darlene's first 100 days report

14
The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio Report Abstract CHARACTERIZED BY BOTH CHANGE AND PERMANENCE, THE FIRST ONE HUNDRED DAYS UNDER THIS NEW ADMINISTRATION UNRAVELLED CHALLENGES, OPPORTUNITIES AND POSSIBILITIES. CHANGES ARE BEING INSTITUTED IN THE FORM OF ENHANCING EXISTING PROGRAMS OR ELIMINATING NONRESPONSIVE ONES. ON ONE HAND, PROGRAMS THAT CONTINUE TO YIELD POSITIVE IMPACT ON THE GENERAL WELFARE ARE RETAINED. THE FIRST ONE HUNDRED DAYS REPORT NEITHER PRESENTS THE STATE OF AFFAIRS OF THE LOCAL GOVERNNACE NOR THE STATE OF THE CITY AS A WHOLE, YET. IT IS MERELY A PARTIAL ACCOUNT OF INITIAL ACCOMPLISHMENTS OF THE LOCAL GOVERNMENT COVERING THE THIRD QUARTER OF CALENDAR YEAR 2010. THE REPORT IS AN ENUMERATION OF OUTCOMES OF SERVICE DELIVERY ACCORDINGLY INDEXED BY CONTEXT. REPORT ENTRIES EMPHASIZE ON IMPACT OF STATISTICAL INPUTS AND NOT ON FIGURES OR DATA PER SE. INCLUDED IN THIS REPORT ARE SALIENT INITIATIVES UNDERTAKEN BY THE LOCAL CHIEF EXECUTIVE WHICH TRANSLATE INTO GOVERNANCE POLICIES CARRIED OUT THROUGH ISSUANCES AND PRONOUNCEMENTS. THIS REPORT IS A PRELIMINARY INVENTORY OF HIGHLIGHTS UNDER THE FOUR CITY DEVELOPMENT STRATEGIES (CDS) CLUSTER: GENERAL POLICIES ON GOOD GOVERNANCE INSTITUTED, SOCIAL SERVICES AND CONDITION OF LIVABILITY, FISCAL MANAGEMENT AND THE BANKABILITY, AND INVESTMENTS, JOBS, ECONOMY AND COMPETITIVENESS. WHILE THE FIRST 100 DAYS IS A PRELUDE, IT ESSENTIALLY PROVIDES A GLIMPSE ON HOW THE NEXT THREE YEARS AND BEYOND WILL BE RUN. IT BASICALLY SERVES AS POINT OF ENTRY ON EVALUATING FURTHER THE BASIC SERVICE DELIVERY SYSTEMS AND PROCESSES IN THE LOCAL GOVERNMENT. SINCE GOVERNANCE IS A DYNAMIC ENTERPRISE, FUTURE PLANS AND PROGRAMS ARE THEREFORE EXPECTED TO SPRING FROM THE CONTINUOUS ANALYSIS AND ASSESSMENT OF DATA AND RELEVANT INFORMATION DERIVED FROM THIS REPORT AND ALL OTHER FUTURE REPORTS. Page 1 of 14

Upload: avel-manansala

Post on 08-Apr-2015

1.621 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

Report Abstract

CHARACTERIZED BY BOTH CHANGE AND PERMANENCE, THE FIRST ONE HUNDRED DAYS UNDER THIS NEW ADMINISTRATION UNRAVELLED CHALLENGES, OPPORTUNITIES AND POSSIBILITIES. CHANGES ARE BEING INSTITUTED IN THE FORM OF ENHANCING EXISTING PROGRAMS OR ELIMINATING NONRESPONSIVE ONES. ON ONE HAND, PROGRAMS THAT CONTINUE TO YIELD POSITIVE IMPACT ON THE GENERAL WELFARE ARE RETAINED.

THE FIRST ONE HUNDRED DAYS REPORT NEITHER PRESENTS THE STATE OF AFFAIRS OF THE LOCAL GOVERNNACE NOR THE STATE OF THE CITY AS A WHOLE, YET. IT IS MERELY A PARTIAL ACCOUNT OF INITIAL ACCOMPLISHMENTS OF THE LOCAL GOVERNMENT COVERING THE THIRD QUARTER OF CALENDAR YEAR 2010.

THE REPORT IS AN ENUMERATION OF OUTCOMES OF SERVICE DELIVERY ACCORDINGLY INDEXED BY CONTEXT. REPORT ENTRIES EMPHASIZE ON IMPACT OF STATISTICAL INPUTS AND NOT ON FIGURES OR DATA PER SE.

INCLUDED IN THIS REPORT ARE SALIENT INITIATIVES UNDERTAKEN BY THE LOCAL CHIEF EXECUTIVE WHICH TRANSLATE INTO GOVERNANCE POLICIES CARRIED OUT THROUGH ISSUANCES AND PRONOUNCEMENTS.

