of

Imp

lem

ent

atio

n(5

/7

yrs)

Est

imat

ed

Co

st(R

s.

in L

acs)

Drains/ Gabbion Structure

17.5 DoLR-MoRD

Other Ground Water Recharge Structure/ Dug Well/Entry Point/ Fencing

30/65655 Rft./11

2480 1981.09

17.6 DoLR-MoRD Fishery ponds/cattle pond/ livelihood Sport System

3635 1284.57

18 DoLR-MoRD Renovated WHS

18.1 DoLR-MoRD Farm Ponds

18.2 DoLR-MoRD PMKSY Watershed Check Dams 2268 2268 55.66

18.3 DoLR-MoRD Nallah Bunds

18.4 DoLR-MoRD Percolation Tanks

18.5 DoLR-MoRD Other Ground Water Recharge Structure

54 37.9

18.6 DoLR-MoRD W.H.S on Individual Land

1065 53.25

19 DoLR-MoRD Newly Created

Page 195: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

186

Table 8.3 Continue

Projected Outlay Of District Irrigation Plan (DIP)

S No. Name

of Blocks

Concerned Ministry/Departm

ent Component Activity

To

tal

No

./Cap

acit

y(cu

m)

Co

mm

and

A

rea/

Irri

ga

tio

n

Po

ten

tial

(H

a)

Per

iod

of

Imp

lem

ent

atio

n(5

/7

yrs)

Est

imat

ed

Co

st(R

s.

in L

acs)

19.1 DoLR-MoRD Water & Soil Conservation 1222 882.2 293.9825

19.2 DoLR-MoRD Water Harvesting Structures

4698 7606 2481.89

19.3 DoLR-MoRD Creation of Irrigation canals and Drains

414 820.8 327.16

19.4 DoLR-MoRD

Providing infrastructure for Irrigation/Fishery Ponds/Cattle Pond

121 46405 121

19.5 DoLR-MoRD Convergence with MGNREGS

Land Development/Farm Bunds/Nallah Bunds

2760 3303.6

20 DoLR-MoRD Renovation

20.1 DoLR-MoRD Renovation of Water

Bodies including Desiliting:

388720/3220

8246 /397.5

585.7

20.2 DoLR-MoRD

Renovation & Maintenance of irrigation Canals & Drains/ W.H.S:

8587/177 9199.4 285.68

21

Page 196: DISTRICT IRRIGATION PLAN - pmksy.gov.in · vii Chapter Contents Page No. Chapter-I Introduction 1-5 LAND CAPABILITY CLASSIFICATION (AREA in Ha) 6 SOIL FERTILITY INDICES 7 Fig.1 (Land

187

Table 8.3 Continue

Projected Outlay Of District Irrigation Plan (DIP)

S No. Name

of Blocks

Concerned Ministry/Departm

ent Component Activity

To

tal

No

./Cap

acit

y(cu

m)

Co

mm

and

A

rea/

Irri

ga

tio

n

Po

ten

tial

(H

a)

Per

iod

of

Imp

lem

ent

atio

n(5

/7

yrs)

Est

imat

ed

Co

st(R

s.

in L

acs)

21.1 State Irrigation Department

Name of the Scheme Major Irrigation

21.2 State Irrigation Department

Name of the Scheme

Medium Irrigation

21.3 State Irrigation Department

Name of the Scheme

Surface Minor Irrigation

22

Irrigation Scheme of State of Agriculture Department

Name of the Scheme

23

Irrigation Scheme of State of Other lines Department of state Govt.

Name of the Scheme

24 Externally Aided Projects

Name of the Scheme

25 Other loan projects like NABARD

Name of the Scheme

Total 98633.5525