C O N T A C T : Prasath. V ( Managing Director) Mobile : +91 98400 40758 E - Mail : [email protected] [email protected] Phone No : +91 044 – 23664945, 23652551,4216 2637
M/s. CRESCON PROJECTS AND SERVICES PVT LTD
A COMPLETE MEP SERVICE PROVIDER
CRESCON PROJECTS & SERVICES PVT LTD VALUE ENGINEERING – CLIENT FOCUS – TEAMWORK – SAFETY
CRESCON PROJECTS & SERVICES PVT LTD
Crescon Projects is an Engineering Construction Company established in the year 2011, specialized in Industrial MEP works, Mechanical, Electrical, HVAC Utility, Process & Firefighting works, Civil & PEB works. The company is dedicated to hardcore Commitment to Client, Quality, Health, Safety & Environmental policies that will always ensure that its products and services fully meet the requirements of the customers.
To become one of the leading Industrial Engineering Procurement and Construction (EPC) company all over Asia. To enhance this company as Crescon Group of Companies and to enter different verticals of businesses such as Manufacturing, Hospitality, Chain Restaurants, Educational Institutions & Engineering Consultancy Services.
Our Strategy is to have close co-ordination with consultants and the clients to understand their requirements clearly and accomplish them on time with prime focus on Quality and Safety
CRESCON PROJECTS & SERVICES PVT LTD
Our Mission We mainly aim at reaching our
customer’s expectation with consistent efforts and hard work
Our expert team ensures to
work with complete dedication in order to gain the trust factor from our customers. We believe in establishing long-term relationship with the stakeholders
Our Vision To reach No. 1 position
among Industrial Construction Companies of Asia
CRESCON PROJECTS & SERVICES PVT LTD
TIME MANAGEMENT
Conscious control over time for maximizing productivity
QUALITY CONTROL
Deliver Quality results through Quality assurance and Quality Control procedures
COST CONTROL
Cash flow projections for better control over budget
PLANNING
Plan ahead with a sound exit strategy
RISK MANAGEMENT
Provide crucial protection for your business
HEALTH, SAFETY and ENVIRONMENT QUALITY MANAGEMENT
Ensure workers Health, safety and good working environment
CRESCON PROJECTS & SERVICES PVT LTD
5
R. Vaikunth possesses the rich experience of about 35 years in the field of General Management and Internal audits. He got relieved as the Managing Director – Commercial of the reputed Saud Bhawan Group in the year May 2012. This company is well versed in various industrial sectors such as Automotive, Allied Business, Heavy Vehicles, Construction Equipment, Oil & Gas, Turnkey Project and much more since 40 years.
V. Prasath is a skilled Mechanical Engineer possessing more than 15 years of Technical Expertise. He had worked in India and South East countries handling plenty of Electro-Mechanical projects. Apart from this, he had also served Saud Bahwan Group as an efficient Project Manager. Later he returned to India to commence business. Coming from a village-background family, he had proved to be the most energetic and dynamic leader with the positive mentality. Most importantly his dedication in starting the business in India is highlighted when he personally influenced his work at Muscat.
CRESCON PROJECTS & SERVICES PVT LTD
Most prominently, our quality policy states that the eminence of our products and services are 100% assured as per the customer requirements. This objective has helped us to earn our customer satisfaction.
We significantly believe in a working environment which supports the mutual contribution from the both client as well as contractor. As a result, the policy statements can be completely fulfilled along with the consistent efforts in improving the service quality. We have structured 3 basic principles upon which all our quality policy is based on.
Ensure to identify and conform to the customer needs.
Understand the right way of doing any job for the first time.
Identification of errors at the earliest and take necessary steps to eliminate.
The company staffs are solely responsible for accomplishing the customer requirements by following the strict set of rules and procedures.
We frame the list of objectives needed to meet the customer expectations. Additionally, these objectives include the set of points required to maintain the service quality and monitored regularly.
We maintain the transparent environment among the staff members which allows the easy reach of quality policy principles and objectives. Along with this, the training is provided as an integral part of policy statements.
The quality of the services are consistently reviewed and improved which portrays the perfection in which the task has been completed in the most economical way. Also the delivery of services is supposed to be within the stipulated period of time.
As a whole, we proclaim to implement all the policy statements efficiently in a duty-bound manner.
