GOVERNMENT OF INDIA

PRADHANMANTRI KRISHI SINCHAI YOJANA

(PMKSY)

DISTRICT IRRIGATION PLAN

HOSHANGABAD

Department of Irrigation & CAD And

Department of Agriculture, Hoshangabad

Page 2: HBAD DIP FINAL ab - pmksy.gov.in

2

HOSHANGABAD DISTRICT IRRIGATION PLAN (PMKSY)

SHRI SANKET BHONDVE, IAS District Collector/District Magistrate, Hoshangabad (M.P)

Preparation and Compilation 1. Abhijeet Agrawal IAS, Chief Executive Officer, District Hoshangabad 2. J.S. Gurjar, DDA District Hoshangabad 3. Shailesh Ukey, Technical Expert (IWMP), District Hoshangabad

Page 3: HBAD DIP FINAL ab - pmksy.gov.in

3

INDEX

S.No. Chapter's Name Page No.

1 Introduction 4-12

2 General InFormation of the District 13-41

3 District Water Profile 42-56

4 Water Availability 57-67

5 Water Requirement/Demand 68-77

6 Strategic Action Plan 78-95

7 Annexures 96-357

Page 4: HBAD DIP FINAL ab - pmksy.gov.in

4

Introduction

The major objective of PMKSY is to achieve convergence of investments in

irrigation at the field level, expand cultivable area under assured irrigation, improve

on-farm water use efficiency to reduce wastage of water, enhance the adoption of

precision-irrigation and other water saving technologies (More crop per drop), enhance

recharge of aquifers and introduce sustainable water conservation practices by

exploring the feasibility of reusing treated municipal waste water for peri-urban

agriculture and attract greater private investment in precision irrigation system.

PMKSY has been conceived amalgamating ongoing schemes viz. Accelerated

Irrigation Benefit Programme (AIBP) of the Ministry of Water Resources, River

Development & Ganga Rejuvenation (MoWR, RD&GR), Integrated Watershed

Management Programme (IWMP) of Department of Land Resources (DoLR) and the

On Farm Water Management (OFWM) of Department of Agriculture and Cooperation

(DAC). The scheme will be implemented by Ministry of Agriculture, Water Resources

and Rural Development. Ministry of Rural Development is to mainly undertake rain

water conservation, construction of farm pond, water harvesting structures, small

check dams and contour bunding etc. MoWR, RD &GR, is to undertake various

measures for creation of assured irrigation source, construction of diversion canals,

field channels, water diversion/lift irrigation, including development of water

distribution systems. Ministry of Agriculture will promote efficient water conveyance

and precision water application devices like drips, sprinklers, pivots, rain-guns in the

farm “(Jal Sinchan)”, construction of micro-irrigation structures to supplement source

creation activities, extension activities for promotion of scientific moisture

conservation and agronomic measures.

Programme architecture of PMKSY will be to adopt a ‘decentralized State level

planning and projectised execution’ structure that will allow States to draw up their

Page 5: HBAD DIP FINAL ab - pmksy.gov.in

5

own irrigation development plans based on District Irrigation Plan (DIP) and State

Irrigation Plan (SIP). It will be operative as convergence platform for all water sector

activities including drinking water & sanitation, MGNREGA, application of science &

technology etc. through comprehensive plan. State Level Sanctioning Committee

(SLSC) chaired by the Chief Secretary of the State with the authority to oversee its

implementation and sanction of projects.

The programme will be supervised and monitored by an Inter-Ministerial

National Steering Committee (NSC) and will be constituted under the Chairmanship of

Prime Minister with Union Ministers from concerned Ministries. A National Executive

Committee (NEC) constituted under the Chairmanship of Vice Chairman, NITI Aayog

to oversee programme implementation, allocation of resources, inter ministerial

coordination, monitoring & performance assessment, addressing administrative issues

etc.

Components and responsible Ministries/ Departments

1. AIBP by MoWR, RD &GR To focus on faster completion of ongoing Major and

Medium Irrigation including National Projects.

2. PMKSY (Har Khet ko Pani) by MoWR, RD & GR Creation of new water sources

through Minor Irrigation (both surface and groundwater). Repair, restoration and

renovation of water bodies; strengthening carrying capacity of traditional water

sources, construction rain water harvesting structures (Jal Sanchay); Command area

development, strengthening and creation of distribution network from source to the

farm. Improvement in water management and distribution system for water bodies to

take advantage of available source, which is not utilised to its fullest capacity (deriving

benefits from low hanging fruits). At least 10% of the command area to under

micro/precision irrigation.

Diversion of water from source of different location where it is plenty to nearby

water scarce areas, lift irrigation from water bodies/rivers at Lower elevation to

supplement requirements beyond IWMP and MGNREGS irrespective of irrigation

Page 6: HBAD DIP FINAL ab - pmksy.gov.in

6

command. Creation and rejuvenation of traditional water storage systems like Jal

Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs

(Assam); Katas, Bandhas (Odisha and M.P.) etc. at feasible locations.

3. PMKSY (Watershed) by Dept. of Land Resources, MoRD Water harvesting

structures such as check dams, nala bund, farm ponds, tanks etc. Capacity building,

entry point activities, ridge area treatment, drainage line treatment, soil and moisture

conservation, nursery raising, afforestation, horticulture, pasture development,

livelihood activities for the asset-less persons and production system & micro

enterprises for small and marginal farmers etc. Effective rainfall management like field

bunding, contour bunding/trenching, staggered trenching, land levelling, mulching etc.

4. PMKSY (Per drop more crop) by Dept. of Agriculture & Cooperation, MoA

Programme management, preparation of State/District Irrigation Plan, approval of

annual action plan, Monitoring etc. Promoting efficient water conveyance and

precision water application devices like drips, sprinklers, pivots, rain-guns in the farm

(Jal Sinchan) Topping up of input cost particularly under civil construction beyond

permissible limit (40%), under MGNREGS for activities like lining inlet, outlet, silt

traps distribution system etc. Construction of micro irrigation structures to supplement

source creation activities including tube wells and dug wells (in areas where

groundwater is available and not under semi critical /critical /over exploited category

of development) which are not supported under PMKSY (WR), PMKSY (Watershed)

and MGNREGS.

Secondary storage structures at tail end of canal system to store water when

available in abundance (rainy season) or from perennial sources like streams for use

during dry periods through effective on-farm water management Water lifting devices

like diesel/ electric/ solar pumpsets including water carriage pipes. Extension activities

for promotion of scientific moisture conservation and agronomic measures including

cropping alignment to maximise use of available water including rainfall and minimise

irrigation requirement (Jal sarankchan) Capacity building, training for encouraging

Page 7: HBAD DIP FINAL ab - pmksy.gov.in

7

potential use water source through technological, agronomic and management

practices including community irrigation. Awareness campaign on water saving

technologies, practices, programmes etc. organisation of workshops, conferences,

publication of booklets, pamphlets, success stories, documentary, advertisements etc.

Improved/innovative distribution system like pipe and box outlet system with

controlled outlet and other activities of enhancing water use efficiency.

District Irrigation Plans (DIPs)

District Irrigation Plan (DIP) shall be the cornerstone for planning and implementation

of PMKSY. DIP will identify the gaps in irrigation infrastructure after taking into

consideration the District Agriculture Plans (DAPs) already prepared for Rashtriya

Krishi Vikas Yojana (RKVY) vis-à-vis irrigation infrastructure currently available and

resources that would be added during XII Plan from other ongoing schemes (both State

and Central), like Mahatma Gandhi National Rural Employment Guarantee

Scheme(MGNREGS), Rashtriya Krishi Vikash Yojana (RKVY), Rural Infrastructure

Development Fund (RIDF), Member of Parliament Local Area Development

(MPLAD) Scheme, Member of Legislative Assembly Local Area Development

(MLALAD) Scheme, Local body funds etc. The gaps indentified under Strategic

Research & Extension Plan (SREGP) are be used in preparation of DIP.

DIPs will present holistic irrigation development perspective of the district

outlining medium to long term development plans integrating three components viz.

water sources, distribution network and water use applications incorporating all usage

of water like drinking & domestic use, irrigation and industry. Preparation of DIP will

be taken up as joint exercise of all participating departments. DIP will form the

compendium of all existing and proposed water resource network system in the

district.

The DIPs may be prepared at two levels, the block and the district. Keeping in

view the convenience of map preparation and data collection, the work would be

primarily done at block level. Block wise irrigation plan is to be prepared depending

Page 8: HBAD DIP FINAL ab - pmksy.gov.in

8

on the available and potential water resources and water requirement for agriculture

sector prioritizing the activities based on socio-economic and location specific

requirement. In case of planning is made based on basin/sub basin level, the

comprehensive irrigation plan may cover more than one district. The activities

identified in the basin/sub-basin plan can be further segregated into district/block level

action plans. Use of satellite imagery, topo sheets and available database may be

appropriately utilized for developing irrigation plans at least on pilot basis to begin

with and subsequently extended to all projects.

Background

Hon’ble President in his address to the joint Session of the Parliament of 16th

Lok Sabha indicated that “Each drop of water is precious. Government is committed to

giving high priority to water security. It will complete the long pending irrigation

projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the

motto of ‘Har Khet Ko Paani’.

There is a need for seriously considering all options including linking of rivers,

where feasible; for ensuring optimal use of our water resources to prevent the

recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and

‘Jal Sinchan’, we will nurture water conservation and groundwater recharge. Micro

irrigation will be to ensure ‘Per drop-More crop’. Out of about 141 m.Ha of net area

sown in the country, about 65 million hectare (or 45%) is presently covered under

irrigation. Substantial dependency on rainfall makes cultivation in unirrigated areas a

high risk, less productive profession. Empirical evidences suggest that assured or

protective irrigation encourages farmers to invest more in farming technology and

inputs leading to productivity enhancement and increased farm income. The

overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to

ensure access to some means of protective irrigation to all agricultural farms in the

country, to produce ‘per drop more crop’, thus bringing much desired rural prosperity.

Vision,

Page 9: HBAD DIP FINAL ab - pmksy.gov.in

9

To use the available water resources in the district to the maximum potential in

an efficient way catering to the basic needs of every living being and enhancing the

livelihoods of rural population to the maximum extent thus alleviating poverty in a

sustainable way without compromising the interests of future generations.

Objective,

The broad objectives of PMKSY will be:-

a) Achieve convergence of investments in irrigation at the field level (preparation of

district level and, if required, sub district level water use plans).

b) Enhance the physical access of water on the farm and expand cultivable area under

assured irrigation (Har Khet ko pani).

c) Integration of water source, distribution and its efficient use, to make best use of

water through appropriate technologies and practices.

d) Improve on-farm water use efficiency to reduce wastage and increase availability

both in duration and in extent.

e) Enhance the adoption of precision-irrigation and other water saving technologies

(More crop per drop).

f) Enhance recharge of aquifers and introduce sustainable water conservation practices.

g) Ensure the integrated development of rainfed areas using the watershed approach

towards soil and water conservation, regeneration of groundwater, arresting runoff,

providing livelihood options and other NRM activities.

h) Promote extension activities relating to water harvesting, water management and

crop alignment for farmers and grass root level field functionaries.

i) Explore the feasibility of reusing treated municipal wastewater for peri-urban

agriculture.

j) Attract greater private investments in irrigation.

This will in turn increase agricultural production and productivity and enhance farm

income.

Page 10: HBAD DIP FINAL ab - pmksy.gov.in

10

Strategy /approach,

To achieve above objectives, PMKSY will strategize by focussing on end-to end

solution in irrigation supply chain, viz. water sources, distribution network, efficient

farm level applications, extension services on new technologies & inFormation etc.

Broadly, PMKSY will focus on:-

a) Creation of new water sources; repair, restoration and renovation of defunct water

sources; construction of water harvesting structures, secondary & micro storage,

groundwater development, enhancing potentials of traditional water bodies at village

level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis

(T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.

b) Developing/augmenting distribution network where irrigation sources (both assured

and protective) are available or created;

c) Promotion of scientific moisture conservation and run off control measures to

improve groundwater recharge so as to create opportunities for farmer to access

recharged water through shallow tube/dug wells;

d) Promoting efficient water conveyance and field application devices within the farm

viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other

application devices etc.

e) Encouraging community irrigation through registered user groups/farmer producers

organisations/NGOs.

Methodology:

The preparation of District Irrigation plan is an integration of geospatial

technology, Space application technologies and spatial and non-spatial data.

1. TransFormation of available thematic inFormation on to the village level on Bhuvan

portal and extract geo-referenced village map data.

2. Integration of thematic layers with socio-economic data for classification of area

into specific composite land units on village level.

Page 11: HBAD DIP FINAL ab - pmksy.gov.in

11

3. Preparation of appropriate action plan based on potential of composite land units

and developmental needs of study area is on the basis of available data.

4. Field visit to validate the recommended measures with respect to the ground

situation and requirement of the local people.

5. Finalization of development plans based on field observation. Available thematic

inFormation for preparation for water resource and land resource development plan.

Landuse / land cover map

Groundwater potential map

Soil map - depth, texture, erosion and land capability

Slope map.

Lithology.

Hydro geomorphology.

In areas for development of water resources structure, geospatial technology has

been used in this process to identify the area of crop land based on high resolution

satellite data and then identify the irrigated area by different source of irrigation

methods. To identify the unirrigated area an overlay method is used. District irrigation

plan covers the following planning component of the district in sustainable

development approach:

Increase in vegetation/biomass in the district.

More number of surface water bodies in district.

Shift from annual crop to perennial.

Increase in the extent of crop area.

Improvement in the soil moisture availability

Reclamation of waste lands.

Convergence of investments in irrigation at the field level.

Enhance the physical access of water on the farm and expand cultivable area under

assured irrigation (Har Khet ko pani)

Best use of water through appropriate technologies and practices.

Page 12: HBAD DIP FINAL ab - pmksy.gov.in

12

Improve on-farm water use efficiency.

Enhance the adoption of precision-irrigation and other water saving technologies

(More crop per drop).

Enhance recharge of aquifers and introduce sustainable water conservation

practices.

Ensure the integrated development of rainfed areas.

Promote extension activities relating to water harvesting, water management and

crop alignment for farmers and grass root level field functionaries.

Explore the feasibility of reusing treated municipal waste water for peri-urban

agriculture,

Attract greater private investments in irrigation.

Page 13: HBAD DIP FINAL ab - pmksy.gov.in

13

Chapter- 1 General InFormation of the District

District Profile

Hoshangabad district has predominantly an agricultural based economy. It is

situated in the eastern part of Madhya Pradesh. Prior to 1998-99 District Harda was a

part of Hoshangabad District. After the division of the district, the present area of the

district is 668089 Ha. It is surrounded by Sehore and Raisen districts in the North,

Narsinghpur district in the east, Chhindwara district in the south west, Betul district in

the south and Harda district in the west. Hoshangabad district lies between north

latitudes 22º 15’ and 23º 00’ and east longitudes 77º 15’ and 78º 42’ in part of survey

of India toposheet Nos, 55F & 55J. Hoshangabad is the district headquarter and Itarsi,

Sohagpur, Piparia, Pachmarhi and Bankheri are some of the major towns. Itarsi is a

very important railway Junction lying on Delhi-Chennai, Delhi-Bangalore and Patna-

Mumbai railway routes. National Highway No. 69 and State Highway No. 21 and 22

pass through the district. The villages in the district are approachable by fair weather

motorable tract.

Hoshangabad is a district that is located on the Lower middle portion of Madhya

Pradesh. Hoshangabad, along with its ten adjoining districts in a contiguous cluster,

makes the Mahakoshal region, of Madhya Pradesh state. It lies in the central Narmada

Valley, and is just on the northern fringe of the state’s Satpura Plateau. Its district

headquarters is the town of Hoshangabad, and the district has been named after this

town. There are two schools of thought about the origin of Hoshangabad town. The

first school of thought says that the town’s name came from Sultan Hushang Shah

Gori, the second king of Malwa, based at Mandu, during the 15th century.

Hoshangabad is located on the left bank of the Narmada River. The second school of

Page 14: HBAD DIP FINAL ab - pmksy.gov.in

14

thought believes that there had already been a small town of Narmadapuram along the

bank of the Narmada which Hushang Shah later named after him.

The District headquarter has connectivity with all the block headquarters with

coal tar road and other villages by PM links road as well kacha roads. Transport

facility is good as far as district to block headquarters are concerned. Other means of

communication, such as telephone connection is available in all the area. The

electricity supply is available in all parts of the district. Majority of villages with about

90 % of household have domestic electric connections. An irregular supply of power

becomes main hindrance economic development of the area.

In Hoshangabad district, there is only one industry namely Security Papers Mill,

Hoshangabad which is functioning under the Ministry of Finance, Government of

India. Other units are also working i.e. Ordinance Factory, Kesla which works under

Ministry of Defence, Government of India and Railway Engineering Factory, Diesel

Shade, Oil Federation (manufacturing plant), Banapura. The threads industries are also

making space in the district. In this category name of Vardhman and Abhisekha may

be included. The main trades in the district are Handicraft, Silk, Leather, Pulses etc.

Other main business deals in the delivering of Sand and Tiles which come from River

Narmada.

Page 15: HBAD DIP FINAL ab - pmksy.gov.in

15

Table: 1.1 District Profile District Code 449 Geographical Area in Ha. 668089 Latitude and Longitude 22º 15’ to 23º 00’, 77º 15’ to 78º 42’ Area under Forest in Ha. 175340 Area under Agriculture use in Ha. 324025 Net Sown Area in Ha. 317100 Gross Cropped Area in Ha. 326995 Net Irrigated(Rabi/kharif) in. Ha 281300 Net Rainfed in Ha. 29910 Total Number of block 7 Total Number of Panchayat 424 Total Number of Villages 936 Total Population 1237495 Population Growth Rate(Decadal) 14.49% Total Male Population 598008 Total Female Population 506142 Total Population ST 193633 Total Population SC 211902 Total Population GEN 831960 Total livestock 770135 Poultry 230343

Page 16: HBAD DIP FINAL ab - pmksy.gov.in

16

Page 17: HBAD DIP FINAL ab - pmksy.gov.in

17

Demography: The total population of the District is 1237495 persons distributed among 255099 households residing in seven blocks. It has low sex ratio 914. Among all the blocks low sex ratio observe in Hoshangabad, Pipariya and Sohagpur blocks. High sex ratio observes in Kesla, Seoni Malwa and Bankhedi blocks. The population growth rates between 2001 and 2011 explain that 14.49 percent of population increased during the period. The high growth rate was found in Kesla block where as lowest in Hoshangabad block. The proportion of SC and ST population in the district is near about similar. Both the categories have just over fifteen percent share in total population. High proportion of SC population is found in Bankhedi block where as Babai block has low SC proportion. In the similar way distribution of ST population reveals that Kesla block has the highest proportion (20.66%) of ST population.

Table 1.2 Demography

Name of Block:

Number of the

Villages

covered

Population SC ST General Total

M F CH* Total

No. of Househ

old

No. of Memb

ers

No. of Househ

old

No. of Memb

ers

No. of Househ

old

No. of Memb

ers

No. of Househ

old

No. of Memb

ers Hoshangabad 103

82788

76680 6281

165749 5328 28160 5675 10376 23375

127213 34378

165749

Kesla 128 1514

78 1289

45 1789

9 29832

2 9873 48387 12749 61633 39088 18830

2 61710 29832

2 Seonimalwa 202

89825

76547

20453

186825 5267 32160 8391 38017 24960

116648 38618

186825

Babai 107 6852

5 5240

9 1343

0 13436

4 4433 17641 5542 14148 17736 10257

5 27711 13436

4

Sohagpur 141 7262

8 5837

1 1818

5 14918

4 4874 26659 6294 21765 19297 10076

0 30465 14918

4

Piparya 135 9550

6 7274

1 1301

4 18126

1 6037 34234 7735 26881 23961 12014

6 37733 18126

1

Bankhedi 120 3725

8 4044

9 4408

3 12179

0 4574 24661 3835 20813 16075 76316 24484 12179

0 Total District 936

598008

506142

133345

1237495 40386

211902 50221

193633 164492

831960 255099

1237495

* 1-14 years Age Bracket

Page 18: HBAD DIP FINAL ab - pmksy.gov.in

18

Table 1.2 Population

S.No.

Blocks No of HH

Total Pop

Sex Ratio

Growth Rate In %

% of SCP

% of STP

% of Child

1 Hoshangabad 34378 165749 907 7.9 13.64 21.73 10.95 2 Kesla 61710 298322 924 25.06 16.22 20.66 9.99 3 Seonimalwa 38618 186825 922 1.29 16.99 6.2 3.79 4 Babai 27711 134364 913 15.44 13.13 10.53 10.04 5 Sohagpur 30465 149184 907 14.99 17.87 14.59 12.19 6 Piparya 37733 181261 896 15.95 18.92 14.83 7.18 7 Bankhedi 24484 121790 919 17.96 19.35 14.01 11.79

Hoshangabad 255099 1237495 914 14.49 17.12 15.64 10.77

Page 19: HBAD DIP FINAL ab - pmksy.gov.in

19

Table 1.4 Rainfed Area in District S. No. Name Of Block Rainfed Area (Ha)

1 Hoshangabad 1260

2 Babai 4410

3 Sohagpur 4631

4 Pipariya 3153

5 Bankhedi 2950

6 Seonimalwa 5040

7 Kesla 8466

Total 29910

The district has total 29910 Ha. Rainfed area and Kesla block has largest rainfed area

8466 Ha. Hoshangabad has maximum irrigated area and minimum rainfed area (1260

Ha).

Biomass and Livestock:

Livestock are domesticated animals raised in an agricultural setting to

produce commodities such as food, fiber, and labour. The term is often used to refer

solely to those raised for food, and sometimes only farmed ruminants, such

as cattle and goats. The breeding, maintenance, and slaughter of these animals, known

as animal husbandry, is a component of modern agriculture that has been practiced in

many cultures since humanity's transition to farming from hunter-gatherer lifestyles.

Hoshangabad is one of the agriculturally advanced districts of Madhya

Pradesh. Yet animal husbandry sector in the district did not develop as much as its

sisterly sector of agriculture did. Unlike the districts of Malwa region (Shajapur and

Ujjain), Hoshangabad district did not develop synergetic relation between the

agriculture and animal husbandry based livelihoods. The reason that dairy

development did not emerge as a key livelihood of the villagers could be traced to the

Page 20: HBAD DIP FINAL ab - pmksy.gov.in

20

fact that the villagers from the blocks of Sohagpur, Hoshangabad, Babai and Piparia,

were, on an average, 70 to 120 Km. away from Bhopal city. Even though the Bhopal

milk Union collects some milk from primary milk producers’ Cooperatives located in

Hoshangabad, district, as well. However, there is no milk chilling plant in

Hoshangabad district.

Table 1.5 (A) Livestock

S.No. Name of the Blocks

Small Animals

Poultry (Nos.) Goats (Nos.) Pigs (Nos.)

Sheeps (Nos.)

1 Hoshangabad 2401 7726 281 0 2 Babai 2785 9082 8 0 3 Sohagpur 2976 9024 1000 0 4 Pipariya 8995 13407 262 40 5 Bankhedi 6676 11756 184 12 6 Kesla 199770 12483 88 0 7 Seoni Malva 6740 17107 144 0

Total 230343 80585 1967 52

Table 1.5 (B) Livestock

S.No. Name of the Blocks

Large Animals

Indigenous Cow (Nos.) In descriptive Buffalo(Nos.)

1 Hoshangabad 36442 13018 2 Babai 47461 15010 3 Sohagpur 44853 16273 4 Pipariya 39960 14801 5 Bankhedi 37876 16775 6 Kesla 42973 9872 7 Seoni Malva 74245 27403

Total 323810 113152

Page 21: HBAD DIP FINAL ab - pmksy.gov.in

21

Table 1.5 (C) Wildlife

S.No. Name of the Blocks Total Number of Wild Life

1 Hoshangabad 560 2 Babai 640 3 Sohagpur 2210 4 Pipariya 1830 5 Bankhedi 980 6 Kesla 1430 7 Seoni Malva 1250

Total 8900

The total livestock population consisting of Cattle, Buffalo, Sheep, Goat, Pig,

Horses & Ponies, Mules, and Donkeys are divided into the three main category on the

basis of requirement of water. Agro-Ecology, Climate, Hydrology and Topography:

Hoshangabad district is divided in to four agro ecological situations; Piparia and

Sohagpur blocks come under Zone-I; Babai and Bankhedi under II; Hoshangabad and

Seoni Malwa under-III and Kesla block in zone-IV. Besides agriculture and

horticulture the district has very good scope of sericulture, mulbery and tusser.

Table 1.6 Agro – Ecological Zone

S. No.

Agroecological Zone Type

Type of Terrain

District Area (ha)

Normal Annual Rainfall

(mm)

No of Rainy

Days(No)

Maximum Rainfall Intensity (mm)

Upto 15

mm

Beyond 15 but

upto 30 mm

Beyond 15 but upto 30

mm

1 Central Narmada Valley

Plain and Hilly 668089 1311.70 53 20 45 105

Page 22: HBAD DIP FINAL ab - pmksy.gov.in

22

Climate

The annual normal rainfall in the district is 1311.70 mm. About 92% of the

annual rainfall is received from southwest monsoon. On an average there are 53 rainy

days while at Pachmarhi there are 80 rainy days. The district remains dry in climate

except during the southwest monsoon season. The year may be divided into three

periods. The cold period is from December to February, followed by the hot from

March to June and rainy from July to October. May is the hottest month with mean

daily maximum temperature 430C. December-January forms the coldest part of the

year with mean minimum temperature 10.930C.

Table 1.7 Temperatures and Potential Evapo-Transpiration

Average Weekly Temprature (degree celsius) Potential Evapo - Transpiration (PET) Elevation In MSL

Period Period (season) Cumulative

Total

Min

Max

Mean

Summer (April- May)

Winter(Oct- May)

Rainy( June- sept) Sum

mer

Winter

Rainy Mi

n Max

Mean

Min

Max

Mean

Min

Max

Mean

22 43 31 11 34 22 22 37 29 115 79 90 284 270 1352 946

Slope

Slope of land is also one of the important physiographic aspects influencing the

landuse of an area. The effect of slope on agriculture may be both direct and indirect.

The most obvious direct influence of slope is in the form of the restrain on cultivation

and accessibility. The indirect effect of slope manifests itself in pedological and

climatic modification including the position of water table, development of soils, air

drainage, and relative freedom from frost. This classification gives inFormation

Page 23: HBAD DIP FINAL ab - pmksy.gov.in

23

regarding slope percent classes in the study area. The general slope of the area in the

southern part.

Table 1.8 Slope Category

Slope Category Slope class Nearly level 0-1 % Very gently sloping 1-3 % Gently sloping 3-8 % Strongly sloping 8-15 % Mod. steep to steep 15-35 % Steep sloping 35-45 % Very Steep sloping >45 %

Page 24: HBAD DIP FINAL ab - pmksy.gov.in

24

Page 25: HBAD DIP FINAL ab - pmksy.gov.in

25

GEOMORPHOLOGY & SOIL TYPES

The study area is bounded by Satpura ranges in south and by Narmada river in

the north. The area slopes north west toward the Narmada river. The slope is generally

steep at the foothills of Satpura but moderate to gentle towards Narmada river. The

land surface attains a maximum altitude of 1352 m above Mean Sea Level at Dhupgarh

(77º 22’30”: 22º 27’ 00”), near Pachmarhi and minimum altitude of 270 m above

Mean Sea Level at confluence of Ganjal river with the Narmada (77º 12’30”: 22º 33’

30”).

The area may be divided into three zones on the basis of the Physiography (1)

The Satpura range in the south, (2) An alluvial plain in the middle and (3) Badland

topography zone confined to the vicinity of Narmada river. The maximum width of the

valley between Satpura and Narmada river is about 30 kms.

The famous Adamgarh hill, which stands out in the valley portion near

Hoshangabad, is known in history from stone age. Another hill, which stands out in the

valley portion is near Chautalia village close to Narmada river. A large number of

north westerly flowing tributaries originating from the Satpura join the Narmada along

the left bank.

Soils of the area are characterized by black grey, red and yellow colours, often

mixed with red and black alluvium and ferruginous red ravel or lateritic soils. These

soils are commonly known as black soils. About 15% of the area is covered by sandy

loam soils immediately on the high bank of Tawa river. Remaining part is occupied by

clay loam with big pockets of sandy clay loam and sandy loam. The permeability of

the soil is low when the clay contains montorillonite. They swell intensively when wet

and shrink with deep cracks when dry. Intake of water is very rapid till the cracks

disappear after complete wetting.

Page 26: HBAD DIP FINAL ab - pmksy.gov.in

26

The soils have been classified as Ustocherpts/Ustorthents/

Haplustalfs/Haplusterts as per pedological taxonomy.

The soil of district is identified as medium black soil, which is characterized by

moderately well drained, fine soils on very gently sloping with moderate erosion. Its

pH ranges between 7.2 and 8.0. This soil has medium to high potential for rice, wheat

gram, linseed and vegetable growing. The depths of soil vary from place to place. The

water holding capacity of soil is mainly controlled by structure of soil. The clayey soil

has high water holding capacity than sandy soil. Historically, land and soils of Seoni

Malwa, Babai, Sohagpur and Hoshangabad blocks have been fertile and cultivated for

many centuries. Many areas of Piparia, Kesla and Bankhedi blocks have also been

tilled for growing crops for many decades.

Table 1.9 Soil Profile of District

S.No. Block Soil type Land Slopes

Major Soil Classes Area(ha) 0-3%(ha) 3-8%(ha) 8-25%(ha) >25%

1 Hoshangabad black grey, red and yellow

colours, often mixed with red

and black alluvium and

ferruginous red ravel or lateritic

soils

51262 49062 2000 0 0 2 Kesla 96567 70201 6142 20224 0 3 Seonimalwa 124314 76045 19575 28694 0 4 Babai 58977 42595 16382 0 0 5 Sohagpur 126819 51345 65919 9555 0 6 Pipariya 147344 40345 60503 46496 0 7 Bankhedi 62806 37253 25553 0 0

Total 668089 366846 196074 104969 0 The rocks occurring in the district range in age from Palaeoproterozoic to

Quaternary. The Mahakoshal Group of rocks mainly comprise quartzite, slate and

phyllites. The rocks of Vindhyan Supergroup comprise Bhander Group. Bhander group

consists of Lower Bhander sandstone which is fine to coarse grained and at places,

pebbly and quartzitic.

The Gondwana sequence belonging to the Gondwana basin of Central India

comprises of Talchir, Barakar, Motur, Bijori, Panchmari, Denwa, Bagra and Jabalpur

Page 27: HBAD DIP FINAL ab - pmksy.gov.in

27

Formations. The Talchir Formation comprises tillite, diamictite, fine to medium

grained sandstone and grey to olive green shales. The Barakar Formation is dominantly

made up of coarse grained feldspathic sandstone, grey shales and carbonaceous shale.

Motur Formation overlies Barakar Formation with a gradational contact. It comprises

coarse grained sandstone with pebbly interbands, variegated shales and clay. The

Bijori Formation is exposed as a broad band of olive and buff coloured clays and

shales, alternating with massive sandstone. The Pachmarhi Formation consists of thick

beds of coarse to granular, white arenite or quartzwacke, separated by lenses or thin

layers of conglomerate and thin red clay bands. The Denwa Formation consists mainly

of alternating bands of sandstone and red to variegated calcareous clay. The Bagra

Formation comprises of conglomerate, variegated shales and subordinate limestone

bands.

The youngest Gondwana sequence is represented by Jabalpur Formation. It

consists mainly of massive sandstone alternating with white clays. Lenses of

conglomerate are common. Discontinuous patchy exposures of Lameta Group are seen

east of Barapura, Gotabari and Tangna. The basaltic lava flows of Deccan trap are well

exposed in the southern and southwestern part of the district. These flows, grouped

under Satpura Group are mainly of Aa type and non-porphyritic to porphyritic to

mega-porphyritic in nature. The thickness of individual flows varies from 15m to 47m.

The Satpura Group comprises of 18 to 21 basaltic flows which are further classified in

5 Formations. Numerous dykes and sills, mostly of doleritic composition intrude the

Gondwana rocks and basaltic flows.

The dykes range in the length from few hundred meters to few kilometres, with

width ranging from few meters to few hundred meters. Most of the dykes trend in NE-

SW direction. Quaternary Narmada alluvial deposits occupy a major part of the district

and have been sub divided into seven litho-stratigraphic Formations viz. Surajkund

Formation, Beneta Formation, Hirdepur Formation, Bauras Formation and Ramgarh

Formation, on the basis of lithological characters, degree of oxidation, calcification of

Page 28: HBAD DIP FINAL ab - pmksy.gov.in

28

the sediments, erosional unconformities, soil stratigraphy, morpho-stratigraphy and

presence of volcanic ash.

Page 29: HBAD DIP FINAL ab - pmksy.gov.in

29

Page 30: HBAD DIP FINAL ab - pmksy.gov.in

30

DRAINAGE

The entire district is drained by Narmada River and its tributaries. Thus the area

falls in the Narmada Basin. The River Narmada flows along the northern boundary of

the district. The River Narmada originates from the Amarkantak plateau and after

flowing through Hoshangabad, Mandla, Jabalpur from the north-eastern part. The

Tawa river is the major tributary of the Narmada river and flows from south to north

west before merging into the Narmada river. Denwa River originates from south-

eastern part of the Hoshangabad district and flows from east to west direction before

joining the Tawa river (south of Rainpur) where Tawa dam has been constructed. The

important nalas are Keolari, Hather and Indra Nadi. The rivers draining the area in the

western part are Morand, Banjal and Ajnal. The Morand river joins the Ganjal river

near Chhidgaon and flows towards Narmada river.

Page 31: HBAD DIP FINAL ab - pmksy.gov.in

31

Page 32: HBAD DIP FINAL ab - pmksy.gov.in

32

HYDROGEOLOGY Aquifer System And Aquifer Parameters

The water bearing properties of different hydrogeological units occurring in

Hoshangabad District are described below. Hydrogeology of the district is shown in

Plate-II.

Northern part of Hoshangabad district, adjoining the Narmada river is covered

with alluvium, which makes for more than 50% of the entire district. Deccan traps

occur as lava flows in the west central part of the district. The southern part of the

district is hilly and occupied by rocks belonging to Gondwanas. The Archaeans are

exposed south of Itarsi around Kesla railway station between the rocks of Gondwana in

the form of inliers in very small patches and no groundwater structure exist in them for

hydrogeological studies. In general groundwater occurs in phreatic condition.

Vindhyans

Upper Vindhyans represented by Lower Bhander sandstone are exposed south of

Hoshangabad in Adamgarh quarry and at the confluence of Hather nala and River

Narmada, north of Misrod and Dhamasa village near Chautalai village. These

sandstones are medium grained, hard, compact, red light pink in colour and dip 12º due

N. top of sandstone is buff coloured and fine grained and traversed by two sets of

joints, one parallel to the strike and another at right angles to it. The rocks have poor

groundwater potential as they form hills in the district. The Vindhyan sandstone serves

as a good building stone.

Gondwanas

Lower Gondwanas are well exposed in the Satpura region of the district on the

sides of upper Denwa valley in the southern base of Pachmarhi hills, and at the

confluence of the Anjan river and at Pathapani north of Fatehpur (55J/10). The Lower

Gondwana are divided into the Talchirs (pebbles and boulders and green clays shales

and sandstones) and the Damuda Series (white to fawn coloured coarse grained

sandstones, micaceous flagstones, grits, conglomerates, shales and carbonaceous

Page 33: HBAD DIP FINAL ab - pmksy.gov.in

33

shales). Damuda Series of the Lower Gondwana is overlain by the rocks of the

Mahadeva (coarse grained red to buff colured Pachmarhi sandstones with thin

intercalations of pebbles, red Denwa clays containing calcitic nodules, with a few

bands of white to yellow sandstones and Bagra conglomerates and pebble beds with

occasional bands of calcareous sandstones variegated clays, limestones and dolomites)

and Jabalpur series (soft, fine grained, occasionally pebbly sandstones with thin

subordinate beds of conglomerate, earthy hematite, coal, carbonaceous red clays,

shales and chert) of Upper Gondwana system. Gondwana rocks are criss-crossed by

dykes/sills in the southern part of the district.

In the Gondwana occupying the southern part of the district, the aquifers are

formed by fractured/weathered rocks occurring below alluvium and form

confined/semi confined aquifer which are not very productive. In the exploratory

tubewells, drilled by Central Groundwater Board during Narmada Project, water

bearing zones in the Gondwana were encountered at Pathrai (Nibhora), Taron,

Mahuakhera, Sohagpur Manegaon, Pathrota, Guraria and Kalkuhi. The Pachmarhi

sandstone especially in Pachmarhi, though hard and massive, form potential zones

wherever fractured and jointed. The transmissivity of Gondwana aquifer in general

varies from 249 to 449 m2/day.

Deccan Trap

Deccan Trap basaltic lava flows are exposed in the southern part of the district

and also criss-cross the Gondwana Formations as dykes and are also encountered as

basement rock below alluvium around Powarkhera and Itarsi. The phreatic aquifer in

weathered/vesicular basalt are tapped by dugwells, which in general does not yield a

good discharge.

Alluvium

The alluvial aquifer system in the district is the most extensive. Two to three

granular zones and at places more number of potential granular zones comprising of

fine to medium to coarse grained sand, gravel and pebbles and laterite are encountered

Page 34: HBAD DIP FINAL ab - pmksy.gov.in

34

in alluvium. The top phreatic aquifer range in thickness from 2 to 10m and is

encountered in the depth range of 4 to 20 mbgl. The phreatic aquifer has intercalations

of clay and silt, and at places also of coarse sand or gravel.

It appears that all the alluvial aquifer zones constitute a single aquifer system.

The unconfined aquifer along the southern fringe adjacent to Gondwana, passes

laterally to the north into a number of aquifer zones separated by thick clay zones. The

deeper aquifers are of semi-confined to confined nature with varying potentiometric

heads. The yield of alluvial aquifers ranges from 180 to 3000 litres per minute.

All the aquifers are principally recharged by a lateral low from the south and

also by direct vertical percolation rain/irrigation water/seepage from tanks/canals.

Hot Spring

A hot water spring occurs in the area at Anhoni (55J/5) (west of road from

Pipariya to Pachmarhi). The temperature of Anhoni spring water is 41ºC. A borehole

has been drilled by Geological Survey of India, Geothermal Division,Nagpur down to

a depth of 250 mbgl near the spring. The lithology encountered in the borehole is

Gondwana sandstone intruded the borehole is 54ºC and free flow discharge is about 30

lpm from top of casing pipe 0.6 mbgl. The water smells of sulphur and occurrence of

methane gas during drilling is reported by G.S.I. staff.

Page 35: HBAD DIP FINAL ab - pmksy.gov.in

35

Page 36: HBAD DIP FINAL ab - pmksy.gov.in

36

Soil Health

The soil health is one of the important components of agriculture development.

It determines the fertility of the soil of the district. Overall, the soils can be stated as

black (64%), Red soil (15%), Sandy soil (9%), Sandy loam (9%) and others (3%).

Around 510 hact area is under water logged conditions.

The spatial distribution of soil health, on the basis of random sampling at all the

blocks reveals that available Potash is found high in all the blocks. This district has

high levels of phosphorus, medium levels of nitrogen and low levels of potassium.

Potassium assists in carbon assimilation and photosynthesis process. Low Potassium

levels affect adversely the leaves and thus the chlorophyll shortage and poor growth.

Older leaves of potassium deficient plant give a scorched look around the edges or as if

these got wilted. Also inter veinal chlorosis (yellowing between the leaf veins) can.

The low proportion of organic carbon is present in all over the district. In the

Pipariya and Kesla blocks amount of available nitrogen is found low. In the similar

manner available nitrogen vary from low to medium in remaining blocks. The nature

of phosphorous availability range between medium to high in Kesala and Pipariya

blocks and rest of the blocks have medium level phosphorous availability.

Page 37: HBAD DIP FINAL ab - pmksy.gov.in

37

Table 1.10 Distributions of Major Elements of Soil in the Hosangabad District

S.No Name of Blocks Organic

Carbon

Available

Nitrogen

Available

Phosphorus

Available

Potash

1 Hoshangabad Low Medium Low Medium Medium High

2 Seoni Malwa Low Medium Low Medium Medium High

3 Kesla Low Medium Low Medium- High High

4 Babai Low Medium Low Medium Medium High

5 Sohagpur Low Medium Low Medium Medium High

6 Pipariya Low Medium Low High Medium- High

7 Bankhedi Low Medium Low Medium Medium High

Land-use pattern:

Land use involves the management and modification of natural

environment or wilderness into built environment such as settlements and semi-natural

habitats such as arable fields, pastures, and managed woods. It also has been defined as

"The total of arrangements, activities, and inputs that people undertake in a certain

land cover type”.

The land use of Hoshangabad district can be classified as Net Sown Area

(61.20%), Forest Area (16.37%), Land not available for cultivation (5.34%),

Cultivable wasteland (5.07%), other uncultivated land excluding both fallow land and

cultivable wasteland (2.67%).

Page 38: HBAD DIP FINAL ab - pmksy.gov.in

38

Table 1.11 Land Use Pattern in District Hoshangabad

S.No.

Block

Number of Gram panchay

at

Number of the

villages

covered

Total Geographi

cal area

Area under Agriculture

Area under Forest

Area under Wasteland

Area

under

other

uses

Gross Cropped Area(1)

Net Sown Area(2)

Area sown more than

once (1-2)

Cropping

Intensit

y (%)

1 Hoshangabad 49 103 51262 46080 48575 38316 203 0 2470 101 2 Kesla 49 128 96567 32475 32475 24338 201 20224 6230 155 3 Seonimalwa 95 202 124915 76045 76045 66485 205 28694 6480 108 4 Babai 61 107 58977 42595 42595 24338 204 0 3835 120 5 Sohagpur 65 141 126819 51345 41450 23141 202 65909 6010 141 6 Pipariya 52 135 147344 40345 40345 27752 203 60503 6190 120 7 Bankhedi 53 120 62806 35615 35615 25183 201 0 3125 115

Total 424 936 668690 324500 317100 229553 203 175330 34340 860

Page 39: HBAD DIP FINAL ab - pmksy.gov.in

39

84Seonimalwa

Page 40: HBAD DIP FINAL ab - pmksy.gov.in

40

Babai

Page 41: HBAD DIP FINAL ab - pmksy.gov.in

41

Table 1.12 Surface Water Bodies in the District Hoshangabad

S.No. Block No. of Water Bodies Total Area (In

Ha) 1 Hoshanagabad 3405 11250 2 Kesla 5427 10200 3 Seonimalwa 7825 14100 4 Babai 3806 12430 5 Sohagpur 3990 11550 6 Pipariya 3855 13140 7 Bankhedi 4197 12350

Total 32505 85020

Page 42: HBAD DIP FINAL ab - pmksy.gov.in

42

Chapter -2 District Water Profile

Irrigation is the method in which water is supplied to plants at regular

intervals for agriculture. It is used to assist in the growing of agricultural crops,

maintenance of landscapes, and revegetation of disturbed soils in dry areas and

during periods of inadequate rainfall. Additionally, irrigation also has a few other

uses in crop production, which include protecting plants against frost, suppressing

weed growth in grain fields and preventing soil consolidation. In

contrast, agriculture that relies only on direct rainfall is referred to as rain-fed

or dry land farming.

Tawa dam is a major irrigation system in the district. About 60% of the total

area of Hoshangabad district is irrigated by Tawa canal system. The Tawa dam is

constructed about 823 m. downstream of the confluence of Tawa and Denwa rivers

at east longitude 77º 58’30” and north latitude 22º 33’ 40”. It has a Catchment area

of 598290 Ha. with 20055 ha area under submergence. The Left Bank Canal starts

from Ranipur and runs parallel to Narmada river course along the limits of the foot

hill pediments of Satpura. This canal takes off directly from the reservoir with a

head discharge of 103.06 cumecs. The first 6.44 km length is lined with thick

concrete. The Handia branch canal with a head discharge of 29.9 cumecs takes off

from the main canal at 92 km point. The Right Bank Canal is taken through a

tunnel from Kamthi and runs parallel more or less to the course of Narmada river.

The distributaries system has been planned along the drainage divide. Due to

topographic difference between the right and left bank the canal has been taken

through 6 km long tunnel. Bagra branch canal and Piparia branch canals take off

on either side of the pickup weir. The Bagra canal is 60 km long. The total length

of distributaries and minors on the right bank is 450 km.

Page 43: HBAD DIP FINAL ab - pmksy.gov.in

43

Found many minor irrigation schemes are also operating in the district, amongst

which Dokrikhera Tank Project in Bankheri block is prominent. Dokrikhera Tank

Project has a gross command area 9104 ha and culturable command area 7625 ha.

The area irrigated by canals, tubewells, dugwells and tanks are tabulated below in

Table 2.1. Table 2.1 Irrigation by Different Sources

S.No. Source Hoshangabad District Total

Number Area (In Ha.)

1 Canal 6 147400 2 Tube Wells 62188 52300 3 Dug Wells 56784 53500 4 Tank 9 1100 5 Other Sources 12 16300

Net Area Irrigated 270600

CGWB ACTIVITES

Preliminary hydrogeological studies in parts of Hoshangabad district were

carried out by the erstwhile groundwater wing of Geological Survey of India in

coordination with the erstwhile exploratory tube wells organization from 1953 to

1963 (Adyalkar, 1975). A comprehensive hydrogeological study of the alluvial

area of the district was carried out by Central Groundwater Board, during the

Narmada Project period from 1971 to 1978. During the above mentioned studies,

besides hydrogelogical, hydrological and hydrometeorological studies, extensive

exploratory drilling was also carried out covering the entire Narmada upland

alluvial valley. Systematic hydrogeological survey has been carried out by Shri K.

Srinivasan, Junior Geologist of the GSI in the western part of the district in 1969-

90 and by Shri A. K. Jain, Asstt. Hydrogeologist of Central Groundwater Board in

the southern part of the district in 1984-85. Reappraisal of hydrogeological

Page 44: HBAD DIP FINAL ab - pmksy.gov.in

44

conditions in parts of the Tawa commond area of the district was taken up by Shri

A. K. Mishra, Jr. Hydrogeologist of the Central Groundwater Board in the year

1984-85 to study and define the extent and causes of water logging and by Shri A.

K. Budhauliya, Scientist B, Km. Anu Radha Bhatia, AHG, Seraj Khan, AHG and

R. M. Verma AHG during AAP 1991-92 to assess the scenario of groundwater

regime and the extent of water logging, its causes and suggesting remedial

measures.

CROPPING PATTERN

District is very rich in the field of agriculture due to good sources of

irrigation and fertile alluvial soil. Wheat and gram are the main crops grown during

Rabi season. Soyabean, Mustard, Til and Groundnut are the main oilseeds

produced here. The farmers have started the production of SunfLowers.

Table 2.2 Crop wise Irrigation Status of District Hoshangabad

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 73075 1549 74624 184079 63650 247729 100 0 100 257254 65199 322453

B. Coarse Cereals 2520 3398 5918 0 0 0 0 0 0 2520 3398 5918

C. Pulses 6972 35618 42590 50751 5500 56251 67665 0 67665 125388 41118 166506 D. Oil Seeds 6565 129693 136258 1411 90 1501 0 0 0 7976 129783 137759

E. Fibre 300 0 300 0 0 0 0 0 0 300 0 300

F. Any other crops 5050 1805 6855 5625 0 5625 250 0 250 10925 1805 12730

Total 94482 172063 266545 241866 69240 311106 68015 0 68015 404363 241303 645666

Page 45: HBAD DIP FINAL ab - pmksy.gov.in

45

Table 2.3 Block Kesla Crop wise Irrigation Status

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 5850 970 6820 23150 0 23150 0 0 0 29000 970 29970

B. Coarse Cereals

0 1495 1495 0 0 0 0 0 0 0 1495 1495

C. Pulses 122 818 940 4552 2200 6752 3900 0 3900 8574 3018 11592

D. Oil Seeds 565 16980 17545 228 0 228 0 0 0 793 16980 17773

E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0

F. Any other crops

0 105 105 0 0 0 0 0 0 0 105 105

Total 6537 20368 26905 27930 2200 30130 3900 0 3900 38367 22568 60935

Table 2.4 Block Seonimalwa Crop wise Irrigation Status

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 1975 81 2056 0 63500 63500 0 0 0 1975 63581 65556

B. Coarse Cereals 0 0 0 0 0 0 0 0 0 0 0 0

C. Pulses 0 1199 1199 10000 2500 12500 13500 0 13500 23500 3699 27199 D. Oil Seeds 0 54035 54035 89 0 89 0 0 0 89 54035 54124

E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0

F. Any other crops

0 0 0 0 0 0 0 0 0 0 0 0

Total 1975 55315 57290 10089 66000 76089 13500 0 13500 25564 121315 146879

Page 46: HBAD DIP FINAL ab - pmksy.gov.in

46

Table 2.5 Block Hoshangabad Crop wise Irrigation Status

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 6880 0 6880 39530 150 39680 0 0 0 46410 150 46560

B. Coarse Cereals

2520 1000 3520 0 0 0 0 0 0 2520 1000 3520

C. Pulses 100 1000 1100 1000 300 1300 1500 0 1500 2600 1300 3900

D. Oil Seeds 6000 21560 27560 20 0 20 0 0 0 6020 21560 27580

E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0

F. Any other crops

50 0 50 75 0 75 0 0 0 125 0 125

Total 15550 23560 39110 40625 450 41075 1500 0 1500 57675 24010 81685

Table 2.6 Block Babai Crop wise Irrigation Status

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 19250 460 19710 37150 0 37150 0 0 0 56400 460 56860

B. Coarse Cereals

0 0 0 0 0 0 0 0 0 0 0 0

C. Pulses 0 7020 7020 2374 0 2374 3000 0 3000 5374 7020 12394

D. Oil Seeds 0 12860 12860 65 0 65 0 0 0 65 12860 12925

E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0

F. Any other crops

450 1500 1950 3050 0 3050 250 0 250 3750 1500 5250

Total 19700 21840 41540 42639 0 42639 3250 0 3250 65589 21840 87429

Page 47: HBAD DIP FINAL ab - pmksy.gov.in

47

Table 2.7 Block Sohagpur Crop wise Irrigation Status

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 12000 38 12038 31050 0 31050 0 0 0 43050 38 43088

B. Coarse Cereals

0 48 48 0 0 0 0 0 0 0 48 48

C. Pulses 0 17900 17900 11200 0 11200 10500 0 10500 21700 17900 39600

D. Oil Seeds 0 2858 2858 200 0 200 0 0 0 200 2858 3058

E. Fibre 100 0 100 0 0 0 0 0 0 100 0 100

F. Any other crops

0 0 0 90 0 90 0 0 0 90 0 90

Total 12100 20844 32944 42540 0 42540 10500 0 10500 65140 20844 85984

Table 2.8 Block Pipariya Crop wise Irrigation Status

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 15800 0 15800 29379 0 29379 0 0 0 45179 0 45179

B. Coarse Cereals

0 505 505 0 0 0 0 0 0 0 505 505

C. Pulses 0 7681 7681 9575 500 10075 17045 0 17045 26620 8181 34801

D. Oil Seeds 0 10110 10110 9 0 9 0 0 0 9 10110 10119

E. Fibre 0 0 0 0 0 0 0 0 0 0 0 0

F. Any other crops

0 200 200 910 0 910 0 0 0 910 200 1110

Total 15800 18496 34296 39873 500 40373 17045 0 17045 72718 18996 91714

Page 48: HBAD DIP FINAL ab - pmksy.gov.in

48

Table 2.9 Block Bankhedi Crop wise Irrigation Status

Crop Type

Kharif (Area in ha) Rabi (Area in ha) Summer Crop (Area in ha) Total (Area in ha)

Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total

A. Cereals 11320 0 11320 23820 0 23820 100 0 100 35240 0 35240

B. Coarse Cereals

0 350 350 0 0 0 0 0 0 0 350 350

C. Pulses 6750 0 6750 12050 0 12050 18220 0 18220 37020 0 37020

D. Oil Seeds 0 11290 11290 800 90 890 0 0 0 800 11380 12180

E. Fibre 200 0 200 0 0 0 0 0 0 200 0 200

F. Any other crops

4550 0 4550 1500 0 1500 0 0 0 6050 0 6050

Total 22820 11640 34460 38170 90 38260 18320 0 18320 79310 11730 91040

Table 2.10 District Hoshangabad Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 6564 5657 907 6564 5278 179 200 5657 2 B. Vegetables 11685 10560 1125 11685 9769 249 542 10560 3 C. Spices 4360 4179 181 4360 3962 58 159 4179 4 D. Flowers 692 600 92 692 587 10 3 600 5 E. Medicinal Plant 48 33 15 48 33 0 0 33

Total 23349 21029 2320 23349 19629 496 904 21029

Page 49: HBAD DIP FINAL ab - pmksy.gov.in

49

Table 2.11 Block Seonimalwa Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 831 678 153 831 652 26 0 678 2 B. Vegetables 1966 1920 46 1966 1812 22 86 1920 3 C. Spices 442 430 12 442 376 12 42 430 4 D. Flowers 51 40 11 51 37 1 2 40 5 E. Medicinal Plant 0 0 0 0 0 0 0 0

Total 3290 3068 222 3290 2877 61 130 3068

Table 2.12 Block Kesla Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 700 600 100 700 515 85 0 600 2 B. Vegetables 1640 1540 100 1640 1444 36 60 1540 3 C. Spices 750 710 40 750 669 17 24 710 4 D. Flowers 350 312 38 350 305 7 0 312 5 E. Medicinal Plant 0 0 0 0 0 0 0 0

Total 3440 3162 278 3440 2933 145 84 3162

Table 2.13 Block Hoshangabad Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area

in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 1471 1097 374 1471 1055 10 32 1097 2 B. Vegetables 1456 1058 398 1456 998 25 35 1058 3 C. Spices 1017 957 60 1017 951 5 1 957 4 D. Flowers 147 114 33 147 111 2 1 114 5 E. Medicinal Plant 32 17 15 32 17 0 0 17

Total 4123 3243 880 4123 3132 42 69 3243

Page 50: HBAD DIP FINAL ab - pmksy.gov.in

50

Table 2.14 Block Babai Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 762 610 152 762 509 11 90 610 2 B. Vegetables 1974 1678 296 1974 1429 39 210 1678 3 C. Spices 620 558 62 620 519 9 30 558 4 D. Flowers 66 60 6 66 60 0 0 60 5 E. Medicinal Plant 0 0 0 0 0 0 0 0

Total 3422 2906 516 3422 2517 59 330 2906

Table 2.14 Block Babai Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area

in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 1738 1722 16 1738 1678 13 31 1722 2 B. Vegetables 2014 1834 180 2014 1673 79 82 1834 3 C. Spices 597 594 3 597 579 3 12 594 4 D. Flowers 4 3 1 4 3 0 0 3 5 E. Medicinal Plant 1 1 0 1 1 0 0 1

Total 4354 4154 200 4354 3934 95 125 4154

Table 2.15 Block Sohagpur Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area

in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 1738 1722 16 1738 1678 13 31 1722 2 B. Vegetables 2014 1834 180 2014 1673 79 82 1834 3 C. Spices 597 594 3 597 579 3 12 594 4 D. Flowers 4 3 1 4 3 0 0 3 5 E. Medicinal Plant 1 1 0 1 1 0 0 1

Total 4354 4154 200 4354 3934 95 125 4154

Page 51: HBAD DIP FINAL ab - pmksy.gov.in

51

Table 2.16 Block Pipariya Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area

in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 812 700 112 812 689 4 7 700 2 B. Vegetables 2275 2170 105 2275 2113 8 49 2170 3 C. Spices 504 500 4 504 468 2 30 500 4 D. Flowers 54 51 3 54 51 0 0 51 5 E. Medicinal Plant 0 0 0 0 0 0 0 0

Total 3645 3421 224 3645 3321 14 86 3421

Table 2.17 Block Bankhedi Horticulture Irrigation Status

S.No. Horticulture

Net Sown Area

in Ha

Horticulture & Plantation crops (Area in ha) Irrigation (Area in ha)

Irrigated Rainfed Total Surface Irrigation

Drip Irrigation Sprinkler Total

1 A. Fruits 250 250 0 250 180 30 40 250 2 B. Vegetables 360 360 0 360 300 40 20 360 3 C. Spices 430 430 0 430 400 10 20 430 4 D. Flowers 20 20 0 20 20 0 0 20 5 E. Medicinal Plant 15 15 0 15 15 0 0 15

Total 1075 1075 0 1075 915 80 80 1075

Table 2.17(A) Production and Productivity of major Crops

Season Crop Sown

Cereals Coarse Cereals

Pulses Oil seeds

Fibre Crops

Any other Crops

A. Kharif 114.81 0.51 51.00 85.90 0.00 0.00 B. Rabi 252.00 0.00 66.00 1.11 0.00 5.10 C.Summer 0.00 0.00 6.20 0.00 0.00 0.00

Total 366.81 0.51 123.20 87.01 0.00 5.10

Page 52: HBAD DIP FINAL ab - pmksy.gov.in

52

Table 2.17(B) Production and Productivity of major Crops

Season

Rainfed Area (in ha) Production

on (qtn/yr) Productivity

or Yield (kgs/ha)

Cost of Cultivation on (Rs/ha)

A. Kharif 163.12 161.05 987 25023.00 B. Rabi 1.40 0.89 635 12291.00 C.Summer 0.00 0.00 0 0.00

Total 164.52 161.94 - 37314.00

Table 2.17(C) Production and Productivity of major Crops

Season

Irrigated Total Area

(in ha) Production on (qtn/yr)

Productivity or Yield (kgs/ha)

Cost of Cultivation on (Rs/ha)

Production on (qtn/yr)

Productivity or Yield (kgs/ha)

Cost of Cultivation on (Rs/ha)

A. Kharif 111.50 467.63 4350 30886.00 626.68 2282.00 27240.00 B. Rabi 297.00 1323.65 4456 25257.00 1324.54 3888.00 23867.00 C.Summer 6.20 620.00 1000 8621.00 620.00 1000 8621.00

Total 414.70 2411.28 - 64764.00 2571.22 - 59728.00

Table 2.18 (A) Production and Productivity in Horticulture Crops

Season Crop Sown Fruts Vegitable Spices FLowers Medicinal Any other Crops

Hoshangabad 1471.00 1456.00 1017.00 147.00 32.00 0.00

Babai 762.00 1974.00 620.00 66.00 0.00 0.00

Sohagpur 1738.00 2014.00 597.00 4.00 1.00 0.00

Bankhedi 250.00 360.00 430.00 20.00 15.00 0.00

Pipariya 812.00 2275.00 504.00 54.00 0.00 0.00

Kesla 700.00 1640.00 750.00 350.00 0.00 0.00

Seonimalwa 831.00 1966.00 442.00 51.00 0.00 0.00

Total 6564.00 11685.00 4360.00 692.00 48.00 0.00

Page 53: HBAD DIP FINAL ab - pmksy.gov.in

53

Table 2.18 (B) Production and Productivity in Horticulture Crops

Block Rainfed

Area (in ha)

Production on (qtn/yr)

Productivity or Yield (kgs/ha)

Cost of Cultivation on (Rs/ha)

Hoshangabad 880.00 39512.00 4490.00 70808

Babai 516.00 23168.40 4490.00 70808

Sohagpur 200.00 8980.00 4490.00 70808

Bankhedi 0.00 0.00 4490.00 70808

Pipariya 224.00 10057.60 4490.00 70808

Kesla 278.00 12482.20 4490.00 70808

Seonimalwa 222.00 9967.80 4490.00 70808

Total 2320.00 104168.00 _ 495656

Table 2.18 (C) Production and Productivity in Horticulture Crops

Block

Irrigated Total

Area (in ha)

Production on

(qtn/yr)

Productivity or Yield (kgs/ha)

Cost of Cultivatio

n on (Rs/ha)

Production on (qtn/yr)

Productivity or Yield (kgs/ha)

Cost of Cultivation on (Rs/ha)

Hoshangabad 3243.00 145611 4490.00 70808 185122.70 8980.00 141616.00

Babai 2906.00 130479 4490.00 70808 153647.80 8980.00 141616.00

Sohagpur 4154.00 186515 4490.00 70808 195494.60 8980.00 141616.00

Bankhedi 1075.00 48268 4490.00 70808 48267.50 8980.00 141616.00

Pipariya 3421.00 153603 4490.00 70808 163660.50 8980.00 141616.00

Kesla 3162.00 141974 4490.00 70808 154456.00 8980.00 141616.00

Seonimalwa 3068.00 137753 4490.00 70808 147721.00 8980.00 141616.00

Total 21029.00 944202 _ 495656 1048370.10 _ 991312.00

Page 54: HBAD DIP FINAL ab - pmksy.gov.in

54

Page 55: HBAD DIP FINAL ab - pmksy.gov.in

55

Table 2.19 Irrigation based Classification

S.No. Block

Irrigated (Area in ha) Rainfed (Area in ha)

Gross Irrigated

area

Net Irrigated

area

Partially Irrigated / Protective Irrigation

Un- Irrigated or

Totally Rainfed

1 Hoshangabad 44400 42900 1500 1260 2 Kesla 28648 26800 1848 8466 3 Seoni Malva 72184 69334 2850 5040 4 Babai 38376 36701 1675 4410 5 Sohagpur 38286 36466 1820 4631 6 Pipariya 37192 35292 1900 3153 7 Bankhedi 35604 33807 1797 2950

Total 294690 281300 13390 29910

Table 2.20 Irrigated and Unirrigated Area Kharif season area in Ha

S.No. Block Name Total Sown Area

Irrigated Partially/Total Rainfed In Ha. In % In Ha. In %

1 Hoshangabad 39110 15550 39.75965226 1500 3.835336231 2 Kesla 26905 6537 24.29659915 1848 6.868611782 3 Seoni Malva 57290 1975 3.447373014 2850 4.974690173 4 Babai 41540 19700 47.42416948 1675 4.032258065 5 Sohagpur 32944 12100 36.72899466 1820 5.524526469 6 Pipariya 34296 15800 46.06951248 1900 5.540004665 7 Bankhedi 34460 22820 66.22170633 1797 5.21474173

Total 266545 94482 35.4469227 13390 5.02354199

Page 56: HBAD DIP FINAL ab - pmksy.gov.in

56

Table 2.20 Irrigated and Unirrigated Area Rabi season area in Ha

S.No. Block Name Total Sown Area

Irrigated Partially/Total Rainfed In Ha. In % In Ha. In %

1 Hoshangabad 41075 40626 98.90687766 1500 3.65185636 2 Kesla 30130 27930 92.69830733 1848 6.133421839 3 Seoni Malva 76089 10089 13.25947246 2850 3.745613689 4 Babai 42639 42639 100 1675 3.928328526 5 Sohagpur 42540 42540 100 1820 4.278326281 6 Pipariya 40373 39873 98.76154856 1900 4.706115473 7 Bankhedi 38260 38170 99.76476738 1797 4.696811291

Total 311106 241867 77.7442415 13390 4.30399928

Table 2.21 Irrigated and Unirrigated Area Summer season area in Ha

S.No. Block Name Total Sown

Area Irrigated Partially/Total Rainfed

In Ha. In % In Ha. In % 1 Hoshangabad 1500 1500 100 1500 100 2 Kesla 3900 3900 100 1848 47.38461538 3 Seoni Malva 13500 13500 100 2850 21.11111111 4 Babai 3250 3250 100 1675 51.53846154 5 Sohagpur 10500 10500 100 1820 17.33333333 6 Pipariya 17045 17045 100 1900 11.14696392 7 Bankhedi 18320 18320 100 1797 9.808951965

Total 68015 68015 100 13390 19.6868338

Page 57: HBAD DIP FINAL ab - pmksy.gov.in

57

Chapter -3 Water Availability

The possibility of supplying as much water to the irrigation area as is needed

during each period of the irrigation season depends primarily on the availability of

the water at its source. Availability may vary a lot over the year, or even between

one year and another. Secondly, the supply depends on the capacity of the facility

installed to withdraw the water from the water source. Further, technicians should

be aware that water must be available during each week or month of the growing

season. This is illustrated with an example.

It is thus important to know how much water one can tap from a given water source over the course of a season or a year, when:

-Developing a new irrigation scheme, -Extendin an existing scheme, -Changing the cropping season, -Adding a second or third irrigation season, -Switching from a low water demand crop to a crop such as rice with high water requirements.

Status of water Availability

Hoshangabad district is characterized by alluvial Formations, Gondwana,

Archaean and Deccan trap basaltic lava flow. Dynamic groundwater resources of

the district have been estimated for base year -2008/09 on block-wise basis. Out of

6,68089 ha of geographical area, 5,58,352 ha ( 84 %) is groundwater recharge

worthy area and 1,12,048 ha (16 %) is hilly area. There are six number of

assessment units (block) in the district which fall under command (43 %) and non-

command (57 % Bankhedi, Pipariya and Kesla ) sub units. All blocks of the district

Page 58: HBAD DIP FINAL ab - pmksy.gov.in

58

are categorized as safe blocks, Bankhedi block is with highest stage of

groundwater development of 61 %. The net groundwater availability in the district

2,01,888 ham and groundwater draft for all uses is 35,617ham, making stage of

groundwater development 18 % (14 % in 2003/04) as a whole for district. After

making allocation for future domestic and industrial supply for next 25 years,

balance available groundwater for future irrigation would be 1,64,889 ham at 50 %

stage of groundwater development’s safe limits in the district.

Table 3.1: Season wise Water Availability in District Level

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S. no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 1.299536 0.08835 1.387886 (ii) Minor Irrigation tanks 0 0 0 0 (iii) Lift Irrigation/Diversion 0 0 0 0 (iv) Various water Bodies including Rain water harvesting 0.01529 0.011385 0 0.026675 (v) Treated Effluent Received from STP 0 0 0 0 (vi) Untreated Effluent 0 0 0 0 (vii) Perennial sources of water 0 0.007425 0.014735 0.02216

Total 0.01529 1.318346 0.103085 1.436721 2 Groundwater (i) Open Well 0.051105 0.113568 0.04128 0.205953 (ii) Deep Tube Well 0.24095 0.223866 0.148198 0.6130135 (iii) Medium Tube Well 0.151804 0.124385 0.075465 0.351654 (iv) Shallow Tube wells 0 0 0 0

Total 0.443859 0.461819 0.264943 1.1706205 Grand Total 0.459149 1.780165 0.368028 2.6073415

Page 59: HBAD DIP FINAL ab - pmksy.gov.in

59

Table 3.2: Season wise Water Availability in Seonimalwa Block

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 0.46127 0.0259 0.487172 (ii) Minor Irrigation tanks 0 (iii) Lift Irrigation/Diversion 0 (iv) Various water Bodies including Rain water harvesting 0.002 0.00208 0.0040835 (v) Treated Effluent Received from STP 0 (vi) Untreated Effluent 0 (vii) Perennial sources of water 0.0012 0.00228 0.003475

Total 0.002 0.46456 0.02818 0.4947305 2 Groundwater (i) Open Well 0.01344 0.02258 0.00646 0.04248 (ii) Deep Tube Well 0.0549 0.00602 0.02976 0.090673 (iii) Medium Tube Well 0.0416 0.00335 0.01474 0.0596875 (iv) Shallow Tube wells 0 0 0 0

Total 0.10994 0.03195 0.05095 0.1928405 Grand Total 0.11194 0.4965 0.07913 0.687571

Page 60: HBAD DIP FINAL ab - pmksy.gov.in

60

Table 3.3: Season wise Water Availability in Kesla Block

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 0.13083 0 0.130832 (ii) Minor Irrigation tanks 0 (iii) Lift Irrigation/Diversion 0 (iv) Various water Bodies including Rain water harvesting 0 0 0 (v) Treated Effluent Received from STP 0 (vi) Untreated Effluent 0 (vii) Perennial sources of water 0.00105 0.00193 0.002975

Total 0 0.13188 0.00193 0.133807 2 Groundwater (i) Open Well 0.0072975 0.00667 0.0021 0.0160675 (ii) Deep Tube Well 0.027175 0.01412 0.00666 0.047948 (iii) Medium Tube Well 0.01878 0.00785 0.0032 0.029825 (iv) Shallow Tube wells 0 0 0 0

Total 0.0532525 0.02864 0.01195 0.0938405 Grand Total 0.0532525 0.16052 0.01388 0.2276475

Page 61: HBAD DIP FINAL ab - pmksy.gov.in

61

Table 3.4: Season wise Water Availability in Babai Block

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S. no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 0.17494 0.01605 0.190994 (ii) Minor Irrigation tanks 0 (iii) Lift Irrigation/Diversion 0 (iv) Various water Bodies including Rain water harvesting 0.00438 0.00234 0.00672 (v) Treated Effluent Received from STP 0 (vi) Untreated Effluent 0 (vii) Perennial sources of water 0.00105 0.00229 0.0033425

Total 0.00438 0.17833 0.01834 0.2010565 2 Groundwater (i) Open Well 0.004725 0.03209 0.00452 0.041335 (ii) Deep Tube Well 0.0261 0.04107 0.01617 0.08334 (iii) Medium Tube Well 0.02298 0.02282 0.00864 0.05444 (iv) Shallow Tube wells 0 0 0 0

Total 0.053805 0.09598 0.02933 0.179115 Grand Total 0.058185 0.27431 0.04767 0.3801715

Page 62: HBAD DIP FINAL ab - pmksy.gov.in

62

Table 3.5: Season wise Water Availability in Sohagpur Block

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S. no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 0.19953 0.02188 0.221403 (ii) Minor Irrigation tanks 0 (iii) Lift Irrigation/Diversion 0 (iv) Various water Bodies including Rain water harvesting 0.00192 0 0.00192 (v) Treated Effluent Received from STP 0 (vi) Untreated Effluent 0 (vii) Perennial sources of water 0.0006 0.00158 0.002175

Total 0.00192 0.20013 0.02345 0.225498 2 Groundwater (i) Open Well 0.007335 0.00439 0.00672 0.018443 (ii) Deep Tube Well 0.028075 0.02132 0.01719 0.0665865 (iii) Medium Tube Well 0.01664 0.01185 0.01166 0.04014 (iv) Shallow Tube wells 0 0 0 0

Total 0.05205 0.03756 0.03556 0.1251695 Grand Total 0.05397 0.23769 0.05901 0.3506675

Page 63: HBAD DIP FINAL ab - pmksy.gov.in

63

Table 3.6: Season wise Water Availability in Pipariya Block

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S. no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 0.11928 0.02043 0.139705 (ii) Minor Irrigation tanks 0 (iii) Lift Irrigation/Diversion 0 (iv) Various water Bodies including Rain water harvesting 0.00199 0.00084 0.0028345 (v) Treated Effluent Received from STP 0 (vi) Untreated Effluent 0 (vii) Perennial sources of water 0.00113 0.00229 0.0034175

Total 0.00199 0.12125 0.02272 0.145957 2 Groundwater (i) Open Well 0.0065325 0.0096 0.00627 0.0224005 (ii) Deep Tube Well 0.03435 0.04645 0.02206 0.102851 (iii) Medium Tube Well 0.021052 0.02581 0.01314 0.059997 (iv) Shallow Tube wells 0 0 0 0

Total 0.0619345 0.08185 0.04147 0.1852485 Grand Total 0.0639245 0.2031 0.06418 0.3312055

Page 64: HBAD DIP FINAL ab - pmksy.gov.in

64

Table 3.7: Season wise Water Availability in Hoshangabad Block

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S. no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 0.21368 0.0041 0.21778 (ii) Minor Irrigation tanks 0 (iii) Lift Irrigation/Diversion 0 (iv) Various water Bodies including Rain water harvesting 0.005 0.00585 0.0108485 (v) Treated Effluent Received from STP 0 (vi) Untreated Effluent 0 (vii) Perennial sources of water 0.0018 0.0028 0.0046

Total 0.005 0.22133 0.0069 0.2332285 2 Groundwater (i) Open Well 0.004545 0.01455 0.0025 0.021593 (ii) Deep Tube Well 0.0379 0.00726 0.007755 0.052915 (iii) Medium Tube Well 0.0128 0.00404 0.00135 0.018185 (iv) Shallow Tube wells 0 0 0 0

Total 0.055245 0.02584 0.011605 0.092693 Grand Total 0.060245 0.24717 0.018505 0.3259215

Page 65: HBAD DIP FINAL ab - pmksy.gov.in

65

Table 3.8: Season wise Water Availability in Bankhedi Block

Source: AGRICULTURE OFFICE RECORDS Water Availability BCM

S. no. Sources Kharif Rabi Summer Total

1 Surface Irrigation (i) Canal (Major & Medium Irrigation) 0 0 0 0 (ii) Minor Irrigation tanks 0 (iii) Lift Irrigation/Diversion 0 (iv) Various water Bodies including Rain water harvesting 0 0.00027 0.0002685 (v) Treated Effluent Received from STP 0 (vi) Untreated Effluent 0 (vii) Perennial sources of water 0.0006 0.00158 0.002175

Total 0 0.00087 0.00158 0.0024435 2 Groundwater (i) Open Well 0.00723 0.02369 0.01271 0.043634 (ii) Deep Tube Well 0.03245 0.08763 0.04862 0.1687 (iii) Medium Tube Well 0.017952 0.04868 0.02275 0.0893795 (iv) Shallow Tube wells 0 0 0 0

Total 0.057632 0.16 0.08408 0.3017135 Grand Total 0.057632 0.16087 0.08565 0.304157

Table 3.9: Status of Groundwater Availability

Status of Block as per Central Groundwater Board notification Groundwater (MCM) Critical Semi-critical Safe Draft Recharge Nil Nil All Development Blocks 356.17 210.18

Page 66: HBAD DIP FINAL ab - pmksy.gov.in

66

Table 3.10: Status of Command Area

Area in Ha

S no. Block

InFormation of canal command InFormation on the other services command Total area

Total Area

Developed Area

Undeveloped Area

Total Area

Developed Area

Undeveloped Area

Developed command

Undeveloped command

1 2 3 4 5 6 7 8 4+7 5+8

1 Hoshangabad 32489 32489 0 13476 10565 2911 43054 2911

2 Babai 24936 23153 0 1783 0 0 23153 0

3 Sohagpur 23818 23643 175 0 0 0 23643 175

4 Pipariya 8628 7995 633 0 0 0 7995 633

5 Bankhedi 3321 0 0 3319 0 0 0 0

6 Seonimalwa 60113 56553 3560 0 0 0 56553 3560

7 Kesla 0 0 0 0 0 0 0 0

Total 153305 143833 4368 18578 10565 2911 154398 7279

Page 67: HBAD DIP FINAL ab - pmksy.gov.in

67

Table 3.11: Existing type of Irrigation

Block Name

Surface Irrigation (1) Groundwater (2) Other

sources including

traditional WH

S (3)

Treated effluen

t discharged from STP

Water Extraction devices /Lift Total

Canal Based Tanks/Ponds/Reservoirs Tube wells Open

wells Bore well

Govt. canal

Communit

y pvt ltd.

Community ponds includi

ng small

Individual/ pvt pond

s

Govt. Reservoir

/Dams

Govt.

Pvt.

Govt.

Pvt. Govt. Pvt.

Electricity

Diesel

pumps

Others

Irrigation

sources

Water extracti

ng units

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1

7 18 19

Hoshangabad 26025 _ _ _ _ 2017 _ 7274 906 _ 0 _ 2366 286 _ 26025 9291

Kesla 8267 _ _ _ 1385 _ 3923 _ 3335 1663 _ 381 _ 1180 1308 _ 9652 7639

Seonimalwa 58563 _ _ _ _ 1673 _ 11290 1449 _ 14 _ 1460 1886 _ 58563 12977

Babai 24936 _ _ _ _ 11409 _ 16045 943 _ 0 _ 3200 1500 _ 24936 27454

Sohagpur 23818 _ _ _ _ 5923 _ 2194 1297 _ 320 _ 1708 816 _ 23818 8437

Piparya 8628 _ _ _ _ 12902 _ 4799 1311 _ 0 _ 3150 445 _ 8628 17701

Bankhedi 3321 _ _ _ _ 24341 _ 11847 1319 _ 6 _ 8398 571 _ 3321 36194

Total 153558 _ _ _ 1385 _ 62188 _ 56784 8888 _ 721 _ 21462 6812 _ 154943 119693

Page 68: HBAD DIP FINAL ab - pmksy.gov.in

68

Chapter - 4 Water Requirement/Demand

A water supply is an essential requirement for all people. Determining how

much is needed is one of the first steps in providing that supply. Providing enough

water to meet everybody’s needs may be difficult in the short-term so water can be

made available in stages. Continuous checking - including talking to the various

users of the supply (especially women) will enable limited resources to be focused

effectively. Providing water is never free; the water needs to be collected, stored,

treated and distributed - providing too much water is a waste of money. Taking too

much water from a limited source may deprive people elsewhere of water and have

adverse environmental and health impacts.

It is a worldwide perception that water supply will decrease in times to

come. It is estimated that global water withdrawals will increase 35 per cent

between 1995 and 2020. It has been estimated that in India per capita withdrawal

of water is 585 m3 /year, out of which 8 per cent is for domestic 6 per cent for

industrial use and 86 per cent for agriculture. Failure to balance the supply side and

demand side of water resource management provides a number of negative links in

our society, like links to public health problems, environmental degradation and

economic loss that are associated with the resulting water shortages and / or water

contamination.

The total amount of water inclusive of water in the field applied through

irrigation is termed as gross irrigation requirement, which in other words is net

irrigation requirement plus application and other losses.

A minimum of 135 liters per head per day may be considered adequate for domestic needs of urban communities, apart from non domestic needs as flushing

Page 69: HBAD DIP FINAL ab - pmksy.gov.in

69

requirements. As a general rule the following rates per capita per day may be considered minimum for domestic and non domestic needs:

Table 4.1 Domestic Water Requirement/Demand

District and Status Report (unit BCM)

S.No. Blocks Population in 2011

Decadal Growth

Rate

Projected Population

in 2015

Present Water

Requirment

Projected population

in 2020

Gross Water

Demand in 2020

Water Gap in 2020 (BCM)

1 Hoshangabad 165749 7.9 172296 0.00875533 178843 0.009350721 0.000595395 2 Babai 298322 15.44 321352 0.01575820 344383 0.016829820 0.001071617 3 Sohagpur 186825 14.99 200828 0.00986862 214830 0.010539723 0.000671103 4 Pipariya 134364 15.95 145080 0.00709748 155795 0.007580138 0.000482655 5 Bankhedi 149184 17.96 162581 0.00788032 175977 0.008416208 0.000535891 6 Kesla 181261 25.06 203973 0.00957471 226685 0.010225830 0.000651116 7 Seonimalwa 121790 1.29 122576 0.00643329 123361 0.006870776 0.000437488

Total 1237495 14.49 1328685 0.06536795 1419875 0.069813215 0.004445265 Calculated as 135 litres per person per day

Calculated Gross water Demand for a Year

Table 4.2 Average Domestic Water Consumption Calculated

S.No. Use Consumption in Liter per person per day

1 Drinking 5 2 Cooking 5 3 Bathing (including abloution) 55 4 Washing Clothes 20 5 Washing of Utentials 10 6 Cleaning of Houses 10 7 Flushing of Laterines 30

Total 135

Source : Central Public Health and Environmental Engineering Organisation (CPHEEO India Water Portal)

Total Population of District Hoshangabad in 2011 was 1237495, growth rate for district is 14.49% per decade and projected population in 2020 is 1419875. Average per capita domestic water requirement is 135 liters per day; Based on this inFormation gross water demand for whole district in current year is 0.06536795 BCM per annum. The projected gross water demand in 2020 is 0.069813215 BCM

Page 70: HBAD DIP FINAL ab - pmksy.gov.in

70

for per annum. Thus water gap is 0.004445265 BCM for district Hoshangabad per annum.

Crop water Demand

Water requirement of crop is the quantity of water regardless of source, needed for normal crop growth and yield in a period of time at a place and may be supplied by precipitation or by irrigation or by both.

Water requirement of any crop depends on crop factors such as variety, growth stage, and duration of plant, plant population and growing season. Soil factors such as temperature, relative humidity, wind velocity and crop management practices such as tillage, fertilization, weeding, etc. Water requirement of crops vary from area to area and even field to field in a farm depending on the factors.

The net irrigation requirement is the amount of irrigation water just required to bring the soil moisture content in the root zone depth of the crops to field capacity. Thus, net irrigation requirement is the difference between the field capacity and soil moisture content in the root zone before application of irrigation water.

Table 4.3 District Hoshangabad Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential

to be created (BCM)

A) Cereals Rice 107500 58535 1200 0.129000 0.070242 0.0587580 Wheat 252000 252000 500 0.126000 0.126000 0.0000000

B) Coarse Cereals Maize 6310 0 650 0.004102 0.000000 0.0041015 C) Pulses 200085 75830 400 0.080034 0.030332 0.0497020 D) Oil Seeds 109900 7976 400 0.043960 0.003190 0.0407696 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 4600 4600 2300 0.010580 0.010580 0.0000000 G) Any Other Crops 6610 4812 350 0.002314 0.001684 0.0006293 Vegetables 11685 10560 700 0.008180 0.007392 0.0007875 Fruit Plants 6564 5657 1800 0.011815 0.010183 0.0016326 Total 705254 419970 10300 0.41598 0.2596032 0.1563805

Page 71: HBAD DIP FINAL ab - pmksy.gov.in

71

Table 4.4 Block Babai Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential to be created

(BCM)

A) Cereals Rice 21100 10040 1200 0.025320 0.012048 0.0132720 Wheat 35340 35340 500 0.017670 0.017670 0.0000000

B) Coarse Cereals Maize 765 0 650 0.000497 0.000000 0.0004973 C) Pulses 25760 9765 400 0.010304 0.003906 0.0063980 D) Oil Seeds 10705 975 400 0.004282 0.000390 0.0038920 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 30 30 2300 0.000069 0.000069 0.0000000 G) Any Other Crops 706 618 350 0.000247 0.000216 0.0000308 Vegetables 1974 1678 700 0.001382 0.001175 0.0002072 Fruit Plants 762 610 1800 0.001372 0.001098 0.0002736 Total 97142 59056 10300 0.06114275 0.0365719 0.02457085

Table 4.5 Block Sohagpur Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential to be created

(BCM)

A) Cereals Rice 10870 7115 1200 0.013044 0.008538 0.0045060 Wheat 31945 31945 500 0.015973 0.015973 0.0000000

B) Coarse Cereals Maize 800 0 650 0.000520 0.000000 0.0005200 C) Pulses 32140 12180 400 0.012856 0.004872 0.0079840 D) Oil Seeds 10445 1000 400 0.004178 0.000400 0.0037780 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 90 90 2300 0.000207 0.000207 0.0000000 G) Any Other Crops 882 598 350 0.000309 0.000209 0.0000994 Vegetables 2014 1834 700 0.001410 0.001284 0.0001260 Fruit Plants 1738 1722 1800 0.003128 0.003100 0.0000288 Total 90924 56484 10300 0.0516244 0.0345822 0.0170422

Page 72: HBAD DIP FINAL ab - pmksy.gov.in

72

Table 4.6 Block Pipariya Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential to be created

(BCM)

A) Cereals Rice 15800 9010 1200 0.018960 0.010812 0.0081480 Wheat 27490 27490 500 0.013745 0.013745 0.0000000

B) Coarse Cereals Maize 775 0 650 0.000504 0.000000 0.0005038 C) Pulses 33810 12815 400 0.013524 0.005126 0.0083980 D) Oil Seeds 10290 970 400 0.004116 0.000388 0.0037280 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 1025 1025 2300 0.002358 0.002358 0.0000000 G) Any Other Crops 898 551 350 0.000314 0.000193 0.0001215 Vegetables 2275 2170 700 0.001593 0.001519 0.0000735 Fruit Plants 812 700 1800 0.001462 0.001260 0.0002016 Total 93175 54731 10300 0.05657465 0.03540035 0.0211743

Table 4.7 Block Bankhedi Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential to be created

(BCM)

A) Cereals Rice 12580 7045 1200 0.015096 0.008454 0.0066420 Wheat 24390 24390 500 0.012195 0.012195 0.0000000

B) Coarse Cereals Maize 850 0 650 0.000553 0.000000 0.0005525 C) Pulses 38000 14400 400 0.015200 0.005760 0.0094400 D) Oil Seeds 9905 1106 400 0.003962 0.000442 0.0035196 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 3355 3355 2300 0.007717 0.007717 0.0000000 G) Any Other Crops 895 465 350 0.000313 0.000163 0.0001505 Vegetables 360 360 700 0.000252 0.000252 0.0000000 Fruit Plants 250 250 1800 0.000450 0.000450 0.0000000 Total 90585 51371 10300 0.05573725 0.0354327 0.0203046

Page 73: HBAD DIP FINAL ab - pmksy.gov.in

73

Table 4.8 Block Kesla Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential to be

created (BCM)

A) Cereals Rice 13780 7200 1200 0.016536 0.008640 0.0078960 Wheat 25650 25650 500 0.012825 0.012825 0.0000000

B) Coarse Cereals Maize 1760 0 650 0.001144 0.000000 0.0011440 C) Pulses 18550 7030 400 0.007420 0.002812 0.0046080 D) Oil Seeds 11490 995 400 0.004596 0.000398 0.0041980 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 95 95 2300 0.000219 0.000219 0.0000000 G) Any Other Crops 1280 1022 350 0.000448 0.000358 0.0000903 Vegetables 1640 1540 700 0.001148 0.001078 0.0000700 Fruit Plants 700 600 1800 0.001260 0.001080 0.0001800 Total 74945 44132 10300 0.0455955 0.0274092 0.0181863

Table 4.9 Block Hoshangabad Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential to be created

(BCM)

A) Cereals Rice 13550 8025 1200 0.016260 0.009630 0.0066300 Wheat 42835 42835 500 0.021418 0.021418 0.0000000

B) Coarse Cereals Maize 410 0 650 0.000267 0.000000 0.0002665 C) Pulses 10775 4085 400 0.004310 0.001634 0.0026760 D) Oil Seeds 13315 950 400 0.005326 0.000380 0.0049460 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 2 2 2300 0.000005 0.000005 0.0000000 G) Any Other Crops 1266 1088 350 0.000443 0.000381 0.0000623 Vegetables 1456 1058 700 0.001019 0.000741 0.0002786 Fruit Plants 1471 1097 1800 0.002648 0.001975 0.0006732 Total 85080 59140 10300 0.051695 0.0361621 0.0155326

Page 74: HBAD DIP FINAL ab - pmksy.gov.in

74

Table 4.10 Block Seonimalwa Crop Water Requirement

Crops Area sown(ha)

Irrigated area(ha)

Crop water demand(mm)

Water potential required (BCM)

Existing water

potential (BCM)

Water potential to be created (BCM)

A) Cereals Rice 19820 10100 1200 0.023784 0.012120 0.0116640 Wheat 64350 64350 500 0.032175 0.032175 0.0000000

B) Coarse Cereals Maize 950 0 650 0.000618 0.000000 0.0006175 C) Pulses 41050 15555 400 0.016420 0.006222 0.0101980 D) Oil Seeds 43750 1980 400 0.017500 0.000792 0.0167080 E) Fibre 0 0 2000 0.000000 0.000000 0.0000000 F) Sugarcane 3 3 2300 0.000007 0.000007 0.0000000 G) Any Other Crops 683 470 350 0.000239 0.000165 0.0000746 Vegetables 1966 1920 700 0.001376 0.001344 0.0000322 Fruit Plants 831 678 1800 0.001496 0.001220 0.0002754

Total 173403 95056 10300 0.09361445 0.0540448 0.03956965

Livestock water Demand

Providing enough quality water is essential for good livestock husbandry.

Water makes up 80% of the blood, regulates body temperature and is vital for

organ functions such as digestion, waste removal and the absorption of

nutrients. Understanding daily livestock watering needs is key when designing

a livestock watering system.

The daily water requirement of livestock varies significantly among

animal species. The animal's size and growth stage will have a strong influence

on daily water intake. Consumption rates can be affected by environmental and

management factors. Air temperature, relative humidity and the level of animal

exertion or production level are examples of these factors. The quality of the

water, which includes temperature, salinity and impurities affecting taste and

Page 75: HBAD DIP FINAL ab - pmksy.gov.in

75

odour, will also have an effect. The water content of the animal's diet will

influence its drinking habits. Feed with relatively high moisture content

decreases the quantity of drinking water required.Milk is composed of nearly

87% water. An adequate supply of quality water for dairy cattle is extremely

important.

Table 4.11 Livestock Water Requirement

Blocks Total number

of live stocks/wildlife

Present water demand (BCM)

Water demand in 2020 (BCM)

Existing water potential

Water potential to be created (BCM)

Hoshangabad 60428 0.000639410 0.001342761 0.000639410 0.000703351 Babai 74986 0.000793453 0.001626579 0.000793453 0.000833126

Sohagpur 76336 0.000807738 0.001704327 0.000807738 0.000896589 Pipariya 79295 0.000839048 0.018526183 0.000839048 0.017687135

Bankhedi 74259 0.000785760 0.001595094 0.000785760 0.000809333 Kesla 266616 0.002821157 0.005980853 0.002821157 0.003159696

Seonimalwa 126889 0.001342657 0.002806153 0.001342657 0.001463496 Total 758809 0.008029224 0.033581950 0.008029224 0.025552726

Table 4.12 Water Consumptions by Animals/Birds

S.No. Livestock Category Water Requirement Range Average Water Use

L/Day

1 Poultry 0.16-0.24 0.2 2 Small Animals 13-20 16.5

3 Large Animals 39-59 49

Source: National Research Council,1994. Table 4.13 Water Consumptions by Wildlife

S.No. Livestock Category Water Requirement Range Average Water Use

L/Day

1 Small Animals 0-20 10

2 Medium Animals 20-30 25 3 Large Animals 30-60 45

Source: National Research Council,1994.

Page 76: HBAD DIP FINAL ab - pmksy.gov.in

76

Industrial water Demand

In Hoshangabad, two major industries are consuming water. The main

sources of water for the industrial sector are groundwater and surface water.