THIS REPORT IS A PRELIMINARY INVENTORY OF HIGHLIGHTS UNDER THE FOUR CITY DEVELOPMENT STRATEGIES (CDS) CLUSTER: GENERAL POLICIES ON GOOD GOVERNANCE INSTITUTED, SOCIAL SERVICES AND CONDITION OF LIVABILITY, FISCAL MANAGEMENT AND THE BANKABILITY, AND INVESTMENTS, JOBS, ECONOMY AND COMPETITIVENESS.

WHILE THE FIRST 100 DAYS IS A PRELUDE, IT ESSENTIALLY PROVIDES A GLIMPSE ON HOW THE NEXT THREE YEARS AND BEYOND WILL BE RUN. IT BASICALLY SERVES AS POINT OF ENTRY ON EVALUATING FURTHER THE BASIC SERVICE DELIVERY SYSTEMS AND PROCESSES IN THE LOCAL GOVERNMENT. SINCE GOVERNANCE IS A DYNAMIC ENTERPRISE, FUTURE PLANS AND PROGRAMS ARE THEREFORE EXPECTED TO SPRING FROM THE CONTINUOUS ANALYSIS AND ASSESSMENT OF DATA AND RELEVANT INFORMATION DERIVED FROM THIS REPORT AND ALL OTHER FUTURE REPORTS.

OVERALL, THE INITIATIVES DISCUSSED IN THIS REPORT ARE A STARTING POINT IN IMPROVING SERVICE DELIVERY PROCESSES AND THE EFFICIENCY OF UTILIZING RESOURCES. HENCE, THE FIRST 100 DAYS REPORT IS ONLY THE BEGINNING OF FURTHER PAVING THE CITY’S ROADMAP TO GLOBAL JOURNEY TOWARDS GREATER HEIGHTS AND PROSPERITY.

Page 1 of 10

Page 2: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

General Policies On Good Governance

THE CITY’S GENERAL DIRECTION ON ITS GLOBAL JOURNEY INITIALLY STARTS WITH POLICIES AND GUIDELINES THAT SHOULD SET THE TONE AND ATTUNE THE MINDSET OF ALL STAKEHOLDERS IN LOCAL GOVERNANCE TO THE GLOBAL CONCEPT. THE HEREIN RUNDOWN OF POLICIES UNDER GOOD GOVERNANCE ARE INTANGIBLES EXPECTED TO RESULT IN MATERIAL OUTCOMES.

WE CREATED EO NO. 22 SERIES OF 2010, CREATING THE GSC ANTI-DRUG ABUSE COUNCIL WHICH ESTABLISHES A MECHANISM FOR EFFECTIVE PARTNERSHIP ESPECIALLY WITH THE BARANGAYS REQUIRING THEM TO CREATE RESPECTIVE BARANGAY ANTI-DRUG ABUSE COMMITTEES.

THIS IS AMONG FIRST FEW STEPS IN CURBING IF NOT ERADICATING THE DRUG ABUSE PROBLEM, ALONGSIDE INTENSIFYING EDUCATION AND INFORMATION COMPONENT ON ILL-EFFECTS OF ILLEGAL DRUGS, IN COORDINATION WITH ALL OTHER STAKEHOLDERS.

WE CREATED EO NO. 23 SERIES OF 2010, DECLARING THE CITY AS A NO-FIREARM ZONE WHICH SEEKS TO FULLY ACHIEVE A FIREARM-FREE CITY IN THE INTEREST OF PEACE AND ORDER. THE MOST SIGNIFICANT IMPACT OF EXECUTIVE ORDER 23 IS THE IMMEDIATE REDUCTION OF SHOOTING INCIDENTS AND FIREARM RELATED CRIMES IN GENSAN. END-GOAL IS THE FORMULATION OF A CITY ORDINANCE TO THIS EFFECT.

WE AMENDED 16 EXISTING EXECUTIVE ORDERS, INCLUDING EO NO. 25 SERIES OF 2010, AMENDING EO NO. 001A SERIES OF 1999, WHICH PROVIDES PROVISION ON ENHANCEMENT OF SERVICES OF CITY HALL SA BARANGAY (CHB) PROGRAM ESTABLISHING SERVICE DELIVERY PROCEDURES BEFORE, DURING AND AFTER EVERY CONDUCT OF CITY HALL SA BARANGAY.

AS A RESULT, THERE HAVE BEEN CONCERNS THAT ARE ALREADY ADDRESSED DURING THE CONDUCT OF CHB WHICH DO NOT NECESSARILY REQUIRE BUDGET ALLOCATION. i.e., CEO’s IMMEDIATE REPAIRS OF FARM-TO-MARKET ROADS.

