Page 1: Design of Thrust Block

Name of Project:- _____________________________________

DESIGN OF THRUST BLOCK

TOTAL FLOW 150 MLD (Input Data)

PEAKING FACTOR 1.1

PEAKING FLOW 165 MLD

DIAMETER OF PIPE 1100 MM (Input Data)

AREA OF PIPE 0.95 SQMT

VELOCITY IN PIPE 2.01 MT/SECOND

FLOW IN CUMSECS 1.91 CUMECS

HMG OF LINE 82 MT (Input Data)

LOWEST LEVEL ON GROUND 30 MT (Input Data)

MAXIMUM STATIC PRESSURE 52 MT

I.E 5.2 Kg/sqcmi.e 0.52 MpaI.e 520 Kpa

DEGREE OF BEND 90.00 (Input Data)Radiants of degree 1.571cos of given degree 0.00Sin of given degree 1.00

FORMULA

p1xa1 - Fx - p2xa2cos 90 = gQ ( v2cos 90-v1)

Unitsp1,p2 pascalsA1,A2 sqmtv1,v2 mt/secondg= 1000Q cumecs

p1xa1 493922p2xa2xcos degree 3.0244E-11

Page 2: Design of Thrust Block

gQ(v2cos degree-v1) -3839.5946Fx 497761.59

p1xa1 - Fy - p2xa2sin 90 = gQ ( v2sin 90-v1)

p1xa1 493922p2xa2xsin degree 493922gQ(v2sin degree-v1) 0Fy 0

F=(Fx*Fx +fyxFy)^0,5 497761.59

F= 497761.59 Newton

Force in Kg 49776.159

Density of concrete 2400 kg/cum

Volume of concrete required 20.74 cum

Keeping depth as 2 mt

Area required 10.37 sqmt

Size required considering square block 3.22 mt

Hence provide size in plan as 3.5 (Input Data)

Check for net volume after pipe diameter

Total volume 24.5

Less pipe volume'3,75*,785*1,1*1,1 3.324 cum

Net volume 21.18 cum

Volume required 20.74 cum

HENCE OK

Note: Add some extra length to get net required volume after deduction of pipe

Page 3: Design of Thrust Block

_____________________________________

DESIGN OF THRUST BLOCK

(Input Data)

(Input Data)

(Input Data)

(Input Data)

(Input Data)