1 Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia . Sunantyo TARSISIUS. ARIS 1 , Suryolelolo KABUL. BASAH. 2 , Djawahir FAKRURAZZI. 1 , Swastana ADIN. 3 , Darmawan ADHI . 2 , and Adityo SUSILO 4 , Indonesia 1 Geodetic Engineering Department, Faculty of Engineering, Gadjah Mada University, Yogyakarta, Indonesia, 1. INTRODUCTION 2. SERMO DAM MONITORING SYSTEM COMPONENTS 3. DESIGN AND INSTALLATION SERMO DAM MONITORING. 3.1 GNSS CORS sensors at Base Station 3.2 Prism as Monitoring points 3.3 GNSS CORS sensors at Back sight station 3.4 Sensors of Tilt, Zoom digital IP Camera (CCTV) 3.1 GNSS CORS sensors at Base Station

Upload: lamcong

Post on 11-May-2019

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

1

Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam,

Yogyakarta Province, Indonesia.

Sunantyo TARSISIUS. ARIS1, Suryolelolo KABUL. BASAH.2, Djawahir FAKRURAZZI.1, Swastana ADIN.3, Darmawan ADHI .2, and Adityo SUSILO4, Indonesia1 Geodetic Engineering Department, Faculty of Engineering, Gadjah Mada University,

Yogyakarta, Indonesia,

1. INTRODUCTION

2. SERMO DAM MONITORING SYSTEM COMPONENTS

3. DESIGN AND INSTALLATION SERMO DAMMONITORING.

3.1 GNSS CORS sensors at Base Station3.2 Prism as Monitoring points3.3 GNSS CORS sensors at Back sight station3.4 Sensors of Tilt, Zoom digital IP Camera (CCTV)

3.1 GNSS CORS sensors at Base Station

Page 2: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

2

5. CONCLUDING REMARKS

4. RESULT AND DISCUSSION

6. ACKNOWLEDGMENT

3.5 The sensor of Automatic Water Level Recorder(AWLR)

3.6 Installation of Communication System

PROBLEMS : How to desaign and to install For monitoring using multi sensor at sermo dam

Page 3: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

3

Fig.1. Indonesia Tectonic map with respect to ITRF 2000.0. Arraws are indicating horizontal displacements vector using

GPS data in 1991 to 2001 (Bock et al, 2003).

Table.1. Risk Assessment of Dams in Indonesia (Adzan dan Samekto, 2008)

.

Page 4: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

4

Fig.2. (a) Map of Sermo dam with dark blue color and its catchment area

Ja timu lyo

Ka li re jo

Ban ja royo

Gi ripur wo

Hargo ti rto

Hargo re jo

Sidom ulyo

Pur wosari

Har gow i li s

Tuk s ono

Sidoharjo

Tawangsari

Ban ja r har jo

Hargomul yo

Buge l

Ban ja ra rum

Ban ja ras ri

G erbos a ri

Sido r ejo

Ple re t

Bumi re jo

Sendangsari

Banar an

Pager harjo

Suk oreno

Ban ja rs a ri

Ja ti re jo

Donom u lyo

G lagah

Pur woharjo

Wates

Banyuro to

Karangsewu

Sen to lo

Pendowore jo

Ka liagung

Wi jim u lyo

G arongan

G ulu rej o

Kebonharjo

Ngargos a ri

Triharjo

Bo jong

Kembang

Kar angwuni

Cerm e

Ku lur

Ngen takr ejo

Sa lam re jo

Tan jungharjo

Broso t

Srik ayangan

Tir ta rahayu

Karangs ari

Pa lihan

Ja t is ar ono

Bendungan

G ir ipen i Krem bangan

Kedungs ari

Go tak an

Depok

Sogan

Bangunc ip to

Plum bon

Jangk aran

Sindutan

Mar gos ar i

Ku lwaruDem angre jo

Pengasih

Tayuban

Kanoman

J ant en

Kr anggan

Ngesti ha rjo

Ka lig intung

Temonwetan

Nom pore jo

Kebonr ejo

Wahyuharjo

Pan ja tan

Kedundang

Temonk u lon

Kal idengen

Pandowan

Dem en

Karangwu luh

Ko k ap

Se nto lo

P en gas ih

Samigalu h

Gi rimu lyo

Galu r

Tem on

Len dah

P an jatan

W at es

Kalibaw an g

Nangg ul an

40 0000

40 0000

41 00 00

41 00 00

4200 00

4200 00

9120

000 91

20000

913

0000

91300

00

9140

000 91

40000

915

0000

915

0000

Ja lanBa ta s D esaBa ta s K ec a ma tan

Leg end a:

S am ud ra H india

P eta A dministra si Ka bupaten K ulonprogo

S kala 1:1 8 0.00 0

5 0 5 10 Km

Kab u pat en K ulo n prog o

Fig.3. Sermo dam area at upstream

Page 5: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

5

Fig. 3. Sermo dam area at downstream area.

