DEPARTMENT OF COMMUNICATIONS
DRAFT PRESENTATION TO THE PORTFOLIO COMMITTEE ON COMMUNICATIONS ON
ALIGNMENT OF PRIORITIES BETWEEN THE DoC AND ITS ENTITIES
02 August 2011
A global leader in the development and use of Information and Communication Technologies for socio-economic development
2
DoC TeamDoC Team
Rosey Sekese Director-General
Gift Buthelezi DDG: ICT International Affairs & Trade
Sam Vilakazi ADDG: Finance & ICT Enterprise Development
Norman Munzhelele ADDG: ICT Policy Development
Themba Phiri ADDG: Presidential National Commission
Harold Wesso ACEO: e-Skills Institute
Farhad Osman CD: Strategic Planning & Monitoring
Linden Petzer CD: Radio & Satellite
3
Introduction Introduction
PCC requested that the Department present an integrated plan which includes interventions being led by the DoC and those being led by the relevant Entities
The DoC held an alignment workshop so as to integrate interventions being led by both the DoC and those by the Entities
The presentation covers specific areas of collaborations which are:
Broadband
Digital Terrestrial Television
Local Digital Content Development
Spectrum
Hubs / Access Centres
E-Skills
In respect of the above areas, the presentation covers, key elements, deliverables, relevant stakeholders, current status, timelines and funding.
Elements of BB Deliverables Role Players Status Timelines Funding
Policy and regulatory
Costing model for Broadband services
ICASA and DoC Terms of reference being drafted, with consultant to be appointed by September 2011
March 2012 Funding for this project to be sourced from the MTEF allocation of R100m allocated for BB in 2011/12 FY
Facilities Sharing and Local Loop Unbundling
ICASA Discussion document released for public comment in Governmnet Gazette No. 34282 of 22 June 2011
Nov 2011 R179,822 allocated
Broadband Mapping
ICASA Development of indicators to be collected to measure geographic access, as well as ongoing engagement with licensees regarding sharing of geographic information system information
October 2011 R 471,000 allocated
Licensing of Spectrum for Broadband application
ICASA Draft policy direction to be signed off by the Minister
March 2012 n/a
Broadband (1) Broadband (1)
Elements of BB Deliverables Role Players Status Timelines Funding
Rural Connectivity
USAASA definitions
USAASA/ICASA Definitions drafted and list of under-serviced areas compiled. Draft regulations to be released for public comment.
Final Regulations by March 2012
R 55,000 allocated
Regulations on Universal Access Service Obligations
USAASA/ICASA Consultation with under-serviced area representatives to take place in August 2011
Final Regulations by March 2012
R 65,000 allocated
Alignment of USAASA’s existing rural initiatives
Alignment with the Comprehensive Rural Development Programme
USAASA Pilots underway: uMsinga, Greater Tzaneen
Potential projects: Sisonke, Emalahleni, Greater Giyani
March 2012
March 2012
Total funding required for Greater Tzaneen R25 Million Available R9 million from USAASAR5 million from Greater TzaneenShortfall R11 million
Broadband (2) Broadband (2)
Elements of BB Deliverables Role Players Status Timelines Funding
Institutional arrangements
Establishment of a Broadband Intergovernmental Committee
DoC (coordination)ProvincesMunicipalities
(Dept of Public Enterprises, Dept of Science and technology, Dept of Basic Education , Dept of Health and Dept of Public Service and Administration)
Established in terms of the Broadband Policy by DoC in Nov 2010 to coordinate intergovernmental Broadband effortsConsists of 8 focus groupsThe Committee met 4 timesMajor achievement is the Provincial and Municipal alignment
Completed KZN and Limpopo BB projects already commenced as Provincial pilot projectsFinancial ImplicationsNational Treasury current allocated R450 million for Broadband over MTEFR100 million allocated for Broadband in 2011/2012 financial yearThe R500 million allocated to Sentech is for broadband.