Groundwater has emerged as an important source to meet the water requirements

of industries. Choice of source of water depends on the availability of sufficient

and regular supply of water and the cost of water from the source.

Table 4.14 Industrial Water Demand

Blocks Name of the Industry

Water Demand (BCM)

Water demand in 2020 (BCM)

Existing water potential(BCM)

Water potential to be created (BCM)

Hoshangabad SPM Hoshangabad 0.0047 0.0091 0.0047 0.0044

Kesla Ordinance Factory 0.012 0.016 0.012 0.004

Total 0.0167 0.0251 0.0167 0.0084

Water Demand for Power Generation

There is only one power plant HEG which generates hydel electricity. No additional water is required for this purpose.

Table 4.15 Water Demand of the District for various sectors (Present)

S.No. Blocks Components

Total BCM Domestic Crop Livestock Industrial

Power generation

1 Hoshangabad 0.0087553 0.0155326 0.0006394 0.0047000 0.0000000 0.0296273 2 Babai 0.0157582 0.0245709 0.0007935 0.0000000 0.0000000 0.0411225 3 Sohagpur 0.0098686 0.0170422 0.0008077 0.0000000 0.0000000 0.0277186 4 Pipariya 0.0070975 0.0211743 0.0008390 0.0000000 0.0000000 0.0291108 5 Bankhedi 0.0078803 0.0203046 0.0007858 0.0000000 0.0000000 0.0289707 6 Kesla 0.0095747 0.0181863 0.0028212 0.0120000 0.0000000 0.0425822 7 Seonimalwa 0.0064333 0.0395697 0.0013427 0.0000000 0.0000000 0.0473456

Total 0.0653680 0.1563805 0.0080292 0.0167000 0.0000000 0.2464777

Page 77: HBAD DIP FINAL ab - pmksy.gov.in

77

Based on calculation it is reflecting that total current water requirement is

0.2464777 BCM. Highest water requirement is in Seonimalwa Block and lowest

requirement is in Sohagpur Block. Due to rapid urbanization and increasing

population in 2020 water requirement is near about 0.287273 BCM.

Table 4.16 Water Demand of the District for various sectors (Projected 2020)

S no Blocks Components

Total BCM Domestic Crop Livestock Industrial

Power generation

1 Hoshangabad 0.009351 0.015766 0.001343 0.009100 0.000000 0.035559 2 Babai 0.016830 0.025013 0.001627 0.000000 0.000000 0.043470 3 Sohagpur 0.010540 0.017264 0.001704 0.000000 0.000000 0.029508 4 Pipariya 0.007580 0.021407 0.018526 0.000000 0.000000 0.047514 5 Bankhedi 0.008416 0.020554 0.001595 0.000000 0.000000 0.030566 6 Kesla 0.010226 0.018532 0.005981 0.016000 0.000000 0.050739 7 Seonimalwa 0.006871 0.040242 0.002806 0.000000 0.000000 0.049919

Total 0.069813 0.158778 0.033582 0.025100 0.000000 0.287273

Water Budget

A water budget reflects the relationship between input and output of water through a region. Thus we have a direct comparison of supply of water and the natural demand for water. The following data provides current water gap and projected water gap for the year 2020.

Table 4.17 Water Budget

S.No. Name of Block

Existing water availability (BCM) Total

water

Water Demand (BCM) Water Gap (BCM)

Surface Water Groundwater Present Projected

(2020) Present Projected (2020)

1 Hoshangabad 0.233229 0.092693 0.3259215 0.029627336 0.035559071 0.296294164 0.290362429 2 Babai 0.201057 0.179115 0.3801715 0.041122506 0.043469524 0.339048994 0.336701976 3 Sohagpur 0.225498 0.1251695 0.3506675 0.027718558 0.029507798 0.322948942 0.321159702 4 Pipariya 0.145957 0.1852485 0.3312055 0.029110831 0.047513538 0.302094669 0.283691962 5 Bankhedi 0.002444 0.3017135 0.304157 0.028970677 0.030565648 0.275186323 0.273591352 6 Kesla 0.133807 0.0938405 0.2276475 0.042582171 0.050738523 0.185065329 0.176908977 7 Seonimalwa 0.494731 0.1928405 0.687571 0.047345596 0.049919263 0.640225404 0.637651737

Total 1.43672 1.1706205 2.6073415 0.24647767 0.287273366 2.36086383 2.320068134

Page 78: HBAD DIP FINAL ab - pmksy.gov.in

78

Chapter -5 Strategic Action plan

Groundwater is a most important natural resource of the earth and is

required for drinking, irrigation and industrialization. The resource can be

optimally used and sustained only when quantity and quality of groundwater is

assessed. Water conservation encompasses the policies, strategies and activities

made to manage fresh water as a sustainable resource, to protect the water

environment, and to meet current and future human demand. Population,

household size, and growth and affluence all affect how much water is used.

Factors such as climate change have increased pressures on natural water resources

especially in manufacturing and agricultural irrigation.

The goals of water conservation efforts include:

• Ensuring availability of water for future generations where the withdrawal of

fresh water from an ecosystem does not exceed its natural replacement rate.

• Energy conservation as water pumping, delivery and waste water treatment

facilities consume a significant amount of energy. In some regions of the world

over 15% of total electricity consumption is devoted to water management.

• Habitat conservation where minimizing human water use helps to preserve

freshwater habitats for local wildlife and migrating waterfowl, but also water

quality.

Agriculture Applications

For crop irrigation, optimal water efficiency means minimizing losses due

to evaporation, runoff or subsurface drainage while maximizing production.

An evaporation pan in combination with specific crop correction factors can be

used to determine how much water is needed to satisfy plant requirements. Flood

Page 79: HBAD DIP FINAL ab - pmksy.gov.in

79

irrigation, the oldest and most common type, is often very uneven in distribution,

as parts of a field may receive excess water in order to deliver sufficient quantities

to other parts. Overhead irrigation, using center-pivot or lateral-moving sprinklers,

has the potential for a much more equal and controlled distribution pattern. Drip

irrigation is the most expensive and least-used type, but offers the ability to deliver

water to plant roots with minimal losses. However, drip irrigation is increasingly

affordable, especially for the home gardener and in light of rising water rates.

There are also cheap effective methods similar to drip irrigation such as the use of

.soaking hoses that can even be submerged in the growing medium to eliminate

evaporation.

As changing irrigation systems can be a costly undertaking, conservation

efforts often concentrate on maximizing the efficiency of the existing system. This

may include chiseling compacted soils, creating furrow dikes to prevent runoff,

and using soil moisture and rainfall sensors to optimize irrigation

schedules. Usually large gains in efficiency are possible through measurement and

more effective management of the existing irrigation system. The 2011 UNEP

Green Economy Report notes that "improved soil organic matter from the use of

green manures, mulching, and recycling of crop residues and animal manure

increases the water holding capacity of soils and their ability to absorb water

during torrential rains", which is a way to optimize the use of rainfall and irrigation

during dry periods in the season.

Methodology

It has been observed that lack of standardization of methodology in

estimating the groundwater and improper tools for handling the same, leads to

miscalculation of estimation of groundwater. It is essential to maintain a proper

balance between the groundwater quantity and its exploitation. Otherwise it leads

Page 80: HBAD DIP FINAL ab - pmksy.gov.in

80

to large scale decline of groundwater levels, which ultimately cause a serious

problem for sustainable agricultural production. A possible solution for such

problems is micro level planning, and use of standard methodology for assessing

the groundwater. Recently micro level planning has gained acceptance, since it can

be locally applied and readily managed by self-sufficient rural governance.

Groundwater resources are dynamic in nature as they grow with the expansion of

irrigation activities, industrialization, urbanization etc. As it is the largest available

source of fresh water laying beneath the ground it has become crucial not only for

targeting of groundwater potential zones, but also monitoring and conserving this

important resource. When the recharge rate cannot meet the demand for water, the

balance is disturbed and hence calls for artificial recharge on a country wise basis.

With the increasing use of groundwater for agricultural, municipal and industrial

needs, the annual extraction of groundwater is far in excess of net average recharge

from natural resources. Consequently, groundwater is being withdrawn from

storage and water levels are declining resulting in crop failures, seawater intrusion

in coastal aquifers, land subsidence etc. Vagaries of monsoon and indiscriminate

development of groundwater often result in declining trend of groundwater levels.

There is an urgent need for artificial recharge of groundwater by augmenting the

natural infiltration of precipitation into subsurface Formation by some suitable

method of recharge. Artificial recharge is one method of modifying the

hydrological cycle and thereby providing groundwater in excess of that available

by process.

The District Irrigation Plan was carried out in 3 steps, in which GIS

interpretation, spatial database creation, ground truthing of the thematic maps and

field work (for collection of well data, hydrological data from WRD etc.) was

Page 81: HBAD DIP FINAL ab - pmksy.gov.in

81

carried out in first 2 steps starting from pre-field to field work. The intergration and

analysis was done in third step.

Pre-field

Literature Survey and data collection: Detailed literature survey was carried

out to understand the methodology and analytical framework of the plan. The

topographical maps, geological maps etc. was collected from Bhuvan Portal and

Survey of India. GIS layers were interpreted to prepare various themes which

mainly include lithology, geomorphology, structures, hydrology and groundwater

irrigated area. Other secondary data like well yield, depth of water table was also

projected on the base map. The SoI topographical maps and other maps were used

for preparation of base maps. This analog to digital conversion was done for

overlay analysis of all the thematic maps.

Field Reconnaissance

Ground truthing for spatial database: The field checks and ground truthing of

individual thematic maps was carried out by visiting the sample sites. The

generated theme was taken for field verification.

Finalization of the spatial database: After ground truthing and field validation

all the thematic maps were modified by incorporating the field findings.

Field Work

A field work was done in order to collect the groundwater and well data

from the CGWB and WRD etc. During the field work, all the wells were measured

for the depth and water level. Also the yield of all the wells surveyed was obtained.

In each village, interactions with community was also undertaken to know the

water availability, sources of water and sites for recharge structures. On the basis

Page 82: HBAD DIP FINAL ab - pmksy.gov.in

82

of lithology, geomorphology and hydrology, suitable sites for recharge structures

were selected and cross-checked on the ground.

Recommended recharge structures

After detailed analysis of the groundwater prospects map generated using

GIS techniques, the various suitable recharge structures such as check dams,

percolation ponds, recharge pits / shaft, nallah bund, etc., were suggested based on

the field condition.

In most of the village area, check dam was suggested as the wells in those

area was sunk, dried up and they didn’t give sufficient yield. The location where

the check dam was proposed falls under highly favorable zone with good potential

of groundwater.

Similarly, other recharge structures such as Nalla bund, desilting of tanks,

were suggested wherever feasible.

Prioritization and activity for Strategic Planning

Water is available in the distributory, but the conveyance system is not

capable of tail area to take it into the farms through the minors, sub minors and

outlets. Thus the 'deprived' could be the farmers at the tail end, not only of the

main canal system but could be in various parts of the system and "other deprived"

on account of the system failure. District decided to look at into District Irrigation

Plan for Irrigation Project, which had a command area treatment with ample water

to irrigate all the land in the command.

Page 83: HBAD DIP FINAL ab - pmksy.gov.in

83

Table 5.1 Component and Yearwise Strategic Action Plan

S.No. Component 1st Year 2nd Year 3rd Year 4th Year 5th Year

Total Cost (Rs. In Lakh)

I AIBP 7081.462 10394.97 8035.91 9027.293 8889.803 43429.45 a Her Khet Ko Pani 4720.974 6929.983 5357.28 6018.195 5926.535 28952.96 b MGNREGA 2895.13 2799.88 1726.89 1072.14 1854.82 10348.86 c Per Drop More Crop 3853.8 4024.2 4123 3856 3235.84 19092.84 II PMKSY (IWMP) 320 101 89 82.0536 42 634.05

Grand Total 18871.4 24250 19332 20055.7 19949 102458.16

Table 5.2 Water Saving

S.No. Component No. of structures

Water Saving/work (cum)

Total Saving in (cum)

1 Drip Irrigation 13320 3000 39960000

2 Sprinklers 46100 2000 92200000 Total 59420 132160000

Table 5.3 Ministry Wise Strategic Plan

S.No. Departments 1st Year 2nd Year 3rd Year 4th Year 5th Year Total Cost

(Rs. In Lakh)

1 DOLR/MORD 507.37 307.80 182.10 86.25 42.00 1125.52 2 MOA & FW-DAC & FW 3853.80 4024.20 4123.00 3856.00 3235.84 19092.84 3 MOUD 2707.76 2593.08 1633.79 1067.94 1854.82 9857.39 4 MOWR 11802.44 17324.96 13393.19 15045.49 14816.34 72382.41

Grand Total 18871.4 24250 19332.1 20055.7 19949 102458.16

Page 84: HBAD DIP FINAL ab - pmksy.gov.in

84

Table 5.4 Departments/Schemes wise Proposed Work Detail of District

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No. Amount in Lakh No. Amount

in Lakh No. Amount in Lakh No.

Amount in Lakh

No. Amount in Lakh No. Amount

in Lakh

1 Farm Ponds 0 0 405 450.27 0 0 4 12.55 0 0 409 462.82

2 Check Dam/Nala Bund 0 0 98 250.07 18 165 50 225.989 0 0 166 641.06

3 Percolation Tanks 0 0 0 0 39 528.63 4 14.68 0 0 43 543.31

4 Stop Dam 28 7135.23 431 6055.24 0 0 64 299.725 0 0 523 13490.20

5 Earthen Dam 4 740 24 106.97 0 0 5 21.066 0 0 33 868.04 6 Well Construction 0 0 240 878.2 0 0 0 0 0 0 240 878.20 7 Pond Construction 11 90 60 554.1 0 0 3 18 0 0 74 662.10 8 Gabion 0 0 0 0 0 0 37 42.044 0 0 37 42.04 9 Bori Bandhan 0 0 54 4.22 0 0 0 0 0 0 54 4.22 10 Minor Irrigation Tanks 2 1630 0 0 45 1106.46 0 0 0 0 47 2736.46

11 Command Area Treatment 287 26775.23 0 0 0 0 0 0 0 0 287 26775.23

12 Farm Ponds Renovation 0 0 9 19.12 0 0 0 0 0 0 9 19.12

13 Check Dam/Nala Bund Renovation 0 0 0 0 0 0 0 0 0 0 0 0.00

14 Stop Dam Renovation 3 15 36 120.17 0 0 0 0 0 0 39 135.17 15 Earthen Dam Renovation 0 0 7 14.55 0 0 0 0 0 0 7 14.55 16 Well/Nallah Deepening 0 0 308 363.82 0 0 0 0 0 0 308 363.82 17 Pond Deepening 1 1.44 201 999.59 0 0 0 0 0 0 202 1001.03 18 Canal Lining Work 486 35258.3 0 0 0 0 0 0 0 0 486 35258.30 19 Pond Renovation 10 10 131 371.2 0 0 0 0 0 0 141 381.20 20 Recharge Pit Renovation 0 0 0 0 0 0 0 0 0 0 0 0.00 21 Recharge Pit 0 0 1323 158.34 0 0 0 0 0 0 1323 158.34

Page 85: HBAD DIP FINAL ab - pmksy.gov.in

85

22 Drip Irrigation 0 0 0 0 4200 2100 0 0 9120 5949.46 13320 8049.46 23 Sprinkler 0 0 0 0 32000 6400 0 0 14350 2843.29 46350 9243.29 24 Dyke Consruction 0 0 3 3 0 0 0 0 0 0 3 3.00

25 Weist Weir Renovation 1 3.96 0 0 0 0 0 0 0 0 1 3.96

26 Anicut Construction 23 723.25 0 0 0 0 0 0 0 0 23 723.25 Total 856 72382.41 3330 10348.86 36302 10300.09 167 634.05 23470 8792.75 64125 102458.16

Table 5.5 Departments/Schemes wise Proposed Work Detail of Kesla Block

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount

in Lakh No. Amount in Lakh No. Amount

in Lakh 1 Farm Ponds 258 183.32 4 12.55 262 195.87 2 Check Dam/Nala Bund 21 2.10 34 142.189 55 144.29 3 Percolation Tanks 5 50 4 14.68 9 64.68 4 Stop Dam 2 200.00 78 624.08 50 233.715 130 1057.80 5 Earthen Dam 4 740.00 24 106.97 5 21.066 33 868.04 6 Well Construction 105 562.20 105 562.20 7 Pond Construction 3 18 3 18.00 8 Gabion 25 26.314 25 26.31 9 Bori Bandhan 0 0.00

10 Minor Irrigation Tanks 2 1630.00 3 79.26 5 1709.26 11 Command Area Treatment 50 2518.48 50 2518.48 12 Farm Ponds Renovation 0 0.00

13 Check Dam/Nala Bund Renovation 0 0.00

14 Stop Dam Renovation 28 101.50 28 101.50 15 Earthen Dam Renovation 5 3.5 5 3.50

Page 86: HBAD DIP FINAL ab - pmksy.gov.in

86

16 Well/Nallah Deepening 27 9.43 27 9.43 17 Pond Deepening 0 0.00 18 Canal Lining Work 34 3166.75 34 3166.75 19 Pond Renovation 131 371.20 131 371.20 20 Recharge Pit Renovation 0 0.00 21 Recharge Pit 194 19.40 194 19.40 22 Drip Irrigation 600 300 900 1225.93 1500 1525.93 23 Sprinkler 5000 1000 2750 404.564 7750 1404.56 24 Dyke Consruction 0 0.00 25 Weist Weir Renovation 0 0.00 26 Anicut Construction 0 0.00

Total 92 8255.23 871 1983.70 5608 1429.26 125 468.51 3650 1630.49 10346 13767.20

Table 5.6 Departments/Schemes wise Proposed Work Detail of Seonimalwa Block

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount

in Lakh 1 Farm Ponds 22 25.25 22 25.25 2 Check Dam/Nala Bund 57 193.13 2 40.00 16 83.80 75 316.93 3 Percolation Tanks 6 74.73 6 74.73 4 Stop Dam 17 5840.23 92 1534.90 14 66.01 123 7441.14 5 Earthen Dam 0 0.00 6 Well Construction 130 298.00 130 298.00 7 Pond Construction 11 90.00 7 59.00 18 149.00 8 Gabion 12 15.73 12 15.73 9 Bori Bandhan 54 4.22 54 4.22

10 Minor Irrigation Tanks 0 0.00

Page 87: HBAD DIP FINAL ab - pmksy.gov.in

87

11 Command Area Treatment 112 15212.33 112 15212.33 12 Farm Ponds Renovation 0 0.00

13 Check Dam/Nala Bund Renovation 0 0.00

14 Stop Dam Renovation 0 0.00 15 Earthen Dam Renovation 0 0.00 16 Well/Nallah Deepening 101 106.61 101 106.61 17 Pond Deepening 36 258.35 36 258.35 18 Canal Lining Work 356 16013.56 356 16013.56 19 Pond Renovation 10 10 10 10.00 20 Recharge Pit Renovation 0 0.00 21 Recharge Pit 261 44.00 261 44.00 22 Drip Irrigation 600 300.00 450 753.33 1050 1053.33 23 Sprinkler 5000 1000.00 5500 1122.594 10500 2122.59 24 Dyke Consruction

0 0.00

25 Weist Weir Renovation 0 0.00 26 Anicut 23 723.25 23 723.25

Total 529 37889.37 760 2523.46 5608 1414.73 42 165.54 5950 1875.92 12866 43145.77

Table 5.7 Departments/Schemes wise Proposed Work Detail of Babai Block

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount

in Lakh 1 Farm Ponds 0 0.00 2 Check Dam/Nala Bund 18 48.84 18 48.84 3 Percolation Tanks 0 0.00 4 Stop Dam 58 483.26 58 483.26 5 Earthen Dam 0 0.00

Page 88: HBAD DIP FINAL ab - pmksy.gov.in

88

6 Well Construction 0 0.00 7 Pond Construction 0 0.00 8 Gabion 0 0.00 9 Bori Bandhan 0 0.00

10 Minor Irrigation Tanks 0 0.00 11 Command Area Treatment 0 0.00 12 Farm Ponds Renovation 0 0.00

13 Check Dam/Nala Bund Renovation 0 0.00

14 Stop Dam Renovation 1 4.25 1 4.25 15 Earthen Dam Renovation

0 0.00

16 Well/Nallah Deepening 12 35.61 12 35.61 17 Pond Deepening 29 166.62 29 166.62 18 Canal Lining Work 5 1927.22 5 1927.22 19 Pond Renovation 0 0.00 20 Recharge Pit Renovation 0 0.00 21 Recharge Pit 0 0.00 22 Drip Irrigation 600 300 2400 1246.53 3000 1546.53 23 Sprinkler 4000 800 3200 551.348 7200 1351.35 24 Dyke Consruction 0 0.00 25 Weist Weir Renovation 0 0.00 26 Anicut 0 0.00

Total 5 1927.22 118 738.58 4600 1100 0 0 5600 1797.88 10323 5563.68

Page 89: HBAD DIP FINAL ab - pmksy.gov.in

89

Table 5.8 Departments/Schemes wise Proposed Work Detail of Bankhedi Block

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No.

Amount in

Lakh No. Amount

in Lakh No. Amount in Lakh

No.

Amount in Lakh No.

Amount in

Lakh No. Amount

in Lakh

1 Farm Ponds 95 109.20 95 109.20 2 Check Dam/Nala Bund 2 6.00 5 25 7 31.00 3 Percolation Tanks 5 74.9 5 74.90 4 Stop Dam 18 180.00 18 180.00 5 Earthen Dam 0 0.00 6 Well Construction 0 0.00 7 Pond Construction 0 0.00 8 Gabion 0 0.00 9 Bori Bandhan 0 0.00 10 Minor Irrigation Tanks 7 174.2 7 174.20 11 Command Area Treatment 0 0.00 12 Farm Ponds Renovation 6 12.07 6 12.07

13 Check Dam/Nala Bund Renovation 0 0.00

14 Stop Dam Renovation 0 0.00 15 Earthen Dam Renovation 2 11.05 2 11.05 16 Well/Nallah Deepening 1 0.50 1 0.50 17 Pond Deepening 20 53.12 20 53.12 18 Canal Lining Work 0 0.00 19 Pond Renovation 0 0.00

Page 90: HBAD DIP FINAL ab - pmksy.gov.in

90

20 Recharge Pit Renovation 0 0.00 21 Recharge Pit 121 38.27 121 38.27 22 Drip Irrigation 600 300.00 750 481.215 1350 781.22 23 Sprinkler 5000 1000.00 950 155.62 5950 1155.62 24 Dyke Consruction 3 3.00 3 3.00 25 Weist Weir Renovation 0 0.00 26 Anicut 0 0.00

Total 0 0 268 413.21 5617 1574.1 0 0 1700 636.835 7585 2624.1

Table 5.9 Departments/Schemes wise Proposed Work Detail of Sohagpur Block

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No.

Amount in

Lakh No.

Amount in

Lakh No. Amount

in Lakh

1 Farm Ponds 0 0.00 2 Check Dam/Nala Bund 2 45 2 45.00 3 Percolation Tanks 2 25 2 25.00 4 Stop Dam 9 1095 85 1905.00 94 3000.00 5 Earthen Dam 0 0.00 6 Well Construction 2 6.00 2 6.00 7 Pond Construction 20 258.00 20 258.00 8 Gabion 0 0.00 9 Bori Bandhan 0 0.00

10 Minor Irrigation Tanks 28 680 28 680.00 11 Command Area Treatment 0 0.00

Page 91: HBAD DIP FINAL ab - pmksy.gov.in

91

12 Farm Ponds Renovation 0 0.00

13 Check Dam/Nala Bund Renovation 0 0.00

14 Stop Dam Renovation 3 15 3 11.00 6 26.00 15 Earthen Dam Renovation 0 0.00 16 Well/Nallah Deepening 85 82.42 85 82.42 17 Pond Deepening 1 1.44 52 236.50 53 237.94 18 Canal Lining Work 5 1548.46 5 1548.46 19 Pond Renovation 0 0.00 20 Recharge Pit Renovation 0 0.00 21 Recharge Pit 570 28.55 570 28.55 22 Drip Irrigation 600 300 2300 1089.10 2900 1389.10 23 Sprinkler 4000 800 1000 188.944 5000 988.94 24 Dyke Consruction

0 0.00

25 Weist Weir Renovation 1 3.96 1 3.96 26 Anicut 0 0.00

Total 19 2663.86 817 2527.47 4632 1850 0 0 3300 1278.04 8768 8319.4

Table 5.10 Departments/Schemes wise Proposed Work Detail of Hoshangabad Block

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount

in Lakh 1 Farm Ponds 6 33.00 6 33.00 2 Check Dam/Nala Bund 0 0.00 3 Percolation Tanks 0 0.00 4 Stop Dam 40 795.00 40 795.00 5 Earthen Dam 0 0.00 6 Well Construction 3 12.00 3 12.00

Page 92: HBAD DIP FINAL ab - pmksy.gov.in

92

7 Pond Construction 8 62.00 8 62.00 8 Gabion 0 0.00 9 Bori Bandhan 0 0.00

10 Minor Irrigation Tanks 0 0.00 11 Command Area Treatment 125 9044.42 125 9044.42 12 Farm Ponds Renovation 0 0.00

13 Check Dam/Nala Bund Renovation 0 0.00

14 Stop Dam Renovation 0 0.00 15 Earthen Dam Renovation

0 0.00

16 Well/Nallah Deepening 80 118.25 80 118.25 17 Pond Deepening 16 107.00 16 107.00 18 Canal Lining Work 81 12045.31 81 12045.31 19 Pond Renovation 0 0.00 20 Recharge Pit Renovation 0 0.00 21 Recharge Pit 31 10.60 31 10.60 22 Drip Irrigation 600 300.00 1700 810.55 2300 1110.55 23 Sprinkler 4000 800.00 150 245.00 4150 1045.00 24 Dyke Consruction 0 0.00 25 Weist Weir Renovation 0 0.00 26 Anicut 0 0.00

Total 206 21089.73 184 1137.85 4600 1100.00 0 0 1850 1055.55 6840 24383

Page 93: HBAD DIP FINAL ab - pmksy.gov.in

93

Table 5.11 Departments/Schemes wise Proposed Work Detail of Pipariya Block

S.No. Structure Name

Departments/Schemes Name Total

Irrigation RES/MGNREGA Agriculture IWMP Horticulture

No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount in

Lakh No. Amount in Lakh No. Amount

in Lakh 1 Farm Ponds 24 99.50 24 99.50 2 Check Dam/Nala Bund 9 55.00 9 55.00 3 Percolation Tanks 21 304.00 21 304.00 4 Stop Dam 60 533.00 60 533.00 5 Earthen Dam 0 0.00 6 Well Construction 0 0.00 7 Pond Construction 25 175.10 25 175.10 8 Gabion 0 0.00 9 Bori Bandhan 0 0.00

10 Minor Irrigation Tanks 7 173.00 7 173.00 11 Command Area Treatment 0 0.00 12 Farm Ponds Renovation 3 7.05 3 7.05

13 Check Dam/Nala Bund Renovation 0 0.00

14 Stop Dam Renovation 4 3.42 4 3.42 15 Earthen Dam Renovation

0 0.00

16 Well/Nallah Deepening 2 11.00 2 11.00 17 Pond Deepening 48 178.00 48 178.00 18 Canal Lining Work 5 557.00 5 557.00 19 Pond Renovation 0 0.00 20 Recharge Pit Renovation 0 0.00

Page 94: HBAD DIP FINAL ab - pmksy.gov.in

94

21 Recharge Pit 146 17.52 146 17.52 22 Drip Irrigation 600 300.00 620 342.8 1220 642.80 23 Sprinkler 5000 1000.00 800 175.224 5800 1175.22 24 Dyke Consruction 0 0.00 25 Weist Weir Renovation 0 0.00 26 Anicut 0 0.00

Total 5 557 312 1024.59 5637 1832.00 0 0 1420 518.024 7374 3931.61

Page 95: HBAD DIP FINAL ab - pmksy.gov.in

95

Table 5.12 Total Proposed Structures

S.No. Structure Total No.

Total Water Storage (cum)

1 Farm Ponds 409 409000 2 Check Dam/Nala Bund 166 9130000 3 Percolation Tanks 43 1935000 4 Stop Dam 523 65375000 5 Earthen Dam 33 16500000 7 Pond Construction 74 11100000 9 Bori Bandhan 54 37800 10 Minor Irrigation Tanks 47 23500000 11 Command Area Treatment 287 200900000 12 Farm Ponds Renovation 9 9000 13 Stop Dam Renovation 39 97500000 14 Earthen Dam Renovation 7 3850000 16 Pond Deepening 202 50500000 18 Pond Renovation 141 28200000 25 Anicut Construction 23 11500000

Total 2057 520445800 Total Water Storage 0.052045 BCM

Table 5.13 Develop Crop Pattern Area (In Ha.)

Crops Area sown Present (ha)

Area sown Projected

(ha)

Increase in Area (ha)

A) Cereals Rice 107500 115000 56465 Wheat 252000 260000 8000

B) Coarse Cereals Maize 6310 15156 8846 C) Pulses 200085 210204 10119 D) Oil Seeds 109900 95545 -14355 E) Sugarcane 4600 5156 556 F) Any Other Crops 6610 7506 896 Vegetables 11685 16589 4904 Fruit Plants 6564 8569 2005

Total 705254 733725 77436

Page 96: HBAD DIP FINAL ab - pmksy.gov.in

96

Annexures

Page 97: HBAD DIP FINAL ab - pmksy.gov.in

97

Kesla

Page 98: HBAD DIP FINAL ab - pmksy.gov.in

98

PRADHANMANTRI KRISHI SINCHAI YOJNA – HOSHANGABAD BLOCK- KESLA

S.No.

Name of

Block Gram Panchayat Village Name Name of

Work

Type Of Structure

( New/Renovat

ion)

Co-ordinates Khas

ra No.

Total

Cost In Lak

h

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implementa

tion

Scheme Name

Latitude Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 KESLA SILWANI SOMUKHEDA Stop Dam NEW Lat 22.37071

N

Log 77.8798

E 14.5

0 9062.5 18.13 1 MGNREGA

2 KESLA SILWANI SILWANI

Pond Deepenin

g

RENOVATION Lat 22.37560

N

Log 77.88394

E 3.50 2187.5 4.375 1 MGNRE

GA

3 KESLA SILWANI SOMUKHEDA

Pond Construct

ion NEW Lat 22.38065

N

Log 77.86035

E 14.5

0 9062.5 18.13 1 MGNREGA

4 KESLA SILWANI BADCHAPADA

Stop Dam Renovatio

n

RENOVATION Lat 22.37702

N

Log 77.90632

E 3.75 2343.8 4.688 1 MGNRE

GA

5 KESLA SILWANI LADIMOU

Stop Dam Renovatio

n

RENOVATION Lat 22.37357

N

Log 77.89393

E 3.80 2375 4.75 1 MGNRE

GA

6 KESLA SILWANI SOMUKHEDA

Stop Dam Renovatio

n

RENOVATION Lat 22.37688

N

Log 77.87365

E 3.75 2343.8 4.688 1 MGNRE

GA

7 KESLA SILWANI SILWANI

Stop Dam Renovatio

n

RENOVATION Lat 22.38514

N

Log 77.88585

E 3.80 2375 4.75 1 MGNRE

GA

8 KESLA SILWANI SILWANI

Stop Dam Renovatio

n

RENOVATION Lat 22.38411

N

Log 77.89020

E 4.25 2656.3 5.313 2 MGNRE

GA

9 KESLA SILWANI BADCHAPADA

Stop Dam Renovatio

n

RENOVATION Lat 22.37525

N

Log 77.90423

E 3.75 2343.8 4.688 2 MGNRE

GA

10 KESLA SILWANI SILWANI

Stop Dam Renovatio

n

RENOVATION Lat 22.39399

N

Log 77.88681

E 4.50 2812.5 5.625 2 MGNRE

GA

11 KESLA SILWANI BADCHAPADA

Pond Construct

ion NEW Lat 22.38110

N

Log 77.90765

E 13.5

0 8437.5 16.88 1 MGNREGA

Page 99: HBAD DIP FINAL ab - pmksy.gov.in

99

12 KESLA SILWANI SOMUKHEDA Stop Dam NEW Lat 22.37432

N

Log 77.87408

E 9.80 6125 12.25 1 MGNRE

GA

13 KESLA SILWANI SILWANI Stop Dam NEW Lat 22.38527

N

Log 77.88413

E 10.0

0 6250 12.5 1 MGNREGA

14 KESLA SILWANI KOTMIRAIYAT

Pond Deepenin

g

RENOVATION Lat 22.39249

N

Log 77.90029

E 1.80 1125 2.25 1 MGNRE

GA

15 KESLA SILWANI KOTMIRAIYAT

Pond Construct

ion NEW Lat 22.39939

N

Log 77.89082

E 15.0

0 9375 18.75 1 MGNREGA

16 KESLA NAYAGAON NAYAGAON

Pond Deepenin

g

RENOVATION Lat

22.334603 N

Log

77.695123 E 2.10 1312.5 2.625 1 MGNRE

GA

17 KESLA TAKU BRLAWADA Percolatio

n Tank RENOVATIO

N Lat 22.493905N

Log

77.802102 E 1.50 937.5 1.875 1 MGNRE

GA

18 KESLA TAKU BRLAWADA Percolatio

n Tank RENOVATIO

N Lat 22.491768 N

Log

77.802392 E 1.50 937.5 1.875 1 MGNRE

GA

19 KESLA TAKU BRLAWADA Percolatio

n Tank RENOVATIO

N Lat 22.490227 N

Log

77.804427E 1.50 937.5 1.875 1 MGNRE

GA

20 KESLA TAKU BRLAWADA Percolatio

n Tank RENOVATIO

N Lat 22.292949 N

Log

77.481897 E 1.50 937.5 1.875 2 MGNRE

GA

21 KESLA TAKU BRLAWADA Percolatio

n Tank RENOVATIO

N Lat 22.490575N

Log

77.805663E 1.50 937.5 1.875 2 MGNRE

GA

22 KESLA TAKU BRLAWADA Percolatio

n Tank RENOVATIO

N Lat22.293004

N log.77.48254

6E 1.50 937.5 1.875 2 MGNRE

GA

23 KESLA TAKU BRLAWADA Percolatio

n Tank RENOVATIO

N LAT-22.293355N

LOG.77.4835

76E 1.50 937.5 1.875 2 MGNRE

GA

24 KESLA TAKU TAKU Farm

Pond NEW LAT.22.281523N

LOG.77.485264 E

2.33 600 1.2 1 MGNREGA

25 KESLA TAKU TAKU Farm

Pond NEW LAT.22.281686N

LOG.77.49042E

2.33 600 1.2 1 MGNREGA

26 KESLA TAKU TAKU Farm

Pond NEW Lat 22.495795 N

Log

77.808510E 2.33 600 1.2 1 MGNRE

GA

27 KESLA TAKU TAKU Farm

Pond NEW Lat 22.491120N

Log

77.801737 E 2.33 600 1.2 1 MGNRE

GA

Page 100: HBAD DIP FINAL ab - pmksy.gov.in

100

28 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.491677 N

Log

77.807073 E 1.50 937.5 1.875 2 MGNRE

GA

29 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.492652 N

Log

77.809933 E 2.00 1250 2.5 3 MGNRE

GA

30 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.470898 N

Log

77.814623 E 3.00 1875 3.75 3 MGNRE

GA

31 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.471348 N

Log

77.816783E 2.00 1250 2.5 3 MGNRE

GA

32 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.495822 N

Log

77.808700 E 3.00 1875 3.75 3 MGNRE

GA

33 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.496272 N

Log

77.811870 E 2.00 1250 2.5 5 MGNRE

GA

34 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.493635 N

Log

77.812847 E 2.00 1250 2.5 5 MGNRE

GA

35 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.495090 N

Log

77.815797 E 2.00 1250 2.5 5 MGNRE

GA

36 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.490433 N

Log

77.817122 E 2.00 1250 2.5 4 MGNRE

GA

37 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.484887N

Log

77.818907 E 5.00 3125 6.25 4 MGNRE

GA

38 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.485193 N

Log

77.819132 E 2.00 1250 2.5 4 MGNRE

GA

39 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.471890 N

Log

77.813893 E 2.00 1250 2.5 4 MGNRE

GA

40 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.471633 N

Log

77.812853 E 3.00 1875 3.75 4 MGNRE

GA

41 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.478320 N

Log

77.819482 E 3.00 1875 3.75 4 MGNRE

GA

42 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.491525 N

Log

77.805270E 3.00 1875 3.75 4 MGNRE

GA

Page 101: HBAD DIP FINAL ab - pmksy.gov.in

101

43 KESLA TAKU TAKU Percolatio

n Tank RENOVATIO

N Lat 22.493163 N

Log

77.815873 E 3.00 1875 3.75 4 MGNRE

GA

44 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat 22.44080

N

Log 77.85501

E 4.50 2812.5 5.625 2 MGNRE

GA

45 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat 22.43509

N

Log 77.85231

E 3.90 2437.5 4.875 3 MGNRE

GA

46 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat 22.43050

N

Log 77.85377

E 3.50 2187.5 4.375 3 MGNRE

GA

47 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat 22.43633

N

Log 77.84866

E 3.00 1875 3.75 3 MGNRE

GA

48 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT Stop Dam NEW Lat 22.43613

N

Log 77.85076

E 7.50 4687.5 9.375 1 MGNRE

GA

49 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT Stop Dam NEW Lat 22.43162

N

Log 77.84980

E 6.50 4062.5 8.125 2 MGNRE

GA

50 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT Stop Dam NEW Lat 22.43159

N

Log 77.85140

E 6.90 4312.5 8.625 2 MGNRE

GA

51 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT Stop Dam NEW Lat 22.43374

N

Log 77.85396

E 7.50 4687.5 9.375 2 MGNRE

GA

52 KESLA

GHOGHARARAIYAT

GHOGHARARAIYAT Stop Dam NEW Lat 22.43787

N

Log 77.84344

E 6.70 4187.5 8.375 2 MGNRE

GA

53 KESLA PIPARIYAKALA AMZIRA

Pond Deepenin

g

RENOVATION Lat

22.526389 N

Log

77.873243 E 3.50 2187.5 4.375 1 MGNRE

GA

54 KESLA PIPARIYAKALA AMZIRA Stop Dam NEW Lat

22.525849 N

Log

77.870756 E 7.80 4875 9.75 2 MGNRE

GA

55 KESLA PIPARIYAKALA AMZIRA

Stop Dam Renovatio

n

RENOVATION Lat

22.532210 N

Log

77.879868 E 2.90 1812.5 3.625 3 MGNRE

GA

56 KESLA PIPARIYAKALA CHATUA

Stop Dam Renovatio

n

RENOVATION Lat

22.524059 N

Log

77.890639 E 2.20 1375 2.75 4 MGNRE

GA

57 KESLA PIPARIYAKALA CHATUA

Pond Construct

ion NEW Lat

22.523820 N

Log

77.886609 E 9.00 5625 11.25 1 MGNRE

GA

Page 102: HBAD DIP FINAL ab - pmksy.gov.in

102

58 KESLA PIPARIYAKALA NAYACHICHA

Pond Construct

ion NEW Lat 22.62970

N

Log

77.933923 E 11.0

0 6875 13.75 2 MGNREGA

59 KESLA KESLA KESLA Stop Dam NEW Lat

22.466873 N

Log

77.836204 E 7.90 4937.5 9.875 3 MGNRE

GA

60 KESLA KESLA KESLA Stop Dam NEW Lat

22.489441 N

Log

77.836174 E 6.80 4250 8.5 3 MGNRE

GA

61 KESLA KESLA KESLA

Stop Dam Renovatio

n

RENOVATION Lat

22.494263 N

Log

77.841247 E 6.90 4312.5 8.625 4 MGNRE

GA

62 KESLA KESLA KESLA Stop Dam NEW Lat 22483553

N

Log

77850959 E 8.00 5000 10 3 MGNRE

GA

63 KESLA KESLA KESLA Stop Dam NEW Lat

22.462286 N

Log

77.851788 E 7.50 4687.5 9.375 3 MGNRE

GA

64 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION lat.22.478464

N log.77.83491

2 E 1.80 1125 2.25 1 MGNRE

GA

65 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.274365 N

Log 77.51784

E 1.50 937.5 1.875 1 MGNRE

GA

66 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.452344 N

Log

77.841971E 1.60 1000 2 1 MGNRE

GA

67 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.476280 N

Log

77.877715 E 1.50 937.5 1.875 1 MGNRE

GA

68 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.449677 N

Log

77.843981 E 1.50 937.5 1.875 1 MGNRE

GA

69 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.450057 N

Log

77.842761 E 1.80 1125 2.25 1 MGNRE

GA

70 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.466209 N

Log

77.827732 E 1.40 875 1.75 2 MGNRE

GA

71 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.467630 N

Log

77.835562E 1.40 875 1.75 2 MGNRE

GA

72 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.475650 N

Log

77.840523 E 1.60 1000 2 2 MGNRE

GA

Page 103: HBAD DIP FINAL ab - pmksy.gov.in

103

73 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.468905N

Log

77.831784E 1.40 875 1.75 2 MGNRE

GA

74 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.466640 N

Log

77.845807 E 1.80 1125 2.25 2 MGNRE

GA

75 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION lat.22.471308

n log77.841375

e 1.70 1062.5 2.125 2 MGNRE

GA

76 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.478263 N

Log 77.84907

E 1.80 1125 2.25 3 MGNRE

GA

77 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.459623 N

Log

77.839451 E 1.70 1062.5 2.125 3 MGNRE

GA

78 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.481112 N

Log

77.834852 E 1.40 875 1.75 3 MGNRE

GA

79 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.475910 N

Log

77.844339 E 1.40 875 1.75 3 MGNRE

GA

80 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.462125 N

Log

77.852178 E 1.60 1000 2 3 MGNRE

GA

81 KESLA KESLA KESLA

Pond Deepenin

g

RENOVATION Lat

22.476152 N

Log

77.844894 E 1.40 875 1.75 3 MGNRE

GA

82 KESLA KESLA KESLA Stop Dam NEW Lat

22.493936 N

Log

77.838664 E 7.80 4875 9.75 4 MGNRE

GA

83 KESLA ZUNKAR ZUNKAR Stop Dam NEW Lat 22.42491

N

Log 77.89461

E 7.40 4625 9.25 4 MGNRE

GA

84 KESLA ZUNKAR ZUNKAR

Stop Dam Renovatio

n

RENOVATION Lat 22.42725

N

Log 77.89662

E 1.50 937.5 1.875 4 MGNRE

GA

85 KESLA ZUNKAR ZUNKAR Stop Dam NEW Lat 22.42540

N

Log 77.89506

E 8.70 5437.5 10.88 4 MGNRE

GA

86 KESLA ZUNKAR ZUNKAR Stop Dam NEW Lat 22.42495

N

Log 77.90147

E 7.80 4875 9.75 4 MGNRE

GA

87 KESLA ZUNKAR ZUNKAR Stop Dam NEW Lat 22.42500

N

Log 77.89253

E 9.70 6062.5 12.13 5 MGNRE

GA

Page 104: HBAD DIP FINAL ab - pmksy.gov.in

104

88 KESLA ZUNKAR DOUDI Stop Dam NEW Lat 22.44635

N

Log 77.89428

E 7.40 4625 9.25 5 MGNRE

GA

89 KESLA ZUNKAR DOUDI

Stop Dam Renovatio

n

RENOVATION Lat 22.44532

N

Log 77.89300

E 1.60 1000 2 4 MGNRE

GA

90 KESLA ZUNKAR DOUDI Stop Dam NEW Lat 22.44661

N

Log 77.89777

E 7.40 4625 9.25 5 MGNRE

GA

91 KESLA ZUNKAR DOUDI Stop Dam NEW Lat 22.44796

N

Log 77.90354

E 7.80 4875 9.75 5 MGNRE

GA

92 KESLA ZUNKAR DOUDI Stop Dam NEW Lat 22.44393

N

Log 77.90286

E 8.70 5437.5 10.88 5 MGNRE

GA

93 KESLA ZUNKAR ZUNKAR

Pond Deepenin

g

RENOVATION Lat 22.43207

N

Log 77.89792

E 4.25 2656.3 5.313 3 MGNRE

GA

94 KESLA ZUNKAR >qudj Stop Dam NEW Lat 22.83133

N

Log 77.90065

E 7.50 4687.5 9.375 3 MGNRE

GA

95 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION Lat

22.293798 N

Log

77.513574 E 1.50 937.5 1.875 4 MGNRE

GA

96 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION lat.22.293357

N log.77.51256

5E 3.50 2187.5 4.375 4 MGNRE

GA

97 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION Lat

22.487684N

Log

77.879979E 4.00 2500 5 4 MGNRE

GA

98 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION lat.22.490909

N log.77.85457

7E 4.30 2687.5 5.375 4 MGNRE

GA

99 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION Lat

22.488519N

Log

77.865131 E 4.00 2500 5 4 MGNRE

GA

100 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION Lat.

22.487801N

Log

77.862582E 2.80 1750 3.5 4 MGNRE

GA

101 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION lat.22.486166

N log.77.86357

1 2.00 1250 2.5 5 MGNRE

GA

102 KESLA MORPANI MORPANI

Pond Deepenin

g

RENOVATION Lat

22.472957 N

Log

77.895964 E 2.10 1312.5 2.625 5 MGNRE

GA

Page 105: HBAD DIP FINAL ab - pmksy.gov.in

105

103 KESLA MORPANI MANDIKHOH

Pond Deepenin

g

RENOVATION Lat

22.473578 N

Log

77.903825 E 2.50 1562.5 3.125 5 MGNRE

GA

104 KESLA MORPANI MANDIKHOH

Pond Construct

ion NEW Lat

22.473044 N

Log

77.908365 E 10.5

0 6562.5 13.13 2 MGNREGA

105 KESLA MORPANI MANDIKHOH

Pond Construct

ion NEW Lat

22.465513N

Log

77.901506 E 12.5

0 7812.5 15.63 2 MGNREGA

106 KESLA MORPANI MANDIKHOH

Pond Construct

ion NEW Lat

22.491578N

Log

77.857970 E 12.5

0 7812.5 15.63 2 MGNREGA

107 KESLA CHOKIPURA CHOKIPURA Stop Dam NEW Lat 22.40555

N

Log 77.84224

E 7.50 4687.5 9.375 3 MGNRE

GA

108 KESLA CHOKIPURA CHOKIPURA

Pond Deepenin

g

RENOVATION Lat 22.39074

N

Log 77.85127

E 5.50 3437.5 6.875 5 MGNRE

GA

109 KESLA CHOKIPURA KASDARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat 22.40968

N

Log 77.82406

E 2.80 1750 3.5 4 MGNRE

GA

110 KESLA CHOKIPURA KASDARAIYAT

Pond Deepenin

g

RENOVATION Lat 22.41541

N

Log 77.83238

E 2.50 1562.5 3.125 5 MGNRE

GA

111 KESLA CHOKIPURA KASDARAIYAT Stop Dam NEW Lat 22.40762

N

Log 77.82485

E 7.20 4500 9 3 MGNRE

GA

112 KESLA CHOKIPURA KASDARAIYAT Farm

Pond NEW Lat 22.41968 N

Log 77.83274

E 2.50 625 1.25 1 MGNRE

GA

113 KESLA CHOKIPURA KASDARAIYAT Farm

Pond NEW Lat 22.41425 N

Log 77.82845

E 2.50 625 1.25 1 MGNRE

GA

114 KESLA CHOKIPURA KASDARAIYAT

Pond Construct

ion NEW Lat 22.41309

N

Log 77.83290

E 12.3

0 7687.5 15.38 2 MGNREGA

115 KESLA CHOKIPURA CHOKIPURA

Pond Construct

ion NEW Lat 22.39417

N

Log 77.85853

E 14.5

0 9062.5 18.13 3 MGNREGA

116 KESLA CHOKIPURA KASDARAIYAT Stop Dam NEW Lat 22.41317

N

Log 77.82415

E 7.80 4875 9.75 3 MGNRE

GA

117 KESLA CHOKIPURA KASDARAIYAT Farm

Pond NEW Lat 22.41683 N

Log 77.82437

E 2.50 625 1.25 1 MGNRE

GA

Page 106: HBAD DIP FINAL ab - pmksy.gov.in

106

118 KESLA CHOKIPURA KASDARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat 22.40974

N

Log 77.83233

E 7.80 4875 9.75 4 MGNRE

GA

119 KESLA CHOKIPURA CHOKIPURA Stop Dam NEW Lat 22.38375

N

Log 77.85013

E 8.20 5125 10.25 2 MGNRE

GA

120 KESLA BHARGDA KALARIPATBAN

DI

Pond Deepenin

g

RENOVATION Lat

22.430322 N

Log

77.871219 E 2.30 1437.5 2.875 5 MGNRE

GA

121 KESLA BHARGDA PURANIBANDI

Pond Deepenin

g

RENOVATION Lat

22.426564 N

Log

77.869271 E 2.20 1375 2.75 5 MGNRE

GA

122 KESLA BHARGDA KALARIPATBAN

DI

Pond Deepenin

g

RENOVATION Lat

22.437018 N

Log

77.865681 E 2.50 1562.5 3.125 1 MGNRE

GA

123 KESLA BHARGDA KALARIPATBAN

DI Stop Dam NEW Lat 22.436133 N

Log

77.863881 E 7.80 4875 9.75 2 MGNRE

GA

124 KESLA BHARGDA BHARAGDA

Pond Construct

ion NEW Lat 22.39592

N

Log 77.86534

E 8.50 5312.5 10.63 3 MGNRE

GA

125 KESLA BHARGDA KALARIPATBAN

DI Stop Dam NEW Lat 22.430468 N

Log

77.864601 E 7.25 4531.3 9.063 2 MGNRE

GA

126 KESLA BHARGDA PURANIBANDI Stop Dam NEW Lat

22.423769 N

Log 77.85887

E 7.30 4562.5 9.125 2 MGNRE

GA

127 KESLA BHARGDA BHARAGDA

Pond Deepenin

g

RENOVATION Lat 22.39953

N

Log 77.85922

E 11.5

0 7187.5 14.38 1 MGNREGA

128 KESLA BHARGDA BHARAGDA Stop Dam NEW Lat 22.40316

N

Log 77.87230

E 8.50 5312.5 10.63 1 MGNRE

GA

129 KESLA BHARGDA BHARAGDA

Pond Deepenin

g

RENOVATION Lat 22.39463

N

Log 77.86340

E 6.50 4062.5 8.125 1 MGNRE

GA

130 KESLA BHARGDA PIPALPURA Stop Dam NEW Lat 22.41612

N

Log 77.87160

E 7.30 4562.5 9.125 1 MGNRE

GA

131 KESLA BHARGDA PIPALPURA Stop Dam NEW Lat

22.415346 N

Log

77.863995 E 7.30 4562.5 9.125 1 MGNRE

GA

132 KESLA BHARGDA RAISALPATA

Pond Deepenin

g

RENOVATION Lat

22.413022 N

Log

77.847167 E 6.50 4062.5 8.125 1 MGNRE

GA

Page 107: HBAD DIP FINAL ab - pmksy.gov.in

107

133 KESLA BHARGDA KALARIPATBAN

DI Stop Dam NEW Lat 22.434974 N

Log

77.868917 E 7.20 4500 9 2 MGNRE

GA

134 KESLA BHARGDA BHARAGDA

Pond Construct

ion NEW Lat 22.38847

N

Log 77.86918

E 13.0

0 8125 16.25 3 MGNREGA

135 KESLA BHARGDA PIPALPURA Farm

Pond NEW Lat 22.416860 N

Log 77.88080

E 2.50 625 1.25 1 MGNRE

GA

136 KESLA BHARGDA KOTMIMAL Stop Dam NEW Lat 22.40428

N

Log 77.90049

E 7.80 4875 9.75 2 MGNRE

GA

137 KESLA DANDIWADA DANDIWADA

Pond Deepenin

g

RENOVATION Lat

22.316405 N

Log

77.889883E 15.0

0 9375 18.75 1 MGNREGA

138 KESLA DANDIWADA DANDIWADA

Stop Dam Renovatio

n

RENOVATION Lat 22.31247

N

Log 77.87266

E 7.00 4375 8.75 5 MGNRE

GA

139 KESLA DANDIWADA DANDIWADA

Stop Dam Renovatio

n

RENOVATION Lat 22.30700

N

Log 77.88255

E 1.80 1125 2.25 5 MGNRE

GA

140 KESLA DANDIWADA DANDIWADA Stop Dam NEW Lat 22.30561

N

Log 77.87324

E 7.50 4687.5 9.375 2 MGNRE

GA

141 KESLA DANDIWADA DANDIWADA Stop Dam NEW Lat 22.30865

N

Log 77.87700

E 7.50 4687.5 9.375 2 MGNRE

GA

142 KESLA DANDIWADA VIRGWADI

Pond Construct

ion NEW Lat 22.31799

N

Log 77.91810

E 13.0

0 8125 16.25 3 MGNREGA

143 KESLA DANDIWADA NAYAPURA

Pond Deepenin

g

RENOVATION Lat 22.32165

N

Log 77.89502

E 5.00 3125 6.25 1 MGNRE

GA

144 KESLA DANDIWADA DANDIWADA

Pond Construct

ion NEW Lat 22.33319

N

Log 77.91689

E 9.30 5812.5 11.63 1 MGNRE

GA

145 KESLA DANDIWADA DANDIWADA Farm

Pond NEW Lat 22.33658 N

Log 77.92114

E 2.50 625 1.25 1 MGNRE

GA

146 KESLA DANDIWADA DANDIWADA Farm

Pond NEW Lat 22.33343 N

Log 77.91837

E 2.50 625 1.25 1 MGNRE

GA

147 KESLA SAHELI HIRANCHAPADA

Pond Deepenin

g

RENOVATION Lat

22.431683 N

Log

77.829893 E 3.50 2187.5 4.375 2 MGNRE

GA

Page 108: HBAD DIP FINAL ab - pmksy.gov.in

108

148 KESLA SAHELI HIRANCHAPADA

Pond Deepenin

g

RENOVATION Lat

22.430015 N

Log 77.83073

E 3.00 1875 3.75 2 MGNRE

GA

149 KESLA SADHPURA SADHPURA Stop Dam NEW Lat

22.350015 N

Log

77.746828 E 8.00 5000 10 2 MGNRE

GA

150 KESLA SADHPURA SADHPURA Farm

Pond NEW Lat 22.376542 N

Log

77.747850 E 2.30 600 1.2 1 MGNRE

GA

151 KESLA SADHPURA SADHPURA Farm

Pond NEW Lat 22.378759 N

Log

77.742799 E 2.30 600 1.2 1 MGNRE

GA

152 KESLA SADHPURA SADHPURA Farm

Pond NEW Lat 22.382492 N

Log

77.744303 E 2.30 600 1.2 1 MGNRE

GA

153 KESLA SADHPURA SADHPURA

Pond Construct

ion NEW Lat

22.378623 N

Log

77.724748 E 8.00 5000 10 4 MGNRE

GA

154 KESLA SADHPURA SADHPURA Farm

Pond NEW Lat 22.379231 N

Log

77.744362 E 2.30 600 1.2 1 MGNRE

GA

155 KESLA SADHPURA SADHPURA

Stop Dam Renovatio

n

RENOVATION Lat

22.349787 N

Log

77.745521 E 2.50 1562.5 3.125 5 MGNRE

GA

156 KESLA SADHPURA SADHPURA Stop Dam NEW Lat

22.381610 N

Log

77.736718 E 8.00 5000 10 3 MGNRE

GA

157 KESLA SADHPURA SADHPURA Stop Dam NEW Lat

22.378361 N

Log

77.743096 E 8.00 5000 10 3 MGNRE

GA

158 KESLA SADHPURA SADHPURA

Stop Dam Renovatio

n

RENOVATION Lat

22.357600 N

Log

77.743096 E 3.00 1875 3.75 5 MGNRE

GA

159 KESLA SADHPURA SADHPURA

Pond Deepenin

g

RENOVATION Lat

22.376781 N

Log

77.747504 E 3.00 1875 3.75 2 MGNRE

GA

160 KESLA SADHPURA BHOBDARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat

22.379358 N

Log

77.743856 E 3.00 1875 3.75 5 MGNRE

GA

161 KESLA SADHPURA BHOBDARAIYAT

Stop Dam Renovatio

n

RENOVATION Lat

22.376732 N

Log

77.742394 E 3.00 1875 3.75 2 MGNRE

GA

162 KESLA CHANDAKIYA CHANDAKIYA

Pond Deepenin

g

RENOVATION Lat

22.332094 N

Log

77.728062 E 3.00 1875 3.75 2 MGNRE

GA

Page 109: HBAD DIP FINAL ab - pmksy.gov.in

109

163 KESLA CHANDAKIYA CHANDAKIYA

Pond Deepenin

g

RENOVATION Lat

22.329823 N

Log

77.729062 E 2.40 1500 3 2 MGNRE

GA

164 KESLA CHANDAKIYA CHANDAKIYA

Pond Deepenin

g

RENOVATION Lat

22.332643 N

Log

77.738802 E 2.40 1500 3 2 MGNRE

GA

165 KESLA CHANDAKIYA CHANDAKIYA

Pond Deepenin

g

RENOVATION Lat

22.332478 N

Log

77.746406 E 4.00 2500 5 2 MGNRE

GA

166 KESLA CHANDAKIYA CHANDAKIYA

Pond Construct

ion NEW Lat

22.332050 N

Log

77.733515 E 9.00 5625 11.25 4 MGNRE

GA

167 KESLA CHANDAKIYA CHANDAKIYA

Pond Construct

ion NEW Lat

22.342109 N

Log

77.743807 E 10.0

0 6250 12.5 4 MGNREGA

168 KESLA CHANDAKIYA CHANDAKIYA

Pond Construct

ion NEW Lat

22.339950 N

Log

77.745664 E 8.00 5000 10 5 MGNRE

GA

169 KESLA CHANDAKIYA CHANDAKIYA Stop Dam NEW Lat

22.352564 N

Log

77.732535 E 8.00 5000 10 3 MGNRE

GA

170 KESLA CHANDAKIYA CHANDAKIYA

Pond Construct

ion NEW Lat

22.330433 N

Log

77.734440 E 8.00 5000 10 5 MGNRE

GA

171 KESLA CHANDAKIYA CHANDAKIYA

Pond Deepenin

g

RENOVATION Lat

22.334186 N

Log

77.744536 E 3.00 1875 3.75 3 MGNRE

GA

172 KESLA CHANDAKIYA CHANDAKIYA Stop Dam NEW Lat

22.333640 N

Log

77.737207 E 8.00 5000 10 3 MGNRE

GA

173 KESLA CHANDAKIYA CHANDAKIYA Stop Dam NEW Lat

22.346411 N

Log

77.725251 E 8.00 5000 10 3 MGNRE

GA

174 KESLA CHANDAKIYA CHANDAKIYA

Stop Dam Renovatio

n

RENOVATION Lat

22.354110 N

Log

77.733770 E 3.00 1875 3.75 2 MGNRE

GA

175 KESLA CHANDAKIYA CHANDAKIYA

Stop Dam Renovatio

n

RENOVATION Lat

22.344494 N

Log

77.725344 E 4.50 2812.5 5.625 2 MGNRE

GA

176 KESLA CHANDAKIYA CHANDAKIYA Stop Dam NEW Lat

22.335333 N

Log

77.729861 E 8.50 5312.5 10.63 4 MGNRE

GA

177 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Pond Deepenin

g

RENOVATION Lat

22.395274 N

Log

77.725895 E 2.50 1562.5 3.125 3 MGNRE

GA

Page 110: HBAD DIP FINAL ab - pmksy.gov.in

110

178 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Pond Deepenin

g

RENOVATION Lat

22.384256 N

Log

77.735475 E 2.50 1562.5 3.125 3 MGNRE

GA

179 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Pond Deepenin

g

RENOVATION Lat

22.400480 N

Log

77.720119 E 2.50 1562.5 3.125 3 MGNRE

GA

180 KESLA

PIPARIYAKHURD PIPARIYAKHURD Stop Dam NEW Lat

22.394628 N

Log

77.728691 E 9.80 6125 12.25 4 MGNRE

GA

181 KESLA

PIPARIYAKHURD PIPARIYAKHURD Stop Dam NEW Lat

22.394631 N

Log

77.731569 E 8.90 5562.5 11.13 4 MGNRE

GA

182 KESLA

PIPARIYAKHURD PIPARIYAKHURD Stop Dam NEW Lat

22.385440 N

Log

77.741785 E 9.50 5937.5 11.88 4 MGNRE

GA

183 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Pond Deepenin

g

RENOVATION Lat

22.397469 N

Log

77.727322 E 3.00 1875 3.75 3 MGNRE

GA

184 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Pond Deepenin

g

RENOVATION Lat

22.407388 N

Log

77.727322 E 3.00 1875 3.75 3 MGNRE

GA

185 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Pond Deepenin

g

RENOVATION Lat

22.406989 N

Log

77.741818 E 3.00 1875 3.75 3 MGNRE

GA

186 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Pond Construct

ion NEW Lat

22.406763 N

Log

77.739521 E 10.0

0 6250 12.5 5 MGNREGA

187 KESLA

PIPARIYAKHURD PIPARIYAKHURD

Well Deepenin

g

RENOVATION

0.50 312.5 0.625 1 MGNREGA

188 KESLA CHITAPURA CHICHWANI

Pond Deepenin

g

RENOVATION Lat

22.357732 N

Log

77.715942 E 5.00 3125 6.25 3 MGNRE

GA

189 KESLA CHITAPURA CHICHWANI

Pond Deepenin

g

RENOVATION Lat

22.360029 N

Log

77.706938 E 1.50 937.5 1.875 3 MGNRE

GA

190 KESLA CHITAPURA CHICHWANI

Pond Deepenin

g

RENOVATION Lat

22.362381 N

Log

77.711228 E 1.50 937.5 1.875 4 MGNRE

GA

191 KESLA CHITAPURA CHICHWANI

Pond Deepenin

g

RENOVATION Lat

22.363202 N

Log

77.710712 E 1.50 937.5 1.875 4 MGNRE

GA

192 KESLA CHITAPURA CHICHWANI

Pond Deepenin

g

RENOVATION Lat

22.362758 N

Log

77.707562 E 1.50 937.5 1.875 4 MGNRE

GA

Page 111: HBAD DIP FINAL ab - pmksy.gov.in

111

193 KESLA CHITAPURA CHICHWANI Stop Dam NEW Lat

22.353035 N

Log

77.706870 E 8.00 5000 10 4 MGNRE

GA

194 KESLA CHITAPURA CHICHWANI Stop Dam NEW Lat

22.362970 N

Log

77.704424 E 8.00 5000 10 4 MGNRE

GA

195 KESLA CHITAPURA CHICHWANI

Pond Construct

ion NEW Lat

22.360556 N

Log

77.710511 E 5.00 3125 6.25 5 MGNRE

GA

196 KESLA CHITAPURA CHITAPURA

Pond Deepenin

g

RENOVATION Lat

22.360263 N

Log

77.716570 E 1.50 937.5 1.875 4 MGNRE

GA

197 KESLA CHITAPURA CHITAPURA

Well Deepenin

g

RENOVATION Lat

22.363239 N

Log

77.725722 E 0.20 125 0.25 1 MGNRE

GA

198 KESLA CHITAPURA CHITAPURA

Well Deepenin

g

RENOVATION Lat

22.363239 N

Log

77.725722 E 0.20 125 0.25 1 MGNRE

GA

199 KESLA SANKHEDA SANKHEDA

Pond Deepenin

g

RENOVATION

5.00 3125 6.25 3 MGNREGA

200 KESLA PANDRI eksgyk Stop Dam NEW

12.0

0 7500 15 4 MGNREGA

201 KESLA KOHDA KOHDA

Pond Construct

ion NEW Lat

22.429714 N

Log

77.742875 E 10.0

0 6250 12.5 5 MGNREGA

202 KESLA KOHDA KOHDA

Pond Deepenin

g

RENOVATION Lat

22.422810 N

Log

77.744477 E 3.00 1875 3.75 3 MGNRE

GA

203 KESLA KOHDA KOHDA Stop Dam NEW Lat

22.427658 N

Log

77.748890 E 8.00 5000 10 1 MGNRE

GA

204 KESLA KOHDA KOHDA

Pond Construct

ion NEW Lat

22.427180 N

Log

77.747679 E 5.00 1100 2.2 1 MGNRE

GA

205 KESLA KOHDA KOHDA

Pond Deepenin

g

RENOVATION Lat

22.425148 N

Log

77.747257 E 2.50 1562.5 3.125 3 MGNRE

GA

206 KESLA KOHDA KOHDA

Pond Deepenin

g

RENOVATION Lat

22.425855 N

Log

77.744791 E 2.50 1562.5 3.125 3 MGNRE

GA

207 KESLA KOHDA KOHDA

Pond Deepenin

g

RENOVATION Lat

22.431380 N

Log

77.740818 E 2.50 1562.5 3.125 4 MGNRE

GA

Page 112: HBAD DIP FINAL ab - pmksy.gov.in

112

208 KESLA KOHDA KOHDA

Pond Deepenin

g

RENOVATION Lat

22.426881 N

Log

77.742590 E 2.50 1562.5 3.125 4 MGNRE

GA

209 KESLA KOHDA KOHDA

Pond Deepenin

g

RENOVATION Lat

22.427548 N

Log

77.740211 E 2.50 1562.5 3.125 4 MGNRE

GA

210 KESLA KOHDA KOHDA

Pond Deepenin

g

RENOVATION Lat

22.425323 N

Log

77.740589 E 2.50 1562.5 3.125 4 MGNRE

GA

211 KESLA KOHDA RANZI

Stop Dam Renovatio

n

RENOVATION Lat

22.427408 N

Log

77.690385 E 3.00 1875 3.75 2 MGNRE

GA

212 KESLA KOHDA RANZI

Pond Construct

ion NEW Lat

22.426329 N

Log

77.690825 E 8.00 5000 10 1 MGNRE

GA

213 KESLA KOHDA RANZI

Pond Deepenin

g

RENOVATION Lat

22.428995 N

Log

77.687359 E 2.50 1562.5 3.125 4 MGNRE

GA

214 KESLA KOHDA RANZI Stop Dam NEW Lat

22.428612 N

Log

77.686975 E 8.00 5000 10 1 MGNRE

GA

215 KESLA KOHDA RANZI

Pond Construct

ion NEW Lat

22.438582 N

Log

77.685734 E 8.00 5000 10 1 MGNRE

GA

216 KESLA KOHDA RANZI

Pond Deepenin

g

RENOVATION Lat

22.436574 N

Log

77.701084 E 2.50 1562.5 3.125 5 MGNRE

GA

217 KESLA KOHDA RANZI

Pond Deepenin

g

RENOVATION Lat

22.431148 N

Log

77.704362 E 2.50 1562.5 3.125 5 MGNRE

GA

218 KESLA KOHDA BHATNA

Pond Deepenin

g

RENOVATION Lat

22.436302 N

Log

77.711442 E 3.00 1875 3.75 5 MGNRE

GA

219 KESLA KOHDA BHATNA

Pond Deepenin

g

RENOVATION Lat

22.433917 N

Log

77.712271 E 2.50 1562.5 3.125 5 MGNRE

GA

220 KESLA KOHDA BHATNA

Pond Deepenin

g

RENOVATION Lat

22.434875 N

Log

77.415254 E 3.00 1875 3.75 5 MGNRE

GA

221 KESLA KOHDA LALPANI

Pond Deepenin

g

RENOVATION Lat

22.445524 N

Log

77.743879 E 2.50 1562.5 3.125 3 MGNRE

GA

222 KESLA KOHDA LALPANI

Pond Deepenin

g

RENOVATION Lat

22.447734 N

Log

77.742852 E 2.50 1562.5 3.125 3 MGNRE

GA

Page 113: HBAD DIP FINAL ab - pmksy.gov.in

113

223 KESLA KOHDA LALPANI

Pond Deepenin

g

RENOVATION Lat

22.450104 N

Log

77.740461 E 2.50 1562.5 3.125 3 MGNRE

GA

224 KESLA KOHDA LALPANI

Pond Deepenin

g

RENOVATION Lat

22.423316 N

Log

77.746214 E 2.50 1562.5 3.125 3 MGNRE

GA

225 KESLA CHARTEKRA CHARTEKRA

Pond Deepenin

g

RENOVATION Lat

22.402235 N

Log

77.807852 E 1.75 1093.8 2.188 3 MGNRE

GA

226 KESLA CHARTEKRA CHARTEKRA

Pond Deepenin

g

RENOVATION Lat

22.399926 N

Log

77.808081 E 2.40 1500 3 3 MGNRE

GA

227 KESLA CHARTEKRA CHARTEKRA

Pond Deepenin

g

RENOVATION Lat

22.397750 N

Log

77.806518 E 2.20 1375 2.75 3 MGNRE

GA

228 KESLA CHARTEKRA CHARTEKRA

Pond Deepenin

g

RENOVATION Lat

22.398087 N

Log

77.868954 E 2.20 1375 2.75 3 MGNRE

GA

229 KESLA CHARTEKRA CHARTEKRA

Stop Dam Renovatio

n

RENOVATION Lat

22.387565 N

Log

77.808947 E 2.50 1562.5 3.125 3 MGNRE

GA

230 KESLA CHARTEKRA KASDAKHURD

Pond Deepenin

g

RENOVATION Lat

22.430429 N

Log

77.809866 E 2.50 1562.5 3.125 2 MGNRE

GA

231 KESLA CHARTEKRA KASDAKHURD

Pond Deepenin

g

RENOVATION Lat

22.435353 N

Log

77.812444 E 1.80 1125 2.25 2 MGNRE

GA

232 KESLA CHARTEKRA BIZADABAR Stop Dam NEW Lat

22.387565 N

Log

77.808947 E 8.00 5000 10 1 MGNRE

GA

233 KESLA CHARTEKRA KASDAKHURD

Pond Deepenin

g

RENOVATION Lat

22.434404 N

Log

77.815066 E 2.40 1500 3 2 MGNRE

GA

234 KESLA CHARTEKRA KASDAKHURD

Pond Deepenin

g

RENOVATION Lat

22.441397 N

Log

77.821010 E 6.00 3750 7.5 2 MGNRE

GA

235 KESLA CHARTEKRA KASDAKHURD

Pond Construct

ion NEW Lat

22.429615 N

Log

77.813688 E 2.30 1437.5 2.875 1 MGNRE

GA

236 KESLA CHARTEKRA CHARTEKRA Farm

Pond NEW Lat 22.398311 N

Log

77.805810 E 2.30 600 1.2 1 MGNRE

GA

237 KESLA CHARTEKRA KASDAKHURD Farm

Pond NEW Lat 22.411941 N

Log

77.813461 E 2.30 600 1.2 1 MGNRE

GA

Page 114: HBAD DIP FINAL ab - pmksy.gov.in

114

238 KESLA MORPANI MORPANI

Pond Construct

ion NEW lat.22.292579

N log.77.51162

3E 8.90 5562.5 11.13 1 MGNRE

GA

239 KESLA MORPANI MORPANI

Pond Construct

ion NEW lat.22.29784

N log.77.51519

E 8.40 5250 10.5 2 MGNRE

GA

240 KESLA MORPANI MORPANI

Pond Construct

ion NEW lat.22.491578

N log.77.51286

9E 9.00 5625 11.25 2 MGNRE

GA

241 KESLA JUZHARPUR JUZHARPUR Stop Dam NEW

7.80 4875 9.75 1 MGNRE

GA

242 KESLA JUZHARPUR JUZHARPUR Stop Dam NEW

7.60 4750 9.5 1 MGNRE

GA

243 KESLA JUZHARPUR JUZHARPUR Stop Dam NEW

7.60 4750 9.5 1 MGNRE

GA

244 KESLA JUZHARPUR JUZHARPUR Stop Dam NEW

7.50 4687.5 9.375 2 MGNRE

GA

245 KESLA JUZHARPUR JUZHARPUR Stop Dam NEW

7.98 4987.5 9.975 2 MGNRE

GA

246 KESLA KALAAKHAR NAYAKHAKHRA

PURA

Pond Deepenin

g

RENOVATION lat.22.355899

N log.77.82961

6 E 3.00 1875 3.75 2 MGNRE

GA

247 KESLA KALAAKHAR NAYAKHAKHRA

PURA

Pond Deepenin

g

RENOVATION lat.22.357933

N log.77.83395

6 E 2.50 1562.5 3.125 2 MGNRE

GA

248 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.368584

N log.77.83172

1 E 5.00 3125 6.25 2 MGNRE

GA

249 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.367583

N log.77.83058

1 E 1.50 937.5 1.875 1 MGNRE

GA

250 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.368440

N

log.77.82975

5 E 1.50 937.5 1.875 1 MGNRE

GA

251 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.369727

N log.77.82298

9 E 3.00 1875 3.75 1 MGNRE

GA

252 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.381720

N log.77.82212

8 E 2.00 1250 2.5 1 MGNRE

GA

253 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.381344

N log.77.82093

2 E 2.00 1250 2.5 1 MGNRE

GA

Page 115: HBAD DIP FINAL ab - pmksy.gov.in

115

254 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.376700

N log.77.82753

8 E 2.00 1250 2.5 2 MGNRE

GA

255 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.377452

N log.77.82727

2 E 2.00 1250 2.5 2 MGNRE

GA

256 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.373644

N log.77.82824

2 E 5.00 3125 6.25 2 MGNRE

GA

257 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.373758

N log.77.82821

9 E 2.00 1250 2.5 2 MGNRE

GA

258 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.370464

N log.77.81857

7 E 2.00 1250 2.5 2 MGNRE

GA

259 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.365005

N log.77.82403

7 E 3.00 1875 3.75 2 MGNRE

GA

260 KESLA KALAAKHAR KALAAKHAR

Pond Deepenin

g

RENOVATION lat.22.366940

N log.77.83135

0 E 2.00 1250 2.5 2 MGNRE

GA

261 KESLA KALAAKHAR ZIRNAPURA Stop Dam NEW lat.22.363398

N log.77.83456

9 E 12.0

0 7500 15 2 MGNREGA

262 KESLA KALAAKHAR JAMUNDHOL

Pond Deepenin

g

RENOVATION lat.22.368475

N log.77.81047

2 E 15.0

0 9375 18.75 2 MGNREGA

263 KESLA DHURPAN DHURPAN

Pond Construct

ion NEW Lat

22.576634 N

Log

77.421111 E 15.0

0 9375 18.75 2 MGNREGA

264 KESLA BABAIKHURD BABAIKHURD

Pond Construct

ion NEW Lat

22.546812N

Log

77.730294 E 11.5

0 7187.5 14.38 2 MGNREGA

265 KESLA NAYAGAON NAYAGAON

Pond Deepenin

g

RENOVATION Lat

22.571684N

Log

77.705417 E 4.50 2812.5 5.625 2 MGNRE

GA

266 KESLA BHATTI BHATTI

Pond Deepenin

g

RENOVATION Lat

22.562531 N

Log

77.695344 E 1.70 1062.5 2.125 2 MGNRE

GA

267 KESLA JAMANI JAMANI

Pond Deepenin

g

RENOVATION

Lat 22.5521906

N Log

77.710462E

Log

77.710462E

2.30 1437.5 2.875 2 MGNREGA

268 KESLA TIKHAD TIKHAD

Pond Construct

ion NEW Lat

22.537456 N

Log

77.682636E 15 9375 18.75 2 MGNRE

GA

Page 116: HBAD DIP FINAL ab - pmksy.gov.in

116

269 KESLA TAGNA AMADA

Pond Construct

ion NEW Lat

22.484401N

Log

77.675407E 25 15625 31.25 2 MGNRE

GA

270 KESLA MALOTHAR MALOTHAR Stop Dam NEW Lat

22.513146 N

Log

77.666160E 5 3125 6.25 2 MGNRE

GA

271 KESLA MALOTHAR MALOTHAR Stop Dam NEW Lat

22.509960 N

Log

77.668128E 5 3125 6.25 2 MGNRE

GA

272 KESLA MALOTHAR MALOTHAR

Pond Construct

ion NEW Lat

22.509364 N

Log

77.670281E 15.0

0 600 1.2 3 MGNREGA

273 KESLA MALOTHAR BANDRI

Pond Construct

ion NEW Lat

22.486554 N

Log

77.646533E 5 3125 6.25 3 MGNRE

GA

274 KESLA MALOTHAR PARCHHA

Pond Construct

ion NEW Lat

22.482366 N

Log

77.652158E 10 6250 12.5 3 MGNRE

GA

275 KESLA MALOTHAR PARCHHA Stop Dam NEW Lat

22.483034N

Log

77.656249E 25 15625 31.25 3 MGNRE

GA

276 KESLA DOBITALPURA AMADA

Pond Deepenin

g

RENOVATION Lat

22.521033N

Log

77.413004E 5 3125 6.25 3 MGNRE

GA

277 KESLA MARODA MARODA Stop Dam NEW

8.35 5218.8 10.44 3 MGNRE

GA

278 KESLA MARODA MARODA

Well Deepenin

g

RENOVATION

0.3 187.5 0.375 1 MGNREGA

279 KESLA MARODA MARODA

Well Deepenin

g

RENOVATION

0.35 218.75 0.438 1 MGNREGA

280 KESLA MARODA GUWADI

Well Deepenin

g

RENOVATION

0.4 250 0.5 1 MGNREGA

281 KESLA BICHUA BICHUA Stop Dam NEW

7.5 4687.5 9.375 3 MGNRE

GA

282 KESLA BICHUA BICHUA

Well Deepenin

g

RENOVATION

0.4 250 0.5 1 MGNREGA

283 KESLA BICHUA BICHUA

Well Deepenin

g

RENOVATION

0.5 312.5 0.625 1 MGNREGA

284 KESLA GAJPUR GAJPUR Well

DeepeninRENOVATIO

N 0.45 281.25 0.563 1 MGNRE

GA

Page 117: HBAD DIP FINAL ab - pmksy.gov.in

117

g

285 KESLA GAJPUR GAJPUR

Well Deepenin

g

RENOVATION

0.38 237.5 0.475 1 MGNREGA

286 KESLA GAJPUR GAJPUR

Well Deepenin

g

RENOVATION

0.55 343.75 0.688 1 MGNREGA

287 KESLA GAJPUR GAJPUR

Well Deepenin

g

RENOVATION

0.48 300 0.6 1 MGNREGA

288 KESLA GAJPUR GAJPUR

Well Deepenin

g

RENOVATION

0.57 356.25 0.713 1 MGNREGA

289 KESLA GAJPUR GAJPUR

Well Deepenin

g

RENOVATION

0.42 262.5 0.525 1 MGNREGA

290 KESLA GAJPUR GAJPUR Stop Dam NEW

7.7 4812.5 9.625 3 MGNRE

GA

291 KESLA BELAWADA BELAWADA Stop Dam NEW

7.8 4875 9.75 3 MGNRE

GA

292 KESLA BELAWADA BELAWADA

Well Deepenin

g

RENOVATION

0.38 237.5 0.475 1 MGNREGA

293 KESLA BHATTI BHATTI Stop Dam NEW

9.5 5937.5 11.88 2 MGNRE

GA

294 KESLA BHATTI BHATTI Stop Dam NEW

8 5000 10 2 MGNRE

GA

295 KESLA BHATTI BHATTI

Well Deepenin

g

RENOVATION

0.35 218.75 0.438 1 MGNREGA

296 KESLA BHATTI BHATTI

Well Deepenin

g

RENOVATION

0.35 218.75 0.438 1 MGNREGA

297 KESLA BHATTI BHATTI

Well Deepenin

g

RENOVATION

0.35 218.75 0.438 1 MGNREGA

298 KESLA BHATTI BHATTI

Well Deepenin

g

RENOVATION

0.35 218.75 0.438 1 MGNREGA

299 KESLA PIPALDHANA PIPALDHANA

Well Deepenin

g

RENOVATION

0.2 125 0.25 1 MGNREGA

Page 118: HBAD DIP FINAL ab - pmksy.gov.in

118

300 KESLA PIPALDHANA PIPALDHANA

Well Deepenin

g

RENOVATION

0.2 125 0.25 1 MGNREGA

301 KESLA PIPALDHANA PIPALDHANA

Well Deepenin

g

RENOVATION

0.2 125 0.25 1 MGNREGA

302 KESLA PIPALDHANA PIPALDHANA

Pond Construct

ion NEW

9 5625 11.25 3 MGNRE

GA

303 KESLA

GOCHITARONDA GOCHITARONDA Stop Dam NEW Lat

22.585385N

Log

77.757804E 15 9375 18.75 2 MGNRE

GA

304 KESLA

GOCHITARONDA GOCHITARONDA

Well Deepenin

g

RENOVATION

0.25 156.25 0.313 1 MGNREGA

305 KESLA DHURPAN DHURPAN

Well Deepenin

g

RENOVATION

0.35 218.75 0.438 1 MGNREGA

306 KESLA DHURPAN DHURPAN

Well Deepenin

g

RENOVATION

0.30 187.5 0.375 1 MGNREGA

307 KESLA JAMANI JAMANI

Well Deepenin

g

RENOVATION

0.20 125 0.25 1 MGNREGA

308 KESLA JAMANI JAMANI

Well Deepenin

g

RENOVATION

0.25 156.25 0.313 1 MGNREGA

PRADHANMANTRI KRISHI SINCAHI YOJNA DISTRICT HOSHANGABAD

IWMP II KESLA

S.No. Name of

Block

Village Panchayat

Village Name

Name of Work Type Of Structure New/ Renovation

Co-ordinates Khasra No.

Total Cost In

Lakh

Storage Capacit

y In Cum

Irrigation

Potential In Ha.

Year of Implementatio

n

Scheme

Name Latitude Longitude

1 KESL

A SEMRI KHURD

SEMRI KHURD STOP DAM NEW 22°33'16.56

'' 77°39'10.51''

512 5.36000 6000 6 FIRST YEAR

IWMP

2 KESL

A SEMRI KHURD

SEMRI KHURD STOP DAM NEW 22°34'26.72

'' 77°39'16.37''

323 5.65000 6000 6 FIRST YEAR

IWMP

3 KESL

A SEMRI KHURD

SEMRI KHURD STOP DAM NEW 22°34'30.61

'' 77°39'29.22''

217 6.35000 6000 6 FIRST YEAR

IWMP

Page 119: HBAD DIP FINAL ab - pmksy.gov.in

119

4 KESL

A SEMRI KHURD

SEMRI KHURD STOP DAM NEW 22°34'09.31

'' 77°39'51.42''

392 4.98000 5000 5 FIRST YEAR

IWMP

5 KESL

A SEMRI KHURD

SEMRI KHURD STOP DAM NEW 22°33'52.06

'' 77°38'53.95''

345 5.20000 5000 5 FIRST YEAR

IWMP

6 KESL

A SEMRI KHURD

SEMRI KHURD GABION NEW 22°33'52.42

'' 77°38'54.20''

395 4.81000 8000 8 FIRST YEAR

IWMP

7 KESL

A MALOTHAR PARCHA STOP DAM NEW 22°29'06.15''

77°39'44.46''

103 4.41000

4500 4.5 FIRST YEAR

IWMP

8 KESL

A MALOTHAR PARCHA EARTHEN DAM NEW 22°28'46.51

'' 77°39'49.22''

158 4.2600 4500 4.5 FIRST YEAR IWMP

9 KESLA

DOBI TALPURA

DOBI TALPURA STOP DAM NEW

22°30'40.51''

77°41'29.27''

27 4.97000

4500 4.5 FIRST YEAR

IWMP

10 KESL

A DOBI

TALPURA DOBI

TALPURA STOP DAM NEW 22°31'18.14''

77°40'45.01''

117 4.92000

4000 4 FIRST YEAR

IWMP

11 KESL

A JAMANI JAMANI STOP DAM NEW 22°32'02.01''

77°43'03.10''

145 4.09000

4500 5 FIRST YEAR

IWMP

12 KESL

A JAMANI JAMANI STOP DAM NEW 22°32'51.09''

77°42'40.69''

157/1 4.97000

5000 5 FIRST YEAR

IWMP

13 KESL

A JAMANI JAMANI STOP DAM NEW 22°31'21.84''

77°42'47.61''

292/1 4.90000

4500 5 FIRST YEAR

IWMP

14 KESL

A JAMANI JAMANI STOP DAM NEW 22°32'15.83''

77°41'57.54''

442 4.90000

5000 5 FIRST YEAR

IWMP

15 KESL

A JAMANI JAMANI STOP DAM NEW 22°32'32.94''

77°43'05.41''

289 4.98000

4500 5 FIRST YEAR

IWMP

16 KESL

A JAMANI JAMANI STOP DAM NEW 22°32'53.07''

77°41'38.71''

246 5.20000

6500 7 FIRST YEAR

IWMP

17 KESL

A JAMANI JAMANI GABION NEW 22°31'21.91''

77°42'02.21''

396 5.22000

8000 8 FIRST YEAR

IWMP

18 KESL

A JAMANI JAMANI CHECK DAM NEW 22°30'12.73''

77°43'27.43''

28 5.06000

6500 6 FIRST YEAR

IWMP

19 KESL

A JAMANI JAMANI CHECK DAM NEW 22°30'19.38''

77°43'14.59''

8 5.10000

6000 6 FIRST YEAR

IWMP 20 KESL

A JAMANI JAMANI GABION NEW 22°30'08.38''

77°43'26.26''

8 4.81000

8000 8 FIRST YEAR

IWMP 21 KESL

A JAMANI JAMANI GABION NEW 22°30'11.17''

77°43'30.85''

28 5.01000

6000 6 FIRST YEAR

IWMP 22 KESL

A JAMANI JAMANI CHECK DAM NEW 22°32'24.63''

77°43'07.28''

109 4.98000

6000 6 FIRST YEAR

IWMP

Page 120: HBAD DIP FINAL ab - pmksy.gov.in

120

23 KESLA JAMANI JAMANI CHECK DAM NEW

22°30'41.14''

77°43'18.81''

28 4.94000

4000 4 FIRST YEAR

IWMP

PRADHANMANTRI KRISHI SINCAHI YOJNA DISTRICT HOSHANGABAD IWMP III KESLA

S.No.

Name of

Block

Village Panchaya

t

Village Name Name of Work

Type Of Structure

New/ Renovatio

n

Co-ordinates Khasra No. Total Cost In

Lakh

Storage Capacit

y In Cum

Irrigation

Potential In Ha.

Year of Implementati

on

Scheme

Name Latitude Longitude

1 KESL

A TANGNA TANGNA STOP DAM NEW 22°30'20.32''

77°40'32.48''

83 5.88160 4800 5.0 FIRST YEAR

IWMP

2 KESL

A TANGNA TANGNA STOP DAM NEW 22°29'49.11''

77°41'00.27''

93 4.97400 4400 5.0 FIRST YEAR

IWMP

3 KESL

A TANGNA TANGNA CHECK DAM NEW 22°30'10.0

4'' 77°40'39.55''

83 4.98000 4500 5.0 FIRST YEAR

IWMP

4 KESL

A TANGNA TANGNA EARTHEN DAM NEW 22°29'22.7

8'' 77°41'00.09''

199 5.9800 4500 4.5 FIRST YEAR IWMP

5 KESL

A TANGNA KASDA KAL EARTHEN DAM NEW 22°28'50.2

6'' 77°40'47.81''

4 5.6800 4400 4.0 FIRST YEAR IWMP

6 KESL

A TEEKHA

D TEEKHAD STOP DAM NEW 22°32'38.49''

77°39'57.82''

5 4.99440 6500 7 FIRST YEAR

IWMP

7 KESL

A TEEKHA

D TEEKHAD STOP DAM NEW 22°33'38.42''

77°39'42.62''

78 4.96000 6500 7 FIRST YEAR

IWMP

8 KESL

A

DOBI TALPUR

A KHATAMA STOP DAM NEW 22°29'41.4

2'' 77°42'25.37''

94 4.27000 3800 4 FIRST YEAR

IWMP 9 KESL

A DOBI

TALPURA

KHATAMA STOP DAM NEW 22°29'46.57''

77°42'21.21'' 94 4.6000

0 3500 4 FIRST YEAR IWMP

10 KESL

A

DOBI TALPUR

A KHATAMA STOP DAM NEW 22°29'49.7

8'' 77°42'20.02''

94 4.38620 3800 4 FIRST YEAR

IWMP

11 KESL

A

DOBI TALPUR

A KHATAMA STOP DAM NEW 22°29'52.5

5'' 77°42'13.14''

94 4.97500 4100 4 FIRST YEAR

IWMP

12 KESL

A DHABA KALA DHABA KALA STOP DAM NEW 22°31'41.2

2'' 77°38'57.42''

207 6.26760 7000 7 FIRST YEAR

IWMP

Page 121: HBAD DIP FINAL ab - pmksy.gov.in

121

13 KESL

A DHABA KALA DHABA KALA STOP DAM NEW 22°31'49.5

1'' 77°38'54.12''

3 2.64000 4000 4.0 FIRST YEAR

IWMP

14 KESL

A DHABA KHURD DHURGADA STOP DAM NEW 22°33'07.1

3'' 77°40'08.94''

563 3.20000 4500 4.5 FIRST YEAR

IWMP

15 KESL

A DHABA KHURD DHURGADA STOP DAM NEW 22°33'14.2

4'' 77°40'13.77''

333 4.92000 5800 6 FIRST YEAR

IWMP

16 KESL

A DHABA KHURD DHURGADA STOP DAM NEW 22°33'18.1

4'' 77°40'11.57''

443 6.32120 7000 7 FIRST YEAR

IWMP

17 KESL

A DHABA KHURD DHURGADA STOP DAM NEW 22°33'14.2

1'' 77°39'48.52''

461 6.30000 6.5 7 FIRST YEAR

IWMP

18 KESL

A DHABA KHURD

DHABA KHURD STOP DAM NEW 22°32'52.0

4'' 77°38'30.38''

145 4.99500 4500 4.5 FIRST YEAR

IWMP

19 KESL

A DHABA KHURD

DHABA KHURD STOP DAM NEW 22°33'00.9

4'' 77°38'13.58''

68 4.51000 3400 4.0 FIRST YEAR

IWMP 20 KESL

A DHABA KHURD

DHABA KHURD

CHECK DAM NEW

22°33'01.95''

77°38'10.59'' 68 4.1086

0 3500 4.0 FIRST YEAR IWMP

21 KESLA

DHABA KHURD

DHABA KHURD GABION NEW

22°34'03.09''

77°38'48.68'' 162 2.0700

0 4000 4.0 FIRST YEAR IWMP

22 KESLA

DHABA KALA PATLAI KAL STOP DAM NEW

22°32'06.94''

77°37'05.17'' 665 4.9000

0 4500 4.5 FIRST YEAR IWMP

23 KESLA

DHABA KALA PATLAI KAL GABION NEW

22°32'51.67''

77°37'05.80'' 125 4.3940

0 6000 6.0 FIRST YEAR IWMP

24 KESL

A KOHDA RANJHI/BHATNA

EARTHEN DAM NEW 22°25'50.1

0'' 77°42'34.96''

BHATNA/RF/164 2.6200 2500 3.0 FIRST YEAR IWMP

25 KESL

A KOHDA RANJHI/BHATNA

EARTHEN DAM NEW 22°25'54.6

1'' 77°42'48.62''

BHATNA/RF/164 2.5260 2500 3.0 FIRST YEAR IWMP

26 KESL

A KOHDA RANJHI/BHATNA

CHECK DAM NEW 22°24'52.4

1'' 77°41'43.61'' RAnjhi/RF/168 2.2600 2500 3.0 FIRST YEAR IWMP

PRADHANMANTRI KRISHI SINCAHI YOJNA DISTRICT HOSHANGABAD IWMP KESLA 4

S.No.

