data centre infrastructure management
TRANSCRIPT
-
8/12/2019 Data Centre Infrastructure Management
1/39
Data Centre InfrastructureManagement DCIM
Where it fits with whats going on
-
8/12/2019 Data Centre Infrastructure Management
2/39
ITIL reducing IT OPEX by 25%
ITIL is about processes these are defined in two main areas
ITIL Service Delivery processes :
Capacity management
Financial management for IT services
Availability Management
IT service continuity management
Service Delivery is concerned with setting up service level agreementsand monitoring the targets within these agreements.
On the operational level, the Service Support processes can be viewed as
deliverin service as laid down in these a reements.
.
ITIL Service support processes :Configuration management
Change management
n rastructure rary s t e most w e y accepte
approach to IT Service Management internationally.
ITIL processes covers IT service management best
practice for internal IT departments and for managing
outsourced service delivery.
Release management
Incident management
Problem management
Service desk
-
8/12/2019 Data Centre Infrastructure Management
3/39
Change Management Release Management Configuration Management Other Service Management
Processes
Configuration Management Database CMDB
Request for Change Incident & ProblemManagementnt
ification
Change Approval
Assess
Analyse Impact
Financial Management
Availability & IT Continuityanagem
se
B rol-Status-Ve
Implement Change
Release: and distribute new
software/hardware with
documentation
Capacity Management
uration
Datab
CM
D
tification-C
ont
&audi
Post Implementation
Review
Close Change IT Security Management
Service Level Management
Config
Planning-Iden
-
8/12/2019 Data Centre Infrastructure Management
4/39
Platforms follow ITIL Processes
IBM Tivoli
BMC Remedy
HP So tware EMC Ionix
-
8/12/2019 Data Centre Infrastructure Management
5/39
The Data Centre --- Significant events
UK is 65 millionpeople how many DC needed 100 to 1000
estimates
Facebook 500 million provided by 10 DC
Business computers are at Risk because Gaminguses 5X the CPUs
Keith Cambron President and CEO of AT&TApril 2010 100Gigwith Cisco CRS-3 and the Ethernet
Alliance has been testing 40gig interoperability.
Steve Ballmer CEO, Microsoft
90% of staff deployed on CLOUD Computing
Kevin Timmons GM Microsoft DCPreassembled SOLUTIONS
-
8/12/2019 Data Centre Infrastructure Management
6/39
Standard Pre-Configured6509 Basic Confi uration
SM
-
8/12/2019 Data Centre Infrastructure Management
7/39
Example of Deployment Solutions
Net-Access- Net-AccessNet-AccessCisco Nexus 7010
Nexus 7018sco
Servers in Net-SERVsco
-
8/12/2019 Data Centre Infrastructure Management
8/39
Ready Deployment to Best Practices
VBLOCK
V0 800 VM
Known PUE
-
8/12/2019 Data Centre Infrastructure Management
9/39
Physical layer Services
Assessment Services Cover
SPACE How to et more 35%-50%COOLING Focused on Air flow and
containment issues with technical
placementPOWER Rack and Cabinet level
CABLING- the 1-10 - 40 -100 migration
and the routing of cables in the DCPUE Assessing and measuring
-
8/12/2019 Data Centre Infrastructure Management
10/39
Requirement for DCIM
Data Centre Infrastructure Management
-
8/12/2019 Data Centre Infrastructure Management
11/39
Power Usage Effectiveness
PUE = IT + DC ower 100 watts + 100 watts = 2IT power 100watts
The Green Grid
Traditions DC are PUE of 2.5 Inefficient Nirvana is 1
Capgeminis new facility Merlin, Swindon .UK uses fresh air cooling
PUE 1.08
-
8/12/2019 Data Centre Infrastructure Management
12/39
Using new Servers
= + power wa s + wa s =
IT power 50watts
Nirvana is
Data Centre Efficiency
-
8/12/2019 Data Centre Infrastructure Management
13/39
Requirement is Risk Mitigation
User community
Data Centre
pp ca on e very
-
8/12/2019 Data Centre Infrastructure Management
14/39
Power Consumption and CFD
CRAC unit notaligned with HotCRAC unit not
aligned with HotColdaisle
HotHot Hot
Coldaisle
ices
aisleaisle aisle
Elevated inlet
temperatures due
