daftar acuan - lontar.ui.ac.idlontar.ui.ac.id/file?file=digital/119477-d 00925...
TRANSCRIPT
217 Universitas Indonesia
DAFTAR ACUAN [1] Infrastructure Policy Brief, “The Road To Economic Growth, Strategic Priorities For The Road Sector in Indonesia”, (ADB: Januari, 2005). [2] APBN-RAPBN 1999-2000. [3] Bappenas, Rincian Anggaran Pembangunan Menurut Sektor/Sub Sektor, 2005. [4] Heru Dewanto, Kualitas Layanan Jasa Infrastruktur, (www.suarapublik.org, 2005). [5] Kwik Kian Gie, Memprihatinkan, Kualitas Layanan Jasa Infrastruktur, (www.suarapublik.org, April 2005). [6] US Department of Energy, How To Measure Performance, A Handbook Of Techniques And Tools, (www.ini.gov/PBM/Handbook), hal. 1-4. [7] Data Departemen Pekerjaan Umum, 2003. [8] [9] Global Competitiveness Report, 2006-2007. [10] Competitiveness in Developing Asia, p 214, 2003. [11] Competitiveness in Developing Asia, p 215, 2003 [12] BPS: Stratifikasi Pendidikan Formal Angkatan Kerja, 1995. [13] Jacob Nuwa Wea, Antara Kualitas Pencari Kerja dan Pasar,
(www.suarapublik.org. 2005). [14] LPJK, Workshop Harmonisasi Standar Kompetensi 5 Bidang Jasa Konstruksi, (Jakarta: LPJKN, 2003). [15] Asiyanto, , Metoda Pelaksanaan Pekerjaan Jalan Aspal, (Jakarta: Fakultas Teknik, UI, 1999). [16] [17] Listiana Rozana, ”Peningkatan Produktifitas Tenaga Kerja Konstruksi Pekerjaan Jalan Berdasarkan Elemen Waktu Kerja”, Tesis, Fakultas Teknik, UI, 2005. [18] Purnomo, Manajemen Pembangunan Jalan, Seminar Orientasi Pegawai
Baru di Proyek Induk Pembangunan Jalan Jalur Pantura, 2005. [19] Central Product Classification – Version 11, United Nation, 2000. [20] Peraturan LPJK No. 11 tahun 2006.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
218 Universitas Indonesia
[21] Peraturan LPJK No. 12 tahun 2006. [22] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [23] International Labour Office, Bureau of Statistics, 2002. [24] Dolly Yuono, Optimasi Biaya Tenaga Kerja Proyek Jalan Pada Kontraktor Jalan Kelas Besar, Tesis Manajemen Konstruksi, 2005. [25] [26] Noor Dhulam, , Analisis Masalah Hambatan Dalam Pencapaian Kompetensi Kerja Tenaga Terampil Pada Proyek Konstruksi Jalan, Thesis Manajemen Konstruksi FTUI, 2005. [27] www.tamu.edu , International Competitiveness, 2003. [28] Michael E Porter, Competitive Strategy: Techniques for Analyzing Industries and Competitors, The Free Press, 1980. [29] Competitiveness in Developing Asia, 2003. [30] Sutermeister, R.A. People and Productivity, (New York: Mc Graw Hill, 1976), hal. 45. [31] Gibson, Organisasi-Perilaku-Proses Edisi III, Jilid 1, Jakarta: Erlangga, 1996. [32] Ilyas Yaslis, “Kinerja”, Makalah Pusat Kajian Administrasi, Jakarta, 2000. [33] Sutermeister, R.A. People and Productivity, (New York: Mc Graw Hill, 1976), hal. 45. [34] Ilyas Yaslis, “Kinerja”, Makalah Pusat Kajian Administrasi, Jakarta, 2000. [35] US Department of Energy, How To Measure Performance, A Handbook Of Techniques And Tools, (www.ini.gov/PBM/Handbook), hal. 1-4. [36] Ilyas Yaslis, “Kinerja”, Makalah Pusat Kajian Administrasi, Jakarta, 2000. [37] US Department of Energy, loc.cit. [38] Ratna Juwita, “Hubungan Kepuasan Kerja dengan Kinerja Tenaga Kerja”, Makalah Program Studi Kajian Administrasi, (Jakarta: 2003). [39] US Department of Energy, “How To Measure Performance, A Handbook Of Techniques And Tools”, 2001. [40] Capacity Building Workshop Sektor Konstruksi, LPJK, 2005.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
219 Universitas Indonesia
[41] Dolly Yuono Optimasi Biaya Tenaga Kerja Proyek Jalan Pada Kontraktor Jalan Kelas Besar, Tesis Manajemen Konstruksi FTUI, 2005.