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS AND SERVICES PVT LTD (CPS) establish EHS policy throughout the entire organization, the concept is that people and property are our most important company assets, and the protection thereof has management's highest priority. CPS acknowledges and accepts its responsibility to provide a safe and healthy working environment for its employees. CPS endorses the concept that this responsibility cannot be discharged passively but requires the active effort and support of every level of management through constant training and supervision of its employees and through continued review of its construction methods. Specifically, it is the policy of the CPS to: Provide the organizational set up to achieve this. Comply with all the requirements of International and local standards as they pertain to safe
and healthy working conditions on the construction sites. Provide employees with necessary and approved personal protective equipment and enforce their use.
Establish and maintain a system for continual awareness of safety habits and techniques through trainings, periodic meetings and constant supervision.
Promptly respond to any proposed recommendation with respect to safety or fire protection.
Periodically assessing the actual performances.
CRESCON PROJECTS & SERVICES PVT LTD
Name Designation Years of Experience
Abroad India Crescon
V. Prasath Managing Director 14 8 8
M. Janakiraman MEP Coordinator 12 15 8
S. Sankaranarayanan HVAC Manager - Execution 8 15 7
N. Kathirvelu MEP Manager - Execution 6 15 8
K.S.A.Karthick MEP Manager - Execution - 16 5
R. Arunkumar Mechanical Manager - Coordination 2 6 5
P. Mathavan MEP- Planning & Coordination - 6 6
S. Syed Abdul Rahman Procurement Head - 16 4
R. Jayakumar Manager - MEP Estimation 7 9 6
D. Vikram Design Manager - Mechanical 3 7 6
A. Sameeullah Design Manager - HVAC - 13 6
AR Khan Design Manager - FPS 4 11 4
A. Prasath Manager - Process Division - 6 6
S. Koteeswaran Safety Lead - 8 4
R. Prem Anand QA/QC Incharge - 7 3
K. Srivijayavelrajan Finance Manager - 8 5
CRESCON PROJECTS & SERVICES PVT LTD
Name Designation
Years of Experience
Abroad India Crescon
V. Anil Kumar Project Manager - Mechanical - 17 0.8
S. Rajasekar HR Manager - 17 0.6
C. Selvakumar Design Coordinator - 10 0.3
CRESCON PROJECTS & SERVICES PVT LTD
S. No Consultant Projects
1 M/s. Tebodin Consultants, Chennai 1. DFE Pharmaceuticals, Cuddalore
2 M/s. NNE Pharma, Bengaluru 1. RAS Life Scienses, Hyderabad, 2. Clariant Medical Specialities, Cuddalore 3.
Novozymes South Asia, Mumbai, 4. West Pharma, Sricity, 5. Biocon, Bengaluru
3 M/s. Tata Consulting Engineers Limited, Chennai 1. M/s. Toshiba JSW Power System, Chennai 2. M/s. Saint Gobain India Pvt Ltd,
Chennai, 3. TVS Logistics, Hosur, 4. Schwing Stetter, Cheyyar
4 M/s. C.R. Narayana Rao Consultants, Chennai 1. Colgate Palmolive, Sricity, 2. Haworth India, Sricity, 3. Saint Gobain Research
India, Chennai, 4. Thermax, Sricity