IN THE FIRST 100 DAYS WE INITIATED OF AUSTERITY MEASURES IN THE LOCAL GOVERNMENT THROUGH THE FOLLOWING;

SUSPENSION OF ALL REQUISITIONS FOR PROCUREMENT OF ALL I.T. AND I.T. - RELATED EQUIPMENT. THIS IS ALSO GROUND-LAYING FOR A COMPREHENSIVE AND CITY-WIDE I.T. PLAN WHICH SHALL BE IMPLEMENTED IN THE NEXT TWO YEARS. THIS IS AN INTEGRATION APPROACH IN COMMUNICATION TECHNOLOGY, SYNCHRONIZING ALL LOCAL GOVERNMENT DEPARTMENTS.

SUSPENSION OF ALL APPLICATIONS FOR MONETIZATION OF LEAVE CREDITS AS WE PRIORITIZE THE REMAINING RESOURCES FOR THE LAST QUARTER OF THE YEAR.

Page 2 of 10

Page 3: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

ENERGY CONSERVATION MEASURE (PUTTING OFF LIGHTS AND AIRCON UNITS FROM 12-1PM EVERYDAY). RELATIVE TO REDUCTION OF ELECTRICTY CONSUMPTION, A COMPREHENSIVE STUDY IS ONGOING TO ASSESS REPLACEMENT OF SODIUM STREETLIGHTS TO LED LIGHT WITH THE ENDVIEW OF SAVING AROUND P50M OF ENERGY CONSUMPTION.

WE ORDERED REVIEW OF PROCESSES ON DISPOSITIONS OF PUBLIC LANDS IN THE CITY (SINCE THE EFECTIVITY OF RA 9649 OR AN ACT AMENDING RA 5412 OTHERWISE KNOWN AS THE CITY CHARTER OF GENERAL SANTOS CITY) EFFECTING THAT ALL TRANSFERS MUST PASS THROUGH THE CITY ADMINISTRATOR’S OFFICE FOR EVALUATION AND CLEARANCE PRIOR TO ENDORSEMENT TO DENR. THE CITY HAS STARTED THE PROCESS OF RECLAIMING LANDS BY FILING CASES AGAINST UNSCRUPULOUS CLAIMANTS OF PUBLIC LANDS.

WE ORDERED REVOCATION OF BUSINESS PERMITS OF ALL GAMBLING ESTABLISHMENTS ALONGSIDE CLOSURE OF NIGHT SPOTS WITH LEWD SHOWS. THIS IS TO SEND A MESSAGE THAT THIS GLOBAL CITY WILL NOT TOLERATE BUSINESSES THAT ARE NOT LAW- ABIDING.

WE ARE ALSO FINALIZING THE REDESIGNING OF PROCESSES, STRUCTURES, COMPETENCIES AND CULTURE UNDER THE ORGANIZATIONAL DEVELOPMENT PROGRAM WHICH WILL SEE IMPLEMENTATION IN THE NEXT TWO YEARS.

WE ALSO HAVE REVIEWED THE 2011 BUDGET AMOUNTING TO P1.3 BILLION ENSURING A RATIONAL PRIORITIZATION OF FUND ALLOCATION SPECIFICALLY FOR EDUCATION AND SOCIAL SERVICES. IT IS NOW SUBMITTED TO SP FOR APPROPRIATE LEGISLATION.

Social Services and Condition of Livability

OUR LOCAL GOVERNMENT CONTINUES TO UPSIZE ITS RESOURCE ALLOCATION IN THE DELIVERY OF SOCIAL SERVICES AND SOCIAL ASSISTANCE PROGRAMS, A MANIFESTATION OF THE IMPORTANCE IT GIVES IN ITS DELIVERY OF ADEQUATE SERVICES OF HIGH QUALITY.

THE CURRENT SITUATION HIGHLIGHTS THE NEED FOR LONG-TERM STRATEGIC PLANNING, COORDINATED SOLUTIONS AND CAPACITY STRENGTHENING WHICH IN THE END, WILL AUGUR WELL IN THE CITY’S VISION TO APPROACH LIVABILITY NORMS SET ON A GLOBAL SCALE.

Page 3 of 10

Page 4: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

PEACE AND ORDER

OUR LONG TERM OBJECTIVE ON PEACE AND ORDER IS TO BUILD THE CONFIDENCE OF THE INTERNATIONAL COMMUNITY IN THE LEADERSHIP OF THE LOCAL GOVERNMENT. IT IS IMPERATIVE THAT WE NURTURE THE CITY AND ITS PEOPLE TO BE PEACE-LOVING AND LAW-ABIDING.