[42] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [43] [44] Kurniawan,Wawan. Pengukuran dan peningkatan produktifitas PT “P”. 1996. [45] [46] Thomas, H. Randolp; Maloney, William F.; Horner,R. Malcolm; Smith,W. Gary R.; Handa, Vir K. dan Steve R. Sanders, 1990, Modeling Construction Labor Productivity, Journal of Construction Engineering and Management, ASCE Vol. 116 No.4 December 1990, NP, ASCE. [47] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [48] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [49] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [50] Thomas, H. Randolp; Maloney, William F.; Horner,R. Malcolm; Smith,W.
Gary R.; Handa, Vir K. dan Steve R. Sanders, 1990, Modeling Construction Labor Productivity, Journal of Construction Engineering and Management, ASCE Vol. 116 No.4 December 1990, NP, ASCE,p 2
[51] Humphreys, Kenneth K., 1991, Jelen’s Cost and Optimization Engineering
3rd Ed., Singapore, McGraw-Hill International Editions. [52] Trigunarsyah, B. Constructability Practices among Construction Contractors
in Indonesia. Journal of Construction Engineering and Management, ASCE. Vol.130 No.5. October 2004.
[53] Soenarno, Pemerintah Akan Dorong Teknologi Tepat Guna di Bidang Konstruksi, (Jakarta: Properti.net, 2004). [54] Young H. Park & David M. Miller, Multi-Factor Analysis of Firm-Level Performance through Feed-Forward, Feed-Back Relationships, (Alabama: Management Science and Statistics Journal, University of Alabama, 2003). [55] [56] Makarand Hastak and Aury Shaked, Journal of Management in
Engineering – January-February 2000 [57] Akbar Alfa, Standar Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam Pekerjaan Jalan, Tesis Manajemen Konstruksi FTUI, 2005. [58] [59] PT. Wijaya Karya, “Rencana Kerja Proyek”, 2004 [60] U.S. Department of Labor, Bureau of Labor Statistics, Construction Laborers [http://www.bls.gov, Mei 2005]
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
220 Universitas Indonesia
[61] Construction Online, Promoting Competence in Construction [www.ConstructionOnline.com, 2005] [62] [63] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [64] [65] Arditi, David and Gunaydin, H.Murat, (1998). Factor That Affect Process Quality In The Life Cycle of Building Project, Journal of Construction Engineering and Management, Vol. 124, No. 3, ASCE. [66] Ronald E. Walpole dan Raymond H. Myers, Probability and Statictics for
Engineers and Scientist, Edisi IV, (Macmillan Publishing, 1990). [67] Singgih Santoso, Mengatasi Berbagai Masalah Statistik dengan SPSS versi
11.5, (Jakarta: PT. Elex Media Komputindo, 2003). [68] Phillip B. Stark, Glossary of Statistical Term, (www.berkeley.edu/~stark/ SticiGui/Text /gloss.htm. 2004). [69] Ronald E. Walpole dan Raymond H. Myers, Probability and Statictics for
Engineers and Scientist, Edisi IV, (Macmillan Publishing, 1990).
[70] Singgih Santoso, Mengatasi Berbagai Masalah Statistik dengan SPSS versi 11.5, (Jakarta: PT. Elex Media Komputindo, 2003).
[71] Phillip B. Stark, Glossary of Statistical Term, (www.berkeley.edu/~stark/ SticiGui/Text /gloss.htm. 2004). [72] M. Nazir, Metode Penelitian, (Jakarta: Ghalia Indonesia, 1988), hal. 99. [73] W. Gulo, Metodologi Penelitian, (Jakarta: Grasindo, 2002), hal. 110. [74] [75] Riduwan, Skala Pengukuran dan Variabel-Variabel Penelitian,
(Jakarta: Alfabeta, 2002), hal. 24. [76] Robert K.Yin, Case Study Research ; Design and Methods, Edisi II, (India:
SAGE Publication, 1994), hal. 6. [77] Masri Singarimbun, Metode Penelitian Survei, (Jakarta:LP3ES, 1989), hal. 3. [78] Riduwan, Skala Pengukuran dan Variabel-Variabel Penelitian, (Jakarta:
Alfabeta, 2002), hal. 24. [79] Singgih Santoso, Menguasai Statistik di Era Informasi dengan SPSS 12,
(Jakarta: Elex Media Komputindo, 2005).