5 M/s. ATP Architects, Germany 1. Ball Beverage Packaging, Sricity
6 M/s. Lead Consultancy & Engineering, Bengaluru 1. ITC Limited – ICML Division, Trichy
7 M/s. MJ Associates, Bengaluru 1. Ashirvad Pipes Pvt Ltd, Bengaluru
8 M/s. Jacobs, Mumbai 1. Godrej Consumer products, Baddi, 2. Tata Chemicals Ltd, Mambattu
9 M/s. VMS Consultants, Gujarat 1. Volt-beko Home Appliances, Sanand
10 M/s. Scube, Trichy 1. ITC, Trichy, 2. ITC, Kapurthala
11 M/s. Archetype Engineering & Industry Pvt Ltd., 1. Pepsico, Kolkata, 2. Thales Reliance Defence Systems, Nagpur
12 M/s. AECOM, Gurugram 1. ITC –Rajarhat
13 M/s. FABS Consultant, Pune 1. TATA Smart Foodz, SriCity
CRESCON PROJECTS & SERVICES PVT LTD
MAJOR INDUSTRIAL PROJECTS COMPLETED as on SEP 2019
S. No
Client Nature of Work Consultant Value Duration Completed During
(Millions) (Months)
1 M/s. Advanex India Pvt Ltd.,
Chennai Civil, HVAC, Electrical Crescon – Design Build 43 6 Apr-19
2 M/s. Berger Paints, Hindupur Electrical, Mechanical Internal 30 5 Mar-19
3 M/s. Electromotive Progress rail,
Raipur Electrical, Mechanical Knight Frank 26 5 Mar-19
4 M/s. ITC Ltd., Trichy MEP – HVAC, ELT, FPS, FAS, ELV M/s Lead Consultancy &
Engineering Services 520 24 Mar – 2019
5 M/s. Thermax Limited, Sri City MEP & Test Bay Structural
Erection M/s. CR Narayana Rao Architects 150 9 Feb – 2019
6 M/s. Salcomp Manufacturing India,
Chennai Chiller ,HVAC, Civil, PEB Crescon – Design Build 55 5 Feb – 2019
7 M/s. Mubea Automative
Components, Pune Mechanical, Utility Internal 13 5 Jan – 2019
8 M/s. Syngene – Biocon, Bangalore Electrical, HVAC, Civil Internal 43 3 Jan – 2019
9 M/s. Gulf Oil India Ltd., Chennai Process piping and automation Internal 16 4 Nov – 2018
CRESCON PROJECTS & SERVICES PVT LTD
MAJOR INDUSTRIAL PROJECTS COMPLETED as on SEP 2019
S. No Client & Nature of Work Consultant Value
(Millions) Duration (Months)
Completion Date
10 M/s. ZTT Cable – HVAC M/s. Archivista Consutants 23 6 Nov – 2018
11 M/s. Novozymes South Asia Pvt Ltd
Fire Protection & Process Ventilation M/s. NNE Pharma 80 9 Jul – 2018
12 M/s. Godrej Consumer Products, Baddi, Himachal
Pradesh – MEP M/s. Jacobs 48 7 Jul – 2018
13 M/s. TVS Infrastructure Pvt Ltd
Bhubaneshwar - Elect & FF Works
TATA CONSULTING
ENGINEERS 37 4 Jun – 2018
14 M/s. TVS Infrastructure Pvt Ltd
Hosur - Electrical Works
TATA CONSULTING
ENGINEERS 27 3 Jun – 2018
15 M/s. Saint Gobain India Pvt Ltd
Fire Protection, Process Ventilation & Ducting
Tata Consulting Engineers
Ltd, Chennai 85 12 Jun – 2018
16 M/s. ITC Ltd, Warehouse Chennai
MEP Turnkey – HVAC, ELT, FPS, FAS
M/s. CR Narayana Rao
Architects 150 9 Mar – 2018
17 M/s. Gulf Oil India Limited Chennai
Lube Oil Process Piping Excel Consultants 160 7 Feb – 2018
18 M/s. TVS Infrastructure– Chakan Pune
Fire Fighting & Protection System Crescon Projects 30 9 Aug – 2017
CRESCON PROJECTS & SERVICES PVT LTD
S.N Client & Nature of Work Consultant Value
(Millions) Duration (Months)
Completion Date
19
M/s. BALL Corporation, Sri City Rexam Beverage Can India Pvt Ltd.
