(c.v.marwan gaber)

23
H.S.E. diver CV Air Diver Name : Marwan Mohamed Gaber Nationality : Egyptian Date of Birth : 09/12/1981 Education : Bachelor of Social Studies 2004 Mobile : ( +2) 01273030019 Tel : (+203) 5462818 Religion : Muslem Aramco ID : 8065579 Passport no : A11522915 valid 04 -02-2021 E-mail : [email protected] Medical Certificate Expired at :20.04.2016 Training H.S.E. equivalent - Surface supply- offshore IDSA Standards The Arab Academy for scince and technology 2006. IMCA Surface Supplied air diver The Interdive services Ltd. UK-Jan-2010

Upload: marwan-gaber

Post on 13-Aug-2015

45 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: (c.v.marwan gaber)

H.S.E. diver

CV Air Diver

Name : Marwan Mohamed Gaber

Nationality : Egyptian

Date of Birth : 09/12/1981

Education : Bachelor of Social Studies – 2004

Mobile : ( +2) 01273030019

Tel : (+203) 5462818

Religion : Muslem

Aramco ID : 8065579

Passport no : A11522915 – valid 04 -02-2021

E-mail : [email protected]

Medical Certificate Expired at :20.04.2016

Training

H.S.E. equivalent - Surface supply- offshore – IDSA

Standards – The Arab Academy for scince and

technology – 2006.

IMCA Surface Supplied air diver – The Interdive services

Ltd. – UK-Jan-2010

Page 2: (c.v.marwan gaber)

H.S.E. diver

IMCA Diver medic- The Interdive services Ltd –UK- 19-

08-2013—18/08/2015

Certifcate of First-Aid Training – Date of lssue:19-08-

2013—18/08/2016

NDT LEVEL II . Marsh-13-2012 (Magnetic particle Testing

( MT ) , Level I , II -Ultrasonic Testing ( UT ) , Level I , II )

H2S & breathing apparatus (Opito Approved)from Enertech

Qatar.

Basic offshore safety induction &emergency EBS- (BOSIT) -

(Opito Approved)

Safe Lifting operations from Gulf technical & safety training

(L.L.C.)

(Fire prevention, fire fighting – Sea survival, search & rescue –

First aid) Aug.2010.

Highlights of Experience : 9 years of progressive experience

Career History

Cutting the concerting by using hydraulic disk. Concerting removal by using the hydraulic jack hammers or

water jet. Inspection test by C.P, U.T, video recording and general visual

inspection. installation and disconnection riser, spool piece and pipelines by

using hydra tides. Welding and cutting under deep see. Work for the maintenance and cutting the pipes in the deep

sea. Insulation work for the pipe lines by using the coating. Maintenance for S.P.M. loading tankers buoys. Replacements for the old damaged floating & submersed hoses.

Page 3: (c.v.marwan gaber)

H.S.E. diver

Check anchor mooring system. Change the pipeline end manifold. Routine Maintenance check.

Experience

- Qatar: ccc(Underwater Engineering) :Total field:Jan 2015 – Feb

2015: Diver on board Dp Stanford Eagle: Marine growth removal by using the water jet& sand blasting. Cathodic protection measurements. CP inspection for clamps and anodes.

- ARAMCO: Saudi Aramco, Yanbu Field - Saudi Arabia Aug. 2014– Sep.

2014. Survey and Inspection of Yanbu NGL Offshore Structures : Job details:

Diver on board M/V Midyan

G.V.I for NGL offshore structure's piles/legs. Wall thickness measurements. Cathodic protection measurements. Anomalies C.V.I. Anode G.V.I.(Impressed Current Cathodic protection system). Sacrificial anode survey. Marine growth measurements.

- SUCO - barge MD 300–Apr/2014 Jul/2014

contract NO – op/47/2011

Diver on board crane barge Maridive 300the hot tapping project, scope of

work including the following:

Laying for 3 new pipelines from shore to platforms.

Install spool pieces.

Bottom survey for them.

Install sand bags at free span location.

Video Recorder.

Install risers and riser clamps.

spools connection for risers and P / L.

Page 4: (c.v.marwan gaber)

H.S.E. diver

- ARAMCO: Saudi Aramco, Gizan - Saudi Arabia Dec. 2013 –Mar.

2014.

Job details: : Diver on board M/V Midyan.

Maintenance for S.P.M. loading tankers buoys. Replacements for the old damaged floating & submersed hoses. Check anchor mooring system. Change the pipeline end manifold. Routine Maintenance check.

- Petrobel: Port Fouad Field , Baltim Field JAN 2013- Mar 2013 .

Job details: Diver on board Maridive 232 DSV DP-TYPE 2.

Smith Clamp installation at sea line leakage point. Water jetting & sand blasting Welds C.V.I. G.V.I for NGL offshore structure's piles/legs. Wall thickness measurements. Cathodic protection measurements. Anomalies C.V.I. Sacrificial anode survey. Marine growth measurements. Still photo and video recording.