to poor airflow
Elevated inlet
temperatures due
to poor airflowfessionalServ
Wasted
bypass air
Wasted
bypass air
Hot aisleHot aisleUITGlobal
Pr
CRAC unit not
aligned with
CRAC unit not
aligned with
exhaust air
recirculation
exhaust air
recirculation
B
eforePAND
Hot AisleHot Aisle
14
-
8/12/2019 Data Centre Infrastructure Management
15/39
Initial step
Do I monitor
service
e very
Monitor DC Power and
Over provision cooling
Periodic CFD Analysis
-
8/12/2019 Data Centre Infrastructure Management
16/39
Business Priority 11
22
33
-
8/12/2019 Data Centre Infrastructure Management
17/39
Platform Data Centre Management
Platform tracks by IP and MAC address
-
8/12/2019 Data Centre Infrastructure Management
18/39
Platform Data Centre Management
Business is now at RISK
-
8/12/2019 Data Centre Infrastructure Management
19/39
Provisioning, Moves, Changes and Fault MTTR
Real Time Physical location TrackingSpeeds up Physical Provisioning
Changes from human error
Reduces MTTR
-
8/12/2019 Data Centre Infrastructure Management
20/39
Data Centre Infrastructure Management
Line of Business ApplicationDCIM adds physical deployments, power and thermals
-
8/12/2019 Data Centre Infrastructure Management
21/39
Data Centre Infrastructure Management
No
n ow
of Risk
Line of Business ApplicationDCIM automates physical layer tracking of moves and changes
-
8/12/2019 Data Centre Infrastructure Management
22/39
-
8/12/2019 Data Centre Infrastructure Management
23/39
Logical to Physical Layer Mapping
Network Management Logical View
Virtualization is another layer
DCIM Physical View
-
8/12/2019 Data Centre Infrastructure Management
24/39
Software & Appliance Market Evolution: 2011-201524
-
8/12/2019 Data Centre Infrastructure Management
25/39
Analyst Validation of DCIM Category
Gartner (research note:
G00174769) DCIM: Going Beyond IT by
David Cappuccio
Forrester (December 2009) Put DCIM Into Your
Schreck
DCIM = Data Center Infrastructure Management
-
8/12/2019 Data Centre Infrastructure Management
26/39
DCIM positioning with standards
ITILITIL
Real-Time Physical Connectivity Monitoring AutomatedDocumentation &
Reporting
Configuration
Management
Database (CMDB)
Data CenterData CenterTIA/EITIA/EI
Unauthorized Physical Access and PhysicalChange Alerts
InfrastructureInfrastructure
ManagementManagement
HIPPAHIPPA
A 606A 606--
AA Physical Location Tracking of IT Assets
Ph sical De lo ment Environment Monitorin and
ISOISO1779917799
Managing
Automated Documentation
Managed &
Secure ServicesCompliant Labeling
& Inventory Mgt.
-
8/12/2019 Data Centre Infrastructure Management
27/39
27
Total Economic Impact
Layers 2-8Layers 0-7 (OSI)
Layers 0 and 1 Provided by DCIM Power
Thermal
Connectivity
Location
Layers 0-1
Layers 2 through 7
Provided through integrations withmanagement Platform
Change management
Capacity management
PUE reporting
-
8/12/2019 Data Centre Infrastructure Management
28/39
Example from IPLM
-
8/12/2019 Data Centre Infrastructure Management
29/39
Cross-Connect Installations
-
8/12/2019 Data Centre Infrastructure Management
30/39
Interconnect Installations
-
8/12/2019 Data Centre Infrastructure Management
31/39
Enterprise Installations
-
8/12/2019 Data Centre Infrastructure Management
32/39
Sensor Appliance
Managed POU
Temperature
Humidity
SM
-
8/12/2019 Data Centre Infrastructure Management
33/39
Cabinet Integration
-
8/12/2019 Data Centre Infrastructure Management
34/39
Reference Designs = Best Practices (Logical and Physical)
ayer ggrega on ou ng
Layer 2 Access Bridging & Spanning Tree
Protocol
-
8/12/2019 Data Centre Infrastructure Management
35/39
35
SM
-
8/12/2019 Data Centre Infrastructure Management
36/39
Cabinet To Tem svs. Used Power
ASHRAE recommendations. 18-27 C or 64.4 de F throu h 80.6 de F
-
8/12/2019 Data Centre Infrastructure Management
37/39
Cabinet Elevation View
-
8/12/2019 Data Centre Infrastructure Management
38/39
DCIM Physical Deployment by Line of business
Monitor
Plan
ep oy
SM
-
8/12/2019 Data Centre Infrastructure Management
39/39
Questions ?