HVAC, ELT EHT, Safety, IBMS, & Mechanical
M/s, ATP Architects Engineers,
Germany 550 9 July – 2017
20 M/s. Clariant Medical Specialities India Ltd,
MEP Turnkey – Utility Piping, FPS, Electrical M/s. NNE Pharma 95 9 July – 2017
21 M/s. ITC Limited, Guntur
Plumbing & Fire fighting System Internal Team 14 4 Aug – 2017
22 M/s. Renault Nissan India Pvt Ltd Chennai
Sprinkler & Hydrant System Internal Team 13 6 Aug – 2017
23 M/s. Michelin India Pvt Ltd – Chennai
Mechanical works – Utility Piping, Ducting Internal Team 25 15 Dec – 2016
24 M/s. Isuzu Motors Pvt Ltd – Plumbing Works M/s. Shimzu Corporation 29 15 May –2016
25 M/s. Ashirvad Pipes Pvt Ltd. – Bangalore
Mechanical & Piping works M/s. MI Associates, Bangalore 24 6 May– 2016
26 M/s. Saint Gobain India Pvt Ltd – MEP Package M/s. C R Narayana Rao
Architects, Chennai 100 9 Feb – 2016
27 M/s. MMD (India), Sri City – MEP Package Tata Consulting Engineers Ltd., 22 18 Mar – 2016
MAJOR INDUSTRIAL PROJECTS COMPLETED as on SEP 2019
CRESCON PROJECTS & SERVICES PVT LTD
S.N Client & Nature of Work Consultant Value
(Millions) Duration (Months)
Completion Date
28 M/s. Toshiba JSW power system– Chennai
GTB Cooling water & Tunnel Ventilation
Tata Consulting Engineers Ltd,
Chennai 98 15 May – 2015
29 M/s. Colgate Palmolive (India)Limited –
Plumbing Works - Internal & External
M/s. C R Narayana Rao
Architects, Chennai 29 15 May – 2015
30 M/s. OBO BETTERMANN
Electrical & Mechanical Package
M/s. Sumanam Electrical
Consultants 15 10 Jan – 2015
31 M/s. DFE Pharma India LLP. Cuddalore
MEP Package – Utility Piping, FPS Tebodin Consultants 41 3 Sep – 2013
Value of Completed Projects 2591
MAJOR INDUSTRIAL PROJECTS COMPLETED as on SEP 2019
CRESCON PROJECTS & SERVICES PVT LTD
MAJOR INDUSTRIAL ONGOING PROJECTS as on SEP 2019
S.N Client Nature of Work Design / PMC Consultant
Value (Mn) Duration (Months)
Completion
1 M/s. ITC Ltd., Hyderabad Complete MEP Package M/s. TATA Consulting Engineers Limited
70.55 5 Dec-19
2 M/s. Schwing Stetter India Pvt Ltd, Cheyyar
FPS and Mechanical Utility Package
M/s. TATA Consulting Engineers Limited
92.50 6 Jan-20
3 M/s. Syngene International, Bengaluru
Electrical, FPS and Utility Package
M/s. NNE 31.00 4 Oct-19
4 M/s. Thales Reliance Defence Systems Limited, Nagpur
Complete MEP Package M/s. Archetype Engineering & Industry Pvt Ltd.,
194.00 5 Oct-19
5 M/s. Indus Coffee, Naidupet Electrical Package Crescon – Design Build 47.00 12 Apr-20
6 M/s. Syngene International, Bengaluru
HVAC & Clean room Panel M/s. NNE 38.00 4 Sep-19
7 M/s. ITC Ltd. Trichy FPS Package M/s. Scube 113.00 9 Sep-19
8 M/s.Novozyme, Mumbai FPS Package M/s. NNE 12.00 4 Sep-19
9 M/s. West Pharma, Sri City FPS and Utility M/s. NNE 11.00 4 Sep-19
CRESCON PROJECTS & SERVICES PVT LTD
MAJOR INDUSTRIAL ONGOING PROJECTS as on SEP 2019
S.N Client Nature of Work Design / PMC Consultant
Value (Mn) Duration (Months)
Completion
10 M/s. Tata Chemicals ltd, Mambattu
Electrical, Mechanical, Utility Piping
M/s. Jacobs 360.00 9 Sep-19
11 M/s. Volt-beko Home Appliances, Sanand, Gujarat
Complete MEP Package M/s. VMS Consultants 210.00 4 Oct-19
12 M/s. ITC Ltd., Kolkata HVAC, HSD M/s. Aecom Consultants 157.00 12 Sep-19
13 M/s. Hero Motocorp Ltd., Sri City FPS and Utility Crescon – Design Build 200.00 6 Sep-19
14 M/s ITC Ltd., Kapurthala Fire Protection System Crescon – Design Build 100.00 12 Mar-20