- ARAMCO: Saudi Aramco, Yanbu Field - Saudi Arabia Oct. 2012 –

Dec. 2012.

Contract No. 6400072411.

(Survey and Inspection of Yanbu NGL Offshore Structures & COT Fender

Installation)

Job details: Diver on board M/V Midyan.

Fender installation for berth-64 for crude oil terminal (20 tons). G.V.I for NGL offshore structure's piles/legs. Wall thickness measurements. Cathodic protection measurements. Anomalies C.V.I. Anode G.V.I.(Impressed Current Cathodic protection system).

Page 5: (c.v.marwan gaber)

H.S.E. diver

Sacrificial anode survey. Marine growth measurements.

- Petrobel: Port Siad Field , Baltim Field Aug 2012- Sep 2012 .

Job details: Diver on board Maridive 232 DSV DP-TYPE 2.

Smith Clamp installation at sea line leakage point. Water jetting & sand blasting Welds C.V.I. G.V.I for NGL offshore structure's piles/legs. Wall thickness measurements. Cathodic protection measurements. Anomalies C.V.I. Sacrificial anode survey. Marine growth measurements. Still photo and video recording.

- PetroRabigh : Saudi Arabia- May. 2012 till July. 2012.

Job Title: Diver Inspection on platforms.

Under water Video recording. CP & UT . Anodes Inspection. Marine growth removal.

- Manifa Offshore crude , water pipeline and power cables-

Saudi Arabia – June 2011 - Dec. 2011.

Job Title: Diver on board M/V Maridive 32 & Barge constructor.

Pipeline laying. Cable laying. Tie in spool installation and skid valves installation.

-Petrobel – Contract No. 1650/2003 – Belayiem Oil Field – April

2011 till May 2011:

Job Title: Diver Inspector on board M/V Maridive 87.

Page 6: (c.v.marwan gaber)

H.S.E. diver

UT inspection for pipelines & risers. CP inspection for clamps and anodes. Maintenance for platforms. Boat landing installation. Splash zone coating. Marine growth removal. Underwater cutting. Visual inspection and video recording.

- Saudi Aramco – Gizan – Since Nov 2010 till Feb 2011:

Job Title: Diver on board M/V Yathreb 3.

Maintenance for S.P.M. loading tankers buoys. Replacements for the old damaged floating & submersed hoses. Check anchor mooring system. Change the pipeline end manifold.

Routine Maintenance check.

- Petrobel 113 M7 Pipeline repair – Sep 2010 till Oct2010:

Job Title: Diver on board M/v explorer.

riser, spool piece and pipeline survey, inspection and

damage evaluation. Repairing the damage .

- Petrobel – Contract No. CT 4600000930 – Marine diving

Services – from Jan. 2008 To June. 2010:

Job Title: Diver on board M/V Maridive 87 during the project

for marine diving services for Belayem Offshore Installations

Field. Carried out the following.

General Maintenance for offshore platforms. Debris removal from the platforms perimeters.

Page 7: (c.v.marwan gaber)

H.S.E. diver

- AGIBA - Gulf of Suez – June. 2008 – Feb 2009:

Job Title: Diver on board crane barge Maridive 300, the hot

tapping project, scope of work including the following:

8" Pipe line preparation & air lifting the sea bed underneath

the pipe line. Install 8" x 4" oil states Tee clamp C/W tapping machine

and carried out leak pressure test. Hot tapping operation & installing two spool pieces 4"

diameter between the Tee clamp and 4" pipe line. Installing five No.'s of riser clamps around the leg of

platform WHP-2. Installing the 4" riser at WHP-2 platform.

- Nospoco –Port Said –Dec. 2008.- Jan. 2009 - “SubSea Maintenance

For Pipelines & Structure” Job Title: Diver On board DP Vessel ADAMS NOMAD.

Diver on board diving support vessel on the project Sub sea Maintenance for pipelines and structures.

-Petrobel – Baltim Gaz Field – Oct. 2007 – Nov. 2007:

Job Title: Diver on board Maridive 87 during the project of hiring DP

vessel Scope of work included :-

UT inspection for pipelines & risers. CP inspection for clamps and anodes U/W inspection for platforms at Port foad & Baltim fields. Maintenance for platforms. Applying inter zone coat on pipelines & risers. Boat landing installation. Marine growth removal. Under water cutting. Visual inspection and video recording.

Page 8: (c.v.marwan gaber)

H.S.E. diver

-SUCO – Rasfanar Field – May 2007 – Sep 2007 :The Universal Co.

For Marine Works.

Job Title: Diver on board barge GEBO –GRT: 2952 – NRT : 1344 SUEZ

Applying inter zone coat on pipelines & risers. Maintenance for platforms. Visual inspection and video recording. Marine growth removal. U/W inspection for platforms at Rasfanar Field.