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
221 Universitas Indonesia
[80] Saaty, T.L., Fundamental of Decision Making, RSW Publication, Pittsburg, PA, 1994. [81] Boediono dan Wayan Koster, Teori dan Aplikasi Statistik dan Probabilitas,
(Bandung: PT. Remaja Rosdakarya, 2004). [82] Singgih Santoso, Menguasai Statistik di Era Informasi dengan SPSS 12,
(Jakarta: Elex Media Komputindo, 2005). [83] [84] Boediono dan Wayan Koster, Teori dan Aplikasi Statistik dan Probabilitas, (Bandung: PT. Remaja Rosdakarya, 2004. [85] [86] [87] [88] [89] [90] [91] Andi, 10 Model Penelitian dan Pengolahannya Dengan SPSS 10.01., Wahana Komputer Yogyakarta, 2002. [92] James R. Evans and David L. Olson, Introduction to Simulation and Risk
Analysis, Prentice Hall Inc., New Jersey, 1998. [93] [94] [95] Walpole, R.E and R.H. Myers, Probability and statistics for engineers and scientist, 5-th edition, New Jersey, Prentice Hall. [96] [97] Yin, Robert K., Case Study Research, Design and Methods, Second
Edition, Sage Publications, 1997. [98] Apriyani Talaohu, Perencanaan Alokasi Tenaga Kerja Pada Proyek Jalan Di Perusahaan Skala Besar, Tesis Manajemen Konstruksi FTUI, 2005 [99] Project Management Institute. A Guide to the Project Management Body Of Knowledge. 2000. [100] Dolly Yuono Optimasi Biaya Tenaga Kerja Proyek Jalan Pada Kontraktor
Jalan Kelas Besar, Tesis Manajemen Konstruksi FTUI, 2005. [101] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [102] Thomas, H. Randolp; Maloney, William F.; Horner,R. Malcolm; Smith,W. Gary R.; Handa, Vir K. dan Steve R. Sanders, 1990, Modeling Construction Labor Productivity, Journal of Construction Engineering and Management, ASCE Vol. 116 No.4 December 1990, NP, ASCE [103] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [104] Andi, 10 Model Penelitian dan Pengolahannya Dengan SPSS 10.01., Wahana Komputer Yogyakarta, 2002. [105] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
222 Universitas Indonesia
[106] Construction Industry Training Study, Indentifikasi Nama Jabatan Kerja untuk Pekerjaan Jalan, Puslatjakon – LPJK, 2003. [107] Noor Dhulam, , Analisis Masalah Hambatan Dalam Pencapaian
Kompetensi Kerja Tenaga Terampil Pada Proyek Konstruksi Jalan, Thesis Manajemen Konstruksi FTUI, 2005.