DURING THE FIRST 100 DAYS, 22 OPERATIONS IN THE CAMPAIGN AGAINST ILLEGAL DRUGS RESULTED TO TOTAL ARREST OF 31 PERSONS, CONFISCATION OF ILLEGAL DRUGS AMOUNTING TO PHP 337,820.00 AND FILING OF 22 CASES IN COURT.

OUR GSC POLICE OFFICE BUSTED THE OPERATION OF BIG TIME SUGAR SMUGGLING SYNDICATE ON SEPTEMBER 30, 2010 THAT RESULTED IN THE SEIZURE OF A TOTAL OF 17 UNITS OF 20-FOOTER CONTAINER VANS, EACH LOADED WITH AN AVERAGE 536 BAGS OF SMUGGLED GRANULATED SUGAR OR A TOTAL OF MORE OR LESS 9,112 BAGS, WITH AN ESTIMATED STREET VALUE OF MORE OR LESS PHP 22,780,000.00

OUR CAMPAIGN AGAINST ILLEGAL GAMBLING RESULTED IN THE ARREST OF 105 PERSONS AND THE FILING OF 59 CASES IN COURT IN THE COURSE OF 55 POLICE OPERATIONS.

IN RESPONSE TO THE ORDER OF MAKING GSC AS “NO-FIREARM-ZONE”, THE GSCPO CONDUCTED 17 POLICE OPERATIONS THAT RESULTED IN THE CONFISCATION OF 15 SHORT FIREARMS AND 7 HIGH POWERED FIREARMS WITH A TOTAL OF 10 CASES FILED IN COURT.

HEALTH

EQUAL ATTENTION HAS ALSO BEEN GIVEN TO OUR HEALTH SECTOR. WHILE GOVERNANCE POLICIES ARE THE VESSELS THAT WILL TAKE GENSAN ON ITS GLOBAL DESTINATION, THE HUMAN RESOURCE IS THE FUEL THAT POWERS THE JOURNEY. HEALTHY CONSTITUENTS ARE PRODUCTIVE. HEALTHIER PEOPLE MEANS WEALTHIER LOCAL ECONOMY. THESE FIRST FEW ACCOMPLISHMENTS ARE EXPECTED TO DRAW POSITIVE GRAPHS IN THE INDICATORS OF A HEALTHY CITIZENRY, FIT AND ABLE CONSTITUENCY.

THROUGH A RESOLUTION OF THE LOCAL HEALTH BOARD, THE MERGER OF LYING-IN CENTER AND THE BARANGAY HEALTH CENTERS IS ALREADY UNDER WAY. THIS MERGER WILL INCREASE THE CAPABILITIES OF OUR HEALTH CENTERS TO INCLUDE MATERNAL AND NEO-NATAL CARE, AND MINOR SURGICAL PROCEDURES, ALONG WITH THE CONDUCT OF DAILY MEDICAL CONSULTATIONS.

Page 4 of 10

Page 5: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

FIVE OF OUR LYING-IN CENTERS ARE ALREADY ACCREDITED UNDER THE PHIC MATERNAL PACKAGE. THE PHILHEALTH HOLDERS WILL PAY ONLY AN AVERAGE OF 1,800.00 FOR THE WHOLE DURATION OF THEIR ADMISSION INSTEAD OF THE 5,000.00 MATERNITY PACKAGES AT PRIVATE CLINICS

WE HAVE SUBMITTED APPLICATION WITH PHILHEALTH TO OPEN AN OUT-PATIENT PACKAGE FOR OUR LYING-IN CENTERS. THIS PACKAGE WILL ENABLE PHIC-MEMBER PATIENTS TO AVAIL OF THE DIFFERENT MEDICAL SERVICES SUCH AS MINOR SURGICAL PROCEDURE FOR FREE.

ENVIRONMENT

HEALTHY CITIZENRY DESERVES A HEALTHY ENVIRONMENT. THE EXERCISE OF ENVIRONMENTAL RESPONSIBILITY IS A MORAL OBLIGATION. IN GENSAN, IT IS ALSO A MEANS TO AVOID THE PITFALLS THAT URBANIZED CITIES HAVE FALLEN INTO. THE PATH THAT GENSAN’S GLOBAL JOURNEY IS TREADING IS A WELL-BALANCED GREEN SCENERY AND CURRENCY. IN BECOMING A GLOBAL CITY, GLOBAL CONCERNS HAVE TO BE ADDRESSED. ENVIRONMENT AS A WORLDWIDE MATTER IS DEALT WITH LOCALLY ON A DAY TO DAY AND LONG TERM BASIS.

ON THIS NOTE, WE INCREASED GARBAGE COLLECTION EFFICIENCY FROM 51% TO 65% THROUGH THE PROVISION OF DUMP TRUCKS AND THE REHABILITATION OF CITY COLLECTION FLEET.

