design considerations to increase setback
TRANSCRIPT
ITEM 7.0CONSIDERATION OF OPTIONS WHICH MAY INCREASE THE NORTHERN SETBACK OF THE TOP LEVEL OF THE BUILDING.
- THE DESIGN AIMS TO MAINTAIN THE EXISTING CEREMONIAL WALK - CEREMONIAL WALK WIDTH IS SET OUT BY AMBULANCE AND HEARSE ACCESS CLEARANCES WIDTHS.- INCREASING THE TOP LEVEL SETBACK WILL RESULT IN AN INEFFICIENT CIRCULATION STAIR DESIGN WHICH WILL CAUSE INCREASES THE TOTAL BUILDING FLOOR AREAS. TO MAINTAIN USABLE CLASSROOM SPACES WITHIN THE INNOVATION HUB, ADDITIONAL BUILDING HEIGHT AND ENVELOPE WILL BE INCREASED
CONCEPT DESIGN - FORM TESTING
OPTION STAGGERED SETBACK OPTION
PROS• COMPACT FORM REDUCING COST• END POINT OF NEW AXIS VISIBLE FROM COMMONS BUILDING• HISTORIC BUILDING AXIS CAN BE REINSTATED/RETAINED• STAGGERED SET BACKS TO UPPER LEVELSCONS• TOO HIGH COMPARED TO SITE, NEIGHBOURING RESIDENTS AND HERITAGE
BUILDING• OFFENSIVE / CONTROVERSIAL TO NEIGHBOURING RESIDENTS• NO INTERACTION WITH SITE• TOP FLOORS DISCONNECT FROM CAMPUS
STAGGERED SETBACK OPTION
• EARLY CONCEPT DESIGNS (OPTION 1) DEMONTRATES TESTING OF A STAGGERED SETBACK FORM WHICH INCREASED THE SETBACK OF AS THE BUILDING INCREASED IN HEIGHT. STARTING FROM A 5M SETBACK AT THE LOWER GROUND TO A 10M SETBACK FROM GROUND TO THREE AND A 15M SETBACK ON LEVEL 4.
• THIS OPTION REQUIRED THE BUILDING TO BE 6 STOREYS IN ORDER TO FACILITATE USABLE CLASSROOM SPACES. FOOTPRINT OF BUILDING IS COMPARATIVELY SMALLER, HOWEVER HEIGHT OF BUILDING IN GREATLY INCREASED.
DESIGN CONSIDERATIONS TO INCREASE SETBACK
6 STOREY , 15M / 10M / 5M SETBACKS FROM NORTHERN BOUNDARY
2 SETBACKS OPTION
• THE MASTERPLAN OPTION HAD LOOKED AT HAVING 7.5 METRE SETBACK FROM LOWER GROUND AND 15.5 METRE SETBACK TO UPPER LEVELS.• THIS OPTION HAD LARGER FOOTPRINT AND ALSO LARGER FRONTAGE TO NORTHERN NEIGHBOURS• HEIGHT OF THIS OPTION WAS STILL DEEMED TO HIGH IN COMPARISION TO SURROUNDING CONTEXT• LARGE BUILDING FRONTAGE TO NORTHERN BOUNDARY
5 STOREY , 15.5M / 7.5M SETBACKS FROM NORTHERN BOUNDARY
ITEM 7.0CONSIDERATION OF OPTIONS WHICH MAY INCREASE THE NORTHERN SETBACK OF THE TOP LEVEL OF THE BUILDING.