Name of Bloc

k

Village Panchayat

Village Name

Name of Work Type Of Structure New/ Renovation

Co-ordinates Khasra No.

Total Cost In

Lakh

Storage Capacit

y In Cum

Irrigation

Potential In Ha.

Year of Implementatio

n

Scheme

Name Latitude Longitude

1 Kesla Pipaldhana Nazarpur Check Dam New

22°32'11.81"

N

77°46'21.83"E 127 5.0000

0 5300 5 Frist Year IWMP

Page 122: HBAD DIP FINAL ab - pmksy.gov.in

122

2 Kesla Pipaldhana Nazarpur Stop Dam New

22°32'36.99"

N

77°46'22.04"E 65 6.0000

0 4800 4 Second Year IWMP

3 Kesla Pipaldhana Nazarpur Check Dam New 22°32'7.11"N 77°45'20.40"E 160 3.8500

0 5500 4 Second Year IWMP

4 Kesla Pipaldhana Nazarpur Check Dam New

22°32'13.18"

N

77°45'14.32"E 160 5.0000

0 5500 4 Thired Year IWMP

5 Kesla Pipaldhana Nazarpur Stop Dam New

22°32'53.51"

N

77°45'44.45"E 57 3.7500 4200 4

Fourth Year IWMP

6 Kesla Pipaldhana Nazarpur Tank New 22°32'4.59"N 77°46'1.95"E 162/1,153 6.0000 5300 3 Thired Year IWMP

7 Kesla Pipaldhana Nazarpur Parcolation

Tank New

22°32'18.01"N

77°46'12.62"E 137 4.1800

0 4800 3 Fourth Year IWMP

8 Kesla Dehri Chirpani Check Dam New

22°33'31.39"

N

77°45'42.97"E 65 5.3600

0 5500 5 Frist Year IWMP

9 Kesla Dehri Chirpani Check Dam New

22°33'40.41"

N

78°33'40.41"

N 65 4.4200

0 4200 4 Second Year IWMP

10 Kesla Dehri Chirpani Stop Dam New

22°33'47.35"

N

77°45'57.95"E 65 4.2000

0 5300 5 Thired Year IWMP

11 Kesla Dehri Chirpani Stop Dam New

22°33'25.11"

N 77°46'10.38"E 171 3.4000

0 4800 6 Second Year IWMP

12 Kesla Pandukhedi Kirtpur Check Dam New 22°32'50.12"N 77°48'36.91"E 14 6.0000

0 5500 5 Frist Year IWMP

13 Kesla Pandukhedi Kirtpur Stop Dam New

22°32'40.01"

N 77°48'29.54"E 14 5.0000

0 4200 5 Thired Year IWMP

14 Kesla Pandukhedi Kirtpur Check Dam New 22°32'47.95"N 77°48'13.99"E 130 4.2800

0 5300 4 Second Year IWMP

15 Kesla Pandukhedi Kirtpur Check Dam New 22°32'40.55"N 77°48'16.09"E 156 4.0000

0 4800 5 Thired Year IWMP

16 Kesla Pandukhedi Kirtpur Parcolation Tank New 22°32'47.87"

N 77°48'8.40"E 153-154 3.50000 5500 3 Thired Year IWMP

17 Kesla Pandukhedi Kirtpur Farm Pond New 22°33'3.37"N 77°47'55.70"E 51-52-53 3.50000 3800 4 Fourth Year IWMP

18 Kesla Pandukhedi Pandukhedi Check Dam New 22°35'1.58"N 77°49'2.19"E 64 3.50000 5300 5 Frist Year IWMP

19 Kesla Pandukhedi Pandukhedi Check Dam New

22°34'33.58"

N 77°49'7.94"E 31 4.0000

0 3500 3.5 Second Year IWMP

Page 123: HBAD DIP FINAL ab - pmksy.gov.in

123

20 Kesla Pandukhedi Pandukhedi Check Dam New

22°34'53.59"

N 77°49'1.36"E 31 4.1800

0 4800 5 Fifth Year IWMP

21 Kesla Pandukhedi Pandukhedi Check Dam New 22°33'55.08"N 77°49'4.30"E 202 5.0000

0 5500 5 Thired Year IWMP

22 Kesla Pandukhedi Pandukhedi Farm Pond New 22°34'4.46"N 77°49'0.35"E 186 3.50000 4200 3 Fifth Year IWMP

23 Kesla Pandukhedi Pandukhedi Check Dam New

22°33'36.05"

N

77°48'58.40"E 335 4.1800

0 5300 3 Forth Year IWMP

24 Kesla Pandukhedi KARKA

JAMAI Check Dam New

22°33'12.39"N

77°49'3.70"E 5 4.18000 4800 4

Frist Year IWMP

25 Kesla Pandukhedi KARKA

JAMAI Check Dam New

22°33'11.25"N

77°48'49.57"E 31 5.0000

0 5500 5 Fifth Year IWMP

26 Kesla Nagpurkala

n Nagpurkalan Check Dam New

22°34'46.89"

N

77°49'27.66"E 226 4.1800

0 4200 4 Frist Year IWMP

27 Kesla Nagpurkala

n Nagpurkalan Check Dam New

22°34'56.98"

N

77°49'28.41"E 25 3.5000 5300 4

Second Year IWMP

28 Kesla Nagpurkala

n Nagpurkalan Check Dam New

22°34'58.69"

N

77°49'31.98"E 34 4.6000 4800 3

Fifth Year IWMP

29 Kesla Nagpurkala

n Nagpurkalan Stop Dam

New

22°34'53.79"N

77°49'59.34"E 126

4.5000 5500

3 Second Year IWMP

30 Kesla Nagpurkala

n Nagpurkalan Stop Dam

New

22°35'12.12"N

77°49'30.17"E 42

4.5000 4200

3 Fourth Year IWMP

31 Kesla Nagpurkala

n Nagpurkalan Parcolation

Tank New

22°35'44.37"

N

77°49'25.14"E 8

3.5000 4200

3 Second Year IWMP

32 Kesla Nagpurkala

n Nagpurkalan Tank

New

22°35'18.24"N

77°49'31.30"E 46

6.0000 5500

4.5 Thired Year IWMP

33 Kesla Nagpurkalan

Nagpurkalan Stop Dam New 22°35'6.14"N

77°49'39.71"E 62 4.5000 5300 3 Second Year IWMP

34 Kesla Nagpurkala

n Jamaikala Stop Dam

New

22°33'54.80"N

77°49'25.69"E 5

4.0000 4800

3 Frist Year IWMP

35 Kesla Nagpurkala

n Jamaikala Stop Dam

New

22°33'41.05"N

77°49'35.55"E 31

4.0000 5500

3 Thired Year IWMP

36 Kesla Nagpurkala Jamai Check Dam New 10 3.5000 4200 3 Frist Year IWMP

Page 124: HBAD DIP FINAL ab - pmksy.gov.in

124

n Damami 22°33'52.38"N

77°49'41.63"E

37 Kesla Nagpurkala

n Jamai Damami Check Dam

New

22°33'47.78"N

77°49'45.24"E 16

4.5000 5300

3 Second Year IWMP

38 Kesla Nagpurkala

n Jamai Damami Check Dam

New

22°33'38.36"N

77°49'42.33"E 10

2.5000 4800

3 Second Year IWMP

39 Kesla Kandaikala Jhirmau

Stop Dam New

22°35'39.78"

N

77°51'22.45"E 51

3.7500 5500

5 Frist Year IWMP

40 Kesla Kandaikala Jhirmau

Stop Dam New

22°35'49.43"

N

77°51'19.16"E 170

4.5000 5500

5 Second Year IWMP

41 Kesla Kandaikala Jhirmau

Stop Dam New

22°35'37.74"

N

77°51'46.87"E 203

3.5000 4200

4 Fifth Year IWMP

42 Kesla Kandaikala Jhirmau

Check Dam New

22°35'29.89"

N

77°51'44.41"E 292

2.8000 5300

5 Forth Year IWMP

43 Kesla Kandaikala Jhirmau

Stop Dam New

22°35'26.23"

N

77°51'41.96"E 226

3.5000 4800

6 Fifth Year IWMP

44 Kesla Kandaikala Jhirmau Parcolation

Tank New

22°35'36.19"

N

77°51'50.68"E 210

3.5000 4200

4 Thired Year IWMP

45 Kesla Kandaikala Dhobh

Check Dam New

22°34'23.33"

N

77°51'36.55"E 36

2.5000 4500

3 Frist Year IWMP

46 Kesla Kandaikala Dhobh

Farm Pond New

22°34'19.42"

N

77°51'40.42"E 33-34

2.3500 2300

3 Second Year IWMP

47 Kesla Pandhri Pandhri

Farm Pond New

22°33'53.53"

N

77°50'50.17"E 139/2/139/

3 3.2000

3500 3

Frist Year IWMP

48 Kesla Pandhri Pandhri

Check Dam New

22°33'52.80"

N 77°51'15.00"E

188/2 5.2000

5300 3

Second Year IWMP

49 Kesla Pandhri Pandhri

Stop Dam New

22°34'12.48"

N 77°51'3.05"E

185 5.3600

4800 3

Fifth Year IWMP

50 Kesla Pandhri Pandhri Check Dam New 22°34'8.60"N 77°51'3.45"E 186 4.1800 5500 5 Forth Year IWMP

51 Kesla Pandhri Pandhri Check Dam New 22°34'0.81"N 77°50'52.0"E 140 2.8500 2300 3 Thired Year IWMP

52 Kesla Pandhri Pandhri Stop Dam New 22°33'38.72" 77°51'7.87"E 251 4.1800 4200 5 Fifth Year IWMP

Page 125: HBAD DIP FINAL ab - pmksy.gov.in

125

N

53 Kesla Pandhri Pandhri

Stop Dam New

22°33'52.74"

N

77°50'32.57"E 15

3.6000 5300

4 Forth Year IWMP

54 Kesla Pandhri Mohla

Check Dam New

22°33'48.72"

N 77°50'32.13"E

15 2.5000

4800 5

Frist Year IWMP

55 Kesla Pandhri Mohla Tank New 22°34'7.00"N 77°50'43.65"E 36 6.0000 7500 5.5 Second Year IWMP

56 Kesla Pandhri Mohla

Stop Dam New

22°33'44.29"

N

77°50'27.19"E 42

3.5000 3500

3 Thired Year IWMP

57 Kesla Pandhri Mohla

Stop Dam New

22°33'44.29"

N

77°50'27.19"E 42

4.0000 4000

3 Fifth Year IWMP

Pradhanmantri Krishi Sinchai Yojna -Hoshangabad - 5.22

Proposed New Water Conservation Structures List Of Dupty Director Farmer Welfare & Agriculture Devlopment District :- Hoshangabad

SN. Name of Block

Gram Panchayat

Village Name

Name of Work

Type of Structure

Position of Working place

Khasra No.

Total Cost

Storage Capacity

Irrigation Potential

Year of Implementation

Scheme Name

New Latitude Longitude

1 Kesla Silvani Silvani M.I.T. New 77.53.25 22.24.25 57/98/99 27.53 1,10,000 40.00 PMKSY

2 Kesla Bhargda Kalaripat M.I.T. New 77.40.30 22.28.0 46/161/1 24.73 1,10,000 40.00 PMKSY

3 Kesla Morpani Morpani M.I.T. New 77.52.20 22.29.20 45/202 27.00 1,10,000 40.00 PMKSY

4 Kesla Chartekra Kasda khurd

Percolation Tank New 77.49.30 22.24.30 50/153 10.00 82,000 10.00 PMKSY

5 Kesla Chartekra Kasda khurd

Percolation Tank New 77.49.30 22.24.30 50/115 10.00 82,000 10.00 PMKSY

6 Kesla Taku Taku Percolation Tank New 77.81.95 22.48º29 42/81/1 10.00 82,000 10.00 PMKSY

7 Kesla Silvani Silvani Percolation Tank New 77.53.25 22.24.25 57/58/10 10.00 82,000 10.00 PMKSY

Page 126: HBAD DIP FINAL ab - pmksy.gov.in

126

8º Kesla Chartekra Cheep kheda

Percolation Tank New 77.80.76 22.38.50 0/36 10.00 82,000 10.00 PMKSY

Total :- _ _ _ _ _ _ _ 129.26 _ _ _

Pradhanmantri Krishi Sinchai Yojna -Block KESALA DIST. Hoshangabad

IRRIGATION

S.No.

Name of

Block

Gram Panchayat

Village Name

Name of Work

Type Of Structure(New/Renova

tion)

Co-Ordinates Khasra No.

Total Cost In

Lakh

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implementat

ion Scheme Name

Latitude Longitude

(A) LINING WORK

1

KESALA

Chandon Chandon Chandon disty

Renovation 22⁰36'24''N

77⁰50'21''E N.A 30.660 Tawa

Dam First Year SUPERLY

2 Sankheda Sankheda Chandon disty Renovation 22⁰36'24'

'N 77⁰50'21'

'E N.A 72.680 do First Year

3 Taronda Taronda

Taronda Disty Renovation 22⁰34'13'

'N 77⁰44'58'

'E N.A 226.410

do Second Year

Bortalai Disty Renovation 22⁰34'14'

'N 77⁰44'39'

'E N.A do Second Year

4 Bhatti Bhatti

Bhatti Disty. Renovation 22⁰34'07'

'N 77⁰44'03'

'E N.A 67.500 do Third Year

Akhiya disty Renovation 22⁰33'12'

'N 77⁰42'32'

'E N.A 134.500 do Third Year

5 Tikhad Tikhad superly Disty. Renovation 22⁰32'57'

'N 77⁰41'11'

'E N.A 15.210 do Third Year

6 Naygoan Naygoan superly Disty. Renovation 22⁰32'57'

'N 77⁰41'11'

'E N.A 181.220 do First Year

7 Dhurpan kalmesra superly Disty. Renovation 22⁰32'57'

'N 77⁰41'11'

'E N.A 101.870 do Fourth Year

9 Semri khurd

Semri khurd Semri disty. Renovation 22⁰31'46'

'N 77⁰39'56'

'E N.A 39.000 do Fourth Year

10 Talpura Kukadi Semri disty. Renovation 22⁰31'46''N

77⁰39'56''E N.A 44.460 do Fourth Year

11 Dhabakala Dhabakala Semri disty. Renovation 22⁰31'46''N

77⁰39'56''E N.A 23.000 do Fifth Year

12 Dhabakhurad

Dhabakhurad Semri disty. Renovation 22⁰31'46'

'N 77⁰39'56'

'E N.A 43.000 do Fifth Year

Page 127: HBAD DIP FINAL ab - pmksy.gov.in

127

Dhurgada Semri disty. Renovation 22⁰31'46''N

77⁰39'56''E N.A 36.640 do Fifth Year

TOTAL

1016.150

(B) CAD WORK

1

KESALA

Chandon Chandon Chandon disty Renovation 22⁰36'24'

'N 77⁰50'21'

'E N.A 123.570

Tawa Dam Second Year SUPERLY

2 Sankheda Sankheda Chandon disty Renovation 22⁰36'24'

'N 77⁰50'21'

'E N.A 122.000 do Second Year

3 Taronda Taronda

Taronda Disty Renovation 22⁰34'13'

'N 77⁰44'58'

'E N.A 232.750

do Second Year

Bortalai Disty Renovation 22⁰34'14'

'N 77⁰44'39'

'E N.A do Second Year

4 Bhatti Bhatti

Bhatti Disty. Renovation 22⁰34'07'

'N 77⁰44'03'

'E N.A 78.750 do Second Year

Akhiya disty Renovation 22⁰33'12'

'N 77⁰42'32'

'E N.A 105.000 do Second Year

5 Tikhad Tikhad superly Disty. Renovation 22⁰32'57'

'N 77⁰41'11'

'E N.A 10.500 do Second Year

6 Naygoan Naygoan superly Disty. Renovation 22⁰32'57'

'N 77⁰41'11'

'E N.A 101.030 do Second Year

7 Dhurpan kalmesra superly Disty. Renovation 22⁰32'57'

'N 77⁰41'11'

'E N.A 32.000 do Second Year

9 Semri khurd

Semri khurd Semri disty. Renovation 22⁰31'46'

'N 77⁰39'56'

'E N.A 38.000 do Second Year

10 Talpura Kukadi Semri disty. Renovation 22⁰31'46''N

77⁰39'56''E N.A 28.000 do Second Year

11 Dhabakala Dhabakala Semri disty. Renovation 22⁰31'46''N

77⁰39'56''E N.A 35.000 do Second Year

12 Dhabakhurad

Dhabakhurad Semri disty. Renovation 22⁰31'46'

'N 77⁰39'56'

'E N.A 50.000 do Second Year

Dhurgada Semri disty. Renovation 22⁰31'46''N

77⁰39'56''E N.A 70.000 do Second Year

TOTAL

1026.600

1

KESALA

Ghogarraiyat Kalaripat Earthen

Dam New 22'27'15'' 77'52'30'

N.A.

100.000 450000 80 First Year Kalaripat Dam

2 Taku Suiya Stop Dam New 22'28'30 77'23'45 100.000 250000 40 First Year Taku stop Dam

3 Chokipura Sukhatawa Stop Dam New 22'24''30' 77'50'45'' 100.000 500000 100 First Year Sukhatawa stop

dam

4 Morpani Mandikho MR Dam New 22'28'50'' 77'54'40'' 680.000 850000 160 Fifth Year Mandikho MR

Dam

Page 128: HBAD DIP FINAL ab - pmksy.gov.in

128

5 Mriyarpura

Earthen Dam New 22'29''30' 77'52'20' 300.00

0 500000 100 Second Year Maroyarpura Dam

6 Pipriya Khurd Malnkheda Earthen

Dam New 22'23''15'' 77'42'00' 300.000 500000 100 Second Year Malankheda

Dam

7 Bhargada Bhargada MR Dam New 23'42'00' 77'52'00'' 950.000

1090000 164 Third Year Bhargada Dam

8 Bhargada Raisal patha

Earthen Dam New 22'25'10'' 77'51'30'' 40.000 75000 20 Second Year Raipatha- Bandi

Dam

9 Kala Akhar Jamundol

Rapair of Dam Canal

lining Rennovation 22'22'00'' 77'49''00' 82.500 660000 94 Second Year Jamundol MR

Dam

10 Chartekra Kasda Rapair of

Dam Canal lining

Rennovation 22'26'30'' 77'57'30'' 87.500 670000 95 Second Year Kasda MR Dam

11 Dandiwada

Dandiwada

Rapair of Dam Canal

lining do 22'19''05' 77'53''20'

' 207.00

0 770000 21 Fourth Year Dandiwada MR Dam

12 Silwani Vasniya Rapair of

Dam Canal lining

do 22'21''38'' 77'54'00' 81.500 460000 60 Third Year Basniya MR Dam

13 Patharota Kubdakhedi

Rapair of Dam Canal

lining do 22'33''30'' 77'48''00'

' 67.500 670000 90 Fourth Year Kubadakhedi MR Dam

14 Kesla Bhamkapur

Rapair of Dam Canal

lining do 22'28'30'' 77'50''30'

' 81.000 510000 73 Fifth Year Bhamkapur MR Dam

15 Chitapura Chichavani

Rapair of Dam Canal

lining do 22'21'20'' 77'45''00'

' 468.50

0 241000

0 511 Third Year Chichavani MR Dam

16 Pipriya Khurd Saradeh

Rapair of Dam Canal

lining do 22'22''00'' 77'42'00'' 235.50

0 153000

0 314 Fifth Year Saradeh MR Dam

17 Silwani Silwani Rapair of

Dam Canal lining

do 22'24''00'' 77'24''00''

235.000

Tawa dam 202 First Year Silwani LIS

18 Dandiwada Bardha

Rapair of Dam Canal

lining do 22'15''20'' 77'55''40'

' 5.500 Tawa dam 90 First Year Bardha LIS

19 Silwani Silwani CADA Work New 22'24''00' 77'24''00'

' 50.600 - 202 Second Year Silwani LIS

20 Dandiwada Bardha CADA

Work Rennovation 22'15''20'' 77'55''40'' 22.500 - 90 Second Year Bardha LIS

21 Pipriya khurd Saradeh CADA

Work do 22'22''00'' 77'42''00' 78.660 - 314 Fourth Year Saradeh MR Dam

Page 129: HBAD DIP FINAL ab - pmksy.gov.in

129

22 Chitapura Chichaewani

CADA Work do 22'21''20'' 77'45''00'

' 101.45

0 405 Third Year Chichavani MR Dam

23 Kesla Bhamkapur

CADA Work do 22'28'30'' 77'50''30'

' 16.280 - 65 First Year Bhamkapur MR Dam

24 Patharota Kubdakhedi

CADA Work do 22'33''30'' 77'48''00'

' 16.280 65 Fifth Year Kubadakhedi MR Dam

25 Silwani Vasniya CADA Work do 22'21''38'' 77'54'00' 15.000 - 60 Fourth Year Basniya MR

Dam

26 Dandiwada

Dandiwada

CADA Work do 22'19''05' 77'53''20'

' 30.310 - 121 Third Year Dandiwada MR Dam

27 Chartekra Kasda CADA Work do 22'26'30'' 77'57'30'' 23.800 - 95 First Year Kasda MR

Dam

28 Kala Akhar Jamundol CADA

Work do 22'22'00'' 77'49''00' 23.550 - 94 Fourth Year Jamundol MR Dam

TOTAL

4499.930

A (LINING WORK)

1

Kesla

Sontalai kotha Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 40.000 Tawa dam First Year

HEAD WORKS

sontalai Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 50.000 Tawa dam First Year

Belawada Dy. Renovation 22⁰36'10'

'N 77⁰57'02'

'E N.A 92.000 Tawa dam Third Year

2 Maroda Gwadikala Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 40.000 Tawa dam Second Year

Maroda Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 32.000 Tawa dam Second Year

3 Belawada Belawada Belawada Dy. Renovation 22⁰36'10'

'N 77⁰57'02'

'E N.A 13.100 Tawa dam Third Year

4 Gajpur Gajpur Ghoghri Dy. Renovation 22⁰36'26'

'N 77⁰55'16'

'E N.A 45.000 Tawa dam Fourth Year

Dhobikhapa

Ghoghri Dy. Renovation 22⁰36'26'

'N 77⁰55'16'

'E N.A 40.000 Tawa dam Fourth Year

5 Bichhua Bichhua Bichhua Minor 1 Renovation 22⁰36'59'

'N 77⁰55'12'

'E N.A 69.100 Tawa dam Fifth Year

Bichhua Minor 2 Renovation 22⁰37'32'

'N 77⁰54'56'

'E N.A 69.000 Tawa dam Fifth Year

TOTAL

490.200

B (CADA WORK)

1 Kesla Sontalai kotha Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 24.020 Tawa dam First Year HEAD

WORKS

Page 130: HBAD DIP FINAL ab - pmksy.gov.in

130

sontalai Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 15.000 Tawa dam First Year

Belawada Dy. Renovation 22⁰36'10'

'N 77⁰57'02'

'E N.A 15.000 Tawa dam First Year

2 Maroda Gwadikala Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 22.000 Tawa dam Second Year

Maroda Pahanburri Dy. Renovation 22⁰36'22'

'N 77⁰58'28'

'E N.A 23.000 Tawa dam Second Year

3 Belawada Belawada Belawada Dy. Renovation 22⁰36'10'

'N 77⁰57'02'

'E N.A 12.000 Tawa dam Third Year

4 Gajpur Gajpur Ghoghri Dy. Renovation 22⁰36'26'

'N 77⁰55'16'

'E N.A 25.000 Tawa dam Fourth Year

Dhobikhapa

Ghoghri Dy. Renovation 22⁰36'26'

'N 77⁰55'16'

'E N.A 21.000 Tawa dam Fourth Year

5 Bichhua Bichhua Bichhua Minor 1 Renovation 22⁰36'59'

'N 77⁰55'12'

'E N.A 11.000 Tawa dam Fifth Year

Bichhua Minor 2 Renovation 22⁰37'32'

'N 77⁰54'56'

'E N.A 11.000 Tawa dam Fifth Year

Total 179.020

(B) CADAWORK

1

Kesla

Somalwara khurd

Somalwara khurd

Itsrsi Distry. Renovation 22⁰36'40'

'N 77⁰48'7''

E N.A 6.890 Tawa dam First Year

ITARSI DISTRY. Sankheda Itsrsi

Distry. Renovation 22⁰36'40''N

77⁰48'7''E N.A 6.900 Tawa

dam First Year

Itarsi Itsrsi Distry. Renovation 22⁰36'40'

'N 77⁰48'7''

E N.A 22.490 Tawa dam First Year

Total 36.280

A (LINING WORK)

1 Kesla Sankheda Sankheda Sankheda mr 22⁰36'54'

'N 77⁰48'58'

'E 108.9 First Year HOSHANGABAD DISTRY. TOTA

L 108.9

(B) CADA WORK

1 Kesla Somalwada khurd

Somalwada khurd

commond area

development

22⁰36'26''N

77⁰48'54''E 11.020 44 First Year

HOSHANGABAD DISTRY.

2 Sankheda Sankheda commond area 22⁰36'54'

'N 77⁰48'58'

'E 105.210 420 First Year

Page 131: HBAD DIP FINAL ab - pmksy.gov.in

131

development

TOTAL

116.230 464

PMKSY

S.No.

Name of

Block

Dawa Kala Dawa Kala

95.78 2.72 Fourth Year

1 2 .

33 13'00"

77 37'50"

63.84 1.68 Fourth Year

1 Keshla

57.00 1.50 Fourth Year

32 08'00"

77 37'42"

51.30 1.35 Fourth Year

33.06 0.69 Fourth Year

32 18'00"

77 38'02"

79.80 2.10 Fourth Year

7.00 First Year

119.75 327 Fifth Year

Churwadi Churwadi

Dawakhurd

33 33'00" 77 37'33"

61.56 1.62 Fourth Year

38.76 1.02 Fourth Year

2 Keshla

54.72 1.41 Fourth Year

119.35 314 Fifth Year

Total 781.92

Grand Total 8255.23

Page 132: HBAD DIP FINAL ab - pmksy.gov.in

132

Pradhanmantri Krishi Sinchai Yojna, Hosangabad (Forest Village) Block – Kesla

S.N.

Name Of Block

Gram Panchayat Village name Name of Work

Type of Stricture (New/Renovation)

Co-ordinates Khasra No.

Total Cost (In lakh)

Storge Capacity (Cum)

Inigation Potentiai (Ha.)

Year of implementation

Scheme Name

Latitude Longitude

1 Kesla Kalakhar Naya Khakrapura

Earthen Dam-01 Renovation 22°21'21.67"N 77°49'45.91"E 0.9 4500 1.5 1

2 Kesla Kalakhar Naya Khakrapura

Earthen Dam-02 Renovation 22°21'27.93"N 77°50'6.05"E 0.8 4000 1 1

3 Kesla Kalakhar Naya Khakrapura

Earthen Dam-03 Renovation 22°21'25.70"N 77°50'11.91"E 0.5 1500 0.5 1

4 Kesla Kalakhar Naya Khakrapura

Earthen Dam-01 New 22°21'20.67"N 77°49'34.03"E 3 10000 2 1

5 Kesla Kalakhar Naya Khakrapura

Earthen Dam-02 New 22°21'14.68"N 77°49'37.22"E 4 20000 8 2

6 Kesla Kalakhar Naya Khakrapura

Earthen Dam-03 New 22°21'33.66"N 77°50'17.14"E 4.5 15500 3.5 2

7 Kesla Kalakhar Naya Khakrapura Stop dam-01 New 22°21'7.22"N 77°49'29.65"E 5.5 1650 3.5 2

8 Kesla Kalakhar Naya Khakrapura Gully plug-10 New 22°21'19.30"N 77°49'35.62"E 0.9 - WSR 1

9 Kesla Kalakhar Naya Khakrapura Group well-01 New 22°21'18.53"N 77°50'1.36"E 2.5 12 2 1

10 Kesla Kalakhar Naya Khakrapura Group well-02 New 22°21'18.53"N 77°50'1.36"E 2.5 12 2 1

11 Kesla Kalakhar Naya Khakrapura Group well-03 New 22°21'18.53"N 77°50'1.36"E 2.5 12 2 2

12 Kesla Kalakhar Naya Khakrapura Group well-04 New 22°21'18.53"N 77°50'1.36"E 2.5 12 2 2

13 Kesla Kalakhar Naya Khakrapura Soak Pit-01 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

14 Kesla Kalakhar Naya Khakrapura Soak Pit-02 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

15 Kesla Kalakhar Naya Khakrapura Soak Pit-03 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

16 Kesla Kalakhar Naya Khakrapura Soak Pit-04 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

17 Kesla Kalakhar Naya Khakrapura Soak Pit-05 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

18 Kesla Kalakhar Naya Khakrapura Soak Pit-06 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

19 Kesla Kalakhar Naya Soak Pit-07 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

Page 133: HBAD DIP FINAL ab - pmksy.gov.in

133

Khakrapura

20 Kesla Kalakhar Naya Khakrapura Soak Pit-08 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

21 Kesla Kalakhar Naya Khakrapura Soak Pit-09 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

22 Kesla Kalakhar Naya Khakrapura Soak Pit-10 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

23 Kesla Kalakhar Naya Khakrapura Soak Pit-11 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

24 Kesla Kalakhar Naya Khakrapura Soak Pit-12 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

25 Kesla Kalakhar Naya Khakrapura Soak Pit-13 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

26 Kesla Kalakhar Naya Khakrapura Soak Pit-14 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

27 Kesla Kalakhar Naya Khakrapura Soak Pit-15 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

28 Kesla Kalakhar Naya Khakrapura Soak Pit-16 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

29 Kesla Kalakhar Naya Khakrapura Soak Pit-17 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

30 Kesla Kalakhar Naya Khakrapura Soak Pit-18 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

31 Kesla Kalakhar Naya Khakrapura Soak Pit-19 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

32 Kesla Kalakhar Naya Khakrapura Soak Pit-20 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

33 Kesla Kalakhar Naya Khakrapura Soak Pit-21 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

34 Kesla Kalakhar Naya Khakrapura Soak Pit-22 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

35 Kesla Kalakhar Naya Khakrapura Soak Pit-23 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

36 Kesla Kalakhar Naya Khakrapura Soak Pit-24 New 22°21'18.53"N 77°50'1.36"E 0.1 5 WSR 1

37 Kesla Kalakhar Naya Khakrapura Farm Pond-01 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

38 Kesla Kalakhar Naya Khakrapura Farm Pond-02 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

39 Kesla Kalakhar Naya Khakrapura Farm Pond-03 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

40 Kesla Kalakhar Naya Khakrapura Farm Pond-04 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

41 Kesla Kalakhar Naya Khakrapura Farm Pond-05 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

Page 134: HBAD DIP FINAL ab - pmksy.gov.in

134

42 Kesla Kalakhar Naya Khakrapura Farm Pond-06 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

43 Kesla Kalakhar Naya Khakrapura Farm Pond-07 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

44 Kesla Kalakhar Naya Khakrapura Farm Pond-08 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

45 Kesla Kalakhar Naya Khakrapura Farm Pond-09 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

46 Kesla Kalakhar Naya Khakrapura Farm Pond-10 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 1

47 Kesla Kalakhar Naya Khakrapura Farm Pond-11 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

48 Kesla Kalakhar Naya Khakrapura Farm Pond-12 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

49 Kesla Kalakhar Naya Khakrapura Farm Pond-13 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

50 Kesla Kalakhar Naya Khakrapura Farm Pond-14 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

51 Kesla Kalakhar Naya Khakrapura Farm Pond-15 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

52 Kesla Kalakhar Naya Khakrapura Farm Pond-16 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

53 Kesla Kalakhar Naya Khakrapura Farm Pond-17 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

54 Kesla Kalakhar Naya Khakrapura Farm Pond-18 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

55 Kesla Kalakhar Naya Khakrapura Farm Pond-19 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

56 Kesla Kalakhar Naya Khakrapura Farm Pond-20 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 2

57 Kesla Kalakhar Naya Khakrapura Farm Pond-21 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 3

58 Kesla Kalakhar Naya Khakrapura Farm Pond-22 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 3

59 Kesla Kalakhar Naya Khakrapura Farm Pond-23 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 3

60 Kesla Kalakhar Naya Khakrapura Farm Pond-24 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 3

61 Kesla Kalakhar Naya Khakrapura Farm Pond-25 New 22°21'19.89"N 77°49'28.22"E 0.6 1059.75 1.5 3

62 Kesla Kalakhar Naya Khakrapura Sprinklar set New 22°21'19.92"N 77°49'28.32"E 4 2 1

63 Kesla Chokipura Naya

Bhadbhud Earthen Dam-01 New

22°22'49.56"N

77°49'48.90"E

5 25000 9 1

Page 135: HBAD DIP FINAL ab - pmksy.gov.in

135

64 Kesla Chokipura Naya

Bhadbhud Earthen Dam-02 New

22°22'59.48"N

77°49'47.40"E

4 20000 8 1

65 Kesla Chokipura Naya

Bhadbhud Earthen Dam-03 New 22°23'5.83"N

77°49'46.26"E

4 20000 8 2

66 Kesla Chokipura Naya

Bhadbhud Earthen Dam-04 New 22°23'0.81"N

77°49'50.38"E

5 25000 10 2

67 Kesla Chokipura Naya

Bhadbhud Group well-01 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 1

68 Kesla Chokipura Naya

Bhadbhud Group well-02 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 1

69 Kesla Chokipura Naya

Bhadbhud Group well-03 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 1

70 Kesla Chokipura Naya

Bhadbhud Group well-04 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 1

71 Kesla Chokipura Naya

Bhadbhud Group well-05 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 1

72 Kesla Chokipura Naya

Bhadbhud Group well-06 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 2

73 Kesla Chokipura Naya

Bhadbhud Group well-07 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 2

74 Kesla Chokipura Naya

Bhadbhud Group well-08 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 2

75 Kesla Chokipura Naya

Bhadbhud Group well-09 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 2

76 Kesla Chokipura Naya

Bhadbhud Group well-10 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 2

77 Kesla Chokipura Naya

Bhadbhud Group well-11 New 22°22'31.32"

77°50'16.75" 2.5 12 2 3

Page 136: HBAD DIP FINAL ab - pmksy.gov.in

136

N E

78 Kesla Chokipura Naya

Bhadbhud Group well-12 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 3

79 Kesla Chokipura Naya

Bhadbhud Group well-13 New 22°22'31.32"N

77°50'16.75"E

2.5 12 2 3

80 Kesla Chokipura Naya

Bhadbhud Soak Pit-01 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

81 Kesla Chokipura Naya

Bhadbhud Soak Pit-02 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

82 Kesla Chokipura Naya

Bhadbhud Soak Pit-03 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

83 Kesla Chokipura Naya

Bhadbhud Soak Pit-04 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

84 Kesla Chokipura Naya

Bhadbhud Soak Pit-05 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

85 Kesla Chokipura Naya

Bhadbhud Soak Pit-06 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

86 Kesla Chokipura Naya

Bhadbhud Soak Pit-07 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

87 Kesla Chokipura Naya

Bhadbhud Soak Pit-08 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

88 Kesla Chokipura Naya

Bhadbhud Soak Pit-09 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

89 Kesla Chokipura Naya

Bhadbhud Soak Pit-10 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

90 Kesla Chokipura Naya

Bhadbhud Soak Pit-11 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

91 Kesl Chokipura Naya Soak Pit-12 New 0.1 8 WSR 1

Page 137: HBAD DIP FINAL ab - pmksy.gov.in

137

a Bhadbhud 22°22'43.60"N

77°50'10.55"E

92 Kesla Chokipura Naya

Bhadbhud Soak Pit-13 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

93 Kesla Chokipura Naya

Bhadbhud Soak Pit-14 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

94 Kesla Chokipura Naya

Bhadbhud Soak Pit-15 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

95 Kesla Chokipura Naya

Bhadbhud Soak Pit-16 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

96 Kesla Chokipura Naya

Bhadbhud Soak Pit-17 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

97 Kesla Chokipura Naya

Bhadbhud Soak Pit-18 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

98 Kesla Chokipura Naya

Bhadbhud Soak Pit-19 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

99 Kesla Chokipura Naya

Bhadbhud Soak Pit-20 New 22°22'43.60"N

77°50'10.55"E

0.1 8 WSR 1

100 Kesla Chokipura Naya

Bhadbhud Farm Pond-01 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

101 Kesla Chokipura Naya

Bhadbhud Farm Pond-02 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

102 Kesla Chokipura Naya

Bhadbhud Farm Pond-03 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

103 Kesla Chokipura Naya

Bhadbhud Farm Pond-04 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

104 Kesla Chokipura Naya

Bhadbhud Farm Pond-05 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

Page 138: HBAD DIP FINAL ab - pmksy.gov.in

138

105 Kesla Chokipura Naya

Bhadbhud Farm Pond-06 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

106 Kesla Chokipura Naya

Bhadbhud Farm Pond-07 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

107 Kesla Chokipura Naya

Bhadbhud Farm Pond-08 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

108 Kesla Chokipura Naya

Bhadbhud Farm Pond-09 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 1

109 Kesla Chokipura Naya

Bhadbhud Farm Pond-10 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 2

110 Kesla Chokipura Naya

Bhadbhud Farm Pond-11 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 2

111 Kesla Chokipura Naya

Bhadbhud Farm Pond-12 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 2

112 Kesla Chokipura Naya

Bhadbhud Farm Pond-13 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 2

113 Kesla Chokipura Naya

Bhadbhud Farm Pond-14 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 2

114 Kesla Chokipura Naya

Bhadbhud Farm Pond-15 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 2

115 Kesla Chokipura Naya

Bhadbhud Farm Pond-16 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 2

116 Kesla Chokipura Naya

Bhadbhud Farm Pond-17 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

117 Kesla Chokipura Naya

Bhadbhud Farm Pond-18 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

118 Kesla Chokipura Naya

Bhadbhud Farm Pond-19 New 22°22'28.88" 77°50'0.80"E 0.6 1059.7

5 1.5 3

Page 139: HBAD DIP FINAL ab - pmksy.gov.in

139

N

119 Kesla Chokipura Naya

Bhadbhud Farm Pond-20 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

120 Kesla Chokipura Naya

Bhadbhud Farm Pond-21 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

121 Kesla Chokipura Naya

Bhadbhud Farm Pond-22 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

122 Kesla Chokipura Naya

Bhadbhud Farm Pond-23 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

123 Kesla Chokipura Naya

Bhadbhud Farm Pond-24 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

124 Kesla Chokipura Naya

Bhadbhud Farm Pond-25 New 22°22'28.88"N

77°50'0.80"E 0.6 1059.75 1.5 3

125 Kesla Chokipura Naya

Bhadbhud Sprinkler Set New 22°22'29.88"N

77°50'0.81"E 6 0 2 1

126 Kesla Saheli Naya Podar Earthen Dam-

01 New 22°25'53.76"N

77°49'12.51"E

4.5 22500 9 1

127 Kesla Saheli Naya Podar Earthen Dam-

02 New 22°26'15.70"N

77°50'5.76"E 4 20000 8 2

128 Kesla Saheli Naya Podar Earthen Dam-

03 New 22°26'21.61"N

77°49'44.77"E

4.5 22500 9 1

129 Kesla Saheli Naya Podar Earthen Dam-

04 New 22°25'47.21"N

77°49'19.21"E

4 20000 8 2

130 Kesla Saheli Naya Podar Group well-01 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

131 Kesla Saheli Naya Podar Group well-02 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

Page 140: HBAD DIP FINAL ab - pmksy.gov.in

140

132 Kesla Saheli Naya Podar Group well-03 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

133 Kesla Saheli Naya Podar Group well-04 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

134 Kesla Saheli Naya Podar Group well-05 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

135 Kesla Saheli Naya Podar Group well-06 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

136 Kesla Saheli Naya Podar Group well-07 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

137 Kesla Saheli Naya Podar Group well-08 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 1

138 Kesla Saheli Naya Podar Group well-09 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 2

139 Kesla Saheli Naya Podar Group well-10 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 2

140 Kesla Saheli Naya Podar Group well-11 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 2

141 Kesla Saheli Naya Podar Group well-12 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 2

142 Kesla Saheli Naya Podar Group well-13 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 2

143 Kesla Saheli Naya Podar Group well-14 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 2

144 Kesla Saheli Naya Podar Group well-15 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 2

Page 141: HBAD DIP FINAL ab - pmksy.gov.in

141

145 Kesla Saheli Naya Podar Group well-16 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

146 Kesla Saheli Naya Podar Group well-17 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

147 Kesla Saheli Naya Podar Group well-18 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

148 Kesla Saheli Naya Podar Group well-19 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

149 Kesla Saheli Naya Podar Group well-20 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

150 Kesla Saheli Naya Podar Group well-21 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

151 Kesla Saheli Naya Podar Group well-22 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

152 Kesla Saheli Naya Podar Group well-23 New

22°26'10.24"N

77°49'22.80"E

2.5 12 2 3

153 Kesla Saheli Naya Podar Soak Pit-01 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

154 Kesla Saheli Naya Podar Soak Pit-02 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

155 Kesla Saheli Naya Podar Soak Pit-03 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

156 Kesla Saheli Naya Podar Soak Pit-04 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

157 Kesla Saheli Naya Podar Soak Pit-05 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

Page 142: HBAD DIP FINAL ab - pmksy.gov.in

142

158 Kesla Saheli Naya Podar Soak Pit-06 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

159 Kesla Saheli Naya Podar Soak Pit-07 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

160 Kesla Saheli Naya Podar Soak Pit-08 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

161 Kesla Saheli Naya Podar Soak Pit-09 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

162 Kesla Saheli Naya Podar Soak Pit-10 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

163 Kesla Saheli Naya Podar Soak Pit-11 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

164 Kesla Saheli Naya Podar Soak Pit-12 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

165 Kesla Saheli Naya Podar Soak Pit-13 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

166 Kesla Saheli Naya Podar Soak Pit-14 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 1

167 Kesla Saheli Naya Podar Soak Pit-15 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

168 Kesla Saheli Naya Podar Soak Pit-16 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

169 Kesla Saheli Naya Podar Soak Pit-17 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

170 Kesla Saheli Naya Podar Soak Pit-18 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

Page 143: HBAD DIP FINAL ab - pmksy.gov.in

143

171 Kesla Saheli Naya Podar Soak Pit-19 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

172 Kesla Saheli Naya Podar Soak Pit-20 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

173 Kesla Saheli Naya Podar Soak Pit-21 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

174 Kesla Saheli Naya Podar Soak Pit-22 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

175 Kesla Saheli Naya Podar Soak Pit-23 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

176 Kesla Saheli Naya Podar Soak Pit-24 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

177 Kesla Saheli Naya Podar Soak Pit-25 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

178 Kesla Saheli Naya Podar Soak Pit-26 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

179 Kesla Saheli Naya Podar Soak Pit-27 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

180 Kesla Saheli Naya Podar Soak Pit-28 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

181 Kesla Saheli Naya Podar Soak Pit-29 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

182 Kesla Saheli Naya Podar Soak Pit-30 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

183 Kesla Saheli Naya Podar Soak Pit-31 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

Page 144: HBAD DIP FINAL ab - pmksy.gov.in

144

184 Kesla Saheli Naya Podar Soak Pit-32 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

185 Kesla Saheli Naya Podar Soak Pit-33 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

186 Kesla Saheli Naya Podar Soak Pit-34 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

187 Kesla Saheli Naya Podar Soak Pit-35 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

188 Kesla Saheli Naya Podar Soak Pit-36 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

189 Kesla Saheli Naya Podar Soak Pit-37 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

190 Kesla Saheli Naya Podar Soak Pit-38 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

191 Kesla Saheli Naya Podar Soak Pit-39 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

192 Kesla Saheli Naya Podar Soak Pit-40 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

193 Kesla Saheli Naya Podar Soak Pit-41 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

194 Kesla Saheli Naya Podar Soak Pit-42 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

195 Kesla Saheli Naya Podar Soak Pit-43 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

196 Kesla Saheli Naya Podar Soak Pit-44 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

Page 145: HBAD DIP FINAL ab - pmksy.gov.in

145

197 Kesla Saheli Naya Podar Soak Pit-45 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

198 Kesla Saheli Naya Podar Soak Pit-46 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

199 Kesla Saheli Naya Podar Soak Pit-47 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

200 Kesla Saheli Naya Podar Soak Pit-48 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

201 Kesla Saheli Naya Podar Soak Pit-49 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

202 Kesla Saheli Naya Podar Soak Pit-50 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

203 Kesla Saheli Naya Podar Soak Pit-51 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

204 Kesla Saheli Naya Podar Soak Pit-52 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

205 Kesla Saheli Naya Podar Soak Pit-53 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

206 Kesla Saheli Naya Podar Soak Pit-54 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

207 Kesla Saheli Naya Podar Soak Pit-55 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

208 Kesla Saheli Naya Podar Soak Pit-56 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

209 Kesla Saheli Naya Podar Soak Pit-57 New

22°26'11.24"N

77°49'23.80"E

0.1 8 WSR 2

Page 146: HBAD DIP FINAL ab - pmksy.gov.in

146

210 Kesla Saheli Naya Podar Farm Pond-01 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

211 Kesla Saheli Naya Podar Farm Pond-02 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

212 Kesla Saheli Naya Podar Farm Pond-03 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

213 Kesla Saheli Naya Podar Farm Pond-04 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

214 Kesla Saheli Naya Podar Farm Pond-05 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

215 Kesla Saheli Naya Podar Farm Pond-06 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

216 Kesla Saheli Naya Podar Farm Pond-07 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

217 Kesla Saheli Naya Podar Farm Pond-08 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

218 Kesla Saheli Naya Podar Farm Pond-09 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

219 Kesla Saheli Naya Podar Farm Pond-10 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

220 Kesla Saheli Naya Podar Farm Pond-11 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

221 Kesla Saheli Naya Podar Farm Pond-12 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

222 Kesla Saheli Naya Podar Farm Pond-13 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

Page 147: HBAD DIP FINAL ab - pmksy.gov.in

147

223 Kesla Saheli Naya Podar Farm Pond-14 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

224 Kesla Saheli Naya Podar Farm Pond-15 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

225 Kesla Saheli Naya Podar Farm Pond-16 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

226 Kesla Saheli Naya Podar Farm Pond-17 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

227 Kesla Saheli Naya Podar Farm Pond-18 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

228 Kesla Saheli Naya Podar Farm Pond-19 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

229 Kesla Saheli Naya Podar Farm Pond-20 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 1

230 Kesla Saheli Naya Podar Farm Pond-21 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

231 Kesla Saheli Naya Podar Farm Pond-22 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

232 Kesla Saheli Naya Podar Farm Pond-23 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

233 Kesla Saheli Naya Podar Farm Pond-24 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

234 Kesla Saheli Naya Podar Farm Pond-25 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

235 Kesla Saheli Naya Podar Farm Pond-26 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

Page 148: HBAD DIP FINAL ab - pmksy.gov.in

148

236 Kesla Saheli Naya Podar Farm Pond-27 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

237 Kesla Saheli Naya Podar Farm Pond-28 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

238 Kesla Saheli Naya Podar Farm Pond-29 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

239 Kesla Saheli Naya Podar Farm Pond-30 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

240 Kesla Saheli Naya Podar Farm Pond-31 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

241 Kesla Saheli Naya Podar Farm Pond-32 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

242 Kesla Saheli Naya Podar Farm Pond-33 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

243 Kesla Saheli Naya Podar Farm Pond-34 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

244 Kesla Saheli Naya Podar Farm Pond-35 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

245 Kesla Saheli Naya Podar Farm Pond-36 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

246 Kesla Saheli Naya Podar Farm Pond-37 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

247 Kesla Saheli Naya Podar Farm Pond-38 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

248 Kesla Saheli Naya Podar Farm Pond-39 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

Page 149: HBAD DIP FINAL ab - pmksy.gov.in

149

249 Kesla Saheli Naya Podar Farm Pond-40 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 2

250 Kesla Saheli Naya Podar Farm Pond-41 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

251 Kesla Saheli Naya Podar Farm Pond-42 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

252 Kesla Saheli Naya Podar Farm Pond-43 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

253 Kesla Saheli Naya Podar Farm Pond-44 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

254 Kesla Saheli Naya Podar Farm Pond-45 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

255 Kesla Saheli Naya Podar Farm Pond-46 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

256 Kesla Saheli Naya Podar Farm Pond-47 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

257 Kesla Saheli Naya Podar Farm Pond-48 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

258 Kesla Saheli Naya Podar Farm Pond-49 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

259 Kesla Saheli Naya Podar Farm Pond-50 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

260 Kesla Saheli Naya Podar Farm Pond-51 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

261 Kesla Saheli Naya Podar Farm Pond-52 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

Page 150: HBAD DIP FINAL ab - pmksy.gov.in

150

262 Kesla Saheli Naya Podar Farm Pond-53 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

263 Kesla Saheli Naya Podar Farm Pond-54 New

22°26'11.27"N

77°49'23.79"E

0.6 1059.75 1.5 3

264 Kesla Saheli Naya Podar Sprinkler Set New

22°26'11.27"N

77°49'23.79"E

16 0 2 1

265 Kesla Chokipura Naya

Ratibandar Earthen Dam-01 New

22°22'46.51"N

77°51'17.08"E

4 20000 6 1

266 Kesla Chokipura Naya

Ratibandar Earthen Dam-02 New 22°23'14.64"

N

77°51'30.55"E

4 20000 5 1

267 Kesla Chokipura Naya

Ratibandar Earthen Dam-03 New

22°22'50.16"N

77°50'58.51"E

4 20000 6 2

268 Kesla Chokipura Naya

Ratibandar Earthen Dam-04 New

22°22'33.38"N

77°51'6.72"E 3.5 17000 4 2

269 Kesla Chokipura Naya

Ratibandar Stop Dam-01 New 22°22'59.84"N

77°51'30.36"E

4.8 1550 5 1

270 Kesla Chokipura Naya

Ratibandar Stop Dam-02 New 22°22'51.58"N

77°51'19.99"E

4.8 1500 5 1

271 Kesla Chokipura Naya

Ratibandar Stop Dam-03 New 22°22'45.61"N

77°51'6.69"E 4.8 1500 5 1

272 Kesla Chokipura Naya

Ratibandar Stop Dam-04 New 22°22'42.41"N

77°51'1.41"E 4.9 1550 5 2

273 Kesla Chokipura Naya

Ratibandar Gully plug New 22°22'34.94"N

77°50'50.65"E

1.2 - WSR 1

274 Kesla Chokipura Naya

Ratibandar Group well-01 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 1

275 Kesla Chokipura Naya

Ratibandar Group well-02 New 22°22'44.19" 77°51'8.85"E 2.5 12 2 1

Page 151: HBAD DIP FINAL ab - pmksy.gov.in

151

N

276 Kesla Chokipura Naya

Ratibandar Group well-03 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 1

277 Kesla Chokipura Naya

Ratibandar Group well-04 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 2

278 Kesla Chokipura Naya

Ratibandar Group well-05 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 2

279 Kesla Chokipura Naya

Ratibandar Group well-06 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 2

280 Kesla Chokipura Naya

Ratibandar Group well-07 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 2

281 Kesla Chokipura Naya

Ratibandar Group well-08 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 3

282 Kesla Chokipura Naya

Ratibandar Group well-09 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 3

283 Kesla Chokipura Naya

Ratibandar Group well-10 New 22°22'44.19"N

77°51'8.85"E 2.5 12 2 3

284 Kesla Chokipura Naya

Ratibandar Soak Pit-01 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

285 Kesla Chokipura Naya

Ratibandar Soak Pit-02 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

286 Kesla Chokipura Naya

Ratibandar Soak Pit-03 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

287 Kesla Chokipura Naya

Ratibandar Soak Pit-04 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

288 Kesla Chokipura Naya

Ratibandar Soak Pit-05 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

289 Kesl Chokipura Naya Soak Pit-06 New 22°23'3.42"N 0.1 8 WSR 1

Page 152: HBAD DIP FINAL ab - pmksy.gov.in

152

a Ratibandar 77°51'13.09"E

290 Kesla Chokipura Naya

Ratibandar Soak Pit-07 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

291 Kesla Chokipura Naya

Ratibandar Soak Pit-08 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

292 Kesla Chokipura Naya

Ratibandar Soak Pit-09 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

293 Kesla Chokipura Naya

Ratibandar Soak Pit-10 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

294 Kesla Chokipura Naya

Ratibandar Soak Pit-11 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

295 Kesla Chokipura Naya

Ratibandar Soak Pit-12 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

296 Kesla Chokipura Naya

Ratibandar Soak Pit-13 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

297 Kesla Chokipura Naya

Ratibandar Soak Pit-14 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

298 Kesla Chokipura Naya

Ratibandar Soak Pit-15 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

299 Kesla Chokipura Naya

Ratibandar Soak Pit-16 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

300 Kesla Chokipura Naya

Ratibandar Soak Pit-17 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

301 Kesla Chokipura Naya

Ratibandar Soak Pit-18 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

302 Kesla Chokipura Naya

Ratibandar Soak Pit-19 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

Page 153: HBAD DIP FINAL ab - pmksy.gov.in

153

303 Kesla Chokipura Naya

Ratibandar Soak Pit-20 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

304 Kesla Chokipura Naya

Ratibandar Soak Pit-21 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

305 Kesla Chokipura Naya

Ratibandar Soak Pit-22 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

306 Kesla Chokipura Naya

Ratibandar Soak Pit-23 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

307 Kesla Chokipura Naya

Ratibandar Soak Pit-24 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

308 Kesla Chokipura Naya

Ratibandar Soak Pit-25 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 1

309 Kesla Chokipura Naya

Ratibandar Soak Pit-26 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

310 Kesla Chokipura Naya

Ratibandar Soak Pit-27 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

311 Kesla Chokipura Naya

Ratibandar Soak Pit-28 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

312 Kesla Chokipura Naya

Ratibandar Soak Pit-29 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

313 Kesla Chokipura Naya

Ratibandar Soak Pit-30 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

314 Kesla Chokipura Naya

Ratibandar Soak Pit-31 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

315 Kesla Chokipura Naya

Ratibandar Soak Pit-32 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

316 Kesla Chokipura Naya

Ratibandar Soak Pit-33 New 22°23'3.42"N 77°51'13.09" 0.1 8 WSR 2

Page 154: HBAD DIP FINAL ab - pmksy.gov.in

154

E

317 Kesla Chokipura Naya

Ratibandar Soak Pit-34 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

318 Kesla Chokipura Naya

Ratibandar Soak Pit-35 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

319 Kesla Chokipura Naya

Ratibandar Soak Pit-36 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

320 Kesla Chokipura Naya

Ratibandar Soak Pit-37 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

321 Kesla Chokipura Naya

Ratibandar Soak Pit-38 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

322 Kesla Chokipura Naya

Ratibandar Soak Pit-39 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

323 Kesla Chokipura Naya

Ratibandar Soak Pit-40 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

324 Kesla Chokipura Naya

Ratibandar Soak Pit-41 New 22°23'3.42"N 77°51'13.09"E

0.1 8 WSR 2

325 Kesla Chokipura Naya

Ratibandar Farm Pond-01 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

326 Kesla Chokipura Naya

Ratibandar Farm Pond-02 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

327 Kesla Chokipura Naya

Ratibandar Farm Pond-03 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

328 Kesla Chokipura Naya

Ratibandar Farm Pond-04 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

329 Kesla Chokipura Naya

Ratibandar Farm Pond-05 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

330 Kesl Chokipura Naya Farm Pond-06 New 0.6 1059.7 1.5 1

Page 155: HBAD DIP FINAL ab - pmksy.gov.in

155

a Ratibandar 22°22'56.07"N

77°51'15.27"E

5

331 Kesla Chokipura Naya

Ratibandar Farm Pond-07 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

332 Kesla Chokipura Naya

Ratibandar Farm Pond-08 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

333 Kesla Chokipura Naya

Ratibandar Farm Pond-09 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

334 Kesla Chokipura Naya

Ratibandar Farm Pond-10 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

335 Kesla Chokipura Naya

Ratibandar Farm Pond-11 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

336 Kesla Chokipura Naya

Ratibandar Farm Pond-12 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

337 Kesla Chokipura Naya

Ratibandar Farm Pond-13 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

338 Kesla Chokipura Naya

Ratibandar Farm Pond-14 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

339 Kesla Chokipura Naya

Ratibandar Farm Pond-15 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

340 Kesla Chokipura Naya

Ratibandar Farm Pond-16 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

341 Kesla Chokipura Naya

Ratibandar Farm Pond-17 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

342 Kesla Chokipura Naya

Ratibandar Farm Pond-18 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

343 Kesla Chokipura Naya

Ratibandar Farm Pond-19 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

Page 156: HBAD DIP FINAL ab - pmksy.gov.in

156

344 Kesla Chokipura Naya

Ratibandar Farm Pond-20 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 1

345 Kesla Chokipura Naya

Ratibandar Farm Pond-21 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

346 Kesla Chokipura Naya

Ratibandar Farm Pond-22 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

347 Kesla Chokipura Naya

Ratibandar Farm Pond-23 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

348 Kesla Chokipura Naya

Ratibandar Farm Pond-24 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

349 Kesla Chokipura Naya

Ratibandar Farm Pond-25 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

350 Kesla Chokipura Naya

Ratibandar Farm Pond-26 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

351 Kesla Chokipura Naya

Ratibandar Farm Pond-27 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

352 Kesla Chokipura Naya

Ratibandar Farm Pond-28 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

353 Kesla Chokipura Naya

Ratibandar Farm Pond-29 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

354 Kesla Chokipura Naya

Ratibandar Farm Pond-30 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

355 Kesla Chokipura Naya

Ratibandar Farm Pond-31 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

356 Kesla Chokipura Naya

Ratibandar Farm Pond-32 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

357 Kesla Chokipura Naya

Ratibandar Farm Pond-33 New 22°22'56.07"

77°51'15.27" 0.6 1059.7

5 1.5 2

Page 157: HBAD DIP FINAL ab - pmksy.gov.in

157

N E

358 Kesla Chokipura Naya

Ratibandar Farm Pond-34 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

359 Kesla Chokipura Naya

Ratibandar Farm Pond-35 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

360 Kesla Chokipura Naya

Ratibandar Farm Pond-36 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

361 Kesla Chokipura Naya

Ratibandar Farm Pond-37 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

362 Kesla Chokipura Naya

Ratibandar Farm Pond-38 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

363 Kesla Chokipura Naya

Ratibandar Farm Pond-39 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

364 Kesla Chokipura Naya

Ratibandar Farm Pond-40 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 2

365 Kesla Chokipura Naya

Ratibandar Farm Pond-41 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

366 Kesla Chokipura Naya

Ratibandar Farm Pond-42 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

367 Kesla Chokipura Naya

Ratibandar Farm Pond-43 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

368 Kesla Chokipura Naya

Ratibandar Farm Pond-44 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

369 Kesla Chokipura Naya

Ratibandar Farm Pond-45 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

370 Kesla Chokipura Naya

Ratibandar Farm Pond-46 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

371 Kesl Chokipura Naya Farm Pond-47 New 0.6 1059.7 1.5 3

Page 158: HBAD DIP FINAL ab - pmksy.gov.in

158

a Ratibandar 22°22'56.07"N

77°51'15.27"E

5

372 Kesla Chokipura Naya

Ratibandar Farm Pond-48 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

373 Kesla Chokipura Naya

Ratibandar Farm Pond-49 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

374 Kesla Chokipura Naya

Ratibandar Farm Pond-50 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

375 Kesla Chokipura Naya

Ratibandar Farm Pond-51 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

376 Kesla Chokipura Naya

Ratibandar Farm Pond-52 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

377 Kesla Chokipura Naya

Ratibandar Farm Pond-53 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

378 Kesla Chokipura Naya

Ratibandar Farm Pond-54 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

379 Kesla Chokipura Naya

Ratibandar Farm Pond-55 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

380 Kesla Chokipura Naya

Ratibandar Farm Pond-56 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

381 Kesla Chokipura Naya

Ratibandar Farm Pond-57 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

382 Kesla Chokipura Naya

Ratibandar Farm Pond-58 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

383 Kesla Chokipura Naya

Ratibandar Farm Pond-59 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

384 Kesla Chokipura Naya

Ratibandar Farm Pond-60 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 3

Page 159: HBAD DIP FINAL ab - pmksy.gov.in

159

385 Kesla Chokipura Naya

Ratibandar Farm Pond-61 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 4

386 Kesla Chokipura Naya

Ratibandar Farm Pond-62 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 4

387 Kesla Chokipura Naya

Ratibandar Farm Pond-63 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 4

388 Kesla Chokipura Naya

Ratibandar Farm Pond-64 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 4

389 Kesla Chokipura Naya

Ratibandar Farm Pond-65 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 4

390 Kesla Chokipura Naya

Ratibandar Farm Pond-66 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 4

391 Kesla Chokipura Naya

Ratibandar Farm Pond-67 New 22°22'56.07"N

77°51'15.27"E

0.6 1059.75 1.5 4

392 Kesla Chokipura Naya

Ratibandar Sprinklar Set New 22°22'56.07"N

77°51'15.27"E

10 0 2 1

393 Kesla Naya Sakai Earthen

Dam-01 New 22°22'30.73"N

77°50'25.02"E

5 25000 7 2

394 Kesla Naya Sakai Earthen

Dam-02 New 22°22'30.90"N

77°50'40.31"E

5 25000 8 2

395 Kesla Naya Sakai Stop Dam New

22°22'27.82"N

77°50'16.30"E

4.5 1700 3.5 2

396 Kesla Naya Sakai Stop Dam New

22°22'29.02"N

77°50'23.25"E

5 1500 3 3

397 Kesla Naya Sakai Group well-

01 New 22°22'29.02"N

77°50'23.25"E

2.5 12 2 2

Page 160: HBAD DIP FINAL ab - pmksy.gov.in

160

398 Kesla Naya Sakai Group well-

02 New 22°22'29.02"N

77°50'23.25"E

2.5 12 2 2

399 Kesla Naya Sakai Group well-

03 New 22°22'29.02"N

77°50'23.25"E

2.5 12 2 3

400 Kesla Naya Sakai Group well-

04 New 22°22'29.02"N

77°50'23.25"E

2.5 12 2 3

401 Kesla Naya Sakai Soak Pit-01 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

402 Kesla Naya Sakai Soak Pit-02 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

403 Kesla Naya Sakai Soak Pit-03 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

404 Kesla Naya Sakai Soak Pit-04 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

405 Kesla Naya Sakai Soak Pit-05 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

406 Kesla Naya Sakai Soak Pit-06 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

407 Kesla Naya Sakai Soak Pit-07 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

408 Kesla Naya Sakai Soak Pit-08 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

409 Kesla Naya Sakai Soak Pit-09 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

Page 161: HBAD DIP FINAL ab - pmksy.gov.in

161

410 Kesla Naya Sakai Soak Pit-10 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 2

411 Kesla Naya Sakai Soak Pit-11 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

412 Kesla Naya Sakai Soak Pit-12 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

413 Kesla Naya Sakai Soak Pit-13 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

414 Kesla Naya Sakai Soak Pit-14 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

415 Kesla Naya Sakai Soak Pit-15 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

416 Kesla Naya Sakai Soak Pit-16 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

417 Kesla Naya Sakai Soak Pit-17 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

418 Kesla Naya Sakai Soak Pit-18 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

419 Kesla Naya Sakai Soak Pit-19 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

420 Kesla Naya Sakai Soak Pit-20 New

22°22'29.02"N

77°50'23.25"E

0.1 8 WSR 3

421 Kesla Naya Sakai Farm Pond-

01 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

Page 162: HBAD DIP FINAL ab - pmksy.gov.in

162

422 Kesla Naya Sakai Farm Pond-

02 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

423 Kesla Naya Sakai Farm Pond-

03 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

424 Kesla Naya Sakai Farm Pond-

04 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

425 Kesla Naya Sakai Farm Pond-

05 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

426 Kesla Naya Sakai Farm Pond-

06 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

427 Kesla Naya Sakai Farm Pond-

07 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

428 Kesla Naya Sakai Farm Pond-

08 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

429 Kesla Naya Sakai Farm Pond-

09 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

430 Kesla Naya Sakai Farm Pond-

10 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

431 Kesla Naya Sakai Farm Pond-

11 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 2

432 Kesla Naya Sakai Farm Pond-

12 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 3

433 Kesla Naya Sakai Farm Pond-

13 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 3

Page 163: HBAD DIP FINAL ab - pmksy.gov.in

163

434 Kesla Naya Sakai Farm Pond-

14 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 3

435 Kesla Naya Sakai Farm Pond-

15 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 3

436 Kesla Naya Sakai Farm Pond-

16 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 3

437 Kesla Naya Sakai Farm Pond-

17 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 3

438 Kesla Naya Sakai Farm Pond-

18 New 22°22'29.02"N

77°50'23.25"E

0.6 1059.8 1.5 3

439 Kesla Naya Sakai Sprinklar Set New

22°22'29.02"N

77°50'23.25"E

4.2 1059.8 2 2

440 Kesla

Rayyat Bhogara Naya Jaam

Earthen Dam-01 New

22°25'34.23"N 77°51'9.30"E 4 20000 8 2

441 Kesla

Rayyat Bhogara Naya Jaam

Earthen Dam-02 New

22°25'21.13"N

77°51'25.58"E 4.5 18000 7.2 2

442 Kesla

Rayyat Bhogara Naya Jaam

Earthen Dam-03 New

22°25'12.30"N

77°51'24.90"E 5 25000 10 1

443 Kesla

Rayyat Bhogara Naya Jaam

Earthen Dam04 New 22°25'8.13"N

77°50'45.24"E

4.97 25000 8.5 1

444 Kesla

Rayyat Bhogara Naya Jaam Stop dam-01 New

22°25'17.18"N

77°51'32.53"E 6.5 2100 4.5 2

445 Kesla

Rayyat Bhogara Naya Jaam Group well-01 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 1

446 Kesl Rayyat Naya Jaam Group well-02 New 2.5 12 2 1

Page 164: HBAD DIP FINAL ab - pmksy.gov.in

164

a Bhogara 22°25'15.49"N

77°50'56.53"E

447 Kesla

Rayyat Bhogara Naya Jaam Group well-03 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 1

448 Kesla

Rayyat Bhogara Naya Jaam Group well-04 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 2

449 Kesla

Rayyat Bhogara Naya Jaam Group well-05 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 2

450 Kesla

Rayyat Bhogara Naya Jaam Group well-06 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 2

451 Kesla

Rayyat Bhogara Naya Jaam Group well-07 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 2

452 Kesla

Rayyat Bhogara Naya Jaam Group well-08 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 3

453 Kesla

Rayyat Bhogara Naya Jaam Group well-09 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 3

454 Kesla

Rayyat Bhogara Naya Jaam Group well-10 New

22°25'15.49"N

77°50'56.53"E 2.5 12 2 3

455 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-01 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

456 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-02 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

457 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-03 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

458 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-04 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

459 Kesl Rayyat Naya Jaam Soak Pit-05 New 0.1 8 WSR 1

Page 165: HBAD DIP FINAL ab - pmksy.gov.in

165

a Bhogara 22°25'15.49"N

77°50'56.53"E

460 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-06 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

461 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-07 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

462 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-08 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

463 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-09 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

464 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-10 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

465 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-11 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

466 Kesla

Rayyat Bhogara Naya Jaam Soak Pit-12 New

22°25'15.49"N

77°50'56.53"E 0.1 8 WSR 1

467 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-01 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

468 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-02 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

469 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-03 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

470 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-04 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

471 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-05 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

472 Kesl Rayyat Naya Jaam Farm Pond-06 New 0.6 1059.7 1.5 1

Page 166: HBAD DIP FINAL ab - pmksy.gov.in

166

a Bhogara 22°25'15.49"N

77°50'56.53"E

5

473 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-07 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

474 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-08 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

475 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-09 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

476 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-10 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

477 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-11 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 1

478 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-12 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

479 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-13 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

480 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-14 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

481 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-15 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

482 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-16 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

483 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-17 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

484 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-18 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

485 Kesl Rayyat Naya Jaam Farm Pond-19 New 0.6 1059.7 1.5 2

Page 167: HBAD DIP FINAL ab - pmksy.gov.in

167

a Bhogara 22°25'15.49"N

77°50'56.53"E

5

486 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-20 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

487 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-21 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

488 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-22 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

489 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-23 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

490 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-24 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 2

491 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-25 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

492 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-26 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

493 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-27 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

494 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-28 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

495 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-29 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

496 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-30 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

497 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-31 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

498 Kesl Rayyat Naya Jaam Farm Pond-32 New 0.6 1059.7 1.5 3

Page 168: HBAD DIP FINAL ab - pmksy.gov.in

168

a Bhogara 22°25'15.49"N

77°50'56.53"E

5

499 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-33 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

500 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-34 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

501 Kesla

Rayyat Bhogara Naya Jaam Farm Pond-35 New

22°25'15.49"N

77°50'56.53"E 0.6

1059.75 1.5 3

502 Kesla

Rayyat Bhogara Naya Jaam Sprinklar Set New

22°25'15.49"N

77°50'56.53"E 6.6 0 2 1

503 Kesla Kalakhar Shri Dhana

Earthen Dam01 New

22°21'33.33"N

77°48'42.06"E 7 35000 14 1

504 Kesla Kalakhar Shri Dhana

Earthen Dam-02 New

22°21'28.75"N

77°48'56.25"E 5 25000 10 1

505 Kesla Kalakhar Shri Dhana

Earthen Dam-03 New 22°21'6.96"N

77°49'21.41"E 4.5 22500 9 2

506 Kesla Kalakhar Shri Dhana Stop Dam-01 New

22°21'20.39"N

77°48'59.24"E 3.5 1550 2.5 2

507 Kesla Kalakhar Shri Dhana

Earthen Dam01 Renovation

22°21'22.22"N 77°49'3.78"E 0.5 1600 3.5 1

508 Kesla Kalakhar Shri Dhana

Earthen Dam-02 Renovation

22°21'14.71"N

77°49'21.45"E 0.8 1650 4 1

509 Kesla Kalakhar Shri Dhana Group well-01 New

22°21'14.54"N

77°49'12.32"E 2.5 12 2 1

510 Kesla Kalakhar Shri Dhana Group well-02 New

22°21'14.54"N

77°49'12.32"E 2.5 12 2 1

511 Kesl Kalakhar Shri Dhana Group well-03 New 2.5 12 2 2

Page 169: HBAD DIP FINAL ab - pmksy.gov.in

169

a 22°21'14.54"N

77°49'12.32"E

512 Kesla Kalakhar Shri Dhana Group well-04 New

22°21'14.54"N

77°49'12.32"E 2.5 12 2 2

513 Kesla Kalakhar Shri Dhana Soak Pit-01 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

514 Kesla Kalakhar Shri Dhana Soak Pit-02 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

515 Kesla Kalakhar Shri Dhana Soak Pit-03 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

516 Kesla Kalakhar Shri Dhana Soak Pit-04 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

517 Kesla Kalakhar Shri Dhana Soak Pit-05 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

518 Kesla Kalakhar Shri Dhana Soak Pit-06 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

519 Kesla Kalakhar Shri Dhana Soak Pit-07 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

520 Kesla Kalakhar Shri Dhana Soak Pit-08 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

521 Kesla Kalakhar Shri Dhana Soak Pit-09 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

522 Kesla Kalakhar Shri Dhana Soak Pit-10 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

523 Kesla Kalakhar Shri Dhana Soak Pit-11 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

524 Kesl Kalakhar Shri Dhana Soak Pit-12 New 0.1 8 WSR 1

Page 170: HBAD DIP FINAL ab - pmksy.gov.in

170

a 22°21'14.54"N

77°49'12.32"E

525 Kesla Kalakhar Shri Dhana Soak Pit-13 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

526 Kesla Kalakhar Shri Dhana Soak Pit-14 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

527 Kesla Kalakhar Shri Dhana Soak Pit-15 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

528 Kesla Kalakhar Shri Dhana Soak Pit-16 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

529 Kesla Kalakhar Shri Dhana Soak Pit-17 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

530 Kesla Kalakhar Shri Dhana Soak Pit-18 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

531 Kesla Kalakhar Shri Dhana Soak Pit-19 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

532 Kesla Kalakhar Shri Dhana Soak Pit-20 New

22°21'14.54"N

77°49'12.32"E 0.1 8 WSR 1

533 Kesla Kalakhar Shri Dhana Farm Pond-01 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

534 Kesla Kalakhar Shri Dhana Farm Pond-02 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

535 Kesla Kalakhar Shri Dhana Farm Pond-03 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

536 Kesla Kalakhar Shri Dhana Farm Pond-04 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

537 Kesl Kalakhar Shri Dhana Farm Pond-05 New 0.6 1059.7 1.5 1

Page 171: HBAD DIP FINAL ab - pmksy.gov.in

171

a 22°21'14.54"N

77°49'12.32"E

5

538 Kesla Kalakhar Shri Dhana Farm Pond-06 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

539 Kesla Kalakhar Shri Dhana Farm Pond-07 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

540 Kesla Kalakhar Shri Dhana Farm Pond-08 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

541 Kesla Kalakhar Shri Dhana Farm Pond-09 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 1

542 Kesla Kalakhar Shri Dhana Farm Pond-10 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

543 Kesla Kalakhar Shri Dhana Farm Pond-11 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

544 Kesla Kalakhar Shri Dhana Farm Pond-12 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

545 Kesla Kalakhar Shri Dhana Farm Pond-13 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

546 Kesla Kalakhar Shri Dhana Farm Pond-14 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

547 Kesla Kalakhar Shri Dhana Farm Pond-15 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

548 Kesla Kalakhar Shri Dhana Farm Pond-16 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

549 Kesla Kalakhar Shri Dhana Farm Pond-17 New

22°21'14.54"N

77°49'12.32"E 0.6

1059.75 1.5 2

550 Kesl Kalakhar Shri Dhana Farm Pond-18 New 0.6 1059.7 1.5 2

Page 172: HBAD DIP FINAL ab - pmksy.gov.in

172

a 22°21'14.54"N

77°49'12.32"E

5

551 Kesla Kalakhar Shri Dhana Sprinklar Set New

22°21'14.54"N

77°49'12.32"E 3.2 0 2 1

Page 173: HBAD DIP FINAL ab - pmksy.gov.in

173

Seonimalwa

Page 174: HBAD DIP FINAL ab - pmksy.gov.in

174

Pradhanmantri Krishi Sinchai Yojna, Seonimalwa Bloock - Seoni Malwa S.N.

Name Of Block

Gram Panchayat Village Name Name Of Work

Type Of Structure ( New /

Renovation)

Co - ordinates Khasra

No.

Total

Cost ( In Lakh)

Storge Capaci

ty ( cum)

Irrigation

Potential (Ha.)