.

Fig.3. Sermo dam area at upstream

Page 6: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

6

Fig.Plate motion based on Global Positioning System (GPS) satellite data from NASA JPL. The vectors show direction and

magnitude of motion.

Fig. The Ring of Fire

Page 7: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

7

Fig.2. (a) Map of Sermo dam with dark blue color and (b) is cross section of Sermo dam

Fig. Net Work Adjusment for Sermo Dam

Page 8: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

8

SERMO DAM MONITORING SYSTEM COMPONENTS

Component for Sermo dam monotoring systemconsists of remote area (in Sermo dam area) andcomputer center system. In the romete area, thecomponents of the monitoring scheme consist oftwo main systems, there are :

a) Dam Deformation Monitoring System (DDMS)which includes a number of monitored objectpoints on the dams and a network of

local reference stations with respect to whichdisplacements of the object points are to bedetermined.

b) On-site GNSS CORS System is the system formonitoring the stability of the area surroundingthe reservoir (ridge lines) and for checking andupdating positions of DDMS reference stations.

The computer center system consists of serverand communication system from the remote areato computer center.

Page 9: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

9

DESIGN AND INSTALLATION SERMO DAM MONIRORING

The multi sensors in this research that permanentlyinstalled are 3D of RTS sensor, an array of permanentlymounted prisms, two units of GNSS CORS sensors,Automatic Water Level Recording (AWLR) sensor, and Pan,Tilt, and Zoom digital IP Camera.

GNSS CORS sensors at Base Station

The GNSS CORS sensors consits of Leica andJavad receiver. The Leica receiver has been installedat the first tower and the Javad receiver has beeninstalled at the second tower.

The GNSS-CORS Receiver Main MonitoringReceiver Leica GRX1200+ and antenna CHOKERING - GNSS Antenna with Dome, geodetic type asbase station, at the first tower as SRM1 station (seeFig 4 (a)).

Page 10: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

10

Robotic Total Station and GNSS receiver has beenhoused in an “observation shelter”. Thisobservation shelter is located at DMU station (Fig.4). The window has been constructed of four largeglass panels joined in a faceted arrangement,similar to a control tower window at the airport.Windows has been 6 mm thick soda lime float glass.This glass has 91% transmission of light due to lowiron content. The window has been installed at aslight angle. This is to prevent the theodolite line ofsight perpendicular to the glass panel.

(a) (b) (c)Fig. 4. (a) Design and (b) the first tower for RTS

and GNSS CORS at SRM1 station,(c) Setting up of Robotic Total Station

Page 11: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

11

(c) box for GNSS CORS receiver at SRM1 station.

.

Fig. Coverage Ares of Monitoring Points

Page 12: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

12

Prism as Monitoring points

The survey of object points has been accomplished by takingradial shots in direct and reverse mode to all the objectprisms. The RTS has been monitored horizontal and verticaldirections, and slope distances. One of the referencestations as base station (presumably the most stable one)has been assigned as the main reference back sight fordirection measurements as DMU area.

The targeting of the total station to each prism is typicallyachieved by automatic target recognition. An AutomaticTarget Recognition (ATR) uses a charge-coupled device(CCD) camera mounted in the telescope of the total stationto measure the return from a laser.

Page 13: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

13

(a) (b)

Fig.5. (a) Crest of Sermo dam where points monitor (prisms with yellow color) have been installed

(a) (b)

Fig.6. Target of monitoring with prism at slope of Sermo dam body

Page 14: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

14

GNSS CORS sensors at Back sight station

The second tower has been used for a GNSS CORSand one unit of prism as a back side monitoring asSRM2 station where the station is in upstream area ofSermo dam. Then at the back sight station has beenplaced for a GNSS CORS Javad Delta G3T GNSS Basic(GPS+Glonass) and Javad antenna GrAntG3T withCone. The distance between the first and the secondtowers is about 2500 m.

(a) (b) (c)Fig.7. An antenna of the second GNSS CORS and a single of Prism as back sight (a) and (b); (c) box for GNSS CORS receiver at SRM2

station.

Page 15: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

15

Sensors of Tilt, Zoom digital IP Camera (CCTV)

Sensors of Tilt, Zoom digital IP Camera hasbeen installed at Intake Sermo Dam. Thissensor is ued to show video situation directlyin upstream and downstream area.