2 SETBACKS OPTION
PROS• END POINT OF NEW AXIS VISIBLE FROM COMMONS BUILDING• TOTAL HEIGHT DOES NOT EXCEED HERITAGE BUILDINGS• MATURE GUM TREES CAN BE RETAINED BENEFITING RESIDENTS AND
SCHOOLCONS• PINE TREE OF SIGNIFICANT HERITAGE VALUE NEEDS TO BE TAKEN DOWN• STEPS OF SIGNIFICANT HERITAGE VALUE NEED TO BE TAKEN DOWN• NEW AXIS DISREGARDS HISTORIC “KINKED” AXIS TO OLD COX BUILDING• 5 STOREY HIGH BUIILDING COMPROMISES VIEW AMENITY AND PRIVACY OF
NEIGHBOURING RESIDENTS
CONCEPT DESIGN - FORM TESTING
4 STOREY , 10M / 5M SETBACKS FROM NORTHERN BOUNDARY REDUCED HEIGHT WITH 2 SETBACKS OPTION
PROS• PINE TREE OF SIGNIFICANT HERITAGE VALUE RETAINED• REDUCTION OF HEIGHT TO 3-4 STOREYS• COURTYARD SPACE BENEFITS (OUTDOOR SPACE AND LIGHT TO INTERNAL SPACES)CONS• LARGER FOOTPRINT• DEMOLITION OF SMALL PORTION OF ADJACENT “BROTHER QUENTIN BUILDING”
(POTENTIALLY)• LARGE NORTHERN FRONTAGE OF UPPER LEVELS
ITEM 7.0CONSIDERATION OF OPTIONS WHICH MAY INCREASE THE NORTHERN SETBACK OF THE TOP LEVEL OF THE BUILDING.
CONCEPT DESIGN - FORM TESTING
2 SETBACKS OPTION WITH LARGER FOOTPRINT & REDUCED HEIGHT
• THE 4 STOREY OPTION WAS TESTED WITH 5M SETBACK FOR LOWER GROUND AND 10M SETBACK FOR UPPER LEVELS• FOOTPRINT OF THE BUILDING WAS INCREASED TO ACCOMODATE A LOWER OVERALL BUILDING HEIGHT• LARGE BUILDING FRONTAGE TO NORTHERN BOUNDARY
ITEM 7.0CONSIDERATION OF OPTIONS WHICH MAY INCREASE THE NORTHERN SETBACK OF THE TOP LEVEL OF THE BUILDING.
PROPOSED CONCEPT DESIGN FORM
24m
9m
5m
4 STOREY, 9M / 5M SETBACKS FROM NORTHERN BOUNDARY
2 SETBACKS OPTION WITH REDUCED NORTHERN FRONTAGE
• THE UPPER LEVELS WERE PROPOSED TO BE ROTATED 90 DEGREES TO REDUCE FRONTAGE TO NORTHERN BOUNDARY• MAINTAINED EXISTING CEREMONIAL WALK ON GROUND LEVEL• REDUCED HEIGH AND REDUCED NORTHERN FRONTAGE DESIGN ALLOWED FOR LESS VISUAL IMPACT TO NEIGHBOURS
UP UP UP
UP UP
UP
UP
UP UP
A
A
C
C
D
D
5 5
N
N
3
3
4 4
B
B
E
E
F
F
6 6
7 7
8 8
9 9
10 10
11 11
2 2
1 1
12 12
G
G
H
H
I
I
J
J
K
K
L
L
M
M
620 8380 6000 8380 620 4000 5000 5000 5000 5000 5000 5000 5000
5000
3600
1350
5400
5400
5400
6750
5400
5400
5400
5400
5400
2100
GPLA
00.02
MAKERSPACE
00.04
RISER
MACHINES
00.05
13 13
BOUNDARY
VE
RA
ND
AH
VE
RA
ND
AH
SKYLIGHT
?
??
?
FOYER
00.01
VOID
RL RL 177.700
QUENTIN BUILDING(EXISTING)
CARMODY THEATRE(EXISTING)
SOLOMON BUILDING(EXISTING)
LIFT 01
00.06
STAIR 02
00.09
STAIR 01
00.03
7.1% 7.1% 7.1%RL RL 176.525
FUTURE OAKHILL WALK
GLAZING TO
LIFT SHAFT
7.1%RL RL 177.150
BAL112
VERANDAH
00.08
ROOF ACCESS
MAINTENANCE SYSTEM
DUST EXTRACTOR AND
FUME EXHAUST
SOLAR PV (SHOWN IND.)
SOLAR PV (SHOWN IND.)
WC - ACC.
00.20
WC
00.19?
?