Year of Implementa

tion

Scheme Name Latitude Longitude

1 Seoni Malwa Malapat Zondhal Stop Dam New 22°26' 44.141'' 77°36' 17.820'' 12.0

0 2450.0

0 4.90 Third Year MGNREGA

2 Seoni Malwa Malapat Zondhal Well

Deepening Renovati

on 22° 27' 14.161'' 77°35' 52.441'' 0.30 18.50 water

store Second Year

MGNREGA

3 Seoni Malwa Malapat Malapat Well

Deepening Renovati

on 22° 27' 01.623'' 77°35' 31.732'' 0.22 18.00 water

store First Year MGNREGA

4 Seoni Malwa Malapat Zondhal Well

Deepening Renovati

on 22° 26' 03.808'' 77°35' 56.479'' 0.25 20.50 water

store Second Year

MGNREGA

5 Seoni Malwa Malapat Malapat Soak Pit New 22° 27'

01.822'' 77°35' 30.688'' 0.10 5.00 W S R First Year MGNREGA

6 Seoni Malwa Malapat Malapat Soak Pit New 22° 27'

07.954'' 77°35' 26.614'' 0.10 5.00 W S R First Year MGNREGA

7 Seoni Malwa Malapat Malapat Soak Pit New 22° 27'

02.557'' 77°35' 26.685'' 0.10 5.00 W S R Third Year MGNREGA

8 Seoni Malwa Malapat Malapat Soak Pit New 22° 27'

00.566'' 77°35' 32.941'' 0.10 5.00 W S R Second Year

MGNREGA

9 Seoni Malwa kewaljhir Malapat Soak Pit New 22° 26'

00.629'' 77°35' 46.729'' 0.10 5.00 W S R Third Year MGNREGA

10 Seoni Malwa kewaljhir Salai Stop Dam New 22° 28'

03.414'' 77°39' 44.857'' 15.00

2630.00 5.50 Third Year MGNRE

GA

11 Seoni Malwa kewaljhir kewaljhir Well

Deepening Renovati

on 22° 27' 13.880'' 77°38' 38.143'' 0.23 18.00 water

store Second Year

MGNREGA

12 Seoni Malwa kewaljhir narri Well

Deepening Renovati

on 22° 27' 06.649'' 77°35' 02.217'' 0.25 19.50 water

store Second Year

MGNREGA

13 Seoni Malwa kewaljhir kewaljhir Soak Pit New 22° 27'

07.960'' 77°38' 40.560'' 0.10 5.00 W S R First Year MGNREGA

14 Seoni Malwa kewaljhir kewaljhir Soak Pit New 22° 27'

07.968'' 77°38' 40.560'' 0.10 5.00 W S R First Year MGNREGA

15 Seoni Malwa kewaljhir kewaljhir Soak Pit New 22° 27'

12.513'' 77°37' 56.450'' 0.10 5.00 W S R Third Year MGNREGA

16 Seoni Malwa Nandarwada Nandarwada Well

Deepening Renovati

on 22° 27' 01.397'' 77°34' 47.430'' 0.25 18.00 water

store Second Year

MGNREGA

17 Seoni Malwa Nandarwada Nandarwada Well

Deepening Renovati

on 22° 27' 01.067'' 77°35' 05.832'' 0.22 15.60 water

store Second Year

MGNREGA

18 Seoni Malwa Nandarwada Nandarwada Pond

Construction New 22° 26' 48.515'' 77°35' 25.497'' 8.00 2010.0

0 4.20 Third Year MGNREGA

Page 175: HBAD DIP FINAL ab - pmksy.gov.in

175

19 Seoni Malwa Nandarwada Nandarwada Soak Pit New 22° 27'

01.431'' 77°34' 43.804'' 0.10 5.00 W S R First Year MGNREGA

20 Seoni Malwa Nandarwada Nandarwada Soak Pit New 22° 27'

01.623'' 77°35' 51.742'' 0.10 5.00 W S R First Year MGNREGA

21 Seoni Malwa Nandarwada Nandarwada Soak Pit New 22° 26'

57.538'' 77°34' 57.784'' 0.10 5.00 W S R Second Year

MGNREGA

22 Seoni Malwa Nandarwada Nandarwada Soak Pit New 22° 26'

53.995'' 77°35' 17.038'' 0.10 5.00 W S R Third Year MGNREGA

23 Seoni Malwa Nandarwada Nandarwada Soak Pit New 22° 26'

55.567'' 77°35' 16.132'' 0.10 5.00 W S R First Year MGNREGA

24 Seoni Malwa Dhamaniya Dhamaniya Pond

Construction New 22° 25' 36.15'' 77°24' 63.41'' 8.00 3200.00 6.40 Second

Year MGNRE

GA

25 Seoni Malwa Dhamaniya Dhamaniya Well

Deepening Renovati

on 22° 25' 01.227'' 77°24' 42.413'' 0.25 18.50 water

store Third Year MGNREGA

26 Seoni Malwa Dhamaniya Dhamaniya Well

Deepening Renovati

on 22° 25' 05.127'' 77°24' 44.418'' 0.25 19.20 water

store Second Year

MGNREGA

27 Seoni Malwa Dhamaniya Dhamaniya Soak Pit New 22° 25'

28.851'' 77°24' 11.459'' 0.10 5.00 W S R First Year MGNREGA

28 Seoni Malwa Dhamaniya Dhamaniya Soak Pit New 22° 25'

31.942'' 77°24' 19.177'' 0.10 5.00 W S R First Year MGNREGA

29 Seoni Malwa Faridpur Amlada khurd stop dam New 22° 23'

40.505'' 77°20' 50.299'' 14.00

2800.00 5.60 Fourth Year MGNRE

GA

30 Seoni Malwa Faridpur Amlada khurd Well

Deepening Renovati

on 22° 22' 39.743'' 77°20' 50.739'' 0.25 18.00 water

store Second Year

MGNREGA

31 Seoni Malwa Faridpur Faridpur Well

Deepening Renovati

on 22° 23' 11.261'' 77°22' 23.655'' 0.25 17.50 water

store Third Year MGNREGA

32 Seoni Malwa Faridpur Faridpur Kapildhara

koop New 22° 22' 32.918'' 77°21' 467141'' 2.00 18.50 1.00 First Year MGNRE

GA

33 Seoni Malwa Faridpur Faridpur Kapildhara

koop New 22° 22' 32.925'' 77°21' 43.830'' 2.00 18.50 1.00 Second

Year MGNRE

GA

34 Seoni Malwa Pagdhal Pagdhal Stop dam New 22° 22'

23.559'' 77°14' 03.887'' 10.00

1920.00 3.80 Fourth Year MGNRE

GA

35 Seoni Malwa Pagdhal Pagdhal Pond

Construction New 22° 22' 23.415'' 77°14' 04.750'' 9.00 3000.0

0 6.00 Third Year MGNREGA

36 Seoni Malwa Pagdhal Pagdhal Stop dam New 22° 22'

23.470'' 77°14' 03.558'' 10.00

1950.00 3.90 Fifth Year MGNRE

GA

37 Seoni Malwa Pagdhal Pagdhal Soak Pit New 22° 22'

23.552'' 77°14' 04.965'' 0.10 5.00 W S R First Year MGNREGA

38 Seoni Malwa Pagdhal Pagdhal Soak Pit New 22° 22'

25.477'' 77°14' 02.613'' 0.10 5.00 W S R First Year MGNREGA

39 Seoni Malwa Pagdhal Pagdhal Soak Pit New 22° 22'

23.408'' 77°14' 04.189'' 0.10 5.00 W S R Second Year

MGNREGA

40 Seoni Malwa Pagdhal Pagdhal Soak Pit New 22° 22'

23.264'' 77°14' 03.107'' 0.10 5.00 W S R Third Year MGNREGA

41 Seoni Malwa Choukimafi Choukimafi Stop dam New 22° 23'

36.760'' 77°17' 27.960'' 10.00

2000.00 4.00 Third Year MGNRE

GA

Page 176: HBAD DIP FINAL ab - pmksy.gov.in

176

42 Seoni Malwa Choukimafi Liladiya Stop Dam New 22° 17' 16.18'' 77° 20' 51.45'' 15.0

0 2150.0

0 4.30 Third Year MGNREGA

43 Seoni Malwa Choukimafi Liladiya Pond

Deepening Renovati

on 22° 17' 16.180'' 77° 20' 51.450'' 6.00 2800.0

0 5.60 Second Year

MGNREGA

44 Seoni Malwa Choukimafi Liladiya Pond

Deepening Renovati

on 22° 17' 19.150'' 77° 20' 51.450'' 6.00 2500.0

0 5.00 Fourth Year MGNREGA

45 Seoni Malwa Choukimafi Choukimafi Well

Deepening Renovati

on 22° 23' 36.740'' 77° 17' 27.900'' 0.24 18.10 water

store Second Year

MGNREGA

46 Seoni Malwa Choukimafi Choukimafi Kapildhara

koop New 22° 22' 08.020'' 77° 19' 16.190'' 2.00 18.00 1.00 Fifth Year MGNRE

GA

47 Seoni Malwa Choukimafi Choukimafi Kapildhara

koop New 22° 21' 06.037'' 77° 20' 41.290'' 2.00 18.00 1.00 First Year MGNRE

GA

48 Seoni Malwa Choukimafi Choukimafi Kapildhara

koop New 22° 21' 35.800'' 77° 19' 44.780'' 2.00 17.50 1.00 First Year MGNRE

GA

49 Seoni Malwa Choukimafi Liladiya Kapildhara

koop New 22° 21' 00.550'' 77° 20' 31.190'' 2.00 18.50 1.00 Third Year MGNRE

GA

50 Seoni Malwa Choukimafi Liladiya Kapildhara

koop New 22° 21' 18.590'' 77° 20' 34.050'' 2.00 18.50 1.00 Fourth Year MGNRE

GA

51 Seoni Malwa Ghana Ghana Well

Deepening Renovati

on 22° 20' 03.278'' 77° 22' 39.393'' 0.22 19.00 water

store Second Year

MGNREGA

52 Seoni Malwa Ghana Bandarkho Well

Deepening Renovati

on 22° 19' 47.746'' 77° 21' 16.282'' 0.20 18.50 water

store First Year MGNREGA

53 Seoni Malwa Ghana Bandarkho Kapildhara

koop New 22° 19' 17.897'' 77° 21' 54.349'' 2.00 18.90 1.00 Third Year MGNRE

GA

54 Seoni Malwa Ghana Bandarkho Kapildhara

koop New 22° 19' 14.848'' 77° 21' 00.007'' 2.00 18.50 1.00 Third Year MGNRE

GA

55 Seoni Malwa Ghana Bandarkho Kapildhara

koop New 22° 19' 22.573'' 77° 21' 58.936'' 2.00 18.50 1.00 Fourth Year MGNRE

GA

56 Seoni Malwa Ghana Bandarkho Kapildhara

koop New 22° 19' 09.664'' 77° 21' 58.442'' 2.00 18.50 1.00 Fourth Year MGNRE

GA

57 Seoni Malwa Ghana Bandarkho Kapildhara

koop New 22° 20' 04.452'' 77° 23' 11.336'' 2.00 18.50 1.00 Fifth Year MGNRE

GA

58 Seoni Malwa Nawalgawn Ranipur Stop dam New 22° 21'

37.815'' 77° 22' 57.576'' 10.00

1890.00 3.80 Fifth Year MGNRE

GA

59 Seoni Malwa Nawalgawn Nawalgawn stop dam New 22° 21'

526804' 77° 22' 01.906'' 12.00

1950.00 3.90 Second

Year MGNRE

GA

60 Seoni Malwa Nawalgawn Nawalgawn Well

Deepening Renovati

on 22° 21' 00.000'' 77° 22' 40.684'' 0.22 1850.0

0 water store

Second Year

MGNREGA

61 Seoni Malwa Nawalgawn Ranipur Well

Deepening Renovati

on 22° 21' 23.780'' 77° 23' 49.376'' 0.25 17.50 water

store Third Year MGNREGA

62 Seoni Malwa Nawalgawn Nawalgawn Kapildhara

koop New 22° 21' 39.930'' 77° 22' 34.175'' 2.00 18.50 1.00 First Year MGNRE

GA

63 Seoni Malwa Nawalgawn Nawalgawn Kapildhara

koop New 22° 21' 33.304'' 77° 22' 32.107'' 2.00 18.50 1.00 First Year MGNRE

GA

64 Seoni Malwa Nawalgawn Nawalgawn Kapildhara

koop New 22° 22' 01.120'' 77° 22' 50.627'' 2.00 18.50 1.00 Fourth Year MGNRE

GA

Page 177: HBAD DIP FINAL ab - pmksy.gov.in

177

65 Seoni Malwa Nawalgawn Ranipur Farm Pond New 22° 21'

00.846'' 77° 23' 084947' 0.50 300.00 1.00 Second Year

MGNREGA

66 Seoni Malwa Guranjghant Guranjghant stop dam New 22° 20 59.944'' 77° 21' 58.277'' 11.0

0 2500.0

0 5.00 Fourth Year MGNREGA

67 Seoni Malwa Guranjghant Guranjghant stop dam New 22° 21'

15.266'' 77° 21' 49.186'' 9.00 1950.00 3.90 Fifth Year MGNRE

GA

68 Seoni Malwa Guranjghant Guranjghant Well

Deepening Renovati

on 22° 21' 02.734'' 77° 22' 88.627'' 0.22 17.50 water

store Second Year

MGNREGA

69 Seoni Malwa Guranjghant Guranjghant Well

Deepening Renovati

on 22° 21' 01.162'' 77° 22' 20.101'' 0.25 18.20 water

store Third Year MGNREGA

70 Seoni Malwa Guranjghant Paraswada Well

Deepening Renovati

on 22° 21' 46.700'' 77° 21' 22.736'' 0.22 16.50 water

store First Year MGNREGA

71 Seoni Malwa Basaniya kala Basaniya kala Pond

Construction New 22° 23' 08.555'' 77° 24' 21.758'' 10.0

0 3000.0

0 6.00 Third Year MGNREGA

72 Seoni Malwa Basaniya kala Basaniya kala Well

Deepening Renovati

on 22° 23' 17.729'' 77° 24' 07.421'' 0.25 17.50 water

store First Year MGNREGA

73 Seoni Malwa Basaniya kala Basaniya kala Soak Pit New 22° 23'

18.285'' 77° 23' 58.440'' 0.10 5.00 W S R First Year MGNREGA

74 Seoni Malwa Basaniya kala Jhinganpur Soak Pit New 22° 21'

55.627'' 77° 24' 10.140'' 0.10 5.00 W S R First Year MGNREGA

75 Seoni Malwa Basaniya kala Jhinganpur Soak Pit New 22° 23'

21.663'' 77° 24' 00.582'' 0.10 5.00 W S R Second Year

MGNREGA

76 Seoni Malwa Basaniya kala Jhinganpur Soak Pit New 22° 23'

18.360'' 77° 24' 06.405'' 0.10 5.00 W S R Second Year

MGNREGA

77 Seoni Malwa Basaniya kala Jhinganpur Soak Pit New 22° 21'

53.457'' 77° 24' 08.767'' 0.10 5.00 W S R Fourth Year MGNREGA

78 Seoni Malwa Nirkhi Nirkhi Stop dam New 22° 27'

06.148'' 77° 20' 43.542'' 13.00

2000.00 5.00 Third Year MGNRE

GA

79 Seoni Malwa Nirkhi Nirkhi Well

Deepening Renovati

on 22° 27' 11.277'' 77° 20' 50.629'' 0.20 17.50 water

store Second Year

MGNREGA

80 Seoni Malwa Nirkhi Golgawn Well

Deepening Renovati

on 22° 28' 03.463'' 77° 22' 09.730'' 0.22 18.10 water

store Third Year MGNREGA

81 Seoni Malwa Nirkhi Nirkhi Well

Deepening Renovati

on 22° 27' 11.250'' 77° 20' 56.918'' 0.23 18.90 water

store Fourth Year MGNREGA

82 Seoni Malwa Nirkhi Nirkhi Soak Pit New 22° 27' 13.694' 77° 20' 42.966'' 0.10 5.00 W S R First Year MGNRE

GA

83 Seoni Malwa Nirkhi Nirkhi Soak Pit New 22° 27'

13.224'' 77° 20' 55.984'' 0.10 5.00 W S R First Year MGNREGA

84 Seoni Malwa Nirkhi Golgawn Soak Pit New 22° 27'

56.054'' 77° 22' 21.376'' 0.10 5.00 W S R First Year MGNREGA

85 Seoni Malwa Nirkhi Golgawn Soak Pit New 22° 27'

56.253'' 77° 22' 20.854'' 0.10 5.00 W S R Fifth Year MGNREGA

86 Seoni Malwa Nirkhi Golgawn Soak Pit New 22° 27'

34.768'' 77° 22' 29.725'' 0.10 5.00 W S R Fifth Year MGNREGA

87 Seoni Malwa Rawan pipal Rawan pipal Well

Deepening Renovati

on 22° 22' 23.415'' 77° 14' 03.558'' 0.22 18.50 water

store Second Year

MGNREGA

Page 178: HBAD DIP FINAL ab - pmksy.gov.in

178

88 Seoni Malwa Rawan pipal Rawan pipal Soak Pit New 22° 22'

25.644'' 77° 14' 04.965'' 0.10 5.00 W S R First Year MGNREGA

89 Seoni Malwa Rawan pipal Rawan pipal Soak Pit New 22° 22'

23.408'' 77° 14' 03.107'' 0.10 5.00 W S R First Year MGNREGA

90 Seoni Malwa Rawan pipal Rawan pipal Soak Pit New 22° 22'

23.522'' 77° 14' 03.887'' 0.10 5.00 W S R Third Year MGNREGA

91 Seoni Malwa Gajan pur Gajanpur Check dam New 22° 28'

08.894'' 77° 31' 30.692'' 6.00 1850.00 3.70 Second

Year MGNRE

GA

92 Seoni Malwa Gajan pur Gajanpur Check dam New 22° 27'

57.317'' 77° 31' 31.901'' 5.00 1750.00 3.50 Third Year MGNRE

GA

93 Seoni Malwa Gajan pur Gajanpur Well

Deepening Renovati

on 22° 28' 02.968'' 77° 31' 28.138'' 0.25 18.00 water

store First Year MGNREGA

94 Seoni Malwa Gajan pur Gajanpur Well

Deepening Renovati

on 22° 28' 10.645'' 77° 31' 25.391'' 0.25 19.00 water

store Second Year

MGNREGA

95 Seoni Malwa Gajan pur Gajanpur Well

Deepening Renovati

on 22° 27' 51.419'' 77° 31' 24.320'' 0.22 18.50 water

store Second Year

MGNREGA

96 Seoni Malwa Gajan pur Gajanpur Well

Deepening Renovati

on 22° 27' 31.094'' 77° 31' 36.130'' 0.30 18.90 water

store Fourth Year MGNREGA

97 Seoni Malwa Gajan pur Gajanpur Well

Deepening Renovati

on 22° 28' 00.000'' 77° 31' 28.330'' 0.30 18.90 water

store Fifth Year MGNREGA

98 Seoni Malwa Gajan pur Gajanpur Well

Deepening Renovati

on 22°

27'581.134'' 77° 31' 23.688'' 0.25 18.90 water store Fifth Year MGNRE

GA

99 Seoni Malwa Batki iklani Iklani Well

Deepening Renovati

on 22° 26' 09.109'' 77° 33' 36.321'' 0.30 50.00 water

store Second Year

MGNREGA

100 Seoni Malwa Batki iklani Batki Well

Deepening Renovati

on 22° 25' 22.657'' 77° 33' 44.066'' 0.25 17.20 water

store Third Year MGNREGA

101 Seoni Malwa Batki iklani Iklani Pond

Construction New 22° 25' 50.487'' 77° 33' 33.245'' 10.0

0 2500.0

0 5.00 Second Year

MGNREGA

102 Seoni Malwa Batki iklani Batki Stop dam New 22° 24'

46.004'' 77° 34' 01.452'' 15.00

1920.00 3.85 Fourth Year MGNRE

GA

103 Seoni Malwa Batki iklani Batki Stop dam New 22° 25'

11.465'' 77° 33' 57.140'' 15.00

1990.00 4.00 Fifth Year MGNRE

GA

104 Seoni Malwa Batki iklani Batki Kapildhara

koop New 22° 24' 54.477'' 77° 33' 51.290'' 2.50 18.90 1.00 First Year MGNRE

GA

105 Seoni Malwa Batki iklani Batki Kapildhara

koop New 22° 24' 56.762'' 77° 33' 51.674'' 2.50 18.90 1.00 First Year MGNRE

GA

106 Seoni Malwa Bhamedi Bhamedi Stop dam New 22° 27' 18.927' 77° 33' 50.273'' 12.0

0 2500.0

0 5.00 Fifth Year MGNREGA

107 Seoni Malwa Bhamedi Bhamedi Check dam New 22° 27'

23.060'' 77° 33' 34.398'' 8.00 1890.00 3.80 Third Year MGNRE

GA

108 Seoni Malwa Bhamedi Bhamedi Check dam New 22° 27'

39.959'' 77° 33' 04.406'' 8.00 1920.00 3.85 Second

Year MGNRE

GA

109 Seoni Malwa Bhamedi Bhamedi Well

Deepening Renovati

on 22° 27' 17.480'' 77° 33' 10.778'' 0.22 18.50 water

store First Year MGNREGA

110 Seoni Malwa Bhamedi Bhamedi Well

Deepening Renovati

on 22° 27' 24.070'' 77° 33' 02.593'' 0.25 19.50 water

store First Year MGNREGA

Page 179: HBAD DIP FINAL ab - pmksy.gov.in

179

111 Seoni Malwa Bhamedi Bhamedi Pond

Deepening Renovati

on 22° 27' 17.354'' 77° 32' 48.448'' 6.00 2500.0

0 5.00 Second Year

MGNREGA

112 Seoni Malwa Barakhad kala Barakhad kala Stop dam New 22° 27'

48.597'' 77° 29' 42.990'' 15.00

2500.00 5.00 Second

Year MGNRE

GA

113 Seoni Malwa Barakhad khurd Barakhad khurd Well

Deepening Renovati

on 22° 27' 28.567'' 77° 29' 55.946'' 0.25 1750.0

0 water store

Second Year

MGNREGA

114 Seoni Malwa Barakhad khurd Barakhad khurd Well

Deepening Renovati

on 22° 27' 29.137'' 77° 29' 59.341'' 0.25 1850.0

0 water store First Year MGNRE

GA

115 Seoni Malwa Barakhad khurd Barakhad khurd Well

Deepening Renovati

on 22° 27' 30.339'' 77° 29' 53.024'' 0.24 1790.0

0 water store Third Year MGNRE

GA

116 Seoni Malwa Barakhad kala Barakhad kala Well

Deepening Renovati

on 22° 27' 29.089'' 77° 29' 40.692'' 0.25 1850.0

0 water store Fourth Year MGNRE

GA

117 Seoni Malwa Barakhad kala Barakhad kala Well

Deepening Renovati

on 22° 27' 29.000'' 77° 29' 44.152'' 0.22 1950.0

0 water store Fifth Year MGNRE

GA

118 Seoni Malwa Barakhad kala Barakhad kala Soak Pit New 22° 27'

24.447'' 77° 29' 37.808'' 0.10 5.00 W S R First Year MGNREGA

119 Seoni Malwa Barakhad kala Barakhad kala Soak Pit New 22° 27'

29.000'' 77° 29' 44.152'' 0.10 5.00 W S R First Year MGNREGA

120 Seoni Malwa Sotachikli Sotachikli Stop dam New 22° 25'

27.446'' 77° 35' 41.785'' 15.00

2200.00 4.40 Third Year MGNRE

GA

121 Seoni Malwa Borkunda Borkunda Well

Deepening Renovati

on 22° 25' 43.799'' 77° 34' 30.291'' 0.25 18.50 water

store Second Year

MGNREGA

122 Seoni Malwa Sotachikli Sotachikli Soak Pit New 22° 25'

41.169'' 77° 35' 36.346'' 0.10 5.00 W S R First Year MGNREGA

123 Seoni Malwa Sotachikli Sotachikli Soak Pit New 22° 25'

28.933'' 77° 35' 52.469'' 0.10 5.00 W S R Second Year

MGNREGA

124 Seoni Malwa Sotachikli Sotachikli Kapildhara

koop New 22° 25' 23.440'' 77° 35' 36.566'' 2.50 18.00 1.00 First Year MGNRE

GA

125 Seoni Malwa Sotachikli Sotachikli Kapildhara

koop New 22° 24' 57.079'' 77° 35' 25.552'' 2.50 18.00 1.00 Third Year MGNRE

GA

126 Seoni Malwa Sotachikli Borkunda Kapildhara

koop New 22° 25' 33.547'' 77° 34' 49.435'' 2.50 18.00 1.00 Second

Year MGNRE

GA

127 Seoni Malwa Amlada kala Amlada kala Stop dam New 22° 22' 77.054' 77° 20' 37.802'' 15.0

0 23.50 4.70 Fourth Year MGNREGA

128 Seoni Malwa Amlada kala Amlada kala Pond

Construction New 22° 21' 39.680'' 77° 20' 13.690'' 6.00 1900.0

0 3.80 Second Year

MGNREGA

129 Seoni Malwa Amlada kala Amlada kala Farm Pond New 22° 22' 51.72'' 77° 19' 28.746'' 0.50 300.00 1.00 First Year MGNRE

GA

130 Seoni Malwa Amlada kala Amlada kala Farm Pond New 22° 23' 35.76'' 77° 19' 31.33'' 0.50 300.00 1.00 Second

Year MGNRE

GA

131 Seoni Malwa Amlada kala Amlada kala Kapildhara

koop New 22° 23' 00.670'' 77° 19' 39.320'' 2.00 18.00 1.00 First Year MGNRE

GA

132 Seoni Malwa Amlada kala Amlada kala Kapildhara

koop New 22° 22' 56.50'' 77° 19' 38.33'' 2.00 18.00 1.00 Fourth Year MGNREGA

133 Seoni Malwa Amlada kala Amlada kala Kapildhara

koop New 22° 22' 01.970'' 77° 20' 48.320'' 2.00 18.00 1.00 Third Year MGNRE

GA

Page 180: HBAD DIP FINAL ab - pmksy.gov.in

180

134 Seoni Malwa Dhekna Dhekna Check dam New 22° 17'

45.000'' 77° 25' 13.000'' 2.40 2000.00 2.00 First Year MGNRE

GA

135 Seoni Malwa Dhekna Dhekna Check dam New 22° 14'

30.000'' 77° 25' 23.000'' 5.68 5000.00 5.00 Second

Year MGNRE

GA

136 Seoni Malwa Dhekna Gitkheda Check dam New 22° 17'

21.000'' 77° 25' 11.000'' 5.60 5500.00 5.50 Third Year MGNRE

GA

137 Seoni Malwa Dhekna Ama katara Check dam New 22° 17'

19.000'' 77° 25' 13.000'' 6.65 6000.00 6.00 Fourth Year MGNRE

GA

138 Seoni Malwa Dhekna Gitkheda Check dam New 22° 14'

40.000'' 77° 25' 25.000'' 6.65 6000.00 6.00 Fifth Year MGNRE

GA

139 Seoni Malwa Dhekna Palasi Check dam New 22° 17'

50.000'' 77° 26' 19.000'' 6.65 6000.00 6.00 First Year MGNRE

GA

140 Seoni Malwa Dhekna Gitkheda Stop dam New 22° 14'

40.000'' 77° 25' 25.000'' 3.37 4000.00 4.50 First Year MGNRE

GA

141 Seoni Malwa Dhekna Dhekna Stop dam New 22° 17'

19.000'' 77° 25' 13.000'' 3.37 4000.00 4.50 Fourth Year MGNRE

GA

142 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 23' 47.124'' 77° 38' 40.340'' 2.50 12.00 1.00 First Year MGNRE

GA

143 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 03.082'' 77° 38' 43.883'' 2.50 12.00 1.00 First Year MGNRE

GA

144 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 01.475'' 77° 39' 01.214 2.50 12.00 1.00 First Year MGNRE

GA

145 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 23' 57.039'' 77° 39' 00.000'' 2.50 12.00 1.00 First Year MGNRE

GA

146 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 00.713'' 77° 38' 56.819'' 2.50 12.00 1.00 First Year MGNRE

GA

147 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 02.155'' 77° 39' 00.811'' 2.50 12.00 1.00 First Year MGNRE

GA

148 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 12.399'' 77° 39' 23.791'' 2.50 12.00 1.00 Second

Year MGNRE

GA

149 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 16.691'' 77° 39' 18.820'' 2.50 12.00 1.00 Second

Year MGNRE

GA

150 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 10.957'' 77° 39' 10.580'' 2.50 12.00 1.00 Second

Year MGNRE

GA

151 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 09.035'' 77° 39' 09.619'' 2.50 12.00 1.00 Second

Year MGNRE

GA

152 Seoni Malwa Pipal gota Pipal gota Kapildhara

koop New 22° 24' 08.568'' 77° 39' 05.773'' 2.50 12.00 1.00 Second

Year MGNRE

GA

153 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 22' 07.814'' 77° 39' 23.397'' 2.50 12.00 1.00 Third Year MGNRE

GA

154 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 22' 11.550'' 77° 39' 15.579' 2.50 12.00 1.00 Third Year MGNRE

GA

155 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 22' 05.480'' 77° 39' 23.599'' 2.50 12.00 1.00 Third Year MGNRE

GA

156 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 21' 48.327'' 77° 39' 03.686'' 2.50 12.00 1.00 Third Year MGNRE

GA

Page 181: HBAD DIP FINAL ab - pmksy.gov.in

181

157 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 21' 01.422'' 77° 39' 00.000'' 2.50 12.00 1.00 Third Year MGNRE

GA

158 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 22' 06.160'' 77° 39' 00.005'' 2.50 12.00 1.00 Fourth Year MGNRE

GA

159 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 22' 18.609' 77° 38' 48.854'' 2.50 12.00 1.00 Fourth Year MGNREGA

160 Seoni Malwa Pipal gota Ghogara Kapildhara

koop New 22° 22' 17.283'' 77° 38' 44.899'' 2.50 12.00 1.00 Fourth Year MGNRE

GA

161 Seoni Malwa Pipal gota Baspani Kapildhara

koop New 22° 22' 56.978'' 77° 36' 38.007'' 2.50 12.00 1.00 Fourth Year MGNRE

GA

162 Seoni Malwa Pipal gota Baspani Kapildhara

koop New 22° 22' 59.162'' 77° 36' 41.962'' 2.50 12.00 1.00 Fourth Year MGNRE

GA

163 Seoni Malwa Pipal gota Jatamau Kapildhara

koop New 22° 22' 46.425'' 77° 35' 17.862'' 2.50 12.00 1.00 Fifth Year MGNRE

GA

164 Seoni Malwa Pipal gota Jatamau Kapildhara

koop New 22° 22' 47.928' 77° 35' 27.612'' 2.50 12.00 1.00 Fifth Year MGNREGA

165 Seoni Malwa Pipal gota Jatamau Kapildhara

koop New 22° 22' 42.250'' 77° 34' 55.999'' 2.50 12.00 1.00 Fifth Year MGNRE

GA

166 Seoni Malwa Pipal gota Jatamau Kapildhara

koop New 22° 22' 49.281'' 77° 35' 28.958'' 2.50 12.00 1.00 Fifth Year MGNRE

GA

167 Seoni Malwa Pipal gota Nayagawn Kapildhara

koop New 22° 25' 14.678'' 77° 40' 56.268'' 2.50 12.00 1.00 Fifth Year MGNRE

GA

168 Seoni Malwa Pipal gota Nayagawn Kapildhara

koop New 22° 25' 12.865'' 77° 40' 45.364'' 2.50 12.00 1.00 Fifth Year MGNRE

GA

169 Seoni Malwa Pipal gota Nayagawn Kapildhara

koop New 22° 25' 30.526'' 77° 40' 47.122'' 2.50 12.00 1.00 Fifth Year MGNRE

GA

170 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 37.35'' 77° 38' 30.86'' 2.50 12.00 1.00 First Year MGNREGA

171 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 35.54'' 77° 38' 22.53'' 2.50 12.00 1.00 First Year MGNREGA

172 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 00.63'' 77° 38' 47.03'' 2.50 12.00 1.00 First Year MGNREGA

173 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 04.04'' 77° 38' 44.19'' 2.50 12.00 1.00 First Year MGNREGA

174 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 18' 55.64'' 77° 39' 40.21'' 2.50 12.00 1.00 First Year MGNREGA

175 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 06.7'' 77° 38' 55.83'' 2.50 12.00 1.00 First Year MGNREGA

176 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 35.050'' 77° 25' 13.000'' 2.50 12.00 1.00 Second

Year MGNRE

GA

177 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 17' 19.000'' 77° 37' 46.13'' 2.50 12.00 1.00 Second

Year MGNRE

GA

178 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 29.96'' 77° 37' 21.34'' 2.50 12.00 1.00 Second Year

MGNREGA

179 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 35.02'' 77° 37' 50.05'' 2.50 12.00 1.00 Second Year

MGNREGA

Page 182: HBAD DIP FINAL ab - pmksy.gov.in

182

180 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 36.06'' 77° 38' 24.61'' 2.50 12.00 1.00 Second Year

MGNREGA

181 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 13.83'' 77° 38' 27.38'' 2.50 12.00 1.00 Third Year MGNREGA

182 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 18' 51.9'' 77° 39' 27.1'' 2.50 12.00 1.00 Third Year MGNREGA

183 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 04.36'' 77° 38' 57.3'' 2.50 12.00 1.00 Third Year MGNREGA

184 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 18' 56.06'' 77° 39' 39.16'' 2.50 12.00 1.00 Third Year MGNREGA

185 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 18' 58.57'' 77° 39' 18.12'' 2.50 12.00 1.00 Third Year MGNREGA

186 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 19' 09.01'' 77° 38' 55.57'' 2.50 12.00 1.00 Third Year MGNREGA

187 Seoni Malwa Barasel Barasel Kapildhara

koop New 22° 18' 55.11'' 77° 39' 31.91'' 2.50 12.00 1.00 Third Year MGNREGA

188 Seoni Malwa Barasel Barasel Farm Pond New 22° 19' 40.48'' 77° 37' 31.77'' 1.00 500.00 1.00 Second

Year MGNRE

GA

189 Seoni Malwa Barasel Barasel Farm Pond New 22° 19' 01.63'' 77° 38' 57.49'' 1.00 500.00 1.00 Second

Year MGNRE

GA

190 Seoni Malwa Barasel Barasel Stop dam New 22° 19' 36.16'' 77° 38' 28.64'' 14.0

0 2450.0

0 4.90 Fourth Year MGNREGA

191 Seoni Malwa Barasel Barasel Stop dam New 22° 20' 51.19'' 77° 37' 14.62'' 13.0

0 2300.0

0 4.60 Fifth Year MGNREGA

192 Seoni Malwa Barasel Napupura Kapildhara

koop New 22° 20' 24.02'' 77° 37' 30.08'' 2.50 12.00 1.00 Fourth Year MGNREGA

193 Seoni Malwa Barasel Napupura Kapildhara

koop New 22° 20' 23.74'' 77° 37' 39.02'' 2.50 12.00 1.00 Fourth Year MGNREGA

194 Seoni Malwa Barasel Napupura Kapildhara

koop New 22° 20' 40.57'' 77° 37' 12.06'' 2.50 12.00 1.00 Fourth Year MGNREGA

195 Seoni Malwa Barasel Napupura Kapildhara

koop New 22° 20' 43.53'' 77° 37' 22.11'' 2.50 12.00 1.00 Fifth Year MGNREGA

196 Seoni Malwa Barasel Napupura Kapildhara

koop New 22° 20' 26.17'' 77° 37' 70.09'' 2.50 12.00 1.00 Fifth Year MGNREGA

197 Seoni Malwa Barasel Napupura Farm Pond New 22° 20' 36.62'' 77° 36' 50.98'' 1.00 500.00 1.00 Second

Year MGNRE

GA

198 Seoni Malwa Barasel Benth Kapildhara

koop New 22° 21' 11.11'' 77° 36' 15.53'' 2.50 12.00 1.00 Fifth Year MGNREGA

199 Seoni Malwa Barasel Bhawanda Kapildhara

koop New 22° 22' 13.34'' 77° 38' 04.37'' 2.50 12.00 1.00 First Year MGNREGA

200 Seoni Malwa Barasel Bhawanda Kapildhara

koop New 22° 21' 51.29'' 77° 37' 51.97'' 2.50 12.00 1.00 First Year MGNREGA

201 Seoni Malwa Barasel Bhawanda Kapildhara

koop New 22° 22' 05.65'' 77° 38' 22.52'' 2.50 12.00 1.00 Second Year

MGNREGA

202 Seoni Malwa Barasel Bhawanda Kapildhara

koop New 22° 22' 09.3'' 77° 38' 20.79'' 2.50 12.00 1.00 Second Year

MGNREGA

Page 183: HBAD DIP FINAL ab - pmksy.gov.in

183

203 Seoni Malwa Barasel Bhawanda Kapildhara

koop New 22° 22' 04.12'' 77° 38' 22.69'' 2.50 12.00 1.00 Second Year

MGNREGA

204 Seoni-Malwa Naharkola kala Naharkola kala Bori

Bandhan New 22026'17.884" 77030'49.631" 0.10 350 0.7 Second Year

MGNREGA

205 Seoni-Malwa Naharkola kala Naharkola kala Well

Deepening Renoveti

on 22026'46.131" 77030'57.321" 0.50 24 - Second Year

MGNREGA

206 Seoni-Malwa Naharkola kala Naharkola kala Soak Pit New 22026'29.296" 77030'47.818" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

207 Seoni-Malwa Naharkola kala Naharkola kala Well

Deepening Renoveti

on 22026'134.775

" 77030'44.632" 0.8 24 - Second Year

MGNREGA

208 Seoni-Malwa Naharkola kala Devipura Well

Deepening Renoveti

on 22026'05.868" 77030'53.888" 0.70 26 - Second Year

MGNREGA

209 Seoni-Malwa naharkolakalan naharkolakalan Stop Dam New 220.26.24.373 0770.30.49.658 20.0

0 4500 9 Fifth Year MGNREGA

210 Seoni-Malwa naharkolakalan naharkolakalan Stop Dam New 220.26.14.025 0770.30.53.558 18.0

0 4000 8 Fifth Year MGNREGA

211 Seoni-Malwa Naharkola kala Devipura Soak Pit New 22026'02.997" 77030'54.822" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

212 Seoni-Malwa Kharar Kharar Stop Dam New 22024' 59.030'' 770 28'10.988" 6.00 2500 5 Fifth Year MGNRE

GA

213 Seoni-Malwa Kharar Kharar Farm Pond New 22025' 08.849'' 770 28'32.466" 1.25 150 0.3 Third Year MGNRE

GA

214 Seoni-Malwa Kharar Kharar Farm Pond New 22024' 42.330'' 770 28'48.580" 1.25 150 0.3 Third Year MGNRE

GA

215 Seoni-Malwa Kharar Lohariya kala Soak Pit New 22025'35.8970'

' 770 27'45.939" 0.10 5 Water

Storege Recharge

.

First Year MGNREGA

216 Seoni-Malwa Kharar Lohariya kala Stop Dam New 22025'35.758'' 770 27'48.878" 4.00 2700 5.4 Fifth Year MGNRE

GA

217 Seoni-Malwa Bildi Bildi Stop Dam New 22026' 01.610'' 770 29'57.556" 12.0

0 3000 6 Fifth Year MGNREGA

218 Seoni-Malwa Bildi Mohanpur Check dam New 22026' 42.095'' 770 29'38.687" 0.20 4000 8 Third Year MGNRE

GA

219 Seoni-Malwa Bildi Bildi Harvestin

system New 22026' 00.677'' 770 29'57.418" 0.30 40 - Second Year

MGNREGA

220 Seoni-Malwa Bildi Mohanpur Check dam New 22026' 33.498'' 770 29'59.478" 3.00 3000 6 First Year MGNRE

GA

221 Seoni-Malwa Bhairopur Bhairopur Stop Dam New 22026' 64.410'' 770 23'54.080" 5.00 1500 3 Fifth Year MGNRE

GA

222 Seoni-Malwa Bhairopur Bhairopur Stop Dam New 22026'88.000" 770 23'66.140" 12.0

0 5500 11 Fifth Year MGNREGA

223 Seoni-Malwa Bhairopur Bhairopur Check dam New 22026'59.970" 770 23'44.550" 3.00 1500 3 Third Year MGNRE

GA

Page 184: HBAD DIP FINAL ab - pmksy.gov.in

184

224 Seoni-Malwa Bhairopur Bhairopur Check dam New 22026'87.57" 77023''6809" 3.00 1500 3 Third Year MGNRE

GA

225 Seoni-Malwa Chouki gawa Chouki gawa Stop Dam New 22026'37.234" 77023''36.385" 6.00 2000 4 Fifth Year MGNRE

GA

226 Seoni-Malwa Chouki gawa Chouki gawa Stop Dam New 22025'42.570" 77024'02.752" 8.00 2500 5 Fifth Year MGNRE

GA

227 Seoni-Malwa Chouki gawa Chouki gawa Check dam New 22026'40.241" 77023''19.246" 5.00 3500 7 Third Year MGNRE

GA

228 Seoni-Malwa Chouki gawa Chouki gawa Check dam New 22026'19.868" 77023''23.311" 5.00 3500 7 Third Year MGNRE

GA

229 Seoni-Malwa Chouki gawa Chouki gawa Well

Deepening Renoveti

on 22026'34.679" 77023''25.234" 0.80 21 - Second Year

MGNREGA

230 Seoni-Malwa Chouki gawa Chouki gawa Well

Deepening Renoveti

on 22026'30.889" 77023''26.277" 0.80 21 - Second Year

MGNREGA

231 Seoni-Malwa Kothra Kothra Well

Deepening Renoveti

on 22043'48.82'" 77031'24.97" 1.00 25 - Second Year

MGNREGA

232 Seoni-Malwa Kothra Kothra Stop Dam New 22043'90.13" 77030'98.47" 70.0

0 6500 13 Fifth Year MGNREGA

233 Seoni-Malwa Kothra Kothra Check dam New 22042'75.5'" 77031''22.02" 7.00 3500 7 Third Year MGNRE

GA

234 Seoni-Malwa Kothra Kothra Check dam New 22026'45.280" 77020'"26.19 5.00 3000 6 Third Year MGNRE

GA

235 Seoni-Malwa Kothra Kothra Nirmal Neer New 22044'01.800'" 77031'23.680" 4.00 21 - Second

Year MGNRE

GA

236 Seoni-Malwa Kothra Kothra Kapildhara

koop New 22024'"48.426" 77018'28.43" 2.50 28 1 Second Year

MGNREGA

237 Seoni-Malwa Kothra Kothra Kapildhara

koop New 22042'"81.77" 77031'40.6" 2.50 28 1 Second Year

MGNREGA

238 Seoni-Malwa Kothra Kothra Kapildhara

koop New 22026'30.889" 77023''26.277" 2.50 28 1 Second Year

MGNREGA

239 Seoni-Malwa Kothra Kothra Soak Pit New 220 43'

96.750" 770 31'40530" 0.10 5 Water

Storege Recharge

.

First Year MGNREGA

240 Seoni-Malwa Rajorakurmi Rajorakurmi Well

Deepening Renoveti

on 22031'"10.258" 77030'22.055" 1.00 20 - Second Year

MGNREGA

241 Seoni-Malwa Rajorakurmi Javora Well

Deepening Renoveti

on 22030'"18.279" 77030'54.794" 1.20 21 - Second Year

MGNREGA

242 Seoni-Malwa Rajorakurmi Luhariya Well

Deepening Renoveti

on 22032'22.719" 77022'57.336" 1.00 21 - Second Year

MGNREGA

243 Seoni-Malwa Rajorakurmi Rajorakurmi Stop Dam New 22031'03.020" 77030'31.833" 10.0

0 7000 14 Fifth Year MGNREGA

244 Seoni-Malwa Rajorakurmi Chabora Stop Dam New 22030'05.658" 77030'48.732" 12.0

0 5000 10 Fifth Year MGNREGA

245 Seoni-Malwa Rajorakurmi Luhariya Bori

Bandhan New 22032'28.796" 77029'30.667" 0.30 1500 3 Second Year

MGNREGA

246 Seoni-Malwa Rehda Rehda Stop Dam New 22036'35.330" 77028'28.484" 8.00 4000 8 Fifth Year MGNRE

GA

Page 185: HBAD DIP FINAL ab - pmksy.gov.in

185

247 Seoni-Malwa Rehda Rehda Stop Dam New 22037'04.182" 77028'18.581" 45.0

0 12000 24 Fifth Year MGNREGA

248 Seoni-Malwa Rehda Rehda Stop Dam New 22025'38.180" 77027'13.420" 60.0

0 15000 30 Fifth Year MGNREGA

249 Seoni-Malwa Rehda Rehda Soak Pit New 22035'54.0.62" 77028'07.473" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

250 Seoni-Malwa Rehda Rehda Soak Pit New 22035'55.092" 77028'06.594" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

251 Seoni-Malwa Khapariya Khapariya Pond

Deepening Renovati

on 22055' 57.480'' 77047' 39.930'' 4.30 2000 4 Second Year

MGNREGA

252 Seoni-Malwa Khapariya Khapariya Pond

Deepening Renovati

on 22056' 59.020'' 77047' 46.980'' 6.50 2500 5 Second Year

MGNREGA

253 Seoni-Malwa Khapariya Khapariya Kapildhara

koop New 22031'22.828'' 77028'42.079'' 2.50 28 1 Second Year

MGNREGA

254 Seoni-Malwa Khapariya Khapariya Kapildhara

koop New 22034'53.404'' 77028'36.806'' 2.50 28 1 Second Year

MGNREGA

255 Seoni-Malwa Khapariya Khapariya Kapildhara

koop New 22034'03.615'' 77029'31.573'' 2.50 28 1 Second Year

MGNREGA

256 Seoni-Malwa Khapariya Khapariya Kapildhara

koop New 22034'03.292'' 77029'31.600'' 2.50 28 1 Second Year

MGNREGA

257 Seoni-Malwa Khapariya Khapariya Well

Deepening Renoveti

on 22024'04.617" 77028'51.583" 1.00 28 - Second Year

MGNREGA

258 Seoni-Malwa Khapariya Khapariya Soak Pit New 22034'02.736" 77028'47.188" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

259 Seoni-Malwa Khapariya Khapariya Soak Pit New 22033.53.281" 77028'40.679" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

260 Seoni-Malwa Harpalpur Harpalpur Pond

Deepening Renovati

on 22032'36.335" 77027.41.929" 5.00 3000 6 Fourth Year MGNREGA

261 Seoni-Malwa Harpalpur Harpalpur Check dam New 22032'42.090" 77027'51.487" 0.50 200 0.4 Third Year MGNRE

GA

262 Seoni-Malwa Harpalpur Harpalpur Farm Pond New 22032'37.015" 77027.32.673" 1.25 150 0.3 Third Year MGNRE

GA

263 Seoni-Malwa Harpalpur Surgi Pond

Deepening Renovati

on 22054'54.67" 77048'15.35" 4.50 2500 5 Fourth Year MGNREGA

264 Seoni-Malwa Harpalpur Surgi Check dam New 0.80 350 0.7 Third Year MGNRE

GA

265 Seoni-Malwa Harpalpur Surgi Well

Deepening Renoveti

on 1.00 28 - Second Year

MGNREGA

266 Seoni-Malwa Harpalpur Harpalpur Pond

Deepening Renovati

on 22032'36.335'' 77027'41.929'' 7.25 3500 7 Second Year

MGNREGA

Page 186: HBAD DIP FINAL ab - pmksy.gov.in

186

267 Seoni-Malwa bhiladiya bhiladiya Soak Pit New 22030'07.506'' 077028'42.299'' 0.10 5

Water Storege

Recharge.

First Year MGNREGA

268 Seoni-Malwa bhiladiya bhiladiya Soak Pit New 22030'54.691'' 077028'27.578'' 0.10 5

Water Storege

Recharge.

First Year MGNREGA

269 Seoni-Malwa bhiladiya bhiladiya Soak Pit New 22030'54.781'' 077028'27.578'' 0.10 5

Water Storege

Recharge.

First Year MGNREGA

270 Seoni-Malwa bhiladiya bhiladiya Check Dam New 22031'08.671'' 077028'30.352'' 2.00 900 1.8 Third Year MGNRE

GA

271 Seoni-Malwa bhiladiya bhiladiya Well

Deepening Renoveti

on 22031'02.631'' 077028'29.800'' 1.00 24 - Second Year

MGNREGA

272 Seoni-Malwa bhiladiya bhiladiya Check Dam New 22031'08.671 077028'30.352'' 2.00 900 1.8 Third Year MGNRE

GA

273 Seoni-Malwa bhiladiya bhiladiya Pond

Deepening Renovati

on 22051'45.93'' 077047'40.240'' 6.50 3000 6 Second Year

MGNREGA

274 Seoni-Malwa soyat soyat Stop Dam New 22035'43.302'' 077029'18.417'' 18.0

0 2100 4.2 Fifth Year MGNREGA

275 Seoni-Malwa soyat pipal ber Stop Dam New 22036'1.088'' 077029'08.792'' 19.0

0 2200 4.4 Fifth Year MGNREGA

276 Seoni-Malwa soyat kalya khedi Soak Pit New 22034'49.675'' 077029'04.656'' 0.10 5

Water Storege

Recharge.

First Year MGNREGA

277 Seoni-Malwa soyat soyat Pond

Deepening Renovati

on 22035'45.074'' 077029'18.774 4.00 3000 6 First Year MGNREGA

278 Seoni-Malwa soyat soyat Soak Pit New 22035'39.711'' 077029'18.911'' 0.10 5

Water Storege

Recharge.

First Year MGNREGA

279 Seoni-Malwa soyat kalya khedi Stop Dam New 220.34.59.452 0770.29.04.958 22.0

0 2400 4.8 Fifth Year MGNREGA

280 Seoni-Malwa makdai makdai Stop Dam New 25.0

0 5500 11 Fifth Year MGNREGA

281 Seoni-Malwa makdai makdai Farm Pond New 220.36.56.956 0770.27.10.641 1.25 150 0.3 Third Year MGNRE

GA

282 Seoni-Malwa makdai gogra Kapildhara

koop New 220..36.58.737 0770.26.52.231 2.50 28 1 Second Year

MGNREGA

283 Seoni-Malwa makdai gogra Check Dam New 220.36.51.630 0770.26.15.302 2.00 900 1.8 Third Year MGNRE

GA

284 Seoni-Malwa makdai gogra Check Dam New 220.37.03.476 0770.26.11.375 1.50 700 1.4 Third Year MGNRE

GA

285 Seoni-Malwa pipanton pipanton Stop Dam New 220.24.28.659 0770.30.42.325 25.0

0 6500 13 Fifth Year MGNREGA

Page 187: HBAD DIP FINAL ab - pmksy.gov.in

187

286 Seoni-Malwa pipanton pipanton Stop Dam New 220.24.07.835 0770.30.25.955 19.0

0 2400 4.8 Fifth Year MGNREGA

287 Seoni-Malwa pipanton berakhedi Soak Pit New 220.25.24.040 0770.29.34.841 0.10 5

Water Storege

Recharge.

First Year MGNREGA

288 Seoni-Malwa pipanton pipanton Bori

Bandhan New 220.25.14.960 077030.23.346 0.10 300 0.6 Second Year

MGNREGA

289 Seoni-Malwa pipanton berakhedi Bori

Bandhan New 220.25.24.154 0770.21.38.027 0.10 300 0.6 Second Year

MGNREGA

290 Seoni-Malwa bhagiya bhagiya Check Dam New 220.33.19.258 0770.28.01.155 2.00 900 1.8 Third Year MGNRE

GA

291 Seoni-Malwa bhagiya bhagiya Check Dam New 220.33.32.936 0770.28.07.433 2.00 900 1.8 Third Year MGNRE

GA

292 Seoni-Malwa bhagiya bhagiya Check Dam New 220.33.58.142 0770.27.49.318 2.00 900 1.8 Third Year MGNRE

GA

293 Seoni-Malwa bhagiya bhagiya Well

Deepening Renoveti

on 220.33.58.142 0770.27.49.318 0.60 28 - Second Year

MGNREGA

294 Seoni-Malwa bhagiya bhagiya Soak Pit New 220.34.02.619 0770.27.47.120 0.10 5

Water Storege

Recharge.

First Year MGNREGA

295 Seoni-Malwa bhagiya bhagiya Farm Pond New 220.34.03.979 0770.28.12.636 1.50 400 0.9 Third Year MGNRE

GA

296 Seoni-Malwa bhagiya bhagiya Farm Pond New 220.34.21.969 0770.28.29.253 1.50 400 0.9 Third Year MGNRE

GA

297 Seoni-Malwa bhagiya bhagiya Farm Pond New 220.34.41.030 0770.28.19.997 1.50 400 0.9 Third Year MGNRE

GA

298 Seoni-Malwa bhagiya bhagiya Farm Pond New 220.34.34.809 0770.28.21.480 1.50 400 0.9 Third Year MGNRE

GA

299 Seoni-Malwa bhagiya bhagiya Pond

Deepening Renovati

on 22034'47.567'' 077027'01.060'' 5.00 600 1.2 Fourth Year MGNREGA

300 Seoni-Malwa jhadvida bandi Check Dam New 220.34.22.328 0770.33.09.157 8.00 6000 12 Third Year MGNRE

GA

301 Seoni-Malwa jhadvida bandi Check Dam New 220.24.35.402 0770.33.14.815 8.00 6000 12 Third Year MGNRE

GA

302 Seoni-Malwa jhadvida bandi Farm Pond New 220.24.35.706 0770.33.05.641 1.25 150 0.3 Third Year MGNRE

GA

303 Seoni-Malwa jhadvida patlai Pond

Deepening Renovati

on 220.24.44.232 0770.32.36.088 5.0 4500 9 Fourth Year MGNREGA

304 Seoni-Malwa jhadvida bandi Stop Dam New 220.24.55.741 0770.32.48.558 25.0 6500 13 Fifth Year MGNRE

GA

305 Seoni-Malwa jhadvida jhadvida Well

Deepening Renoveti

on 220.25.49.477 0770.32.09.034 1.0 22 - Second Year

MGNREGA

306 Seoni-Malwa jhadvida nayapura Well

Deepening Renoveti

on 220.25.08.155 0770.32.27.986 50.0 14 - Second Year

MGNREGA

307 Seoni-Malwa jhadvida patlai Well

Deepening Renoveti

on 220.24.35.896 0770.32.25.267 1.25 20 - Second Year

MGNREGA

Page 188: HBAD DIP FINAL ab - pmksy.gov.in

188

308 Seoni-Malwa jhadvida jhadvida Soak Pit New 220.25.51.242 0770.32.02.003 0.10 5

Water Storege

Recharge.

First Year MGNREGA

309 Seoni-Malwa jhadvida jhadvida Soak Pit New 220.25.40.208 0770.32.15.709 0.10 5

Water Storege

Recharge.

First Year MGNREGA

310 S. Malwa GURADIYAJAT GURADIYAJAT Soak Pit New 22032'03.768" 077022'18.464" 0.10 5.00 Water

Recharge

First Year MGNREGA

311 S. Malwa GURADIYAJAT GURADIYAJAT Soak Pit New 22032'55.748" 077022'15.992" 0.10 5.00 Water

Recharge

First Year MGNREGA

312 S. Malwa GURADIYAJAT GURADIYAJAT Soak Pit New 22031'59.996" 077022'50.442" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

313 S. Malwa GURADIYAJAT GURADIYAJAT Soak Pit New 22032'09.330" 077022'26.457" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

314 S. Malwa GURADIYAJAT GURADIYAJAT Stop Dam New 22031'45.600" 077022'13.305" 42.00

25000.00 50.00 Third year MGNRE

GA

315 S. Malwa THUA THUA Well Deepening

Renovation 22029'35.863" 077024'26.208" 1.00 16.00 Water

Storage First Year MGNREGA

316 S. Malwa THUA THUA Well Deepening

Renovation 22030'38.535" 077023'55.336" 1.00 16.00 Water

Storage Second Year

MGNREGA

317 S. Malwa THUA THUA Soak Pit New 22029'30.186" 077024'20.852" 0.10 5.00 Water

Recharge

Third year MGNREGA

318 S. Malwa THUA THUA Stop Dam New 22029'25.916" 077024'32.305" 35.00

20000.00 40.00 Third year MGNRE

GA

319 S. Malwa JIRAVEH JIRAVEH Stop Dam New 22026'23.900" 077021'27.800" 40.00

25000.00 50.00 First Year MGNRE

GA

320 S. Malwa JIRAVEH JIRAVEH Well Deepening

Renovation 22026'23.425" 077021'27.653" 1.00 18.00 Water

Storage Second Year

MGNREGA

321 S. Malwa JIRAVEH JIRAVEH Soak Pit New 22026'22.526" 077021'31.278" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

322 S. Malwa JIRAVEH JIRAVEH Soak Pit New 22026'23.913" 077021'27.301" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

323 S. Malwa JIRAVEH JIRAVEH Soak Pit New 22026'24.332" 077021'40.413" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

Page 189: HBAD DIP FINAL ab - pmksy.gov.in

189

324 S. Malwa JIRAVEH JIRAVEH Soak Pit New 22026'24.249" 077021'30.326" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

325 S. Malwa VISONIKALA VISONIKALA Stop Dam New 22028'37.149" 077021'60.869" 42.00

25000.00 50.00 First Year MGNRE

GA

326 S. Malwa VISONIKALA VISONIKALA Pond deepening

Renovation 22029'39.813" 077021'11.008" 8.00 1500.0

0 3.00 Second Year

MGNREGA

327 S. Malwa VISONIKALA VISONIKALA Soak Pit New 22028'85.209" 077020'09.732" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

328 S. Malwa VISONIKALA VISONIKALA Soak Pit New 2202845.904" 077020'11.188" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

329 S. Malwa VISONIKALA VISONIKALA Soak Pit New 22028'43.274" 077020'10.638" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

330 S. Malwa VISONIKALA VISONIKALA Soak Pit New 22028'42.993" 077019'56.741" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

331 S. Malwa VISONIKALA VISONIKALA Soak Pit New 22028'52.311" 077019'13.702" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

332 S. Malwa VISONIKALA VISONIKALA Soak Pit New 22028'41.510" 077019'50.451" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

333 S. Malwa CHANDWAD Daheri Soak Pit New 22034'24.400" 077034'18.344" 0.10 5.00 Water

Recharge

First Year MGNREGA

334 S. Malwa CHANDWAD Daheri Soak Pit New 22034'25.347" 077034'22.546" 0.10 5.00 Water

Recharge

First Year MGNREGA

335 S. Malwa CHANDWAD CHANDWAD Soak Pit New 22035'28.539" 07703402.056" 0.10 5.00 Water

Recharge

First Year MGNREGA

336 S. Malwa CHANDWAD CHANDWAD Soak Pit New 22035'35.639" 077034'11.944" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

337 S. Malwa CHANDWAD CHANDWAD Soak Pit New 22035'33.057" 077034'07.247" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

338 S. Malwa CHANDWAD CHANDWAD Soak Pit New 22035'36.422" 077034'11.889" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

339 S. Malwa JHAKLAI JHAKLAI Stop Dam New 22029'28.751" 077025'01.839" 30.00

22000.00 44.00 First Year MGNRE

GA

Page 190: HBAD DIP FINAL ab - pmksy.gov.in

190

340 S. Malwa JHAKLAI JHAKLAI Well Deepening

Renovation 22029'30.117" 077024'50.460" 1.00 16.00 Water

Storage Second Year

MGNREGA

341 S. Malwa JHAKLAI JHAKLAI Well Deepening

Renovation 22029'23.539" 077024'49.938" 1.00 16.00 Water

Storage Third year MGNREGA

342 S. Malwa JHAKLAI JHAKLAI Well Deepening

Renovation 22029'24.979" 077024'56.860" 1.00 16.00 Water

Storage Fourth Year MGNREGA

343 S. Malwa JHAKLAI JHAKLAI Soak Pit New 2202728.450" 077027'39.402" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

344 S. Malwa JHAKLAI Banapura Soak Pit New 22027'27.984" 077027'37.919" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

345 S. Malwa JHAKLAI JHAKLAI Soak Pit New 22029'17.105" 077024'58.068" 0.10 5.00 Water

Recharge

Fifth Year MGNREGA

346 S. Malwa DHARAMKUNDI Jijalwarada Stop Dam New 22031'44.343" 077031'37.361" 20.00

15000.00 30.00 First Year MGNRE

GA

347 S. Malwa DHARAMKUNDI Jijalwarada Well Deepening

Renovation 22031'48.298" 077031'48.243" 1.00 16.00 Water

Storage Second Year

MGNREGA

348 S. Malwa DHARAMKUNDI Jijalwarada Soak Pit New 22031'48.662" 077031'48.325" 0.10 5.00 Water

Recharge

Third year MGNREGA

349 S. Malwa DHARAMKUNDI DHARAMKUNDI Soak Pit New 22030'42.922" 077032'56.770" 0.10 5.00 Water

Recharge

Third year MGNREGA

350 S. Malwa DHARAMKUNDI DHARAMKUNDI Soak Pit New 22030'44.804" 077032'46.498" 0.10 5.00 Water

Recharge

Third year MGNREGA

351 S. Malwa DHARAMKUNDI DHARAMKUNDI Soak Pit New 22030'43.149" 077032'55.479" 0.10 5.00 Water

Recharge

Third year MGNREGA

352 S. Malwa KOTLAKHEDI KOTLAKHEDI Stop Dam New 22033'03.108" 077031'35.882" 20.00

12500.00 25.00 First Year MGNRE

GA

353 S. Malwa KOTLAKHEDI KOTLAKHEDI Soak Pit New 22032'56.564" 07703152.280" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

354 S. Malwa KOTLAKHEDI KOTLAKHEDI Soak Pit New 22033'06.369" 077031'34.839" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

355 S. Malwa KOTLAKHEDI KOTLAKHEDI Soak Pit New 22033'15.234" 077031'40.772" 0.10 5.00 Water

Recharge

Third year MGNREGA

356 S. Malwa KOTLAKHEDI KOTLAKHEDI Soak Pit New 22032'34.928" 077031'09.269" 0.10 5.00 Water Recharg Third year MGNRE

GA

Page 191: HBAD DIP FINAL ab - pmksy.gov.in

191

e

357 S. Malwa KOTLAKHEDI KOTLAKHEDI Soak Pit New 22032'34.482" 077031'11.109" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

358 S. Malwa BHAISADEH BHAISADEH Check dam New 22032'28.288" 077020'21.652" 2.00 500.00 1.00 First Year MGNREGA

359 S. Malwa BHAISADEH BHAISADEH Check dam New 22032'21.023" 077020'09.747" 2.00 500.00 1.00 First Year MGNREGA

360 S. Malwa BHAISADEH BHAISADEH Soak Pit New 22032'21.593" 077020'10.419" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

361 S. Malwa BHAISADEH BHAISADEH Soak Pit New 22032'22.379" 077020'22.366" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

362 S. Malwa BHAISADEH BHAISADEH Soak Pit New 22032'28.775" 077020'15.500" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

363 S. Malwa BHAISADEH BHAISADEH Well Deepening

Renovation 22032'22.045" 077020'18.439" 1.00 16.00 Water

Storage Third year MGNREGA

364 S. Malwa BHILADIYAKHURD Hamidapur Kapildhara

koop New 22033'58.749" 077016'33.713" 2.50 12.00 1.00 First Year MGNREGA

365 S. Malwa BHILADIYAKHURD Hamidapur Kapildhara

koop New 22033'53.096" 077017'06.782" 2.50 12.00 1.00 First Year MGNREGA

366 S. Malwa BHILADIYAKHURD Hamidapur Kapildhara

koop New 22033'48.914" 077016'54.175" 2.00 12.00 1.00 Second Year

MGNREGA

367 S. Malwa BHILADIYAKHURD Hamidapur Well

Deepening Renovati

on 22033'19.608" 077016'57.773" 1.00 16.00 Water Storage

Second Year

MGNREGA

368 S. Malwa BHILADIYAKHURD Hamidapur Well

Deepening Renovati

on 22033'14.286" 07701715.104" 1.00 16.00 Water Storage Fourth Year MGNRE

GA

369 S. Malwa BHILADIYAKHURD Kundkala Kapildhara

koop New 22033'07.090 077017'41.966 2.00 12.00 1.00 Fifth Year MGNREGA

370 S. Malwa BHILADIYAKHURD Kundkala Well

Deepening Renovati

on 22033'10.091" 07701739.824" 1.00 16.00 Water Storage Fifth Year MGNRE

GA

371 S. Malwa BHILADIYAKHURD

BHILADIYAKHURD Soak Pit New 22033'16.854" 077018'39.864" 0.10 5.00

Water Recharg

e First Year MGNRE

GA

372 S. Malwa BHILADIYAKHURD

BHILADIYAKHURD Soak Pit New 22033'15.776" 077018'39.864" 0.10 5.00

Water Recharg

e First Year MGNRE

GA

373 S. Malwa NAHARKOLAKHURD Bheemgao Check dam New 22028'53.037" 077017'36.500" 2.50 500.00 1.00 First Year MGNRE

GA

Page 192: HBAD DIP FINAL ab - pmksy.gov.in

192

374 S. Malwa NAHARKOLAKHURD

NAHARKOLAKHURD Farm Pond New 22029'10.101" 077017'11.342" 1.50 500.00 1.00 Second

Year MGNRE

GA

375 S. Malwa NAHARKOLAKHURD

NAHARKOLAKHURD Soak Pit New 22029'36.716" 077017'15.269" 0.10 5.00

Water Recharg

e

Second Year

MGNREGA

376 S. Malwa NAHARKOLAKHURD

NAHARKOLAKHURD Soak Pit New 22029'35.495" 077017'11.863" 0.10 5.00

Water Recharg

e

Second Year

MGNREGA

377 S. Malwa NAHARKOLAKHURD Bheemgao Soak Pit New 22028'06.223" 077017'08.842" 0.10 5.00

Water Recharg

e Third year MGNRE

GA

378 S. Malwa NAHARKOLAKHURD Chapadevri Soak Pit New 22027'01.534" 077017'38.423" 0.10 5.00

Water Recharg

e Third year MGNRE

GA

379 S. Malwa KAJLI KAJLI Check dam New 22033'40.145" 077020'17.834" 2.50 500.00 1.00 First Year MGNREGA

380 S. Malwa KAJLI KAJLI Soak Pit New 22033'51.118" 077021'02.933" 0.10 5.00 Water

Recharge

First Year MGNREGA

381 S. Malwa KAJLI KAJLI Soak Pit New 22033'51.668" 077021.04.417" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

382 S. Malwa KAJLI Dimabar Soak Pit New 22035'10.529" 077021'90.402" 0.10 5.00 Water

Recharge

Third year MGNREGA

383 S. Malwa LUCHGAON LUCHGAON Stop Dam New 22034'30.525" 077015'33.426" 20.00

15000.00 30.00 First Year MGNRE

GA

384 S. Malwa LUCHGAON Ramgarha Kapildhara koop New 22035'46.058" 077015'58.777" 2.00 12.00 1.00 Second

Year MGNRE

GA

385 S. Malwa LUCHGAON Ramgarha Kapildhara koop New 22036'01.890" 077016'04.325" 2.00 12.00 1.00 Third year MGNRE

GA

386 S. Malwa LUCHGAON LUCHGAON Farm Pond New 22035'30.421" 077016'07.236" 1.50 500.00 1.00 Fourth Year MGNREGA

387 S. Malwa UMARIYA Papan Kapildhara koop New 22033'40.640" 077013'40.761" 2.00 12.00 1.00 First Year MGNRE

GA

388 S. Malwa UMARIYA Papan Kapildhara koop New 22033'41.928" 077013'18.843" 2.00 12.00 1.00 Second

Year MGNRE

GA

389 S. Malwa UMARIYA UMARIYA Kapildhara koop New 22034'31.994" 077015'03.406" 2.00 12.00 1.00 First Year MGNRE

GA

390 S. Malwa UMARIYA UMARIYA Kapildhara koop New 22035'25.628" 077015'00.000" 2.00 12.00 1.00 Second

Year MGNRE

GA

391 S. Malwa UMARIYA Papan Soak Pit New 22033'52.789" 077013'26.699" 0.10 5.00 Water

Recharge

Third year MGNREGA

392 S. Malwa UMARIYA UMARIYA Soak Pit New 22034'53.280" 077014'36.929" 0.10 5.00 Water Recharg Fourth Year MGNRE

GA

Page 193: HBAD DIP FINAL ab - pmksy.gov.in

193

e

393 S. Malwa NIPANIYA NIPANIYA Stop Dam New 22027'26.082" 077026'02.311" 20.00

4000.00 8.00 First Year MGNRE

GA

394 S. Malwa NIPANIYA NIPANIYA Stop Dam New 22027'43.392" 077025'18.146" 20.00

4000.00 8.00 Second

Year MGNRE

GA

395 S. Malwa NIPANIYA NIPANIYA Well Deepening

Renovation 22027'52.778" 077025'14.355" 1.00 16.00 Water

Storage Third year MGNREGA

396 S. Malwa NIPANIYA NIPANIYA Soak Pit New 22027'51.824" 077025'13.092" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

397 S. Malwa NIPANIYA NIPANIYA Soak Pit New 22027'52.092" 077025'13.724" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

398 S. Malwa NIPANIYA NIPANIYA Soak Pit New 22027'46.681" 077025'16.223" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

399 S. Malwa NIPANIYA NIPANIYA Soak Pit New 22027'46.513" 077025'27.237" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

400 S. Malwa ACHNAGAON ACHNAGAON Well Deepening

Renovation 22033'28.067" 077015'00.330" 1.00 16.00 Water

Storage First Year MGNREGA

401 S. Malwa ACHNAGAON ACHNAGAON Well Deepening

Renovation 22033'25.122" 077014'57.446" 1.00 16.00 Water

Storage Second Year

MGNREGA

402 S. Malwa ACHNAGAON ACHNAGAON Well Deepening

Renovation 22033'20.665" 077014'16.989" 1.00 16.00 Water

Storage Third year MGNREGA

403 S. Malwa ACHNAGAON ACHNAGAON Kapildhara koop New 22033'47.637" 077015'03.625" 2.00 12.00 1.00 Third year MGNRE

GA

404 S. Malwa ACHNAGAON ACHNAGAON Kapildhara koop New 22033''31.384" 077013'27.358" 2.00 12.00 1.00 Fourth Year MGNRE

GA

405 S. Malwa ACHNAGAON ACHNAGAON Kapildhara koop New 22034'09.136" 077014'37.780" 2.00 12.00 1.00 Third year MGNRE

GA

406 S. Malwa ACHNAGAON ACHNAGAON Kapildhara koop New 22034'03.491" 077014'39.895" 2.00 12.00 1.00 Fifth Year MGNRE

GA

407 S. Malwa TEMLAKALA TEMLAKALA Well Deepening

Renovation 22036'91.509" 077033'17.617" 1.00 18.00 Water

Storage First Year MGNREGA

408 S. Malwa TEMLAKALA TEMLAKALA Pond deepening

Renovation 22036'28.916" 077032'43.229" 5.00 500.00 1.00 Second

Year MGNRE

GA

409 S. Malwa TEMLAKALA TEMLAKALA Soak Pit New 22036'39.291" 077033'01.879" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

Page 194: HBAD DIP FINAL ab - pmksy.gov.in

194

410 S. Malwa TEMLAKALA TEMLAKALA Soak Pit New 22036'39.470" 077033'08.745" 0.10 5.00 Water

Recharge

Second Year

MGNREGA

411 S. Malwa DATVASA DATVASA Soak Pit New 22034'31.804" 077033'46.538" 0.10 5.00 Water

Recharge

First Year MGNREGA

412 S. Malwa DATVASA DATVASA Soak Pit New 22038'24.753" 077033'43.489" 0.10 5.00 Water

Recharge

First Year MGNREGA

413 S. Malwa GWADI GWADI Well Deepening

Renovation 22038'24.753" 077028'01.924" 1.00 16.00 Water

Storage First Year MGNREGA

414 S. Malwa GWADI Hathanapur Well Deepening

Renovation 22037'52.678" 077029'34.210" 1.00 16.00 Water

Storage Second Year

MGNREGA

415 S. Malwa GWADI GWADI Farm Pond New 22038'18.251" 077028'55.278" 1.50 500.00 1.00 Second Year

MGNREGA

416 S. Malwa GWADI GWADI Farm Pond New 22038'18.285" 077027'43.605" 1.50 500.00 1.00 Third year MGNREGA

417 S. Malwa GWADI Hathanapur Soak Pit New 22037'56.765" 077029'37.835" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

418 S. Malwa GWADI GWADI Soak Pit New 22038'18.251" 077027'52888" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

419 S. Malwa BUDARKALA BUDARKALA Stop Dam New 22037'27.130" 077030'26.697" 10.00

1500.00 3.00 First Year MGNRE

GA

420 S. Malwa BUDARKALA Godikhara Pond deepening

Renovation 22037'11.907" 077031'23.798" 8.00 16.00 Water

Storage Second Year

MGNREGA

421 S. Malwa BUDARKALA BUDARKALA Soak Pit New 22037'30.790" 077030'38.892" 0.10 5.00 Water

Recharge

Third year MGNREGA

422 S. Malwa BUDARKALA Godikhara Soak Pit New 22037'07.293" 077031'20.365" 0.10 5.00 Water

Recharge

Third year MGNREGA

423 S. Malwa RICHHI RICHHI Pond deepening

Renovation 22032'50.628" 077017''48.267" 8.00 5000.0

0 10.00 First Year MGNREGA

424 S. Malwa RICHHI Kolgao Pond deepening

Renovation 22031'38.605" 077021'33.723" 8.00 5000.0

0 10.00 Second Year

MGNREGA

425 S. Malwa RICHHI RICHHI Well Deepening

Renovation 22032'53.807" 077015'55.004" 1.00 5.00

Water Recharg

e Third year MGNRE

GA

426 S. Malwa RICHHI Kolgao Soak Pit New 22031'49.971" 077016'18.180" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

427 S. Malwa CHAPDAGRAHAN

CHAPDAGRAHAN

Pond deepening

Renovation 22030'39.771" 077021'33.723" 12.0

0 18000.

00 36.00 First Year MGNREGA

Page 195: HBAD DIP FINAL ab - pmksy.gov.in

195

428 S. Malwa CHAPDAGRAHAN

CHAPDAGRAHAN

Well Deepening

Renovation 22030'46.795" 077021'27.103" 1.00 18.00 Water

Storage Second Year

MGNREGA

429 S. Malwa CHAPDAGRAHAN

CHAPDAGRAHAN

Well Deepening

Renovation 22030'48.065" 077021'20.511" 1.00 18.00 Water

Storage Third year MGNREGA

430 S. Malwa CHAPDAGRAHAN

CHAPDAGRAHAN Soak Pit New 2203041.109" 077021'29.713" 0.10 5.00

Water Recharg

e Fourth Year MGNRE

GA

431 S. Malwa CHAPDAGRAHAN

CHAPDAGRAHAN Soak Pit New 22030'41.343" 077021'30.619" 0.10 5.00

Water Recharg

e Fourth Year MGNRE

GA

432 S. Malwa SHIVPUR SHIVPUR Pond deepening

Renovation 22029'26.547" 0770'19'18.865" 13.0

0 17222.

00 34.44 First Year MGNREGA

433 S. Malwa SHIVPUR SHIVPUR Pond deepening

Renovation 22030'33.604" 077019'06.039" 11.0

0 13200.

00 26.40 Second Year

MGNREGA

434 S. Malwa SHIVPUR SHIVPUR Farm Pond New 22031'04.497" 077018'47.280" 1.50 500.00 1.00 Third year MGNREGA

435 S. Malwa SHIVPUR SHIVPUR Soak Pit New 22030'47.145" 077018'36.403" 0.10 5.00 Water

Recharge

Fourth Year MGNREGA

436 S. Malwa JHILLAI JHILLAI Pond deepening

Renovation 22034'24.523" 077030'25.131" 15.0

0 18000.

00 36.00 First Year MGNREGA

437 S. Malwa JHILLAI JHILLAI Well Deepening

Renovation 22034'18.646" 077030'24.912" 1.00 18.00 Water

Storage First Year MGNREGA

438 S. Malwa JHILLAI Jhagar Well Deepening

Renovation 22033'41.831" 077030'04.412" 1.00 18.00 Water

Storage Second Year

MGNREGA

439 S. Malwa JHILLAI JHILLAI Soak Pit New 22034'29.277" 077030'52.412" 0.10 5.00 Water

Recharge

Third year MGNREGA

440 S. Malwa JHILLAI JHILLAI Soak Pit New 22034'23.500" 077030'22.412" 0.10 5.00 Water

Recharge

Third year MGNREGA

441 S. Malwa JHILLAI JHILLAI Stop Dam New 22034'24.043" 077030'56.552" 15.00

2000.00 4.00 Fourth Year MGNRE

GA

442 S. Malwa JHILLAI JHILLAI Stop Dam New 22034'16.263" 077030'44.879" 15.00

4000.00 8.00 Fifth Year MGNRE

GA

443 S. Malwa CHAUTLAI CHAUTLAI Pond deepening

Renovation 22031'45.600" 077022'13.305" 14.0

0 7600.0

0 15.00 First Year MGNREGA

444 S. Malwa CHAUTLAI CHAUTLAI Pond deepening

Renovation 22036'24.322 077031'43.052" 9 12500.

00 25.00 First Year MGNREGA

445 S. Malwa CHAUTLAI CHAUTLAI Pond deepening

Renovation 22035'39.505" 077031'20.228"" 15 7500.0

0 15.00 Second Year

MGNREGA

446 S. Malwa CHAUTLAI CHAUTLAI Pond deepening

Renovation 22035'40.102" 077031'29.566" 7 4500.0

0 9.00 Second Year

MGNREGA

Page 196: HBAD DIP FINAL ab - pmksy.gov.in

196

447 S. Malwa CHAUTLAI CHAUTLAI Soak Pit New 22037'45.506" 077031'20.502" 0.10 5.00 Water

Recharge

Third year MGNREGA

448 S. Malwa CHAUTLAI CHAUTLAI Soak Pit New 22037'46.303" 077031'15.943" 0.10 5.00 Water

Recharge

Third year MGNREGA

449 Seoni malwa Ratwada Ratwada Soak Pit New

Lt-N22°33'40.406

"

Ln-E077°,36'09.360

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

450 Seoni malwa Ratwada Ratwada Soak Pit New

Lt-N22°34'01.214

"

Ln-E077°36'38749" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

451 Seoni malwa Ratwada Ratwada Soak Pit New

Lt-N22°33'43.750

"

Ln-E077°36'07.750

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

452 Seoni malwa Ratwada Ratwada Soak Pit New

Lt-N22°33'33.210

"

Ln-E077°36'10.184

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

453 Seoni malwa Ratwada Ratwada Soak Pit New

Lt-N22°33'32.386

"

Ln-E077°36'02.411

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

454 Seoni malwa Ratwada Ratwada Soak Pit New

Lt-N22°33'26.998

"

Ln-E077°35'58.127

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

455 Seoni malwa Ratwada Ratwada Stop Dam New Lt-

N22°33'0.589

Ln-E077°36'13.947

" 18.0

0 2000 4 Fourth Year

MGNREGA

456 Seoni malwa Ratwada Ratwada Bori

Bandhan New Lt-

N22°33'32.228"

Ln-E077°36'13.920

" 0.10 200 0.4 Second

Year MGNRE

GA

457 Seoni malwa Ratwada Sonkhedi Stop Dam New

Lt-N22°33'04.653

"

Ln-E077°35'16.416

" 22.0

0 3500 7 Fourth Year

MGNREGA

458 Seoni malwa Ratwada Sonkhedi Bori

Bandhan New Lt-

N22°32'58.995"

Ln-E077°35'25.882

" 0.15 300 0.6 Second

Year MGNRE

GA

459 Seoni malwa Ratwada Sonkhedi Soak Pit New

Lt-N22°32'52.354

"

Ln-E077°35'17.395

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

460 Seoni malwa Ratwada Sonkhedi Soak Pit New Lt-

N22°33'04.653

Ln-E077°35'16.406

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

Page 197: HBAD DIP FINAL ab - pmksy.gov.in

197

461 Seoni malwa Ratwada Ratwada Pond

Deepening Renovati

on

Lt-N22°33'30.931

''

Ln-E077°36'02.164

" 8.00 2000 4 Second

Year MGNRE

GA

462 Seoni malwa Khutwasa Khutwasa Soak Pit New

Lt-N22°3'151.195

"

Ln-E077°35'16.187

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

463 Seoni malwa Khutwasa Khutwasa Soak Pit New

Lt-N22°31'46.110

"

Ln-E077°35'18.109

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

464 Seoni malwa Khutwasa Khutwasa Soak Pit New

Lt-N22°31'50.358

"

Ln-E077°35'06.271

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

465 Seoni malwa Khutwasa Khutwasa Pond

Deepening Renovati

on

Lt-N22°31'14.439

"

Ln-E077°35'00.311

" 8.00 2200 4.4 Third Year MGNRE

GA

466 Seoni malwa Khutwasa Khutwasa Stop Dam New

Lt-N22°31'23.853

"

Ln-E077°35'09.567

" 19.0

0 2500 5 Fourth Year

MGNREGA

467 Seoni malwa Khutwasa Khutwasa Stop Dam New

Lt-N22°31'10.395

"

Ln-E077°,34'27.792

" 20.0

0 2600 5.2 Fourth Year

MGNREGA

468 Seoni malwa Khutwasa Khutwasa Check Dam New

Lt-N22°31'20.138

"

Ln-E077°34'11.845

" 2.00 1200 2.4 Third Year MGNRE

GA

469 Seoni malwa Khutwasa Khutwasa Check Dam New

Lt-N22°31'43.148

"

Ln-E077°34'30.538

" 2.00 1200 2.4 Third Year MGNRE

GA

470 Seoni malwa Khutwasa Khutwasa Check Dam New

Lt-N22°31'43.828

"

Ln-E077°34'35.592

" 1.50 1100 2.2 Third Year MGNRE

GA

471 Seoni malwa Satwasa Satwasa Stop Dam New

Lt-N22°29'53.182

"

Ln-E077°33'29.152

" 24.0

0 2650 5.3 Fourth Year

MGNREGA

472 Seoni malwa Satwasa Satwasa Stop Dam New

Lt-N22°29'58.716

"

Ln-E077°33'45.824

" 22.0

0 2500 5 Fourth Year

MGNREGA

473 Seoni malwa Satwasa Satwasa Bori

Bandhan New Lt-

N22°29'37.911"

Ln-E077°33'47.197

" 0.10 300 0.6 Second

Year MGNRE

GA

474 Seoni malwa Satwasa Satwasa Bori

Bandhan New Lt-

N22°30'04.175"

Ln-E077°33/15.584

" 0.10 300 0.6 Second

Year MGNRE

GA

Page 198: HBAD DIP FINAL ab - pmksy.gov.in

198

475 Seoni malwa Satwasa Satwasa Soak Pit New

Lt-N22°30'02.451

"

Ln-E077°33'36.293

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

476 Seoni malwa Satwasa Satwasa Soak Pit New Lt-

N22°30'05.301

Ln-E077°33'32.640

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

477 Seoni malwa Satwasa Satwasa Soak Pit New

Lt-N22°31'36.918

"

Ln-E077°33'23.961

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

478 Seoni malwa Satwasa Satwasa Soak Pit New

Lt-N22°31'42.928

"

Ln-E077°33'23.824

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

479 Seoni malwa Satwasa Satwasa Well

Deepening Renovati

on

Lt-N22°30'60.606

"

Ln-E077°33'40.221

" 0.30 12 - Second

Year MGNRE

GA

480 Seoni malwa Satwasa Satwasa Well

Deepening Renovati

on

Lt-N22°30'02.204

"

Ln-E077°33'32.283

" 0.50 12 - Second

Year MGNRE

GA

481 Seoni malwa Bhamedi deo Bhamedi deo Well

Deepening Renovati

on

Lt-N22°29,34.60

8"

Ln-E077°31'32.725

" 0.40 12 - Second

Year MGNRE

GA

482 Seoni malwa Bhamedi deo Bhamedi deo Well

Deepening Renovati

on

Lt-N22°29,33.02

2"

Ln-E077°31'30.884

" 0.45 12 - Second

Year MGNRE

GA

483 Seoni malwa Bhamedi deo Bhamedi deo Well

Deepening Renovati

on

Lt-N22°29'20.751

"

Ln-E077°31'53.763

" 0.40 12 - Second

Year MGNRE

GA

484 Seoni malwa Bhamedi deo Bhamedi deo Well

Deepening Renovati

on

Lt-N22°29'18.341

"

Ln-E077°32'03.322

" 0.50 12 - Second

Year MGNRE

GA

485 Seoni malwa Bhamedi deo Bhamedi deo Well

Deepening Renovati

on

Lt-N22°29'29.691

"

Ln-E077°31'37.147

" 0.40 12 - Second

Year MGNRE

GA

486 Seoni malwa Bhamedi deo Bhamedi deo Stop Dam New

Lt-N22°29'52.461

"

Ln-E077°32'03.129

" 19.0

0 2200 4.4 Fifth Year MGNREGA

487 Seoni malwa Bhamedi deo Kahariya Stop Dam New

Lt-N22°28'52.832

"

Ln-E077°30'25.735

" 16.0

0 2000 5 Fifth Year MGNREGA

488 Seoni malwa Bhamedi deo Kahariya Well

Deepening Renovati

on

Lt-N22°28'48.163

"

Ln-E077°30'34.305

" 0.35 24 - Second

Year MGNRE

GA

489 Seoni malwa Bhaghwada Bhaghwada Check Dam New Lt-

N22°31'58.261Ln-

E077°33'20.281 2.00 1200 2.4 Third Year MGNREGA

Page 199: HBAD DIP FINAL ab - pmksy.gov.in

199

" "

490 Seoni malwa Bhaghwada Bhaghwada Bori

Bandhan New Lt-

N22°31'55.569"

Ln-E077°32'49.107

" 0.10 300 0.6 Second

Year MGNRE

GA

491 Seoni malwa Bhaghwada Bhaghwada Well

Deepening Renovati

on

Lt-N22°32'13.244

"

Ln-E077°33'29.207

" 0.35 12 - Second

Year MGNRE

GA

492 Seoni malwa Bhaghwada Bhaghwada Well

Deepening Renovati

on

Lt-N22°32'07.750

"

Ln-E077°33'23.494

" 0.40 12 - Second

Year MGNRE

GA

493 Seoni malwa Bhaghwada Bhaghwada Soak Pit New

Lt-N22°32'12.014

"

Ln-E077°33'20.858

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

494 Seoni malwa Bhaghwada Bhaghwada Soak Pit New

Lt-N22°32'18.359

"

Ln-E077°33'20.253

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

495 Seoni malwa Bhaghwada Bhaghwada Soak Pit New

Lt-N22°23'16.340

"

Ln-E077°33°17.754

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

496 Seoni malwa Bhaghwada Bhaghwada Soak Pit New

Lt-N22°23'16.340

"

Ln-E077°33'15.395

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

497 Seoni malwa Bhaghwada Bhaghwada Soak Pit New

Lt-N22°32'12.481

"

Ln-E077°33'25.939

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

498 Seoni malwa Rajora Jat Rajora jat Check Dam New

Lt-N22°3'144.337

"

Ln-E077°31'10.312

" 1.50 1000 2 Third Year MGNRE

GA

499 Seoni malwa Rajora Jat Paretiya Stop Dam New 19.0

0 2400 4.8 Fifth Year MGNREGA

500 Seoni malwa Rajora Jat Rajora Jat Soak Pit New Lt-

N22°31'18.52

Ln-E077°30'59.409

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

501 Seoni malwa Rajora Jat Rajora Jat Soak Pit New

Lt-N22°31'12.331

"

Ln-E077°31'02.265

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

502 Seoni malwa Rajora Jat Rajora Jat Soak Pit New

Lt-N22°31'06.570

"

Ln-E077°31'01.359

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

Page 200: HBAD DIP FINAL ab - pmksy.gov.in

200

503 Seoni malwa Rajora Jat Paretiya Soak Pit New 0.10 5

Water Storege

Recharge.

First Year MGNREGA

504 Seoni malwa Rajora Jat Rajora jat Well

Deepening Renovati

on

Lt-N22°31'04.929

"

Ln-E077°31'02.073

" 0.35 12 - Second

Year MGNRE

GA

505 Seoni malwa Rajora Jat Paretiya Well

Deepening Renovati

on

Lt-N22°31'15.188

"

Ln-E077°30'58.392

" 0.40 12 - Second

Year MGNRE

GA

506 Seoni malwa Rajora Jat Paretiya Well

Deepening Renovati

on

Lt-N22°32'16.159

''

Ln-E077°31'96.301'

' 0.25 12 - Second

Year MGNRE

GA

507 Seoni malwa Bhadangchikli Bhadangchikli Soak Pit New

Lt-N22°29'24.036

"

Ln-E077°37'27.126

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

508 Seoni malwa Bhadangchikli Bhadangchikli Soak Pit New

Lt-N22°29'22.698

"

Ln-E077°37'22.614

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

509 Seoni malwa Bhadangchikli Bhadangchikli Soak Pit New

Lt-N22°29'17.838

"

Ln-E077°37'25.134

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

510 Seoni malwa Bhadangchikli Bhadangchikli Soak Pit New

Lt-N22°29'22.050

"

Ln-E077°37'25.164

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

511 Seoni malwa Bhadangchikli Bhadangchikli Well

Deepening Renovati

on

Lt-N22°29'23.574

"

Ln-E077°37'24.852

" 0.25 12 - Second

Year MGNRE

GA

512 Seoni malwa Bhadangchikli Bhadangchikli Stop Dam New

Lt-N22°29'57.636

"

Ln-E077°37'27.018

" 20.0

0 2300 4.6 Fifth Year MGNREGA

513 Seoni malwa Bhadangchikli Bhadangchikli Stop Dam New

Lt-N22°29'56.586

"

Ln-E077°37'16.668

" 19.0

0 2200 4.4 Fifth Year MGNREGA

514 Seoni malwa Bhadangchikli Bhadangchikli Soak Pit New 0.10 5

Water Storege

Recharge.

First Year MGNREGA

515 Seoni malwa Tiliaawli Tiliaawli Soak Pit New

Lt-N22°2807.363

"

Ln-E077°37'07.363

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

516 Seoni malwa Tiliaawli Tiliaawli Soak Pit New

Lt-N22°28'17.395

"

Ln-E077°37'24.342

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

Page 201: HBAD DIP FINAL ab - pmksy.gov.in

201

517 Seoni malwa Tiliaawli Tiliaawli Check Dam New

Lt-N22°27'59.157

"

Ln-E077°37'27.665

" 2.00 900 1.8 Third Year MGNRE

GA

518 Seoni malwa Tiliaawli Chandakhad Soak Pit New

Lt-N22°27'61.664

"

Ln-E077°26'56.356

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

519 Seoni malwa Somalwada Somalwada Check Dam New

Lt-N22°29'08.653

"

Ln-E077°35'34.122

" 2.00 900 1.8 Third Year MGNRE

GA

520 Seoni malwa Somalwada Somalwada Check Dam New

Lt-N22°29'13.748

"

Ln-E077°33'32.034

" 2.00 1000 2 Third Year MGNRE

GA

521 Seoni malwa Somalwada Somalwada Stop Dam New

Lt-N22°29'17.806

"

Ln-E077°35'58.374

" 19.0

0 2200 4.4 Fifth Year MGNREGA

522 Seoni malwa Somalwada Somalwada Stop Dam New

Lt-N22°28'55.167

"

Ln-E077°35'45.932

" 20.0

0 2200 4.4 Fifth Year MGNREGA

523 Seoni malwa Somalwada Somalwada Well

Deepening Renovati

on

Lt-N22°29'21.774

"

Ln-E077°37'35.220

" 0.35 12 - Second

Year MGNRE

GA

524 Seoni malwa Somalwada Somalwada Well

Deepening Renovati

on

Lt-N22°29'23.416

"

Ln-E077°35'21.515

" 0.30 12 - Second

Year MGNRE

GA

525 Seoni malwa Somalwada Somalwada Soak Pit New

Lt-N22°29'22.743

"

Ln-E077°35'35.962

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

526 Seoni malwa Somalwada Somalwada Soak Pit New

Lt-N22°29'29.053

"

Ln-E077°35'25.909

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

527 Seoni malwa Somalwada Somalwada Soak Pit New

Lt-N22°29'22.310

"

Ln-E077°35'19.565

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

528 Seoni malwa Somalwada Somalwada Soak Pit New

Lt-N22°29'15.513

"

Ln-E077°37'26.239

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

529 Seoni malwa Hirankheda Hirankheda Soak Pit New

Lt-N22°31'01.860

"

Ln-E077°36'05.378

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

530 Seoni malwa Hirankheda Hirankheda Soak Pit New

Lt-N22°31'04.991

"

Ln-E077°36'06.422

" 0.10 5

Water Storege

Recharge.