15 M/s. USG Boral, Sri City Electrical Package Crescon – Design Build 44.00 3 Sep-19
16 M/s. Tata Smart Foods, Sri City Electrical Package M/s. Fabs Consultants 31.00 3 Sep-19
17 M/s. Pepsico India Ltd, Kolkata HVAC Package M/s. Archetype Engineering & Industry Pvt Ltd.,
35.00 4 Sep-19
TOTAL 1746.05
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON STRENGTH
1. EHS Department
2. Quality Assurance & Control Department
3. Estimation Department
4. Procurement Department
5. Design & Engineering Department
6. Accounts and Finance Department
7. Planning Department
8. Human Resource & Admin Department
9. Execution Co ordination Department
10. Commercial Department
ORGANIZATION CHART EHS DEPARTMENT
KOTEESWARAN
R. SURESH
C. SAKTHI
S. SURESH
MANIKANDAN
S. SANAL
S. SATHISH
SANTHOSH
DURAI ARUN G. SRIGURU
P SHANMUGAM
SR. SAFETY OFFICER R. VINOTH
SR. SAFETY OFFICER A. SAJIL KUMAR SR. SAFETY OFFICER
S. SARAVANAN SR. SAFETY OFFICER
EHS HEAD
V.PRASATH
MANAGING DIRECTOR
CRESCON PROJECTS & SERVICES PVT LTD EHS MANANGEMENT SYSTEM
SYSTEM FOLLOWED TO ACHIEVE SAFETY ENVIRONMENT 1. POLICY AWARENESS 2. PLAN 3. IMPLEMENTATION AND OPERATION 4. REVIEW AND MEASURE 5. AUDITS 6. IMPROVE
Quality Head
QUALITY ENGINEER
( MECHANICAL )
6 Paxs
QUALITY ENGINEER
( ELECTRICAL)
3 Paxs
QUALITY ENGINEER
( FAPA )
2 Paxs
QUALITY ENGINEER
( HVAC )
2 Paxs
QA /QC DEPARTMENT
Quality management at M/s. CRESCON PROJECTS & SERVICES PVT LTD begins with a company-wide drive to improve customer satisfaction by supporting the customers' business goals. Effective processes are developed for every project from Estimation, Planning, Procurement, Execution , Testing and commissioning of the System. The objective is to create high-quality system, services and implementing ongoing improvements that will meet or exceeds Project needs. M/s. CRESCON PROJECTS & SERVICES PVT LTD is committed to continuous improvement of its business processes by implementing globally accepted standards such as ASME, ASTM, NFPA, ASHRAC, IEC and ANSI. Our Company operating projects implement the appropriate quality policies that depend upon Customer, types of System or services, provided and prevailing regulatory requirements.
QUALITY POLICY
CRESCON PROJECTS & SERVICES PVT LTD
Prepare Quality Assurance Plan Prepare Inspection Test Plan Prepare Work Methodology Prepare Welding Procedure Specification Conduct Welder Qualification Test Testing - Equipment's Calibration and Maintenance Prepare GRN & MRIR for the Inward Material. Inspect Material Installation and Prepare Checklist Conduct Testing and Commissioning for the individual System &
Equipments. Check and Approve As- Built Drawing. Project Handover Document Preparation
QUALITY RESPONSIBILITY
CRESCON PROJECTS & SERVICES PVT LTD
QUALITY INSTRUMENTS
Vernier Caliper Screw Gauge DFT Meter DPT Kit Holiday Detector Laser Distance Sensor Boroscopic Instrument Multimeter Digital Megger Clamp meter Earth Tester Lux Meter
ELCB Tester Phase Sequence Meter Psychrometer RH meter Anemometer Tachometer Thermometer DB meter CO2 Meter PH Meter Water Flow Meter IR Thermometer
CRESCON PROJECTS & SERVICES PVT LTD
MECHANICAL TESTING Fabrication Inspection Bevel Checking Fit up Inspection Dry Film Thickness Inspection Holiday Detector test Load Test Liquid Penetrant Test Radiography Test Hydro Test Pneumatic Test Boroscopic Testing Tank Leak Test Pump Alignment Test Pump Performance Test Pump Commissioning Gas Suppression Test