-Golobal Santafy RIG 124 –Zeit Bay (SUCO) –Mar 2007 –Apr 2007 -

The Universal Co. For Marine Works.

Job Title: Diver on board RIG 124 :

Seabed Survey.

Debris and Coral reef removal. Cheak legs pantretion after preload.

-SUCO Oil Co. ZeitBay – Dec 2006 –Jan 2007- The Universal Co. For

Marine Works.

Job Title: Diver on board M/V SIR Tarek:

Replacements for the old damaged floating & submersed hoses. Change the pipeline end manifold.

Routine Maintenance check.

-Geisum Oil Co.ZeitBay –Oct 2006 –Nov 2006 -- The Universal Co.

For Marine Works.

Job Title: Diver on board barge GEBO –GRT: 2952 – NRT : 1344

SUEZ.

Seabed Survey.

Debris and Coral reef removal.

Page 9: (c.v.marwan gaber)

H.S.E. diver

Page 10: (c.v.marwan gaber)

H.S.E. diver

Page 11: (c.v.marwan gaber)

H.S.E. diver

Page 12: (c.v.marwan gaber)

H.S.E. diver

Page 13: (c.v.marwan gaber)

H.S.E. diver

Page 14: (c.v.marwan gaber)

H.S.E. diver

Page 15: (c.v.marwan gaber)

H.S.E. diver

Page 16: (c.v.marwan gaber)

H.S.E. diver

Page 17: (c.v.marwan gaber)

H.S.E. diver

Page 18: (c.v.marwan gaber)

H.S.E. diver

Page 19: (c.v.marwan gaber)

H.S.E. diver

Page 20: (c.v.marwan gaber)

H.S.E. diver

Page 21: (c.v.marwan gaber)

H.S.E. diver

Page 22: (c.v.marwan gaber)

H.S.E. diver

Eng /.Mohamed Shaaban

Maridive Offshore Projects

www.maridivegruop.net

[email protected]

EGY. (+2)01005306304

KSA. (+966)0553728895

----- Forwarded Message ----- From: mohamed shaban <[email protected]>

To: tarek omer galal <[email protected]>

Cc: moustafa ashour <[email protected]>; diving sector <[email protected]>; yasser ibrahim ramadan <[email protected]>; KSA khafji <[email protected]>; gizan team <[email protected]>; M/V Maridive 4000 <[email protected]>

Sent: Thursday, December 19, 2013 1:27 PM

Subject: Fw: Appreciation

Dear all,

Please see the below email from Gizan marine office boss Mr/Abdulhameedd Shauaid to the diving team on Gizan:

1. Div. Supv./ Mohamed Shaban

2. Lead Diver/ Atef Morsy

3. Diver/ Tamer El Adawy

4. Diver/ Ahmed Anwar

5. Diver/ Marwan Mohamed Gaber

We hope our attitude gain your satisfaction and appreciation with promising you to

keep doing the best ISA.

Thanks &Regards,

Eng /.Mohamed Shaaban

Maridive Offshore Projects

www.maridivegruop.net

[email protected]

EGY. (+2)01005306304

KSA. (+966)0553728895

----- Forwarded Message ----- From: "Shuaib, Abdulhameed A" <[email protected]>

To: "Anbar, Hasan A" <[email protected]>; "Najjar, Abdulaziz Y" <[email protected]>

Cc: "Juhar, Mohammed A" <[email protected]>; "Jafar, Makki A"

Page 23: (c.v.marwan gaber)

H.S.E. diver

<[email protected]>; "mohamed shaban ([email protected])" <[email protected]>

Sent: Thursday, December 19, 2013 9:46 AM

Subject: Appreciation

Gentlemen,

This email is coming late as I was engaged out of the office most of the time .

The diving team in Gizan showed their great efforts during SBM-2 dismantling operation. As usual all the divers met our expectation and complete the job in time, this time the team was

consist of about 75% as new divers but they were very qualified and active as they were

supported by one of the most expert diver Mr. Atef Morsy and supervised by Eng /.

Mohammed Shaban.

Therefore, I would like to appreciate all the team member efforts for their excellent efforts and good job.

Best regards,

Abdulhameed A .Shuaib

Marine Coordinator, Gizan Marine Office

Tel. 073213640 Fax 073213637

Mob. 0547744343

Mob. 0582224453

[email protected]

The contents of this email, including all related responses, files and attachments transmitted with it (collectively referred to as “this Email”), are intended solely for

the use of the individual/entity to whom/which they are addressed, and may contain confidential and/or legally privileged information. This Email may not be

disclosed or forwarded to anyone else without authorization from the originator of this Email. If you have received this Email in error, please notify the sender

immediately and delete all copies from your system. Please note that the views or opinions presented in this Email are those of the author and may not necessarily

represent those of Saudi Aramco. The recipient should check this Email and any attachments for the presence of any viruses. Saudi Aramco accepts no liability for

any damage caused by any virus/error transmitted by this Email.