First Year MGNREGA

Page 202: HBAD DIP FINAL ab - pmksy.gov.in

202

531 Seoni malwa Hirankheda Hirankheda Well

Deepening Renovati

on

Lt-N22°31'05.376

"

Ln-E077°36'06.339

" 0.45 12 - Second

Year MGNRE

GA

532 Seoni malwa Hirankheda Hirankheda Well

Deepening Renovati

on

Lt-N22°31'11.610

"

Ln-E077°36'15897" 0.55 12 - Second

Year MGNRE

GA

533 Seoni malwa Hirankheda Hirankheda Check Dam New

Lt-N22°31'55.605

''

Ln-E077°36'18.112'

' 2.00 900 1.8 Third Year MGNRE

GA

534 Seoni malwa Kharda Kharda Stop Dam New

Lt-N22°24'05.256

''

Ln-E077°35'02.159'

' 19.0

0 2400 4.8 Fifth Year MGNREGA

535 Seoni malwa Kharda Khal Stop Dam New

Lt-N22°23'04.251

''

Ln-E077°32'03.164'

' 18.0

0 2200 4.4 Fifth Year MGNREGA

536 Seoni malwa Kharda Bijapur tola Soak Pit New

Lt-N22°21'57.154

"

Ln-E077°31'21.243'

' 18.0

0 2200 4.4 Fifth Year MGNREGA

537 Seoni malwa DAMADIYA DAMADIYA Soak Pit New 22, 29, 03.915 077, 29, 38.824 0.10 5.00 - First Year MGNRE

GA

538 Seoni malwa DAMADIYA DAMADIYA Soak Pit New 22 29, 01.724 077, 29, 43.603 0.10 5.00 - First Year MGNRE

GA

539 Seoni malwa DAMADIYA DAMADIYA Soak Pit New 22, 28, 58.408 077, 29, 39.840 0.10 5.00 - Fifth Year MGNRE

GA

540 Seoni malwa DAMADIYA DAMADIYA Soak Pit New 22, 29, 01.663 077, 29, 37.396 0.10 5.00 - Third Year MGNRE

GA

541 Seoni malwa DAMADIYA DAMADIYA Soak Pit New 22, 29, 02.081 077, 29, 32.726 0.10 5.00 - First Year MGNRE

GA

542 Seoni malwa DAMADIYA DAMADIYA Bag

Bunding New 22, 29, 02.727 077, 29, 32.369 0.06 12.50 1 Fourth Year MGNREGA

543 Seoni malwa DAMADIYA DAMADIYA Bag

Bunding New 22, 29, 06.881 077, 29, 34.265 0.06 12.50 1 First Year MGNREGA

544 Seoni malwa DAMADIYA DAMADIYA Bag

Bunding New 22, 29, 09.099 077, 29, 35.803 0.08 12.50 1 First Year MGNREGA

545 Seoni malwa DAMADIYA DAMADIYA Bag

Bunding New 22, 28, 38.921 077, 28, 45.348 0.08 12.50 - First Year MGNREGA

546 Seoni malwa DAMADIYA DAMADIYA Soak Pit New 22, 28, 38.921 077, 28, 45.348 0.10 5.00 - Fourth Year MGNRE

GA

547 Seoni malwa BABARI BABARI Soak Pit New 22, 36, 07.905 077, 22, 12.449 0.10 5.00 - First Year MGNRE

GA

548 Seoni malwa BABARI BABARI Soak Pit New 22, 36, 13.961 077, 22, 14.784 0.10 5.00 - First Year MGNRE

GA

549 Seoni malwa BABARI BABARI Soak Pit New 22, 36, 17.380 077, 22, 18.766 0.10 5.00 - Third Year MGNRE

GA

550 Seoni malwa BABARI BABARI Soak Pit New 22, 36, 19.907 077, 22, 25.825 0.10 5.00 - Fifth Year MGNRE

GA

Page 203: HBAD DIP FINAL ab - pmksy.gov.in

203

551 Seoni malwa BABARI BABARI Soak Pit New 22, 36, 18.767 077, 22, 16.899 0.10 5.00 - Fourth Year MGNRE

GA

552 Seoni malwa BABARI BABARI Pond

Construction New 22, 35, 35.735 077, 22, 02.314 8.00 2400.00 5 Second

Year MGNRE

GA

553 Seoni malwa BABARI BABARI Bag

Bunding New 22, 35, 34.307 077, 22, 08.577 0.03 6.00 - First Year MGNREGA

554 Seoni malwa BABARI BABARI Soak Pit New 22, 36, 02.114 077, 22, 09.813 0.10 5.00 - First Year MGNRE

GA

555 Seoni malwa BABARI BABARI Soak Pit New 22, 36, 10.864 077, 22, 12.806 0.10 5.00 - Fifth Year MGNRE

GA

556 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Soak Pit New 22, 34, 01.953 077, 21, 51.768 0.10 5.00 - Fifth Year MGNREGA

557 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Soak Pit New 22, 33, 39.139 077, 22, 03.468 0.10 5.00 - Fifth Year MGNREGA

558 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Soak Pit New 22, 33, 43.503 077, 22, 06.187 0.10 5.00 - Fourth Year MGNREGA

559 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Soak Pit New 22, 33, 38.889 077, 22, 08.357 0.10 5.00 - First Year MGNREGA

560 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Soak Pit New 22, 33, 36.321 077, 22, 02.699 0.10 5.00 - Fourth Year MGNREGA

561 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Bag Bunding New 22, 33, 31.947 077, 21, 49.213 0.06 50.00 2 First Year MGNRE

GA

562 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Bag Bunding New 22, 33, 33.732 077, 21, 47.483 0.06 50.00 2 First Year MGNRE

GA

563 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Bag Bunding New 22, 33, 33.560 077, 21, 44.269 0.06 50.00 2 Fourth Year MGNRE

GA

564 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Bag Bunding New 22, 33, 30.594 077, 21, 47.208 0.06 50.00 2 First Year MGNRE

GA

565 Seoni malwa MUDIYAKHEDI BASANIYA

KEER Bag Bunding New 22, 33, 29.715 077, 21, 45.945 0.06 50.00 2 Fourth Year MGNRE

GA

566 Seoni malwa BANADA SAHAJKUI Soak Pit New 22, 33, 31.974 077, 23, 09.716 0.10 5.00 - First Year MGNRE

GA

567 Seoni malwa BANADA SAHAJKUI Soak Pit New 22, 33, 29.248 077, 23, 04.964 0.10 5.00 - First Year MGNRE

GA

568 Seoni malwa BANADA SAHAJKUI Bag

Bunding New 22, 33, 31.425 077, 23, 26.277 0.10 60.00 3 First Year MGNREGA

569 Seoni malwa BANADA BANADA Soak Pit New 22, 33, 33.272 077, 23, 32.430 0.10 5.00 - Fifth Year MGNRE

GA

570 Seoni malwa BANADA BANADA Soak Pit New 22, 33, 33.457 077, 23, 34.682 0.10 5.00 - Fifth Year MGNRE

GA

571 Seoni malwa BANADA BANADA Soak Pit New 22, 33, 37.803 077, 23, 43.087 0.10 5.00 - Fourth Year MGNRE

GA

Page 204: HBAD DIP FINAL ab - pmksy.gov.in

204

572 Seoni malwa BANADA BANADA Stop Dam New 22, 33, 54.963 077, 22, 54.252 35.7

2 2000.0

0 6 Fifth Year MGNREGA

573 Seoni malwa BANADA BANADA Bag

Bunding New 22, 33, 51.496 077, 22, 55.488 0.10 100.00 3 First Year MGNREGA

574 Seoni malwa BANADA BANADA Bag

Bunding New 22, 33, 49.923 077, 22, 56.340 0.10 100.00 3 First Year MGNREGA

575 Seoni malwa BANADA BANADA Bag

Bunding New 22, 33, 56.007 077, 22, 53.456 0.10 100.00 3 First Year MGNREGA

576 Seoni malwa BANADA BANADA Bag

Bunding New 22,33, 60.097 077, 22, 50.456 0.10 100.00 3 Fourth Year MGNREGA

577 Seoni malwa MAHUADHANA BEGANIYA Soak Pit New 22, 22, 58.667 077, 28, 03.160 0.10 5.00 - First Year MGNRE

GA

578 Seoni malwa MAHUADHANA MAHUADHANA Soak Pit New 22, 22, 27.813 077, 28, 28.154 0.10 5.00 - First Year MGNRE

GA

579 Seoni malwa MAHUADHANA MAHUADHANA Check Dam New 22, 21, 13.164 077, 28, 38.417 2.00 6.00 - Third Year MGNRE

GA

580 Seoni malwa MAHUADHANA MAHUADHANA Bag

Bunding New 22, 21, 07.710 077, 28, 33.483 0.04 6.00 - First Year MGNREGA

581 Seoni malwa MAHUADHANA MAHUADHANA Kapildhara

Koop New 22, 21, 13.515 077, 28, 30.159 2.00 5.00 1 Second Year

MGNREGA

582 Seoni malwa MAHUADHANA SUKALDHANA Soak Pit New 22, 20, 49.633 077, 28, 28.951 0.10 5.00 - Fourth Year MGNRE

GA

583 Seoni malwa MAHUADHANA SUKALDHANA Soak Pit New 22, 20, 50.395 077, 28, 21.837 0.10 5.00 - Fifth Year MGNRE

GA

584 Seoni malwa MAHUADHANA MAHUADHANA Bag

Bunding New 22, 20, 59.102 077, 28, 27.962 0.04 6.00 - First Year MGNREGA

585 Seoni malwa MAHUADHANA MAHUADHANA Soak Pit New 22, 21, 30.248 077, 28, 36.861 0.10 5.00 - Fourth Year MGNRE

GA

586 Seoni malwa MAHUADHANA MAHUADHANA Soak Pit New 22,21, 34.210 077, 28, 43.233 0.10 5.00 - Fifth Year MGNRE

GA

587 Seoni malwa MAHUADHANA MAHUADHANA Soak Pit New 22, 21, 37.485 077, 28, 46.996 0.10 5.00 - Fifth Year MGNRE

GA

588 Seoni malwa MAHUADHANA MAHUADHANA Well

Deepening Renovation 22, 21, 33.091 077, 28, 42.931 0.40 6.00 - Second

Year MGNRE

GA

589 Seoni malwa MAHUADHANA MAHUADHANA Check Dam New 22, 21, 38.055 077, 28, 41.118 2.50 6.00 - Third Year MGNRE

GA

590 Seoni malwa MAHUADHANA MAHUADHANA Stop Dam New 22,21,14.422 077,27,48.245 26 4.58 6000.0

0 6 Fifth Year MGNREGA

591 Seoni malwa MAHUADHANA MAHUADHANA Stop Dam New 22,21,28.488 077,28,23.978 32 4.57 5800.0

0 6 Fourth Year MGNREGA

Page 205: HBAD DIP FINAL ab - pmksy.gov.in

205

592 Seoni malwa MAHUADHANA DHANDIWADA Stop Dam New 22,22,05.145 077,28,59.566 155 4.08 6000.0

0 6 Third Year MGNREGA

593 Seoni malwa MAHUADHANA MANAKPUR Stop Dam New 22,21,17.245 077,27,49.378 31/2 4.99 5200.0

0 5 Fifth Year MGNREGA

594 Seoni malwa MAHUADHANA MANAKPUR Stop Dam New 22,21,14.128 077,27,48.078 31/2 5.1 6500.0

0 6 Fifth Year MGNREGA

595 Seoni malwa MAHUADHANA MANAKPUR Stop Dam New 22,21,02.005 077,27,06.899 15 4.99 5200.0

0 5 Third Year MGNREGA

597 Seoni malwa MAHUADHANA DHANDIWADA Pond

Deepening Renovati

on 22,20,18.525 077,28,26.122 3.00 25.00 - Second Year

MGNREGA

598 Seoni malwa BHARLAI BHARLAI Soak Pit New 22, 25, 45.028 077, 25, 23.749 0.10 5.00 - First Year MGNRE

GA

599 Seoni malwa BHARLAI BHARLAI Soak Pit New 22, 25, 39.960 077, 25, 25.040 0.10 5.00 - Fifth Year MGNRE

GA

600 Seoni malwa BHARLAI BHARLAI Soak Pit New 22, 25, 39.713 077, 25, 30.807 0.10 5.00 - Fifth Year MGNRE

GA

601 Seoni malwa BHARLAI BHARLAI Soak Pit New 22, 25, 36.884 077, 25, 33.252 0.10 5.00 - First Year MGNRE

GA

602 Seoni malwa BHARLAI BHARLAI Soak Pit New 22, 25, 46.168 077, 25, 39.679 0.10 5.00 - Fourth Year MGNRE

GA

603 Seoni malwa BHARLAI BHARLAI Bag

Bunding New 22, 26, 00.999 077, 25, 30.176 0.04 5.00 1 First Year MGNREGA

604 Seoni malwa BHARLAI BHARLAI Bag

Bunding New 22, 26, 07.433 077, 25, 25.232 0.04 5.00 1 First Year MGNREGA

605 Seoni malwa BHARLAI BHARLAI Bag

Bunding New 22, 25, 38.745 077, 24, 28.707 0.04 5.00 1 First Year MGNREGA

606 Seoni malwa BHARLAI BHARLAI Pond

Deepening Renovati

on 22,25,48.207 077,25,40.421 7.00 7250.00 6 Third Year MGNRE

GA

607 Seoni malwa BHARLAI BHARLAI Well

Deepening Renovation 22,25,38.786 77,25,24.820 0.25 0.00 - Third Year MGNRE

GA

608 Seoni malwa LODHDI LODHDI Soak Pit New 22, 33, 35.222 077, 26, 05.799 0.10 5.00 - First Year MGNRE

GA

609 Seoni malwa LODHDI LODHDI Soak Pit New 22, 33, 36.232 077, 26, 11.979 0.10 5.00 - Fifth Year MGNRE

GA

610 Seoni malwa LODHDI LODHDI Soak Pit New 22, 33, 31.075 077, 26, 14.945 0.10 6.00 - Fifth Year MGNRE

GA

611 Seoni malwa LODHDI LODHDI Soak Pit New 22, 33, 37.570 077, 26, 14.090 0.10 5.00 - Fourth Year MGNRE

GA

612 Seoni malwa LODHDI LODHDI Soak Pit New 22, 33, 38.621 077, 26, 08.436 0.10 5.00 - First Year MGNRE

GA

613 Seoni malwa LODHDI LODHDI Bag

Bunding New 22, 33, 33.496 077, 26, 01.047 0.06 6.00 1 First Year MGNREGA

614 Seoni malwa LODHDI LODHDI Bag

Bunding New 22, 33, 35.215 077, 26, 00.000 0.06 6.00 1 First Year MGNREGA

Page 206: HBAD DIP FINAL ab - pmksy.gov.in

206

615 Seoni malwa LODHDI LODHDI Bag

Bunding New 22, 33, 38.985 077, 25, 59.070 0.06 6.00 1 Fourth Year MGNREGA

616 Seoni malwa LODHDI LODHDI Bag

Bunding New 22, 33, 40.818 077, 25, 58.493 0.06 6.00 1 First Year MGNREGA

617 Seoni malwa LODHDI LODHDI Bag

Bunding New 22, 33, 42.617 077, 25, 57.889 0.06 6.00 1 First Year MGNREGA

618 Seoni malwa PATHADA PATHADA Soak Pit New 22, 35, 46.014 077, 24, 32.168 0.10 5.00 - First Year MGNRE

GA

619 Seoni malwa PATHADA PATHADA Soak Pit New 22, 36, 22.496 077, 24, 21.621 0.10 5.00 - First Year MGNRE

GA

620 Seoni malwa PATHADA PATHADA Soak Pit New 22, 36, 18.397 077, 24, 26.483 0.10 5.00 - Fourth Year MGNRE

GA

621 Seoni malwa PATHADA PATHADA Soak Pit New 22, 36, 23.842 077, 24, 23.489 0.10 5.00 - First Year MGNRE

GA

622 Seoni malwa PATHADA PATHADA Check Dam New 22, 35, 51.995 077, 24, 13.409 2.50 6.00 - Third Year MGNRE

GA

623 Seoni malwa PATHADA PATHADA Check Dam New 22, 35, 36.703 077, 24, 09.207 2.50 6.00 - Third Year MGNRE

GA

624 Seoni malwa PATHADA PATHADA Check Dam New 22, 35, 37.054 077, 24, 23.544 6.00 7.00 1 Third Year MGNRE

GA

625 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Soak Pit New 22, 23, 49.637 077, 29, 29.211 0.10 5.00 - First Year MGNRE

GA

626 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Soak Pit New 22, 23, 15.580 077, 30, 28.290 0.10 5.00 - Fifth Year MGNRE

GA

627 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Soak Pit New 22, 23, 37.078 077, 29, 50.250 0.10 5.00 - First Year MGNRE

GA

628 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Soak Pit New 22, 23, 35.236 077, 30, 42.874 0.10 5.00 - First Year MGNRE

GA

629 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Soak Pit New 22, 23, 53.463 077, 30, 02.499 0.10 5.00 - Fifth Year MGNRE

GA

630 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Soak Pit New 22, 22, 54.733 077, 29, 58.270 0.10 5.00 - Fourth Year MGNRE

GA

631 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN

Well Deepening

Renovation 22, 23, 23.036 077, 30, 18.787 0.40 6.00 - Second

Year MGNRE

GA

632 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Check Dam New 22, 23, 19.548 077, 30, 47.845 2.50 5.00 - Third Year MGNRE

GA

633 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN Check Dam New 22, 23, 48.923 077, 29, 24.487 2.50 5.00 - Third Year MGNRE

GA

634 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN

Bag Bunding New 22, 23, 09.036 077, 29, 29.363 0.05 6.00 - First Year MGNRE

GA

635 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN

Water Harvesting New 22, 23, 44.865 077, 29, 14.984 0.50 6.00 - Fourth Year MGNRE

GA

Page 207: HBAD DIP FINAL ab - pmksy.gov.in

207

636 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN

Water Harvesting New 22, 23, 44.446 077, 29, 13.363 0.50 6.00 - Fourth Year MGNRE

GA

637 Seoni malwa

PIPALIYAKALAN

PIPALIYAKALAN

Pond Deepening

Renovation 22,23,50.976 077,29,21.411 7.30 6000.0

0 10 Third Year MGNREGA

638 Seoni malwa

AMLADADONGAR RASHI Soak Pit New 22, 34, 31.239 077, 25, 49.869 0.10 5.00 - First Year MGNRE

GA

639 Seoni malwa

AMLADADONGAR RASHI Bag

Bunding New 22, 34, 35.015 077, 25, 55.692 0.05 6.00 - First Year MGNREGA

640 Seoni malwa

AMLADADONGAR

AMLADADONGAR Soak Pit New 22, 34, 29.907 077, 25, 46.985 0.10 5.00 - Fifth Year MGNRE

GA

641 Seoni malwa

AMLADADONGAR

AMLADADONGAR Soak Pit New 22, 34, 29.948 077, 25, 43.579 0.10 5.00 - Fourth Year MGNRE

GA

642 Seoni malwa

AMLADADONGAR

AMLADADONGAR Soak Pit New 22, 34, 33.642 077, 25, 39.522 0.10 5.00 - First Year MGNRE

GA

643 Seoni malwa

AMLADADONGAR

AMLADADONGAR Soak Pit New 22, 34, 36.601 077, 25, 34.528 0.10 5.00 - First Year MGNRE

GA

644 Seoni malwa

AMLADADONGAR

AMLADADONGAR

Bag Bunding New 22, 34, 40.378 077, 25, 56.268 0.04 6.00 - First Year MGNRE

GA

645 Seoni malwa

AMLADADONGAR

AMLADADONGAR Stop Dam New 22, 35, 25.250 077, 25, 30.533 16.0

0 6.00 1 Fifth Year MGNREGA

646 Seoni malwa

AMLADADONGAR

AMLADADONGAR Stop Dam New 22, 35, 13.083 077, 25, 37.670 16.5

0 6.00 1 Fifth Year MGNREGA

647 Seoni malwa BANKABEDI BANKABEDI Soak Pit New 22, 22, 11.187 077, 25, 22.398 0.10 5.00 - First Year MGNRE

GA

648 Seoni malwa BANKABEDI BANKABEDI Soak Pit New 22, 22, 13.054 077, 25, 20.316 0.10 5.00 - Fifth Year MGNRE

GA

649 Seoni malwa BANKABEDI BANKABEDI Soak Pit New 22, 22, 10.389 077, 25, 19.080 0.10 5.00 - Fourth Year MGNRE

GA

650 Seoni malwa BANKABEDI BANKABEDI Soak Pit New 22, 22, 13.696 077, 25, 16.690 0.10 5.00 - Fifth Year MGNRE

GA

651 Seoni malwa BANKABEDI BANKABEDI Soak Pit New 22, 22, 15.065 077, 25, 15.454 0.10 5.00 - First Year MGNRE

GA

652 Seoni malwa BANKABEDI BANKABEDI Bag

Bunding New 22, 22, 42.366 077, 24, 33.624 0.03 8.00 - First Year MGNREGA

653 Seoni malwa BANKABEDI BANKABEDI Bag

Bunding New 22, 22, 43.266 077, 24, 33.679 0.03 8.00 - First Year MGNREGA

654 Seoni malwa

BABADIYABHAU

BABADIYABHAU Soak Pit New 22, 24, 35.951 077, 22, 05.391 0.10 5.00 - First Year MGNRE

GA

655 Seoni malwa

BABADIYABHAU

BABADIYABHAU Soak Pit New 22, 24, 46.670 077, 22, 01.710 0.10 5.00 - Fifth Year MGNRE

GA

Page 208: HBAD DIP FINAL ab - pmksy.gov.in

208

656 Seoni malwa

BABADIYABHAU

BABADIYABHAU Soak Pit New 22, 24, 58.611 077, 21, 42.979 0.10 5.00 - First Year MGNRE

GA

657 Seoni malwa

BABADIYABHAU

BABADIYABHAU Soak Pit New 22, 25, 03.733 077, 22, 14.619 0.10 5.00 - Fifth Year MGNRE

GA

658 Seoni malwa

BABADIYABHAU

BABADIYABHAU Soak Pit New 22, 24, 48.915 077, 22, 05.748 0.10 5.00 - First Year MGNRE

GA

659 Seoni malwa

BABADIYABHAU

BABADIYABHAU Stop Dam New 22, 25, 49.497 077, 21, 53.113 14.0

0 300.00 2 Fifth Year MGNREGA

660 Seoni malwa

BABADIYABHAU

BABADIYABHAU

Bag Bunding New 22,25. 48.138 077, 21, 56.492 0.06 10.00 1 Fourth Year MGNRE

GA

661 Seoni malwa

BABADIYABHAU

BABADIYABHAU

Bag Bunding New 22, 25, 45.124 077, 21, 56.272 0.06 10.00 1 Fourth Year MGNRE

GA

662 Seoni malwa

BABADIYABHAU

BABADIYABHAU

Bag Bunding New 22, 25, 42.460 077, 21, 54.871 0.06 10.00 1 First Year MGNRE

GA

663 Seoni malwa

BABADIYABHAU

BABADIYABHAU

Bag Bunding New 22, 25, 36.452 077, 21, 54.487 0.06 10.00 1 First Year MGNRE

GA

664 Seoni malwa TINSIYA TINSIYA Soak Pit New 22, 24, 01.722 077, 25, 32.098 0.10 5.00 - First Year MGNRE

GA

665 Seoni malwa TINSIYA TINSIYA Soak Pit New 22, 23, 58.914 077, 25, 33.060 0.10 5.00 - First Year MGNRE

GA

666 Seoni malwa TINSIYA TINSIYA Soak Pit New 22, 24, 08.383 077, 25, 31.384 0.10 5.00 - Fifth Year MGNRE

GA

667 Seoni malwa TINSIYA TINSIYA Soak Pit New 22, 23, 49.074 077, 25, 30.643 0.10 5.00 - Fifth Year MGNRE

GA

668 Seoni malwa TINSIYA TINSIYA Soak Pit New 22, 23, 36.337 077, 25, 34.927 0.10 5.00 - Fourth Year MGNRE

GA

669 Seoni malwa TINSIYA BERKHEDI Soak Pit New 22, 44, 47.569 077, 25, 30.148 0.10 5.00 - First Year MGNRE

GA

670 Seoni malwa TINSIYA BERKHEDI Soak Pit New 22, 44, 47.383 077, 25, 27.676 0.10 5.00 - Fifth Year MGNRE

GA

671 Seoni malwa TINSIYA BERKHEDI Soak Pit New 22, 24, 53.118 077, 25, 32.291 0.10 5.00 - First Year MGNRE

GA

672 Seoni malwa TINSIYA BERKHEDI Soak Pit New 22, 24, 53.536 077, 25, 30.176 0.10 5.00 - Fourth Year MGNRE

GA

673 Seoni malwa TINSIYA BERKHEDI Bag

Bunding New 22, 24, 52.321 077, 25, 32.565 0.04 6.00 - Fourth Year MGNREGA

674 Seoni malwa TINSIYA BERKHEDI Bag

Bunding New 22, 24, 56.674 077, 25, 27.754 0.04 6.00 - First Year MGNREGA

675 Seoni malwa TINSIYA BERKHEDI Bag

Bunding New 22, 25, 00.801 077, 25, 25.781 0.04 6.00 - First Year MGNREGA

676 Seoni malwa RAMPURA RAMPURA Soak Pit New 22, 31, 13.025 077, 25, 26.797 0.10 5.00 - First Year MGNRE

GA

677 Seoni RAMPURA RAMPURA Soak Pit New 22, 31, 15.359 077, 25, 29.187 0.10 5.00 - Fourth Year MGNRE

Page 209: HBAD DIP FINAL ab - pmksy.gov.in

209

malwa GA

678 Seoni malwa ROOPADEH TORANIYA Pond

Deepening Renovati

on 22,30,31.593 077,27,53.767 3.00 4.00 Second Year

MGNREGA

679 Seoni malwa RAMPURA GADARIYA Soak Pit New 22, 31, 17.186 077, 25, 32.785 0.10 5.00 - First Year MGNRE

GA

680 Seoni malwa RAMPURA GADARIYA Soak Pit New 22, 31, 19.246 077, 25, 34.735 0.10 5.00 - Fifth Year MGNRE

GA

681 Seoni malwa RAMPURA RAMPURA Soak Pit New 22, 31, 18.477 077, 25, 31.934 0.10 5.00 - First Year MGNRE

GA

682 Seoni malwa RAMPURA RAMPURA Bag

Bunding New 22, 31, 24.547 077, 25, 29.517 0.15 6.00 - First Year MGNREGA

683 Seoni malwa RAMPURA RAMPURA Bag

Bunding New 22, 31, 19.349 077, 25, 18.228 0.15 6.00 - Fourth Year MGNREGA

684 Seoni malwa RAMPURA RAMPURA Bag

Bunding New 22, 31, 11.713 077, 25, 17.459 0.15 6.00 - First Year MGNREGA

685 Seoni malwa ROOPADEH ROOPADEH Stop Dam New 22, 31, 13.183 077, 25, 35.861 8.00 350.00 2 Fifth Year MGNRE

GA

686 Seoni malwa ROOPADEH ROOPADEH Soak Pit New 22, 31, 08.984 077, 25, 37.454 0.10 5.00 - Fifth Year MGNRE

GA

687 Seoni malwa ROOPADEH ROOPADEH Soak Pit New 22, 31, 04.517 077, 25, 42.508 0.10 5.00 - First Year MGNRE

GA

688 Seoni malwa ROOPADEH ROOPADEH Soak Pit New 22, 31, 06.749 077, 25, 36.163 0.10 5.00 - Fifth Year MGNRE

GA

689 Seoni malwa ROOPADEH ROOPADEH Soak Pit New 22, 31, 07.401 077, 25, 35.092 0.10 5.00 - Fifth Year MGNRE

GA

690 Seoni malwa ROOPADEH ROOPADEH Soak Pit New 22, 31, 07.738 077, 25, 29.160 0.10 5.00 - Fifth Year MGNRE

GA

691 Seoni malwa ROOPADEH ROOPADEH Stop Dam New 22, 31, 01.420 077, 25, 25.534 8.00 400.00 2.5 Fifth Year MGNRE

GA

692 Seoni malwa ROOPADEH ROOPADEH Bag

Bunding New 22, 31, 12.269 077, 25, 30.121 0.15 100.00 - First Year MGNREGA

693 Seoni malwa RAMPURA GADARIYA Pond

Deepening Renovati

on 22,31,47.590 077,26,31.727 4.15 6000.00 8 Third Year MGNRE

GA

694 Seoni malwa SURAJPUR SURAJPUR Pond

Deepening Renovati

on 22, 22, 0.995 077, 27, 03.999 6.50 900.00 3 Second Year

MGNREGA

695 Seoni malwa SURAJPUR KANSKHEDI Pond

Deepening Renovati

on 22, 22, 54.678 077, 26, 38.378 6.00 600.00 2 Second Year

MGNREGA

696 Seoni malwa SURAJPUR SURAJPUR Soak Pit New 22,22,06.496 077,26,16.483 0.10 5.00 - First Year MGNRE

GA

697 Seoni malwa SURAJPUR SURAJPUR Soak Pit New 22,22,13.184 077,26,13.819 0.10 5.00 Fourth Year MGNRE

GA

698 Seoni malwa SURAJPUR SURAJPUR Soak Pit New 22,22,13.404 077,26,24.064 0.10 5.00 Fifth Year MGNRE

GA

699 Seoni malwa SURAJPUR SURAJPUR Soak Pit New 22,22,16.555 077,26,22.004 0.10 5.00 First Year MGNRE

GA

Page 210: HBAD DIP FINAL ab - pmksy.gov.in

210

700 Seoni malwa SURAJPUR SURAJPUR Soak Pit New 22,22,10.829 077,26,17.472 0.10 5.00 Fourth Year MGNRE

GA

701 Seoni malwa SURAJPUR SURAJPUR Pond

Deepening Renovati

on 22,222,00.995 077,27,03.099 2.00 3.00 Second Year

MGNREGA

702 Seoni malwa LOKHARTALAI LOKHARTALAI Well

Deepening Renovation 22, 21, 47.140 077, 26, 02.860 2.00 4.00 - Second

Year MGNRE

GA

703 Seoni malwa LOKHARTALAI LOKHARTALAI Check Dam New 22,20, 08.036 077, 26, 57.345 2.50 5.00 - Third Year MGNRE

GA

704 Seoni malwa LOKHARTALAI LOKHARTALAI Kapildhara

Koop New 22,21,26.005 077,24,42.742 2.00 5.00 1 Third Year MGNREGA

705 Seoni malwa LOKHARTALAI LOKHARTALAI Kapildhara

Koop New 22,21,40.520 077,25,56.955 2.00 5.00 1 Second Year

MGNREGA

706 Seoni malwa LOKHARTALAI LOKHARTALAI Kapildhara

Koop New 22,21,54.693 077,26,00.965 2.00 5.00 1 Third Year MGNREGA

707 Seoni malwa LOKHARTALAI LOKHARTALAI Kapildhara

Koop New 22,21,31.566 077,24,49.389 2.00 5.00 1 Second Year

MGNREGA

708 Seoni malwa LOKHARTALAI LOKHARTALAI Soak Pit New 22, 21, 39.223 077, 26, 04.151 0.10 5.00 - First Year MGNRE

GA

709 Seoni malwa LOKHARTALAI LOKHARTALAI Soak Pit New 22, 20, 08.441 077, 26, 31.068 0.10 5.00 - Fifth Year MGNRE

GA

710 Seoni malwa LOKHARTALAI LOKHARTALAI Soak Pit New 22, 21, 56.931 077, 25, 54.922 0.10 5.00 - First Year MGNRE

GA

711 Seoni malwa LOKHARTALAI SHEERUPURA Check Dam New 22,20,08.036 077,26,57.345 2.50 6.00 - Third Year MGNRE

GA

712 Seoni malwa LOKHARTALAI LOKHARTALAI Stop Dam New 22,21,08.256 077,24,59.345 13 5.09 5800.0

0 6 Fifth Year MGNREGA

713 Seoni malwa LOKHARTALAI SHEERUPURA Stop Dam New 22,20,24.564 077,26,51.557 94 4.99 5500.0

0 5 Fifth Year MGNREGA

716 Seoni malwa BI JAMANI BI JAMANI Check Dam New 22, 22, 10.733 077, 29, 23.773 2.00 40.00 - Third Year MGNRE

GA

717 Seoni malwa BI JAMANI BI JAMANI Check Dam New 22, 22, 08.206 077, 29, 14.908 2.00 6.00 - Third Year MGNRE

GA

718 Seoni malwa BI JAMANI BI JAMANI Bag

Bunding New 22, 22, 47.743 077, 28, 22.862 0.05 6.00 - First Year MGNREGA

719 Seoni malwa BI JAMANI BI JAMANI Bag

Bunding New 22, 22, 44.262 077, 28, 27.358 0.05 5.00 - Fourth Year MGNREGA

720 Seoni malwa BI JAMANI BI JAMANI Bag

Bunding New 22, 23, 03.426 077, 28, 11.208 0.05 5.00 - First Year MGNREGA

723 Seoni malwa BI JAMANI BI JAMANI Pond

Deepening Renovati

on 22,23,33.26 077,28,28.704 4.35 2250.00 8 Third Year MGNRE

GA

724 Seoni malwa CHATARKHEDA CHATARKHEDA Well

Deepening Renovation 22, 28, 53.979 077, 28, 21.645 0.25 6.00 - Second

Year MGNRE

GA

Page 211: HBAD DIP FINAL ab - pmksy.gov.in

211

725 Seoni malwa CHATARKHEDA CHATARKHEDA Soak Pit New 22, 28, 56.211 077, 28, 31.642 0.10 5.00 - Fifth Year MGNRE

GA

726 Seoni malwa CHATARKHEDA CHATARKHEDA Soak Pit New 22, 29, 00.000 077, 28, 39.213 0.10 5.00 - First Year MGNRE

GA

727 Seoni malwa CHATARKHEDA CHATARKHEDA Soak Pit New 22, 29, 33.173 077, 29, 22.839 0.10 5.00 - First Year MGNRE

GA

728 Seoni malwa CHATARKHEDA CHATARKHEDA Soak Pit New 22, 29, 33.825 077, 29, 24.981 0.10 5.00 - Fifth Year MGNRE

GA

729 Seoni malwa CHATARKHEDA CHATARKHEDA Soak Pit New 22, 29, 35.253 077, 29, 27.700 0.10 5.00 - Fifth Year MGNRE

GA

730 Seoni malwa SAMARDHA LAHI Stop Dam New 22, 18, 09.288 077, 28, 25.545 38.0

0 5600.0

0 15 Fifth Year MGNREGA

731 Seoni malwa SAMARDHA LAHI Stop Dam New 22,18,35.227 077,27,08.970 8.00 7.00 2 Fourth Year MGNRE

GA

732 Seoni malwa SAMARDHA LAHI Check Dam New 22,18,36.142 077,27,09.190 2.00 4.00 Third Year MGNRE

GA

733 Seoni malwa SAMARDHA LAHI Stop Dam New 22,18,40.354 077,28,04.645 32 4.99 4800.0

0 5 Fifth Year MGNREGA

734 Seoni malwa SAMARDHA MORGHAT Stop Dam New 22,18,47.745 077,27,34.987 84 4.07 4500.0

0 4 Fifth Year MGNREGA

735 Seoni malwa SAMARDHA SAMARDHA Stop Dam New 22,16,53.004 077,27,58.157 11 4.50 4000.0

0 4 Fifth Year MGNREGA

736 Seoni malwa SAMARDHA SAMARDHA Stop Dam New 22,16,56.347 077,27,56.305 16 4.99 5500.0

0 6 Fifth Year MGNREGA

737 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,54.345 077,27,44.591 2.00 5.00 1 Second Year

MGNREGA

738 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,45.110 077,27,51.625 2.00 5.00 1 Second Year

MGNREGA

739 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,15.261 077,26,52.985 2.00 5.00 1 Third Year MGNREGA

740 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,24.771 077,28,12.911 2.00 5.00 1 Fourth Year MGNREGA

741 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,10.606 077,28,00.359 2.00 5.00 1 Second Year

MGNREGA

742 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,40.269 077,27,16.908 2.00 5.00 1 Third Year MGNREGA

743 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,18.502 077,28,00.000 2.00 5.00 1 Second Year

MGNREGA

744 Seoni malwa SAMARDHA LAHI Kapildhara

Koop New 22,18,05.854 077,28,10.741 2.00 5.00 1 Fourth Year MGNREGA

746 Seoni malwa SAMARDHA MORGHAT Kapildhara

Koop New 22,18,59.378 077,26,38.346 2.00 5.00 1 Second Year

MGNREGA

747 Seoni malwa SAMARDHA MORGHAT Kapildhara

Koop New 22,19,04.933 077,27,08.503 2.00 5.00 1 Third Year MGNREGA

Page 212: HBAD DIP FINAL ab - pmksy.gov.in

212

748 Seoni malwa SAMARDHA MORGHAT Kapildhara

Koop New 22,18,45.110 077,27,51.625 2.00 5.00 1 Third Year MGNREGA

749 Seoni malwa SAMARDHA MORGHAT Kapildhara

Koop New 22,19,00.395 077,26,48.508 2.00 5.00 1 Second Year

MGNREGA

750 Seoni malwa SAMARDHA MORGHAT Kapildhara

Koop New 22,18,48,.152 077,26,40.049 2.00 5.00 1 Fourth Year MGNREGA

751 Seoni malwa SAMARDHA KAMTHA Kapildhara

Koop New 22,16,26.744 077,28,34.856 2.00 5.00 1 Second Year

MGNREGA

752 Seoni malwa SAMARDHA KAMTHA Kapildhara

Koop New 22,16,19.795 077,28,33.235 2.00 5.00 1 Second Year

MGNREGA

753 Seoni malwa SAMARDHA KAMTHA Kapildhara

Koop New 22,15,40.876 077,29,00.207 2.00 5.00 1 Second Year

MGNREGA

754 Seoni malwa SAMARDHA SAMARDHA Kapildhara

Koop New 22,16,38.925 077,28,53.588 2.00 5.00 1 Second Year

MGNREGA

755 Seoni malwa SAMARDHA SAMARDHA Kapildhara

Koop New 22,16,42.681 077,29,06.304 2.00 5.00 1 Second Year

MGNREGA

756 Seoni malwa SAMARDHA SAMARDHA Kapildhara

Koop New 22,17,09.240 077,28,35.680 2.00 5.00 1 Second Year

MGNREGA

757 Seoni malwa SAMARDHA SAMARDHA Kapildhara

Koop New 22,17,00.019 077,18,40.404 2.00 5.00 1 Fourth Year MGNREGA

758 Seoni malwa SAMARDHA MORGHAT Check Dam New 22, 18, 33.227 077, 27, 08.970 5.00 6.00 - Third Year MGNRE

GA

759 Seoni malwa SAMARDHA MORGHAT Check Dam New 22, 18, 36.142 077, 27, 09.190 4.00 4.00 - Third Year MGNRE

GA

760 Seoni malwa SATAI SATAI Check Dam New 22, 20, 22.250 077, 25, 39.899 4.00 6.00 - Third Year MGNRE

GA

761 Seoni malwa SATAI SATAI Bag

Bunding New 22, 20, 21.652 077, 25, 42.233 0.15 500.00 - First Year MGNREGA

762 Seoni malwa SATAI SATAI Kapildhara

Koop New 22, 20, 28.347 077, 25, 52.615 2.00 5.00 1 Second Year

MGNREGA

763 Seoni malwa SATAI SATAI Kapildhara

Koop New 22,20,53.973 077,25,49.814 2.00 5.00 1 Third Year MGNREGA

764 Seoni malwa SATAI SATAI Soak Pit New 22,19,26.563 077,24,16.705 0.10 5.00 - Fourth Year MGNRE

GA

765 Seoni malwa SATAI SATAI Soak Pit New 22,19,26.803 077,24,18.023 0.10 5.00 - Fifth Year MGNRE

GA

766 Seoni malwa SATAI SATAI Soak Pit New 22,19,14.320 077,24,22.967 0.10 5.00 - First Year MGNRE

GA

767 Seoni malwa SATAI MORIYA Soak Pit New 22,20,12.012 077,25,36.658 0.10 5.00 - Fourth Year MGNRE

GA

768 Seoni malwa SATAI MORIYA Soak Pit New 22,20,12.719 077,25,39.899 0.10 5.00 - Fifth Year MGNRE

GA

Page 213: HBAD DIP FINAL ab - pmksy.gov.in

213

PRADHANMANTRI KRISHI SINCAHI YOJNA DISTRICT HOSHANGABAD IWMP I SEONI MALWA

S.No.

Name of Block

Village Panchayat

Village Name

Name of Work

Type Of Structure New/ Renovation

Co-ordinates Khasra No.

Total

Cost In

Lakh

Storage Capacit

y In Cum

Irrigation

Potential In Ha.

Year of Implementati

on

Scheme

Name Latitude Longitude

1 Seonimalwa

Samardha Morghat Check Dam

New 22˚18' 52"N

77˚28' 44''E 84 4.99 4500 4.5 I Year IWMP

2 Seonimal

wa Samardha Lahi Check

Dam New 22˚18' 24˝

N 77˚28' 58' E 63 4.99 4800 4.5 I Year IWMP

3 Seonimal

wa Samardha Lahi Check

Dam New 22˚18' 32 '' ̋

N 77˚28' 01''E 32 5.41 5500 5 I Year IWMP

4 Seonimal

wa Samardha Samardha Check

Dam New 22˚16 3̒2 N̋ 77˚29 3̒6 E̋ 70 4.99 4600 4.5 I Year IWMP

5 Seonimal

wa Samardha Samardha Check

Dam New 22˚16 4̒9"N 77˚29 5̒2 E̋ 65 8.07 10000 9 I Year IWMP

6 Seonimal

wa Samardha Samardha Check

Dam New 22˚16 3̒9"N 77˚29 1̒6 E̋ 11 5.68 8000 8 I Year IWMP

7 Seonimal

wa Samardha Samardha Check

Dam New 22˚16 4̒1"N 77˚29 2̒1 E̋ 16 8.07 7000 8 I Year IWMP

8 Seonimal

wa Samardha Samardha Check

Dam New 22˚16 3̒8"N 77˚29 1̒5 E̋ 16 2.45 2000 2.5 I Year IWMP

9 Seonimalwa

Mahuadhana Dandiwara Check

Dam New 22˚22'

34"N 77˚28' 25 E̋ 94 4.02 6000 6 I Year IWMP

10 Seonimal

wa Mahuadha

na Mahuadha

na Check Dam

New 22˚21 3̒2 N̋ 77˚28' 23 E̋ 84 4.99 4900 5 I Year IWMP

11 Seonimal

wa Lokhartala

i Sirupura Check Dam

New 22˚20 2̒4"N 77˚26 5̒2 E̋ 94 5.57 7000 7 I Year IWMP

12 Seonimal

wa Lokhartala

i Sirupura Check Dam

New 22˚20 0̒7"N 77˚26 2̒4 E̋ 20 5.58 8000 6.5 I Year IWMP

13 Seonimal

wa Lokhartala

i Lokhartala

i Check Dam

New 22˚21 0̒5"N 77˚24 6̒1"E 230 4.99 4800 4.8 I Year IWMP

14 Seonimal

wa Lokhartala

i Lokhartala

i Check Dam

New 22˚21 0̒4"N 77˚24 6̒3 E̋ 230 4.99 4800 4.5 I Year IWMP

15 Seonimal

wa Mahuadha

na Mahuadha

na Check Dam

New 22˚21 2̒6 "N

77˚28 2̒2"E 26 4.99 4700 4.7 I Year IWMP

Page 214: HBAD DIP FINAL ab - pmksy.gov.in

214

16 Seonimal

wa Mahuadha

na Mahuadha

na Check Dam

New 22˚21 4̒9"N 77˚28 15 E̋ 51 4.02 5000 4.8 I Year IWMP

17 Seonimal

wa Mahuadha

na Dandiwara Gabion New 22˚22 0̒9"N 77˚28' 33 ̋ 69 1.13 … … I Year IWMP

18 Seonimal

wa Mahuadha

na Mahuadha

na Gabion New 22˚21 4̒8"N 77˚28' 11 E̋ 51 1.41 … … I Year IWMP

19 Seonimal

wa Mahuadha

na Mahuadha

na Gabion New 22˚21 4̒9"N 77˚28̒17"E 54/1 1.34 … … I Year IWMP

20 Seonimalwa Samardha Samardha Gabion New 22˚16 5̒5

"N 77˚29 3̒8 E̋ 70 1.59 … … I Year IWMP

21 Seonimalwa Samardha Samardha Gabion New 22˚16 4̒5

"N 77˚29 5̒6 E̋ 65 1.41 … … I Year IWMP

22 Seonimalwa Dhekna Dhekna Gabion New 22˚14 4̒5"N 77˚25 2̒5 E̋ 299 coop

no. 1.41 … … I Year IWMP

23 Seonimalwa

Mahuadhana Dandiwara Stop Dam New 22˚22 0̒5"N 77˚28 59 E̋ 155 5.58 6000 6.5 I Year IWMP

24 Seonimalwa

Mahuadhana

Mahuadhana Stop Dam New 22˚21 1̒4

"N 77˚27 4̒8 E̋ 26 5.57 6000 6.5 I Year IWMP

25 Seonimalwa

Mahuadhana

Mahuadhana Stop Dam New 22˚21 2̒8"N 77˚28 '23

"E 32 5.08 5800 6 I Year IWMP

26 Seonimalwa

Lokhartalai

Lokhartalai Stop Dam New 22˚21 0̒8

"N 77˚24 5̒9 E̋ 13 5.09 5800 6 I Year IWMP

27 Seonimalwa

Lokhartalai Siupura Stop Dam New 22˚20 2̒4" 77˚26 5̒1 E̋ 94 4.99 5500 5 I Year IWMP

28 Seonimalwa Samardha Morghat Stop Dam New 22˚18 4̒7

"N 77˚27 3̒4 E̋ 84 4.07 4500 4.5 I Year IWMP

29 Seonimalwa Samardha Lahi Stop Dam New 22˚18 4̒0 N̋ 77˚28 04 E̋ 32 4.99 4800 5 I Year IWMP

30 Seonimalwa Samardha Samardha Stop Dam New 22˚16 5̒3 N̋ 77˚27 5̒8 E̋ 11 3.83 4000 4 I Year IWMP

31 Seonimalwa Samardha Samardha Stop Dam New 22˚16 5̒6"N 77˚27 5̒6 E̋ 16 4.99 5500 6 I Year IWMP

32 Seonimalwa

Mahuadhana Manakpur Stop Dam New 22˚21 1̒7"N 77˚27 4̒9 E̋ 31/2 4.99 5200 5.5 I Year IWMP

33 Seonimalwa

Mahuadhana Manakpur Stop Dam New 22˚21 1̒4"N 77˚27 4̒8 E̋ 31/2 5.1 6500 6.5 I Year IWMP

34 Seonimalwa

Mahuadhana Manakpur Stop Dam New 22˚21 0̒2"N 77˚27 0̒6 E̋ 15 4.99 5200 5.5 I Year IWMP

35 Seonimalwa Dhekna Geetkheda Stop Dam New 22˚14 4̒0"N 77˚25 2̒5 E̋ 476 3.37 4000 4.5 I Year IWMP

36 Seonimal Dhekna Dhekna Stop Dam New 22˚17 1̒9"N 77˚25 1̒3 E̋ 388 3.37 4000 4.5 I Year IWMP

Page 215: HBAD DIP FINAL ab - pmksy.gov.in

215

wa 37 Seonimal

wa Beejmani Beejmani Gabion New 22˚18' 32"N

77˚28' 01 E̋ 235 0.96 … … I Year IWMP

38 Seonimalwa Beejmani Beejmani Gabion New 22˚16 3̒2˝N 77˚29 3̒6 E̋ 265 0.87 … … I Year IWMP

39 Seonimalwa

Mahuadhana Dandiwara Gabion New 22˚22 0̒3 ̋

N 77˚29 0̒2 ̋E 155 1.48 … … I Year IWMP

40 Seonimalwa

Lokhartalai

Lokhartalai Gabion New 22˚21 0̒7 ̋ ̋

N 77˚24 6̒0 ̋E 13 1.46 … … I Year IWMP

41 Seonimalwa

Lokhartalai Sirupura Gabion New 22˚20 2̒3 ̋ ̋

N 77˚26 5̒3 ̋E 94 1.23 … … I Year IWMP

42 Seonimalwa Samardha Lahi Gabion New 22˚18 3̒2 ̋ ̋

N 77˚28̒01 ̋ E 32 1.44 … … I Year IWMP

Pradhanmantri Krishi Sinchai Yojna -Hoshangabad - 5.22 Proposed New Water Conservation Structures List Of Dupty Director Farmer Welfare & Agriculture Devlopment District :- Hoshangabad

SN. Name of Block

Gram Panchayat

Village Name

Name of Work

Type of Structure

Position of Working place

Khasra No.

Total Cost

Storage Capacity

Irrigation Potential

Year of Implementation

Scheme Name

New Latitude Longitude

1 Seonimalwa Jhhavida Bandi Percolation Tank New 77.33.42.33 22.24.19.66 8º0/94 10.00 82,000 10.00 PMKSY

2 Seonimalwa Guranjghhat Guranjghhat Percolation Tank New 77.73.10 22.74.49 30.25 24.73 1,10,000 40.00 PMKSY

3 Seonimalwa Guranjghhat Guranjghhat Percolation Tank New 77.73.10 22.74.49 30/27 10.00 82,000 10.00 PMKSY

4 Seonimalwa Ghhana Ghhana Percolation Tank New 77.33.41 22.33.19 32/105 10.00 82,000 10.00 PMKSY

5 Seonimalwa Guranjghhat Parswada Percolation Tank New 77.73.10 22.73.49 30/54/13 10.00 82,000 10.00 PMKSY

6 Seonimalwa Batki Iklani Iklani Percolation Tank New 77.33.42 22.24.19 160/139/3 10.00 82,000 10.00 PMKSY

7 Seonimalwa Chouki Mafi

Chouki Mafi

Check Dam New 77.22.15 22.21.0 29/21 20.00 1,10,000 30.00 PMKSY

Page 216: HBAD DIP FINAL ab - pmksy.gov.in

216

8 Seonimalwa Amlada kalan

Amlada kalan

Check Dam New 77.21.10 22.20.0 28-Dec 20.00 1,10,000 30.00 PMKSY

Total :- _ _ _ _ _ _ _ 114.73 _ _ _

Pradhanmantri Krishi Sinchai Yojna - Hoshangabad ( Misrod ) IRRIGATION

S.No.

Name of Block

Gram Panchayat

Village Name

Name Of Work Type Of Structure (New/Renovation)

Co - ordinates Khasra No.

Total Cost

in Lakh

Storage Capacity/ length Cum/K

m.

Irrigation

Potential In Ha.

Year of Implemen

t

Scheme

Name

Latitude Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Seoni

Malwa Chandwad Chandwad (A) lining work Tawa

Project 1 Chanwad Minor Renovation 34°38'30" 77°88'8" 31.92 0.84 426 Second to

fourth

2 Chanwad sub Minor 31.92 0.84 Second to fourth

(B) Comand Area Development

New work 106.5 426 First to Fifth year

170.34

2 Seoni Malwa

Dahedi 1 Dahedi (A) lining work

2 Manwada 1 Chanwad Minor 114.52

3.54 391 Second to fourth

2 Manwada Minor 34°48'00" 77°35'30"

38.14 1.53 Second to fourth

3 Chanwad sub Minor 140.22

3.69

(B) Comand Area Development

New work 97.75 391 First to Fifth year

390.63

3 Seoni Malwa

Khutwasa 1 Khutwasa (A) lining work

2 Dhamni 1 Chanwad Minor 60.68 1.86 Second to fourth

Page 217: HBAD DIP FINAL ab - pmksy.gov.in

217

2 Chotlay Dy. 50.68 1.86 Second to fourth

3 Khutwasa Minor NO.1 59.80 2.1 Second to Fifth year

4 Khutwasa Minor NO.2 33°25'00" 77°35'55"

26.60 0.7 Second to fourth

5 Sonkhedi Minor NO.1 57.00 1.5 Second to fourth

6 Sonkhedi Minor NO.2 44.46 1.7 Second to fourth

(B) Repair Work Renovation

1 Khutwasa Minor HR 4.00 First year

2 Sonkhedi Minor HR 4.00 First year

(C) Comand Area Development

New work 201.25

805 First to Fifth year

508.47

4 Seoni Malwa

Ratwada 1 Ratwada (A) lining work Renovation

2 Sonkhedi 1 Sonkhedi Minor 38.00 1.05 Second to fourth

2 Ratwada Sub Minor 33°01'00" 77°38'03"

39.90 1.05 Second to fourth

3 Misrod Dy. 68.40 1.8 Second to fourth

4 Sel Minor No.1 125.40

3.3 Second to fourth

(B) Fall Repair Renovation

1 Misrod Dy. 2.00 First year

(C) Comand Area Development

New work 223.50

894 First to Fifth year

497.20

5 Seoni Malwa

Hirankheda 1. Hirankheda

(A) lining work Renovation

Page 218: HBAD DIP FINAL ab - pmksy.gov.in

218

2. Makodiya 1 Misrod Dy. 84.00 3 Second to fourth

2 Jijalwada Minor 33°07'00" 77°37'31"

175.00

5.4 Second to fourth

3 Chotlay Minor 33°17'00" 77°37'31"

84.00 3 Second to fourth

4 Dhamni Minor No. 1 46.12 1.74 Second to fourth

5 Dhamni Minor No. 2 22.30 0.6 Second to fourth

6 Dhamni Minor No. 3 28.50 0.75 Second to fourth

(B) Fall Repair Renovation

1 Head Regulator 3.00 First year

2 Fall 5.00 First year

3 Fall 5.00 First year

4 Fall 5.00 First year

5 Head Repair 4.00 First year

6 Head Repair 4.00 First year

(C) Comand Area Development

New work 276.75

First to Fifth year

742.67

6 Seoni Malwa

Bhadang Chikli

Bhadang Chikli

(A) lining work Renovation

Bhadang Chikli Minor 30°08'00" 77°38'03"

57.00 1.5 Second to fourth

(B) Comand Area Development

New work 13.25 53.00 First to Fifth year

70.25

7 Seoni Malwa

Datwasa Datwsa (A) lining work Renovation

Uradi 1 Datwasa Minor No.1 38.30 1.31 Second to fourth

2 Datwasa Minor No.2 26.60 0.7 Second to fourth

3 Datwasa Minor No.3 49.40 1.3 Second to fourth

Page 219: HBAD DIP FINAL ab - pmksy.gov.in

219

4 Uradi Minor No. 1 109.44

2.88 Second to fourth

5 Uradi Minor No. 2 58.14 1.53 Second to fourth

6 Sirwada Minor 32°32'09" 77°32'14"

77.52 12.04 Second to fourth

(B) Repair Renovation

1 Head Regulator Uradi Mr. No. 2

4.00 First year

2 Head Regulator Sirwada Mr. 4.00 First year

(C) Comand Area Development

New work 280.25

1121.20

First to Fifth year

647.65

8 Seoni Malwa

Kotlakhedi Kotlakhedi (A) lining work Renovation

1 Kotlakhedi Minor 125.40

3.3 Second to fourth

2 Kotlakhedi Sub Minor 32°35'00" 77°31'52"

102.60

2.7 Second to fourth

(B) Comand Area Development

New work 106.00

432.00 First to Fifth year

334.00

9 Seoni Malwa

Baghwada Baghwada (A) lining work Renovation

1 Choutlay Dy. 114.00

3 Second to fourth

2 Baghwada Minor No.1 57.00 1.5 Second to fourth

3 Baghwada Minor No.2 37.62 0.99 Second to fourth

4 Baghwada Minor No.3 47.88 1.26 Second to fourth

5 Kotlakhedi Mr. 33°20'00" 77°34'17"

114.00

3 Second to fourth

(B) Repair Renovation

1 Fall Choutlay Dy. 168 4.98 First year

Page 220: HBAD DIP FINAL ab - pmksy.gov.in

220

2 Fall Choutlay Dy. 211 3.00 First year

3 Fall Kotlakhedi Mr. 12.00 First year

(C) Comand Area Development

New work 161.50

646.00 First to Fifth year

551.98

10 Seoni Malwa

Choutlay Choutlay (A) lining work Renovation

1 Choutlay Minor 34°39'00" 77°31'43"

117.42

3.18 Second to fourth

(B) R epair Work Renovation

1 H.R. Choutlay 5.00 First year

2 C.D. Choutlay 10.00 First year

(C) Comand Area Development

New work 118.50

474.00 First to Fifth year

250.92

11 Seoni Malwa

Somalwada Somalwada (A) lining work Renovation

1 Satwasa Minor 22°32'47" 77°35'44"

256.50

6.75 Second to fourth

2 Khedi Sub Minor 68.40 1.8 Second to fourth

(B) Comand Area Development

New work 218.50

874.00 First to Fifth year

543.40

12 Seoni Malwa

Jhillay Jhillay (A) lining work Renovation 104.5 2.75

1 Jhillay Minor 34°47'00" 77°31'12"

Second to fourth

(B) Repair Renovation

1 Fall Choutlay Dy. 472 4.89 First year

2 Fall Choutlay Dy. 480 4.80 First year

3 Fall Choutlay Dy. 485 4.75 First year

4 Fall Choutlay Dy. 490 4.60 First year

Page 221: HBAD DIP FINAL ab - pmksy.gov.in

221

(C) Comand Area Development

New work 135.50

First to Fifth year

259.04

13 Seoni Malwa

Soyat 1 Soyat (A) lining work Renovation

2 Peepalber 1 Choutlay Dy. 34°44'00" 77°30'00"

157.32

4.14 Second to fourth

2 Soyat Mr. 38.00 1 Second to fourth

3 Kalyakhedi 3 Gwari Tail Minor 20.52 0.54 Second to fourth

(C) Comand Area Development

New work 199.25

797.00 First to Fifth year

415.09

14 Seoni Malwa

Satwasa 1 Satwasa (A) Lining work Renovation

1 Jeegalwada Minor 50.16 1.32 Second to fourth

2 Satwasa Minor-1 102.16

2.7 Second to fourth

3 Satwasa Minor-2 30°34'00" 77°39'20"

34.20 0.9 Second to fourth

(B) Repair

1 Fall Jeegalwada 4.00 First year

2 Fall Jeegalwada 4.00 First year

(C) Comand Area Development

New work 183.25

733.00 First to Fifth year

377.77

15 Seoni Malwa

Dharamkundi

1 Dharamkundi

(A) Lining work Renovation

2 Jeegalwada 1 Jeegalwada Minor 33°57'00" 77°32'56"

112.86

2.97 Second to fourth

2 Dharamkundi Minor 102.60

2.7 Second to fourth

Page 222: HBAD DIP FINAL ab - pmksy.gov.in

222

3 Jeegalwada Sub Minor-1 102.60

2.7 Second to fourth

4 Jeegalwada Sub Minor-2 34.20 0.9 Second to fourth

5 Jeegalwada Tail Minor 13.30 0.35 Second to fourth

(B) Comand Area Development

New work 166.25

665.00 First to Fifth year

531.81

16 Seoni Malwa

Bundara Kala

1 Bundara Kala

(A) Lining work Renovation

1 Chotlai Minor 37°07'00" 77°30'32"

114.00

3 Second to fourth

2 Chotlai Distry 57.00 1.5 Second to fourth

(B) Comand Area Development

New work 77.25 309.00 First to Fifth year

248.25

17 Seoni Malwa

Guwadi Guwadi (A) Lining work Renovation

1 Chotlai Minor 37°33'00" 77°29'10"

20.52 0.54 Second to fourth

(B) Comand Area Development

New work 59.50 238.00 First to Fifth year

Total 80.02

G-Total 6619.49

Pradhanmantri Krishi Sinchai Yojna -Hoshangabad ( Makdai)

Name Of Block:- Seoni Malwa

S.No.

Name of Block

Gram Panchayat

Village Name

Name of Work Type Of Structure(New/Re

novation)

Co-ordinates Khasra No.

Total Cost In

Lakh

Storage Capacity In Cum

Irrigation

Potential In Ha.

Year of Implemen

tation

Scheme

Name

Latitude Longitude

Page 223: HBAD DIP FINAL ab - pmksy.gov.in

223

1 2 3 4 5 6 7 8 9 10 11 12 13 14

(A) Lining of Canal 1 Seoni

Malwa Tinsaya Tinsaya (1) 7 R Minor at ch. 143.50 of

Makdai Dy. Renovation - - - 38.01 - 285.00 Second to

Forth year Tawa Proje

ct (B) Maintanace of Structures

- - - -

(1) H.R. of 7 R Minor at ch. 113.50 of Makdai Dy.

Renovation - - 0.26 - 285.00 First year

(2)V.R.B. at ch. 39 of Makdai Dy.

Renovation 5.97 - 285.00 First year

(C) CADA WORK - - -

(1) 7 R Minor of Makdai Dy. New Work - - - 71.25 - 285.00 First to fifth year

Total 115.49

(A) Lining of Canal Renovation - - - -

2 Seoni Malwa

Bharlay Bharlay (1) 8 R Minor at ch. 149 of Makdai Dy.

Renovation - - - 83.24 - 89.00 Second to Forth year

(B) Maintanace of Structures

- - - -

(1) H.R. of 8 R Minor at ch. 149 of Makdai Dy.

- - - 0.24 - 89.00 First year

(C) CADA WORK - - - -

(1) D.O. of Makdai Dy. New Work - - - 22.25 - 89.00 First to fifth year

Total 105.73

(A) Lining of Canal Renovation - - - -

3 Seoni Malwa

Banapura Banapura (1) 10 R Minor at ch. 192 of Makdai Dy.

Renovation - - - 62.71 - 884.00 Second to Forth year

(2) 15 R Minor at ch. 245 of Makdai Dy.

Renovation - - - 52.07 - 884.00 Second to Forth year

(3) 14 L Minor at ch. 250 of Makdai Dy.

Renovation - - - 22.05 - 884.00 Second to Forth year

(4) Seoni Malwa Minor at ch. 294 of Makdai Dy.

Renovation - - - 340.57

- 884.00 Second to Forth year

(B) Maintanace of Structures

- - - -

Page 224: HBAD DIP FINAL ab - pmksy.gov.in

224

(1) H.R. of 10 R Minor at ch. 192 of Makdai Dy.

Renovation - - - 0.24 - 1056.00

First year

(2)H.R. 2 R Sub Minor at ch. 03 of Seoni Malwa Mr.

Renovation - - - 0.24 - 1056.00

First year

(3) D.R.B. ch. 194 of Makdai Dy.

Renovation - - - 0.26 - - First year

(4) C.D. ch. 186 of Makdai Dy.

Renovation - - - 0.19 - - First year

(5) C.D. ch. 231 of Makdai Dy.

Renovation - - - 0.48 - - First year

(C) CADA WORK -

(1)15 R Mr. at ch. 245 of Makdai Dy.

New Work 221.00

- 884.00 First to fifth year

Bheelpura (2)15 R Mr. at ch. 245 of Makdai Dy.

New Work 43.00 - 172.00 First to fifth year

Total 742.81

(A) Lining of Canal

4 Seoni Malwa

Jhaklay Jhaklay (1)16 L Minor at ch. 299 of Makdai Dy.

Renovation - 39.15 - 1025.00

Second to Forth year

(2)17 L Minor at ch. 317 of Makdai Dy.

Renovation 126.19

- 1025.00

Second to Forth year

(3)21 L Minor at ch. 363 of Makdai Dy.

Renovation 44.09 - 1025.00

Second to Forth year

(4)20 R Minor at ch. 368 of Makdai Dy.

Renovation 31.17 - 1025.00

Second to Forth year

(5)Jamuniya Mr. at ch. 371 of Makdai Dy.

Renovation 218.94

- 1025.00

Second to Forth year

(6) 22 R Mr. at ch. 401 of Makdai Dy.

Renovation 24.32 - 1025.00

Second to Forth year

(B) Maintanace of Structures

- -

(1) H.R. of 17L sub Minor at ch. 317 of Makdai Dy.

Renovation - 0.24 - 1025.00

First year

(2)V.R.B. at ch. 306 of Makdai Dy.

Renovation - 1.55 - 1025.00

First year

(3)H.R. of 20 R Mr. at ch. 368 of Makdai Dy.

Renovation 0.25 - 1025.00

First year

(4)Fall at ch. 401 of Makdai Dy.

Renovation 1.11 - 1025.00

First year

-

Page 225: HBAD DIP FINAL ab - pmksy.gov.in

225

(C) CADA WORK - -

(1) 317 L 20 R 21 L 2R & Jamuniya mr. of Makdai Dy.

New Work - 256.25

- 1025.00

First to fifth year

(D) STOP DAM -

Construction of stop dam of Jhaklay Naka

New work 75.00 - First to fifth year

Total 818.26

-

(A) Lining of Canal

5 Seoni Malwa

Rupadeh Rupadeh (1) 24 L Minor at ch. 445 of Makdai Dy.

Renovation - - - 25.46 - 472.00 Second to Forth year

(2) Khapriya Minor at ch. 445 of Makdai Dy.

Renovation - - - 353.49

- 472.00 Second to Forth year

(3) 27 L Minor at ch. 474 of Makdai Dy.

Renovation - - - 49.79 - 472.00 Second to Forth year

(B) Maintanace of Structures

- - - -

(1) H.R. of Khapriya Minor at ch. 445 of Makdai Dy.

Renovation - - - 0.24 - 472.00 First year

(2)Fall at ch. 07 of Khapariya minor.

Renovation - - - 0.99 - 472.00 First year

(3) Fall at. ch. 19 of Khapriya Mr.

Renovation - - - 1.01 - 472.00 First year

(C) CADA WORK

(1) CADA Work Under village Rupadeh

New Work - - - 118.00

- 472.00 First to fifth year

Torniya (2) CADA Work Under village Torniya

New Work - - - 89.00 - 356.00 First to fifth year

Total 637.98

(A) Lining of Canal -

6 Seoni Malwa

Rampura Gadriya (1) Babri Mr. Minor at ch. 498 of Makdai Dy.

Renovation - - - 463.34

- 775.00 Second to Forth year

(2)Lodhdi Minor 1 at ch. 548 of Makdai Dy.

Renovation - - - 93.50 - 775.00 Second to Forth year

(B) Maintanace of Structures

- -

(1)Fall at ch. 517 of Makdai Dy.

Renovation - - - 1.42 - 775.00 First year

(C) CADA WORK

Page 226: HBAD DIP FINAL ab - pmksy.gov.in

226

(1) CADA Work Under village Gadriya

New Work - - - 193.75

- 775.00 First to fifth year

Rampura (2) CADA Work Under village Rampura

New Work - - - 138.75

- 555.00 First to fifth year

Total 890.76

(A) Lining of Canal -

7 Seoni Malwa

Bhangiya Bhangiya (1) 32 R Minor at ch.644 of Makdai Dy.

Renovation - - - 41.43 - 960.00 Second to Forth year

(2) Lodhari Minor 2 at ch. 652 of Makdai Dy.

Renovation - - - 38.01 - 960.00 Second to Forth year

(3) 37 Minor at ch. 729 of Makdai Dy.

Renovation - - - 46.37 - 960.00 Second to Forth year

(4) Ayapa Minor at ch. 738 of Makdai Dy.

Renovation 168.00

- 960.00 Second to Forth year

(5) Makai Tail Minor 1 of Makdai Dy.

Renovation 190.81

- 960.00 Second to Forth year

(B) Maintanace of Structures

- - - -

(1) H.R. of 32 R Minor at ch. 644of Makdai Dy.

Renovation - - - 0.24 - 960.00 First year

(2) H.R. of Ayapa Minor at ch.738 of Makdai Dy.

Renovation - - - 0.25 - 960.00 First year

(3) H.R. of 37 R Minor at ch.739 of Makdai Dy.

Renovation - - - 0.25 - 960.00 First year

(4) V.R.B. At ch.704 of Makdai Dy.

Renovation 0.34 - 960.00 First year

(5) V.R.B. At ch.751 of Makdai Dy.

Renovation 0.19 - 960.00 First year

(6) Fall At ch.739 of Makdai Dy.

Renovation 0.80 - 960.00 First year

(C) CADA WORK -

(1) Dy. , 32 R, 37R & Ayapa Mr. of Makdai Dy.

New Work 240.00

- 960.00 First to fifth year

Total 726.69

-

(B) Maintanace of Structures

- - - -

8 Seoni Malwa

Chatarkheda

Chatarkheda (1) H.R. of 3 L sub Minor at ch. 38 of Seoni Malwa Mr.

Renovation - - - 0.24 - 778.00 First year

Page 227: HBAD DIP FINAL ab - pmksy.gov.in

227

(2) H.R. of 5 L sub Minor at ch. 82 of Seoni Malwa Mr.

Renovation - - - 0.24 - 778.00 First year

(3) H.R. of 6 R sub Minor at ch. 127 of Seoni Malwa Mr.

Renovation 0.24 - 778.00 First year

(4) H.R. of 8 R sub Minor at ch. 161 of Seoni Malwa Mr.

Renovation 0.25 - 778.00 First year

(5) H.R. of 10 L sub Minor at ch. 191 of Seoni Malwa Mr.

Renovation - - - 0.24 - 778.00 First year

(C) CADA WORK - - - -

(1) Seoni Malwa Mr. of Makdai Dy.

New Work 194.50

- 778.00 First to fifth year

Total 195.71

(B) Maintanace of Structures

9 Seoni Malwa

Bhilariya Kalan

Bhilariya Kalan

(1) Fall at ch. 99 of Khapariya Mr. of Makdai Dy.

Renovation - - - 0.99 - 840.00 First year

(1) Fall at ch. 132 of Khapariya Mr. of Makdai Dy.

Renovation - - - 0.91 - 840.00 First year

(C) CADA WORK -

(1) Khapriya & Seoni Malwa Mr. of Makdai Dy.

New Work - - - 210.00

- 840.00 First to fifth year

Hinotiya (2) Khapriya Mr. of Makdai Dy

New Work - - - 112.00

- First to fifth year

Total 323.90

-

(C) CADA WORK -

10 Seoni Malwa

Makdai Makdai (1) CADA Work Under Village Makdai

Renovation - - - 12.75 - 51.00 First to fifth year

Ghogra (2) CADA Work Under Village Ghogra

Renovation - - - 1.75 - 7.00 First to fifth year

Aypa (3) CADA Work Under Village Aypa

Renovation - - - 96.25 - 385.00 First to fifth year

Total 110.75

(B) Maintanace of Structures

-

11 Seoni Malwa

Harpalpur Harpalpur (1)V.R.B. at ch. 608 of Makdai Dy.

Renovation - - - 0.34 - 565.00 First year

(C) CADA WORK -

Page 228: HBAD DIP FINAL ab - pmksy.gov.in

228

Harpalpur (1) CADA Work Under Village Harpalpur

New Work - - - 141.25

- 565.00 First to fifth year

Surangi (2) CADA Work Under Village Surangi

New Work - - - 41.50 - 166.00 First to fifth year

Total 183.09

(C) CADA WORK

12 Seoni Malwa

Bankaberi Bankaberi (1) D.O. of Makdai Dy. New Work - - - 4.25 - 17.00 First to fifth year

Total 4.25

(C) CADA WORK

13 Seoni Malwa

Kharar Babariya Bapu

(1) D.O. of Makdai Dy. New Work - - - 12.50 50.00 First to fifth year

Total 12.50

(C) CADA WORK

14 Seoni Malwa

Nipaniya Nipaniya (1) 14 L of Makdai Dy. New Work - - - 118.25

473.00 First to fifth year

(D) STOP DAM

Construction of Stop Dam on Nipaniya Nala

New Work 50.00 473.00 Forth

Total 168.25

(C) CADA WORK

15 Seoni Malwa

Damariya Harsul 8 R sub mr. at ch. 161 of Seoni Malwa Mr.

New Work - - - 76.25 305.00 First to fifth year

Total 76.25

(C) CADA WORK

16 Seoni Malwa

Munriyakheri

Munriyakheri

(1) 12 L & 13 R sub Mr. of Babri mr.

New Work - - - 62.50 250.00 First to fifth year

Jamuniya Harji

(2) 10 L sub Mr. of Babri mr. New Work 50.00 200.00 First to fifth year

Total 112.50

(C) CADA WORK

Page 229: HBAD DIP FINAL ab - pmksy.gov.in

229

17 Seoni Malwa

Rajora Kurmi

Rajora Kurmi

(1) CADA Work Under Village Rajora Kurmi

New Work - - - 10.50 42.00 First to fifth year

Lohariya Khurd

(2) CADA Work Under Village Lohariya Khurd

New Work - - - 8.75 35.00

Total 19.25

(C) CADA WORK

18 Seoni Malwa

Khapariya Khapariya (1) Khapariya mr. of Makdai Dy.

New Work - - - 131.50

526.00 First to fifth year

(D) STOP DAM

(1) Construction of Stop Dam on Khapriya Nala

New Work 175.00

526.00 First to fifth year

Total 306.50

(C) CADA WORK

19 Seoni Malwa

Lodhari Lodhari (1) Lodhari mr. 1, Lodhari Mr. 2 of Makdai Dy.

New Work - - - 81.00 324.00 First to fifth year

(D) STOP DAM

(1) Construction of Stop Dam on Lodhri Nala

New Work 200.00

324.00 First to fifth year

Total 281.00

(C) CADA WORK

20 Seoni Malwa

Banara Banara (1)Babri mr.& 18 L,20 R,22R Sub minrs of Babari Mr.

New Work - - - 187.25

749.00 First to fifth year

(D) STOP DAM

(1) Construction of Stop Dam on Banganitola River

New Work 156.50

749.00 First to fifth year

Total 343.75

(C) CADA WORK

21 Seoni Malwa

Babri Babri (1) 23 L, 24 R Sub minrs of Babari Mr. & Babri Mr. Tail.

New Work - - - 75.25 301.00 First to fifth year

Total 75.25

(C) CADA WORK

22 Seoni Malwa

Pathda Pathda (1) CADA Work Under Village Pathada

New Work - - - 110.00

440.00 First to fifth year

Borat (2) CADA Work Under Village Borat

New Work - - - 74.50 298.00

Page 230: HBAD DIP FINAL ab - pmksy.gov.in

230

(D) STOP DAM

Pathda (1) Construction of Stop Dam on Pathra Nala

New Work 260.00

440.00 First to fifth year

Borat (2) Construction of Stop Dam on Borat Nala

New Work 255.00

298.00 First to fifth year

Total 699.50

(C) CADA WORK

23 Seoni Malwa

Amlara Dongar

Amlada dogar

(1) CADA Work Under VillageAmlada dogar

New Work - - - 53.00 212.00 First to fifth year

Rashi (2) CADA Work Under Village Rashi

New Work 112.00

448.00

(D) STOP DAM

Rashi (1) Construction of Stop Dam on Amlara Dongar Nala

New Work 250.00

212.00 First to fifth year

Rashi (2) Construction of Stop Dam on Rashi Nala

New Work 250.00

448.00 First to fifth year

Total 665.00

(C) CADA WORK

24 Seoni Malwa

Rehra Rehra (1)Makdai mr.1 , RehdaNo.1 & 2 sub mr. of Makdai Dy. .

New Work - - - 212.28

849.00 First to fifth year

(D) STOP DAM

Rehra (1) Construction of Stop Dam on Rehda Nala

New Work 50.00 849.00 First to fifth year

Total 262.28

G Total 7877.45

Page 231: HBAD DIP FINAL ab - pmksy.gov.in

231

Pradhanmantri Krishi Sinchai Yojna - Hoshangabad (Bhiladiya) S.No.

Name of Block

Gram Panchayat

Village Name

Name Of Work Type Of Structure (New/Renovation)

Co - ordinates Khasra No.

Total Cost

in Lakh

Storage Capacity Cum./Length km.

Irrigation

Potential In Ha.

Year of Implemen

t

Scheme

Name

Latitude Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Seoni Malwa Bharlai Bharlai (A) Lining Work 5

lining

(1) Bhiladiya canal Renovation 1900 First to Fifth Year

(2) lining of 6 L Bhiladiya canal Renovation

247.25

989

First to Fifth Year

(3) lining of 8 L Bhiladiya canal Renovation

(4) lining of 10 L Bhiladiya canal Renovation

(5) lining of 11 R Bhiladiya canal Renovation

(B) Repair Work

(1) H.R. 6 L Bhiladiya canal Renovation 5 First Year

(2) H.R. 8 L Bhiladiya canal Renovation 5 First Year

(3) H.R.10 L Bhiladiya canal Renovation 5 First Year

(4) H.R. 11 R Bhiladiya canal Renovation 5 First Year

(5) C. R. 0 Ch. Bhiladiya canal Renovation 5 First Year

(6) V. R. B. 65 Ch. Bhiladiya canal Renovation 5 First Year

(C ) L. I. S. Bhiladiya canal New 102 449 Ha.

second Year

2279.

25

2 Seoni Malwa Bhairopur Bhairopur (B) Repair Work

(1) H.R. 12 R Bhiladiya canal Renovation 5 First Year

(2) H.R. 13 L Bhiladiya canal Renovation 5 First Year

(3) H.R. 14 L Bhiladiya canal Renovation 5 First Year

(4) H.R. 17 L Bhiladiya canal Renovation 5 First Year

Page 232: HBAD DIP FINAL ab - pmksy.gov.in

232

(5) C. R. 247 Ch. Bhiladiya canal Renovation 8 First Year

(6) Fall 177 Ch. Bhiladiya canal Renovation 6 First Year

(7) V. R. B. 149 Ch. Bhiladiya canal Renovation 11 First Year

( C ) CADA Development New 237.5 950 First to

Fifth Year

282.5

3 Seoni Malwa Nipaniya Nipaniya (A) Lining Work

(1) Basaniya Minor Lining 0 to 149

169.87

First to Fifth Year

(B) Repair Work

(1) H. R. 18 R. Bhiladiya canal Renovation 10 First Year

(2) H. R. 2 L. Basaniya Mr. Renovation 10 First Year

(3) Fall 2 CH. Basaniya Mr. Renovation 4 First Year

(4) Fall 12 Ch.Basaniya Mr. Renovation 4 First Year

( C ) CADA Development New 97.5 390 First to

Fifth Year

(2) Talab Nipaniya New 22 °29´11"N

77 °24´32"E 50 0.17mcm 25 Hac First Year

Talab

345.3

7

4 Seoni Malwa Goal Gaon Goal Gaon (B) Repair Work

(1) H. R. Bhiladiya 335 Ch. Renovation 5 First Year

(2) H. R. Bhiladiya 335 Ch. Renovation 5 First Year

(3) C. R. Bhiladiya canal 334 Ch. Renovation 8 First Year

(4) Fall 280 Ch. Bhiladiya canal Renovation 8 First Year

( C ) CADA Development New 91.75 367 First to

Fifth Year

117.7

5

5 Seoni Malwa Bisoni kala Bisoni Kala (B) Repair Work

Page 233: HBAD DIP FINAL ab - pmksy.gov.in

233

(1) H.R. 280 Ch. Bhiladiya Canal Renovation 25 First Year

(2) Fall 335 Ch. Bhiladiya canal Renovation 8 First Year

(3) V. R. B. 380 Ch. Bhiladiya Canal Renovation 22 First Year

( C ) CADA Development New 137.5 550 First to

Fifth Year

192.5

6 Seoni Malwa Shivpur Shivpur (B) Repair Work

(1) H.R. 32 L Bhiladiya Disty. Renovation 6 First Year

(2) H.R. Bhaisadeh Mr. Bhiladiya Disty. Renovation 6 First Year

(3) H.R. 600 Ch. Bhiladiya Disty. Renovation 6 First Year

(4) H.R. 25 R Bhiladiya Disty. Renovation 6 First Year

(5) H.R. 30 R Bhiladiya Disty. Renovation 6 First Year

(6) H.R. Mala Mr. Bhiladiya Disty. Renovation 6 First Year

(7) H.R. 29 L Bhiladiya Disty. Renovation 4 First Year

(8) Fall 600 Ch. Bhiladiya Disty. Renovation 8 First Year

(9) V. R. B. 600 Ch. Bhiladiya Disty. Renovation 22 First Year

( C ) CADA Development New 229.7

5 919 First to

Fifth Year

(2) Hamidpur Anicut New 22 °32´47"N

77 °17´27"E 420 0.30mcm 45 Hac

Second to Third Year

Anicut

719.7

5

7 Seoni Malwa

Bhiladiya Khurd

Bhiladiya Khurd (B) Repair Work

(1) H.R. 35 L Bhiladiya Disty. Renovation 5 First Year

(2) H.R. 36 R Bhiladiya Disty. Renovation 5 First Year

(3) H.R. 37 L Bhiladiya Disty. Renovation 5 First Year

(4) H.R. 38 R Bhiladiya Disty. Renovation 5 First Year

(5) H.R. 40 R Bhiladiya Disty. Renovation 5 First Year

Page 234: HBAD DIP FINAL ab - pmksy.gov.in

234

(6) V. R. B. 650 Ch. Bhiladiya canal Renovation 11 First Year

(7) Fall 622 Bhiladiya canal Renovation 9 First Year

( C ) CADA Development New 22.5 90 First to

Fifth Year

67.5

8 Seoni Malwa Thua Myaon Gaon (A) Lining Work

Kusumkui (1) lining of Chandrapura Minor Renovation

169.86

First to Fifth Year

Thua (2) lining of Basaniya Minor 149 to 380 Ch. 263

First to Fifth Year

(B) Repair Work

(1) H. R. 14 Ch. Chandrapura Minor Renovation 5 First Year

(2) H. R. 16 Ch. Chandrapura Minor Renovation 5 First Year

(3) H. R. 112 Ch. Chandrapura Minor Renovation 5 First Year

(4) Fall 16 Ch. Chandrapura Minor Renovation 6 First Year

(5) Fall 27 Ch. Chandrapura Minor Renovation 6 First Year

(6) V. R. B. 14 Ch. Chandrapura Minor Renovation 11 First Year

(7) H.R. 185 Ch. Basaniya Minor Renovation 5 First Year

(8) H.R. 210 Ch. Basaniya Minor Renovation 5 First Year

(9) H.R. 225 Ch. Basaniya Minor Renovation 5 First Year

(10) H.R. 230 Ch. Basaniya Minor Renovation 5 First Year

(110 Fall 149 Ch. Basaniya Minor Renovation 4 First Year

(12) Fall 182 Ch. Basaniya Minor Renovation 4 First Year

(13) V. R. B. 190 Ch. Basaniya Minor Renovation 11 First Year

(14) V. R. B. 210 Ch. Basaniya Minor Renovation 11 First Year

(15) H. R. 6R Minor of Basaniya Minor Renovation 5 First Year

Page 235: HBAD DIP FINAL ab - pmksy.gov.in

235

(16) H. R. 9R Minor of Basaniya Minor Renovation 5 First Year

(17) H. R. 8R Minor of Basaniya Minor Renovation 5 First Year

(18) H. R. 13R Minor of Basaniya Minor Renovation 5 First Year

(19) Fall 121 Ch. Basaniya Minor Renovation 12 First Year

(20) Fall 132 Ch. Basaniya Minor Renovation 12 First Year

(21) V. R. B. 104 Ch. Basanoya Minor Renovation 11 First Year

(22) V. R. B. 139 Ch. Basaniya Minor Renovation 11 First Year

( C ) CADA Development Thua Renovation

148.75 595

First to Fifth Year

(2) CADA Development Mayongaon Renovation 96.25 385

First to Fifth Year

(3) CADA Development Kusumkui New

186.25 745

First to Fifth Year

1018.

11

9 Seoni Malwa Kajali Dimawar ( C ) New work

(1) Anicut Dimawar New 22 °34´13"N

77 °21´19"E 330 0.35mcm 15 Hac

First to SecondYea

r Anicut

330

10 Seoni Malwa

Chapragrahan

Chapragrahan (A) Lining Work

(1) lining of Chandrapura Minor Renovation

177.84

First to Fifth Year

(B) Repair Work

(1) H. R. 13 R Minor of Chapragrahan Minor Renovation 5 First Year

(2) Fall 136 Ch. of Chapragrahan Minor Renovation 4 First Year

(3) Fall 156 Ch. of Chapragrahan Minor Renovation 4 First Year

Page 236: HBAD DIP FINAL ab - pmksy.gov.in

236

(4) V.R.B. 139 Ch. of Chapragrahan Minor Renovation 11 First Year

( C ) CADA Development new 202.5 770 First to

Fifth Year

404.3

4

11 Seoni Malwa

Jat Guradiya Jat Guradiya (B) Repair Work

(1) H.R. 21 R of Chapragrahan Minor Renovation 5 First Year

(2) Fall 340 R of Basaniya Minor Renovation 7 First Year

( C ) CADA Development new 78.75 315 First to

Fifth Year

90.75

12 Seoni Malwa Bhaisadeh Bhaisadeh (B) Repair Work

Anicut

(1) H.R. 22 L of Chapragrahan Minor Renovation 5 First Year

(2) H.R. 26 L of Chapragrahan Minor Renovation 5 First Year

(3) H.R. 28 L of Chapragrahan Minor Renovation 5 First Year

(4) Fall 224 L of Chapragrahan Minor Renovation 4 First Year

(5) Fall 275 L of Chapragrahan Minor Renovation 4 First Year

(6) Fall 26 R of Chapragrahan Minor Renovation 4 First Year

(7) V.R.B. 250 Ch. of Chapragrahan Minor Renovation 11 First Year

( C ) CADA Development New 95 380 First to

Fifth Year

(2) Anicut Bhaisdeh New 22 °33´13"N

77 °19´46"E 380 0.20mcm 30 Hac First Year

513

13 Seoni Malwa Dhamaniya Dhamaniya (A) Lining Work

Page 237: HBAD DIP FINAL ab - pmksy.gov.in

237

(1) lining of Damaniya Disty. Renovation 195.7 First to

Fifth Year

(B) Repair Work

(1) H.R. 1 L of Dhamniya Disty. Renovation 5 First Year

(2) Fall 50 Ch of Dhamniya Disty. Renovation 4 First Year

(3) Fall 240 Ch of Dhamniya Disty. Renovation 4 First Year

(4) V.R.B. 130 of Dhamniya Disty. Renovation 12 First Year

( C ) CADA Development Renovation 85.55 210 First to

Fifth Year

306.2

5

14 Seoni Malwa Rajorajat Rajorajat (A) Lining Work

(1) lining of Rajorajat Disty. Renovation 456 257 First to

Fifth Year

(B) Repair Work

(1) H.R. Tail R Rajora jat Disty. New 10 First Year

(2) H.R. Tail L Rajora jat Disty. Renovation 5 First Year

(3) Fall 28 Ch. Tail l Minor Renovation 5 First Year

(4) Fall 32 Ch. Tail l Minor Renovation 5 First Year

(5) V.R.B. 250 Rajorajat Disty. Renovation 12 First Year

( C ) CADA Development New 69.25 First to

Fifth Year

(2) Anicut Rajora Jat New 22 °31´40"N

77 °31´36"E 150 0.06mcm 10 Hac

Second year

Anicut

712.2

5

15 Seoni Malwa Kharda Kharda (B) Repair Work

(1) H.R. Minor No. 1 Chabora Disty. Renovation 6 First Year

(2) H.R. Minor No. 2 Chabora Renovation 6 First Year

Page 238: HBAD DIP FINAL ab - pmksy.gov.in

238

Disty.

(3) Fall 161 Ch. Of Chabora Disty. Renovation 6 First Year

( C ) CADA Development New 134.2

5 537 First to

Fifth Year

(2) Kharda Anicut New 65.75 0.15 mcm

20 Hact

Second year

Anicut

218

16 Seoni Malwa

Nandarwara Nandarwara (A) Lining Work

(1) lining of Chabora Disty. Renovation 342 First to

Fifth Year

(B) Repair Work

(1) H.R. Kharda Minor of Rajorajat Disty. Renovation 5 First Year

(2) H.R. Khedi No. 1 of Kharda Minor. Renovation 5 First Year

(3) Fall 51 Ch. Of Rajorajat Disty. Renovation 9 First Year

(4) Fall 79 Ch. Of Rajorajat Disty. Renovation 9 First Year

(5) Fall 102 Ch. Of Rajorajat Disty. Renovation 9 First Year

(6) V.R.B. 20 Ch. Of Rajorajat Disty. Renovation 14 First Year

( C ) CADA Development New 51.75 155 First to

Fifth Year

444.7

5

17 Seoni Malwa Bhamedi Bhamedi (B) Repair Work

(1) H.R. 12 Ch. Gajanpur No. 1 Renovation 6 First Year

(2) H.R. 73 Ch. Bhamed Minor Renovation 6 First Year

(3) H.R. 99 Ch. Nimanpur Minor Renovation 6 First Year

(4) Fall 12 Ch. Gajanpur disty. Renovation 7 First Year

(5) Fall 27 Ch. Gajanpur disty. Renovation 7 First Year

Page 239: HBAD DIP FINAL ab - pmksy.gov.in

239

(6) Fall 41 Ch. Gajanpur disty. Renovation 7 First Year

(7) Fall 100 Ch. Gajanpur disty. Renovation 7 First Year

(8) V.R.B. 67 Ch. Gajanpur Disty. Renovation 7 First Year

( C ) CADA Development New 117 480 First to

Fifth Year

(2) Talab Bhamedi Renovation 10 0.15mcm 20 second Year

Talab

180

18 Seoni Malwa

Bhamedi Dev.

Bhamedi Dev. (B) Repair Work

(1) Fall 200 Ch. Of Chabora disty. Renovation 12 First Year

( C ) CADA Development New 42.5 170 First Year

(2) Bhamedidev Anicut New 127.5 0.15 mcm 25

Second year

(3) Talab Bhamedi Dev New 22 °29´50"N

77 °32´07"E 40 0.10mcm

Second year

222

19 Seoni Malwa Batki Batki (B) Repair Work

(1) H.R. 20 First Year

(2) Fall 20 First Year

(3) V.R.B. 32 First Year

( C ) CADA Development New 8 32 First to

fifth year

80

20 Seoni Malwa Gajanpur Gajanpur (A) Lining Work

(1) Lining of Gajanpur Disty. 0 to 192 Renovation 226.6

First to fifth year

(B) Repair Work

(1) Fall 131 Ch. Gajanpur Disty. Renovation 6 First Year

(2) Fall 150 Ch. Gajanpur Disty. Renovation 6 First Year

Page 240: HBAD DIP FINAL ab - pmksy.gov.in

240

(3) Fall 168 Ch. Gajanpur Disty. Renovation 6 First Year

(4) V.R.B. 150 Ch. Gajanpur Disty. Renovation 5 First Year

( C ) CADA Development New 192.7

5 687 First to

fifth year

442.3

5

21 Seoni Malwa Jhadbida Jhadbida ( C ) CADA Development New 67.5 222

First to fifth year

67.5

22 Seoni Malwa Naharkola Naharkola (A) Lining Work

(1) Lining of Kahariya Disty. Renovation 298.6

8 First to

fifth year

(B) Repair Work

(1) H.R. Barakhad Minor Renovation 6 First Year

(2) Fall 0 Ch. Of Kahariya Disty. Renovation 10 First Year

(3) Fall 14 Ch. Of Kahariya Disty. Renovation 10 First Year

(4) V.R.B. 100 Ch. Kahariya Disty. Renovation 10 First Year

(5) V.R.B. 150 Ch. Kahariya Disty. Renovation 10 First Year

( C ) CADA Development New 270.5 706 First to

fifth year

615.1

8

23 Seoni Malwa

Barakhdakhurda

Barakhdakhurda (B) Repair Work

(1) H.R. Barakhad Minor Renovation 8 First Year

(2) Fall 50 Ch of Barakhad Minor Renovation 8 First Year

(3) Fall 70 Ch of Barakhad Minor Renovation 8 First Year

(40 V.R.B. 65 Ch of Barakhad Minor Renovation 8 First Year

Page 241: HBAD DIP FINAL ab - pmksy.gov.in

241

(5) V.R.B. 100 Ch of Barakhad Minor Renovation 8 First Year

( C ) CADA Development New 115.5 366 First to

fifth year

155.5

24 Seoni Malwa

Pippalthone Pippalthone (A) Lining Work

(1) Lining of Pipalthone Disty. Renovation

147.62

First to fifth year

(B) Repair Work

(1) V.R.B. 15 Ch. Pipalthone Disty. Renovation 8 First Year

(2) V.R.B. 32 Ch. Pipalthone Disty. Renovation 8 First Year

( C ) CADA Development New 120 268 First to

fifth year

283.6

2

25 Seoni Malwa

Pipaliyakala Pipaliyakala (A) Lining Work

(1) Lining of Pipaliya 1 Disty. Renovation 89.9

First to fifth year

(B) Repair Work

(1) H.R. Pipaliya 1 Renovation 10 First Year

(2) H.R. Pipaliya 2 Renovation 10 First Year

(3) Fall 14 Ch. Of Pipaliya 2 Renovation 5 First Year

(4) Fall 37 Ch. Of Pipaliya 2 Renovation 5 First Year

(5) V.R.B. 13 Ch. Pipaliya 2 Renovation 7 First Year

( C ) CADA Development New 42.5 170 First to

fifth year

169.4

26 Seoni Malwa Dawadiya Dawadiya CADA Development Renovation 27.5 70

First to fifth year

27.5

Page 242: HBAD DIP FINAL ab - pmksy.gov.in

242

27 Seoni Malwa Kharar Lohariya (A) Lining Work

Kharar (1) Lining of Lohariya Disty. Renovation 110.6 First to

fifth year

(B) Repair Work

(1) H.R. 57 Ch. Lohariya Disty. Renovation 6 First Year

(2) V.R.B. 104 Ch. Lohariya Disty. Renovation 6 First Year

(3) V.R.B. 132 Ch. Lohariya Disty. Renovation 6 First Year

(4) C. D. 19 Ch. Kharar Minor No. 1 Renovation 8 First Year

(5) V. R. B. 21 Ch. Kharar Minor No. 2 Renovation 8 First Year

( C ) CADA Development New 90.75 363 First to

fifth year

(2) CADA Development New 15.5 22 First to

fifth year

(3) CADA Development New 50.5 162 First to

fifth year

301.3

5

28 Seoni Malwa Surajpur Kanskhedi (A) Lining Work

(1) Lining of Lohariya Disty. Renovation 182.4 First to

fifth year

(B) Repair Work

(1) H.R. 57 Ch. Lohariya Disty. Renovation 10 First Year

(2) Fall 73 Ch. Lohariya Disty. Renovation 5 First Year

(3) V.R.B. 36 Ch. Lohariya Disty. Renovation 10 First Year

( C ) CADA Development New 103.5 314 First to

fifth year

310.9

29 Seoni Malwa

Barakhadkala

Barakhadkala ( C ) CADA Development New

114.25 265

First to fifth year

114.2

5

Page 243: HBAD DIP FINAL ab - pmksy.gov.in

243

30 Seoni Malwa Bildi

Bildi /Mohanpur (A) Lining Work

(1) Lining of Dawadiya Disty. Renovation

484.78

First to fifth year

(B) Repair Work

(1) H.R.Bildi 1 Renovation 8 First Year

(2) H.R.Bildi 2 Renovation 8 First Year

(3) H.R.Barakhad Minor Renovation 8 First Year

(4) H.R.Chandrabad Minor Renovation 8 First Year

(5) H.R.Mohanpur Minor Renovation 8 First Year

(6) Fall 65 Ch. dawadiya Disty. Renovation 5 First Year

(7) Fall 36 Ch. Mohanpur Minor Renovation 5 First Year

(8) Fall 258 Ch. dawadiya Disty. Renovation 5 First Year

(9) V.R.B. 65 Mohanpur Minor Renovation 10 First Year

(10) V.R.B. 49 Mohanpur Minor Renovation 10 First Year

( C ) CADA Development New 62.5 250 First to

fifth year

(2) CADA Development New 35 100 First to

fifth year

657.2

8

31 Seoni Malwa Malapat Malapat (B) Repair Work

(1) Talab Malapat Renovation 22 °24´32"N

77 °30´45"E 52 0.15mcm 22 First Year

Talab

(2) H.R. Kharda Minor 2 of Kharda Minor Renovation 10 First Year

( C ) CADA Development New 16.75 67 First to

fifth year

32 Seoni Malwa Jamani Jamani 78.75

(B) Repair Work

(1) V.R.B. 21 Ch Kharar Disty. Renovation 30 First year

Page 244: HBAD DIP FINAL ab - pmksy.gov.in

244

(2) C.D. 19 Ch. Kharar No.1 Renovation 40 First year

(3 ) V.R.B. 28 Ch Kharar No.1. Renovation 50 First year

( C ) CADA Development New 30.25

95 First to

fifth year

150.2

5

Pradhanmantri Krishi Sinchai Yojna - Hoshangabad(Raigarh)

S.No.

Name of Block

Gram Panchayat

Village Name

Name Of Work Type Of Structure (New/Renovation)

Co - ordinates Khasra No.

Total Cost

in Lakh

Storage Capacity/ length Cum/K

m.

Irrigation

Potential In Ha.

Year of Implemen

t

Scheme

Name

Latitude Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Seoni Malwa

Basaniya Kala

1-Basaniya Kala

(A) LINING WORK Renovation

Raighah Dy --do-- 306.17

5.43 km First to second year

2-Jhinganpur 1 Nirkhi Minor --do-- 361.09

9.50 --do--

2 2 R Minor of Raigarh Distry.

--do-- 38.01 1.00 --do--

3 5R Minor of Raigarh Distry.

--do-- 125.43

3.30 --do--

(B) Repair work Renovation

1- S.W.F. Raigarh Dy. --do-- 6.55 First year

2- H.R. cum C.R. of Nirki Minor

--do-- 2.37 --do--

3- H.R. 2R Minor of Raigarh Distry.

--do-- 1.72 --do--

4-C.D. of Raigarh Distry. --do-- 0.85 --do--

Page 245: HBAD DIP FINAL ab - pmksy.gov.in

245

(C) Command Area Development

New work 213.25

853.00 First year to 5th year(20% each year)

TOTAL 1055.44

2 Seoni Malwa

Babadiya Bhau

Babadiya Bhau

(A) lining work Renovation

1 7R Minor of Raigarh Distry.

--do-- 38.01 1 Km. Second year

(B) Repair work --do--

1- H.R. , 7R Minor of Raigarh Distry.

--do-- 2.37 First year

2- V.R.B. of Raigarh Distry. --do-- 32.76 --do--

3- V.R.B. of Raigarh Distry. --do-- 0.42 --do--

4- V.R.B. of Raigarh Distry. 0.84 --do--

(C) Comand Area Development

New work 112.00

448.00 First year to 5th year(20% each year)

TOTAL 186.40

3 Seoni Malwa

Pagdhal Pagdhal (A) lining work Renovation

Raighah Dy --do-- 211.44

3.75 km First to second year

1 Malkakhedi Mr.of Raigarh Distry.

--do-- 521.50

13.72Km.

--do--

2 12R Minor of Raigarh Distry.

--do-- 45.99 1.21Km. --do--

3 13L Minor of Raigarh Distry.

--do-- 52.45 1.38Km. --do--

4 15L Minor of Raigarh Distry.

--do-- 76.02 2.00Km. --do--

(B) Repair work --do--

1- C.D. of Raigarh Distry. --do-- 0.85 First year

2- H.R. cum C.R. of Malkakhedi Mr.

--do-- 2.37 --do--

3- V.R.B. of Raigarh Distry. --do-- 2.38 --do--

Page 246: HBAD DIP FINAL ab - pmksy.gov.in

246

4- C.D. of Raigarh Distry. --do-- 0.85 --do--

5 H.R. of 12R Mr. of Raigarh Distry.

--do-- 6.55 --do--

6 H.R. of 13L Mr.of Raigarh Distry.

--do-- 1.58 --do--

7 Fall of Raigarh Distry. --do-- 10.59 --do--

8 Railway Crossing --do-- 3.09 --do--

9 H.R.of 15L Mr.of Raigarh Distry.

--do-- 2.37 --do--

(C) Command Area Development

New work 127.75

511.00 First year to 5th year(20% each year)

TOTAL 1065.78

4 Seoni Malwa

Kothara 1 Kothara (A) lining work Renovation

Raighah Dy --do-- 399.21

7.08 km First to second year

2 Nimacha 1 16 R Minor of Raigarh Distry.

--do-- 40.29 1.06Km. --do--

2 19L Minor of Raigarh Distry.