WE HAVE DIVERTED 17.3% OR 59, 564 CU. METERS OF TOTAL WASTES. BIODEGRADABLE WASTE ARE BROUGHT TO THE CITY DEMO FARM FOR COMPOSTING AND CONVERTED INTO SOIL ENHANCERS THAT ARE USED IN THE LANDSCAPING PROGRAM OF CITY PARKS AND PLAZAS.

BUT THE MOST IMPORTANT CAMPAIGN IS ON OUR WASTE SEGREGATION BECAUSE THIS IS WHERE OUR PEOPLE CAN SUBSTANTIALLY CONTRIBUTE IN OUR ENVIRONMENT PROTECTION.

Fiscal Management and the City’s Bankability

FINANCING ALL OF THESE SOCIAL SERVICES PROGRAMS NECESSITATES THAT WE MANAGE OUR FISCAL RESOURCES WELL. A WELL-FUNCTIONING PUBLIC SECTOR THAT DELIVERS EXCELLENT SERVICES CONSISTENT WITH THE CITY’S NEEDS INCREASES ITS BANKABILITY. MANAGING FISCAL RESOURCES PRUDENTLY IS CONSIDERED CRUCIAL TO THE LOCAL GOVERNMENT’S ACHIEVEMENT OF ITS ROADMAP TO GLOBAL PROMINENCE.

IN THE FIRST 100 DAYS, OUR ACTUAL COLLECTION DERIVED FROM BUSINESS TAX REACHED P24,139,170.65 INCLUDING PENALTIES OR A COLLECTION EFFICIENCY OF 120.65% AGAINST TARGET OF P20 MILLION.

Page 5 of 10

Page 6: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

OUR ACTUAL COLLECTION DERIVED FROM REAL PROPERTY TAX REACHED P 24,917,022.68 (BASIC AND SEF) WITH A COLLECTION EFFICIENCY OF 149.67% AGAINST TARGET OF P 16 MILLION.

OUR PROPERTY TRANSFER TAX COLLECTED AMOUNTED TO 2,489,067.41 (INCLUDING PENALTIES) OR A COLLECTION EFFICIENCY OF 247.14% FROM THE P1 MILLION TARGET.

TOTAL ACCUMULATED INCOME DERIVED FOR THE PERIOD JULY - SEPTEMBER 2010 IS 4P283,995,735.53

WE HAVE SENT OUT DEMANDS FOR THE DISCLOSED UNDERSUBMISSION OF COLLECTION, UNLIQUIDATED CASH ADVANCES, DISALLOWANCES AND OTHER RECEIVABLES OF THE CITY FROM DIFFERENCE INDIVIDUALS AND NGOS/POS. UNCOMPLYING DEBTORS WILL BE SUBJECTED TO THE PROVISIONS OF PD 1445.

AS OF SEPTEMBER 30, 2010 CASH ADVANCES, UNDERSUBMISSIONS AND DISALLOWANCE ALREADY SETTLED AMOUNTED TO P1,170,713.88

OF THE TOTAL APPROPRIATION FOR GENERAL FUND OF P1,554,583,014.81 THE CITY HAS ALREADY SPENT P 543,495,758.94, AS OF SEPTEMBER 15, 2010. TOTAL AVAILABLE FUNDS FOR THE REMAINDER OF THE YEAR IS P 1,011,087,255.00. NOTE THAT OUR USAGE OF FUNDS FOR THE YEAR HAS BEEN AFFECTED BY THE ELECTION BAN IN THE SECOND QUARTER OF THIS YEAR.

OF THE TOTAL APPROPRIATION FOR HOSPITAL SERVICES AMOUNTING TO P124,481,335.66, THE CITY HAS ALREADY DISBURSED P64,987,619.24. TOTAL FUNDS AVAILABLE IS P59,493,716.36.

TOTAL APPROPRIATION FOR PUBLIC MARKET OPERATIONS IS P24,048,817.64, OF WHICH P15,034,163.04 WAS ALREADY DISBURSED. TOTAL FUNDS AVAILABLE IS P9,014,654.60.

TOTAL APPROPRIATION FOR TERMINAL OPERATION IS P8,000,000.00, AND TOTAL DISBURSEMENTS AMOUNTED TO P2,147,853.04. TOTAL FUNDS AVAILABLE IS P5,852,146.96.

TOTAL APPROPRIATION FOR SLAUGHTERHOUSE OPERATION IS P1,772,289.00. TOTAL DISBURSEMENT IS P510,041.89. TOTAL FUNDS AVAILABLE IS P1,262,247.11.