National Integrated Broadband Plan (fibre & wireless)
SOEs (USAASA, Sentech, Infraco)DoCDPE
Established to align BB initiatives (backhaul, provincial backbone and access)
August 2011 Sentech, Infraco and USAASA, have agreed on a collaborative framework for BB initiatives. The framework provides for acceleration of the KZN pilot which is within funding provisions of all entities.
Broadband (3) Broadband (3)
Elements of DTT
Deliverables Role Players
Status Timelines Funding
Policy and regulatory
Review and amendment of BDM Policy
DoC The Amendments to the Policy completed and ready for Tabling in Cabinet
August 2011 n/a
Review of digital migration regulations
ICASA Regulations are currently under review March 2012 R44,750 allocated
Scheme of Ownership Support Strategy
DoC The draft SOS Rollout Framework developed and expected to be approved by Cabinet
August 2011. n/a
Set Top Box Manufacturing Strategy
DoC The draft STB manufacturing strategy finalised and expected to be approved by Cabinet
August 2011 n/a
Review of Content Regulations
ICASA All broadcasting service regulations are currently under review
March 2012 R 1,541,085 allocated
Identification of needy households and development of means test for subsidies
USAASA Draft Means Test developed and to be forwarded to Minister. Needy household identification under development
End October 2011 R17 m
Establishment of STB distribution channel
USAASASAPO
Engagement with relevant retailers and SAP is at an advances stage
September 2011 n/a
SABS standards specifications
SABS TC74 Committee met and standards being finalised
August 2011 n/a
On 5 & 6 May a DTT roll-out workshop was held involving all relevant stakeholders where a detailed implementation plan was developed which will be presented to the PCC on 19 September hence only key elements of the detailed plan are listed below.
Digital Terrestrial TelevisionDigital Terrestrial Television
Elements of DTT
Deliverables Role Players Status Timelines Funding
Transmission Infrastructure Rollout
74% population coverage
Sentech DVB-T – 60% at 31 March 2011DVB-T2 target is 60% by December 2012target is 74% DVB-T2 coverage by December 2012
March 2012 2011/12 allocation:R355 m (incl. roll-overs from previous FY’s)
Budget Needed for 2011/12:R366 m
Shortfall:R 11 m
84% population coverage
Sentech - March 2013 2012/12 allocation:R167 mBudget need: R363 mShortfall: R196 m
96% population coverage
Sentech - March 2014 2013/14 allocation: R176,1 mBudget need: R263 mShortfall: R87 m
Digital Terrestrial Television (1)Digital Terrestrial Television (1)
Elements of LDCD
Deliverables Role Players
Status Timelines Funding
Local and Digital Content strategy and implem-entation plan
SABC to apply and host channels prioritising education and health in the context of digital migration
SABC Channel line-up plans (including health and education channels) prepared and business plan setting out 3 funding scenarios presented to DoC for MTEF opex funding on 23 June. Full revised DTT business plan incorporating new channel line-up is close to completion (by early August)
A reduced portfolio of channels will be ready for April 2012, which will be increased in September 2012
Required funding:R217.5m 2012/13, R741.8m 2013/14 and R879.2m 2014/15
NEMISA to provide relevant skills training
NEMISA The contract with the shareholder to be finalised. Community Radio Capacity Building training will commence in August 2011
End July 2011 Require funding from DoC (Policy Branch)
ICASA to prescribe content regulations and license the above channels
ICASA Channel authorisation of digital channels will take place under existing local content regulations.
April 2012 (licensees are to apply for channel authorisation when digital broadcasting actually occurs)
n/a
DAC, DBE & DoH to provide key priorities for content generation
DoC, DAC, DBE and DOH
The task team is in place March 2012 n/a
Local Content Development Strategy is due for Cabinet approval following consultations with various station. The Content Task Team has been established comprising, DOC, SABC, Nemisa, MDDA,DBE, DoH, Sentech
Local and Digital Content DevelopmentLocal and Digital Content Development
Elements of Spectrum
Deliverables Role Players Status Timelines Funding
Spectrum audit
Spectrum Audit jointly by DoC and ICASA (Phase 1 500 MHz – 1000 GHz)
Phase 2: 9kHz -500 MHz)
DoC
DoC
Tender process underway
March 2012
March 2013
R7 Million
R10 Million
Spectrum management
Identification of spectrum for Broadband applications
DoC Draft policy direction to be signed off by the Minister
March 2012 R4,873,730 m
Licensing of Digital Dividend
ICASA Draft policy direction to be signed off by the Minister
March 2012 Included in above funding
Re-farming of broadcasting spectrum after analogue TV switch off.
