detailed project reports, feasibility studies, financial modelling, setting up of power plant

11
Ideas for today and tomorrow Precision Research and Consulting Private Limited

Upload: idata-insights

Post on 05-Dec-2014

193 views

Category:

Sales


1 download

DESCRIPTION

Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

TRANSCRIPT

Page 1: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

Ideas for today and tomorrow

Precision Research and Consulting Private Limited

Page 2: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• iData Insights, which has been in the forefront in providing high qualityservices in Research and Consulting Domains is a division of PrecisionResearch and Consulting Private Limited. Its efforts help companies to createand improve products and services based on what the market desires. Itprovides actionable recommendations and provide business expertise forbusiness success today and tomorrow.

• Precision Research and Consulting Private Limited, the parent company ofiData Insights is an extensive developer of Power Plants in India. Its workincludes preparing of DPR’s, Pre-feasibility Reports, Feasibility Reports,Financial Modelling and developing Power Plants from scratch to runningcondition in Indian Renewable Energy Sector (Solar, Wind, Biomass).

• It also helps in Site Selection, Plant Design, Technology Selection, Permitsand Licensing, PV Technology, Financing of the Project. It’s vision is to makerenewable energy most affordable and reliable for forward-thinking powerconsumers.

About Us

Page 3: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

Once after the project is finalized:

• PRC Team will visit the Site for inspection

• Do a Pre-Feasibility Study

• Prepare a Feasibility Report highlighting all the parameters considered

• Present you with a Financial Model

• Get the Clearances done from the Government (On-Grid Project)

• Apply for Loan (if any)

• Get the EPC contractor finalized

• Finalization of Equipment's required for the project

• Finalization of PPA’s

• Training of the Plant Staff

How do we proceed with the work?

Page 4: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• Executive Summary

• Introduction about the project

• Objectives of the project

• Site Details

• Technical Details & System Specification

• Load Calculation

• Block Diagram

• Technical Details of the Power Pack

• Technical Details of the Solar Panel

• Technical Details of the Battery Bank

Our Sample DPR covers the following topics:

Page 5: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• Technical Details of the Charge Controller Unit

• Technical Details of the Inverter

• Technical Details of Mounting Structure and Accessories

• Constructive Characteristics of Solar Panel

• Civil Work

• Bill of Material

• Financial Aspects

• Project Cost

• Financial Implications

Contd…

Page 6: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• Introduction about the project

• PV Technology

• Project Development

• Site Selection

• Energy Yield Prediction

• Plant Design

• Permits and Licensing

Our Sample Feasibility Report covers following topics:

Page 7: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• Construction

• Commissioning

• Operation and Maintenance

• Economics and Financial Model

• Financing PV Projects

• Conclusion

Contd…

Page 8: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• For setting up a 1 MW Solar Power Plant, it costs around INR 7 to 10 Cr.(Approx.) [Land Costs are variable].

• Our Services can be availed through 2 options:

• 1stOption:

• We charge 5% of total project cost.

• Out-of the pocket expenses will be billed on actual basis and paidmonthly.(On advance basis)

• Travelling expenses have to be borne by the client and the means oftravelling will be done through A/c Volvo or by 2nd Class A/c Train.

• The boarding and lodging expenses also have to be borne by the client. Thestay for the PRC team should be arranged in a 3-star hotel. If that is notfeasible an A/c room should be provided.

Cost parameters

Page 9: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• The payment [5% of total project cost] should be made in four phases:

• 10% should be given in advance (kick off of the project)

• 20% after the feasibility study is done

• 30% before execution of the EPC

• 40% at the time of handing over of the plant

• 2ndOption:

• We charge 7 Cr for an On-grid Project and 6 Cr for an Off-grid Project exclusive of Land Costs.

• If loan should be procured, an additional 15% is charged (out of office expense) on the total Loan Amount.

• This charge includes every amount from commissioning to operation of the plant.

Contd..

Page 10: Detailed Project Reports, Feasibility Studies, Financial Modelling, Setting up of Power Plant

• The payment should be made in four phases:

• 20% should be given in advance

• 10% after the feasibility report is done

• 50% before execution of EPC

• 20% after the delivery of the project