Page 6 of 10

Page 7: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

Investments, Jobs, Economy and Competitiveness

ALL EFFORTS ON FISCAL MANAGEMENT ARE NOT WITHOUT PURPOSE. TO MAKE THE CITY AS COMPETITIVE AND AS ATTRACTIVE TO INVESTORS IS A DEFINED DIRECTION. THE CITY’S STATE OF COMPETITIVENESS IS MEASURED BY HOW RESPONSIVE THE CITY IS TO THE NEEDS OF THE BUSINESS SECTOR AND HOW IT CREATES AN ENVIRONMENT THAT IS BENEFICIAL TO THE INVESTORS. SIGNIFICANT EFFORT IS PLACED ON ENSURING THAT THE PROCESSES ARE COST-BENEFICAL TO BOTH PUBLIC AND PRIVATE SECTORS.

ALONG THIS LINE, WE HIRED CONSULTANT-EXPERT TO REVIEW BUSINESS FACILITATION. RECOMMENDATIONS ARE EXPECTED TO BE SUBMITTED EARLY NEXT YEAR, IN TIME FOR THE ANNUAL RENEWAL OF BUSINESS PERMITS. THIS IS RESPONDING TO THE NEED TO HAVE THE CITY NOT JUST BUSINESS-FRIENDLY BUT PROCESS-FRIENDLY. THE GOAL IS TO REDUCE BUSINESS PERMITS AND OTHER PERMITS PROCESSING SIGNIFICANTLY REDUCED TO ONLY HOURS.

BUILDING PERMITS ISSUED FROM JULY TO SEPTEMBER THIS YEAR TOTAL 252 WITH TOTAL COST OF P243 MILLION. WE HAVE REGISTERED AND ISSUED PERMITS TO 276 NEW BUSINESSES WITH AGGREGATE CAPITALIZATION AMOUNTING TO P139 MILLION THAT GENERATED 882 JOBS.

THE ENTRY OF SM PRIME HOLDINGS, INC. WITH CAPITALIZATION OF P1.253 BILLION FOR THE CONSTRUCTION AND OPERATION OF SM MALL OF GENSAN WILL DEFINITELY ENLIVEN MORE OUR LOCAL ECONOMY TO OUR BENEFIT.

OUR PUBLIC EMPLOYMENT SERVICE OFFICE SOLICITED 3,000 JOB VACANCIES FROM PRIVATE ESTABLISHMENTS AND BUSINESS ENTERPRISES AND WAS ABLE TO PLACE 1,366 INDIVIDUALS FOR LOCAL EMPLOYMENT. 78 APPLICANTS HIRED-ON-THE SPOT DURING THE YAMAN GENSAN JOBS FAIR.

WHILE OUR SHORT TERM GOAL IS TO STRENGTHEN THE LGU-PRIVATE PARTNERSHIP, OUR LONG TERM GOAL IN STRENGHTENING PESO PROGRAM IS TO ESTABLISH A COMPREHENSIVE DATA BANK OF THE CITY’S HUMAN RESOURCE (BOTH GRADUATES AND UNEMPLOYED) AND LINK THE DATABASE WITH THE WHAT THE INDUSTRIES AND THE LABOR MARKET NEED .

WE HAVE STARTED UNDERTAKING A COMPREHENSIVE INVENTORY OF OUR LABOR CAPACITIES AND SPECIFIC LABOR NEEDS. WITH THE COOPERATION OF THE DEPARTMENT OF LABOR AND EMPLOYMENT AND THE DEPARTMENT OF EDUCATION, WE WILL BE ABLE TO INCREASE THE LEVEL OF COMPETENCIES OF OUR WORKFORCE TO GLOBAL STANDARDS AS WELL AS ADDRESS THE GAPS IN LOCAL/DOMESTIC EMPLOYMENT.

Page 7 of 10

Page 8: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

Infra Projects Updates

OUR INFRASTRUCTURE INVESTMENTS ARE TANGIBLE MANIFESTATIONS OF THE CITY’S GROWTH. ENGINEERING FACILITIES ARE ALSO INDICATORS OF THE CITY’S READINESS FOR BIGGER AND BETTER OPPORTUNITIES AND CHALLENGES. THE COMPLETED INFRA PROJECTS WITHIN THE FIRST 100 DAYS PRESENT THE CITY’S CONSCIOUS EFFORT TO IMPROVE CONDITIONS OF ITS INNER AND OUTER ROAD NETWORK PAVING FOR A VIBRANT URBAN LANDSCAPE.

THE EXPANSION|RENOVATION OF GSC AIRPORT AMOUNTING TO 20M HAS BEEN FINALLY COMPLETED AND THERE WILL STILL BE MORE INFUSION OF BUDGET COMING FROM LOCAL AS WELL AS NATIONAL AGENCIES TO FURTHER UPGRADE THE FACILITY.