[108] Tan W. “ Research Methods in Real Estate & Construction”. 1995 [109] Naoum, S.G.D. “Dissertation Research and Writing For Construction Students”. 1999 [110] Gulo, W., Metodelogi Penelitian, Grasindo, Jakarta, 2002, hal. 110 - 111 [111] [112] Akbar Alfa, Bakuan Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam Pekerjaan Jalan, Thesis Manajemen Konstruksi FTUI, 2005. [113] Boediono dan Wayan Koster, Teori dan Aplikasi Statistik dan Probabilitas, (Bandung: PT. Remaja Rosdakarya, 2004). [114] [115] [116] [117] Andi, 10 Model Penelitian dan Pengolahannya Dengan
SPSS 10.01., Wahana Komputer Yogyakarta, 2002. [118] Walpole, R.E and R.H. Myers, Probability and statistics for engineers and scientist, 5-th edition, New Jersey, Prentice Hall. [119]. Apriyani Talaohu, Perencanaan Alokasi Tenaga Kerja Pada Proyek Jalan
Di Perusahaan Skala Besar, Tesis Manajemen Konstruksi FTUI, 2005. [120] Asiyanto. Construction Project Cost Management. Jakarta: PT Pradnya Paramita, 2003. [121] Soeharto, I. Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta : Erlangga. 1997. [122] Ashworth. Cost Studies Of Buildings. Longman Group UK Limited, 1988. [123] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [124] Listinia Rozana, Peningkatan Produktifitas Tenaga Kerja Konstruksi Pekerjaan Jalan Berdasarkan Elemen Waktu Kerja, Tesis Manajeman Konstruksi FTUI, 2005. [125] [126] [127] CITS, Construction Industry Training Study, Puslatjakon dan LPJK, 2003. [128] Direktorat Jenderal Bina Marga Departemen Pekerjaan Umum, No. 028/T/BM/1995
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
223 Universitas Indonesia
[129] Construction Industry Training Study (CITS), Puslatjakon – LPJKN, 2003. [130] Akbar Alfa, Bakuan Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam Pekerjaan Jalan, Tesis Manajemen Konstruksi FTUI, 2005. [131] Noor Dhulam, , Analisis Masalah Hambatan Dalam Pencapaian Kompetensi Kerja Tenaga Terampil Pada Proyek Konstruksi Jalan, Tesis Manajemen Konstruksi FTUI, 2005. [132] Riduwan, Skala Pengukuran dan Variabel-Variabel Penelitian, (Jakarta:
Alfabeta, 2002), hal. 9.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
224 Universitas Indonesia
DAFTAR PUSTAKA
A Ravindran, Don T. Phillips, James J. Selberg, Operation Research, Principles and
Practice, John Willey & Sons, 2000.
Agus Dharma, Manajemen Prestasi Kerja, Jakarta: Rajawali Press, 1991.
Akbar Alfa, Bakuan Kompetensi Jabatan Kerja Manajer Konstruksi Jalan dalam
Pekerjaan Jalan, Thesis Manajemen Konstruksi FTUI, 2005.
Aly, Mohamad Anas, Pengertian dasar dan Batasan Teknologi Jalan yang Perlu
Dipahami dan Disikapi secara Bijak, Jakarta, Yayasan Pengembang Teknologi
dan Manajemen, 2001.
Anamaria Iuliana Popescu-Kohler, Improvements to construction delay analysis
techniques, PhD Dissertation NDLTD Collection, Utexas, 1998.
Andi, 10 Model Penelitian dan Pengolahannya Dengan SPSS 10.01., Wahana
Komputer Yogyakarta, 2002.
Arditi, David and Gunaydin, H.Murat, (1998). Factor That Affect Process Quality In
The Life Cycle of Building Project, Journal of Construction Engineering and
Management, Vol. 124, No. 3, ASCE.
ASCO Manual Coding System: Occupation Level.
Australian Standard Classification of Occupations, 2nd Ed.1220.0.
B. Dale & G. Cooper, Total Quality and The Human Resource, Infinity Books, 2000.
Barlow, Christopher Michael, Successful interdisciplinary ad hoc creative teams,
Doctor of Philosophy Dissertation, Case Western Reserve University,
Organizational Behavior, 1990.
Bines, H., lssues in Course Design in Pines, H. & Watson, D., Developing
Professional Education, Puckingham, Open University Press, 1992.
Boediono dan Wayan Koster, Teori dan Aplikasi Statistik dan Probabilitas,
Bandung: PT. Remaja Rosdakarya, 2004.
Bruce T. Barkley, James H. Saylor, Customer Driven Project Management, Building
Quality into Project Processes, McGraw-Hill International, Second Edition,
2001.
Burack, E.H., ”Creative Human Resource Planning and Application”, 1998.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
225 Universitas Indonesia
Burgoyne, J. Creating the managerial portfolio: building on competency approaches
to management development, Management Education and Development, 1989.
Central Product Classification (CPC), United Nations – 2002.
Competency Standards Body Canberra 1994.
Construction Industry Training Study, Puslatjakon – LPJK, 2003.
Construction Online, Promoting Competence in Construction,
www.ConstructionOnline. com, 2005.
Diwan, Parag, Total Quality Management, Golden Book Center, Kuala Lumpur,
1999.