PROPOSED
SUBSTATION
SKYLIGHT SKYLIGHT SKYLIGHT
WC
WC
RL RL 177.700 7.0%
7.0%
RL RL 178.300
RL RL 178.900
RL RL 175.230RL RL 175.902
5500 _8000
7.0%
FA
LL
_7500
16200
1200MM H GRC PLANTER BOX
500
22380
8380 6000 8380
LOCKED
GATED FOR
MAINTENANCE
ACCESS ONLY
LOCKED
GATED FOR
MAINTENANCE
ACCESS ONLY
9m
MAINTAING THE EXISTING CEREMONIAL WALK AXIS
• THE EXISTING CERMONIAL WALK TOWARDS TO CEMETERY WAS MAINTAINED TO PROVIDE PEDESTRIAN CONNECTION THROUGHOUT THE CAMPUS WHILST ALLOWING ENTRY PROCESSIONS TO BE CONDUCTED BY THE COLLEGE IN THE EVENT OF A FUNERAL SERVICE.
• CEREMONIAL WALK REQUIRES VEHICULAR ACCESS AND MINIMUM SWEPT PATHS• WORKSHOPS ON LOWER GROUND OPEN AWAY FROM NORTHERN BOUNDARY TO REDUCE NOISE • MOVING THE CERMONIAL WALK SOUTH WOULD NOT BE POSSIBLE TO LOCATION EXSTING BR QUENTIN BUILDING, WORKSHOP COURTYARD
ORIENTATION AND VEHICULAR ACESS REQUIRED ON SITE.
WORKSHOP COURTYARD ORIENTATED AWAY FROM NEIGHBOURS
EXISTING BR QUENTIN BUILDING
AMBULANCE AND HEARSE ACCESS TO CEMETERY
INCREASE TO BUILDING ENVELOPE DUE TO INCREASE SETBACK
• WHILST MAINTAINING THE CEREMONIAL WALKWAY, TO INCREASE THE SETBACK OF THE UPPER LEVELS WOULD REQUIRED A CHANGE IN THE INTERNAL CIRCULATION OF THE BUILDING
• CURRENTLY THE STAIR SERVICES LOWER GROUND TO LEVEL 2 EFFICIENTLY.
LEVEL 02
186.800m
ROOF
190.600m
5
GROUND
177.700m
LOWER GROUND
173.650m
LEVEL 01
183.000m
3467891011 2 11213
4050
5300
3800
3800
BO
UN
DA
RY
PHOTOVOLTAIC PANELS
(SHOWN INDICATIVELY)
LIFT OVERRUN
ROOF PLANT EQUIPMENT
FLUE TO FUME CUPBOARDS
ROOF PLANT
(SHOWN INDICATIVELY)
EXISTING BUILDINGS BEYOND
EXISTING GROUND LINE
(SHOWN DASHED)
ROOF TERRACE
8.5M HEIGHT PLANE
1200 2400 1400
GRAVEL PATHWAY
WC - ACC.
00.20
WC - ACC.
01.27 CLN.
01.27
INFORMAL LEARNING
01.24
LIFT 01
01.21
?
?
PROJECT STORE
LG.20
MAKER/ EXHIBITION SPACE
LG.01
GRAPHICS
LG.03
STAIR 02
02.08
WC - ACC.
02.22COMMS.
02.21
?
?