ENGINEERING PROJECTS COMPLETED WITHIN THE FIRST 100 DAYS WITH TOTAL COST OF P27.034 MILLION PESOS INCLUDE:

ROAD CONCRETING AT NUÑEZ ST. EXTENSION, BARANGAY SAN ISIDRO (P7.46 MILLION, JULY 2, 2010)

CONTINUATION OF ROAD CONCRETING WITH DRAINAGE AT MABUHAY-ROAD (P3.83 MILLION, JULY 14, 2010)

REHABILITATION OF PUROK GUADALUPE-PUROK NOPOL FARM TO MARKET ROAD LOCATED BRGY. CONEL, (P4.69 MILLION, SEPTEMBER 23, 2010, 80% OF THE COST FUNDED BY DEPARTMENT OF AGRICULTURE)

CONSTRUCTION OF 1-UNIT TRAINING CENTER AT THE BACK OF CITY HALL, GOVERNMENT CENTER, (P287 THOUSAND, JULY 21, 2010)

INSTALLATION OF RAILINGS AT THE CITY PUBLIC MARKET VICINITY (P957 THOUSAND, AUGUST 15, 2010)

CONSTRUCTION OF TRAINING CENTER, GOVERNMENT CENTER (P2.95 MILLION, AUGUST 5, 2010)

REPAIR OF ROOFING AT CENTRAL PUBLIC MARKET PHASE B, BRGY. DADIANGAS SOUTH, (P4.87 MILLION, SEPTEMBER 2, 2010)

CONSTRUCTION OF MEDIAN ISLAND ALONG P. ACHARON BLVD.(P1.99 MILLION, OCTOBER 8, 2010)

ZERO-BACKLOG POLICY IS IN PLACE WITH DIRECTIVE TO CEO TO FINISH ALL BUILDING PLANS FOR 2011 AND MUST BE SUBMITTED FOR BIDDING.

THE ON-GOING IMPROVEMENT/RENOVATION OF CITY HOSPITAL BUILDING, AT GSC HOSPITAL COMPOUND IS 90% COMPLETED. PROJECT COST OF P14.64 MILLION IS PARTLY FUNDED BY THE DEPARTMENT OF HEALTH TARGETED TO BE COMPLETED IN DECEMBER 2010.

Page 8 of 10

Page 9: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

ON THE STATUS OF OUR SANITARY LANDFILL PROJECT, R-II BUILDERS INC., OF PHILIPPINE ECOLOGY SYSTEMS CORPORATION CONSORTIUM HAS ALREADY SIGNIFIED THAT THEY ARE READY FOR THE REMOBILIZATION OF THE DESIGN, BUILD AND OPERATE CONTRACT OF OUR SANITARY SOLID WASTE MANAGEMENT AND DISPOSAL FACILITY.

WE ALSO HAVE REVIEWED AND NEGOTIATED FOR THE RESTRUCTURING OF OUR SUBSIDIARY LOAN AGREEMENT WITH LAND BANK OF THE PHILIPPINES. AWAITING LEGISLATION FOR BORROWING RESOLUTION AND AUTHORITY FOR THE MAYOR TO ENTER AND SIGN THE SUBSIDIARY LOAN AGREEMENT.

FOR OUR TUNA INDUSTRY, THE 12TH TUNA CONGRESS PRODUCED, AMONG OTHERS, RESOLUTION NO. 05, SERIES OF 2010: RESOLUTION REQUESTING THE DEPARTMENT OF AGRICULTURE (DA) AND DEPARTMENT OF TRANSPORTATION & COMMUNICATIONS (DOTC) TO HARMONIZE AND RATIONALIZE ISSUANCE OF FISHING VESSEL REGISTRATION AND LICENSING. THIS IS IN FURTHERANCE OF STRENGTHENING TUNA INDUSTRY ESPECIALLY IN REGULATIONS AND POLICIES DIRECTLY AFFECTING LOCAL FISHERMEN

THE SUCCESSFUL STAGING OF THE 42ND TUNA FESTIVAL EXPERIENCE CONTINUE TO PUT THE CITY IN THE FESTIVAL MAP OF THE COUNTRY. OUR TOURISM OFFICE REPORTED FULL OCCUPANCY OF ALL HOTELS DURING THE CELBRATION.

Awards and Citations

DURING THE FIRST 100 DAYS, THE CITY ALSO RECEIVED AWARDS AND CITATIONS WORTHY OF MENTIONING. NATIONAL COMPETITIONS ARE GAUGES OF THE CITY’S GOVERNANCE EFFECTIVENESS. AWARDS RECEIVED ARE EXTERNAL AFFIRMATIONS THAT THE CITY IS ON THE RIGHT TRACK.