Dolly Yuono, Optimasi Biaya Tenaga Kerja Proyek Jalan Pada Kontraktor Jalan
Kelas Besar, Tesis Manajemen Konstruksi FTUI, 2005.
Efraim Turban, Decision Support and Expert Systems, Management Support Systems,
Prentice-Hall International, Inc., Fourth Edition ,1995.
Eraut, M., ldentifying the Knowledge which Underpins Performance in Black, H. &
Wolf, A Knowledge and Competence: current issues in education and training,
Careers and Occupational Information Centre, 1990.
Ervianto, Wulfram I, Manajemen Proyek Konstruksi, Yogyakarta, Andi Yogyakarta,
2002.
Fisher, Cynthia D.; Schoenfeldt, Lyle F., dan James B.Shaw, , Human Resource
Management, Boston, Houghton Mifflin Company, 1993.
Expert system, http://en.wikipedia.org/wiki/Expert_system
Fitzsimmons, Verne Marie, The Relationship of Performance Based, Financial
Incentives to Productivity and Quality of Work Life, PhD Dissertation, University
of Cincinnati, Engineering : Industrial Engineering, 2002.
Flanagan, Roger & Norman, George, Risk Management and Construction, Blackwell
Scientific Publications, Cambridge, 1993.
Forum Komunikasi Asosiasi Profesi Teknik Jasa Konstruksi dan Lingkungan,
Presentasi Kepada Presiden Habibi, Desember 1998.
Fuh, Du-Shean, Hierarchical workforce scheduling with limited substitution as well
as full-Time and part-Time workforce mix, Doctor of Philosophy Dissertation,
Case Western Reserve University, Operations Research, 1991.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
226 Universitas Indonesia
Garold D. Oberlender, Project Management for Engineering & Construction,
McGraw Hill, Singapore, 2000.
Gatot Bentoro, Manajemen Perusahaan Dalam Meningkatkan Kinerja Perusahaan
Jasa Konstruksi, Jakarta, 2003.
Gibson, Organisasi-Perilaku-Proses Edisi III, Jilid 1, Jakarta, Erlangga, 1996.
Gosling, J. & Ashton, D., Action Learning and Academic Qualifications.
Management Learning, 1994.
Gray, Clifford F. & Larson, Erik W., Project Management, The Managerial Process,
McGraw Hill, 2000.
H. John Bernardin, Human Resource Management : an Experiential Approach, Edisi
III, 2000.
Handoko, T. Hani. “Manajemen Personalia dan Tenaga kerja konstruksi”, 1992.
Hani Handoko, “Pengadaan dan seleksi SDM”, 1996.
Hanna, M. D., W. R. Newman, and P. Johnson, Linking operational and
environmental improvement through employee involvement, International Journal
of Operations and Production Management 20, no. 2, 2000.
Harlan Falkin, Establishing Standard for Construction Managers, Business Journal,
http://seattle.bizjuornal.com., 2003.
Harry Tolley, David Greatbatch, Jean Bolton and Paul Warmington, Improving
Occupational The Validity and Transferability in the Workplace, The University
of Nottingham, Research Report RR425, 2003.
Hendrickson,C. & Au Tung, “Project Management For Construction”, 1989.
Henry Simamora, Manajemen Sumber Daya Manusia,Yogyakarta: STIE YKPN,
1997.
Humphreys, Kenneth K., 1991, Jelen’s Cost and Optimization Engineering 3rd Ed.,
Singapore, McGraw-Hill International Editions
Idawati, Lusiana. Pengaruh aspek-aspek manajemen sdm terhadap peningkatan
produktifitas tenaga kerja pada proyek konstruksi. 2000.
Ilyas Yaslis, “Kinerja”, Makalah Pusat Kajian Administrasi, Jakarta, 2000.
International Standard Classification of Occupations: ISCO-88
Irena Grugulis, Skill and Qualification : The contribution to raising skill levels,
University of Salford. SKOPE Research Paper No.36, 2002.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
227 Universitas Indonesia
J. Richard Cottingham, Should All Engineers Be Licensed, National Society of
Professional Engineers, http://www.nspe.org., 2003.
James R. Evans and David L. Olson, Introduction to Simulation and Risk Analysis,
Prentice Hall Inc., New Jersey, 1998.