INFORMAL LEARNING
02.19
STAIR 01
02.01
FOYER
00.01
GUTTER
COL201COL201
COL201COL201
HORIZONTAL SHELF ANGLES TO PREVENT
VIEWS DOWN INTO NEIGHBOURING PROPERTY
EXISTING GROUND LINE
(SHOWN DASHED)
18764
2060
1600
1600
FE
NC
E
1800
9050
8625
13515
5000
1827
2060
15931
CURRENT STAIR CIRCULATION
• STAIR SHIFTED TO INCREASE SETBACK FROM NORTHERN BOUNDARY - MOVED 1 STRUCTURAL BAY• CHANGING STAIR LOCATION WILL RESULT IN INEFFICIENT FLOOR CIRCULATION AND CLASH WITH INTERNAL LIFT ENTRY.• LIFT CORE WILL NEED TO BE RELOCATED• RESULT IN THE LOSS OF 2 INFORMAL LEARNING SPACES & ENTRY LOBBY• BUILDING ENVELOPE AND FLOOR AREA WILL INCREASE DUE TO RELOCATION OF LIFT AND TEACHING SPACES
LEVEL 02
186.800m
ROOF
190.600m
5
GROUND
177.700m
LOWER GROUND
173.650m
LEVEL 01
183.000m
3467891011 2 11213
4050
5300
3800
3800
BO
UN
DA
RY
PHOTOVOLTAIC PANELS
(SHOWN INDICATIVELY)
LIFT OVERRUN
ROOF PLANT EQUIPMENT
FLUE TO FUME CUPBOARDS
ROOF PLANT
(SHOWN INDICATIVELY)
EXISTING BUILDINGS BEYOND
EXISTING GROUND LINE
(SHOWN DASHED)
ROOF TERRACE
8.5M HEIGHT PLANE
1200 2400 1400
GRAVEL PATHWAY
WC - ACC.
00.20
WC - ACC.
01.27 CLN.
01.27
INFORMAL LEARNING
01.24
LIFT 01
01.21
?
?
PROJECT STORE
LG.20
MAKER/ EXHIBITION SPACE
LG.01
GRAPHICS
LG.03
STAIR 02
02.08
WC - ACC.
02.22COMMS.
02.21
?
?
INFORMAL LEARNING
02.19
STAIR 01
02.01
FOYER
00.01
GUTTER
COL201COL201
COL201COL201
HORIZONTAL SHELF ANGLES TO PREVENT
VIEWS DOWN INTO NEIGHBOURING PROPERTY
EXISTING GROUND LINE
(SHOWN DASHED)
18764
2060
1600
1600
FE
NC
E
1800
9050
8625
13515
5000
1827
2060
15931
• STAIR SHIFTED TO INCREASE SETBACK FROM NORTHERN BOUNDARY - MOVED 1 STRUCTURAL BAY• CHANGING STAIR LOCATION WILL RESULT IN INEFFICIENT FLOOR CIRCULATION AND CLASH WITH INTERNAL LIFT ENTRY.• LIFT CORE WILL NEED TO BE RELOCATED• RESULT IN THE LOSS OF 2 INFORMAL LEARNING SPACES & ENTRY LOBBY• BUILDING ENVELOPE AND FLOOR AREA WILL INCREASE DUE TO RELOCATION OF LIFT AND TEACHING SPACES
CURRENT STAIR CIRCULATION WITH SETBACK TO UPPER LEVELS
INCREASE TO BUILDING ENVELOPE DUE TO INCREASE SETBACK
13 ARMIDALE CRES
2 STOREY SINGLE DWELLING
1:100 @ A3
LEVEL 02186.800m
ROOF190.600m
5
GROUND177.700m
LOWER GROUND173.650m
LOWER GROUND173.650m
LEVEL 01183.000m
3467891011 2 11213
BO
UN
DA
RY
LIN
E
5m
9m
CLASSROOM
STAFFROOM
13 ARMIDALE CRES
2 STOREY SINGLE DWELLING
SECTION 21:100 @ A3
1.8m
HORIZONTAL SHELF ANGLES AT 1600MM
HIGH
8.5m HEIGHT PLANE
1.5
m S
ETB
AC
K
0.9
m S
ETB
AC
K
• INCREASING THE NORTHERN SETBACK WILL HAVE NO ADDITIONAL VISUAL IMPACTS DUE TO THE USE OF HORIZONTAL SHELF ANGLES• SHELF ANGLE WILL PREVENT VISUAL LINE INTO THE NEIGHBOURING PRIVATE OPEN SPACE AT 9M SETBACK, NORTHER WINDOWS MAIN PURPOSE IS
TO ALLOWING SUNLIGHT INDRECT INTO CLASSROOM SPACES.