--do-- 30.02 0.79Km. --do--

3 18R Minor of Raigarh Distry.

--do-- 53.97 1.42Km. --do--

4 20R Minor of Raigarh Distry.

--do-- 64.23 1.69Km --do--

5 21R Minor of Raigarh Distry.

--do-- 38.01 1.00Km. --do--

6 23R Minor of Raigarh Distry.

--do-- 43.71 1.15Km --do--

7 22L Minor of Raigarh Distry.

--do-- 40.29 1.06Km. --do--

8 26L Minor of Raigarh Distry.

--do-- 52.83 1.39Km. --do--

9 25R Minor of Raigarh Distry.

--do-- 153.18

4.03Km. --do--

(B) Repair work --do--

1- H.R. 16R of Raigarh Distry.

--do-- 2.37 First year

2- H.R. 19L of Raigarh Distry. --do-- 2.37 --do--

Page 247: HBAD DIP FINAL ab - pmksy.gov.in

247

3- H.R. 18R of Raigarh Distry.

--do-- 2.37 --do--

4- H.R.20R of Raigarh Distry. --do-- 2.37 --do--

5 H.R. 21R of Raigarh Distry. --do-- 6.55 --do--

6 V.R.B. cum Fall of Raigarh Distry.

--do-- 4.32 --do--

7 C.D. of Raigarh Distry. --do-- 0.87 --do--

8 V.R.B. of Raigarh Distry. --do-- 3.09 --do--

9 H.R.of 23R MR. of Raigarh Distry.

--do-- 2.37 --do--

10 HR. of 22L MR.of Raigarh Distry.

--do-- 2.37 --do--

11 V.R.B. of Raigarh Distry. --do-- 0.84 --do--

12 H.R. of 25R of Raigarh Distry.

--do-- 2.37 --do--

13 H.R. of 26L Mr.of Raigarh Distry.

--do-- 2.37 --do--

14 Fall of Raigarh Distry. --do-- 6.55 --do--

15 C.D. of 15L Mr.of Raigarh Distry.

--do-- 2.70 --do--

16 V.R.B. of Raigarh Distry. --do-- 5.04 --do--

17 W.T.Fall of Raigarh Distry.

--do-- 5.42 --do--

18 V.R.B. of 25R Mr.of Raigarh Distry.

--do-- 2.37 --do--

(C) Command Area Development

New work 343.50

1374.00

First year to 5th year(20% each year)

TOTAL 1315.95

5 Seoni Malwa

Naharkola Khurd

1 Naharkola Khurd

(A) lining work Renovation

Raighah Dy 331.54

5.8 First to second year

2 Bheemgaon

1 35R Minor of Raigarh Distry.

--do-- 75.26 1..98Km. --do--

3 Chapadevdi

--do-- --do--

(B) Repair work --do-- --do--

Page 248: HBAD DIP FINAL ab - pmksy.gov.in

248

1- Fall of Raigarh Distry. --do-- 6.55 First year

2- Fall of Raigarh Distry. --do-- 6.55 --do--

3- Fall of Raigarh Distry. --do-- 4.12 --do--

4- V.R.B. of Raigarh Distry. --do-- 4.24 --do--

5 - V.R.B. of Raigarh Distry. --do-- 4.24 --do--

6- V.R.B. of Raigarh Distry. --do-- 4.24 --do--

7 - V.R.B. of Raigarh Distry. --do-- 4.24 --do--

8 - H.R. of 35R Mr.of Raigarh Distry.

--do-- 2.37 --do--

(C) Command Area Development

New work 245.25

981.00 First year to 5th year(20% each year)

(D) Stop Dam New work

1-Stop Dam on Gangal River 22°29'55.74"N

77°16'58.29"E

900.00

First year to 5th

year(20% each year)

TOTAL 1588.60

6 Seoni Malwa

Reechi 1-Reechi (A) lining work Renovation

Raighah Dy --do-- 355.23

6.3 First to second year

2-Kolgaon 1 38R Minor of Raigarh Distry.

--do-- 95.02 12.50Km.

--do--

2 37LR Minor of Raigarh Distry.

--do-- 74.88 1.97Km. --do--

(B) Repair work --do--

1- V.R.B. of Raigarh Distry. --do-- 2.06 First year

2- V.R.B. of Raigarh Distry. --do-- 2.06 --do--

3- H.R.of 37L Mr.of Raigarh Distry.

--do-- 2.37 --do--

4- V.R.B.of Raigarh Distry. --do-- 2.88 --do--

5-H.R.cum Fall of Raigarh Distry.

--do-- 2.37 --do--

6- V.R.B.of Raigarh Distry. --do-- 2.06 --do--

Page 249: HBAD DIP FINAL ab - pmksy.gov.in

249

(C) Command Area Development

--do-- 231.25

925 First year to 5th

year(20% each year)

TOTAL 770.18

7 Seoni Malwa

Luchgaon 1-Luchgaon (A) lining work Renovation

Raighah Dy --do-- 113.34

2 km First to second year

2-Ramgarh 1 41 L Minor --do-- 103.89

2.85Km. --do--

2 Tail L Minor --do-- 38.01 1.00Km. --do--

3 Tail R Minor --do-- 129.99

3.42Km. --do--

(B) Repair work --do--

1- V.R.B. --do-- 2.38 First year

(C) Command Area Development

New work 189.50

758.00 First year to 5th year(20% each year)

TOTAL 577.11

8 Seoni Malwa

Archanagaon

Archanagaon (C) Command Area Development

New work 129.50

518.00 First year to 5th year(20% each year)

(D) Stop Dam New work

1- Stop Dam on Ganjal River New work 22°33'08.24"N

77°13'40.99"E

1083.07

First /Second year

2- Stop Dam on Ganjal River New work 22°33'13.39"N

77°15'26.86"E

1000.00

First year to Secon year(50% each year)

TOTAL 2212.57

9 Seoni Malwa

Faridpur 1-Faridpur (C) Command Area Development

New work 105.25

First year to 5th

year(20% each year)

2-AmladaKhur

421.00

Page 250: HBAD DIP FINAL ab - pmksy.gov.in

250

d

TOTAL 105.25

10 Seoni Malwa

Rawanpipal

1-Rawanpipal

(C) Command Area Development

New work 134.00

First year to 5th

year(20% each year)

2-Jamunia 536.00

134.00

11 Seoni Malwa

Chokigawan

1-Chokigawan

(C) Command Area Development

New work 151.00

First year to 5th

year(20% each year)

(D) Stop Dam New work First year

1- Stop Dam New work 22°27'00"N

77°22'30"E

92.16 604.00 First /Second year

TOTAL 243.16

12 Seoni Malwa

Jeeraveh 1-Jeeraweh (C) Command Area Development

New work 231.00

924.00 First year to 5th

year(20% each year)

2-Dethi

TOTAL 231.00

13 Seoni Malwa

Nirkhi 1-Nirkhi (C) Command Area Development

New work 199.50

798.00 First year to 5th

year(20% each year)

2- Golgaon

TOTAL 199.50

14 Seoni Malwa

Bisonikala 1-Bisoni Kala

(C) Command Area Development

New work 561.75

2247.00

First year to 5th

year(20% each year)

2- Bisoni Khurd

3- Malaka Khedi

Page 251: HBAD DIP FINAL ab - pmksy.gov.in

251

TOTAL 561.75

15 Seoni Malwa

Shivpur Shivpur (C) Command Area Development

New work 372.50

1490.00

First year to 5th

year(20% each year)

TOTAL 372.50

16 Seoni Malwa

Umaria 1-Umaria (C) Command Area Development

New work 51.75 207.00 First year to 5th

year(20% each year)

2- Papan

TOTAL 51.75

17 Seoni Malwa

Amlada Kala

1-Amlada Kala

(B) Repair

Morand Aquaduct CH 2617 LBMC

500.00

(D) Stop Dam New work 207.00 First year to 5th

year(20% each year)

2- Shahpur 1-Stop Dam on Morand River 22°22'45"N

77°21'15"E

1200.00

First year to 5th

year(20% each year)

TOTAL 1700.00

Grand Total 12370.94

13802.00

Pradhanmantri Krishi Sinchai Yojna - (Block-Keshla) IRRIGATION S.No.

Name of Block

Gram Panchay

at

Village Name Name Of Work Type Of Structure

(New/Renovation)

Co - ordinates Khasra No.

Total Cost

in Lakh

Storage Capacit

y/ length

Cum/Km.

Irrigation

Potential In Ha.

Year of Impleme

nt

Scheme

Name Latitude

Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Keshla Dawa

Kala Dawa Kala (A) lining work Renovation

Page 252: HBAD DIP FINAL ab - pmksy.gov.in

252

1 Misrod Distry 95.78 2.72 Second to Fourth

2 Dawa kala Minor 33 13'00"

77 37'50"

63.84 1.68 Second to Fourth

3 Dawa khurd Minor 57.00 1.50 Second to Fourth

4 Patlai Minor-1 32 08'00"

77 37'42"

51.30 1.35 Second to Fourth

5 Patlai Minor-2 33.06 0.69 Second to Fourth

6 Chandwad Minor 32 18'00"

77 38'02"

79.80 2.10 Second to Fourth

1 H.R. Cum C.R. Chandwar Mr.

7.00 First year

(C) Comand Area Development

New work 119.75 327 Second to Fifth

Dawakhurd 1 Misrod Distry 33 33'00"

77 37'33"

61.56 1.62 Second to Fourth

2 Dawa khurd Minor-2 38.76 1.02 Second to Fourth

3 Dawa khurd Minor-3 54.72 1.41 Second to Fourth

(B) Comand Area Development

New work 119.75 314 Second to Fifth

Total 782.32

Pradhanmantri Krishi Sinchai Yojna - (Block-Hoshangabad) S.No.

Name of Block

Gram Panchay

at

Village Name Name Of Work Type Of Structure

(New/Renovation)

Co - ordinates Khasra No.

Total Cost

in Lakh

Storage Capacit

y/ length

Cum/Km.

Irrigation

Potential In Ha.

Year of Impleme

nt

Scheme

Name Latitude

Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Hoshangab

ad Dolariya Dolariya (A) lining work Renovation

1 Misrod Distry 46.74 /1.23 Second to Fourth

2 Mohari Minor 34 48'00"

77 36'55"

148.20 /3.9 Second to Fourth

Page 253: HBAD DIP FINAL ab - pmksy.gov.in

253

3 Dolariya Minor-1 34 43'00"

77 25'55"

22.80 /0.6 Second to Fourth

4 Dolariya Sub Minor-1 31.92 /0.84 Second to Fourth

5 Dolariya Sub Minor-2 29.64 /0.78 Second to Fourth

6 Dolariya Minor-2 91.20 2.4 1 Mohari Mr. Fall 2.00 First year (C) Comand Area

Development New work 286.00 Second to

Fifth

1 Misrod Distry 37 00'00"

77 32'30"

26.22 /10.69 Second to Fourth

(B) Comand Area Development

New work 108.50 434 1st to 5th year

(2) Khedi Aheer

1 Mohari Minor 37 41'00"

77 36'44"

188.00 /6Km. Second year

(B) Rpair Renovation 4.00 First year (c) Comand Area

Development New work 191.00 764 1st to 5th

year

2-Dudugaon 1 Misrod Distry 189.24 /4.98 Second to Fourth

3-Kharar 2 Dudugaon Minor-1 83.22 /2.15 Second to Fourth

4-Mophada 3 Dudugaon Minor-2 36 24'00"

77 36'38"

98.04 /2.58 Second to Fourth

4 Chandwad Minor 39.90 /1.05 Second to Fourth

5 Kharar Minor 110.58 /2.91 Second to Fourth

6-Mophada Minor -1 85.50 /2.25 Second to Fourth

7-Mophada Minor -2 58.14 /1.53 Second to Fourth

8-Mophada Minor -3 36.48 /0.96 Second to Fourth

1- Misro Distry Fall 406 5.00 First year 2- Misro Distry Fall 482 4.60 First year 3- Misro Distry Fall 449 2.00 First year (C) Comand Area

Development New work 351.75 1407 1st to 5th

year

Page 254: HBAD DIP FINAL ab - pmksy.gov.in

254

1 Shell Minor-2 33.06 /0.87 Second to Fourth

2 Shell Minor-3 31.92 /0.84 Second to Fourth

3 Shell Minor-4 35 18'00"

77 36'37"

55.86 /1.47 Second to Fourth

4 Chandwad Minor 71.82 /1.89 Second to Fourth

(B) Comand Area Development

New work 161.25 645 Second to Fifth

2-Budara Khurd

1 Misrod Tail Awari Minor 37 15'00"

77 84'41"

21.66 /0.57 Second to Fourth

(B) Comand Area Development

New work 60.00 24 1st to 5th year

Total 2676.24

Page 255: HBAD DIP FINAL ab - pmksy.gov.in

255

Hoshangabad

Page 256: HBAD DIP FINAL ab - pmksy.gov.in

256

Pradhanmantri Krishi Sinchai Yojna -Janpad Panchayat Hoshangabad S. No.

Name of Bloc

k

Gram Panchayat

Village Name Name of Work

Type of Structure

(New/Renovation)

Co-ordinates Khasra No.

Total

Cost in

Lakh

Storage Capacit

y in Cu.m.

Irrigation

Potential In Hac.

Year of Implementati

on

Scheme Name

Latitude Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 H'Bad Aamupura Aamupura Stop Dam New 22°37'07.40

0'' 77°37'51.000'' 1 20.0

0 5000 10.00 1 PMKSY

2 H'Bad Aamupura mangwari Stop Dam New 22°38'00.00

0'' 77°37'52.000'' 21/3. 20.0

0 5000 10.00 2 PMKSY

3 H'Bad Aamupura mangwari Stop Dam New 22°37'34.00

0'' 77°34'37.000'' 21/3. 20.0

0 5000 10.00 3 PMKSY

4 H'Bad Aamupura mangwari Farm Pond New 22°37'46.50

0'' 77°38'31.300'' 20/7. 5.00 1250 2.50 2 MGNREGA

5 H'Bad Aamupura mangwari Farm Pond New 22°37'55.10

0'' 77°38'15.800'' 17 5.00 1250 2.50 2 MGNREGA

6 H'Bad Aamupura Aamupura Well

Deepening Renovation 22°36'44.600''

77°38'04.900'' 153 0.50 30 - 1 Panchpermeshv

er

7 H'Bad Aamupura Aamupura Well

Deepening Renovation 22°36'41.600''

77°38'00.900'' 153 0.25 30 - 1 Panchpermeshv

er

8 H'Bad Aamupura Aamupura Well

Deepening Renovation 22°36'40.900''

77°37'59.500'' 153 0.25 30 - 1 Panchpermeshv

er

9 H'Bad Aamupura Aamupura Well

Deepening Renovation 22°36'44.300''

77°38'09.500'' 153 0.25 30 - 1 Panchpermeshv

er

10 H'Bad Aamupura mangwari Well

Deepening Renovation 22°37'28.300''

77°38'39.900'' 0.25 30 - 1 Panchpermeshv

er

11 H'Bad Aamupura mangwari Well

Deepening Renovation 22°37'28.700''

77°38'45.000'' 0.50 30 - 1 Panchpermeshv

er

12 H'Bad Rojhda Rojhda Stop Dam New 22°38'38.70

0'' 77°35'16.400'' 144 20.0

0 5000 10.00 1 PMKSY

13 H'Bad Rojhda Kharar Pond

Deepening Renovation 22°36'11.000''

77°34'37.000'' 12 10.0

0 6400 13.00 2 PMKSY

14 H'Bad Mishrod Mishrod Stop Dam New 22°36'50.10

0'' 77°33'45.000'' 245 20.0

0 5000 10.00 1 PMKSY

15 H'Bad Mishrod Mishrod Pond

Deepening Renovation 22°36'58.500''

77°34'43.100'' 343 5.00 3000 6.00 2 PMKSY

16 H'Bad Gunora Gunora Stop Dam New 22°41'32.20

0'' 77°37'42.800'' 187 20.0

0 5000 10.00 1 PMKSY

17 H'Bad Gunora Gunora Pond

Deepening Renovation 22°41'02.300''

77°37'18.700'' 135/1 8.00 1500 3.00 2 MGNREGA

18 H'Bad Gunora Gunora Well

Deepening Renovation 22°40'57.300''

77°37'36.700'' 281 0.30 30 1 Panchpermeshv

er 19 H'Ba Gunora Gunora Well Renovation 22°40'57.40 77°37'34.50 281 0.30 30 1 Panchpermeshv

Page 257: HBAD DIP FINAL ab - pmksy.gov.in

257

d Deepening 0'' 0'' er

20 H'Bad Gunora Gunora Well

Deepening Renovation 22°41'00.000''

77°37'28.100'' 281 0.30 30 1 Panchpermeshv

er

21 H'Bad Gunora Gunora Well

Deepening Renovation 22°40'55.400''

77°37'32.700'' 281 0.30 30 1 Panchpermeshv

er

22 H'Bad Shail Shail Stop Dam New 22°34'42.50

0'' 77°35'45.700'' 19 20.0

0 5000 10.00 1 PMKSY

23 H'Bad Shail Shail Stop Dam New 22°34'24.60

0'' 77°35'53.200'' 19 20.0

0 5000 10.00 2 PMKSY

24 H'Bad Shail Shail Farm Pond New 22°34'59.50

0'' 77°35'30.300'' 84/2. 5.00 1250 2.50 2 MGNREGA

25 H'Bad Shail Shail Nala

Deepening Renovation 22°34'41.300''

77°35'45.800'' 19 10.0

0 12000 - 1 MGNREGA

26 H'Bad Dolariya Dolariya Stop Dam New 22°35'49.00

0'' 77°37'56.600'' 269 20.0

0 5000 10.00 1 PMKSY

27 H'Bad Dolariya Dolariya Stop Dam New 22°36'23.70

0'' 77°37'42.900'' 119 20.0

0 5000 10.00 2 PMKSY

28 H'Bad Dolariya Dolariya Pond

Deepening Renovation 22°35'44.700''

77°38'17.800'' 468 10.0

0 6000 - 1 Collection

29 H'Bad Dolariya Dolariya

Pond Consruction

New 22°34'04.500''

77°38'40.500'' 376 10.0

0 6000 12.00 2 PMKSY

30 H'Bad Dolariya Dolariya Soak Pit New 22°35'38.60

0'' 77°37'18.200'' 266 0.20 - - 2 MGNREGA

31 H'Bad Dolariya Dolariya Soak Pit New 22°35'31.10

0'' 77°38'13.500'' 266 0.20 - - 2 MGNREGA

32 H'Bad Dolariya Dolariya Well

Deepening Renovation 22°35'42.000''

77°38'09.200'' 266 0.50 25 - 1 Panchpermeshv

er

33 H'Bad Dolariya Dolariya Well

Deepening Renovation 22°35'36.200''

77°38'12.600'' 266 0.50 25 - 1 Panchpermeshv

er

34 H'Bad Dolariya Dolariya Well

Deepening Renovation 22°35'49.400''

77°38'15.200'' 273 0.30 30 - 1 Panchpermeshv

er

35 H'Bad Dolariya Dolariya Well

Deepening Renovation 22°35'38.200''

77°81'15.900'' 445 0.30 25 - 1 Panchpermeshv

er

36 H'Bad Dolariya Dolariya Well

Deepening Renovation 22°35'10.800''

77°38'27.700'' 158 0.30 30 - 1 Panchpermeshv

er

37 H'Bad Dolariya Dolariya Well

Deepening Renovation 22°35'48.400''

77°38'03.000'' 266 0.30 30 - 1 Panchpermeshv

er

38 H'Bad Mohari Mohari Stop Dam New 22°38'32.70

0'' 77°37'22.500'' 1 20.0

0 5000 10.00 1 PMKSY

39 H'Bad Mohari Mohari Stop Dam New 22°38'40.60

0'' 77°36'37.100'' 1 20.0

0 5000 10.00 1 PMKSY

40 H'Bad Mohari Mohari Pond

Deepening Renovation 22°37'52.200''

77°37'10.400'' 10.0

0 3000 6.00 2 MGNREGA

41 H'Ba Mohari Mohari Soak Pit New 22°38'03.50 77°37'17.50 190 0.20 - - 2 MGNREGA

Page 258: HBAD DIP FINAL ab - pmksy.gov.in

258

d 0'' 0''

42 H'Bad Mohari Mohari Soak Pit New 22°38'04.60

0'' 77°37'08.200'' 215 0.20 - - 2 MGNREGA

43 H'Bad Mohari Mohari Soak Pit New 22°38'04.20

0'' 77°37'00.200'' 48/1. 0.20 - - 2 MGNREGA

44 H'Bad Mohari Mohari Soak Pit New 22°37'56.70

0'' 77°37'17.900'' 351 0.20 - - 2 MGNREGA

45 H'Bad Rohna Rohna Stop Dam New 22°41'01.30

0'' 77°41'54.800'' 75 20.0

0 5000 10.00 2 PMKSY

46 H'Bad Rohna Rohna Nala

Deepening Renovation 22°40'46.800''

77°42'00.700'' 204 10.0

0 12000 - 2 MGNREGA

47 H'Bad Talnagri Talnagri Well

Deepening Renovation 22°22'21.900''

77°36'57.300'' 353 0.30 25 - 1 Panchpermeshv

er

48 H'Bad Talnagri Brandua Well

Deepening Renovation 22°43'38.100''

77°37'02.600'' 353 0.30 25 - 1 Panchpermeshv

er

49 H'Bad Talnagri Brandua Well

Deepening Renovation 22°43.34.900''

77°37'04.200'' 353 0.30 25 - 1 Panchpermeshv

er

50 H'Bad Talnagri Talnagri Nala

Deepening Renovation 22°43'47.300''

77°37'37.700'' 353 0.20 12000 - 2 MGNREGA

51 H'Bad Talnagri Talnagri Soak Pit New 22°42'25.30

0'' 77°36'48.500'' 353 0.20 - - 2 MGNREGA

52 H'Bad Talnagri Talnagri Soak Pit New 22°42'27.50

0'' 77°36'48.300'' 353 0.20 - - 2 MGNREGA

53 H'Bad Talnagri Brandua Soak Pit New 22°43'32.10

0'' 77°37'02.500'' 353 0.20 - - 2 MGNREGA

54 H'Bad Talnagri Brandua Soak Pit New 22°43'31.50

0'' 77°37'01.900'' 353 0.20 - - 2 MGNREGA

55 H'Bad Behrakhedi Behrakhedi Stop Dam New 22°37'54.30

0'' 77°39'24.400'' 168 20.0

0 5000 10.00 1 PMKSY

56 H'Bad Behrakhedi Bamuriya Well

Deepening Renovation 22°38'11.200''

77°40'57.200'' 185 0.25 25 - 1 Panchpermeshv

er

57 H'Bad Behrakhedi Bamuriya Well

Deepening Renovation 22°38'10.600''

77°41'00.600'' 185 0.25 25 - 1 Panchpermeshv

er

58 H'Bad Behrakhedi Behrakhedi Soak Pit New 22°37'47.70

0'' 77°39'21.600'' 353 0.20 - - 2 MGNREGA

59 H'Bad Behrakhedi Behrakhedi Soak Pit New 22°37'45.50

0'' 77°39'20.800'' 353 0.20 - - 2 MGNREGA

60 H'Bad Behrakhedi Bamuriya Soak Pit New 22°38'03.00

0'' 77°40'38.400'' 353 0.20 - - 2 MGNREGA

61 H'Bad Behrakhedi Bamuriya Soak Pit New 22°38'08.20

0'' 77°40'59.200'' 353 0.20 - - 2 MGNREGA

62 H'Bad Behrakhedi Suparli Soak Pit New 22°36'43.60

0'' 77°40'16.900'' 353 0.20 - - 2 MGNREGA

63 H'Bad Behrakhedi Suparli Soak Pit New 22°36'51.10

0'' 77°40'18.700'' 353 0.20 - - 2 MGNREGA

Page 259: HBAD DIP FINAL ab - pmksy.gov.in

259

64 H'Bad Sawalkheda Nohar Pond

Deepening Renovation 22°40'20.300''

77°40'21.500'' 209 8.00 3000 6.00 2 MGNREGA

65 H'Bad

Bamhangaonkala Khediahir Stop Dam New 22°38'40.10

0'' 77°36'08.800'' 197 30.0

0 7500 15.00 1 PMKSY

66 H'Bad

Bamhangaonkala

Bamhangaonkala

Well Deepening Renovation 22°38'55.70

0'' 77°36'12.700'' 307 0.30 25 - 1 Panchpermeshv

er

67 H'Bad

Bamhangaonkala

Bamhangaonkala Soak Pit New 22°38'45.70

0'' 77°36'11.500'' 307 0.20 - - 2 MGNREGA

68 H'Bad

Bamhangaonkala

Bamhangaonkala Soak Pit New 22°38'56.50

0'' 77°36'04.700'' 307 0.20 - - 2 MGNREGA

69 H'Bad Kandrakhedi Kandrakhedi Stop Dam New 22°38'37.40

0'' 77°37'52.000'' 1 20.0

0 5000 10.00 1 PMKSY

70 H'Bad Kandrakhedi Jaitpur Stop Dam Renovation 22°38'41.90

0'' 77°39'37.600'' 154 7.00 3500 7.00 1 PMKSY

71 H'Bad Kandrakhedi kandrakhedi Well

Deepening Renovation 22°38'39.000''

77°37'59.300'' 190 0.30 25 - 1 Panchpermeshv

er

72 H'Bad Kharkhedi Khoksar Stop Dam New 22°40'45.20

0'' 77°35'45.200'' 229 15.0

0 4000 8.00 1 PMKSY

73 H'Bad Kharkhedi Kharkhedi Farm Pond New 22°39'48.00

0'' 77°33'37.900'' 63/1. 5.00 2500 5.00 2 MGNREGA

74 H'Bad Kharkhedi Kharkhedi Farm Pond New 22°39'57.10

0'' 77°34'04.000'' 315/2 5.00 2500 5.00 2 MGNREGA

75 H'Bad Kharkhedi Khoksar Well

Deepening Renovation 22°40'36.700''

77°35'21.000'' 14 0.20 25 - 1 Panchpermeshv

er

76 H'Bad Kharkhedi Khoksar Well

Deepening Renovation 22°40'42.000''

77°35'27.100'' 14 0.20 20 - 1 Panchpermeshv

er

77 H'Bad Kharkhedi Tigariya Well

Deepening Renovation 22°39'15.800''

77°33'27.700'' 14 0.20 25 - 1 Panchpermeshv

er

78 H'Bad Kulamadi Kulamadi Pond

Deepening Renovation 22°42'56.500''

77°45'10.600'' 384 12.0

0 14000 28.00 1 Collection

79 H'Bad Kulamadi Kulamadi Pond

Deepening Renovation 22°43'48.500''

77°45'26.500'' 179 12.0

0 14000 28.00 2 Collection

80 H'Bad Palanpur Palanpur Pond

Deepening Renovation 22°40'24.900''

77°38'45.800'' 100 6.00 2000 4.00 2 MGNREGA

81 H'Bad Aawari Aawari Stop Dam New 22°37'48.30

0'' 77°33'04.400'' 178 20.0

0 5000 10.00 1 PMKSY

82 H'Bad Aawari Bundarakhurd Stop Dam New 22°38'18.90

0'' 77°33'53.600'' 55 20.0

0 5000 10.00 2 PMKSY

83 H'Bad Aawari Aawari Stop Dam New 22°37'41.70

0'' 77°33'58.600'' 188 20.0

0 5000 10.00 3 PMKSY

84 H'Bad Aawari Aawari Well

Deepening Renovation 22°37'48.600''

77°33'13.700'' 286 0.20 20 - 1 Panchpermeshv

er

85 H'Bad Aawari Aawari Well

Deepening Renovation 22°37'42.600''

77°33'20.500'' 346 0.20 20 - 1 Panchpermeshv

er

Page 260: HBAD DIP FINAL ab - pmksy.gov.in

260

86 H'Bad Aawari Aawari Well

Deepening Renovation 22°37'41.700''

77°33'22.900'' 345 0.20 20 - 1 Panchpermeshv

er

87 H'Bad Aawari Aawari Well

Deepening Renovation 22°37'39.100''

77°33'25.800'' 296 0.20 25 - 1 Panchpermeshv

er

88 H'Bad Aawari Aawari Well

Deepening Renovation 22°37'28.900''

77°33'53.700'' 430 0.20 20 - 1 Panchpermeshv

er

89 H'Bad Aawari Bundarakhurd Well

Deepening Renovation 22°38'17.900''

77°34'00.700'' 171 0.20 20 - 1 Panchpermeshv

er

90 H'Bad Aawari Bundarakhurd Well

Deepening Renovation 22°38'19.300''

77°33'59.100'' 170 0.20 25 - 1 Panchpermeshv

er

91 H'Bad Parradeh Parradeh Stop Dam New 22°41'56.30

0'' 77°38'43.100'' 20.0

0 5000 10.00 1 PMKSY

92 H'Bad Parradeh Parradeh Stop Dam New 22°42'01.70

0 77°39'08.500'' 20.0

0 5000 10.00 2 PMKSY

93 H'Bad Parradeh Hashalpur Stop Dam New 22°43'33.00

0'' 77°39'58.700'' 75 15.0

0 3750 7.50 3 PMKSY

94 H'Bad Parradeh Parradeh

Pond Consruction

New 22°42'06.200''

77°38'24.900'' 8.00 2500 5.00 2 MGNREGA

95 H'Bad Parradeh Parradeh Well

Deepening Renovation 22°42'20.900''

77°38'37.900'' 0.30 20 - 1 Panchpermeshv

er

96 H'Bad Randhal Randhal Stop Dam New 22°44'03.90

0'' 77°37'39.400'' 15.0

0 3750 7.50 5 PMKSY

97 H'Bad Randhal Randhal

Pond Consruction

New 22°43'37.200''

77°37'50.300'' 8.00 2500 5.00 2 MGNREGA

98 H'Bad Randhal Randhal

Pond Consruction

New 22°43'50.300''

77°38'53.300'' 8.00 2500 5.00 2 MGNREGA

99 H'Bad Randhal Randhal Well

Deepening Renovation 22°44'17.300''

77°38'35.800'' 0.30 20 - 1 Panchpermeshv

er 100

H'Bad Rampur Rampur Stop Dam New 22°38'26.10

0'' 77°52'56.500'' 44 20.0

0 5000 10.00 1 PMKSY

101

H'Bad Rampur Rampur Nala

Deepening Renovation 22°38'33.700''

77°52'56.600'' 44 10.0

0 10000 - 1 MGNREGA

102

H'Bad Rampur Rampur

Pond Consruction

New 22°38'32.400''

77°52'59.100'' 434 8.00 2500 5.00 2 MGNREGA

103

H'Bad Rampur Rampur Well

Deepening Renovation 22°38'31.600''

77°53'10.900'' 680 0.50 20 - 1 Panchpermeshv

er 104

H'Bad Rampur Rampur Well

Deepening Renovation 22°38'31.500''

77°53'08.900'' 680 0.50 20 - 1 Panchpermeshv

er 105

H'Bad Rampur Rampur Well

Deepening Renovation 22°38'41.200''

77°53'05.500'' 465 0.50 20 - 1 Panchpermeshv

er 106

H'Bad Chillai Chillai Stop Dam New 22°36'47.60

0'' 77°53'17.400'' 158 20.0

0 5000 10.00 1 PMKSY

Page 261: HBAD DIP FINAL ab - pmksy.gov.in

261

107

H'Bad Chillai Rupapur Stop Dam New 22°37'38.60

0'' 77°54'19.700'' 150 20.0

0 5000 10.00 2 PMKSY

108

H'Bad Chillai Chillai Nala

Deepening Renovation 22°36'57.600''

77°53'13.900'' 158 10.0

0 10000 - 1 MGNREGA

109

H'Bad Chillai Rupapur Nala

Deepening Renovation 22°37'34.800''

77°54'16.400'' 150 10.0

0 10000 - 2 MGNREGA

110

H'Bad Chillai Chillai Well

Deepening Renovation 22°36'59.000''

77°53'15.900'' 170 0.50 20 - 1 Panchpermeshv

er

111

H'Bad Chillai Rupapur

Well Construction

New 22°37'31.500''

77°54'18.400'' 252 4.00 35 - 1 MGNREGA

112

H'Bad Chillai Chillai Farm Pond New 22°36'34.20

0'' 77°53'16.100'' 67/4 8.00 2500 5.00 2 MGNREGA

113

H'Bad Chillai Chillai Soak Pit New 22°36'58.70

0'' 77°53'14.700'' 170 0.80 - - 1 MGNREGA

114

H'Bad Chillai Rupapur Soak Pit New 22°37'31.40

0'' 77°54'18.400'' 252 1.20 - - 2 MGNREGA

115

H'Bad Bdodiyakala Plashdoh Stop Dam New 22°41'24.90

0'' 77°40'49.100'' 97 20.0

0 5000 10.00 1 PMKSY

116

H'Bad Bdodiyakala Bdodiyakala Stop Dam New 22°41'30.40

0'' 77°39'53.900'' 401 20.0

0 5000 10.00 2 PMKSY

117

H'Bad Bdodiyakala Bdodiyakala Stop Dam New 22°41'42.60

0'' 77°39'54.200'' 401 20.0

0 5000 10.00 4 PMKSY

118

H'Bad Bdodiyakala Bdodiyakala Well

Deepening Renovation 22°41'25.800''

77°39'45.700'' 374 0.50 20 - 1 Panchpermeshv

er 119

H'Bad Bdodiyakala Bdodiyakala Well

Deepening Renovation 22°41'25.900''

77°39'46.900'' 374 0.50 20 - 1 Panchpermeshv

er 120

H'Bad Bdodiyakala Plashdoh Well

Deepening Renovation 22°41'25.400''

77°40'58.100'' 106 0.50 20 - 1 Panchpermeshv

er 121

H'Bad Bdodiyakala Andhiyari Well

Deepening Renovation 22°42'03.500''

77°40'40.500'' 65 0.50 20 - 1 Panchpermeshv

er 122

H'Bad Budhwara Aagrakala Pond

Deepening Renovation 22°41'42.300''

77°43'24.000'' 12/1. 4.00 1500 3.00 1 MGNREGA

123

H'Bad Budhwara Budhwara Well

Deepening Renovation 22°42'21.600''

77°43'37.400'' 282 0.20 20 - 1 Panchpermeshv

er 124

H'Bad Budhwara Budhwara Stop Dam New 22°42'11.00

0'' 77°43'40.600'' 165 20.0

0 5000 10.00 1 PMKSY

125

H'Bad Budhwara Budhwara Soak Pit New 22°42'24.30

0'' 77°43'33.500'' 282 2.00 - - 2 MGNREGA

126

H'Bad Budhwara Aagrakala Soak Pit New 22°42'22.40

0'' 77°43'34.600'' 278 1.20 - - 3 MGNREGA

127

H'Bad Budhwara Aagrakala Well

Deepening Renovation 22°41'46.700''

77°43'40.100'' 278 0.20 20 - 1 Panchpermeshv

er 128

H'Bad Budhwara Budhwara Soak Pit New 22°42'21.60

0'' 77°43'37.500'' 282 0.20 - - 2 MGNREGA

Page 262: HBAD DIP FINAL ab - pmksy.gov.in

262

129

H'Bad Budhwara Aagrakala Soak Pit New 22°41'46.70

0'' 77°43'40.000'' 277 0.20 - - 2 MGNREGA

130

H'Bad Bhilakhedi Bhilakhedi Stop Dam New 22°36'03.70

0'' 77°42'05.500'' 20.0

0 5000 10.00 1 PMKSY

131

H'Bad Bhilakhedi Bhilakhedi Stop Dam New 22°35'49.10

0'' 77°42'17.600'' 20.0

0 5000 10.00 1 PMKSY

132

H'Bad Bhilakhedi Bhilakhedi Stop Dam New 22°36'06.80

0'' 77°42'12.000'' 20.0

0 5000 10.00 1 PMKSY

133

H'Bad Bhilakhedi Bhilakhedi Pond

Deepening Renovation 22°35'48.700''

77°42'11.400'' 4.00 1500 3.00 3 MGNREGA

134

H'Bad Mehragaon Mehragaon Stop Dam new 22°36'19.40

0'' 77°44'58.800'' 20.0

0 5000 10.00 1 PMKSY

135

H'Bad Mehragaon Mehragaon Stop Dam Renovation 22°36'11.50

0'' 77°45'05.200'' 7.00 5000 10.00 2 PMKSY

136

H'Bad Mehragaon Mehragaon

Pond Consruction

New 22°36'68.100''

77°45'06.300'' 4.00 2500 5.00 1 MGNREGA

137

H'Bad Nimsadiya Nimsadiya Pond

Deepening Renovation 22°42'49.700''

77°48'27.200'' 606 5.00 1500 3.00 1 MGNREGA

138

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'48.100''

77°48'24.300'' 606 0.35 20 - 1 Panchpermeshv

er 139

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'36.000''

77°48'13.200'' 494 0.35 20 - 1 Panchpermeshv

er 140

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'34.800''

77°48'15.800'' 584 0.35 20 - 1 Panchpermeshv

er 141

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'46.200''

77°48'17.200'' 793 0.35 20 - 1 Panchpermeshv

er 142

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'28.300''

77°48'14.700'' 518 0.35 20 - 1 Panchpermeshv

er 143

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'27.800''

77°48'13.100'' 518 0.35 20 - 1 Panchpermeshv

er 144

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'29.700''

77°48'06.400'' 494 0.35 20 - 1 Panchpermeshv

er 145

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'26.000''

77°48'09.300'' 402 0.35 20 - 1 Panchpermeshv

er 146

H'Bad Nimsadiya Nimsadiya Well

Deepening Renovation 22°42'33.400''

77°48'17.600'' 518 0.35 20 - 1 Panchpermeshv

er

147

H'Bad Vaikhedi Vaikhedi

Pond Consruction

New 22°38'56.600''

77°42'18.600'' 206 8.00 1500 3.00 2 MGNREGA

148

H'Bad Vaikhedi Vaikhedi Stop Dam New 22°38'31.30

0'' 77°41'01.700'' 369 20.0

0 5000 10.00 1 PMKSY

149

H'Bad Vaikhedi Vaikhedi Stop Dam New 22°38'20.20

0'' 77°42'13.400'' 425 20.0

0 5000 10.00 1 PMKSY

150

H'Bad Vaikhedi Bamhorikhurd Stop Dam New 22°37'48.20

0'' 77°41'44.000'' 325 20.0

0 5000 10.00 1 PMKSY

Page 263: HBAD DIP FINAL ab - pmksy.gov.in

263

151

H'Bad Vaikhedi Vaikhedi Well

Deepening Renovation 22°39'08.400''

77°41'45.200'' 236 0.50 20 - 1 Panchpermeshv

er 152

H'Bad Vaikhedi Vaikhedi Well

Deepening Renovation 22°39'16.000''

77°41'45.200'' 132 0.50 20 - 1 Panchpermeshv

er 153

H'Bad Vaikhedi Vaikhedi Well

Deepening Renovation 22°39'10.700''

77°41'39.100'' 132 0.50 20 - 1 Panchpermeshv

er 154

H'Bad Vaikhedi Bamhorikhurd Well

Deepening Renovation 22°37'47.900''

77°41'35.500'' 129 0.50 20 - 1 Panchpermeshv

er 155

H'Bad Vaikhedi Bamhorikhurd Well

Deepening Renovation 22°37'48.800''

77°41'39.300'' 130 0.50 20 - 1 Panchpermeshv

er 156

H'Bad Byawra Byawra Stop Dam new 22°40'55.30

0'' 77°45'08.600'' 114 20.0

0 5000 10.00 1 PMKSY

157

H'Bad Byawra Byawra Pond

Deepening Renovation 22°40'56.700''

77°45'02.300'' 316 5.00 1500 3.00 2 MGNREGA

158

H'Bad Byawra Byawra

Well Construction

New 22°40'27.100''

77°44'56.400'' 316 4.00 1500 3.00 3 MGNREGA

159

H'Bad Byawra Byawra Well

Deepening Renovation 22°40'57.700''

77°45'06.500'' 316 0.50 20 - 1 Panchpermeshv

er 160

H'Bad Byawra Byawra Well

Deepening Renovation 22°40'53.300''

77°44'57.600'' 316 0.50 20 - 1 Panchpermeshv

er 161

H'Bad Byawra Byawra Well

Deepening Renovation 22°40'41.800

77°45'01.500'' 316 0.50 20 - 1 Panchpermeshv

er 162

H'Bad Byawra Byawra Well

Deepening Renovation 22°40'43.100''

77°44'58.000'' 316 0.50 20 - 1 Panchpermeshv

er 163

H'Bad Byawra Byawra Well

Deepening Renovation 22°40'52.300''

77°45'08.000'' 316 0.50 20 - 1 Panchpermeshv

er 164

H'Bad Byawra Byawra Nala

Deepening Renovation 22°40'50.700''

77°45'05.100'' 114 10.0

0 10000 - 1 MGNREGA

165

H'Bad Nitaya Nitaya Nala

Deepening Renovation 22°41'42.000''

77°46'36.500'' 15 10.0

0 10000 - 1 MGNREGA

166

H'Bad Nitaya Nitaya Stop Dam New 22°41'41.30

0'' 77°46'30.600'' 15 20.0

0 5000 10.00 1 PMKSY

167

H'Bad Nitaya Nitaya

Pond Consruction

New 22°41'04.900''

77°46'41.700'' 124 8.00 1500 3.00 2 MGNREGA

168

H'Bad Nitaya Nitaya Nala

Deepening Renovation 22°41'12.000''

77°46'43.600'' 15 10.0

0 10000 - 1 MGNREGA

169

H'Bad Jasalpur Jasalpur Pond

Deepening Renovation 22°43'45.500''

77°46'51.300'' 338 3.00 1200 2.00 2 MGNREGA

170

H'Bad Jasalpur Jasalpur Well

Deepening Renovation 22°43'40.200''

77°46'59.600'' 93 0.30 20 - 1 Panchpermeshv

er 171

H'Bad Jasalpur Jasalpur Well

Deepening Renovation 22°43.37.400''

77°46'57.300'' 309 0.30 20 - 1 Panchpermeshv

er

Page 264: HBAD DIP FINAL ab - pmksy.gov.in

264

172

H'Bad

Pawarkhedaform Pawarkhedaform

Well Construction

New 22°41'43.700''

77°45'04.700'' 7/6. 4.00 30 - 1 MGNREGA

173

H'Bad Sonasaori Sonasaori Pond

Deepening Renovation 22°37'35.900''

77°46'41.300'' 151 2.50 1000 2.00 2 MGNREGA

174

H'Bad Sonasaori Sonasaori Nala

Deepening Renovation 22°37'34.600''

77°45'46.700'' 124 4.00 10000 - 2 MGNREGA

175

H'Bad Sonasaori Sonasaori Well

Deepening Renovation 22°37'44.100''

77°45'52.400'' 151 0.30 20 - 1 Panchpermeshv

er 176

H'Bad Saket Saket Nala

Deepening Renovation 22°37'47.800''

77°45'21.100'' 342 10.0

0 10000 - 1 MGNREGA

177

H'Bad Saket Saket Soak Pit New 22°37'52.70

0'' 77°45'18.800'' 428 0.20 - - 2 MGNREGA

178

H'Bad Saket Saket Soak Pit New 22°38'00.00

0'' 77°45'17.800'' 434/2. 0.20 - - 2 MGNREGA

179

H'Bad Saket Saket Soak Pit New 22°38'01.10

0'' 77°45'17.400'' 434/2. 0.20 - - 2 MGNREGA

180

H'Bad Saket Saket Soak Pit New 22°38'01.20

0'' 77°45'17.700'' 434/3. 0.20 - - 2 MGNREGA

181

H'Bad Saket Saket Soak Pit New 22°37'53.50

0'' 77°45'18.500'' 425 0.20 - - 2 MGNREGA

182

H'Bad Saket Saket Soak Pit New 22°37'59.50

0'' 77°45'19.500'' 425 0.20 - - 2 MGNREGA

183

H'Bad Saket Bamhangaonkhu

rd Soak Pit New 22°38'40.800''

77°43'44.900'' 253/2 0.20 - - 2 MGNREGA

184

H'Bad Saket Bamhangaonkhu

rd Well Deepening Renovation 22°38'49.80

0'' 77°43'45.900'' 181 0.30 20 - 1 Panchpermeshv

er 185

H'Bad Saket Bamhangaonkhu

rd Well Deepening Renovation 22°38'44.00

0'' 77°43'46.300'' 181 0.30 20 - 1 Panchpermeshv

er 186

H'Bad Saket Bamhangaonkhu

rd Pond Deepening Renovation 22°38'34.80

0'' 77°43'42.300'' 253/1. 2.50 1000 2.00 1 MGNREGA

Pradhanmantri Krishi Sinchai Yojna -Block -Hoshangabad Distt. -Hoshangabad

IRRIGATION

S.No.

Name of Block

Gram Panchay

at Village Name Name of Work

Type Of Structure(New/Ren

ovation)

Co-ordinates Khas

ra No.

Total Cost In

Lakh

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implement

ation

Scheme

Name Latitude

Longitude

Page 265: HBAD DIP FINAL ab - pmksy.gov.in

265

(A)LINING WORK

1

H'BAD

Damdam Damdam Chandon disty Renovation 22⁰36'2

4''N 77⁰50'2

1''E 6.5 First Year Superly

2 pipriya khurda Chandon disty Renovation 22⁰36'24''N

77⁰50'21''E 7 First Year

3 Tararoda Tararoda Chandon disty Renovation 22⁰36'24''N

77⁰50'21''E 7 Second

Year

4 Lohariya kala Lohariya kala Chandon disty Renovation 22⁰36'2

4''N 77⁰50'2

1''E 13.05 Second Year

5 Meharaghat Kandai Himmit Chandon disty Renovation 22⁰36'2

4''N 77⁰50'2

1''E 33.65 Third Year

6 Meharagoan Meharagoan Bortalai Disty. Renovation 22⁰34'1

4''N 77⁰44'3

9''E 29.65 Third Year

7 Boratalai Boratalai Bortalai Disty. Renovation 22⁰34'14''N

77⁰44'39''E 155.8

4 Third Year

8 Bhilakedi Akhiya Bortalai Disty. Renovation 22⁰34'1

4''N 77⁰44'3

9''E 210.5 First Year

9 Bisaroda Ghugvasa Bortalai Disty. Renovation 22⁰34'14''N

77⁰44'39''E 112.0

5 Fourth Year

10 Berakhedi

Bamori khurd,superly,Ba

muriya Superly Disty. Renovation 22⁰32'5

7''N 77⁰41'1

1''E 392.63 Five Year

11 Diolriya Diolriya Amupura MR Renovation 22⁰32'57''N

77⁰41'11''E 160 Fourth Year

12 Bairakhedi Bairakhedi Superly Disty. Renovation 22⁰32'5

7''N 77⁰41'1

1''E 160 Five Year

13 Amupura

Mugvari, Amupura Superly Disty. Renovation 22⁰32'5

7''N 77⁰41'1

1''E 273.96 Five Year

Total 1561.83

(B) CADA WORK

(B) CADAWORK Renovation 896.62 Second

Year Superl

y

1

H'BAD

Damdam Damdam

Chandon disty Renovation 22⁰36'2

4''N 77⁰50'2

1''E 20.1 Second Year

2 pipriya khurda Chandon disty Renovation 22⁰36'24''N

77⁰50'21''E 20.35 Second

Year

3 Tararoda Tararoda Chandon disty

Renovation 22⁰36'24''N

77⁰50'21''E 20.15 Second

Year

4 Lohariya kala Lohariya kala Chandon disty Renovation 22⁰36'2

4''N 77⁰50'2

1''E 40.1 Second Year

Page 266: HBAD DIP FINAL ab - pmksy.gov.in

266

5 Meharaghat Kandai Himmit Chandon disty Renovation 22⁰36'2

4''N 77⁰50'2

1''E 22.08 Second Year

6 Meharagoan Meharagoan Bortalai Disty. Renovation 22⁰34'1

4''N 77⁰44'3

9''E 22.7 Second Year

7 Boratalai Boratalai Bortalai Disty. Renovation 22⁰34'14''N

77⁰44'39''E 124.8

7 Second Year

8 Bhilakedi Akhiya Bortalai Disty. Renovation 22⁰34'1

4''N 77⁰44'3

9''E 95.03 Second Year

9 Bisaroda Ghugvasa Bortalai Disty. Renovation 22⁰34'14''N

77⁰44'39''E 56.75 Second

Year

10 Berakhedi

Bamori khurd,superly,Ba

muriya Superly Disty. Renovation 22⁰32'5

7''N 77⁰41'1

1''E 150 Second Year

11 Diolriya Diolriya Amupura MR Renovation 22⁰32'57''N

77⁰41'11''E 145 Second

Year

12 Bairakhedi Bairakhedi Superly Disty. Renovation 22⁰32'5

7''N 77⁰41'1

1''E 110 Second Year

13 Amupura

Mugvari, Amupura Superly Disty. Renovation 22⁰32'5

7''N 77⁰41'1

1''E 69.49 Second Year

1793.24 Second

Year

A (LINING WORK)

1

Hoshangabad

Chillai Chillai Nandner dy. Renovation 22⁰36'22''N

77⁰53'46''E 40 N.A First Year

HEAD WOR

KS

Rupapur Rupapur minor Renovation 22⁰36'31''N

77⁰53'45''E 34 N.A Third Year

2 Silari Silari Nandner dy. Renovation 22⁰36'22''N

77⁰53'46''E 60 N.A First Year

kesla khurd Nandner dy. Renovation 22⁰36'22''N

77⁰53'46''E 30 N.A First Year

3 Rampur Rampur Rampur Minor Renovation 22⁰37'30''N

77⁰53'52''E 45 N.A Third Year

4 Damdam kandai khurd Kandai dy. Renovation 22⁰36'05''N

77⁰51'36''E 30 N.A Second year

Dumdam Dumdam minor Renovation 22⁰37'15''N

77⁰52'02''E 32.75 N.A Fourth year

5 Gurra Gurra Kandai dy. Renovation 22⁰36'05''N

77⁰51'36''E 30 N.A Second year

6 Lohariya kalan Somalwada Kandai dy. Renovation 22⁰36'0

5''N 77⁰51'3

6''E 20 N.A Five Year

Somalwada minor Renovation 22⁰38'34''N

77⁰52'03''E 20 N.A Five Year

TOTAL

341.75

Page 267: HBAD DIP FINAL ab - pmksy.gov.in

267

B (CADA WORK)

1

HOSHANGABAD

Chillai Chillai Nandner Dy. Renovation 22⁰36'22''N

77⁰53'46''E 8 N.A First Year

HEAD WOR

KS

Rupapur Rupapur Minor Renovation 22⁰36'31''N

77⁰53'45''E 12 N.A Third Year

2 Silari Silari Nandner Dy. Renovation 22⁰36'22''N

77⁰53'46''E 15 N.A First Year

kesla khurd Nandner Dy. Renovation 22⁰36'22''N

77⁰53'46''E 10 N.A First Year

3 Rampur Rampur Rampur Minor Renovation 22⁰37'30''N

77⁰53'52''E 10 N.A Third Year

4 Dumdam Kandai khurd Kandai Dy. Renovation 22⁰36'05''N

77⁰51'36''E 8 N.A Second year

Dumdam Dumdam Minor Renovation 22⁰37'15''N

77⁰52'02''E 10 N.A Second year

Pipariya Kandai Dy. Renovation 22⁰36'05''N

77⁰51'36''E 6 N.A Second year

jhirmau Kandai Dy. Renovation 22⁰36'05''N

77⁰51'36''E 5.53 N.A Second year

5 Gurra Gurra Kandai Dy. Renovation 22⁰36'05''N

77⁰51'36''E 12 N.A Fourth year

6 Lohariya kalan Somalwada Kandai dy. Renovation 22⁰36'0

5''N 77⁰51'3

6''E 8 N.A Five Year

Somalwada Minor Renovation 22⁰38'34''N

77⁰52'03''E 8 N.A Five Year

Total 112.53

(A)LINING WORK

1

HOSHANGABAD

Anwari Anwari Itarsi Distry.&Anwari Minor Renovation 22⁰39'2

1''N 77⁰36'5'

'E 414.75 N.A Fourth Year

ITARSI

DISTRY.

2 Baikhedi Baikhedi Itarsi

Distry.&Baikhedi Minor 1 & 2

Renovation 22⁰39'19''N

77⁰42'14''E 421.1

2 N.A Fourth Year

3 Badodiya kala Badodiya

Itarsi Distry.&Badodiya

Minor Renovation 22⁰40'7'

'N 77⁰40'5

8''E 91.20 N.A Fourth Year

Palasdoh Itarsi

Distry.&Palasdoh Minor

Renovation 22⁰40'7''N

77⁰41'7''E 142.5

0 N.A Fourth Year

4 Biora Biora Itarsi Distry.&Biora Minor Renovation 22⁰38'3'

'N 77⁰46'8'

'E 327.53 N.A Fourth Year

5 Bisaroda Bisaroda Itarsi Distry.& Bisaroda Minor Renovation 22⁰39'1'

'N 77⁰42'4

3''E 88.20 N.A First Year

Page 268: HBAD DIP FINAL ab - pmksy.gov.in

268

6 Bamhan

gaon kala

Bamhan gaon kala Itarsi Distry. Renovation 22⁰39'1

7''N 77⁰33'2

5''E 74.25 N.A First Year

7 Budhwada Agara kalan Agara kala minor Renovation 22⁰39'3

2''N 77⁰45'1

7''E 90.00 N.A First Year

8 Gunara Gunara Gunara minor Itarsi Distry. Renovation 22⁰39'4

5''N 77⁰39'5

7''E 153.38 N.A First Year

9 Kandara khedi Jetpur Itarsi Distry. & jetpur

Minor Renovation 22⁰39'7''N

77⁰38'57''E 191.2

5 N.A Second Year

10 Kharkhedi Khoksar Itarsi Distry. &

khoksar Minor Renovation 22⁰39'18''N

77⁰36'42''E 505.5

8 N.A Second Year

11 Nanpa Kajlash Itarsi Distry. & kajlash Minor Renovation 22⁰39'1

3''N 77⁰32'5

3''E 168.00 N.A Second

Year

12 Palanpur Palanpur Gunara minors Renovation 22⁰39'45''N

77⁰39'57''E 32.70 N.A Second

Year

13 Raisalpur Raisalpur Itarsi Distry. &

Raisalpur minors Renovation 22⁰38'7''N

77⁰46'22''E 170.5

3 N.A Five year

14 Rohana Rohana Itarsi Distry. & Rohana minors Renovation 22⁰38'2

2''N 77⁰45'2

0''E 1401.76 N.A Five year

15 Saket Bamhan gaon khurd

Itarsi Distry. & Bangab gaon minors Renovation 22⁰38'2

5''N 77⁰44'3

7''E 45.30 N.A Five year

16 Sawalkheda Sawalkheda Itarsi Distry. &

sawalkheda minors Renovation 22⁰40'4''N

77⁰40'50''E 191.1

0 N.A Five year

17 Sonasawari Sonasawari Itarsi Distry. &

Sonasawari minors Renovation 22⁰37'2''N

77⁰47'53''E 177.2

3 N.A Third Year

18 Tararoda Dhokheda Itarsi Distry. & dhokheda minors Renovation 22⁰37'4

7''N 77⁰46'4

1''E 253.13 N.A Third Year

19 Undrakhedi Deshmohini Itarsi Distry. &

deshmohini minors Renovation 22⁰39'7''N

77⁰43'8''E 187.5

0 N.A Third Year

Palasi Palasi minor Renovation 22⁰39'38''N

77⁰45'14''E 97.50 N.A Third Year

Ridhora Ridhora miono Renovation 22⁰38'24''N

77⁰44'55''E 90.00 N.A Third Year

Undrakhedi Itarsi Distry. & undrakhedi minors Renovation 22⁰38'4

9''N 77⁰44'3'

'E 150.75 N.A Third Year

Total 5465.26

B (CADA WORK)

1 HOSHANGABAD

Anwari Anwari Anwari Minor Renovation 22⁰39'21''N

77⁰36'5''E 43.61 N.A Fourth Year ITAR

SI DIST Bundra khurd Anwari Minor Renovation 22⁰39'2 77⁰36'5' 5.26 N.A Fourth Year

Page 269: HBAD DIP FINAL ab - pmksy.gov.in

269

1''N 'E RY.

Agra khurd Anwari Minor Renovation 22⁰39'21''N

77⁰36'5''E 16.23 N.A Fourth Year

2 Baikhedi Baikhedi Baikhedi Minor Renovation 22⁰39'19''N

77⁰42'14''E 110.5

2 N.A Fourth Year

3 Badodiya kala Badodiya Badodiya Minor Renovation 22⁰40'7'

'N 77⁰40'5

8''E 53.45 N.A Fourth Year

Palasdoh Palasdoh Minor Renovation 22⁰40'7''N

77⁰41'7''E 35.55 N.A Fourth Year

4 Biora Biora Biora Minor Renovation 22⁰38'3''N

77⁰48'8''E 130.9

7 N.A Fourth Year

5 Bisaroda Bisaroda Bisaroda Minor Renovation 22⁰39'1''N

77⁰42'43''E 73.23 N.A Third Year

6 Bamhan

gaon kala

Bamhan gaon kala Kajlas Minor Renovation 22⁰39'1

3''N 77⁰32'5

3''E 24.37 N.A Third Year

Khedi Kajlas Minor Renovation 22⁰39'13''N

77⁰32'53''E 5.54 N.A Third Year

7 Bortalai Bortalai Bamhan gaon Minor Renovation 22⁰38'25''N

77⁰44'37''E 50.00 N.A Third Year

8 Budhwada Agara kala Agara kala Minor Renovation 22⁰39'3

2''N 77⁰45'1

7''E 47.04 N.A Third Year

9 Gunara Gunara Gunara Minor Renovation 22⁰39'45''N

77⁰39'57''E 200.0

0 N.A Third Year

10 Kandara khedi Jetpur Jetpur Minor Renovation 22⁰39'7'

'N 77⁰38'5

7''E 18.46 N.A Five year

Kandara khedi Jetpur Minor Renovation 22⁰39'7''N

77⁰38'57''E 94.36 N.A Five year

11 Kharkhedi Kharkhedi Khoksar Minor Renovation 22⁰39'1

8''N 77⁰36'4

2''E 58.42 N.A Five year

Khoksar Khoksar Minor Renovation 22⁰39'18''N

77⁰36'42''E 23.85 N.A Five year

Tigariya Khoksar Minor Renovation 22⁰39'18''N

77⁰36'42''E 52.47 N.A Five year

Dattapura Khoksar Minor Renovation 22⁰39'18''N

77⁰36'42''E 30.08 N.A Five year

12 Khedala Patlai khurd Rohana Minor Renovation 22⁰38'22''N

77⁰45'20''E 41.04 N.A Five year

13 Nanpa Kajlas Kajlas Minor Renovation 22⁰39'13''N

77⁰32'53''E 66.62 N.A Five year

Kulhada Kajlas Minor Renovation 22⁰39'13''N

77⁰44'55''E 24.07 N.A Five year

Nanpa Kajlas Minor Renovation 22⁰39'13''N

77⁰44'55''E 71.29 N.A Five year

Page 270: HBAD DIP FINAL ab - pmksy.gov.in

270

14 Palanpur Palanpur Gunara Minor Renovation 22⁰39'45''N

77⁰39'5''E 156.5

6 N.A First Year

15 Raisalpur Raisalpur Raisalpur Minor Renovation 22⁰38'7'

'N 77⁰46'2

2''E 48.66 N.A First Year

16 Rohana Rohana Rohana Minor Renovation 22⁰38'22''N

77⁰45'20''E 144.3

3 N.A First Year

17 Saket Bamhan gaon khurd Bamhan gaon Minor Renovation 22⁰38'2

5''N 77⁰44'3

7''E 45.15 N.A First Year

Saket Motiya Minor Renovation 22⁰38'22''N

77⁰45'20''E 128.5

9 N.A Fourth Year

18 Sawalkheda Nohar Badodiya Minor Renovation 22⁰40'6

0''N 77⁰40'5

8''E 111.72 N.A Fourth Year

Sawalkheda Sawalkheda Minor Renovation 22⁰40'4''N

77⁰40'50''E 103.8

4 N.A Fourth Year

19 Sonasawari Sonasawari Sonasawari Minor Renovation 22⁰37'2'

'N 77⁰47'5

3''E 22.30 N.A Fourth Year

20 Tararoda Dhokheda Dhokheda Minor Renovation 22⁰37'47''N

77⁰46'41''E 22.73 N.A Fourth Year

21 Undrakhedi Deshmohini Deshmohini Minor Renovation 22⁰39'7'

'N 77⁰43'8'

'E 51.70 N.A Fourth Year

Palasi Palasi Minor Renovation 22⁰39'38''N

77⁰45'14''E 33.51 N.A Fourth Year

Ridhora Ridhora Minor Renovation 22⁰38'24''N

77⁰44'55''E 54.71 N.A Fourth Year

Undrakhedi Undrakhedi Minor Renovation 22⁰38'49''N

77⁰44'3''E 49.78 N.A Fourth Year

Total 2250.01

(A)LINING WORK

S.No.

Name of Block

Gram Panchay

at Village Name Name of Work

Type Of Structure(New/Ren

ovation)

Co-ordinates Khas

ra No.

Total Cost In

Lakh

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implement

ation

Scheme

Name Latitud

e Longit

ude

1 hoshangabad dongarwada dongarwada Hbad distrt ch 699 to

721 22⁰42'26''N

77⁰42'30''E 57.75 First Year

Hbad Distry

2,Fefartal & Dongarwada mr 22⁰42'2

6''N 77⁰42'3

0''E 127.8 First Year

2 hoshangabad Gunora Gunora Hbad Distry ch 929 to 979 22⁰42'5

6''N 77⁰38'0

9''E 157.5 First Year

Gunora mr & Tail mr 22⁰42'56''N

77⁰38'09''E 105 First Year

3 hoshangabad Jasalpur Jasalpur Hbad distry ch 390 to 440 22⁰42'4

8''N 77⁰47'1

4''E 131.25 First Year

Page 271: HBAD DIP FINAL ab - pmksy.gov.in

271

Jasalpur Mr 22⁰42'48''N

77⁰47'14''E 60 First Year

4 hoshangabad Khedala Khedala Hbad Distry ch 721 to 724 22⁰42'3

3''N 77⁰42'2

5''E 7.89 second year

Khedala Mr 22⁰42'33''N

77⁰42'25''E 30 second year

Tugariya Hbad Distry ch 556 to 699 22⁰42'3

0''N 77⁰45'0

1''E 375.37 second year

Tugariya mr & Rasuliya mr 22⁰42'3

0''N 77⁰45'0

1''E 75 second year

5 hoshangabad Kulamadi Kulamadi Hbad Distry ch 503 to

530 22⁰42'59''N

77⁰45'37''E 70.87 second year

Jalalabad mr 22⁰42'59''N

77⁰45'37''E 90 second year

Pathodi Hbad Distry ch 530 to 556 22⁰42'5

8''N 77⁰45'1

0''E 68.25 second year

Kishanpur mr 22⁰42'58''N

77⁰45'10''E 176.1 second year

Pawarkheda form Hbad distry ch 165 to 197 22⁰39'2

1''N 77⁰48'2

2''E 84 second year

Pawarkheda mr 22⁰39'21''N

77⁰48'22''E 486 second year

6 hoshangabad Nimsadiya Nimsadiya Hbad distry ch 287 to

347 22⁰41'42''N

77⁰48'10''E 157.5 Third Year

Nimsadiya mr 22⁰41'42''N

77⁰48'10''E 28.8 Third Year

7 hoshangabad Nitaya Chandpura Hbad distry ch 347 to 390 22⁰42'2

2''N 77⁰47'5

9''E 112.87 Third Year

Chandpura mr 22⁰42'22''N

77⁰47'59''E 83.7 Third Year

8 hoshangabad Panjara kalan Badodiya khurd Hbad distry ch 141 to

165 22⁰38'52''N

77⁰48'36''E 63 Third Year

Badodiya mr 22⁰38'52''N

77⁰48'36''E 90.9 Third Year

Panjara kalan Hbad distry ch 89 to 141 22⁰38'3

4''N 77⁰48'5

0''E 136.5 Third Year

Panjara mr no 1 22⁰38'34''N

77⁰48'50''E 316.8 Third Year

9 hoshangabad Parradeh Hasalpur Hbad distry ch 889 to 929 22⁰42'4

3''N 77⁰39'0

9''E 105 fourth year

Parradeh Parradeh mr 22⁰42'43''N

77⁰39'09''E 45 fourth year

Page 272: HBAD DIP FINAL ab - pmksy.gov.in

272

10 hoshangabad Raipur Raipur Hbad distry ch 440 to 503 22⁰42'4

7''N 77⁰46'0

9''E 165.37 fourth year

Raipur mr 22⁰42'47''N

77⁰46'09''E 39.6 fourth year

11 hoshangabad Randhal Randhal Hbad distry ch 724 to 889 22⁰42'4

1''N 77⁰39'5

1''E 433.12 fourth year

Randhal mr 22⁰42'41''N

77⁰39'51''E 75.3 fourth year

12 hoshangabad Talnagari Barandua Hbad distry ch 989 to

1035 22⁰43'19''N

77⁰37'33''E 120.7

5 Five Year

13 hoshangabad Tararoda Dhokheda Hbad distry ch 0 to 89 22⁰37'44''N

77⁰49'03''E 233.6

3 Five Year

Dhokheda mr 22⁰37'44''N

77⁰49'03''E 83.7 Five Year

Tararoda Hbad distry ch 197 to 287 22⁰40'4

6''N 77⁰48'3

1''E 236.25 Five Year

Panjara mr no 2 22⁰40'46''N

77⁰48'31''E 45.9 Five Year

Total 4676.47

B-CADA WORK

1 hoshangabad Badodiya Andhiyari commond area

development 22⁰42'25''N

77⁰40'22''E 52.1 208 First Year

Hbad Distry

2 Biora Biora commond area development 22⁰39'2

1''N 77⁰48'2

2''E 62.29 249 First Year

3 Dongarwada Dongarwada

commond area development of

fefartal & Dongarwada 22⁰42'3

2''N 77⁰42'3

0''E 128 511 First Year

4 Gunora Gunora commond area development 22⁰42'5

6''N 77⁰38'0

9''E 2.64 10.5 First Year

5 Jasalpur Jasalpur commond area development 22⁰42'4

8''N 77⁰47'1

4''E 86.17 344 First Year

6 Khedala Khedala commond area development 22⁰42'3

3''N 77⁰42'2

5''E 72.14 288 second year

Tugariya commond area development 22⁰42'3

0''N 77⁰43'0

1''E 11.02 44 second year

7 Budhwara Budhwara commond area

development 22⁰42'46''N

77⁰43'34''E 58.37 233 second year

Page 273: HBAD DIP FINAL ab - pmksy.gov.in

273

8 Kulamadi Kulamadi

commond area development of

Kulamadi Rasuliya Malakhedi Dongari Kishanpur Jalalabad

22⁰42'58''N

77⁰45'10''E 175.3

4 700 second year

Pathodi commond area development 22⁰42'5

8''N 77⁰45'1

0''E 33.97 136 second year

Pawarkheda farm commond area development 22⁰39'2

1''N 77⁰48'2

2''E 38.35 153 second year

9 Lohariya Kalan Gwari khurd commond area

development 22⁰38'34''N

77⁰48'50''E 52.86 211 Third Year

Lohariya kalan commond area development 22⁰38'3

4''N 77⁰48'5

0''E 64.63 258 Third Year

10 Meharaghat Horiyapiper commond area

development 22⁰38'34''N

77⁰48'50''E 71.64 286 Third Year

Meharaghat commond area development 22⁰38'3

4''N 77⁰48'5

0''E 61.87 247 Third Year

11 Nimsadiya Nimsadiya commond area

development 22⁰41'43''N

77⁰48'10''E 154.6

5 617 Third Year

12 Nitaya Chandpura commond area development 22⁰42'2

2''N 77⁰47'5

9''E 47.87 191 Third Year

Nitaya commond area development 22⁰39'2

1''N 77⁰48'2

2''E 28.43 114 Third Year

Taronda dhana commond area development 22⁰39'2

1''N 77⁰48'2

2''E 52.73 210 Third Year

13 Panjara kalan Badodiya khurd commond area

development 22⁰38'53''N

77⁰48'36''E 78.09 312 Third Year

Panjara kalan commond area development 22⁰38'3

4''N 77⁰48'5

0''E 169.02 675 Third Year

14 Parradeh Hasalpur commond area development 22⁰43'2

2''N 77⁰39'4

1''E 19 75.9 fourth year

Parradeh commond area development 22⁰42'4

3''N 77⁰39'0

9''E 93.55 373 fourth year

15 Pawarkheda basti Pawarkheda basti commond area

development 22⁰42'58''N

77⁰45'10''E 54.84 219 fourth year

16 Raipur Raipur commond area development 22⁰42'4

7''N 77⁰46'0

9''E 56.61 226 fourth year

17 Raisalpur Raisalpur commond area

development 22⁰39'21''N

77⁰48'22''E 256.7

1 1025 fourth year

Page 274: HBAD DIP FINAL ab - pmksy.gov.in

274

18 Randhal Randhal commond area development 22⁰42'4

1''N 77⁰39'5

1''E 94.19 376 fourth year

19 Talnagari Barandua commond area

development 22⁰43'19''N

77⁰37'33''E 9.74 38.9 Five Year

Talnagari commond area development 22⁰43'1

9''N 77⁰37'3

3''E 6.34 25.3 Five Year

20 Tararoda Dhokheda commond area development 22⁰37'4

4''N 77⁰49'0

3''E 74.65 298 Five Year

Tararoda commond area development 22⁰38'3

4''N 77⁰48'5

0''E 44.59 178 Five Year

Total 2212.4 8832

Pradhanmantri Krishi Sinchai Yojna - (Block-Hoshangabad)

S.No.

Name of Block

Gram Panchay

at

Village Name Name Of Work Type Of

Structure(New/Renovation)

Co-ordinates Khas

ra No.

Total Cost In

Lakh

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implement

ation

Scheme

Name Latitud

e Longit

ude

1 2 3 4 5 8 9 10 11 12 13 14 15

SEO

NIM

AL

WA

B-CADA WORK

1 Hoshangabad

Dolariya Dolariya (A) lining work

46.74 /1.23 Fourth Year

1 Misrod Distry

77 36'55"

148.20

/3.9 Fourth Year

2 Mohari Minor

77 25'55"

22.80 /0.6 Fourth Year

3 Dolariya Minor-1

31.92 /0.84 Fourth Year

4 Dolariya Sub Minor-1

29.64 /0.78 Fourth Year

5 Dolariya Sub Minor-2 91.20 2.4

6 Dolariya Minor-2

( B) Repair 2.00 First Year

1 Mohari Mr. Fall

286.00

Five Year

(C) Comand Area Development

658.50

1144 Five Year

B-CADA WORK

Page 275: HBAD DIP FINAL ab - pmksy.gov.in

275

2 Hoshangabad Misrod Misrod (A) lining work

77 32'30"

26.22 /10.69 Fourth Year

1 Misrod Distry

108.50

434 Five Year

3 Hoshangabad Mohari (1) Mohari (A) lining work 77 36'44"

188.00

/6Km. Second year

(2) Khedi Aheer 1 Mohari Minor 4.00 First Year

(B) Rpair

191.00

764 Five Year

4 Hoshangabad Rojhda 1-Rojhda (A) lining work

189.24

/4.98 Fourth Year

2-Dudugaon 1 Misrod Distry

83.22 /2.15 Fourth Year

3-Kharar 2 Dudugaon Minor-1

77 36'38"

98.04 /2.58 Fourth Year

4-Mophada 3 Dudugaon Minor-2

39.90 /1.05 Fourth Year

4 Chandwad Minor

110.58

/2.91 Fourth Year

5 Kharar Minor

85.50 /2.25 Fourth Year

6-Mophada Minor -1

58.14 /1.53 Fourth Year

7-Mophada Minor -2

36.48 /0.96 Fourth Year

8-Mophada Minor -3

( B) Repair 5.00 First Year

1- Misro Distry Fall 406 4.60 First Year

2- Misro Distry Fall 482 2.00 First Year

3- Misro Distry Fall 449

351.75

1407 Five Year

5 Hoshangabad Shell Shell (A) lining work

33.06 /0.87 Fourth Year

1 Shell Minor-2

31.92 /0.84 Fourth Year

2 Shell Minor-3

77 36'37"

55.86 /1.47 Fourth Year

Page 276: HBAD DIP FINAL ab - pmksy.gov.in

276

3 Shell Minor-4

71.82 /1.89 Fourth Year

4 Chandwad Minor

161.25

645 Five Year

6 Hoshangabad Awari 1-Awari (A) lining work

77 84'41"

21.66 /0.57 Fourth Year

2-Budara Khurd 1 Misrod Tail Awari Minor

60.00 24 Five Year

Total 2017.74

Grand Total 21089.73

Page 277: HBAD DIP FINAL ab - pmksy.gov.in

277

Babai

Page 278: HBAD DIP FINAL ab - pmksy.gov.in

278

Pradhanmantri Krishi Sinchai Yojna –Hoshangabad

Block Babai

S.No.

Name of Bloc

k

Gram Panchayat Village Name Name of

Work

Type Of Structure(New/Renova

tion)

Co-ordinates Khasra No.

Total

Cost In Lak

h

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implementati

on

Scheme

Name Latitude Longitude

1 Babai Manvada Manvada Pond

Deepening Renovation 22º43'50.000"

77º50'53.000" 17 4.75 3600 7.20 First Year NREG

A

2 Babai Javli Javli Stop Dam New 22º42'04.07

7" 77º52'25.012" 21 8.25 2745 5.49 Second Year 14 Va

Vitt

3 Babai Managao Managao Well

Deepening Renovation 22º40'59.372"

77º55'50.336" 54 1.05 900 1.80 First Year NREG

A

4 Babai Managao Managao Stop Dam New 22º38'42.07

7" 77º58'28.012" 54 9.23 2700 5.40 First Year 14 Va

Vitt

5 Babai Madavan Madavan Stop Dam New 22º45'23.00

0" 77º51'26.000" 14 9.42 2245 4.49 First Year 14 Va

Vitt

6 Babai Aanchalkheda Aanchalkheda Pond

Deepening Renovation 22º42'30.077"

77º52'11.000" 181/1 4.75 2500 5.00 First Year NREG

A

7 Babai

Pawarkhedakhurd

Pawarkhedakhurd

Pond Deepening Renovation 22º41'28.00

0" 77º51'00.000" 20 4.75 3575 7.15 First Year NREG

A

8 Babai Suakhedi Suakhedi Stop Dam New 22º42'07.87

7" 77º52'16.000" 19 8.20 1800 3.60 First Year 14 Va

Vitt

9 Babai Suakhedi Suakhedi Stop Dam New 22º42'05.00

0" 77º52'21.212" 19 8.30 1770 3.54 Second Year 14 Va

Vitt

10 Babai Ganera Ganera Pond

Deepening Renovation 22º47'25.432"

77º56'46.666" 27 4.59 3200 6.40 First Year NREG

A

11 Babai Ganera Ganera Stop Dam New 22º48'29.64

0" 77º57'04.960" 27 8.60 2400 4.80 Second Year 14 Va

Vitt

12 Babai Ganera Ganera Well

Deepening Renovation 22º47'24.381"

77º57'04.850" 27 1.02 600 1.20 First Year 14 Va

Vitt

13 Babai Ganera Ganera Well

Deepening Renovation 22º47'20.969"

77º57'02.214" 27 1.03 600 1.20 Second Year 14 Va

Vitt

14 Babai Mudiyakheda Mudiyakheda Stop Dam New 22º48'32.01

6" 77º54'46.670" 26 9.25 2800 5.60 First Year 14 Va

Vitt

15 Babai Khargavali Khargavali Pond

Deepening Renovation 22º47'19.101"

77º56'12.830" 25 4.21 1925 3.85 First Year NREG

A

16 Babai Nasirabad Nasirabad Pond

Deepening Renovation 22º48'53.061"

77º57'26.439" 214/1 5.12 4200 8.40 First Year NREG

A

17 Babai Nasirabad Nasirabad Well

Deepening Renovation 22º48'53.109"

77º57'24.598"

155/1,2 1.25 600 1.20 Second Year 14 Va

Vitt

18 Babai Nasirabad Nasirabad Nala

Deepening Renovation 22º47'58.288"

77º58'03.737"

125 4.88 3200 6.40 First Year NREGA

Page 279: HBAD DIP FINAL ab - pmksy.gov.in

279

19 Babai Nasirabad Bhatwadi Stop Dam New 22º48'02.00

5" 77º57'50.718" 46 8.55 3200 6.40 Third Year 14 Va

Vitt

20 Babai Bachwada Bachwada Stop Dam New 22º49'02.57

1" 77º59'17.291" 29 4.35 3000 6.00 First Year 14 Va

Vitt

21 Babai Kondarwada Sarrakeshli Stop Dam New 22º47'20.19

2" 78º00'22.247" 30 4.25 2700 5.40 First Year 14 Va

Vitt

22 Babai Gondalwada Gondalwada Pond

Deepening Renovation 22º46'35.155"

77º57'54.207" 39 7.02 4475 8.95 First Year NREG

A

23 Babai Gondalwada Malhanwada Stop Dam New 22º45'42.59

3" 77º58'39.910" 39 7.02 2700 5.40 Second Year 14 Va

Vitt

24 Babai Sirwad Sirwad Stop Dam New 22º71'47.58

3" 78º00'06.550" 42 8.50 2800 5.60 First Year 14 Va

Vitt

25 Babai Furtala Furtala Stop Dam New 22º45'27.48

6" 78º00'52.185" 255/1 8.00 2880 5.76 Second Year 14 Va

Vitt

26 Babai Furtala Gajanpur Pond

Deepening Renovation 22º43'31.800"

78º00'10.712" 112/1 6.00 4065 8.13 First Year NREG

A

27 Babai Furtala Sendarwada Stop Dam New 22º44'54.85

7" 78º01'37.816" 157 8.25 3000 6.00 Third Year 14 Va

Vitt

28 Babai Bagalkhedi Nagwada Pond

Deepening Renovation 22º45'45.573"

77º26'28.623" 24 4.55 3600 7.20 First Year NREG

A

29 Babai Khidiya Khidiya Check Dam New 22º44'44.75

0" 77º56'00.443" 41 8.12 1870 3.74 First Year 14 Va

Vitt

30 Babai Raipura Raipura Pond

Deepening Renovation 22º44'04.534"

77º58'38.564" 51 4.00 2430 4.86 First Year NREG

A

31 Babai Aankhmau Aankhmau Stop Dam New 22º41'20.01

3" 77º57'00.000" 316 8.90 2655 5.31 Second Year 14 Va

Vitt

32 Babai Aankhmau Aankhmau Pond

Deepening Renovation 22º41'19.298"

77º56'59.275" 316 5.85 3725 7.45 First Year NREG

A

33 Babai Mohgao Mohgao Stop Dam New 22º33'35.00

0" 77º59'48.816" 55 8.55 1330 2.66 First Year 14 Va

Vitt

34 Babai Kotgao Kotgao Stop Dam New 22º38'50.10

7" 77º58'11.016" 361 9.25 1060 2.12 First Year 14 Va

Vitt

35 Babai Kotgao Kotgao Stop Dam New 22º38'50.15

0" 77º57'41.254" 357 8.25 1440 2.88 Second Year 14 Va

Vitt

36 Babai Gujarawada Gujarawada Pond

Deepening Renovation 22º40'25.850"

77º58'03.205" 52 4.25 3625 7.25 First Year NREG

A

37 Babai Gujarawada Gujarawada Stop Dam New 22º39'03.10

5" 77º58'24.402" 52 8.56 1470 2.94 Second Year 14 Va

Vitt

38 Babai Gujarawada Gujarawada Pond

Deepening Renovation 22º40'25.000"

77º58'03.254" 52 5.25 2500 5.00 Third Year NREG

A

39 Babai Kajalkhedi Kajalkhedi Pond

Deepening Renovation 22º40'24.550"

78º00'03.240" 56 4.75 3390 6.78 First Year NREG

A

40 Babai Mahendrawadi Mahendrawadi Stop Dam New 22º38'57.25

9" 78º01'02.018" 57 9.75 3390 6.78 First Year 14 Va

Vitt

41 Babai Mahendrawadi Mahendrawadi Stop Dam New 22º38'41.70

6" 78º00'06.092" 57 9.48 2250 4.50 Second Year 14 Va

Vitt

Page 280: HBAD DIP FINAL ab - pmksy.gov.in

280

42 Babai Rajon Rajon Well

Deepening Renovation 22º40'59.372"

77º55'50.336" 51 1.05 675 1.35 First Year NREG

A

43 Babai Rajon Rajon Well

Deepening Renovation 22º40'32.902"

77º55'46.655" 51 1.05 675 1.35 First Year NREG

A

44 Babai Rajon Rajon Pond

Deepening Renovation 22º40'40.180"

77º55'51.022" 51 6.45 3350 6.70 Second Year NREG

A

45 Babai Nayachurna Ghodanar Check Dam New 22º37'46.43

1" 78º01'35.004" 60 2.3 1550 3.10 First Year 14 Va

Vitt

46 Babai Nayachurna Rorighat Check Dam New 22º38'19.39

0" 78º01'10.000" 60 2.42 1450 2.90 Second Year 14 Va

Vitt

47 Babai Nayachurna Badkachar Check Dam New 22º37'44.31

3" 78º01'25.025" 60 2.81 1625 3.25 Third Year 14 Va

Vitt

48 Babai Budhwada Budhwada Pond

Deepening Renovation 22º42'00.100"

78º00'02.050" 43 4.21 3735 7.47 First Year NREG

A

49 Babai Guradiyakala Guradiyakala Stop Dam New 22º42'00.42

0" 78º00'02.825" 47 9.25 3800 7.60 Second Year 14 Va

Vitt

50 Babai Guradiyakala Guradiyakala Nala

Deepening Renovation 22º42'12.189"

78º02'17.020"

47 4.25 3610 7.22 First Year NREGA

51 Babai Guradiyakala Guradiyakala Stop Dam New 22º41'21.19

0" 78º02'19.820" 47 8.18 3780 7.56 Third Year 14 Va

Vitt

52 Babai Shivpur Simrodha Stop Dam New 22º42'42.00

0" 78º02'14.202" 44 7.48 4000 8.00 Second Year 14 Va

Vitt

53 Babai Shivpur Simrodha Stop Dam New 22º42'16.00

0" 78º02'27.022" 44 6.21 2520 5.04 Third Year 14 Va

Vitt

54 Babai Shivpur Kharideewan Nala

Deepening Renovation 22º43'18.000"

78º02'03.202"

44 7.01 3600 7.20 First Year NREGA

55 Babai Kanskheda Kanskheda Stop Dam New 22º40'01.00

0" 78º02'10.000" 163 9.25 3360 6.72 First Year 14 Va

Vitt

56 Babai Kanskheda Premtala Stop Dam New 22º39'52.89

5" 78º02'15.723" 197 8.30 3080 6.16 Second Year 14 Va

Vitt

57 Babai Gulon Gulon Stop Dam New 22º39'52.89

5" 78º02'15.723" 86 9.00 2700 5.40 First Year 14 Va

Vitt

58 Babai Gulon Meghli Stop Dam New 22º41'20.95

0" 78º03'47.528" 10 8.35 4800 9.60 Second Year 14 Va

Vitt

59 Babai Jhalon Jhalon Pond

Deepening Renovation 22º41'11.555"

78º05'20.230" 59 8.20 3740 7.48 First Year NREG

A

60 Babai Gol Gol Nala

Deepening Renovation 22º43'12.254"

78º04'34.723" 46 5.12 1600 3.20 First Year NREG

A

61 Babai Gol Bamhorikala Stop Dam New 22º42'19.82

0" 78º04'08.389"

46 6.25 3600 7.20 Second Year 14 Va Vitt

62 Babai Baharpur Baharpur Stop Dam New 22º44'14.95

6" 78º04'38.232" 45 7.25 3750 7.50 First Year 14 Va

Vitt

63 Babai Chorahet Chorahet Stop Dam New 22º45'20.03

6" 78º04'34.466" 35 8.65 4140 8.28 First Year 14 Va

Vitt

Page 281: HBAD DIP FINAL ab - pmksy.gov.in

281

64 Babai Chorahet Silarikala Stop Dam New 22º45'08.11

6" 78º04'33.422" 35 8.45 2160 4.32 Second Year 14 Va

Vitt

65 Babai Umerkhedi Umerkhedi Stop Dam New 22º47'05.84

8" 78º06'03.620" 34 9.47 1470 2.94 Second Year 14 Va

Vitt

66 Babai Umerkhedi Jhalsargoud Pond

Deepening Renovation 22º48'02.092"

78º04'25.265" 34 4.20 3025 6.05 First Year NREG

A

67 Babai Satwasa Satwasa Pond

Deepening Renovation 22º47'07.407"

78º04'58.169" 33 8.40 2500 5.00 First Year NREG

A

68 Babai Satwasa Satwasa Stop Dam New 22º47'05.84

8" 78º06'03.620" 33 9.40 1920 3.84 Second Year 14 Va

Vitt

69 Babai Satwasa Satwasa Stop Dam New 22º47'40.90

2" 78º04'34.438" 33 9.54 1710 3.42 Third Year 14 Va

Vitt

70 Babai

Sangakhedakhurd

Sangakhedakhurd Stop Dam New 22º48'03.40

3" 78º02'46.992" 32 8.25 2850 5.70 First Year 14 Va

Vitt

71 Babai

Sangakhedakhurd

Sangakhedakhurd Stop Dam New 22º48'11.66

3" 78º02'51.030" 32 8.25 3090 6.18 Second Year 14 Va

Vitt

72 Babai

Sangakhedakhurd

Sangakhedakhurd Stop Dam New 22º48'25.53

4" 78º03'05.534" 32 8.25 3230 6.46 Third Year 14 Va

Vitt

73 Babai Patni Patni Pond

Deepening Renovation 22º46'31.949"

78º01'16.932" 37 4.68 4320 8.64 First Year NREG

A

74 Babai Patni Patni Nala

Deepening Renovation 22º46'14.453"

78º00'45.813"

281 4.65 2060 4.12 First Year NREGA

75 Babai Patni Patni Pond

Deepening Renovation 22º46'36.124"

78º00'44.028"

348/1,2 4.35 3725 7.45 Second Year NREG

A

76 Babai Patni Patni Nala

Deepening Renovation 22º46'24.169"

78º00'45.099" 23 3.25 1920 3.84 First Year NREG

A

77 Babai Maragao Maragao Stop Dam New 22º47'48.94

2" 78º01'44.233" 31 8.25 2240 4.48 First Year 14 Va

Vitt

78 Babai Maragao Maragao Stop Dam New 22º47'55.73

3" 78º01'22.205" 17 7.85 1775 3.55 Second Year 14 Va

Vitt

79 Babai Maragao Piperpani Stop Dam New 22º47'16.60

1" 78º00'05.383" 31 6.68 4050 8.10 Third Year 14 Va

Vitt

80 Babai Nayadhai Nayadhai Stop Dam New 22º49'09.66

7" 78º05'05.997" 60 6.45 2700 5.40 Second Year 14 Va

Vitt

81 Babai Nayadhai Dob Stop Dam Renovation 22º38'25.22

0" 78º04'54.846" 60 4.25 3315 6.63 First Year 14 Va

Vitt

82 Babai Nayadhai Nayabori Stop Dam New 22º39'48.38

0" 78º06'00.379" 60 8.25 3025 6.05 Third Year 14 Va

Vitt

83 Babai Nayadhai Birjikhapa Stop Dam New 22º39'55.59

6" 78º06'01.862" 60 10.3

5 3800 7.60 Third Year 14 Va Vitt

84 Babai Nayadhai Kakdi Check Dam New 22º39'41.21

8" 78º05'49.860" 129 3.24 2755 5.51 Fourth Year 14 Va

Vitt

85 Babai

Kharda Kharda Pond Deepening Renovation 22º39'29.83

3" 78º05'24.316"

247 4.89 4000 8.00 First Year NREGA

86 Baba Kharda Kharda Stop Dam New 22º39'26.48 78º05'03.60 240 9.5 1600 3.20 Second Year 14 Va

Page 282: HBAD DIP FINAL ab - pmksy.gov.in

282

i 3" 7" Vitt

87 Babai

Kharda Kharda Check Dam New 22º39'51.998"

78º05'15.500" 232 3.5 960 1.92 Second Year 14 Va

Vitt

88 Babai

Kharda Kharda Stop Dam New 22º39'30.589"

78º04'58.829" 248 9.45 2850 5.70 Third Year 14 Va

Vitt

89 Babai

Kharda Dolariyakhurd Check Dam New 22º39'14.404"

78º03'38.436" 72 3.55 1050 2.10 Fourth Year 14 Va

Vitt

90 Babai

Kharda Khutiya Stop Dam New 22º39'34.132"

78º03'53.794" 1 9.85 2660 5.32 Fourth Year 14 Va

Vitt

91 Babai Talkeshri Talkeshri Stop Dam New 22º74'85" 78º03'25" 36 9.25 1470 2.94 First Year 14 Va

Vitt

92 Babai

Shukkarwadakala

Shukkarwadakala Check Dam New 22º51'28.77

2" 77º50'30.029" 2 2.00 3000 6.00 First Year 14 Va

Vitt

93 Babai

Shukkarwadakala

Shukkarwadakala Check Dam New 22º51'32.67

9" 77º50'30.551" 2 2.00 3000 6.00 First Year 14 Va

Vitt

94 Babai

Shukkarwadakala

Shukkarwadakala Check Dam New 22º50'37.67

2" 77º50'34.122" 2 1.50 1260 2.52 Second Year 14 Va

Vitt

95 Babai Gora Gora Pond

Deepening Renovation 22º50'00.600"

77º49'01.397" 7 8.00 4200 8.40 First Year NREG

A

96 Babai Gora Gora Stop Dam New 22º49'29.66

9" 77º48'33.959" 1 9.25 4740 9.48 Second Year 14 Va

Vitt

97 Babai Gora Gora Check Dam New 22º49'29.76

2" 77º48'24.813" 9 2.00 4615 9.23 Third Year 14 Va

Vitt

98 Babai Gora Gora Check Dam New 22º49'28.58

1" 77º48'20.061" 2 2.00 4245 8.49 Fourth Year 14 Va

Vitt

99 Babai Kadhiya Chilachon Stop Dam New 22º49'14.78

0" 77º49'43.859" 14 9.89 4745 9.49 First Year 14 Va

Vitt

100 Babai Kadhiya Chandla Check Dam New 22º49'22.51

7" 77º47'56.383" 25 2.50 4445 8.89 Second Year 14 Va

Vitt

101 Babai

Sangakhedakala

Sangakhedakala Stop Dam New 22º46'59.15

4" 77º49'04.748" 11 5.25 3725 7.45 Second Year 14 Va

Vitt

102 Babai

Sangakhedakala

Sangakhedakala Stop Dam New 22º46'54.71

1" 77º48'45.494" 11 5.25 4490 8.98 Second Year 14 Va

Vitt

103 Babai

Sangakhedakala

Sangakhedakala Stop Dam New 22º45'54.49

1" 77º48'44.368" 5 5.25 4425 8.85 Third Year 14 Va

Vitt

104 Babai Mangrol Mangrol Stop Dam New 22º56'37.67

2" 77º50'34.122" 5 12.5

4 4100 8.20 Third Year 14 Va Vitt

105 Babai Mangrol Mangrol Check Dam New 22º48'38.89

6" 77º50'56.424" 5 2.50 2500 5.00 First Year 14 Va

Vitt

107 Babai Mohasa Mohasa Pond

Deepening Renovation 22º46'14.075"

77º50'30.029" 10 6.00 4950 9.90 First Year NREG

A

108 Babai Mohasa Makodiya Check Dam New 22º46'49.84

0" 77º49'31.884" 10 2.00 2700 5.40 Second Year 14 Va

Vitt

109 Babai Mohasa Makodiya Check Dam New 22º46'48.90

9" 77º49'28.204" 15 2.00 2700 5.40 Third Year 14 Va

Vitt

Page 283: HBAD DIP FINAL ab - pmksy.gov.in

283

110 Babai Aari Aari Pond

Deepening Renovation 22º45'32.410"

77º52'50.490" 15 10.0

0 4935 9.87 First Year NREGA

111 Babai Aari Aari Stop Dam New 22º45'31.01

6" 77º53'34.819" 15 9.49 4925 9.85 Third Year 14 Va

Vitt

112 Babai Aari Aari Check Dam New 22º45'36.55

7" 77º53'23.284" 15 2.20 3960 7.92 Second Year 14 Va

Vitt

113 Babai Aari Aari Check Dam New 22º45'40.16

9" 77º53'09.716" 6 2.20 4060 8.12 Second Year 14 Va

Vitt

114 Babai Budhni Budhni Pond

Deepening Renovation 22º50'24.948"

77º55'12.350" 7 6.50 1800 3.60 First Year NREG

A

115 Babai Bikore Bikore Pond

Deepening Renovation 22º48'47.197"

77º54'04.922" 9 6.50 4710 9.42 First Year NREG

A

116 Babai Majojalpur Majojalpur Pond

Deepening Renovation 22º47'22.740"

77º52'07.972" 9 7.20 3200 6.40 First Year NREG

A

117 Babai Majojalpur Majojalpur Stop Dam New 22º47'30.78

0" 77º52'12.394" 43/1 9.57 4730 9.46 Second Year 14 Va

Vitt

118 Babai Baglon Bhanpur Pond

Deepening Renovation 22º44'45.580"

77º55'43.414" 220 7.20 4350 8.70 First Year NREG

A

119 Babai Bajjarwada Bajjarwada Stop Dam New 22º43'52.64

7" 77º54'27.801" 220 8.20 4945 9.89 First Year 14 Va

Vitt

Page 284: HBAD DIP FINAL ab - pmksy.gov.in

284

Sohagpur

Page 285: HBAD DIP FINAL ab - pmksy.gov.in

285

Pradhanmantri Krishi Sinchai Yojna Janpad Panchyat Sohagpur District - Hoshangabad

S. No.

Name of

Block

Gram Panchyat

Village Name

Name of Work

Type of Structure(New/Renov

ation)

Co-ordinates Khas

ra No.