ICASA Work has not commenced (dependent on analogue switch off)
March 2015 Included in above funding
Spectrum (1)Spectrum (1)
Elements of Spectrum
Deliverables Role Players Status Timelines Funding
Spectrum licensing methods
Methods of licensing Spectrum including spectrum auction are under consideration
ICASA Draft policy direction to be signed off by the Minister
March 2012 Included in above funding
Spectrum (2)Spectrum (2)
Elements of hubs
Deliverables Role Players Status Timelines Funding
Nine Provincial hubs established by USAASA
Coordinate the work of access centres (telecentres, cyberlabs) in provinces
USAASA Design phase Dependant on availability of funds
Funding required from 2012 MTEF
Establish-ment of two ICT incubation hubs to facilitate SMME development in under-served provinces
Provision of business development services and access to infrastructure to SMMEs in the ICT sector
DOC/USAASA Draft business plan developed
March 2012 R14 Million
Hubs / Access (1)Hubs / Access (1)
Elements of hubs
Deliverables Role Players Status Timelines Funding
Establish-ment of knowledge production hubs in four provinces
Conduct research to inform e-skills curriculum development
DoC 5 hubs established (western Cape, Gauteng, Eastern Cape, Limpopo)
March 2012 R34 Million
Establish-ment of 9 content research and training hubs for community radio
Develop programs for community radio
DoC Work still in conceptual phase
March 2012 Funding to be sourced from 2012 MTEF
A team has been established to reconceptualize and integrate all effort in terms of hubs/access centres as part contribution to rural development
Hubs / Access (2)Hubs / Access (2)
Elements of e-Skills
Deliverables Responsibility Status Timelines Funding
National e-Skills Initiative:(Knowledge Production and Innovation)
Signed Memoranda of Understanding (MOUs) with SOEs to increase the optimization of ICT infrastructure for effective service delivery, business development, socio-economic upliftment and research and monitoring for a Knowledge-based Economy.
e-Skills Institute and SOEs
Discussions being held. Work-in-Progress through SOE forums
March 2012 n/a
Established national and provincial e-skills interventions to support impact against MTSF and MDGs, WSIS through a national coordinated organization such as the e-Skills Institute (i.e. knowledge production and innovation)
e-Skills Institute and SOEs (NEMISA, TELKOM, USAASA)
•Establishment of provincial e-skills knowledge production and coordination hubs.•Environmental scans currently being conducted by the provincial e-Skills hubs.•Establishment of three application factories
March 2012
March 2012
Funding required:R8m
Funding required:R6m
Build an ICT infrastructure to support 21st Century Knowledge Economy (i.e. central, provincial hubs) - aggregation, coordination, demand and supply.
DoC – USAASA, TELKOM, SENTECH
Involvement in provincial pilot projects in the Western Cape, Eastern Cape.
March 2013 Funding required:R10m
Develop a research base for new e-skills development for creative industries i.e. digital content production and application development
e-SI / NEMISA Funding to be obtained before TOR can commence
March 2012 Funding required:R5m
E-SkillsE-Skills
15
Conclusion Conclusion
The plan as presented highlights strategic areas of collaboration between the DOC and it Entities.
Going forward, concerted efforts will be made to ensure synergy towards service delivery spearheaded by the DoC.
Cross cutting task teams have been established per programme so as to ensure integrated planning and delivery.
DoC will ensure that such collaboration with its Entities is institutionalised by not only ongoing engagements with Entities but through introducing integrated design and development of plans and budgets.