1600MM HIGH SHELF ANGLES
HORIZONTAL SHELF ANGLES TO PREVENT VIEWS DOWN INTO NEIGHBOURING PROPERTY’S WINDOWS AND BACKYARD
ANGLED METAL FINS - SUNSHADING
STRAIGHT METAL FINS
GLAZED WINDOW
1600
mm
300mm
400mm
1200
mm
1500
mm
WINDOW SECTION
WINDOW SECTION
950m
m
HORIZONTAL SHELF ANGLES TO PREVENT VIEWS DOWN INTO NEIGHBOURING PROPERTY’S WINDOWS AND BACKYARD
ANGLED METAL FINS - SUNSHADING
STRAIGHT METAL FINS
GLAZED WINDOW
1600
mm
400mm18
00m
m
WINDOW SECTION
WINDOW SECTION
UP UP UP
UP UP
UP
UP
UP UP
A
A
C
C
D
D
5 5
N
N
3
3
4 4
B
B
E
E
F
F
6 6
7 7
8 8
9 9
10 10
11 11
2 2
1 1
12 12
G
G
H
H
I
I
J
J
K
K
L
L
M
M
620 8380 6000 8380 620 4000 5000 5000 5000 5000 5000 5000 5000
5000
3600
1350
5400
5400
5400
6750
5400
5400
5400
5400
5400
2100
GPLA
00.02
MAKERSPACE
00.04
RISER
MACHINES
00.05
13 13
BOUNDARY
VERANDAH
VERANDAH
SKYLIGHT
?
??
?
FOYER
00.01
VOID
RL RL 177.700
QUENTIN BUILDING(EXISTING)
CARMODY THEATRE(EXISTING)
SOLOMON BUILDING(EXISTING)
LIFT 01
00.06
STAIR 02
00.09
STAIR 01
00.03
7.1% 7.1% 7.1%RL RL 176.525
FUTURE OAKHILL WALK
GLAZING TO
LIFT SHAFT
7.1%RL RL 177.150
BAL112
VERANDAH
00.08
ROOF ACCESS
MAINTENANCE SYSTEM
DUST EXTRACTOR AND
FUME EXHAUST
SOLAR PV (SHOWN IND.)
SOLAR PV (SHOWN IND.)
WC - ACC.
00.20
WC
00.19?
?
PROPOSED
SUBSTATION
SKYLIGHT SKYLIGHT SKYLIGHT
WC
WC
RL RL 177.700 7.0%
7.0%
RL RL 178.300
RL RL 178.900
RL RL 175.230RL RL 175.902
5500 _8000
7.0%
FALL
_7500
16200
1200MM H GRC PLANTER BOX
500
22380
8380 6000 8380
LOCKED
GATED FOR
MAINTENANCE
ACCESS ONLY
LOCKED
GATED FOR
MAINTENANCE
ACCESS ONLY
LEVEL 02
186.800m
ROOF
190.600m
5
GROUND
177.700m
LOWER GROUND
173.650m
LEVEL 01
183.000m
3467891011 2 11213
4050
5300
3800
3800
BO
UN
DA
RY
PHOTOVOLTAIC PANELS
(SHOWN INDICATIVELY)
LIFT OVERRUN
ROOF PLANT EQUIPMENT
FLUE TO FUME CUPBOARDS
ROOF PLANT
(SHOWN INDICATIVELY)
EXISTING BUILDINGS BEYOND
EXISTING GROUND LINE
(SHOWN DASHED)
ROOF TERRACE
8.5M HEIGHT PLANE
1200 2400 1400
GRAVEL PATHWAY
WC - ACC.
00.20
WC - ACC.
01.27 CLN.
01.27
INFORMAL LEARNING
01.24
LIFT 01
01.21
?
?
PROJECT STORE
LG.20
MAKER/ EXHIBITION SPACE
LG.01
GRAPHICS
LG.03
STAIR 02
02.08
WC - ACC.
02.22COMMS.
02.21
?
?
INFORMAL LEARNING
02.19
STAIR 01
02.01
FOYER
00.01
GUTTER
COL201COL201
COL201COL201
HORIZONTAL SHELF ANGLES TO PREVENT
VIEWS DOWN INTO NEIGHBOURING PROPERTY
EXISTING GROUND LINE
(SHOWN DASHED)
18764
2060
1600
1600
FE
NC
E
1800
9050
8625
13515
5000
1827
2060
15931