QUALITY TESTING
CRESCON PROJECTS & SERVICES PVT LTD
HVAC TESTING Duct Leak Test Water Balancing Air Balancing Clean Room Validation Fan Coil Unit Commissioning Cassette Unit Commissioning DX Unit Commissioning Chiller Commissioning AHU Performance Test Fresh air and Exhaust Fan Commissioning
QUALITY TESTING
CRESCON PROJECTS & SERVICES PVT LTD
FIRE ALARM AND PUBLIC ADDRESS TESTING Local Scare Alarm Beam Detector Smoke Detector Heat Detector Fire Detector Manual Call Point Fire Alarm Flow Switch Duct Smoke Detector Fire Alarm Panel Public Address Testing & Commissioning
QUALITY TESTING
CRESCON PROJECTS & SERVICES PVT LTD
QUALITY TESTING
ELECTRICAL TESTING
Earth Resistance Testing Lux Testing ELCB testing Motor Testing
Insulation Resistance Test Winding Resistance Test Phase Sequence Testing
Transformers commissioning Testing Ratio test Magnetic balance test Magnetization current test Vector group test Mechanical protection testing Insulation resistance Test
Panel commissioning Testing Insulation Resistance Test Continuity Test Torque Test Phase sequence Test Current Transformer testing Potential Transformer testing
Coating thickness testing
CRESCON PROJECTS & SERVICES PVT LTD
ORGANIZATION CHART ESTIMATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
M.JANAKIRAMAN
PROJECT COORDINATOR
KSA KARTHICK MEP EST.INCHARGE
A.PRASATH
R.JAYAKUMAR
K.PRADEEP P.SOLAIMANI HVAC MECHANICAL
K.SANGEETHA ELECTRICAL
S ARIKRISHNAN ELECTRICAL
PROCESS FLOW ESTIMATION DEPARTMENT
TENDER INVITATION
INITIATE TENDER PROCESS
TENDER STUDY
PREPARE PRE-BID QUERIES
FLOATING ENQUIRIES TO
VENDORS
ATTEND PREBID
MEETING
CHECK PRODUCT COMPLIANCE
COMPARISION STATEMENT
TECHICAL & COMMERCIAL
NEGOTIATION WITH VENDORS
BUILD UP RATES
ADDING OVERHEADS
MANAGEMENT APPROVAL
SUBMITTING THE TENDER
REGRET TO TENDER
TO RECEIVE PRE-BID QUERIES
PROJECT TEAM
( SITE SIDE)
METHOD OF STATEMENT / MANPOWER /
EQUIPMENT / TOOLS & TACKLES
NO
MANAGEMENT DECISION
ORGANIZATION CHART DESIGN DEPARTMENT
ABDUL RAHMAN
D.VIKRAM
SELVAKUMAR
FARHAN
MAHADEVAN
DIVAKAR
MARIRAJ
R.VINOTH
NAKEEF
K.DINESH
AKILAN
P.VINOTH S.VINOTH
DHARMA
ASKAR ALI
VENKATESAN
SURYA
M.DINESH
SALIM
HVAC SAMEEULLAH
UTILITY RAJAPANDIAN
ELECTRICAL ALAGARSAMY
FPS & ELV
COORDINATION
DESIGN HEAD
PROCESS FLOW DESIGN & ENGINEETING DEPARTMENT
Design Build Tender Quantity-Build
DATA COLLECTION 01
UNDERSTAND & ANALYZE 02
CONCEPTUAL –COMPILING WITH STANDARDS / CODES
03
DETAIL DESIGN 04
RFQ / ENGG. INPUTS 01
PRE BID QUEIRIES / VISIT 02
DESIGN REVIEW 03
BOQ FINALIZATION 04
PERMITS & FEASIBILITY 05
TECHNICAL VALIDATION 01
PRELIMINERY & SCHEME 02
SHOP DRAWINGS 03
ADDITIONS / ALTERATIONS 04
AS BUILT UPDATION 05
ORGANIZATION CHART PROCUREMENT DEPARTMENT
SYED ABDUL RAHUMAAN PURCHASE HEAD
JUSTIN CHIRSTOPHER
ASST.MGR - MECHANICAL
CHANDRALEKHA VINOTH KUMAR
EBIN RAVI MANIVANNAN
MOHAMMED RIYAS
ASST.MGR - ELECTRICAL
S.SARASWATI SR. EXECUTIVE
SUNDAR SR. ENGINEER
M.ROHINI SR. ENGINEER
B.VENKATRAMAN
ENGINEER
JOHN VICTOR
PROCESS FLOW PROCUREMENT DEPARTMENT
STEP 1 - PURCHASE REQUEST FROM EXECUTION
STEP 2 - MATERIAL DATA SHEET APPROVAL FROM CONSULTANT / CLIENT
STEP 3 - CHECKING AVAILABILITY @ CENTRAL STORE
STEP 4 - FLOATING THE ENQUIRY
STEP 5 - RECEIVING TECHNO COMMERCIAL OFFER
STEP 6 - PREPARATION OF COST COMPARISON WITH MULTIPLE VENDORS