Fig. 8. (a) Is IP Camere presentation (CCTV), (b) and (c) are AWLR (Automatic Water Level Recording)

(a) (b) (c)

Page 16: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

16

The sensor of Automatic Water Level Recorder (AWLR)

The sensor of Automatic Water Level Recorder(AWLR) has been instaleed at intake Sermodam. This sensor has been used to record thefluctuation of water in the upstream area.

Installation of Communication SystemThe total stations will be linked to a computer systemthat will automatically and remotely control allfunctions.The system has operated on a set time schedule andhas automatically turn on at the correct time and startdirection (horizontal and vertical) and distancemeasurement sets. The RTS has been programmed tocollect a prescribed number of sets of angles atpredetermined time intervals to achieve a preset levelof accuracy.

Page 17: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

17

When collection of all the prescribed sets of theobservation data will be completed, the data will betransmitted to the main office computer for itsevaluation, processing and deformation analysis. Thedistribution of monitoring points surrounding Sermodam body is plotted at Fig. 9. According to the finaldesign, the DDM system has been installed apermanently mounted RTS at the first tower formonitoring 20 object targets (EDM prisms) mountedon a pillar type monuments.

The 13 targets stations are at the crest of Sermo damand 6 targets at the slope dam body at thedownstream area and one prism at the back sight.The total station array has been installed to keep alldistance measurements at 400 m or less. At least onereference back sight targets will be installed andincluded in the observation scheme at each robotictotal station.

Page 18: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

18

Fig. 9. Installation of Multi Sensors atSermo dam

Fig. 9. Installation of prisms at Sermo dam where US: Upstream, DS : Down Stream

Page 19: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

19

Explanation of Multi Sensors

= AWLR

= Backsight station

= GNSS Reference/Monitoring Station

= Robotic Total station

= Prisma

= Wireless communication

= IP cam

RESULT AND DISCUSSION

This research monitoring system has been carried usingcomplerized multi sensors. Data will be able to be logged overtime to provide information regarding the effects of aging,earthquakes, erosion, storm events, and other variables onthe overall health of the dam. With an effective monitoringprogram, these causes can be detected early and repaired ormitigated.

Page 20: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

20

Due to the number of factors involved (hydrological,geotechnical, structural, and power related), a wide varietyof measurements are required for dams monitoring systems.Automated monitoring systems have become an importantpart of many dam maintenance programs. The systems willbe flexible enough to measure the wide variety of sensorsused in dam monitoring applications.

Their low power requirements and rugged design allow themto operate unattended in harsh environments for longperiods of time. Telemetry options provide real-time data andalarms to assist remote management system.The GNSS CORS raw data have been computed in a two stepprocess using the GAMIT (GPS Analysis Package Developed atMIT) and GLOBK software to define base station and backsight station.

Page 21: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

21

Sta. Numerical Value

SRM1

LAT.X(m)

x (mm)E (m)

‐7° 46’ 32,92201‐2.174.538,94742

5,130403.787,192

LON.Y(m)

y(mm)N(m)

110° 7’ 38, 718385.933.406,28999

4,1589.140.387,265

h(m)Z(m)

z(mm)

231,43555‐862.922,86462

3,054

SRM2

LAT.X (m)

x (mm)E(m)

‐7° 45’ 58,03710‐2.173.483,16108

5,470402.617,347

LON.Y(m)

y(mm)N(m)

110° 7’ 00,599835.933.919,11690

4,0309.141.456,224

h(m)Z(m)

z(mm)

202,71629‐861.850,60211

2,062

CONCLUDING REMARKS

1. Safety and precise monitoring of Sermo dam deformationsare the most important task to provide vital informationon the stability and safety status.

2. GNSS technology will be extensively used for monitoringSermo dam deformation,The first tower has been installed a GNSS receiver and aRobotic Total Station. The second tower has been a GNSSreceiver and 1 point target monitoring

Page 22: Design and installation for Dam Monitoring Using … Design and installation for Dam Monitoring Using Multi sensors: A Case Study at Sermo Dam, Yogyakarta Province, Indonesia. Sunantyo

22

3. The installation of 20 points are along the center line ofSermo dam body (13 points), slope of Sermo dam body

(6 points) and 1 point at the second tower are supposedto be enuogh for Sermo dam monitoring.

4. The installation of multi sensors (GNSS CORS, RTS,AWLR, and CCTV) to be integrated in one system will be

a good automatic Sermo dam deformationmonitoring system.

ACKNOWLEDGMENT

The authors would like to thank Dean of EngineeringFaculty Gadjah Mada University, Indonesia, Directorof Balai Besar Wilayah Sungai (BBWS) Opak danSerayu Public Work Ministry, and Head Departmentof Geodesy Engineering, Engineering Faculty,Gadjah Mada University to support their valuablecontributions to this research