Total

Cost in Lak

h

Storage

Capacity in Cum.

Irrigation

Potential In Ha.

Year of Implementat

ion

Scheme Name Latitude Longitude

1 Sohagpur Karanpur karanpur Pond

Deepening Renovation 22°43'25.957"

078°13'08.461" 6.00 39000.

00 15.21 First Year MGNREGA

2 Sohagpur Karanpur karanpur Well

Deepening Renovation 22°43'11.814"

078°1309.888" 1.00 0.00 0.00 First Year MGNRE

GA

3 Sohagpur Karanpur karanpur Recharge Pit New 22°43'19.5

06" 078°13'09.68

4" 0.05 0.00 0.00 Second Year MGNREGA

4 Sohagpur Karanpur karanpur Recharge Pit New 22°43'22.2

54" 078°13'09.15

0" 0.05 0.00 0.00 Second Year MGNREGA

5 Sohagpur Karanpur karanpur Recharge Pit New 22°43'15.0

46" 078°13'09.41

5" 0.05 0.00 0.00 Second Year MGNREGA

6 Sohagpur Karanpur karanpur Recharge Pit New 22°43'08.4

42" 078°13'03.79

2" 0.05 0.00 0.00 Third Year MGNREGA

7 Sohagpur Karanpur karanpur Recharge Pit New 22°42'55.2

48" 078°12'56.65

2" 0.05 0.00 0.00 Third Year MGNREGA

8 Sohagpur Karanpur Aamdehi Stop Dam New 22°43'21.2

28" 078°14'43.72

2" 22.00

3200.00 1.25 Fifth Year MGNRE

GA

9 Sohagpur Karanpur Aamdehi Recharge Pit New 22°43'06.8

82" 078°15'10.18

2" 0.05 0.00 0.00 Fourth Year MGNREGA

10 Sohagpur Karanpur Aamdehi Recharge Pit New 22°43'10.8

48" 078°15'10.11

6" 0.05 0.00 0.00 Fourth Year MGNREGA

11 Sohagpur Karanpur Aamdehi Recharge Pit New 22°43'11.6

40" 078°15'13.42

2" 0.05 0.00 0.00 Fourth Year MGNREGA

12 Sohagpur Karanpur Aamdehi Recharge Pit New 22°43'20.5

08" 078°15'02.22

8" 0.05 0.00 0.00 Fourth Year MGNREGA

13 Sohagpur Kalmeshra Hirapur Pond

Deepening Renovation 22°43'26.190"

078°12'26.136" 3.50 24000.

00 9.36 First Year MGNREGA

14 Sohagpur Kalmeshra Hirapur Pond

Deepening Renovation 22°42'50.000"

078°11'27.000" 137 4.00 20400.

00 7.96 First Year MGNREGA

15 Sohagpur Kalmeshra Kalmeshra Pond

Deepening Renovation 22°44'07.815"

078°12'31.685" 4.00 39000.

00 15.21 Fourth Year MGNREGA

16 Sohagpur Kalmeshra Hirapur Recharge Pit New 22°43'16.3

65" 078°11'51.77

7" 0.05 0.00 0.00 Second Year MGNREGA

17 Sohagpur Kalmeshra Hirapur Recharge Pit New 22°43'57.5

43" 078°12'52.80

6" 0.05 0.00 0.00 Second Year MGNREGA

18 Sohagpur Kalmeshra Gujarkhapa Recharge Pit New 22°43'37.2

18" 078°11'10.60

5" 0.05 0.00 0.00 Third Year MGNREGA

19 Sohagpur Kalmeshra Gujarkhapa Recharge Pit New 22°43'42.0

59" 078°11'09.53

4" 0.05 0.00 0.00 Third Year MGNREGA

Page 286: HBAD DIP FINAL ab - pmksy.gov.in

286

20 Sohagpur Kalmeshra Gujarkhapa Recharge Pit New 22°43'42.0

32" 078°11'12.41

2" 0.05 0.00 0.00 Fourth Year MGNREGA

21 Sohagpur Kalmeshra Kalmeshra Recharge Pit New 22°43'57.6

44" 078°12'52.06

4" 0.05 0.00 0.00 Fourth Year MGNREGA

22 Sohagpur Kalmeshra Kalmeshra Recharge Pit New 22°43'58.5

43" 078°1253.80

6" 0.05 0.00 0.00 Fourth Year MGNREGA

23 Sohagpur Kalmeshra Kalmeshra Well

Deepening Renovation 22°43'50.573"

078°12'52.067" 1.10 0.00 0.00 Fifth Year MGNRE

GA

24 Sohagpur Kalmeshra Kalmeshra Well

Deepening Renovation 22°43'53.513"

078°13'56.365" 0.95 0.00 0.00 Fifth Year MGNRE

GA

25 Sohagpur Lakhanpur Dhhana Pond

Deepening Renovation 22°46'15.929"

078°08'56.325" 62 6.00 38000.

00 14.82 First Year MGNREGA

26 Sohagpur Lakhanpur Lakhanpur Stop Dam New 22°47'13.1

47" 078°08'13.94

7" 120/1 25.00

31250.00 12.19 second year MGNRE

GA

27 Sohagpur Lakhanpur Lakhanpur Stop Dam New 22°46'41.5

98" 078°08'14.51

5" 120/1 27.00

38000.00 14.82 third year MGNRE

GA

28 Sohagpur Lakhanpur Lakhanpur Stop Dam New 22°47'23.3

78" 078°08'06.82

5" 120/1 30.00

25000.00 9.75 Fourth Year MGNRE

GA

29 Sohagpur Lakhanpur Lakhanpur Stop Dam New 22°47'46.6

13" 078°07'52.83

6" 120/1 26.00

22000.00 8.58 Fifth Year MGNRE

GA

30 Sohagpur Lakhanpur Lakhanpur Pond

Construction New 22°47'41.598"

078°08'14.515" 15.0

0 42000.

00 16.38 third year MGNREGA

31 Sohagpur Lakhanpur Lakhanpur Well

Deepening Renovation 22°47'07.654"

078°08'06.475" 0.98 0.00 0.00 Fourth Year MGNRE

GA

32 Sohagpur Lakhanpur Lakhanpur Well

Deepening Renovation 22°47'08.698"

078°08'00.707" 0.96 0.00 0.00 third year MGNRE

GA

33 Sohagpur Lakhanpur Mahuakheda Well

Deepening Renovation 22°45'42.950"

078°07'52.330" 0.88 0.00 0.00 Fourth Year MGNRE

GA

34 Sohagpur Lakhanpur Lakhanpur Well

Deepening Renovation 22°45'49.205"

078°07'50.599" 0.72 0.00 0.00 Fourth Year MGNRE

GA

35 Sohagpur Lakhanpur Dhhana Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

36 Sohagpur Lakhanpur Dhhana Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

37 Sohagpur Lakhanpur Lakhanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

38 Sohagpur Lakhanpur Lakhanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

39 Sohagpur Lakhanpur Mahuakheda Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

40 Sohagpur Lakhanpur Mahuakheda Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

41 Sohagpur Chandikhedi Khimara Pond

Deepening Renovation 22°49'25.519"

078°13'47.463" 3.00 21000.

00 8.19 First Year MGNREGA

42 Sohagpur Chandikhedi Khimara Well

Deepening Renovation 22°49'25.601"

078°13'37.916" 1.00 0.00 0.00 First Year MGNRE

GA

Page 287: HBAD DIP FINAL ab - pmksy.gov.in

287

43 Sohagpur Chandikhedi Khimara Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

44 Sohagpur Chandikhedi Khimara Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

45 Sohagpur Chandikhedi Khimara Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

46 Sohagpur Chandikhedi Chandikhedi Well

Deepening Renovation 22°49'05.647"

078°13'00.331" 1.00 0.00 0.00 Fourth Year MGNRE

GA

47 Sohagpur Chandikhedi Chandikhedi Well

Deepening Renovation 22°49'04.693"

078°13'00.524" 1.00 0.00 0.00 third year MGNRE

GA

48 Sohagpur Chandikhedi Chandikhedi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

49 Sohagpur Chandikhedi Chandikhedi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

50 Sohagpur Chandikhedi Chandikhedi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

51 Sohagpur Chandikhedi Palakhedi Well

Deepening Renovation 22°49'58.581"

078°13'19.530" 1.00 0.00 0.00 third year MGNRE

GA

52 Sohagpur Chandikhedi Palakhedi Well

Deepening Renovation 22°49'55.119"

078°13'19.365" 1.00 0.00 0.00 third year MGNRE

GA

53 Sohagpur Chandikhedi Palakhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

54 Sohagpur Chandikhedi Palakhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

55 Sohagpur Chandikhedi Palakhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

56 Sohagpur Sousarkheda Dadinga Pond

Deepening Renovation 22°50'05.029"

078°11'17.444" 3.00 24800.

00 9.67 First Year MGNREGA

57 Sohagpur Sousarkheda Dadinga Well

Deepening Renovation 22°50'08.077"

078°11'22.004" 0.88 0.00 0.00 third year MGNRE

GA

58 Sohagpur Sousarkheda Dadinga Recharge Pit New 22°50'10.8

72" 078°11'15.00

0" 0.05 0.00 0.00 First Year MGNREGA

59 Sohagpur Sousarkheda Dadinga Recharge Pit New 22°50'07.7

13" 078°11'21.94

9" 0.05 0.00 0.00 First Year MGNREGA

60 Sohagpur Sousarkheda Dadinga Recharge Pit New 22°50'08.9

90" 078°11'27.60

9" 0.05 0.00 0.00 First Year MGNREGA

61 Sohagpur Sousarkheda Dadinga Recharge Pit New 22°50'06.1

07" 078°11'28.34

8" 0.05 0.00 0.00 Fourth Year MGNREGA

62 Sohagpur Sousarkheda Sousarkheda Pond

Construction New 22°49'42.465"

078°12'15.947" 15.0

0 28000.

00 10.92 Fourth Year MGNREGA

63 Sohagpur Sousarkheda Sousarkheda Stop Dam New 22°49'52.4

60" 078°11'54.46

8" 25.00

40000.00 15.60 second year MGNRE

GA

64 Sohagpur Sousarkheda Sousarkheda Stop Dam New 22°49'44.3

95" 078°12'05.97

7" 32.00

38000.00 14.82 third year MGNRE

GA

65 Sohagpur Sousarkheda Sousarkheda Recharge Pit New 22°49'59.1

71" 078°11'40.03

8" 0.05 0.00 0.00 Fourth Year MGNREGA

Page 288: HBAD DIP FINAL ab - pmksy.gov.in

288

66 Sohagpur Sousarkheda Sousarkheda Well

Deepening Renovation 22°49'59.117"

078°11'40.049" 0.85 0.00 0.00 Fifth Year MGNRE

GA

67 Sohagpur Sousarkheda Sousarkheda Well

Deepening Renovation 22°50'08.077"

078°11'40.049" 0.88 0.00 0.00 Fifth Year MGNRE

GA

68 Sohagpur Sankala Gagnai Pond

Deepening Renovation 22°51'11.688"

078°11'22.004" 3.00 22400.

00 8.74 third year MGNREGA

69 Sohagpur Sankala Gagnai Stop Dam New 22°51'58.6

65" 078°10'41.51

9" 28.00

30000.00 11.70 second year MGNRE

GA

70 Sohagpur Sankala Gagnai Well

Deepening Renovation 22°51'40.040"

078°10'54.236" 1.00 0.00 0.00 Fourth Year MGNRE

GA

71 Sohagpur Sankala Sankala Stop Dam New 22°87'57.8

00" 078°19'06.05

0" 30.00

24000.00 9.36 Fifth Year MGNRE

GA

72 Sohagpur Sankala Sankala Stop Dam New 22°87'06.0

90" 078°18'88.20

0" 25.00

22000.00 8.58 third year MGNRE

GA

73 Sohagpur Sankala Sankala Stop Dam New 22°86'28.2

90" 078°19'73.11

0" 28.00

21000.00 8.19 Fifth Year MGNRE

GA

74 Sohagpur Sankala Sankala Recharge Pit New 22°51'22.9

08" 078°11'47.98

6" 0.05 0.00 0.00 Fourth Year MGNREGA

75 Sohagpur Bamari Bamari Pond

Deepening Renovation 22°44'11.900"

078°14'54.479" 169 3.00 22400.

00 8.74 First Year MGNREGA

76 Sohagpur Bamari Bamari Stop Dam Renovation 22°44'05.0

13" 078°14'42.50

4" 139 5.00 41560.00 16.21 Fifth Year MGNRE

GA

77 Sohagpur Bamari Bamari Stop Dam New 22°44'17.0

34" 078°14'07.86

5" 22.00

38000.00 14.82 second year MGNRE

GA

78 Sohagpur Bamari Talakheadi Stop Dam New 22°44'14.3

01" 078°15'27.66

1" 27.00

36500.00 14.24 Fourth Year MGNRE

GA

79 Sohagpur Bamari Nakatua Stop Dam New 27.0

0 38500.

00 15.02 Fifth Year MGNREGA

80 Sohagpur Bamari Talakheadi Pond

Deepening Renovation 5.00 22000.00 8.58 Fifth Year MGNRE

GA

81 Sohagpur Bamari Talakheadi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

82 Sohagpur Bamari Talakheadi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

83 Sohagpur Bamari Nakatua Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

84 Sohagpur Bamari Nakatua Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

85 Sohagpur Bamari Nakatua Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

86 Sohagpur Bamari Bamari Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

87 Sohagpur Bamari Bamari Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

88 Sohagpur Bamari Bamari Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

Page 289: HBAD DIP FINAL ab - pmksy.gov.in

289

89 Sohagpur Bamari Bamari Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

90 Sohagpur Utiyashankar Utiyashankar Recharge Pit New 22°49'34.6

79" 078°14'20.91

6" 0.05 0.00 0.00 First Year MGNREGA

91 Sohagpur Utiyashankar Khidiya Recharge Pit New 22°49'20.9

05" 078°14'20.47

7" 0.05 0.00 0.00 First Year MGNREGA

92 Sohagpur Utiyashankar Khidiya Recharge Pit New 22°49'24.9

42" 078°14'05.36

9" 0.05 0.00 0.00 First Year MGNREGA

93 Sohagpur Utiyashankar Khidiya Recharge Pit New 22°49'20.1

63" 078°14'16.85

1" 0.05 0.00 0.00 First Year MGNREGA

94 Sohagpur Utiyashankar Khidiya Well

Deepening Renovation 22°49'21.591"

078°14'20.916" 0.85 0.00 0.00 First Year MGNRE

GA

95 Sohagpur Utiyashankar Ghoorkhedi Recharge Pit New 22°49'26.5

49" 078°14'36.51

7" 0.05 0.00 0.00 Fourth Year MGNREGA

96 Sohagpur Utiyashankar Ghoorkhedi Well

Deepening Renovation 22°49'32.454"

078°14'35.363" 0.92 0.00 0.00 Fifth Year MGNRE

GA

97 Sohagpur Utiyashankar Ghoorkhedi Recharge Pit New 22°49'38.0

30" 078°14'44.97

6" 0.05 0.00 0.00 First Year MGNREGA

98 Sohagpur Utiyashankar Aata shree Stop Dam New 22°50'13.1

24" 078°15'06.07

0" 40.00

34000.00 13.26 second year MGNRE

GA

99 Sohagpur Utiyashankar Aata shree Stop Dam New 22°50'22.4

97" 078°15'22.22

20" 32.00

28000.00 10.92 third year MGNRE

GA 100

Sohagpur Utiyashankar Aata shree Recharge Pit New 22°49'53.9

60" 078°15'03.30

23" 0.05 0.00 0.00 First Year MGNREGA

101

Sohagpur Ranighon Ranighon Stop Dam New 22°49'05.9

49" 078°09'30.20

5" 38.00

30000.00 11.70 second year MGNRE

GA 102

Sohagpur Ranighon Ranighon Pond

Construction New 22°48'37.320"

078°10'33.098" 11.0

0 14000.

00 5.46 First Year MGNREGA

103

Sohagpur Ranighon Ranighon Recharge Pit New 22°48'35.7

54" 078°10'18.84

6" 0.05 0.00 0.00 Second Year MGNREGA

104

Sohagpur Ranighon Ranighon Recharge Pit New 22°48'44.8

68" 078°10'13.71

0" 0.05 0.00 0.00 Second Year MGNREGA

105

Sohagpur Ranighon Ranighon Recharge Pit New 22°48'50.2

62" 078°10'19.28

4" 0.05 0.00 0.00 Second Year MGNREGA

106

Sohagpur Ranighon Ranighon Recharge Pit New 22°48'34.9

86" 078°10'18.88

8" 0.05 0.00 0.00 Second Year MGNREGA

107

Sohagpur Ranighon Sukakhedi Well

Deepening Renovation 22°47'42.204"

078°10'34.746" 0.94 0.00 0.00 third year MGNRE

GA 108

Sohagpur Ranighon Sukakhedi Recharge Pit New 22°47'32.4

78" 078°10'32.95

2" 0.05 0.00 0.00 First Year MGNREGA

109

Sohagpur Ranighon Sukakhedi Recharge Pit New 22°47'52.0

14" 078°10'11.86

2" 0.05 0.00 0.00 First Year MGNREGA

110

Sohagpur Ranighon Sukakhedi Recharge Pit New 22°47'37.6

20" 078°10'16.67

4" 0.05 0.00 0.00 First Year MGNREGA

111

Sohagpur Ranighon Gorigon Well

Deepening Renovation 22°49'27.288"

078°10'23.832" 0.85 0.00 0.00 third year MGNRE

GA

Page 290: HBAD DIP FINAL ab - pmksy.gov.in

290

112

Sohagpur Ranighon Gorigon Recharge Pit New 22°49'27.5

58" 078°10'24.29

4" 0.05 0.00 0.00 Fourth Year MGNREGA

113

Sohagpur Ranighon Gorigon Recharge Pit New 22°49'26.7

30" 078°10'21.70

2" 0.05 0.00 0.00 Fourth Year MGNREGA

114

Sohagpur Ranighon Gorigon Recharge Pit New 22°49'28.9

32" 078°10'24.51

0" 0.05 0.00 0.00 Fourth Year MGNREGA

115

Sohagpur Ranighon Gorigon Recharge Pit New 22°49'26.8

02" 078°10'19.09

2" 0.05 0.00 0.00 Fourth Year MGNREGA

116

Sohagpur Galcha Galcha Pond

Construction New 22°51'48.609"

078°14'11.248" 12.0

0 18000.

00 7.02 second year MGNREGA

117

Sohagpur Galcha Galcha Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 118

Sohagpur Galcha Galcha Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 119

Sohagpur Galcha Galcha Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 120

Sohagpur Galcha Galcha Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 121

Sohagpur Tighra Tighra Pond

Construction New 22°50'39.134"

078°16'24.540" 12.0

0 17000.

00 6.63 First Year MGNREGA

122

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 123

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 124

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 125

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 126

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 127

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 128

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 129

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 130

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 131

Sohagpur Tighra Tighra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 132

Sohagpur Tighra Tighra Stop Dam New 22°50'36.1

68" 078°16'56.48

3" 26.00

18000.00 7.02 third year MGNRE

GA 133

Sohagpur Tighra Tighra Well

Deepening Renovation 22°50'27.468"

078°16'50.138" 1.00 0.00 0.00 second year MGNRE

GA 134

Sohagpur Tighra Tighra Well

Deepening Renovation 22°50'38.262"

078°16'30.390" 1.00 0.00 0.00 second year MGNRE

GA

Page 291: HBAD DIP FINAL ab - pmksy.gov.in

291

135

Sohagpur Thekri Thekri Stop Dam New 22°48'14.0

41" 078°11'07.18

1" 26.00

18000.00 7.02 Fourth Year MGNRE

GA 136

Sohagpur Thekri Thekri Stop Dam New 22°48'39.0

93" 078°11'25.25

3" 28.00

12000.00 4.68 second year MGNRE

GA 137

Sohagpur Thekri Thekri Stop Dam New 22°48'27.4

57" 078°11'02.89

0" 26.00

19000.00 7.41 third year MGNRE

GA 138

Sohagpur Thekri Thekri Stop Dam New 22°51'19.9

93" 078°10'00.46

8" 32.00

12000.00 4.68 Fifth Year MGNRE

GA 139

Sohagpur Thekri Thekri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 140

Sohagpur Thekri Thekri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 141

Sohagpur Thekri Thekri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 142

Sohagpur Nagtra Nagtra Stop Dam New 22°43'49.5

09" 078°10'48.49

5" 28.00

24000.00 9.36 second year MGNRE

GA 143

Sohagpur Nagtra Nagtra Stop Dam New 22°43'52.4

00" 078°10'47.75

4" 25.00

21000.00 8.19 third year MGNRE

GA 144

Sohagpur Nagtra Nagtra Stop Dam New 22°43'53.7

89" 078°10'47.23

2" 27.00

22000.00 8.58 Fourth Year MGNRE

GA 145

Sohagpur Nagtra Nagtra Pond

Deepening Renovation 22°44'49.900"

078°10'54..600" 5.00 24000.

00 9.36 Fourth Year MGNREGA

146

Sohagpur Nagtra Nagtra Pond

Deepening Renovation 22°43'56.909"

078°10'49.574" 5.00 24000.

00 9.36 Fifth Year MGNREGA

147

Sohagpur Nagtra Nagtra Pond

Construction New 22°43'53.509"

078°10'48.001" 12.0

0 34000.

00 13.26 First Year MGNREGA

148

Sohagpur Nagtra Nagtra Stop Dam New 22°43'49.3

17" 078°11'00.33

3" 25.00

21000.00 8.19 second year MGNRE

GA 149

Sohagpur Nagtra Nagtra Well

Deepening Renovation 22°43'98.789"

078°10'97.242" 0.85 0.00 0.00 Fifth Year MGNRE

GA 150

Sohagpur Nagtra Nagtra Well

Deepening Renovation 22°43'50.649"

078°11'03.876" 0.93 0.00 0.00 Fifth Year MGNRE

GA 151

Sohagpur Nagtra Nagtra Recharge Pit New 22°43'56.8

29" 078°10'58.65

8" 0.05 0.00 0.00 First Year MGNREGA

152

Sohagpur Nagtra Nagtra Recharge Pit New 22°43'52.4

39" 078°10'47.75

9" 0.05 0.00 0.00 First Year MGNREGA

153

Sohagpur Nagtra Nagtra Recharge Pit New 22°44'18.9

66" 078°10'50.03

7" 0.05 0.00 0.00 First Year MGNREGA

154

Sohagpur Akola Akola Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 155

Sohagpur Akola Akola Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 156

Sohagpur Akola Akola Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 157

Sohagpur Akola Barwani Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

Page 292: HBAD DIP FINAL ab - pmksy.gov.in

292

158

Sohagpur Akola Barwani Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 159

Sohagpur Akola Barwani Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 160

Sohagpur Akola Barwani Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 161

Sohagpur Akola Barwani Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 162

Sohagpur Akola Barwani Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 163

Sohagpur Nimanmuda Gopalpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 164

Sohagpur Nimanmuda Gopalpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 165

Sohagpur Nimanmuda Gopalpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 166

Sohagpur Nimanmuda Gopalpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 167

Sohagpur Nimanmuda Gopalpur Stop Dam New 28.0

0 18000.

00 7.02 second year MGNREGA

168

Sohagpur Nimanmuda Gopalpur Well

Deepening Renovation 1.20 0.00 0.00 First Year MGNREGA

169

Sohagpur Nimanmuda Gopalpur Stop Dam New 26.0

0 17200.

00 6.71 third year MGNREGA

170

Sohagpur Nimanmuda Markadhana Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 171

Sohagpur Nimanmuda Markadhana Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 172

Sohagpur Nimanmuda Markadhana Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 173

Sohagpur Nimanmuda Markadhana Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 174

Sohagpur Nimanmuda Markadhana Well

Deepening Renovation 0.95 0.00 0.00 First Year MGNREGA

175

Sohagpur Nimanmuda Sukri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 176

Sohagpur Nimanmuda Sukri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 177

Sohagpur Nimanmuda Nimanmuda Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 178

Sohagpur Nimanmuda Nimanmuda Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 179

Sohagpur Nimanmuda Nimanmuda Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 180

Sohagpur Nimanmuda Nimanmuda Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

Page 293: HBAD DIP FINAL ab - pmksy.gov.in

293

181

Sohagpur Nimanmuda Nimanmuda Well

Deepening Renovation 22°45'08.219"

078°13'44.799" 0.82 35.00 0.00 First Year MGNRE

GA 182

Sohagpur Nimanmuda Nimanmuda Stop Dam New 28.0

0 18500.

00 7.22 second year MGNREGA

183

Sohagpur Macha Macha Well

Deepening Renovation 0.95 0.00 0.00 First Year MGNREGA

184

Sohagpur Macha Macha Well

Deepening Renovation 0.99 0.00 0.00 First Year MGNREGA

185

Sohagpur Macha Macha Well

Deepening Renovation 0.74 0.00 0.00 First Year MGNREGA

186

Sohagpur Macha Macha Well

Deepening Renovation 0.65 0.00 0.00 First Year MGNREGA

187

Sohagpur Macha Macha Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 188

Sohagpur Macha Macha Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 189

Sohagpur Macha Macha Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 190

Sohagpur Macha Macha Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 191

Sohagpur Mahuakheda Sodhar Stop Dam New 22°48'40.3

72" 078°15'26.12

0" 26.00

17600.00 6.86 Fifth Year MGNRE

GA 192

Sohagpur Mahuakheda Mahuakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 193

Sohagpur Mahuakheda Mahuakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 194

Sohagpur Mahuakheda Mahuakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 195

Sohagpur Mahuakheda Mahuakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 196

Sohagpur Mahuakheda Mahuakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 197

Sohagpur Mahuakheda Mahuakheda Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 198

Sohagpur Mahuakheda Mahuakheda Well

Deepening Renovation 22°48'57.916"

078°14'35.693" 1.00 0.00 0.00 second year MGNRE

GA 199

Sohagpur Mahuakheda Mahuakheda Well

Deepening Renovation 22°49'01.740"

078°14'35.056" 1.00 0.00 0.00 second year MGNRE

GA 200

Sohagpur Mahuakheda Sodhar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 201

Sohagpur Mahuakheda Sodhar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 202

Sohagpur Bhatgon Bhatgon Pond

Deepening Renovation 22°52'33.417"

078°13'01.698" 3.50 24000.

00 9.36 second year MGNREGA

203

Sohagpur Bhatgoan Bhatgoan Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

Page 294: HBAD DIP FINAL ab - pmksy.gov.in

294

204

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 205

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 206

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 207

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 208

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 209

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 210

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 211

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 212

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 213

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 214

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 215

Sohagpur Bhatgoan Madanpur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 216

Sohagpur

Rewabankhedi

Rewabankhedi Stop Dam New 22°49'59.1

58" 078°08'35.42

4" 32.00

22000.00 8.58 Fifth Year MGNRE

GA 217

Sohagpur

Rewabankhedi

Rewabankhedi Stop Dam New 22°50'55.1

88" 078°08'54.97

9" 15.00

17600.00 6.86 second year MGNRE

GA 218

Sohagpur

Rewabankhedi

Rewabankhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 219

Sohagpur

Rewabankhedi

Rewabankhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 220

Sohagpur

Rewabankhedi

Rewabankhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 221

Sohagpur

Rewabankhedi

Rewabankhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 222

Sohagpur

Rewabankhedi Rewamuhari Stop Dam New 22°51'45.5

35" 078°10'08.56

0" 18.00

18200.00 7.10 third year MGNRE

GA 223

Sohagpur

Rewabankhedi Rewamuhari Stop Dam New 22°51'55.7

64" 078°10'27.23

7" 22.00

22000.00 8.58 Fourth Year MGNRE

GA 224

Sohagpur

Rewabankhedi Rewamuhari Pond

Deepening Renovation 22°51'19.887"

078°10'00.320" 5.00 14000.

00 5.46 Fourth Year MGNREGA

225

Sohagpur

Rewabankhedi Rewamuhari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 226

Sohagpur

Rewabankhedi Rewamuhari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

Page 295: HBAD DIP FINAL ab - pmksy.gov.in

295

227

Sohagpur

Rewabankhedi Rewamuhari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 228

Sohagpur

Rewabankhedi Rewamuhari Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 229

Sohagpur

Rewabankhedi Rewamuhari Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 230

Sohagpur Bhanpur Bhanpur Well

Deepening Renovation 22°51'45.464"

078°14'52.496" 1.00 0.00 0.00 First Year MGNRE

GA 231

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'36.4

83" 078°14'54.83

6" 0.05 0.00 0.00 First Year MGNREGA

232

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'22.5

72" 078°15'03.54

8" 0.05 0.00 0.00 First Year MGNREGA

233

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'23.1

41" 078°15'03.13

1" 0.05 0.00 0.00 First Year MGNREGA

234

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'22.8

32" 078°15'00.22

0" 0.05 0.00 0.00 First Year MGNREGA

235

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'41.5

09" 078°14'52.00

7" 0.05 0.00 0.00 First Year MGNREGA

236

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'44.8

53" 078°14'52.17

2" 0.05 0.00 0.00 First Year MGNREGA

237

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'43.4

52" 078°14'49.94

8" 0.05 0.00 0.00 Second Year MGNREGA

238

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'43.7

82" 078°14'56.12

7" 0.05 0.00 0.00 Second Year MGNREGA

239

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'46.7

69" 078°14'57.91

3" 0.05 0.00 0.00 Second Year MGNREGA

240

Sohagpur Bhanpur Bhanpur Recharge Pit New 22°51'47.4

83" 078°14'50.30

5" 0.05 0.00 0.00 Second Year MGNREGA

241

Sohagpur Kohani Kohani Pond

Construction New 22°46'20.578"

078°13'39.498" 44 8.00 13500.

00 5.27 second year MGNREGA

242

Sohagpur Kohani Kohani Recharge Pit New 44 0.05 0.00 0.00 First Year MGNRE

GA 243

Sohagpur Kohani Kohani Recharge Pit New 44 0.05 0.00 0.00 First Year MGNRE

GA 244

Sohagpur Kohani Barbatpur Well

Deepening Renovation 22°46'54.972"

078°13'29.061" 44 1.00 0.00 0.00 second year MGNRE

GA 245

Sohagpur Kohani Barbatpur Well

Deepening Renovation 22°45'53.871"

078°13'41.760" 44 1.00 0.00 0.00 second year MGNRE

GA 246

Sohagpur

Mudiyakheda

Mudiyakheda Stop Dam New 28.0

0 22000.

00 8.58 second year MGNREGA

247

Sohagpur

Mudiyakheda

Mudiyakheda

Well Deepening Renovation 0.98 0.00 0.00 third year MGNRE

GA 248

Sohagpur

Mudiyakheda

Mudiyakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 249

Sohagpur

Mudiyakheda

Mudiyakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

Page 296: HBAD DIP FINAL ab - pmksy.gov.in

296

250

Sohagpur

Mudiyakheda

Mudiyakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 251

Sohagpur

Mudiyakheda

Mudiyakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 252

Sohagpur

Mudiyakheda

Mudiyakheda Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 253

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 254

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 255

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 256

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 257

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 258

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 259

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 260

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 261

Sohagpur

Mudiyakheda

Dhapada kala Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 262

Sohagpur

Mudiyakheda

Dhapada khurd Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 263

Sohagpur

Mudiyakheda

Dhapada khurd Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 264

Sohagpur

Mudiyakheda

Dhapada khurd Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 265

Sohagpur Bhiladiya Bhiladiya Well

Deepening Renovation 22°48'05.147"

078°12'05.290" 1.00 0.00 0.00 third year MGNRE

GA 266

Sohagpur Bhiladiya Bhiladiya Well

Deepening Renovation 22°48'05.126"

078°12'11.113" 1.00 0.00 0.00 third year MGNRE

GA 267

Sohagpur Bhiladiya Bhiladiya Well

Deepening Renovation 22°48'02.785"

078°11'54.276" 1.00 0.00 0.00 third year MGNRE

GA 268

Sohagpur Bhiladiya Bhiladiya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 269

Sohagpur Bhiladiya Bhiladiya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 270

Sohagpur Bhiladiya Bhiladiya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 271

Sohagpur Bhiladiya Bhiladiya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

Page 297: HBAD DIP FINAL ab - pmksy.gov.in

297

272

Sohagpur Bhiladiya Bhiladiya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 273

Sohagpur Bhiladiya Bhiladiya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 274

Sohagpur Bhiladiya Sodhra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 275

Sohagpur Bhiladiya Sodhra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 276

Sohagpur Bhiladiya Sodhra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 277

Sohagpur Bhiladiya Sodhra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 278

Sohagpur Bhiladiya Bhiladiya Stop Dam New 22°48'02.6

68" 078°11'39.99

4" 22.00

22000.00 8.58 Fourth Year MGNRE

GA 279

Sohagpur Bhiladiya Sodhra Pond

Deepening Renovation 22°48'55.808"

078°12'13.667" 8.00 21000.

00 8.19 second year MGNREGA

280

Sohagpur Kajalkhedi Ranmotha Stop Dam New 22°49'12.6

92" 078°15'32.35

5" 25.00

31000.00 12.09 third year MGNRE

GA 281

Sohagpur Kajalkhedi Kajalkhedi Stop Dam New 22°48'52.9

65" 078°15'39.33

1" 28.00

21500.00 8.39 Fifth Year MGNRE

GA 282

Sohagpur Kajalkhedi Kajalkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 283

Sohagpur Kajalkhedi Kajalkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 284

Sohagpur Kajalkhedi Kajalkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 285

Sohagpur Kajalkhedi Kajalkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 286

Sohagpur Kajalkhedi Kajalkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 287

Sohagpur Kajalkhedi Kajalkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 288

Sohagpur Kajalkhedi Ranmotha Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 289

Sohagpur Ajera Ajera Pond

Deepening New 22°51'05.508"

078°15'42.215" 5.00 12000.

00 4.68 Fourth Year MGNREGA

290

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 291

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 292

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 293

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 294

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

Page 298: HBAD DIP FINAL ab - pmksy.gov.in

298

295

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 296

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 297

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 298

Sohagpur Ajera Ajera Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 299

Sohagpur Gurari Gurari Well

Deepening Renovation 22°47'33.177"

078°14'21.108" 1.00 0.00 0.00 First Year MGNRE

GA 300

Sohagpur Gurari Parsai

Pipariya Well

Deepening Renovation 22°47'21.761"

078°13'06.209" 1.00 0.00 0.00 First Year MGNRE

GA 301

Sohagpur Gurari Gurari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 302

Sohagpur Gurari Gurari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 303

Sohagpur Gurari Gurari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 304

Sohagpur Gurari Gurari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 305

Sohagpur Gurari Gurari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 306

Sohagpur Gurari Gurari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 307

Sohagpur Gurari Gurari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 308

Sohagpur Gurari Parsai

Pipariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNREGA

309

Sohagpur Gurari Parsai

Pipariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNREGA

310

Sohagpur Gurari Parsai

Pipariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNREGA

311

Sohagpur Gurari Parsai

Pipariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNREGA

312

Sohagpur Gurari Parsai

Pipariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNREGA

313

Sohagpur Gurari Parsai

Pipariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNREGA

314

Sohagpur Gurari Parsai

Pipariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNREGA

315

Sohagpur Eesharpur Eesharpur Well

Deepening Renovation 22°81'02.443"

078°13'59.480" 1.00 0.00 0.00 First Year MGNRE

GA 31 Sohagp Eesharpur Eesharpur Stop Dam New 22°80'40.1 078°13'85.08 25.0 31000. 12.09 third year MGNRE

Page 299: HBAD DIP FINAL ab - pmksy.gov.in

299

6 ur 30" 0" 0 00 GA

317

Sohagpur Eesharpur Eesharpur Stop Dam New 22°80'26.1

50" 078°14'01.85

0" 28.00

21500.00 8.39 Fourth Year MGNRE

GA 318

Sohagpur Eesharpur Eesharpur Stop Dam New 22°80'00.0

03" 078°14'74.20

0" 30.00

22000.00 8.58 Fifth Year MGNRE

GA 319

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 320

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 321

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 322

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 323

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 324

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 325

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 326

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 327

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 328

Sohagpur Eesharpur Eesharpur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 329

Sohagpur Malni Malni Stop Dam New 26.0

0 22000.

00 8.58 Fourth Year MGNREGA

330

Sohagpur Malni Malni Pond

Construction New 15.00

15000.00 5.85 Fourth Year MGNRE

GA 331

Sohagpur Malni Malni Pond

Construction New 14.00

12000.00 4.68 Fifth Year MGNRE

GA 332

Sohagpur Malni Malni Pond

Deepening Renovation 5.00 21000.00 8.19 First Year MGNRE

GA 333

Sohagpur Malni Malni Pond

Deepening Renovation 5.00 15000.00 5.85 second year MGNRE

GA 334

Sohagpur Malni Mana Stop Dam New 26.0

0 21500.

00 8.39 third year MGNREGA

335

Sohagpur Malni Mana Stop Dam New 24.0

0 21000.

00 8.19 Fifth Year MGNREGA

336

Sohagpur Malni Mana Pond

Construction New 15.00

18000.00 7.02 Fourth Year MGNRE

GA 337

Sohagpur Malni Mana Pond

Construction New 14.00

16000.00 6.24 Fifth Year MGNRE

GA 338

Sohagpur Malni Mana Pond

Deepening Renovation 5.00 21000.00 8.19 First Year MGNRE

GA

Page 300: HBAD DIP FINAL ab - pmksy.gov.in

300

339

Sohagpur Malni Mana Pond

Deepening Renovation 8.00 15000.00 5.85 second year MGNRE

GA 340

Sohagpur Podar Sankai Pond

Construction New 14.00

12000.00 4.68 First Year MGNRE

GA 341

Sohagpur Podar Sankai Pond

Construction New 13.20

16000.00 6.24 second year MGNRE

GA 342

Sohagpur Podar Sankai Pond

Construction New 14.30

15200.00 5.93 third year MGNRE

GA 343

Sohagpur Suplai Suplai Pond

Construction New 11.50

14200.00 5.54 second year MGNRE

GA 344

Sohagpur Suplai Suplai Pond

Construction New 14.00

15000.00 5.85 Fourth Year MGNRE

GA 345

Sohagpur Suplai Khamda Pond

Construction New 12.00

16500.00 6.44 third year MGNRE

GA 346

Sohagpur Suplai Mallupura Pond

Construction New 13.00

12500.00 4.88 Fifth Year MGNRE

GA 347

Sohagpur Suplai Jhalai Pond

Construction New 12.00

14600.00 5.69 Fifth Year MGNRE

GA 348

Sohagpur Suplai Suplai Pond

Deepening Renovation 5.00 15000.00 5.85 second year MGNRE

GA 349

Sohagpur chargaon chargaon Pond

Deepening Renovation 22°40'29.935"

078°15'40.457" 3.00 21000.

00 8.19 First Year MGNREGA

350

Sohagpur chargaon jijwada Pond

Deepening Renovation 22°40'351" 078°13'58.889" 3.50 24000.

00 9.36 First Year MGNREGA

351

Sohagpur chargaon bhajiyadhhan

a Stop Dam New 22°40'26.763"

078°14'25.007" 30.0

0 4500.0

0 1.76 second year MGNREGA

352

Sohagpur chargaon bhajiyadhhan

a Stop Dam New 22°40'25.795"

078°15'51.788" 25.0

0 4500.0

0 1.76 second year MGNREGA

353

Sohagpur chargaon chargaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 354

Sohagpur chargaon chargaon Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 355

Sohagpur chargaon chargaon Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 356

Sohagpur chargaon jijwada Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 357

Sohagpur chargaon jijwada Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 358

Sohagpur chargaon jijwada Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 359

Sohagpur chargaon jijwada Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 360

Sohagpur Ranipipaiya jhhirmata Pond

Deepening Renovation 22°76'20.96"

078°28'89.683" 124 3.00 21000.

00 8.19 Fourth Year MGNREGA

361

Sohagpur Ranipipaiya jhhirmata Stop Dam New 22°75'89.0

83" 078°29'12.76

67" 112 40.00

42000.00 16.38 First Year MGNRE

GA

Page 301: HBAD DIP FINAL ab - pmksy.gov.in

301

362

Sohagpur Ranipipaiya jhhirmata Stop Dam New 22°76'12.1

28" 078°29'47.06

6" 112 40.00

42500.00 16.58 First Year MGNRE

GA 363

Sohagpur Ranipipaiya Ranipipariya Recharge Pit New 22°77'07.0

2" 078°30'57.57

" 0.05 0.00 0.00 Fourth Year MGNREGA

364

Sohagpur Ranipipaiya chargaon Recharge Pit New 22°76'92.1

0" 078°30'31.22

" 0.05 0.00 0.00 Second Year MGNREGA

365

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°77'07.0

2" 078°30'36.57

" 0.05 0.00 0.00 Second Year MGNREGA

366

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°76'92.4

2" 078°30'31.22

" 0.05 0.00 0.00 Third Year MGNREGA

367

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°77'16.4

7" 078°30'63.35

" 0.05 0.00 0.00 Third Year MGNREGA

368

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°77'24.5

0" 078°30'43.65

" 0.05 0.00 0.00 Fourth Year MGNREGA

369

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°77'10.5

2" 078°30'86.53

" 0.05 0.00 0.00 Fourth Year MGNREGA

370

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°76'92.5

7" 078°30'40.75

" 0.05 0.00 0.00 Fourth Year MGNREGA

371

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°77'16.4

7" 078°30'47.77

" 0.05 0.00 0.00 Fifth Year MGNREGA

372

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 22°77'13.6

5" 078°30'49.82

" 0.05 0.00 0.00 Fifth Year MGNREGA

373

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 374

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 375

Sohagpur Ranipipaiya ranipipaiya Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 376

Sohagpur Kishanpur Kishanpur Pond

Deepening Renovation 22°46'53.070"

078°10'33.774" 3.50 24000.

00 9.36 Fourth Year MGNREGA

377

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°47'00.0

00" 078°10'48.79

8" 0.05 0.00 0.00 Fifth Year MGNREGA

378

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°46'59.4

35" 078°10'43.99

1" 0.05 0.00 0.00 Third Year MGNREGA

379

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°47'00.4

31" 078°10'39.89

9" 0.05 0.00 0.00 Fourth Year MGNREGA

380

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°47'00.0

00" 078°10'35.61

4" 0.05 0.00 0.00 Third Year MGNREGA

381

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°47'00.0

94" 078°10'41.02

5" 0.05 0.00 0.00 Fourth Year MGNREGA

382

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°46'57.7

12" 078°10'34.90

0" 0.05 0.00 0.00 Fourth Year MGNREGA

383

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°46'58.3

36" 078°10'33.14

2" 0.05 0.00 0.00 First Year MGNREGA

384

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°47'14.4

93" 078°10'31.54

9" 0.05 0.00 0.00 First Year MGNREGA

Page 302: HBAD DIP FINAL ab - pmksy.gov.in

302

385

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°47'11.8

91" 078°10'32.37

3" 0.05 0.00 0.00 First Year MGNREGA

386

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°46'53.0

84" 078°10'33.44

4" 0.05 0.00 0.00 First Year MGNREGA

387

Sohagpur Kishanpur Kishanpur Recharge Pit New 22°46'53.0

96" 078°10'33.45

8" 0.05 0.00 0.00 Fourth Year MGNREGA

388

Sohagpur Kishanpur Kishanpur Stop Dam New 40.0

0 5600.0

0 2.18 Fourth Year MGNREGA

389

Sohagpur Barangi Barangi Stop Dam New 22°42'53.8

49" 078°09'00.28

0" 40.00

42000.00 16.38 First Year MGNRE

GA 390

Sohagpur Barangi Barangi Recharge Pit New 22°42'49.1

87" 078°07'40.08

0" 0.05 0.00 0.00 First Year MGNREGA

391

Sohagpur Barangi Barangi Recharge Pit New 22°42'46.6

33" 078°07'16.07

5" 0.05 0.00 0.00 First Year MGNREGA

392

Sohagpur Barangi Barangi Recharge Pit New 22°42'42.3

00" 078°07'10.82

9" 0.05 0.00 0.00 First Year MGNREGA

393

Sohagpur Barangi Barangi Recharge Pit New 22°42'40.7

07" 078°07'07.83

6" 0.05 0.00 0.00 First Year MGNREGA

394

Sohagpur Barangi Barangi Recharge Pit New 22°42'34.5

20" 078°07'16.70

7" 0.05 0.00 0.00 Fourth Year MGNREGA

395

Sohagpur Barangi Barangi Recharge Pit New 22°42'31.9

73" 078°07'41.81

0" 0.05 0.00 0.00 Third Year MGNREGA

396

Sohagpur Barangi Barangi Recharge Pit New 22°42'59.1

57" 078°08'46.54

7" 0.05 0.00 0.00 Fourth Year MGNREGA

397

Sohagpur Barangi Barangi Recharge Pit New 22°43'03.5

86" 078°08'49.23

9" 0.05 0.00 0.00 Fourth Year MGNREGA

398

Sohagpur Barangi Barangi Recharge Pit New 22°43'03.2

3" 078°08'49.23

9" 0.05 0.00 0.00 Fourth Year MGNREGA

399

Sohagpur Gujarkhedi Gujarkhedi Recharge Pit New 22°75'03.5

8" 078°17'19.52

" 0.05 0.00 0.00 Third Year MGNREGA

400

Sohagpur Gujarkhedi Gujarkhedi Recharge Pit New 22°75'11.2

8" 078°17'00.77

" 0.05 0.00 0.00 Third Year MGNREGA

401

Sohagpur Gujarkhedi Gujarkhedi Recharge Pit New 22°75'36.6

8" 078°17'43.52

" 0.05 0.00 0.00 Second Year MGNREGA

402

Sohagpur Gujarkhedi Gujarkhedi Recharge Pit New 22°75'20.3

0" 078°17'00.89

5" 0.05 0.00 0.00 Second Year MGNREGA

403

Sohagpur Gujarkhedi Gujarkhedi Recharge Pit New 22°75'27.7

0" 078°17'13.83

" 0.05 0.00 0.00 Second Year MGNREGA

404

Sohagpur Gujarkhedi Gujarkhedi Recharge Pit New 22°75'21.9

0" 078°17'23.52

" 0.05 0.00 0.00 First Year MGNREGA

405

Sohagpur Gujarkhedi Gujarkhedi Recharge Pit New 22°75'36.4

3" 078°17'46.07

" 0.05 0.00 0.00 Third Year MGNREGA

406

Sohagpur Gujarkhedi Gujarkhedi Well

Deepening Renovation 22°74'98.03"

078°16'97.92" 0.05 0.00 0.00 First Year MGNRE

GA 407

Sohagpur Gujarkhedi Gujarkhedi Well

Deepening Renovation 22°75'22.53"

078°17'12.80" 0.05 0.00 0.00 First Year MGNRE

GA

Page 303: HBAD DIP FINAL ab - pmksy.gov.in

303

408

Sohagpur Bhokhedi Bhokhedi Stop Dam New 22°46'37.9

71" 078°11'44.49

8" 30.00

4500.00 1.76 First Year MGNRE

GA 409

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 410

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 411

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 412

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 413

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 414

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 415

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 416

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 417

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 418

Sohagpur Bhokhedi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 419

Sohagpur Gundrai Gundrai Stop Dam New 22°42'44.2

23" 078°14'30.77

6" 28.0

0 26000.

00 10.14 Fifth Year MGNREGA

420

Sohagpur Gundrai Samnapur Pond

Deepening Renevation 22°41'11.711"

078°13'02.968" 4.00 12000.

00 4.68 third year MGNREGA

421

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 422

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 423

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 424

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 425

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 426

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 427

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 428

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 429

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 430

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

Page 304: HBAD DIP FINAL ab - pmksy.gov.in

304

431

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 432

Sohagpur Gundrai Gundrai Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 433

Sohagpur Nayagaon Dundadeh Pond

Deepening Renevation 22°38'56.421"

078°11'00.883" 2.50 10000.

00 3.90 Fourth Year MGNREGA

434

Sohagpur Nayagaon Dundadeh Well

Deepening Renovation 1.00 40.00 0.02 Fourth Year MGNREGA

435

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 436

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 437

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 438

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 439

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 440

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 441

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 442

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 443

Sohagpur Nayagaon Nayagaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 444

Sohagpur Nayagaon Dundadeh Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 445

Sohagpur Nayagaon Dundadeh Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 446

Sohagpur Nayagaon Dundadeh Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 447

Sohagpur Nayagaon Kookra Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 448

Sohagpur Nayagaon Kookra Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 449

Sohagpur Nayagaon Kookra Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 450

Sohagpur Nayagaon Kookra Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 451

Sohagpur Dhikwada Dhikwada Recharge Pit New 22°48'09.5

55" 078°16'32.56

0" 0.05 0.00 0.00 Second Year MGNREGA

452

Sohagpur Dhikwada Dhikwada Recharge Pit New 22°48'12.0

48" 078°16'46.32

0" 0.05 0.00 0.00 Second Year MGNREGA

453

Sohagpur Dhikwada Dhikwada Recharge Pit New 22°48'05.9

92" 078°16'31.00

7" 0.05 0.00 0.00 Second Year MGNREGA

Page 305: HBAD DIP FINAL ab - pmksy.gov.in

305

454

Sohagpur Dhikwada Dhikwada Recharge Pit New 22°48'06.5

14" 078°16'38.24

5" 0.05 0.00 0.00 Second Year MGNREGA

455

Sohagpur Dhikwada Dhikwada Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 456

Sohagpur Dhikwada Dhikwada Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 457

Sohagpur Dhikwada Dhikwada Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 458

Sohagpur Dhikwada Bareli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 459

Sohagpur Dhikwada Bareli Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 460

Sohagpur Dhikwada Bareli Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 461

Sohagpur Dhikwada Bareli Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 462

Sohagpur Dhikwada Bareli Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 463

Sohagpur Dhikwada Bareli Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 464

Sohagpur Dhikwada Bareli Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 465

Sohagpur Dhikwada Bareli Pond

Deepening Renevation 22°48'15.735"

078°16'45.194" 4.00 12000.

00 4.68 First Year MGNREGA

466

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 467

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 468

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 469

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 470

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 471

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 472

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 473

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 474

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 475

Sohagpur Barua Barua Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 476

Sohagpur Barua Barua Pond

Deepening Renevation 22°41'55.423"

078°16'36.899" 4.00 0.00 0.00 second year MGNRE

GA

Page 306: HBAD DIP FINAL ab - pmksy.gov.in

306

477

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 478

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 479

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 480

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 481

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 482

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 483

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 484

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 485

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 486

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 487

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 488

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 489

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 490

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 491

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 492

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 493

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 494

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 495

Sohagpur Nawalgaon Nawalgaon Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 496

Sohagpur Nawalgaon Nawalgaon Stop dam New

35.00 0.00 0.00 second year MGNRE

GA 497

Sohagpur Nawalgaon Bandichhod Pond

Deepening Renevation 5.00 0.00 0.00 Fifth Year MGNREGA

498

Sobhapur Sobhapur Sobhapur Pond

Deepening Renevation 22°46'16.630"

078°16'03.721" 5.00 0.00 0.00 Fifth Year MGNRE

GA 499

Sohagpur Sobhapur Sobhapur Well

Deepening Renovation 22°46'24.940"

078°15'48.209" 1.00 0.00 0.00 First Year MGNRE

GA

Page 307: HBAD DIP FINAL ab - pmksy.gov.in

307

500

Sohagpur Sobhapur Sobhapur Well

Deepening Renovation 22°46'22.562"

078°16'07.669" 1.00 0.00 0.00 First Year MGNRE

GA 501

Sohagpur Sobhapur Sobhapur Well

Deepening Renovation 22°46'36.398"

078°15'48.477" 1.00 0.00 0.00 First Year MGNRE

GA 502

Sohagpur Sobhapur Sobhapur Well

Deepening Renovation 22°46'35.974"

078°15'50.208" 1.00 0.00 0.00 First Year MGNRE

GA 503

Sohagpur Sobhapur Sobhapur Well

Deepening Renovation 22°46'31.200"

078°115'7.211" 1.00 0.00 0.00 First Year MGNRE

GA 504

Sohagpur Sobhapur Sobhapur Well

Deepening Renovation 22°46'27.630"

078°16'08.390" 1.00 0.00 0.00 First Year MGNRE

GA 505

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°46'28.4

47" 078°16'09.04

9" 0.05 0.00 0.00 First Year MGNREGA

506

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°48'17.4

02" 078°16'13.99

3" 0.05 0.00 0.00 First Year MGNREGA

507

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°46'14.1

65" 078°15'47.76

3" 0.05 0.00 0.00 Second Year MGNREGA

508

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°46'16.6

85" 078°15'43.06

6" 0.05 0.00 0.00 Second Year MGNREGA

509

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°46'21.3

88" 078°16'03.58

3" 0.05 0.00 0.00 Second Year MGNREGA

510

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°46'34.6

61" 078°15'49.76

8" 0.05 0.00 0.00 Second Year MGNREGA

511

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°46'22.3

56" 078°15'48.99

9" 0.05 0.00 0.00 First Year MGNREGA

512

Sohagpur Sobhapur Sobhapur Recharge Pit New 22°46'30.9

94" 078°15'51.69

1" 0.05 0.00 0.00 First Year MGNREGA

513

Sohagpur Sobhapur Sobhapur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 514

Sohagpur Sobhapur Sobhapur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 515

Sohagpur Sobhapur Sobhapur Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 516

Sohagpur Sobhapur Sobhapur Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 517

Sohagpur Niwari Niwari stop Dam New

20.00 0.00 0.00 third year MGNRE

GA 518

Sohagpur Niwari Bhatti Recharge Pit New 22°44'36.8

39" 078°17'06.59

0" 0.05 0.00 0.00 First Year MGNREGA

519

Sohagpur Niwari Bhatti Recharge Pit New 22°44'33.2

14" 078°17'08.43

0" 0.05 0.00 0.00 First Year MGNREGA

520

Sohagpur Niwari Bhatti Recharge Pit New 22°44'29.9

87" 078°17'09.91

3" 0.05 0.00 0.00 First Year MGNREGA

521

Sohagpur Niwari Bhatti Recharge Pit New 22°44'37.7

53" 078°17'16.58

8" 0.05 0.00 0.00 First Year MGNREGA

522

Sohagpur Niwari Bhatti Recharge Pit New 22°44'33.8

59" 078°17'14.85

7" 0.05 0.00 0.00 First Year MGNREGA

Page 308: HBAD DIP FINAL ab - pmksy.gov.in

308

523

Sohagpur Niwari Bhatti Recharge Pit New 22°44'34.7

59" 078°17'14.96

7" 0.05 0.00 0.00 Second Year MGNREGA

524

Sohagpur Niwari Bhatti Recharge Pit New 22°44'29.5

34" 078°17'23.04

2" 0.05 0.00 0.00 Second Year MGNREGA

525

Sohagpur Niwari Bhatti Recharge Pit New 22°44'43.3

49" 078°17'19.33

4" 0.05 0.00 0.00 Second Year MGNREGA

526

Sohagpur Niwari Bhatti Recharge Pit New 22°44'39.6

27" 078°17'14.91

2" 0.05 0.00 0.00 Second Year MGNREGA

527

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 528

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 529

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 530

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 531

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 532

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 533

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 534

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 535

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 536

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 537

Sohagpur Niwari Niwari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 538

Sohagpur Ajneri Ajneri Stop Dam New 22°46'48.9

16" 078°17'37.15

9" 30.0

0 28000.

00 10.92 second year MGNREGA

539

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 540

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 541

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 542

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 543

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 544

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 545

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

Page 309: HBAD DIP FINAL ab - pmksy.gov.in

309

546

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 547

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 548

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 549

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 550

Sohagpur Ajneri Ajneri Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 551

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 552

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 553

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 554

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 555

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 556

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 557

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 558

Sohagpur Chanderi Chanderi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 559

Sohagpur Chanderi Beganiya Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 560

Sohagpur Chanderi Beganiya Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 561

Sohagpur Gurumkhedi Gurumkhedi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 562

Sohagpur Gurumkhedi Gurumkhedi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 563

Sohagpur Gurumkhedi Gurumkhedi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 564

Sohagpur Gurumkhedi Gurumkhedi Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 565

Sohagpur Gurumkhedi Gurumkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 566

Sohagpur Gurumkhedi Gurumkhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 567

Sohagpur Gurumkhedi kewlari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 568

Sohagpur Gurumkhedi kewlari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA

Page 310: HBAD DIP FINAL ab - pmksy.gov.in

310

569

Sohagpur Gurumkhedi kewlari Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 570

Sohagpur Gurumkhedi kewlari Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 571

Sohagpur Gurumkhedi kewlari Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 572

Sohagpur Gurumkhedi kewlari Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 573

Sohagpur Gurumkhedi Gurumkhedi Well

Deepening Renovation 1.00 30.00 0.01 First Year MGNREGA

574

Sohagpur Gurumkhedi Gurumkhedi Well

Deepening Renovation 1.00 40.00 0.02 First Year MGNREGA

575

Sohagpur Gurumkhedi kewlari Well

Deepening Renovation 22°42'05.661"

078°08'39.598" 1.00 40.00 0.02 First Year MGNRE

GA 576

Sohagpur Gurumkhedi kewlari Well

Deepening Renovation 22°42'02.680"

078°08'30.756" 1.00 40.00 0.02 third year MGNRE

GA 577

Sohagpur Gurumkhedi kewlari Stop dam New 22°41'58.0

73" 078°08'18.91

7" 30.0

0 12000.

00 4.68 second year MGNREGA

578

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 579

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 580

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 581

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 582

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 583

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 584

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 585

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 586

Sohagpur Chichli Chichli Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 587

Sohagpur Chichli Chichli Well

Deepening Renovation 1.00 0.00 0.00 second year MGNREGA

588

Sohagpur Telsir Telsir Well

Deepening Renovation 1.00 0.00 0.00 second year MGNREGA

589

Sohagpur Telsir Telsir Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 590

Sohagpur Telsir Telsir Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 591

Sohagpur Telsir Telsir Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA

Page 311: HBAD DIP FINAL ab - pmksy.gov.in

311

592

Sohagpur Telsir Telsir Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 593

Sohagpur Telsir Telsir Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 594

Sohagpur Telsir Telsir Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 595

Sohagpur Telsir Katiyakhapa Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 596

Sohagpur Telsir Katiyakhapa Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 597

Sohagpur Telsir Katiyakhapa Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 598

Sohagpur Telsir Katiyakhapa Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 599

Sohagpur Pamli Pamli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 600

Sohagpur Pamli Pamli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 601

Sohagpur Pamli Pamli Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 602

Sohagpur Pamli Pamli Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 603

Sohagpur Pamli Pamli Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 604

Sohagpur Pamli Ramnagar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 605

Sohagpur Pamli Ramnagar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 606

Sohagpur Pamli Ramnagar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 607

Sohagpur Pamli Ramnagar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 608

Sohagpur Pamli Ramnagar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 609

Sohagpur Pamli Hathnawad Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 610

Sohagpur Pamli Hathnawad Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 611

Sohagpur Bornagujar Bornagujar Stop Dam New

30.00

12000.00 4.68 second year MGNRE

GA 612

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 613

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 614

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA

Page 312: HBAD DIP FINAL ab - pmksy.gov.in

312

615

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 616

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 617

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 618

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 619

Sohagpur Bornagujar Bornagujar Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 620

Sohagpur Bornagujar Ritalkhapa Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 621

Sohagpur Bornagujar Ritalkhapa Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 622

Sohagpur Bornagujar Ritalkhapa Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 623

Sohagpur Bornagujar Ritalkhapa Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 624

Sohagpur Bornagujar Ritalkhapa Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 625

Sohagpur Bornagujar Ritalkhapa Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 626

Sohagpur Bornagujar Ritalkhapa Well

Deepening Renovation 4.00 40.00 0.02 Fourth Year MGNREGA

627

Sohagpur Ajabgaon Ajabgaon Stop Dam New 22°46'05.4

03" 078°09'18.40

8" 30.0

0 42800.

00 16.69 second year MGNREGA

628

Sohagpur Ajabgaon Ajabgaon Stop Dam New 22°46'05.4

03" 078°09'17.54

7" 30.0

0 42800.

00 16.69 third year MGNREGA

629

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 630

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 631

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 632

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 633

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 634

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 635

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 636

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 637

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA

Page 313: HBAD DIP FINAL ab - pmksy.gov.in

313

638

Sohagpur Ajabgaon Ajabgaon Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 639

Sohagpur Ajabgaon khapariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 640

Sohagpur Ajabgaon khapariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 641

Sohagpur Ajabgaon khapariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 642

Sohagpur Ajabgaon khapariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 643

Sohagpur Ajabgaon khapariya Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 644

Sohagpur Mokalwadi Mokalwadi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 645

Sohagpur Mokalwadi Mokalwadi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 646

Sohagpur Mokalwadi Mokalwadi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 647

Sohagpur Mokalwadi Mokalwadi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 648

Sohagpur Mokalwadi Mokalwadi Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 649

Sohagpur Mokalwadi Mokalwadi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 650

Sohagpur Mokalwadi Mokalwadi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 651

Sohagpur Mokalwadi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 652

Sohagpur Mokalwadi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 653

Sohagpur Mokalwadi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 654

Sohagpur Mokalwadi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 655

Sohagpur Mokalwadi Bhokhedi Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 656

Sohagpur

Semri Harchand

Semri Harchand Stop Dam New 22.6903978

3 78.07952241 4.00 12000.00 3.50 First Year MGNRE

GA 657

Sohagpur

Semri Harchand

Semri Harchand Stop Dam New 22.6993253

5 78.10187207 5.00 14000.00 4.70 First Year MGNRE

GA 658

Sohagpur

Semri Harchand Aamgaon Stop Dam New 22.7144753 78.07194515 6.00 18000.

00 7.90 First Year MGNREGA

659

Sohagpur

Semri Harchand Aamgaon Pond

Deepening Renovation 22.71446816 78.07190797 4.00 13000.

00 8.00 First Year MGNREGA

660

Sohagpur

Semri Harchand

Semri Harchand

Pond Deepening Renovation 22.687172 78.0883712 3.50 10000.

00 4.29 second year MGNREGA

Page 314: HBAD DIP FINAL ab - pmksy.gov.in

314

661

Sohagpur

Semri Harchand

Semri Harchand Stop Dam New 22.687927 78.0081522 26.0

0 13000.

00 5.07 second year MGNREGA

662

Sohagpur

Semri Harchand

Semri Harchand

Well Deepening Renovation 22.6993252

9 78.10187229 1.30 0.00 0.00 second year MGNREGA

663

Sohagpur

Semri Harchand

Semri Harchand

Well Deepening Renovation 22.689731 78.089767 1.00 0.00 0.00 second year MGNRE

GA 664

Sohagpur

Semri Harchand

Semri Harchand

Well Deepening Renovation 22.6906873

6 78.8661816 1.00 0.00 0.00 First Year MGNREGA

665

Sohagpur

Semri Harchand

Semri Harchand

Well Deepening Renovation 22.7142049

1 78.07313249 1.00 0.00 0.00 First Year MGNREGA

666

Sohagpur

Semri Harchand

Semri Harchand

Well Deepening Renovation 22.6917278

1 78.0873602 1.00 0.00 0.00 First Year MGNREGA

667

Sohagpur

Semri Harchand

Semri Harchand

Well Deepening Renovation 22.6958762 78.08597582 1.00 0.00 0.00 First Year MGNRE

GA 668

Sohagpur

Semri Harchand

Semri Harchand

Well Deepening Renovation 22.6906867 78.661704 1.00 0.00 0.00 second year MGNRE

GA 669

Sohagpur

Semri Harchand

Semri Harchand Recharge Pit New 22.689234 78.092835 0.10 0.00 0.00 First Year MGNRE

GA 670

Sohagpur jamuniya jamuniyaa stop dam Renovation 4.00 12000.

00 4.49 third year MGNREGA

671

Sohagpur jamuniya jamuniyaa Well

Deepening Renovation 0.75 0.00 0.00 First Year MGNREGA

672

Sohagpur jamuniya jamuniyaa Well

Deepening Renovation 0.85 0.00 0.00 First Year MGNREGA

673

Sohagpur jamuniya jamuniyaa Well

Deepening Renovation 1.00 0.00 0.00 First Year MGNREGA

674

Sohagpur jamuniya jamuniyaa Well

Construction new 1.00 0.00 0.00 First Year MGNREGA

675

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 First Year MGNRE

GA 676

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 677

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 678

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 679

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 680

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 681

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 682

Sohagpur jamuniya jamuniyaa Recharge Pit new 0.05 0.00 0.00 First Year MGNRE

GA 683

Sohagpur paladevri paladevri Stop Dam new 5.00 15000.

00 5.00 second year MGNREGA

Page 315: HBAD DIP FINAL ab - pmksy.gov.in

315

684

Sohagpur paladevri paladevri Stop Dam New 4.00 12000.

00 6.00 First Year MGNREGA

685

Sohagpur paladevri seni Stop Dam New 5.00 14000.

00 7.00 First Year MGNREGA

686

Sohagpur paladevri seni Stop Dam New 6.00 15000.

00 9.00 First Year MGNREGA

687

Sohagpur paladevri bornamiththa Pond

Deepening Renovation 7.00 13000.00 6.50 First Year MGNRE

GA 688

Sohagpur paladevri seni Pond

Deepening Renovation 8.00 14000.00 8.00 second year MGNRE

GA 689

Sohagpur paladevri seni Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 690

Sohagpur paladevri bornamiththa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 691

Sohagpur paladevri bornamiththa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 692

Sohagpur paladevri bornamiththa Well

Construction new 5.00 10000.00 0.00 Fifth Year MGNRE

GA 693

Sohagpur paladevri bornamiththa Pond

Deepening Renovation 2.50 11000.00 3.00 First Year MGNRE

GA 694

Sohagpur paladevri paladevri Pond

Deepening Renovation 4.50 10000.00 3.50 First Year MGNRE

GA 695

Sohagpur paladevri seni Pond

Deepening Renovation 3.50 0.00 2.50 First Year MGNREGA

696

Sohagpur paladevri paladevri Well

Deepening Renovation 0.50 3.50 0.00 First Year MGNREGA

697

Sohagpur paladevri bornamiththa Recharge Pit new 0.05 0.00 0.00 First Year MGNRE

GA 698

Sohagpur paladevri bornamiththa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 699

Sohagpur paladevri paladevri Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 700

Sohagpur paladevri paladevri Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 701

Sohagpur paladevri bornamiththa Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 702

Sohagpur paladevri paladevri Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 703

Sohagpur

goudikherimal sityagohana Pond

Deepening Renovation 22.68585 78.201603 18.0

0 25000.

00 10.50 second year MGNREGA

704

Sohagpur

goudikherimal gohnademal Pond

Deepening Renovation 22.660805 78.238607 6.00 13000.00 4.70 second year MGNRE

GA 705

Sohagpur

goudikherimal chittor pattan Pond

Deepening Renovation 22.390911 78.131498 5.00 12000.00 4.50 First Year MGNRE

GA 706

Sohagpur

goudikherimal

goudikherimal

Well Deepening Renovation 22.649967 78.215569 1.00 0.00 0.00 First Year MGNRE

GA

Page 316: HBAD DIP FINAL ab - pmksy.gov.in

316

707

Sohagpur

goudikherimal gohnademal Well

Deepening Renovation 22.3858344 .78.1432919 1.00 0.00 0.00 First Year MGNREGA

708

Sohagpur

goudikherimal gohnademal Well

Deepening Renovation 22.3853984 78.1432424 1.00 0.00 0.00 First Year MGNREGA

709

Sohagpur

goudikherimal nannair Well

Deepening Renovation 22.643583 78.218155 1.00 0.00 0.00 First Year MGNREGA

710

Sohagpur

goudikherimal gohnademal Pond

Deepening Renovation 22.660225 78.238579 2.00 8000.00 3.50 First Year MGNRE

GA 711

Sohagpur magariya magariya Pond

Deepening Renovation 22.603679 78.10418 3.00 11000.00 3.00 First Year MGNRE

GA 712

Sohagpur magariya rainipani Pond

Deepening new 22.609677 78.119947 6.00 13000.00 5.00 First Year MGNRE

GA 713

Sohagpur magariya khapa Pond

Deepening Renovation 2.00 10000.00 2.00 First Year MGNRE

GA 714

Sohagpur magariya magariya Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 715

Sohagpur magariya magariya Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 716

Sohagpur magariya rainipani Recharge Pit New 0.05 0.00 0.00 First Year MGNRE

GA 717

Sohagpur magariya rainipani Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA 718

Sohagpur magariya pathai Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 719

Sohagpur magariya pathai Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 720

Sohagpur magariya khapa Well

Deepening Renovation 1.00 0.00 0.00 second year MGNREGA

721

Sohagpur tekapar chhenka Pond

Deepening Renovation 22.610577 78.172955 3.00 10000.00 7.80 second year MGNRE

GA 722

Sohagpur tekapar sarangpur Stop Dam new 22.80953 78.14869 8.00 11000.

00 6.90 second year MGNREGA

723

Sohagpur tekapar sehra Pond

Deepening Renovation 22.595475 78.174753 3.00 7000.00 3.90 third year MGNRE

GA 724

Sohagpur tekapar chenka Pond

Deepening Renovation 22.61707 78.180953 6.00 9000.00 7.50 Fourth Year MGNRE

GA 725

Sohagpur tekapar tekapar Recharge Pit new 0.05 0.00 0.00 Fourth Year MGNRE

GA 726

Sohagpur tekapar tekapar Recharge Pit new 0.05 0.00 0.00 First Year MGNRE

GA 727

Sohagpur tekapar tekapar Recharge Pit 0.05 0.00 0.00 First Year MGNRE

GA 728

Sohagpur tekapar tekapar Recharge Pit 0.05 0.00 0.00 First Year MGNRE

GA 729

Sohagpur tekapar tekapar Recharge Pit 0.05 0.00 0.00 Third Year MGNRE

GA

Page 317: HBAD DIP FINAL ab - pmksy.gov.in

317

730

Sohagpur tekapar tekapar Recharge Pit 0.05 0.00 0.00 Second Year MGNRE

GA 731

Sohagpur tekapar sarangpur Recharge Pit 0.05 0.00 0.00 First Year MGNRE

GA 732

Sohagpur baskhapa baskhapa Stop Dam new 8.00 12000.

00 6.00 First Year MGNREGA

733

Sohagpur baskhapa baskhapa Stop Dam new 7.00 10000.

00 4.00 First Year MGNREGA

734

Sohagpur baskhapa jiran Well

Deepening Renovation 1.00 0.00 0.00 First Year MGNREGA

735

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 First Year MGNRE

GA 736

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 First Year MGNRE

GA 737

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 First Year MGNRE

GA 738

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 Second Year MGNRE

GA 739

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 Second Year MGNRE

GA 740

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 Second Year MGNRE

GA 741

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 Second Year MGNRE

GA 742

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 Second Year MGNRE

GA 743

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 First Year MGNRE

GA 744

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 First Year MGNRE

GA 745

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 Second Year MGNRE

GA 746

Sohagpur baskhapa baskhapa Recharge Pit Renovation 0.05 0.00 0.00 Second Year MGNRE

GA 747

Sohagpur bichuaa gohnadehrai

yat Pond

Construction New 22.662527 78.2222215 11.0

0 10000.

00 3.90 second year MGNREGA

748

Sohagpur bichuaa siyrkheda Pond

Deepening Renovation 22.616562 78.2040333 4.00 11500.00 4.49 third year MGNRE

GA 749

Sohagpur bichuaa markadana Stop Dam new 22.586183 78.101877

50.00

18000.00 7.02 First Year MGNRE

GA 750

Sohagpur bichuaa bichuaa Stop Dam new 22.622612 78.204215

20.00

19600.00 7.64 First Year MGNRE

GA 751

Sohagpur bichuaa bichuaa Well

Deepening Renovation 1.00 0.00 0.00 First Year MGNREGA

752

Sohagpur bichuaa godimarkada

na Well

Deepening Renovation 1.00 0.00 0.00 First Year MGNREGA

Page 318: HBAD DIP FINAL ab - pmksy.gov.in

318

753

Sohagpur bichuaa siyarkheda Well

Deepening Renovation 0.10 0.00 0.00 First Year MGNREGA

754

Sohagpur bichuaa gohnadehrai

yat Recharge Pit new 0.05 0.00 0.00 First Year MGNREGA

755

Sohagpur bichuaa markadana Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 756

Sohagpur bichuaa markadana Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 757

Sohagpur bichuaa markadana Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 758

Sohagpur bichuaa markadana Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 759

Sohagpur bichuaa siyarkheda Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 760

Sohagpur bichuaa siyarkheda Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 761

Sohagpur kamtirangpur kamtirangpur Pond

Deepening Renovation 3.00 11000.00 4.20 second year MGNRE

GA 762

Sohagpur kamtirangpur ghoghri Stop Dam new 22.59432 78.123418

10.00

13000.00 7.00 second year MGNRE

GA 763

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 764

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 765

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 766

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Third Year MGNRE

GA 767

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Third Year MGNRE

GA 768

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Third Year MGNRE

GA 769

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 770

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 771

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 772

Sohagpur kamtirangpur kamtirangpur Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 773

Sohagpur kamtirangpur kamtirangpur Stop Dam new 8.00 12000.

00 4.50 second year MGNREGA

774

Sohagpur kamtirangpur ghoghri Well

Deepening Renovation 1.00 0.00 0.00 second year MGNREGA

775

Sohagpur pathrai pathai Stop Dam Renovation 22.673898 78.1211 2.00 11000.

00 3.50 second year MGNREGA

Page 319: HBAD DIP FINAL ab - pmksy.gov.in

319

776

Sohagpur pathrai pathai Stop Dam new 22.66361 78.129723 6.00 10000.

00 2.50 second year MGNREGA

777

Sohagpur pathrai pathai Stop Dam new 4.00 8000.0

0 2.40 second year MGNREGA

778

Sohagpur pathrai pathai Stop Dam new 5.00 11000.

00 3.70 second year MGNREGA

779

Sohagpur pathrai pathai Stop Dam new 5.00 8000.0

0 4.00 Fourth Year MGNREGA

780

Sohagpur pathrai pathai Stop Dam new 6.00 9000.0

0 4.50 second year MGNREGA

781

Sohagpur pathrai pathai Stop Dam new 8.00 8000.0

0 4.00 third year MGNREGA

782

Sohagpur pathrai pathai Well

Deepening Renovation 1.00 0.00 0.00 Fifth Year MGNREGA

783

Sohagpur

bamhorikhurd bodi Well

Deepening Renovation 1.00 0.00 0.00 second year MGNREGA

784

Sohagpur

bamhorikhurd bodi Pond

Deepening Renovation 2.00 8000.00 3.50 second year MGNRE

GA 785

Sohagpur

bamhorikhurd bodi Stop Dam new 22.7092 78.160375 8.00 13000.

00 4.50 second year MGNREGA

786

Sohagpur

bamhorikhurd bodi Well

Deepening Renovation 22.701642 78.15944 1.00 0.00 0.00 second year MGNREGA

787

Sohagpur

bamhorikhurd

bamhorikhurd Stop Dam new 22.707096 78.160374 9.00 13000.

00 6.50 second year MGNREGA

788

Sohagpur

bamhorikhurd

bamhorikhurd

Well Deepening Renovation 22.691253 78.16954 1.00 0.00 0.00 second year MGNRE

GA 789

Sohagpur

bamhorikhurd

bamhorikhurd Stop Dam new 22.707097 78.16375 8.00 14000.

00 5.60 second year MGNREGA

790

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.69697 78.163393 0.05 0.00 0.00 Fourth Year MGNRE

GA 791

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.711903 78.161283 0.05 0.00 0.00 Second Year MGNRE

GA 792

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.701903 78.161283 0.05 0.00 0.00 Second Year MGNRE

GA 793

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.699862 78.162782 0.05 0.00 0.00 Second Year MGNRE

GA 794

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.699861 78.162684 0.05 0.00 0.00 Second Year MGNRE

GA 795

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.698964 78.162779 0.05 0.00 0.00 Second Year MGNRE

GA 796

Sohagpur

bamhorikhurd bodi Recharge Pit new 22.69697 78.163393 0.05 0.00 0.00 Second Year MGNRE

GA 797

Sohagpur

bamhorikhurd bodi Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 798

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.700768 78.158998 0.05 0.00 0.00 Second Year MGNRE

GA

Page 320: HBAD DIP FINAL ab - pmksy.gov.in

320

799

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 0.05 0.00 0.00 Second Year MGNRE

GA 800

Sohagpur

bamhorikhurd

bamhorikhurd Recharge Pit new 22.701903 78.161283 0.05 0.00 0.00 First Year MGNRE

GA 801

Sohagpur

BAMOHARI KHURD

BAMOHARI KHURD Recharge Pit New 22.700768 78.281589 0.05 0.00 0.00 First Year MGNRE

GA 802

Sohagpur

BAMOHARI KHURD

BAMOHARI KHURD Recharge Pit New 22.701903 78.161283 0.05 0.00 0.00 Second Year MGNRE

GA 803

Sohagpur Nibhore singwada Stop Dam New 5.00 10000.

00 4.00 third year MGNREGA

804

Sohagpur Nibhore Nibhore Stop Dam New 7.00 12000.

00 6.00 second year MGNREGA

805

Sohagpur Nibhore singwada Pond

Deepening renvation 3.00 13000.00 8.00 second year MGNRE

GA 806

Sohagpur Nibhore singhwada Well

Deepening Renovation 1.00 0.00 0.00 second year MGNREGA

807

Sohagpur Nibhore singhwada Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 808

Sohagpur Nibhore singhwada Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 809

Sohagpur Nibhore singhwada Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 810

Sohagpur Nibhore singhwada Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 811

Sohagpur Nibhore singhwada Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 812

Sohagpur Nibhore singhwada Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 813

Sohagpur Nibhore singhwada Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 814

Sohagpur Nibhore Nibhore Recharge Pit New 0.05 0.00 0.00 Fourth Year MGNRE

GA 815

Sohagpur Nibhore Nibhore Recharge Pit New 0.05 0.00 0.00 Second Year MGNRE

GA 816

Sohagpur Nibhore Nibhore Recharge Pit New 0.05 0.00 0.00 Third Year MGNRE

GA 817

Sohagpur Nibhore Nibhore Recharge Pit New 0.05 0.00 0.00 Fifth Year MGNRE

GA

Page 321: HBAD DIP FINAL ab - pmksy.gov.in

321

Pradhanmantri Krishi Sinchai Yojna- Irrigation Sohagpur

S.No. Name of Block

Gram Panchayat

Village Name

Name of work

New/ Renovation

Co-Ordinates Khasra No.

Total Cost ( In

Lakhs )

Storage Capicity

(in Mcm.)

Irrigation Potential

in Ha.

Year of Implementation

Scheme Name

Latitude Longitude 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Sohagpur Godikheri

Mal Sitiaya Gohana

Barrage New 22° 41' 00" N

78° 12'10" E

Govt. Land

245.00 0.76 130 Second Year Barrage

2 Sohagpur Godikheri Mal

Godikheri Mal

Tank Renovation

Renovation 22° 29' 00" N

78° 13'20" E

Govt. Land

3.00 1.44 240 Second Year Tank

3 Sohagpur Godikheri Mal

Sitiaya Gohana

Stop dam New 22° 41' 00" N

78° 12'10" E

Govt. Land

225.00 0.70 120 Second Year Stop Dam

4 Sohagpur Bichhua Bichhua Stop dam New 22° 38' 26" N

78° 12'19" E

Govt. Land

450.00 1.00 170 Second Year Stop Dam

5 Sohagpur Tekapar Shri Rangpur

Waste Weir Renovation

Renovation 22° 36' 26" N

78° 10'57" E

Govt. Land

3.96 0.06 10 Second Year Stop Dam

6 Sohagpur Patharai Patharai Stop dam New 22° 40' 31" N

78° 8'0" E Govt. Land

30.00 0.06 11 Second Year Stop Dam

7 Sohagpur Patharai Patharai Stop dam New 22° 39' 53" N

78° 8'9" E Govt. Land

30.00 0.06 09 Second Year Stop Dam

8 Sohagpur Patharai Patharai Stop Dam Renovation

Renovation 22° 40' 23" N

78° 7'10" E

Govt. Land

5.00 0.03 05 Second Year Stop Dam

9 Sohagpur Jamuniya Jamuniya Stop Dam Renovation

Renovation 22° 41' 07" N

78° 8'13" E

Govt. Land

5.00 0.03 05 Second Year Stop Dam

10 Sohagpur Guramkhedi Guramkhedi Stop dam New 22° 41' 13" N

78° 7'36" E

Govt. Land

35.00 0.07 12 Second Year Stop Dam

11 Sohagpur Guramkhedi Guramkhedi Stop Dam Renovation

Renovation 22° 41' 14" N

78° 7'52" E

Govt. Land

5.00 0.03 05 Second Year Stop Dam

Page 322: HBAD DIP FINAL ab - pmksy.gov.in

322

12 Sohagpur Barangi Barangi Stop dam New 22° 42' 36" N

78° 8'6" E Govt. Land

30.00 0.06 10 Second Year Stop Dam

13 Sohagpur Paladeori Paladeori Stop dam New 22° 43' 22" N

78° 6'3" E Govt. Land

30.00 0.06 10 Second Year Stop Dam

14 Sohagpur Paladeori Paladeori Stop dam New 22° 43' 40" N

78° 7'8" E Govt. Land

30.00 0.06 10 Second Year Stop Dam

Pradhanmantri Krishi Sinchai Yojna –Sohagpur

Proposed New Water Conservation Structures List Of Dupty Director Farmer Welfare & Agriculture Devlopment District :- Hoshangabad

SN. Name of Block

Gram Panchayat

Village Name

Name of Work

Type of Structure

Position of Working place

Khasra No.

Total Cost

Storage Capacity

Irrigation Potential

Year of Implementation

Scheme Name

New Latitude Longitude

1 Sohagpur Banskhapa Banskhapa M.I.T. New 78º.09.32.5 22.40.54.3 28/198 25.00 1,10,000 40.00 PMKSY

2 Sohagpur Tekapar Shrirarnpur Percolation Tank New 78º.10.52.4 22.36.9.0 15/48 15.00 95,000 10.00 PMKSY

3 Sohagpur Tekapar Sarangpur Check Dam New 78º.08.52.6 22.34.28º.2 33/263 25.00 1,10,000 30.00 PMKSY

4 Sohagpur Bichhua Siyar kheda Percolation Tank New 78º.12.03.0 22.36.44.7 32/03 10.00 82,000 10.00 PMKSY

5 Sohagpur Nayagoan Dudadeh Check Dam New 78º.11.20.8 22.38.52.4 30/24,

156 20.00 1,10,000 30.00 PMKSY

6 Sohagpur Bichhua Markadhhana M.I.T. New 78º.35.52.6 22.22.19.8 32/85 15.00 95,000 10.00 PMKSY

7 Sohagpur Bichhua Bichhua M.I.T. New 78º.11.57.1 22.37.51.4 32/147 08/8 15.00 95,000 10.00 PMKSY

Total _ _ _ _ _ _ _ 125.00 _ _

Page 323: HBAD DIP FINAL ab - pmksy.gov.in

323

Pipariya

Page 324: HBAD DIP FINAL ab - pmksy.gov.in

324

PRADHANMANTRI KRISHI SINCAHI YOJNA DISTRICT HOSHANGABAD

JANPAD PANCHAYAT PIPARIYA

S.No.

Name of Block Gram Panchayat Village Name Name of Work

Type Of Structure

( New/Renova

tion)

Co-ordinates Khas

ra No.