STEP 7 - COMMITTEE APPROVAL
STEP 8 - PO PREPARATION
STEP 9 - DELIVERY FOLLOW-UP UPTO THE SITE
STEP 10 - SUPPORT FOR DOCUMENTS RELATED TO BILLING
ORGANIZATION CHART FINANCE AND ACCOUNTS
SRI VIJAYAVELRAJAN
MANAGER FINANCE
R. SAROJA EXECUTIVE ACCOUNTS
S. SUMITRA EXECUTIVE ACCOUNTS
S. DIVYA EXECUTIVE ACCOUNTS
B. SUDHARANI
EXECUTIVE ACCOUNTS
CRESCON PROJECTS & SERVICES PVT LTD
TREASURY MANAGEMENT
VENDOR PAYMENTS & CREDIT
MANAGEMENT
BGS & LCS PROCESSING
RECEIVABLES MANAGMENT
STATUTORY RETURNS
MIS REPORTING
CRESCON PROJECTS & SERVICES PVT LTD
Financial Performance
0
200
400
600
800
1000
1200
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
Turnover – Rs. In Millions
Turnover
CRESCON PROJECTS & SERVICES PVT LTD
FINANCIAL HIGHLIGHTS
OPERATIONAL PERFORMANCE Rs. In Millions
BALANCE SHEET SUMMARY Rs. In Millions
PARTICULARS 2014-15 2015-16 2016-17 2017-18 2018-19
TOTAL INCOME 146.96 307.79 706.45 946.49 1050.23
PROFIT BEFORE TAX 10.18 12.85 41.35 60.98 IT Returns in
progress
PROFIT AFTER TAX 6.87 9.75 27.57 38.42 “
PARTICULARS 2014-15 2015-16 2016-17 2017-18 2018-19
EQUITY SHARE CAPITAL 1.00 10.00 10.00 10.00 IT Returns in
progress
SHAREHOLDERS FUNDS 13.85 32.60 60.17 100.32 “
NON CURRENT LIABILITIES 0.00 28.00 16.24 10.72 “
CURRENT LIABILITIES 51.32 178.13 263.62 376.04 “
Non current Assets 1.83 5.26 9.62 13.69 “
Current Assets 63.33 233.48 330.41 473.38 “
CRESCON PROJECTS & SERVICES PVT LTD
CREDIT FACILITIES
OUR BANK: AXIS BANK, CBB BRANCH, CHENNAI
SECURED OVERDRAFT LIMIT RS. 400 LAKHS
BANK GUARANTEE RS. 3600 LAKHS
LETTER OF CREDIT (SUB-LIMIT OF BG)
RS. 800 LAKHS
TOTAL CREDIT LIMIT RS. 4000 LAKHS
ORGANIZATION CHART HUMAN RESOURSE & ADMIN DEPARTMENT
Mr. RAJASEKAR HR MANAGER
Mr. SIVA SHANKAR
SR. HR EXECUTIVE
Mr. VINOTH KUMAR HR EXECUTIVE
Mr. VENKAT HR EXECUTIVE
Mr. KARTHICK
Ms. SUGANYA
Mr. PREM KUMAR IT SUPPORT
HR EXECUTIVE
RECEPTIONIST
HR PROCESS FLOW
HR
Recruitment
Payroll
Performance Appraisal
Statutory
Compliance
Pre Recruitment Post Recruitment
ERP Module Staff Labour
Evaluation & KRA Appraisal
EPF & ESIC Site Audit
ADMIN PROCESS FLOW
ADMIN
Attendance
Travel Desk Maintenance
System Admin
Bio-Metric Time Card
Bus / Train Flight
AMC & Service Break Down
New Requirements
ORGANIZATION CHART PLANNING DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
Mathavan V
MEP – Planning Head
Ram Mohan Sundar Elec. Executive Mech. Executive
PONRAJ Mech. Executive
KICK OFF Once award of Contract, conducting a inter-departmental Kick off meeting for sharing
the Bill of Quantities, Technical specification & List of make considerations and timelines. Preparation of documents and conducting the Site Kick off meeting with Client.
Organization Chart- Project Specific Escalation Matrix EHS Plan-Project Specific Logistic Plan Detailed Schedule of Work- Zero schedule Material Approval Schedule Drawing Approval Schedule Material Delivery Schedule Mobilization Schedule Erection Methodology Manpower Histogram Cash Flow Statement Statutory Requirements
CRESCON PROJECTS & SERVICES PVT LTD PLANNING DEPARTMENT PROCESS FLOW
WORK FLOW- PLANNING DEPARTMENT
BUDGET Allocation of budget for specific allotted project, as per timeline, requirements and
logistics.
TRACKING
Preparation of Master schedule as the inputs from Site kick off meeting and circulating the same to all departments and clients.