WE WERE CONFERRED TWO MAJOR TOURISM AWARDS BY THE ASSOCIATION OF TOURISM OFFICERS OF THE PHILIPPINES DURING THE 11TH NATIONAL CONVENTION IN SUBIC – THE 3RD ECO-KARERA AS BEST TOURISM EVENT SPORTS AND ADVENTURE CATEGORY AND THE FIFTH NATIONAL TOURISM WEEK AS THE BEST NATIONAL TOURISM WEEK CELEBRATION.

THE CITY ALSO GARNERED CITATION FROM ASIAN INSTITUTE OF MANAGEMENT POLICY FORUM LAST JULY BEING THE ONLY CITY UNDER GROWTH CENTER CATEGORY AWARDED UNDER INFRASTRUCTURE DRIVER FOR HIGH SCORE IN THE AVAILABILITY AND CONDITION OF ROAD NETWORKS AS WELL AS COVERAGE AND RELIABILITY OF UTILITY SERVICES

Page 9 of 10

Page 10: Darlene's First 100 Days Report

The First 100 Days Report of the Hon. City Mayor Darlene Antonino-Custodio

New Initiatives as Global City

WHILE WE CONTINUE TO IMPROVE WELL FUNCTIONING PROGRAMS AND PROJECT, THERE HAVE BEEN NEW INITIATIVES UNDERTAKEN DURING THE FIRST 100 DAYS. THESE ARE CONCRETE ACTIONS THAT EMPLOY NEW TECHNOLOGIES AND APPROACHES, FRESH INSIGHTS, AND NEW CONCEPTS THAT POSITION GENSAN AS THE NEXT GLOBAL CITY. THERE ARE STILL MORE IN THE CONCEPTUALIZATION STAGE WHICH ARE ALL ABOUT RESPONDING TO THE DEMANDS OF THE PRESENT TIMES.

WE NOW HAVE AN OFFICIAL WEBSITE FOR OUR MAGANDANG GENSAN BRANDING PROJECT – www.magandangensan.com – WHICH FEATURES OUR FACES FACETS PLACES PROMOTIONAL DIRECTION.

WE SUCCESSFULLY STAGED THE FIRST REGIONAL TOURISM SUMMIT DURING THE RECENTLY CONCLUDED 6TH NATIONAL TOURISM WEEK WHICH PRODUCED COLLECTIVE RESOLUTIONS AMONG WHICH, A DRAFT OF AN INTEGRATED REGION 12 TOURISM DEVELOPMENT PLAN WITH THE CITY AS THE CENTRAL PORT OF ENTRY.

ALL THE 26 BARANGAYS HAVE DIGITIZED MAPS AVAILABLE IN OUR PLANNING OFFICE. IN EFFECT, IT IS NOW EASIER TO RETRIEVE MAP INFORMATION, SUCH AS ACCURATE IDENTIFICATION OF ACTUAL USE AND CLASSIFICATION OF REAL PROPERTY.

WE ALSO HAVE SUBMITTED PROPOSED ORDINANCE PRESCRIBING FOR THE CALIBRATION AND SEALING OF DISPENSING PUMPS OF RETAIL OUTLETS SELLING PETROLEUM PRODUCTS IN THE CITY, IMPOSING FEES IN THE REGISTRAION, PROVIDING PENALTIES FOR VIOLATION. SAID PROPOSAL WAS ENDORSED TO THE SANGGUNIANG PANLUNGSOD BY THE CITY ADMINISTRATOR AND IS NOW ON 2ND READING. THE PROPOSED ORDINANCE IS THE FIRST OF ITS KIND AMONG LGUS OF THE COUNTRY.

WE HAVE IMPLEMENTED “GREENING GENSAN” PROJECT WHICH INCORPORATES GOOD AGRICULTURAL PRACTICES WITH PROPER WASTE MANAGEMENT STRATEGIES ENCOURAGING URBAN DWELLERS TO UTILIZE DISPOSABLE HOUSEHOLD CONTAINERS AS PLANT BOXES TO GROW PLANTS AND VEGETABLES.

Synthesis

WHAT WE HAVE PRESENTED AND REPORTED ARE ONLY THE BEGINNING OF WHAT WILL TRANSPIRE AND UNFOLD IN THE COMING DAYS IN THE CITY OF GENERAL SANTOS. THERE WILL STILL BE MORE EXCITING DEVELOPMENTS. THERE ARE STILL MORE EXCITING POSSIBILITIES.

MANY PROJECTS AND PROGRAMS ARE IN THE PIPELINE AND WILL BE FOR IMPLEMENTATION STARTING 2011. THE GLOBAL JOURNEY HAS JUST BEGUN. THIS ADMINISTRATION VOWS TO CONTINUE BUILDING ON THE STRONG FOUNDATION OF THE PAST ADMINISTRATION AND BRING THE CITY AND ITS PEOPLE TO GREATER HEIGHTS OF GROWTH AND PROSPERITY.

Page 10 of 10