Total

Cost In Lak

h

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implementa

tion

Scheme Name Latitude Longit

ude

1 PIPARIYA TEKAPAR TEKAPAR STOP DAM

RENOVATION RENOVATI

ON 22° 36'

18" 78° 28'

49" 65 0.20 1500 3 1 MGNREGA

2 PIPARIYA TEKAPAR TEKAPAR

POND CONSTRUCTION

NEW 22° 36' 47"

78° 29' 55"

217,218 4.10 1200 2.4 1 MGNRE

GA

3 PIPARIYA TEKAPAR TEKAPAR STOP DAM

RENOVATION RENOVATI

ON 22° 36'

07" 78° 29'

08" 89/1 0.22 1500 3 1 MGNREGA

4 PIPARIYA TEKAPAR TEKAPAR POND

DEEPENING RENOVATI

ON 22° 36'

16" 78° 28'

51" 53,10

7 3.00 1800 3.6 1 MGNREGA

5 PIPARIYA TEKAPAR TEKAPAR POND

DEEPENING RENOVATI

ON 22° 38'

18" 78° 33'

20" 53,10

7 3.00 1800 3.6 2 MGNREGA

6 PIPARIYA TEKAPAR TEKAPAR POND

DEEPENING RENOVATI

ON 22° 44'

20" 78° 38'

56" 53,10

7 3.00 1800 3.6 2 MGNREGA

7 PIPARIYA MATKULI MATKULI FARM POND NEW 22° 36'

08" 78° 26'

47" __ 3.00 900 1.8 1 MGNREGA

8 PIPARIYA MATKULI MATKULI POND

DEEPENING RENOVATI

ON 22° 36'

05" 78° 26'

49" __ 1.00 1800 3.6 2 MGNREGA

9 PIPARIYA MATKULI MATKULI

POND CONSTRUCTION

NEW 22° 35' 52"

78° 26' 39" __ 3.00 1800 3.6 1 MGNRE

GA

10 PIPARIYA MATKULI MATKULI POND

DEEPENING RENOVATI

ON 22° 35'

60" 78° 26'

44" __ 0.50 1800 3.6 2 MGNREGA

11 PIPARIYA MATKULI MATKULI

POND CONSTRUCTION

NEW 22° 36' 10"

78° 26' 51" 5.00 2400 4.8 1 MGNRE

GA

12 PIPARIYA MATKULI MATKULI POND

DEEPENING RENOVATI

ON 22° 37'

11" 78° 28'

44" 5.00 1800 3.6 2 MGNREGA

13 PIPARIYA MATKULI MATKULI POND

DEEPENING RENOVATI

ON 22° 44'

11" 78° 28'

54" 5.00 1800 3.6 2 MGNREGA

14 PIPARIYA MATKULI MOHGAON POND

DEEPENING RENOVATI

ON 22° 44'

36" 78° 32'

11" 5.00 1800 3.6 2 MGNREGA

15 PIPARIYA DAPKA KURSIKHAPA POND

DEEPENING RENOVATI

ON 22° 38'

42" 78° 19'

29" 69 2.00 1800 3.6 3 MGNREGA

16 PIPARIYA DAPKA ANHONI POND

DEEPENING RENOVATI

ON 22° 38'

09" 78° 21'

11" 78 1.00 1800 3.6 3 MGNREGA

Page 325: HBAD DIP FINAL ab - pmksy.gov.in

325

17 PIPARIYA DAPKA DAPKA FARM POND NEW 22° 39'

15" 78° 21'

53" 45 3.00 900 1.8 1 MGNREGA

18 PIPARIYA DAPKA KURSIKHAPA

POND CONSTRUCTION

NEW 22° 38' 42"

78° 19' 29" 41 10.0

0 3600 7.2 1 MGNREGA

19 PIPARIYA DAPKA ANHONI

POND CONSTRUCTION

NEW 22° 38' 09"

78° 21' 11" 50/2 10.0

0 3600 7.2 2 MGNREGA

20 PIPARIYA DAPKA DAPKA

POND CONSTRUCTION

NEW 22° 39' 15"

78° 21' 53" 137 10.0

0 3600 7.2 2 MGNREGA

21 PIPARIYA SINGANAMA CHAKAR FARM POND RENOVATI

ON 22° 34'

35" 78° 27'

15" __ 0.45 1200 2.4 1 MGNREGA

22 PIPARIYA SINGANAMA CHAKAR FARM POND RENOVATI

ON 22° 34'

35" 78° 27'

15" 48/02 0.60 1200 2.4 1 MGNREGA

23 PIPARIYA SINGANAMA GHANA FARM POND NEW 22° 38'

42" 78° 28'

45" __ 3.00 900 1.8 2 MGNREGA

24 PIPARIYA SINGANAMA GHANA FARM POND NEW 22° 34'

52" 78° 28'

48" __ 3.00 900 1.8 2 MGNREGA

25 PIPARIYA SINGANAMA SINGANAMA FARM POND NEW 22° 35'

55" 78° 28'

49" __ 8.00 2400 4.8 2 MGNREGA

26 PIPARIYA PISUA PISUA FARM POND NEW 22° 35'

22° " 78° 25'

09" 158/3 3.00 900 1.8 2 MGNREGA

27 PIPARIYA PISUA MAILI FARM POND NEW 22° 35'

24" 78° 25'

12" 158/5 3.00 900 1.8 2 MGNREGA

28 PIPARIYA PISUA PAAEDMAAL FARM POND NEW 22°

35'26" 78° 25'

11" 15/2 3.00 900 1.8 2 MGNREGA

29 PIPARIYA PISUA CHANDANPIPARI

YA FARM POND NEW 22° 35' 28"

78° 25' 16" 15/1 3.00 900 1.8 2 MGNRE

GA

30 PIPARIYA PISUA CHANDANPIPARI

YA FARM POND NEW 22° 35' 29"

78° 25' 22° " 167/2 3.00 900 1.8 2 MGNRE

GA

31 PIPARIYA PISUA PISUA POND

DEEPENING RENOVATI

ON 22° 35'

22" 78° 25'

20" 88 3.00 1800 3.6 3 MGNREGA

32 PIPARIYA PISUA PISUA POND

DEEPENING RENOVATI

ON 22° 35'

22" 78° 27'

19" 15 3.00 1800 3.6 3 MGNREGA

33 PIPARIYA PISUA BINDAKHERA POND

DEEPENING RENOVATI

ON 22° 35'

22" 78° 29'

24" 5/4 3.00 1800 3.6 3 MGNREGA

34 PIPARIYA PISUA CHANDANPIPARI

YA POND DEEPENING

RENOVATION

22° 36' 02"

78° 25' 37" 103/2 3.00 1800 3.6 3 MGNRE

GA

35 PIPARIYA PISUA CHANDANPIPARI

YA POND DEEPENING

RENOVATION

22° 36' 02"

78° 25' 38" 24 3.00 1800 3.6 3 MGNRE

GA

36 PIPARIYA PISUA MAILI POND

DEEPENING RENOVATI

ON 22° 35'

22" 78° 25'

30" 3.00 1800 3.6 3 MGNREGA

37 PIPARIYA PISUA MAILI POND

DEEPENING RENOVATI

ON 22° 35'

32" 78° 25'

42" 64/5 3.00 1800 3.6 3 MGNREGA

Page 326: HBAD DIP FINAL ab - pmksy.gov.in

326

38 PIPARIYA PISUA PISUA POND

DEEPENING RENOVATI

ON 22° 35'

32" 78° 25'

52" 36/4 3.00 1800 3.6 1 MGNREGA

39 PIPARIYA PISUA BINDAKHERA POND

DEEPENING RENOVATI

ON 22° 35'

32" 78° 25'

58" 36 3.00 1800 3.6 1 MGNREGA

40 PIPARIYA PISUA PISUA POND

DEEPENING RENOVATI

ON 22° 35'

12" 78° 25'

18" 74/1 3.00 1800 3.6 1 MGNREGA

41 PIPARIYA PISUA PISUA POND

DEEPENING RENOVATI

ON 22° 35'

32" 78° 25'

58" 28/1 3.00 1800 3.6 1 MGNREGA

42 PIPARIYA PISUA PISUA STOP DAM NEW 22° 36'

21" 78° 30'

22" 28/1 10.00 2200 4.4 1 MGNRE

GA

43 PIPARIYA NANDWADA NANDWADA FARM POND NEW 22° 69" 78° 43" 4 3.50 900 1.8 2 MGNRE

GA

44 PIPARIYA NANDWADA NANDWADA FARM POND NEW 22° 69" 78° 43" 88 3.50 900 1.8 2 MGNRE

GA

45 PIPARIYA NANDWADA NANDWADA FARM POND NEW 22° 69'

15" 78° 84'

15" 39 3.00 900 1.8 2 MGNREGA

46 PIPARIYA

THOOTHADEHELWADA

THOOTHADEHELWADA FARM POND NEW 22° 73'

78°" 78° 41'

39" 123 3.50 900 1.8 2 MGNREGA

47 PIPARIYA

THOOTHADEHELWADA

THOOTHADEHELWADA FARM POND RENOVATI

ON 22° 74'

01" 78° 41'

42" 219 6.00 1200 2.4 2 MGNREGA

48 PIPARIYA

THUTHADAHALWADA

THUTHADAHALWADA

RECHARGE PIT NEW 22° 74'

81" 78° 40'

13" 186 0.12 0 0 1 MGNREGA

49 PIPARIYA

THUTHADAHALWADA

THUTHADAHALWADA

RECHARGE PIT NEW 22° 74'

81" 78° 40'

15" 101/3 0.12 0 0 1 MGNREGA

50 PIPARIYA

THUTHADAHALWADA

THUTHADAHALWADA

RECHARGE PIT NEW 22° 74'

14" 78° 39'

86" 217/1 0.12 0 0 1 MGNREGA

51 PIPARIYA PALI PALI POND

DEEPENING RENOVATI

ON 22° 75'

12" 78° 40'

43" 132/2 6.00 1800 3.6 1 MGNREGA

52 PIPARIYA PALI PALI

POND CONSTRUCTION

NEW 22° 71' 34"

78° 43' 22" 132/2 2.00 1200 2.4 2 MGNRE

GA

53 PIPARIYA PALI BUDNI

POND CONSTRUCTION

NEW 22° 74' 27"

78° 40' 17" 131 2.00 1200 2.4 2 MGNRE

GA

54 PIPARIYA LANJHI MADHO FARM POND NEW 22° 67'

22° " 78° 40'

68" 30 3.50 900 1.8 2 MGNREGA

55 PIPARIYA LANJHI RAEETVAADI FARM POND NEW 22° 67'

08" 78° 43'

43" 45/1 3.50 900 1.8 2 MGNREGA

56 PIPARIYA LANJHI LANJHI STOP DAM NEW 22° 68'

34" 78° 34'

17" 124/3 5.00 2200 4.4 1 MGNREGA

57 PIPARIYA LANJHI LANJHI STOP DAM

RENOVATION RENOVATI

ON 22° 94'

02" 78° 35'

43" 17 2.00 1500 3 2 MGNREGA

58 PIPARIYA LANJHI LANJHI FARM POND NEW 22° 67'

14" 78° 39'

23" 39/2 2.00 600 1.2 2 MGNREGA

59 PIPARI SIMARA BORANATHAKUR STOP DAM NEW 22° 68' 78° 34' 135 10.0 2200 4.4 1 MGNRE

Page 327: HBAD DIP FINAL ab - pmksy.gov.in

327

YA 90" 77" 0 GA

60 PIPARIYA SIMARA BORANATHAKUR STOP DAM NEW 22° 69'

50" 78° 34'

50" 135 10.00 1980 3.96 1 MGNRE

GA

61 PIPARIYA SIMARA SIMARA POND

DEEPENING RENOVATI

ON 22° 67'

60" 78° 35'

20" 125/1 8.00 1800 3.6 1 MGNREGA

62 PIPARIYA SIMARA SIMARA RECHARGE

PIT NEW 22° 69' 50"

78° 34' 56" 135 0.12 0 0 1 MGNRE

GA

63 PIPARIYA SIMARA SIMARA RECHARGE

PIT NEW 22° 69' 45"

78° 33' 56" 135 0.12 0 0 1 MGNRE

GA

64 PIPARIYA SIMARA SIMARA RECHARGE

PIT NEW 22° 69' 45"

78° 33' 46" 135 0.12 0 0 1 MGNRE

GA

65 PIPARIYA KHAIRA KHAIRA POND

DEEPENING RENOVATI

ON 22° 25'

38" 78° 35'

20" __ 3.00 1800 3.6 4 MGNREGA

66 PIPARIYA KHAIRA KHAIRA STOP DAM NEW 22° 57'

33" 78° 25'

55" 127/4 5.00 2200 4.4 1 MGNREGA

67 PIPARIYA KHAIRA KHAIRA STOP DAM NEW 22° 58'

10" 78° 25'

27" 151 15.00 2200 4.4 1 MGNRE

GA

68 PIPARIYA KHAIRA KHAIRA STOP DAM NEW 22° 58'

03" 78° 24 '

55" 235/1 10.00 1870 3.74 2 MGNRE

GA

69 PIPARIYA KHAIRA KHAIRA STOP DAM NEW 22° 52'

29" 78° 25'

11" __ 15.00 2200 4.4 2 MGNRE

GA

70 PIPARIYA KANHVAR KANHVAR POND

DEEPENING RENOVATI

ON 22° 29'

12" 78° 35'

20" 287 3.50 1800 3.6 4 MGNREGA

71 PIPARIYA KANHVAR KANHVAR POND

DEEPENING RENOVATI

ON 22° 46'

36" 78° 27'

14" 287 3.50 1800 3.6 4 MGNREGA

72 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 13"

78° 27' 34" 140 0.12 0 0 1 MGNRE

GA

73 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 36"

78° 27' 24" 140 0.12 0 0 1 MGNRE

GA

74 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 46"

78° 27' 54" 140 0.12 0 0 1 MGNRE

GA

75 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 56"

78° 27' 44" 140 0.12 0 0 1 MGNRE

GA

76 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 46"

78° 27' 34" 140 0.12 0 0 1 MGNRE

GA

77 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 36"

78° 27' 26" 140 0.12 0 0 1 MGNRE

GA

78 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 29"

78° 27' 64" 140 0.12 0 0 1 MGNRE

GA

79 PIPARIYA KANHVAR KANHVAR RECHARGE

PIT NEW 22° 46' 36"

78° 27' 44" 140 0.12 0 0 1 MGNRE

GA

80 PIPARIYA SIRPAN ITUA STOP DAM NEW 22° 49'

42" 78° 26'

41" __ 5.00 1870 3.74 2 MGNREGA

81 PIPARIYA SIRPAN SIRPAN POND

DEEPENING RENOVATI

ON 22° 49'

03" 78° 25'

48" __ 4.50 1800 3.6 5 MGNREGA

Page 328: HBAD DIP FINAL ab - pmksy.gov.in

328

82 PIPARIYA SIRPAN SIRPAN STOP DAM NEW 22° 49'

27" 78° 25'

40" __ 5.00 2200 4.4 2 MGNREGA

83 PIPARIYA SIRPAN SIRPAN STOP DAM NEW 22° 49'

09" 8 25' 47" __ 3.50 1980 3.96 2 MGNRE

GA

84 PIPARIYA SIRPAN SIRPAN STOP DAM NEW 22° 49'

56" 78° 25'

44" 24 10.00 2200 4.4 2 MGNRE

GA

85 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 12"

78° 25' 17" 24 0.12 0 0 1 MGNRE

GA

86 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 06"

78° 25' 37" 24 0.12 0 0 1 MGNRE

GA

87 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 19"

78° 25' 37" 24 0.12 0 0 1 MGNRE

GA

88 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 16"

78° 25' 37" 139 0.12 0 0 1 MGNRE

GA

89 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 39"

78° 25' 27" 139 0.12 0 0 1 MGNRE

GA

90 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 14"

78° 25' 29" 38 0.12 0 0 1 MGNRE

GA

91 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 42"

78° 25' 59" 39 0.12 0 0 1 MGNRE

GA

92 PIPARIYA SIRPAN SIRPAN RECHARGE

PIT NEW 22° 49' 29"

78° 25' 49" 39 0.12 0 0 1 MGNRE

GA

93 PIPARIYA RAMPUR RAMPUR STOP DAM NEW 22° 46'

47" 78° 24 '

86" 269 5.00 1870 3.74 3 MGNREGA

94 PIPARIYA RAMPUR RAMPUR STOP DAM NEW 22° 46'

37" 78° 24 '

13" 269 5.00 2200 4.4 3 MGNREGA

95 PIPARIYA RAMPUR RAMPUR RECHARGE

PIT NEW 22° 46' 47"

78° 24' 86" 208 0.12 0 0 1 MGNRE

GA

96 PIPARIYA RAMPUR RAMPUR RECHARGE

PIT NEW 22° 46' 87"

78° 24' 66" 208 0.12 0 0 1 MGNRE

GA

97 PIPARIYA RAMPUR RAMPUR RECHARGE

PIT NEW 22° 46' 47"

78° 24' 36" 208 0.12 0 0 1 MGNRE

GA

98 PIPARIYA RAMPUR RAMPUR RECHARGE

PIT NEW 22° 46' 67"

78° 24' 16" 209 0.12 0 0 1 MGNRE

GA

99 PIPARIYA RAMPUR RAMPUR RECHARGE

PIT NEW 22° 46' 67"

78° 24' 26" 209 0.12 0 0 1 MGNRE

GA

100 PIPARIYA RAMPUR RAMPUR RECHARGE

PIT NEW 22° 46' 77"

78° 24' 66" 209 0.12 0 0 1 MGNRE

GA

101 PIPARIYA RAMPUR RAMPUR RECHARGE

PIT NEW 22° 46' 57"

78° 24' 96" 209 0.12 0 0 1 MGNRE

GA

102 PIPARIYA SINGHODI SINGHODI STOP DAM NEW 22° 44'

47" 78° 27 '

35" __ 5.00 2200 4.4 3 MGNREGA

103 PIPARIYA SINGHODI TADA STOP DAM NEW 22° 44'

25" 78° 26'

49" __ 10.00 2200 4.4 3 MGNRE

GA

104 PIPARIYA SINGHODI SINGHODI RECHARGE

PIT NEW 22° 44' 42"

78° 27' 55" 134 0.12 0 0 1 MGNRE

GA

Page 329: HBAD DIP FINAL ab - pmksy.gov.in

329

105 PIPARIYA SINGHODI SINGHODI RECHARGE

PIT NEW 22° 44' 59"

78° 27' 45" 134 0.12 0 0 1 MGNRE

GA

106 PIPARIYA SINGHODI SINGHODI RECHARGE

PIT NEW 22° 44' 57"

78° 27' 34" 162 0.12 0 0 1 MGNRE

GA

107 PIPARIYA SINGHODI SINGHODI RECHARGE

PIT NEW 22° 44' 42"

78° 27' 56" 162 0.12 0 0 1 MGNRE

GA

108 PIPARIYA SINGHODI SINGHODI RECHARGE

PIT NEW 22° 44' 43"

78° 27' 65" 68/1 0.12 0 0 1 MGNRE

GA

109 PIPARIYA SINGHODI SINGHODI RECHARGE

PIT NEW 22° 44' 37"

78° 27' 35" 68/2 0.12 0 0 1 MGNRE

GA

110 PIPARIYA SINGHODI SINGHODI RECHARGE

PIT NEW 22° 44' 67"

78° 27' 25" 208 0.12 0 0 1 MGNRE

GA

111 PIPARIYA KHIDIYA KHIDIYA STOP DAM NEW 22° 47'

38" 78° 22°

' 49" 175 5.50 1980 3.96 3 MGNREGA

112 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 55"

78° 22' 39" 162 0.12 0 0 1 MGNRE

GA

113 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 32"

78° 22' 52" 162 0.12 0 0 1 MGNRE

GA

114 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 56"

78° 22' 42" 162 0.12 0 0 1 MGNRE

GA

115 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 52"

78° 22' 46" 162 0.12 0 0 1 MGNRE

GA

116 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 45"

78° 22' 59" 162 0.12 0 0 1 MGNRE

GA

117 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 42"

78° 22' 56" 162 0.12 0 0 1 MGNRE

GA

118 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 29"

78° 22' 36" 162 0.12 0 0 1 MGNRE

GA

119 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 42"

78° 22' 59" 162 0.12 0 0 1 MGNRE

GA

120 PIPARIYA KHIDIYA KHIDIYA RECHARGE

PIT NEW 22° 47' 47"

78° 22' 65" 162 0.12 0 0 1 MGNRE

GA

121 PIPARIYA SANDIYA SANDIYA STOP DAM NEW 25 24' 57" 78° 21'

10" 163 5.00 2200 4.4 4 MGNREGA

122 PIPARIYA SANDIYA SANDIYA

POND CONSTRUCTION

NEW 22° 54' 56"

78° 21' 20" 135 10.0

0 3600 7.2 3 MGNREGA

123 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 56"

78° 21' 31" 163 0.12 0 0 1 MGNRE

GA

124 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 86"

78° 21' 24" 163 0.12 0 0 1 MGNRE

GA

125 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 66"

78° 21' 30" 137 0.12 0 0 1 MGNRE

GA

126 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 66"

78° 21' 22" 137 0.12 0 0 1 MGNRE

GA

Page 330: HBAD DIP FINAL ab - pmksy.gov.in

330

127 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 52"

78° 21' 58" 137 0.12 0 0 1 MGNRE

GA

128 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 54"

78° 21' 29" 62 0.12 0 0 1 MGNRE

GA

129 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 66"

78° 21' 19" 62 0.12 0 0 1 MGNRE

GA

130 PIPARIYA SANDIYA SANDIYA RECHARGE

PIT NEW 22° 54' 36"

78° 21' 29" 62 0.12 0 0 1 MGNRE

GA

131 PIPARIYA SURELAKISHOR SURELAKISHOR STOP DAM NEW 22° 55'

38" 78° 13'

03" 79 10.00 1870 3.74 4 MGNRE

GA

132 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 68"

78° 13' 13" 35 0.12 0 0 1 MGNRE

GA

133 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 48"

78° 13' 63" 35 0.12 0 0 1 MGNRE

GA

134 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 78"

78° 13' 33" 38 0.12 0 0 1 MGNRE

GA

135 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 68"

78° 13' 63" 178/2 0.12 0 0 1 MGNRE

GA

136 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 68"

78° 13' 43" 178/2 0.12 0 0 1 MGNRE

GA

137 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 98"

78° 13' 73" 125 0.12 0 0 1 MGNRE

GA

138 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 98"

78° 13' 63" 76 0.12 0 0 1 MGNRE

GA

139 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 78"

78° 13' 63" 86 0.12 0 0 1 MGNRE

GA

140 PIPARIYA SURELAKISHORE SURELAKISHORE RECHARGE

PIT NEW 22° 55' 88"

78° 13' 63" 80 0.12 0 0 1 MGNRE

GA

141 PIPARIYA MATHNI MATHNI STOP DAM NEW 22° 55'

02" 78° 23'

28" 114/3 10.00 2200 4.4 4 MGNRE

GA

142 PIPARIYA MATHNI MATHNI WELL

DEEPENING RENOVATI

ON 22° 54'

38" 78° 22°

' 21" 183 1.00 0 0 1 MGNREGA

143 PIPARIYA MATHNI MATHNI WELL

DEEPENING RENOVATI

ON 22° 55'

56" 78° 22°

' 38" 349 10.00 0 0 1 MGNRE

GA

144 PIPARIYA MATHNI MATHNI RECHARGE

PIT NEW 22° 55' 62"

78° 23' 48" 186/1 0.12 0 0 1 MGNRE

GA

145 PIPARIYA MATHNI MATHNI RECHARGE

PIT NEW 22° 55' 62"

78° 23' 38" 186/1 0.12 0 0 1 MGNRE

GA

146 PIPARIYA MATHNI MATHNI RECHARGE

PIT NEW 22° 55' 72"

78° 23' 68" 185 0.12 0 0 1 MGNRE

GA

147 PIPARIYA MATHNI MATHNI RECHARGE

PIT NEW 22° 55' 32"

78° 23' 68" 185 0.12 0 0 1 MGNRE

GA

148 PIPARIYA MATHNI MATHNI RECHARGE

PIT NEW 22° 55' 66"

78° 23' 41" 184 0.12 0 0 1 MGNRE

GA

149 PIPARIYA MATHNI MATHNI RECHARGE

PIT NEW 22° 55' 85"

78° 23' 68" 164 0.12 0 0 1 MGNRE

GA

Page 331: HBAD DIP FINAL ab - pmksy.gov.in

331

150 PIPARIYA SEONI SEONI POND

DEEPENING RENOVATI

ON 22° 54'

57" 78° 20'

25" 35 4.00 1800 3.6 5 MGNREGA

151 PIPARIYA SEONI SEONI STOP DAM NEW 22° 54'

58" 78° 20'

22" 81/1 4.00 1870 3.74 4 MGNREGA

152 PIPARIYA SEONI SEONI STOP DAM NEW 22° 54'

55" 78° 20'

29" 81/2 4.00 2200 4.4 4 MGNREGA

153 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 38"

78° 20' 22" 116 0.12 0 0 1 MGNRE

GA

154 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 38"

78° 20' 31" 116 0.12 0 0 1 MGNRE

GA

155 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 44"

78° 20' 22" 116 0.12 0 0 1 MGNRE

GA

156 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 58"

78° 20' 32" 26 0.12 0 0 1 MGNRE

GA

157 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 40"

78° 20' 33" 26 0.12 0 0 1 MGNRE

GA

158 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 58"

78° 20' 47" 112 0.12 0 0 1 MGNRE

GA

159 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 23"

78° 20' 32" 110 0.12 0 0 1 MGNRE

GA

160 PIPARIYA SEONI SEONI RECHARGE

PIT NEW 22° 54' 36"

78° 20' 37" 17 0.12 0 0 1 MGNRE

GA

161 PIPARIYA SEHELWADA SEHELWADA STOP DAM NEW 22° 53'

49" 78° 18'

31" 232 10.00 2200 4.4 5 MGNRE

GA

162 PIPARIYA SAHALWADA SAHALWADA STOP DAM NEW 22° 53'

22" 78° 18'

21" 47 15.00 1980 3.96 5 MGNRE

GA

163 PIPARIYA SAHALWADA SAHALWADA STOP DAM NEW 22° 53'

39" 78° 18'

42" 48 10.00 2200 4.4 5 MGNRE

GA

164 PIPARIYA SAHALWADA SAHALWADA RECHARGE

PIT NEW 22° 53' 39"

78° 18' 26" 48 0.12 0 0 1 MGNRE

GA

165 PIPARIYA SAHALWADA SAHALWADA RECHARGE

PIT NEW 22° 53' 44"

78° 18' 41" 49 0.12 0 0 1 MGNRE

GA

166 PIPARIYA SAHALWADA SAHALWADA RECHARGE

PIT NEW 22° 53' 42"

78° 18' 36" 49 0.12 0 0 1 MGNRE

GA

167 PIPARIYA SAHALWADA SAHALWADA RECHARGE

PIT NEW 22° 53' 63"

78° 18' 12" 135 0.12 0 0 1 MGNRE

GA

168 PIPARIYA SAHALWADA SAHALWADA RECHARGE

PIT NEW 22° 53' 83"

78° 18' 52" 140 0.12 0 0 1 MGNRE

GA

169 PIPARIYA SAHALWADA SAHALWADA RECHARGE

PIT NEW 22° 53' 33"

78° 18' 12" 140 0.12 0 0 1 MGNRE

GA

170 PIPARIYA RICCHEDA RICCHEDA POND

DEEPENING RENOVATI

ON 22° 70'

49" 78° 38'

24" 191 5.00 1800 3.6 5 MGNREGA

171 PIPARIYA RICCHEDA RICCHEDA POND

DEEPENING RENOVATI

ON 22° 70'

47" 78° 38'

18" 191 5.00 1800 3.6 5 MGNREGA

172 PIPARIYA RICCHEDA RICCHEDA POND

DEEPENING RENOVATI

ON 22° 70'

42" 78° 38'

62" 174 5.00 1800 3.6 5 MGNREGA

Page 332: HBAD DIP FINAL ab - pmksy.gov.in

332

173 PIPARIYA RICCHEDA RICCHEDA POND

DEEPENING RENOVATI

ON 22° 70'

43" 78° 38'

63" 290 5.00 1800 3.6 5 MGNREGA

174 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 68'

71" 78° 40'

59" 251 3.00 1800 3.6 5 MGNREGA

175 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 68'

26" 78° 41'

03" 251 3.00 1800 3.6 5 MGNREGA

176 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 68'

23" 78° 40'

94" 251 3.00 1800 3.6 5 MGNREGA

177 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 68'

14" 78° 39'

68" 251 3.00 1800 3.6 5 MGNREGA

178 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 68'

18" 78° 41'

09" 251 3.00 1800 3.6 1 MGNREGA

179 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 67'

14" 78° 39'

35" 251 3.00 1800 3.6 1 MGNREGA

180 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 67'

09" 78° 41'

46" 251 3.00 1800 3.6 1 MGNREGA

181 PIPARIYA RICCHEDA BORI POND

DEEPENING RENOVATI

ON 22° 67'

32" 78° 40'

96" 251 3.00 1800 3.6 1 MGNREGA

182 PIPARIYA RICCHEDA PANARI POND

DEEPENING RENOVATI

ON 22° 68'

65" 78° 37'

79" 244 5.00 2400 4.8 1 MGNREGA

183 PIPARIYA RICCHEDA PANARI POND

DEEPENING RENOVATI

ON 22° 71'

46" 78° 84'

15" 244 5.00 2400 4.8 1 MGNREGA

184 PIPARIYA PANARI PANARI POND

DEEPENING RENOVATI

ON 22° 71'

46" 78° 37'

88" 244 5.00 1800 3.6 1 MGNREGA

185 PIPARIYA PANARI PANARI

POND CONSTRUCTION

NEW 22° 68' 74"

78° 37' 94" 243/1 5.00 2400 4.8 3 MGNRE

GA

186 PIPARIYA PANARI PANARI

POND CONSTRUCTION

NEW 22° 68' 00"

78° 37' 93" 244 5.00 2400 4.8 3 MGNRE

GA

187 PIPARIYA PANARI PANARI

POND CONSTRUCTION

NEW 22° 69' 15"

78° 39' 11" 244 5.00 2400 4.8 3 MGNRE

GA

188 PIPARIYA PANARI PANARI RECHARGE

PIT NEW 22° 82' 44"

78° 34' 65" 281 0.12 0 0 1 MGNRE

GA

189 PIPARIYA SILARI SILARI FARM POND NEW 22° 77'

63" 78° 34'

93" 904 5.00 900 1.8 2 MGNREGA

190 PIPARIYA SILARI JHILPIPARIYA STOP DAM NEW 22° 79'

26" 78° 35'

46" 902/4 8.00 2200 4.4 5 MGNREGA

191 PIPARIYA SILARI DANDIYA STOP DAM NEW 22° 80'

02" 78° 35'

58" 904 8.00 2200 4.4 5 MGNREGA

192 PIPARIYA PAUSERA PAUSERA STOP DAM NEW 22° 81'

07" 78° 32'

34" 50 8.00 1870 3.74 5 MGNREGA

193 PIPARIYA PAUSERA PAUSERA POND

DEEPENING RENOVATI

ON 22° 81'

68" 78° 40'

79" 50 8.00 1200 2.4 1 MGNREGA

Page 333: HBAD DIP FINAL ab - pmksy.gov.in

333

194 PIPARIYA SILARI SILARI RECHARGE

PIT NEW 22° 78' 55"

78° 34' 68" 45 0.12 0 0 1 MGNRE

GA

195 PIPARIYA SILARI SILARI RECHARGE

PIT NEW 22° 78' 58"

78° 34' 14" 902/4 0.12 0 0 1 MGNRE

GA

196 PIPARIYA SILARI SILARI RECHARGE

PIT NEW 22° 79' 17"

78° 34' 12" 902/4 0.12 0 0 1 MGNRE

GA

197 PIPARIYA SILARI SILARI RECHARGE

PIT NEW 22° 78' 24"

78° 34' 80" 902/4 0.12 0 0 1 MGNRE

GA

198 PIPARIYA SILARI SILARI RECHARGE

PIT NEW 22° 80' 11"

78° 40' 80" 902/4 0.12 0 0 1 MGNRE

GA

199 PIPARIYA MARKADHANA MARKADHANA FARM POND NEW 22° 38'

43" 78° 79'

64" 31/1 3.00 900 1.8 2 MGNREGA

200 PIPARIYA NANDIYA NANDIYA FARM POND NEW 22° 38'

75" 78° 44'

75" 39/4 10.00 3000 6 2 MGNRE

GA

201 PIPARIYA NADIYA SUPDONGAR FARM POND NEW 22° 39'

42" 78° 48'

27" 8/2 10.00 3000 6 2 MGNRE

GA

202 PIPARIYA NANDIYA SUPDONGAR STOP DAM NEW 22° 39'

87" 78° 48'

25" 8/1 10.00 2200 4.4 5 MGNRE

GA

203 PIPARIYA NANDIYA SUPDONGAR STOP DAM NEW 22° 39'

60" 78° 48'

70" 19 10.00 2200 4.4 5 MGNRE

GA

204 PIPARIYA NANDIYA SUPDONGAR FARM POND NEW 22° 39'

95" 78° 48'

70" 13 10.00 3000 6 2 MGNRE

GA

205 PIPARIYA NANDIYA CHURNI

POND CONSTRUCTION

NEW 22° 42' 13"

78° 54' 43" 50/8 10.0

0 3600 7.2 3 MGNREGA

206 PIPARIYA NANDIYA CHURNI

POND CONSTRUCTION

NEW 22° 42' 56"

78° 54' 37" 34/4 10.0

0 3600 7.2 3 MGNREGA

207 PIPARIYA NANDIYA CHURNI

POND CONSTRUCTION

NEW 22° 42' 26"

78° 55' 72" 56 10.0

0 3600 7.2 1 MGNREGA

208 PIPARIYA NANDIA sankri

POND CONSTRUCTION

NEW 22° 39' 60"

78° 48' 70" 4 2.00 1200 2.4 1 MGNRE

GA

209 PIPARIYA NANDIA sankri

POND CONSTRUCTION

NEW 22° 39' 95"

78° 49' 76" 16/2 2.00 1200 2.4 1 MGNRE

GA

210 PIPARIYA NANDIA sankri STOP DAM NEW 22° 39'

99" 78° 49'

03" 9/2 2.00 1870 3.74 1 MGNREGA

211 PIPARIYA NANDIA CHURNI STOP DAM NEW 22° 42'

13" 78° 54'

43" 62/2 2.00 2200 4.4 1 MGNREGA

212 PIPARIYA NANDIA CHURNI STOP DAM NEW 22° 43'

26" 78° 55'

72" 50/4 2.00 1980 3.96 1 MGNREGA

213 PIPARIYA JHALOUN JHALOUN STOP DAM NEW 22° 90'

75" 78° 45'

13" 184 5.00 2200 4.4 1 MGNREGA

Page 334: HBAD DIP FINAL ab - pmksy.gov.in

334

214 PIPARIYA JHALOUN PACHUA STOP DAM NEW 22° 89'

15" 78° 48'

64" 299 5.00 1870 3.74 1 MGNREGA

215 PIPARIYA JHALOUN SOHJANI STOP DAM NEW 22° 78°'

15" 78° 41'

64" 239 5.00 2200 4.4 2 MGNREGA

216 PIPARIYA DHANASHRI MUDIYAKHERA STOP DAM NEW 22° 78°'

24" 78° 49'

15" 104 5.00 2200 4.4 2 MGNREGA

217 PIPARIYA DHANASHRI SANKHNI STOP DAM NEW 22° 79'

15" 78° 49'

65" 104 5.00 2200 4.4 2 MGNREGA

218 PIPARIYA PUNOUR PUNOUR STOP DAM NEW 22° 81'

14" 78° 51'

65" 509 5.00 1870 3.74 2 MGNREGA

219 PIPARIYA PUNOUR PUNOUR

POND CONSTRUCTION

NEW 22° 80' 65"

78° 50' 44" 509 5.00 2400 4.8 3 MGNRE

GA

220 PIPARIYA PUNOUR PUNOUR RECHARGE

PIT NEW 22° 67' 44"

78° 34' 64" 551/9 0.12 0 0 1 MGNRE

GA

221 PIPARIYA PUNOUR PUNOUR RECHARGE

PIT NEW 22° 67' 44"

78° 34' 66"

551/13 0.12 0 0 1 MGNRE

GA

222 PIPARIYA PUNOUR PUNOUR RECHARGE

PIT NEW 22° 67' 44"

78° 34' 64" 323/2 0.12 0 0 1 MGNRE

GA

223 PIPARIYA PUNOUR PUNOUR RECHARGE

PIT NEW 22° 67' 44"

78° 34' 82"

551/12 0.12 0 0 1 MGNRE

GA

224 PIPARIYA PUNOUR PUNOUR RECHARGE

PIT NEW 22° 67' 44"

78° 34' 39" 333/1 0.12 0 0 1 MGNRE

GA

225 PIPARIYA PUNOUR PUNOUR RECHARGE

PIT NEW 22° 67' 44"

78° 34' 24" 454/4 0.12 0 0 1 MGNRE

GA

226 PIPARIYA BANVARI BANVARI STOP DAM NEW 22° 43'

44" 78° 20'

02" 145 20.00 2200 4.4 2 MGNRE

GA

227 PIPARIYA BANVARI BANVARI STOP DAM NEW 22° 42'

26" 78° 55'

72" 145 20.00 2200 4.4 2 MGNRE

GA

228 PIPARIYA MOKALVADA MOKALVADA STOP DAM NEW 22° 44'

28" 78° 19'

44" 336 3.00 2200 4.4 3 MGNREGA

229 PIPARIYA MOKALVADA MOKALVADA

POND CONSTRUCTION

NEW 22° 44' 19"

78° 18' 60" 210 10.0

0 3600 7.2 3 MGNREGA

230 PIPARIYA BMHORIKALAN BMHORIKALAN STOP DAM NEW 22° 43'

18" 78° 18'

34" __ 30.00 2200 4.4 3 MGNRE

GA

231 PIPARIYA BMHORIKALAN BMHORIKALAN STOP DAM NEW 22° 42'

33" 78° 18'

15" 132 15.00 1980 3.96 3 MGNRE

GA

232 PIPARIYA TAROUN KALA UMARIYA STOP DAM NEW 22° 42'

16" 78° 22'

38" 22 15.00 2200 4.4 3 MGNRE

GA

233 PIPARIYA TAROUN KALA TAROULKALA STOP DAM NEW 22° 42'

40" 78° 20'

08" 22 15.00 1870 3.74 4 MGNRE

GA

234 PIPARIYA TAROUN KALA TAROULKALA STOP DAM NEW 22° 45'

30" 78° 22°

45" 22 15.00 2200 4.4 4 MGNRE

GA

235 PIPARIYA KHAIRIKALA KHAIRIKALA STOP DAM NEW 22° 41'

21" 78° 19'

03" 218 10.00 1980 3.96 4 MGNRE

GA

Page 335: HBAD DIP FINAL ab - pmksy.gov.in

335

236 PIPARIYA KHAIRI KALA KHAIRI KALA STOP DAM NEW 22° 40

34" 78° 18'

40" 514 20.00 2200 4.4 4 MGNRE

GA

237 PIPARIYA MUHARIKALA MUHARIKALA

POND CONSTRUCTION

NEW 22° 39' 18"

78° 17' 55" 3/5 10.0

0 3600 7.2 4 MGNREGA

238 PIPARIYA MUHARIKALA MUHARIKALA

POND CONSTRUCTION

NEW 22° 39' 14"

78° 18' 03" 226/2 5.00 2400 4.8 4 MGNRE

GA

239 PIPARIYA MUHARIKALA HATHNIKHAPA STOP DAM NEW 22° 38'

29" 78° 18'

40" 87 10.00 2200 4.4 4 MGNRE

GA

240 PIPARIYA MUHARIKALA°° MUHARIKHURD

POND CONSTRUCTION

NEW 22° 38' 37"

78° 19' 09" __ 10.0

0 3600 7.2 4 MGNREGA

241 PIPARIYA MUHARIKALA MUHARIKALA POND

DEEPENING RENOVATI

ON 22° 39'

18" 78° 17'

55" 4.00 1800 3.6 1 MGNREGA

242 PIPARIYA SAMNAPUR DOKRIKHEDA

POND CONSTRUCTION

NEW 22° 39' 41"

78° 22° ' 41" __ 10.0

0 3600 7.2 5 MGNREGA

243 PIPARIYA SAMNAPUR SAMNAPUR FARM POND NEW 22° ° 44'

11" 78° 22°

' 15" __ 2.00 600 1.2 2 MGNREGA

244 PIPARIYA UNTIYAKISHOR KHAPARIYA STOP DAM NEW 22° 50'

38" 78° 20'

31" __ 15.00 2200 4.4 5 MGNRE

GA

245 PIPARIYA UNTIYAKISHOR SAMRIKISHOR STOP DAM NEW 22° 51'

05" 78° 19'

51" __ 15.00 2200 4.4 5 MGNRE

GA

246 PIPARIYA UNTIYAKISHOR UNTIYAKISHOR

POND CONSTRUCTION

NEW 22° 50' 44"

78° 19' 25" __ 10.0

0 3600 7.2 5 MGNREGA

247 PIPARIYA JAMARA JAMARA

POND CONSTRUCTION

NEW 22° 84' 61"

78° 32' 38" 62/1 10.0

0 3600 7.2 5 MGNREGA

248 PIPARIYA PAGARA PAGARA STOP DAM

RENOVATION RENOVATI

ON 22° 84'

61" 78° 32'

42" __ 1.00 1300 0 2 MGNREGA

249 PIPARIYA KHERA KHERA RECHARGE

PIT NEW 22° 57' 36"

78° 25' 57" 101 0.12 0 0 1 MGNRE

GA

250 PIPARIYA KHERA KHERA RECHARGE

PIT NEW 22° 58' 12"

78° 25' 37" 101 0.12 0 0 1 MGNRE

GA

251 PIPARIYA KHERA KHERA RECHARGE

PIT NEW 22° 58' 13"

78° 24' 65" 225 0.12 0 0 1 MGNRE

GA

252 PIPARIYA KHERA KHERA RECHARGE

PIT NEW 22° 52' 39"

78° 25' 21" 225 0.12 0 0 1 MGNRE

GA

253 PIPARIYA KHERA KHERA RECHARGE

PIT NEW 22° 58' 23"

78° 24' 65" 225 0.12 0 0 1 MGNRE

GA

254 PIPARIYA KHERA KHERA RECHARGE

PIT NEW 22° 52' 39"

78° 25' 21" 225 0.12 0 0 1 MGNRE

GA

255 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 09"

78° 25' 28" 62/1 0.12 0 0 1 MGNRE

GA

Page 336: HBAD DIP FINAL ab - pmksy.gov.in

336

256 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 19"

78° 25' 18" 62/1 0.12 0 0 1 MGNRE

GA

257 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 12"

78° 25' 22" 62/1 0.12 0 0 1 MGNRE

GA

258 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 11"

78° 25' 26" 62/1 0.12 0 0 1 MGNRE

GA

259 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 24"

78° 25' 38" 62/1 0.12 0 0 1 MGNRE

GA

260 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 26"

78° 25' 35" 62/1 0.12 0 0 1 MGNRE

GA

261 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 42"

78° 25' 38" 62/1 0.12 0 0 1 MGNRE

GA

262 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 26"

78° 25' 48" 62/1 0.12 0 0 1 MGNRE

GA

263 PIPARIYA BANSKHEDA BANSKHEDA RECHARGE

PIT NEW 22° 52' 36"

78° 25' 44" 62/1 0.12 0 0 1 MGNRE

GA

264 PIPARIYA BANSKHEDA BANSKHEDA STOP DAM NEW 22° 53'

46" 78° 31'

34" 106 15.00 1980 3.96 5 MGNRE

GA

265 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 58"

78° 24' 36" 65 0.12 0 0 1 MGNRE

GA

266 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 67"

78° 24' 36" 65 0.12 0 0 1 MGNRE

GA

267 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 67"

78° 24' 46" 65 0.12 0 0 1 MGNRE

GA

268 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 77"

78° 24' 56" 65 0.12 0 0 1 MGNRE

GA

269 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 37"

78° 24' 66" 65 0.12 0 0 1 MGNRE

GA

270 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 47"

78° 24' 26" 65 0.12 0 0 1 MGNRE

GA

271 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 77"

78° 24' 66" 61 0.12 0 0 1 MGNRE

GA

272 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 97"

78° 24' 16" 61 0.12 0 0 1 MGNRE

GA

273 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 47"

78° 24' 36" 61 0.12 0 0 1 MGNRE

GA

274 PIPARIYA MAHALWADA MAHALWADA RECHARGE

PIT NEW 22° 46' 97"

78° 24' 46" 61 0.12 0 0 1 MGNRE

GA

275 PIPARIYA MAHALWADA MAHALWADA POND

DEEPENING RENOVATI

ON 22° 46'

87" 78° 24'

66" 107 5.00 1800 3.6 1 MGNREGA

276 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 85"

78° 23' 58" 365 0.12 0 0 1 MGNRE

GA

277 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 85"

78° 23' 68" 365 0.12 0 0 1 MGNRE

GA

278 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 85"

78° 23' 38" 345 0.12 0 0 1 MGNRE

GA

Page 337: HBAD DIP FINAL ab - pmksy.gov.in

337

279 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 85"

78° 23' 31" 384 0.12 0 0 1 MGNRE

GA

280 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 85"

78° 23' 32" 347 0.12 0 0 1 MGNRE

GA

281 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 85"

78° 23' 29" 347 0.12 0 0 1 MGNRE

GA

282 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 86"

78° 23' 28" 347 0.12 0 0 1 MGNRE

GA

283 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 83"

78° 23' 42" 390 0.12 0 0 1 MGNRE

GA

284 PIPARIYA SEMRITALA SEMRITALA RECHARGE

PIT NEW 22° 55' 56"

78° 23' 88" 389 0.12 0 0 1 MGNRE

GA

285 PIPARIYA SEMRITALA SEMRITALA STOP DAM NEW 22° 55'

78" 78° 23'

78" 443 10.00 2200 4.4 5 MGNRE

GA

286 PIPARIYA RAITWADI RAITWADI RECHARGE

PIT NEW 22° 79' 17"

78° 38' 44" 322/4 0.12 0 0 1 MGNRE

GA

287 PIPARIYA SURELAKALA PODI STOP DAM NEW 22° 79'

68" 78° 31'

14" 75 2.00 2200 4.4 5 MGNREGA

288 PIPARIYA SURELAKALA PODI STOP DAM NEW 22° 79'

68" 78° 31'

15" 75 2.00 1870 3.74 1 MGNREGA

289 PIPARIYA SURELAKALA KAJROTA STOP DAM NEW 22° 81'

17" 78° 34'

44" 12 2.00 2200 4.4 1 MGNREGA

290 PIPARIYA SURELAKALA KAJROTA STOP DAM NEW 22° 81'

17" 78° 34'

45" 12 2.00 1980 3.96 1 MGNREGA

291 PIPARIYA POUSERA POUSERA RECHARGE

PIT NEW 22° 81' 74"

78° 40' 80" 50 0.12 0 0 1 MGNRE

GA

292 PIPARIYA POUSERA POUSERA RECHARGE

PIT NEW 22° 81' 74"

78° 40' 81" 50 0.12 0 0 1 MGNRE

GA

293 PIPARIYA POUSERA POUSERA RECHARGE

PIT NEW 22° 81' 74"

78° 40' 83" 50 0.12 0 0 1 MGNRE

GA

294 PIPARIYA HATHWAS HATHWAS RECHARGE

PIT NEW 22° 80' 11"

78° 40' 80" 20/1 0.12 0 0 1 MGNRE

GA

295 PIPARIYA HATHWAS HATHWAS RECHARGE

PIT NEW 22° 80' 11"

78° 40' 88" 20/1 0.12 0 0 1 MGNRE

GA

296 PIPARIYA HATHWAS HATHWAS RECHARGE

PIT NEW 22° 80' 11"

78° 40' 86" 20/1 0.12 0 0 1 MGNRE

GA

297 PIPARIYA BEEJANWADA BEEJANWADA RECHARGE

PIT NEW 22° 82' 17"

78° 34' 12" 258/3 0.12 0 0 1 MGNRE

GA

298 PIPARIYA BEEJANWADA BEEJANWADA RECHARGE

PIT NEW 22° 82' 65"

78° 34' 67" 262/2 0.12 0 0 1 MGNRE

GA

299 PIPARIYA BEEJANWADA BEEJANWADA RECHARGE

PIT NEW 22° 82' 19"

78° 34' 65" 219/3 0.12 0 0 1 MGNRE

GA

300 PIPARIYA BEEJANWADA BEEJANWADA RECHARGE

PIT NEW 22° 82' 44"

78° 34' 65" 149 0.12 0 0 1 MGNRE

GA

301 PIPARIYA BEEJANWADA BEEJANWADA RECHARGE

PIT NEW 22° 82' 54"

78° 38' 38" 156 0.12 0 0 1 MGNRE

GA

Page 338: HBAD DIP FINAL ab - pmksy.gov.in

338

302 PIPARIYA KHERUA KHERUA RECHARGE

PIT NEW 22° 82' 71"

78° 39' 27" 144 0.12 0 0 1 MGNRE

GA

303 PIPARIYA KHERUA KHERUA RECHARGE

PIT NEW 22° 82' 54"

78° 39' 37" 144 0.12 0 0 1 MGNRE

GA

304 PIPARIYA KHERUA KHERUA RECHARGE

PIT NEW 22° 82' 54"

78° 38' 38" 7 0.12 0 0 1 MGNRE

GA

305 PIPARIYA KHERUA KHERUA RECHARGE

PIT NEW 22° 82' 54"

78° 38' 48" 79 0.12 0 0 1 MGNRE

GA

306 PIPARIYA RAIKHEDI RAIKHEDI RECHARGE

PIT NEW 22° 68' 75"

78° 34' 17" 1 0.12 0 0 1 MGNRE

GA

307 PIPARIYA RAIKHEDI RAIKHEDI RECHARGE

PIT NEW 22° 68' 44"

78° 34' 65" 1 0.12 0 0 1 MGNRE

GA

308 PIPARIYA PACHLAVRA PACHLAVRA POND

DEEPENING RENOVATI

ON 22° 52'

38" 78° 21'

41" 278 5.00 1800 3.6 1 MGNREGA

309 PIPARIYA PACHLAVRA PACHLAVRA STOP DAM NEW 22° 51'

34" 78° 29'

24" 5.00 1870 3.74 1 MGNREGA

310 PIPARIYA KHAPARKHEDA KHAPARKHEDA FARM POND NEW 22° 49'

01" 78° 20'

48" 51/8 2.00 600 1.2 2 MGNREGA

311 PIPARIYA KHAPARKHEDA KHAPARKHEDA POND

DEEPENING RENOVATI

ON 22° 49'

05" 78° 21'

56" 327 3.00 1800 3.6 1 MGNREGA

312 PIPARIYA Gadaghat Gadaghat STOP DAM NEW 22° 50'

22" 78° 25'

58" 55 10.00 2200 4.4 1 MGNRE

GA

Pradhanmantri Krishi Sinchai Yojna –Pipariya

Proposed New Water Conservation Structures List Of Dupty Director Farmer Welfare & Agriculture Devlopment District :- Hoshangabad

SN.

Name of

Block

Gram Panchayat

Village Name

Name of Work

Type of Structure

New/Renovation

Position of Working place

Khasra No.

Total Cost

Storage Capacity (CUM)

Irrigation Potential

Year of Implementation

Scheme Name

Latitude Longitude

1 Piparya Tekapar Khari Check Dam New 78º.29.30 22.30.15 31/2 5.00 41,000 7.00

2 Piparya Tekapar Khari M.I.T. New 78º.29.30 22.30.15 28 24.50 1,10,000 40.00

3 Piparya Tekapar Khari Percolation Tank New 78º.29.30 22.30.15 27 15.00 95,000 10.00

4 Piparya Matkuli Mohgaon M.I.T. New 78º.29.30 22.30.15 ,2/2 24.50 1,10,000 40.00

5 Piparya Matkuli Mohgaon Check Dam New 78º.29.30 22.30.15 ,2/2 5.00 41,000 7.00

Page 339: HBAD DIP FINAL ab - pmksy.gov.in

339

6 Piparya Matkuli Mohgaon Percolation Tank New 78º.29.30 22.30.15 35 14.00 95,000 10.00

7 Piparya Matkuli Matkuli Check Dam New 78º.28.20 22.35.30 27 5.00 41,000 7.00

8 Piparya Matkuli Matkuli Percolation Tank New 78º.28.20 22.35.30 ,1/3 10.00 82,000 7.00

9 Piparya Matkuli Matkuli Percolation Tank New 78º.28.20 22.35.30 234/1 10.00 82,000 7.00

10 Piparya Tekapar Chillod Percolation Tank New 78º.30.15 22.37.25 59,58/5 15.00 95,000 10.00

11 Piparya Tekapar Chillod M.I.T. New 78º.30.15 22.37.25 90/1 24.50 1,10,000 40.00

12 Piparya Tekapar Chillod Check Dam New 78º.30.15 22.37.25 40/3 5.00 41,000 7.00

13 Piparya Tekapar Tekapar Percolation Tank New 78º.30.15 22.37.25 22 15.00 95,000 10.00

14 Piparya Pisua Pathai Mal

Percolation Tank New 78º.25.35 22.35.15 66 15.00 95,000 10.00

15 Piparya Pisua Pathai Mal

Percolation Tank New 78º.25.35 22.35.15 58 15.00 95,000 10.00

16 Piparya Pisua Maili M.I.T. New 78º.25.20 22.37.10 62,31 24.50 1,10,000 40.00

17 Piparya Pisua Chandan Pipariya

Percolation Tank New 78º.25.30 22.35.20 51 15.00 95,000 10.00

18 Piparya Pisua Chandan Pipariya

Check Dam New 78º.25.30 22.35.20 51 5.00 41,000 7.00

19 Piparya Pisua Chandan Pipariya

Check Dam New 78º.25.30 22.35.20 27 5.00 41,000 7.00

20 Piparya Pisua Pisua Check Dam New 78º.24.15 22.35.10 87 5.00 41,000 7.00

21 Piparya Pisua Pisua M.I.T. New 78º.24.15 22.35.10 158 25.00 1,10,000 40.00

22 Piparya Pisua Banda kheda

Percolation Tank New 78º.20.20 22.30.10 ,2/3 15.00 95,000 10.00

23 Piparya Pisua Banda kheda

Check Dam New 78º.20.20 22.30.10 ,2/1 15.00 95,000 7.00

24 Piparya Pisua Pathai Thekedri

Percolation Tank New 78º.26.15 22.36.20 3 15.00 95,000 10.00

25 Piparya Pisua Pathai Thekedri

Check Dam New 78º.26.15 22.36.20 ,2/3 5.00 41,000 7.00

26 Piparya Nadiya Churni Percolation Tank New 78º.22.30 22.35.30 20 15.00 95,000 7.00

27 Piparya Nadiya Churni Percolation Tank New 78º.22.30 22.35.30 50/7 15.00 95,000 7.00

28 Piparya Nadiya Churni Percolation Tank New 78º.22.30 22.35.30 34/5 15.00 95,000 7.00

Page 340: HBAD DIP FINAL ab - pmksy.gov.in

340

29 Piparya Nadiya Soop Doagar

Percolation Tank New 78º.22.30 22.35.30 8/4 G 15.00 95,000 7.00

30 Piparya Samnapur Bari Devi

Percolation Tank New 78º.15.10 22.38.15 48 15.00 95,000 10.00

31 Piparya Samnapur Bari Devi

Percolation Tank New 78º.15.10 22.38.15 60 15.00 95,000 10.00

32 Piparya Dapka Dapka Percolation Tank New 78º.21.15 22.37.20 45 15.00 95,000 10.00

33 Piparya Dapka Indra Nagar M.I.T. New 78º.20.18º 22.38.26 19 25.00 1,10,000 40.00

34 Piparya Dapka Kursi Khapa

Percolation Tank New 78º.19.25 22.36.25 100 15.00 95,000 15.00

35 Piparya Dapka Kursi Khapa

Percolation Tank New 78º.19.25 22.36.25 75 15.00 95,000 15.00

36 Piparya Muhari kalan

Muhari Khurd M.I.T. New 78º.18.20 22.369.25 120 25.00 1,10,000 40.00

37 Piparya Muhari kalan

Muhari Khurd

Percolation Tank New 78º.18.20 22.369.25 54,57/1 15.00 95,000 10.00

Total _ _ _ _ _ _ _ 532.00 _ _

Page 341: HBAD DIP FINAL ab - pmksy.gov.in

341

Bankhedi

Page 342: HBAD DIP FINAL ab - pmksy.gov.in

342

Pradhanmantri Krishi Sinchai Yojna - Janpad Bankhedi

S.No.

Name of

Block

Gram Panchayat

Village Name Name of Work

Type Of Structure(New/Reno

vation)

Co-ordinates Khasra No.

Total

Cost In

Lakh

Storage

Capacity In Cum

Irrigation

Potential In Ha.

Year of Implementa

tion

Scheme

Name

Latitude Longitude

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Bankhedi

Junawani Dhana

Devari Pond Deepening Renovation It 22.4312773 log 8.3604.526 51,26/2 5.00

0 1000 5.000 2 NREGS

Chhater Pond Deepening Renovation It

22.42.27.576 log

7834.46.496 51.159/

1 5.00

0 1000 5.000 2 NREGS

Devari Farm Pond New It 22.4238091 log 78.3445207

51 1.07

0 800 1.070 1 NREGS

Khabara Farm Pond New It 22.4311702 log

78.83602714 51 1.07

0 800 1.070 1 NREGS

Junawani Farm Pond New 51 1.07

0 800 1.070 1 NREGS

Khabara Farm Pond New It 22.4556444 log 78.3500217 51 1.07

0 800 1.070 1 NREGS

Khabara Farm Pond New It 22.4552661 log 78.3556232 51 1.07

0 800 1.070 1 NREGS

Chhater Farm Pond New 51 1.07

0 800 1.070 1 NREGS

2 Bankhedi

Padrai Thakur

Fasidhana Farm Pond New It

22.73627166 log 78.5398949 50/80 1.07

0 800 1.070 1 NREGS

Fasidhana Farm Pond New It 22.7364600 log 78598483 50/51 1.07

0 800 1.070 1 NREGS

Fasidhana Farm Pond New It 22.736205 log 78.540015 50/164 1.07

0 800 1.070 1 NREGS

padraithakur Farm Pond New 50/132 1.07

0 800 1.070 1 NREGS

padraithakur Farm Pond New 50/134 1.07

0 800 1.070 1 NREGS

padraithakur Farm Pond New 56 1.07

0 800 1.070 1 NREGS

padraithakur Pond Deepening Renovation 2.00

0 800 2.000 1 NREGS

padraithakur Pond Deepening Renovation 27 2.00

0 800 2.000 1 NREGS

Fasidhana Pond Deepening Renovation It 22.7361066 log 78.5402466 50/27 3.00

0 600 3.000 1 NREGS

Jhiriya Pond Deepening Renovation It 22.7361283 log 78.5398483 50/54 3.00 600 3.000 1 NRE

Page 343: HBAD DIP FINAL ab - pmksy.gov.in

343

Jhora 0 GS

3 Bankhedi Gardha

Khamkhedi Farm Pond New 34/3 1.07

0 800 1.070 1 NREGS

Manakwada Farm Pond New 66 1.07

0 800 1.070 1 NREGS

Gardha Farm Pond New 18 1.07

0 800 1.070 1 NREGS

Gardha Farm Pond New 93/1 1.07

0 800 1.070 1 NREGS

Gardha Farm Pond New 268/2 1.07

0 800 1.070 1 NREGS

4 Bankhedi Isharpur

Isharpur Stop Dam New It 22.8135814 log 78.5105091 10.0

00 800 10.000 1 NREGS

Isharpur Stop Dam New It 22.8137822 log 78.516532 10.0

00 800 10.000 1 NREGS

Isharpur Recharge Pit New It 22.484926 log 78.2095766 0.15

0 500 0.150 1 NREGS

Isharpur Recharge Pit New It 22.469092 log 78.308925 0.15

0 500 0.150 1 NREGS

Isharpur Recharge Pit New It 22.487353 log 78.5305 0.15

0 500 0.150 1 NREGS

Isharpur Recharge Pit New It 22.4889667 log 78.300004 0.15

0 500 0.150 1 NREGS

Isharpur Recharge Pit New It 22.489884 log 78.306131 0.15

0 500 0.150 1 NREGS

Isharpur Recharge Pit New It 22.484926 log 78.2095766 0.15

0 500 0.150 1 NREGS

Isharpur Recharge Pit New It 22.488704 log 78.306074 0.15

0 500 0.150 1 NREGS

5 Bankhedi Khamariya

Khamariya Farm Pond New It 22.7936240 log

78.51850559 33/70 10.0

00 800 10.000 1 NREGS

Rajthari Recharge Pit New It 22.8030944 log 78.4078624 0.15

0 500 0.150 1 NREGS

Rajthari Recharge Pit New It 22.8083420 log 78.5176264 0.15

0 500 0.150 1 NREGS

Rajthari Recharge Pit New It 22.8028792 log 78.5128287 0.16

5 500 0.165 1 NREGS

Rajthari Recharge Pit New It 22.8029078 log 78.5135594 0.15

0 500 0.150 1 NREGS

Rajthari Recharge Pit New It 22.8056255 log 78.520878 0.15

0 500 0.150 1 NREGS

Rajthari Farm Pond New It 22.8030420 log 78.5087013 0.15

0 500 0.150 1 NREGS

Rajthari Farm Pond New It 22.8034360 log 78.5169980 1.15

0 500 1.150 1 NREGS

Page 344: HBAD DIP FINAL ab - pmksy.gov.in

344

Khamariya Stop Dam New It 22.8030023 log 78.5116254 33/105 10.0

00 800 10.000 1 NREGS

6 Bankhedi Bichua

Bichua Farm Pond New It 22.4718903 log 78.32.3544 43,113 1.07

0 800 1.070 1 NREGS

Bichua Farm Pond Renovation It 22.4513406 log 78.8330176 43,117 2.50

0 1500 2.500 3 NREGS

Bichua Farm Pond Renovation It 22.4509077 log 78.3249107 47,72/1 2.50

0 1500 2.500 3 NREGS

Bichua Check Dam Renovation It 22.4510705 log 78.3224196 23 4.50

0 2500 4.500 5 NREGS

Bichua Farm Pond Renovation It 22.4520352 log 78.3237764 47,72/1 1.00

0 500 1.000 1 NREGS

Baghraj Farm Pond New It

22.43.22.922 log

78.3349.869 44/78 10.0

00 6000 10.000 1 NREGS

7 Bankhedi Maidakheda

Maidakheda Farm Pond New 47/180 1.07

0 500 1.070 1 NREGS

Maidakheda Farm Pond New 47/72/1 1.07

0 500 1.070 1 NREGS

Maidakheda Pond Deepening Renovation 47/101 2.50

0 1500 2.500 3 NREGS

Hanotiya Farm Pond Renovation It 22.4350614 log 78.2820901 47,72/1 2.50

0 1500 2.500 3 NREGS

Maidakheda Farm Pond Renovation It 22.4249366 log 78.3009211 47,298 2.50

0 1500 2.500 3 NREGS

Maidakheda Pond Construction New It 22.4238585 log 78.3011783

47,298 2.500 1500 2.500 3

NREGS

8 Bankhedi Singpur Singpur Stop Dam

Renovation Renovation It 22.4426876 log 78.3281501 43 10.0

00 800 10.000 1 NREGS

8 Bankhedi Bachawani

Baghedi Farm Pond New Itn

22.43'37.917'' log

78.28'16.207'' 36,34/2 1.07

0 500 1.070 1 NREGS

Baghedi Farm Pond New Itn

22.4625810 log

78.28'14.888" 1.07

0 500 1.070 1 NREGS

Bachawani Stop Dam Renovation Renovation

Itn 22.4625810

log 78.29015890

1.050 500 1.050 1

NREGS

Bachawani Farm Pond New It

22.45150479 log 78.2048904 1.07

0 800 1.070 1 NREGS

Kajiyakheda Check Dam New It 22.4518436 log 78.2930289 3.00

0 1500 3.000 3 NREGS

Kajiyakheda Recharge Pit New It 22.4514248 log 78.2936375 0.15

0 500 0.150 1 NREGS

Baghedi Check Dam New It 22.4532561 log 78.2807418 19, 189 3.00

0 1500 3.000 3 NREGS

Kajiyakheda Recharge Pit New It 22.4515477 log 78.2939028 0.15

0 500 0.150 1 NREGS

Bachawani Pond Deepening Renovation Itn

22.45'51.986" log

78.29'52.502" 36/405/

2 2.05

0 500 2.050 1 NREGS

Page 345: HBAD DIP FINAL ab - pmksy.gov.in

345

9 Bankhedi Tindwada

Tindwada Farm Pond New It 22.771201 log

78.27552842 30/241 1.07

0 500 1.070 1 NREGS

Tindwada Farm Pond New It 22.824973 log 78.521915 1.07

0 500 1.070 1 NREGS

Tindwada Dyke Construction New It 22.4736789 log 78.3329784

1.070 500 1.070 1

NREGS

Tindwada Farm Pond New It 22.4858479 log 78.3256413 1.07

0 500 1.070 1 NREGS

Tindwada Farm Pond New 30/693 1.07

0 500 1.070 1 NREGS

10 Bankhedi Deveri

Dungariya Farm Pond New 10,68/1

0 1.07

0 500 1.070 1 NREGS

Dungariya Farm Pond New It 22.8216949 log 78.4577316 10,

36/11 1.07

0 500 1.070 1 NREGS

Dungariya Farm Pond New It 22.8257683 log 78.45433 1.00

0 500 1.000 1 NREGS

Dungariya Farm Pond New It 22.8204412 log 78.45567 68/2 1.00

0 500 1.000 1 NREGS

Dharpura Farm Pond New It 22.8720516 log 78.44128 16 1.00

0 500 1.000 1 NREGS

Devri Dyke Construction New It 22.8448083 log 78.4429933

16 1.000 500 1.000 1

NREGS

dugariya Dyke Construction New It 22.8430216 log 78.4396566

16 1.000 500 1.000 1

NREGS

Dungariya Farm Pond New 10,68/1

1 1.07

0 500 1.070 1 NREGS

11 Bankhedi Nayagaon

Ghoghrimatta Farm Pond New

It 22.41'42.047"

log 78.26'41.422"

48/87 1.070 500 1.070 1

NREGS

Nayagaon Pond Deepening Renovation It

22.43'06.298" log

78.26'23.624" 48 1.07

0 500 1.070 1 NREGS

12 Bankhedi Poudi

Poudi Farm Pond Renovation It22.7860559 log 78.79855 35/128/

11 1.07

0 500 1.070 1 NREGS

Poudi Recharge Pit New It 22.7919569 log 78.4235857 99 0.15

0 500 0.150 1 NREGS

Poudi Recharge Pit New It 22.7910390 log 78.4653448 0.15

0 500 0.150 1 NREGS

Kursidhana Recharge Pit New It 22.7882894 log 78.4839777 15 0.01

5 500 0.015 1 NREGS

Kursidhana Recharge Pit New It 22.789322 log 78.4894951 24/1 0.15

0 500 0.150 1 NREGS

Kursidhana Recharge Pit New It 0.15

0 500 0.150 1 NREGS

13 Bankhedi

Mahuakheda

Mahuakheda Farm Pond New It 22.422209 log 78.3050345

0.530 800 0.530 1

NREGS

Mahuakheda Farm Pond New It 22.4226768 log 78.3010602

0.530 800 0.530 1

NREGS

Page 346: HBAD DIP FINAL ab - pmksy.gov.in

346

Mahuakheda Farm Pond New

It 22.422423906

6 log 78.2923708 0.53

0 800 0.530 1 NREGS

Mahuakheda Farm Pond New

It 22.42390066 log 78.2523708

0.530 800 0.530 1

NREGS

Mahuakheda Stop Dam New

It 22.42020603 log 78.3047357 -

10.000 2250 10.000 5

NREGS

Mahuakheda Pond Deepening Renovation It 22.424462 log 78.304435

2.500 1500 2.500 3

NREGS

14 Bankhedi Dangarhai Dangarhai

Pond Construction New It 22.770835 log 78.676565

0.530 800 0.530 1

NREGS

Dangarhai Pond Construction New It 22.679165 log 78.676565

0.530 800 0.530 1

NREGS

15 Bankhedi kothari

kothari Farm Pond New It 22.743892 iog 78.736636 53,167/

13 1.07

0 500 1.070 1 NREGS

kothari Farm Pond New it 22.761837 log 736636 53,54 1.07

0 500 1.070 1 NREGS

kothari Farm Pond New it 22.761839 log 736643 536,09 1.07

0 500 1.070 1 NREGS

16 Bankhedi Patharkuhi

Patharkuhi Farm Pond New it 22.761839 log 736644 1.07

0 500 1.070 1 NREGS

Patharkuhi Farm Pond New it 22.7589878 log 78.8180558 40,135/

3 1.07

0 500 1.070 1 NREGS

Patharkuhi Farm Pond New it 22.758988 log 78.8180560 1.07

0 500 1.070 1 NREGS

Patharkuhi Recharge Pit New it 22.761236 log 78.6915 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761232 log 78.6916 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761230 log 78.6914 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761232 log 78.6912 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761230 log 78.6910 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761231 log 78.6918 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.76123 log 78.6917 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761238 log 78.6919 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761239 log 78.6917 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New it 22.761231 log 78.6913 40 0.15

0 500 0.150 1 NREGS

Patharkuhi Recharge Pit New It 22.761239 log 78.6920 40 0.15 500 0.150 1 NRE

Page 347: HBAD DIP FINAL ab - pmksy.gov.in

347

0 GS

Kharsli Recharge Pit New It 22.761235 log 78.6011 40 0.15

0 500 0.150 1 NREGS

Kharsli Recharge Pit New It 22.761240 log 78.6920 40 0.15

0 500 0.150 1 NREGS

Kharsli Recharge Pit New It 22.761241 log 78.6922 40 0.15

0 500 0.150 1 NREGS

Kharsli Recharge Pit New it 22.761242 log 78.10 40 0.15

0 500 0.150 1 NREGS

Kharsli Recharge Pit New It 22.761244 log 78.691924 40 0.15

0 500 0.150 1 NREGS

17 Bankhedi

Paliyapipariya

Paliyapipariya Farm Pond New

It 22.80900895 log 78.588445

29,108/4

1.070 500 1.070 1

NREGS

Paliyapipariya Farm Pond New

It 22.80900915 log 78.588447

29 1.070 500 1.070 1

NREGS

Paliyapipariya Farm Pond New

It 22.80900875 log 78.588448

29 1.070 500 1.070 1

NREGS

18 Bankhedi

Machherakala

Machherakala Farm Pond New

It 22.80900654 log 78.588743

26,178/2

1.070 500 1.070 1

NREGS

Machherakala Farm Pond New

It 22.80900655 log 78.588742

23,178/3

1.070 500 1.070 1

NREGS

Machherakala Farm Pond New

It 22.80944656 log 78.588741

26,121/2

1.070 500 1.070 1

NREGS

19 Bankhedi Barchhi

Barchhi Farm Pond New 14,107/

2 1.07

0 500 1.070 1 NREGS

Barchhi Farm Pond New 14,167/

2 1.07

0 500 1.070 1 NREGS

Barchhi Farm Pond New 14.167/

3 1.07

0 500 1.070 1 NREGS

Barchhi Recharge Pit New

It 22.906062066

02 log

78.5736947196

14 0.15

0 500 0.150 1 NREGS

Barchhi Recharge Pit New

It 22.906020663

1 log

78.5736947185

14 0.15

0 500 0.150 1 NREGS

Barchhi Recharge Pit New It

22.906020626 log

78.573694727 14 0.15

0 500 0.150 1 NREGS

Barchhi Recharge Pit New

It 22.906062058

8 log

78.5736947136

14 0.15

0 500 0.150 1 NREGS

Barchhi Recharge Pit New

It 22.906062061

3 log

78.5736947172

14 0.15

0 500 0.150 1 NREGS

Barchhi Recharge Pit New

It 22.906062061

9 log

78.5736947138

14 0.15

0 500 0.150 1 NREGS

Page 348: HBAD DIP FINAL ab - pmksy.gov.in

348

Barchhi Recharge Pit New

It 22.906062063

4 log

78.57369418

14 0.15

0 500 0.150 1 NREGS

Barchhi Recharge Pit New

It 22.906062061

7 log

78.5736947126

14 0.15

0 500 0.150 1 NREGS

Jaitbada Recharge Pit New

It 22.906062051

9 log

78.57369312

14 0.15

0 500 0.150 1 NREGS

Jaitbada Recharge Pit New

It 22.906062052

6

log 78.5736944612

2

14 0.15

0 500 0.150 1 NREGS

Jaitbada Recharge Pit New It

22.90606261 log

78.57369336 14 0.15

0 500 0.150 1 NREGS

Jaitbada Recharge Pit New

It 22.906062062

4 log

78.57369454

14 0.15

0 500 0.150 1 NREGS

Jaitbada Recharge Pit New

It 22.906062051

6 log

78.57369352

14 0.15

0 500 0.150 1 NREGS

Jaitbada Recharge Pit New

It 22.906062058

7 log

78.57369471

14 0.15

0 500 0.150 1 NREGS

Jaitbada Recharge Pit New

It 22.906062061

5 log

78.57369454

14 0.15

0 500 0.150 1 NREGS

20 Bankhedi Murgidhana

Murgidhana Farm Pond New It 22.761838 log 736643 55 1.07

0 500 1.070 1 NREGS

Murgidhana Farm Pond New It 22.761837 log 736642 55 1.07

0 500 1.070 1 NREGS

Kamti Farm Pond New It 22.761836 log 736645 56 1.07

0 500 1.070 1 NREGS

Kamti Farm Pond New It 22.761737 log 736546 56/129/

2 1.07

0 500 1.070 1 NREGS

Kamti Farm Pond New it 22.761738 log 736346 56/33/2 1.07

0 500 1.070 1 NREGS

21 Bankhedi

Jamuniyarandhir

Jamuniyarandhir Farm Pond New

It 22.86548612

log 78.51569837

17/30/15

1.070 500 1.070 1

NREGS

Jamuniyarandhir Farm Pond New

It 22.90811711

log 79.54195148

17/30/1 1.070 500 1.070 1

NREGS

Jamuniyarandhir Farm Pond New

It 22.90791895

log 78.54179827

17/73/1 1.070 500 1.070 1

NREGS

Jamuniyarandhir Recharge Pit New

It 22.87238129

log 78.52657357

17 0.150 500 0.150 1

NREGS

Jamuniyarandhir Recharge Pit New

It 22.87238122

log 78.52657354

17 0.150 500 0.150 1

NREGS

Page 349: HBAD DIP FINAL ab - pmksy.gov.in

349

Jamuniyarandhir Recharge Pit New

It 22.87238124

log 78.52657352

17 0.150 500 0.150 1

NREGS

Jamuniyarandhir Recharge Pit New

it 22.87238126

log 78.52657351

17 0.150 500 0.150 1

NREGS

23 Bankhedi Surelarndhir

Surelarandhir Farm Pond New

It 22.879180666

7 log

78.55637124

16/165/7 1.07

0 500 1.070 1 NREGS

Surelarandhir Farm Pond New

It 22.879181666

6 log 78.5547223

16/242/4 1.07

0 500 1.070 1 NREGS

Surelarandhir Farm Pond New

It 22.87916666 log 78.5522222

16/223 1.070 500 1.070 1

NREGS

Surelarandhir Recharge Pit New It 22.8743029 log 78.53426

0.150 500 0.150 1

NREGS

Surelarandhir Recharge Pit New It 22.8743022 log 78.53427

0.150 500 0.150 1

NREGS

Surelarandhir Recharge Pit New It 22.8743020 log 78.53429

0.150 500 0.150 1

NREGS

Surelarandhir Recharge Pit New It 22.8743019 log 78.53425

0.150 500 0.150 1

NREGS

Surelarandhir Recharge Pit New It 22.8743028 log 78.53419

0.150 500 0.150 1

NREGS

Richhida Recharge Pit New It 22.8737066 log 78.54279 0.15

0 500 0.150 1 NREGS

Richhida Recharge Pit New IT

22.8737064 log 78.54723 0.15

0 500 0.150 1 NREGS

Richhida Recharge Pit New It 22.8737060 log 78.54724 0.15

0 500 0.150 1 NREGS

Richhida Recharge Pit New IT

22.83370621 log 78.54727 0.15

0 500 0.150 1 NREGS

Richhida Recharge Pit New It 22.8737062 log 78.54719 0.15

0 500 0.150 1 NREGS

24 Bankhedi piparpani

piparpani Farm Pond New It22.76189 log726642 52/61/4 1.07

0 500 1.070 1 NREGS

piparpani Farm Pond New It22.761830 log 736643 52/224/

8 1.07

0 500 1.070 1 NREGS

piparpani Farm Pond New It22.761840 log 736645 52/223/

8 1.07

0 500 1.070 1 NREGS

25 Bankhedi

purena randheer

purenarandheer Farm Pond New

13/11/1 1.070 500 1.070 1

NREGS

purenarandheer Farm Pond New

13/37/1 1.000 500 1.000 1

NREGS

purenarandheer Farm Pond New

13/70/2 1.000 500 1.000 1

NREGS

purenarandheer Recharge Pit New It 22.6992482 log 72.540745

13 0.150 500 0.150 1

NREGS

Page 350: HBAD DIP FINAL ab - pmksy.gov.in

350

purenarandheer Recharge Pit New It 22.6992481 log 78.540725

13 0.150 500 0.150 1

NREGS

purenarandheer Recharge Pit New It 22.6992478 log78.540742

13 0.150 500 0.150 1

NREGS

26 Bankhedi Anhai

Anhai Recharge Pit New It 22.703273 log78.573456 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.902320 log78.573450 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.9073273 log78.620423 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It

22.229023027 log78.43011 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It

22.22902302 log78.573456 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.907302 log78.573551 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.907402 log78.573367 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.902568 log78.573459 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.905302 log78.574405 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.973468 log78.574503 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.906305 log78.574302 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.902375 log78.573405 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.902265 log78.573667 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.907408 log78.574367 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.902265 log78.573602 13 0.15

0 500 0.150 1 NREGS

Anhai Recharge Pit New It 22.907506 log78.574302 13 0.15

0 500 0.150 1 NREGS

27 Bankhedi Nagwada

Nagwada Recharge Pit New It 22.463001 log78.352535 13 0.15

0 500 0.150 1 NREGS

Nagwada Recharge Pit New It 22.463779 log78.352381 13 0.15

0 500 0.150 1 NREGS

Nagwada Recharge Pit New It 22.465946 log78.351137 13 0.15

0 500 0.150 1 NREGS

Nagwada Recharge Pit New It 22.465998 log78.351985 13 0.15

0 500 0.150 1 NREGS

Nagwada Recharge Pit New It 22.466811 log78.352786 13 0.15

0 500 0.150 1 NREGS

Page 351: HBAD DIP FINAL ab - pmksy.gov.in

351

Nagwada Recharge Pit New It 22.467108 log78.353036 13 0.15

0 500 0.150 1 NREGS

Nagwada Farm Pond New It 22.473385 log 78.347232 0.53

0 500 0.530 1 NREGS

Nagwada Farm Pond New It 22.458745 log 78.352852 0.53

0 500 0.530 1 NREGS

Nagwada Farm Pond New It 22.473389 log

78.34347240 0.53

0 500 0.530 1 NREGS

purenarandheer Recharge Pit New It 22.6992488 log 78.540739

13 0.150 500 0.150 1

NREGS

28 Bankhedi kapoori

kapoori Farm Pond New It 22.8505137 log 78.5255186 13 1.07

0 500 1.070 1 NREGS

kapoori Farm Pond New It 22.8634681 log 78.5237823 13 1.07

0 500 1.070 1 NREGS

kapoori Farm Pond New It 22.8644740 log 78.5168609 13 1.07

0 500 1.070 1 NREGS

kapoori Farm Pond New It 22.8610756 log 78.5227933 13 1.07

0 500 1.070 1 NREGS

29 Bankhedi Tinsari

Tinsari Recharge Pit New It 22.5429037 log 78.2811208 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It 22.541715 log 78.2803968 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It 22.5436233 log 78.283160 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It 22.5434709 log 78.2805742 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It

22.54333631 log 78.2807747 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It

22.54233101 log 78.2816646 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It

22.542109091 log 78.2820574 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It 22.5427039 log 78.2818349 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It 22.5454031 log 78.2814119 13 1.07

0 500 1.070 1 NREGS

Tinsari Recharge Pit New It 22.537730 log 78.2812361 13 1.07

0 500 1.070 1 NREGS

Tinsari Pond Deepening Renovation It 22.90 log 78.47 - 2.50

0 1500 2.500 3 NREGS

30 Bankhedi Bhearopur

Guawadi Stop Dam New - 10.0

00 2250 10.000 5 NREGS

Guawadi Stop Dam New - 10.0

00 2250 10.000 5 NREGS

Guawadi Stop Dam New - 10.0

00 2250 10.000 5 NREGS

Page 352: HBAD DIP FINAL ab - pmksy.gov.in

352

Bhearopur Stop Dam New It 22.854753 log 78.475023 - 10.0

00 2250 10.000 5 NREGS

Bhearopur Stop Dam New It 22.857730 log 78.4712361 - 10.0

00 2250 10.000 5 NREGS

Bhearopur Stop Dam New It 22.856730 log 78.4612361 - 10.0

00 2250 10.000 5 NREGS

31 Bankhedi Samnapur Samnapur Pond Deepening Renovation It 22.85 log 78.47 -

2.500 1000 2.500 2

NREGS

Samnapur Pond Deepening Renovation It 22.85 log 78.47 - 2.50

0 1000 2.500 2 NREGS

32 Bankhedi Puranakala purenakala Pond Deepening Renovation It 22.92 log 78.35 -

2.500 1000 2.500 2

NREGS

33 Bankhedi Umardha Umardha

Pond Construction New It 22.92 log 78.35 -

8.000 1000 8.000 4

NREGS

Umardha Pond Deepening Renovation It 22.85 log 78.47 - 2.50

0 1000 2.500 2 NREGS

34 Bankhedi

Paraswada dhan.

Paraswada dhan. Pond Deepening Renovation -

2.500 1000 2.500 2

NREGS

35 Bankhedi

Salaiyakishor

Salaiyakishor Farm Pond New It22.761830 log 736643

52/224/8

1.070 500 1.070 1

NREGS

36 Bankhedi Kalangwa

Kalangwa Stop Dam New It 22.83 log 78.49 - 10.0

00 500 10.000 1 NREGS

Kalangwa Stop Dam New It 22.83 log 78.47 - 10.0

00 500 10.000 1 NREGS

Kalangwa Recharge Pit New It 22.8392793 log 78.4869071 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It

22.83989002 log 78.487162 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.8384529 log 78.586004 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.8379245 log 78.4869002 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.8389245 log 78.4869002 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.8371797 log 78.4862386 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.8360668 log 78.4870134 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.8376405 log 78.4876574 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It

22.83748065 log 78.4889053 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.8372391 log 78.4862759 13 1.07

0 500 1.070 1 NREGS

Kalangwa Recharge Pit New It 22.83241 log 78.488367 13 1.07

0 500 1.070 1 NREGS

Page 353: HBAD DIP FINAL ab - pmksy.gov.in

353

Kalangwa Recharge Pit New It 22.8372609 log 78.4877777 13 1.07

0 500 1.070 1 NREGS

Kalangwa Farm Pond New It 22.839898 log 78.4866624 - 1.07

0 500 1.070 1 NREGS

Kalangwa Farm Pond New It 22.8395789 log 78.4738699 - 1.07

0 500 1.070 1 NREGS

Kalangwa Farm Pond New It 22.83 log 78.49 - 1.07

0 500 1.070 1 NREGS

Kalangwa Stop Dam New It 22.83 log 78.48 22.31/1 10.0

00 2250 10.000 5 NREGS

37 Bankhedi Jasarwani

Jasarwani Stop Dam New It 22.8578 log 78.50 10.0

00 2250 10.000 5 NREGS

Jasarwani Farm Pond New It 22.853 log 78.515 0.52

0 2250 0.520 1 NREGS

Jasarwani Farm Pond New It 22.853 log 78.514 0.52

0 2250 0.520 1 NREGS

Jasarwani Recharge Pit New It 22.856 log 78.512 0.15

0 500 0.150 1 NREGS

Jasarwani Recharge Pit New It 22.856 log 78.514 0.15

0 500 0.150 1 NREGS

Jasarwani Recharge Pit New It 22.847 log 78.522 0.15

0 500 0.150 1 NREGS

Jasarwani Recharge Pit New It 22.852 log 78.518 0.15

0 500 0.150 1 NREGS

Jasarwani Recharge Pit New It 22.854 log 78.513 0.15

0 500 0.150 1 NREGS

Jasarwani Stop Dam New It 22.86 log 78.50 10.0

00 2250 10.000 5 NREGS

38

Bankhedi

Mahangwa Mahangwa Pond Construction New It 22.8466618

log 78.48911483

10.000 2250 10.000 5

NREGS

39 Bankhedi Chandon Chandon Stop Dam New It 22.84 log 78.48 18,387

10.000 2250 10.000 5

NREGS

Chandon Well Deepening Renovation It 22.84 log 78.48 18 0.50

0 100 0.500 5 NREGS

40 Bankhedi Nibhora

Nibhora Pond Deepening Renovation 8,34 2.50

0 2000 2.500 4 NREGS

Nibhora Farm Pond New 0.53

0 800 0.530 1 NREGS

Nibhora Farm Pond New 1, 30/6 0.53

0 800 0.530 1 NREGS

Nibhora Farm Pond New 8,153/1 0.53

0 800 0.530 1 NREGS

Nibhora Farm Pond New 8,176/2 0.53

0 800 0.530 1 NREGS

Nibhora Farm Pond New 0.53 800 0.530 1 NRE

Page 354: HBAD DIP FINAL ab - pmksy.gov.in

354

0 GS

Nibhora Recharge Pit New 8,84 0.15

0 500 0.150 1 NREGS

Nibhora Recharge Pit New 8,84 0.15

0 500 0.150 1 NREGS

Nibhora Recharge Pit New 8,84 0.15

0 500 0.150 1 NREGS

Nibhora Recharge Pit New 8 0.15

0 500 0.150 1 NREGS

41 Bankhedi Karpa

Karpa Farm Pond New It 22.9356788 log 78.49053 0.53

0 800 0.530 1 NREGS

Karpa Farm Pond New It 22.9356823 log 78.49173 0.53

0 800 0.530 1 NREGS

Karpa Farm Pond New 0.53

0 800 0.530 1 NREGS

Karpa Pond Deepening Renovation It 22.8923366 log 78.4879100 2.50

0 1500 2.500 3 NREGS

Karpa Pond Deepening Renovation It 22.8948416 log

78.48547392 2.50

0 1500 2.500 3 NREGS

Karpa Pond Deepening Renovation It 22.89 log 78.48 2.50

0 1500 2.500 3 NREGS

Karpa Stop Dam New It 22.89465 log 78.477102 10.0

00 2250 10.000 5 NREGS

Karpa Stop Dam New It 22.935683 log 78.4917392 10.0

00 2250 10.000 5 5

42 Bankhedi Bedar Bedar

Pond Construction New It 22.9450826 log 78.50619

0.530 800 0.530 1 1

Page 355: HBAD DIP FINAL ab - pmksy.gov.in

355

Pradhanmantri Krishi Sinchai Yojna –Bankhedi

Proposed New Water Conservation Structures List Of Dupty Director Farmer Welfare & Agriculture Devlopment District :- Hoshangabad

SN. Name of Block

Gram Panchayat

Village Name

Name of Work

Type of Structure

Position of Working place

Khasra No.

Total Cost

Storage Capacity

Irrigation Potential

Year of Implementation

Scheme Name

New Latitude Longitude

1 Bankhedi Kothri Kothri M.I.T. New 78º.37.15 22.44.20 167/1 25.00 1,10,000 40.00

2 Bankhedi Kothri Kothri M.I.T. New 78º.37.15 22.44.20 186 25.00 1,10,000 40.00

3 Bankhedi Junavaani Baghhraj M.I.T. New 78º.33.25 22.45.10 78 24.50 1,10,000 40.00

4 Bankhedi Pathrkuhi Patharkuhi M.I.T. New 78º.37.20 22.40.15 239 24.80 1,10,000 40.00

5 Bankhedi Junavaani Khavra M.I.T. New 78º.36.15 22.44.10 ,17/3 25.00 1,10,000 40.00

6 Bankhedi Nayagaon Ghhoghri Maththa M.I.T. New 78º.27.25 22.42.20 ,28/1 24.90 1,10,000 40.00

7 Bankhedi Nayagaon Najar kheda M.I.T. New 78º.25.10 22.43.15 83/1 25.00 1,10,000 40.00

8º Bankhedi Piparpani Piparpani Percolation Tank New 78º.36.20 22.45.10 59 15.00 95,000 10.00

9 Bankhedi Junavaani Chhater Percolation Tank New 78º.35.20 22.41.15 ,19/1 14.90 95,000 10.00

10 Bankhedi Junavaani Devri Percolation Tank New 78º.30.30 22.42.32 ,12/1 20.00 1,10,000 20.00

11 Bankhedi Junavaani Devri Check Dam New 78º.30.30 22.42.32 3 5.00 41,000 7.00

12 Bankhedi Junavaani Devri Check Dam New 78º.30.30 22.42.32 ,6/3 5.00 41,000 7.00

13 Bankhedi Kothri Chhirpani Check Dam New 78º.37.15 22.44.10 90/1 5.00 41,000 7.00

14 Bankhedi Murgidhhana Murgidhhana Percolation Tank New 78º.38.30 22.46.10 302/1,2 15.00 95,000 10.00

15 Bankhedi Murgidhhana Murgidhhana Check Dam New 78º.38.30 22.46.10 287 5.00 41,000 7.00

16 Bankhedi Dhadav Padav Dhadav Percolation

Tank New 78º.41.25 22.45.15 79,78 10.00 82000.00 7.00

17 Bankhedi Dhadav Padav Dhadav Check

Dam New 78º.41.25 22.45.15 73 5.00 41,000 7.00

Total _ _ _ _ _ _ _ 274.10 _ _ _ _

Page 356: HBAD DIP FINAL ab - pmksy.gov.in

356

AATMA

Page 357: HBAD DIP FINAL ab - pmksy.gov.in

357

OFFICE OF PROJECT DIRECTOR ATMA DISTRICT HOSHANGABAD PMKSY PROPOSED WORK-PLAN FOR NEXT FIVE YEARS

S NO

ACTIVITY NAME

YEAR 2016-17 YEAR 2017-18 YEAR 2018-19 YEAR 2019-20 YEAR 2020-21

PHYSICAL (MAN DAYS)

FINANCIAL ( IN LAKHS)

PHYSICAL (MAN DAYS)

FINANCIAL ( IN LAKHS)

PHYSICAL (MAN DAYS)

FINANCIAL ( IN LAKHS)

PHYSICAL (MAN DAYS)

FINANCIAL ( IN LAKHS)

PHYSICAL (MAN DAYS)

FINANCIAL ( IN LAKHS)

1 CAPACITY BUILDING TRAINING (5 PER BLOCK)

35 TRAINING 1.75 35

TRAINING 1.75 35 TRAINING 1.75 35

TRAINING 1.75 35 TRAINING 1.75

2 INTER STATE TOUR (2) 420 3.36 420 3.36 420 3.36 420 3.36 420 3.36

3 WITHIN STATE TOUR (2) 420 1.68 420 1.68 420 1.68 420 1.68 420 1.68

4 WITHIN DISTRICT TRAINING (2)

200 0.50 200 0.50 200 0.50 200 0.50 200 0.50

5 WITHIN STATE TRAINING (2) 420 4.20 420 4.20 420 4.20 420 4.20 420 4.20

6 INTER STATE TRAINING (2) 420 5.25 420 5.25 420 5.25 420 5.25 420 5.25

Total 1880 16.74 1880 16.74 1880 16.74 1880 16.74 1880 16.74