James R. Larson, Jr., and Christine Callahan, Performance Monitoring: How it
Affects Work Productivity, Journal of Applied Psychology 75, 1990.
Jeffrey Pfeffer, Competitive Advantage Through People, Unleashing The Power of
The Work Force, Harvard Business School Press, Boston, 1999.
Jergeas, George F.; Chishty, Mohammad S. and Marko J. Leitner, Construction
Productivity: A Survey of Industry Practices, NP, AACE International
Transaction, 2000.
JGN Consulting Denver USA.
Journal of Construction Engineering and Management, ASCE Vol. 116 No.4
December 1990, NP, ASCE
Journal of Construction Engineering and Management, ASCE. Vol.130 No.5,
October 2004, NP, ASCE.
Journal of Construction Engineering and Management, March 1994
Katalog BPS 1160, Kesesuaian CPC dengan ISIC Revisi 3, KBLI 2000, KKI
1998/1999, HS 1996, SITC Revisi 3, Badan Pusat Statistik, 2001.
Keneth S. Bordens and Bruce B. Abbott, Research Design and Methods, A Process
Approach, Fifth Edition, Mc Graw Hill, 2002.
Kerzner Harold, Project Management : A Sistem Approach to planning, Scheduling
and controlling, 1995
Koehn, Enno dan Ganapathiraju, Productivity of Construction in Developing Areas:
India, NP, AACE Transactions, 1996.
Latief, Y., Abidin, I.S. & Trigunarsyah, B., 2008, Knowledge-based Material Cost
Control for Building Construction Project using Expert System Approach, Bear
2008, Heritance Kandalama, Sri Langka.
Lewis, James P., The Project Manager’s Desk Reference, Probus Publishing Co.,
2000.
Lynne Cunningham , Capability Through Force, Professional recognition for small
business managers, The HEC Journal Volume 1(3) 1995.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
228 Universitas Indonesia
Makarand Hastak and Aury Shaked, Journal of Management in Engineering –
January-February 2000
Mansfield, B., Competence and Standards in Burke, J. W. Competency Based
Education and Training, London, Falmer Press, 1989.
Masri Singarimbun, Metode Penelitian Survei, Jakarta: LP3ES, 1989.
Meredith,Jack R. & Mantel Jr., Samuel J., Project Management – A Managerial
Approach, John Wiley & Son, 1995.
M. Nazir, Metode Penelitian, Jakarta: Ghalia Indonesia, 1988.
Moore, Jeffrey H. & Weatherford, Larry R., Decision Modeling – with Microsoft
Excel, New Jersey, 2001.
Naoum, S.G.D. “Dissertation Research and Writing For Construction Students”.
1999.
Oberlender, Garold D., Project Management for Engineering & Construction,
McGraw Hill, Singapore, 2000.
Peter Claffey, Hazel Harvey, Luise Vassie and Lawrence Waterman, “Summary
Paper”, IOSH Research Workshop, www.iosh.org, 2005.
Peter J. Frost, Walter R. Nord, Linda A. Krefting, ”HRM In Reality: Putting
Competence In Context, Edisi II, 2001.
Phil Candy, Lifelong Learning and Higher Education in Australia, The HEC Journal
Volume 1(3) 1995.
Phillip B. Stark, Glossary of Statistical Term, www.berkeley.edu/~stark/
SticiGui/Text/ gloss.htm. 2004.
Project Management Body Of Knowledge ( PMBOK ), Chapter 11 – Project Risk
Management, 2000.
PT. Pembangunan Perumahan (Pesero), Buku Referensi Untuk Kontraktor Bangunan
Gedung dan Sipil, Gramedia, 2003.
PT. Pembangunan Perumahan (Pesero), ISO 9000 untuk Kontraktor, Gramedia,
1997. Robbins, Stephen P., Organization Behavior, Prentice Hall, New Jersey,
2001.
Riduwan, Skala Pengukuran dan Variabel-Variabel Penelitian, Jakarta: Alfabeta,
2002.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
229 Universitas Indonesia
Robert K.Yin, Case Study Research ; Design and Methods, Edisi II, India: SAGE
Publication, 1994.
Ronald E. Walpole dan Raymond H. Myers, Probability and Statictics for Engineers
and Scientist, Edisi IV, Macmillan Publishing, 1990.
