design of thrust block
DESCRIPTION
Editable excel sheet, it is sample calculation of design of Thrust block. Any body is free to comment is there is some error in designTRANSCRIPT
Name of Project:- _____________________________________
DESIGN OF THRUST BLOCK
TOTAL FLOW 150 MLD (Input Data)
PEAKING FACTOR 1.1
PEAKING FLOW 165 MLD
DIAMETER OF PIPE 1100 MM (Input Data)
AREA OF PIPE 0.95 SQMT
VELOCITY IN PIPE 2.01 MT/SECOND
FLOW IN CUMSECS 1.91 CUMECS
HMG OF LINE 82 MT (Input Data)
LOWEST LEVEL ON GROUND 30 MT (Input Data)
MAXIMUM STATIC PRESSURE 52 MT
I.E 5.2 Kg/sqcmi.e 0.52 MpaI.e 520 Kpa
DEGREE OF BEND 90.00 (Input Data)Radiants of degree 1.571cos of given degree 0.00Sin of given degree 1.00
FORMULA
p1xa1 - Fx - p2xa2cos 90 = gQ ( v2cos 90-v1)
Unitsp1,p2 pascalsA1,A2 sqmtv1,v2 mt/secondg= 1000Q cumecs
p1xa1 493922p2xa2xcos degree 3.0244E-11
gQ(v2cos degree-v1) -3839.5946Fx 497761.59
p1xa1 - Fy - p2xa2sin 90 = gQ ( v2sin 90-v1)
p1xa1 493922p2xa2xsin degree 493922gQ(v2sin degree-v1) 0Fy 0
F=(Fx*Fx +fyxFy)^0,5 497761.59
F= 497761.59 Newton
Force in Kg 49776.159
Density of concrete 2400 kg/cum
Volume of concrete required 20.74 cum
Keeping depth as 2 mt
Area required 10.37 sqmt
Size required considering square block 3.22 mt
Hence provide size in plan as 3.5 (Input Data)
Check for net volume after pipe diameter
Total volume 24.5
Less pipe volume'3,75*,785*1,1*1,1 3.324 cum
Net volume 21.18 cum
Volume required 20.74 cum
HENCE OK
Note: Add some extra length to get net required volume after deduction of pipe
_____________________________________