Rudiger Dornbush, Stanley Fisher, Macroeconomic, McGraw-Hill, Inc., 3rd Edition,
1984.
Russell, Alan D. and Aminah Fayek, “Automated Corrective Action Selection
Assistant”, ASCE, 2000.
Saaty, T.L., Fundamental of Decision Making, RSW Publication, Pittsburg, PA,
1994.
Schuyler, John R., Decision Analysis in Projects, Project Management Institute USA,
1996.
Sekaran,Uma, Research Methods for Business, A Skill Building Approach, Willey,
New York, 1992.
Singgih Santoso, Mengatasi Berbagai Masalah Statistik dengan SPSS versi 11.5,
Jakarta: PT. Elex Media Komputindo, 2003.
Singgih Santoso, Menguasai Statistik di Era Informasi dengan SPSS 12, Jakarta:
Elex Media Komputindo, 2005
Spencer Lyle & Signe Spencer, ”Competence at Work” Jhon Wiley & Sons Inc.,
Canada, 1993
Stan Lester, Beyond Knowledge and Competence, Toward a Framework for
Professional Educations, The HEC Journal Volume 1(3) 1995.
Standard Occupational Classification – USA.
Standard Occupational Classification 2000 Volume 1 – UK
Stephen Robbins, Organizational Behavior, Edisi VIII, (New Jersey: Prentice Hall,
1998),
Sutermeister, R.A. People and Productivity, New York, Mc Graw Hill, 1976.
Suyono Dikun, Pembangunan Nasional dan Sektor Konstruksi, 2002.
Tan W. Research Methods in Real Estate & Construction. 1995
Thomas F. Gattiker, A Hands-On Application for Teaching Design for the
Environment (DfE) Principles, Quality Management Journal, Volume 10 • Issue
4 • October 2003.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.
230 Universitas Indonesia
Thomas, H. Randolp; Maloney, William F.; Horner,R. Malcolm; Smith,W. Gary R.;
Handa, Vir K. dan Steve R. Sanders, , Modeling Construction Labor
Productivity, 1990.
Tracy Anderson with Hilary Metcalf, Modern Apprenticeship Employers: Evaluation
Study, National Institute of Economic and Social Research, 2003.
Trigunarsyah, Bambang, Constructability Practices among Construction Contractors
in Indonesia, Journal of Construction Engineering and Management, ASCE.
Vol.130 No.5, October 2004, NP, ASCE, 2004.
U.S. Department of Labor, Bureau of Labor Statistics, Construction Laborers,
http://www.bls.gov, 2005.
Uma Sekaran, Research Methods for Business ; a Skill Building Approach, Edisi II,
John Wiley & Son, 1992.
Undang-Undang No. 13 tahun 2003, Tentang Ketenagakerjaan.
Undang-Undang No. 18 tahun 1999 tentang Jasa Konstruksi.
US Department of Energy, How To Measure Performance, A Handbook Of
Techniques And Tools, [www.ini.gov/PBM/Handbook]
Wallace, Scott Douglas, Application of An Integrative Model for Assessing The
Compatibility of Work Factors in The Workplace, Theses for MS Degree,
University of Cincinnati, Engineering : Industrial Engineering, 2001.
Walpole, R.E and R.H. Myers, Probability and statistics for engineers and scientist,
5-th edition, New Jersey, Prentice Hall.
Walter Nicholson, Intermediate Microeconomics, The Dreyden Press, 1983.
Werther, William and Keith Davis, ”Human Resource Management”, 1996
W. Gulo, Metodologi Penelitian, Jakarta: Grasindo, 2002.
William A. McEachern, Macro Economics : A Contemporary Introduction, South
College Publishing, Thomson Learning Asia, 2000.
William Hall dan Mark C. Werner, Key Competencies, 2000.
Wolfgang Dorant & Heinz Kassel "Kosten Aufwand zeitgemässer Schalverfahren",
1995.
Yusuf Kalla, Wakil Presiden Pidato Pembukaan Konstruksi Indonesia, 2005.
Zuber-Skerritt, Action Research in Higher Education: Examples and Reflections,
London, Kogan Page, 1992.
Peningkatan kinerja ..., Suntana Sukma Djatnika, FT UI., 2008.