Weekly tracking, updating and submitting the Drawing and Material approval schedule. Material delivery tracking from Purchase Order, Production, FAT, dispatch, transit and
Delivery to site. Tracking of Mobilization schedule up to the work start-ups
CRESCON PROJECTS & SERVICES PVT LTD PLANNING DEPARTMENT PROCESS FLOW
PROGRESS REPORTS DPR- Preparation and submission of Daily progress report to client with comparing
the Daily Plan vs. Actual works, with daily trade wise manpower and list of equipment available for work.
WPR- Preparation and submission of Weekly progress report to client with comparing the weekly planned versus Actual quantity completion and comparing the schedule manpower versus actual manpower.
MPR- Preparation and submission of Monthly progress reports to client with Comparing the Baseline schedule with the Actual progress, schedules material delivery status, Scheduled cash flow versus Actual Cash flow, Billing plan, site progress photograph comparisons and Milestone status.
CRESCON PROJECTS & SERVICES PVT LTD PLANNING DEPARTMENT PROCESS FLOW
CATCH UP PLAN Identifying the Backlogs in Material delivery or Execution delay and preparation of
Catch up schedule base on site condition and progress to meet the baseline schedule.
PRODUCTIVITY TRACKING Capitalizing the daily productivity of every technician with assigned works and
comparing with the productivity chart.
EXPENSE TRACKING Tracking of Inflow and outflow expenses specific to the project with allotted budget versus
Expenses and cash flow.
CRESCON PROJECTS & SERVICES PVT LTD PLANNING DEPARTMENT PROCESS FLOW
HANDING OVER PLAN Preparing and tracking of Testing and Commission plan for specific project with assigned
team and user connection and completion of works
Preparation and Tracking of demobilization plan, for equipment and manpower
CRESCON PROJECTS & SERVICES PVT LTD PLANNING DEPARTMENT PROCESS FLOW
ORGANIZATION CHART MECH. COORDINATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
ARS ARUN KUMAR
MECH. CO ORDINATOR
PONRAJ AJAY PLANNING ENGR PLANNING ENGR
PROJECT QUALITY ENGINEER ENGINEER
SAFETY ENGINEER
ADMIN/ STORE ENGINEERS
PROCESS FLOW MECH. COORDINATION DEPARTMENT
STEP 1 - TENDER DOCUMENTS RECEIVED FROM ESTIMATION DEPT.
STEP 2 - STUDYING BOQ ALONG WITH CLIENT SCHEDULE OF WORK COMPLETION
STEP 3 - INITIATIVE TO PREPARE SHOP DRAWINGS / MATERIAL APPROVAL
STEP 4 - INITIATIVE SITE TEAM MOBILIZATION
STEP 5 - MOBILIZA MANPOWER/MACHINERIES TO PROJECT SITE
STEP 6 - ARRANGING MATERIALS TO SITE AS PER THE SCHEDULE
STEP 7 - CO ORDINATING WITH CLIENT / CONSIULTANT FOR WORT STARTUP
STEP 8 - ERECTION MEASUREMENT, INTIATIVE THE BILLING
STEP 9 - PREPARING PROJECT HANDOVER DOCUMENTS
STEP 10 – SUPPORTING TO CLIENT IN DLP PERIOD
ORGANIZATION CHART ELECTRICAL COORDINATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
SANJEEVI KUMAR M
ELECTRICAL CO-ORDINATOR
THAMIZHVENDHAN.S PLANNING ENGR2
PROJECT QUALITY ENGINEER ENGINEER
SAFETY ENGINEER
ADMIN/ STORE ENGINEERS
ORGANIZATION CHART HVAC COORDINATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
SANKARANARAYANAN
HVAC CO ORDINATOR
PLANNING ENGR1 PLANNING ENGR2
PROJECT QUALITY ENGINEER ENGINEER
SAFETY ENGINEER
ADMIN/ STORE ENGINEERS
ORGANIZATION CHART COMMERCIAL DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
SRIVIJAYAVELRAJAN
FINANCE HEAD
V PRADEEP COMMERCIAL INCHARGE
K.RAJASEKAR PRABAKARAN
PROCESS FLOW COMMERCIAL DEPARTMENT
STEP 1 - PURCHASE ORDER & BILL OF QUANTITY VERIFICATION
STEP 2 - ADVANCE PAYMENT PROCESS – PI & ABG
STEP 3 - MATERIAL DELIVERY STATUS
STEP 4 - BILLING PLAN
STEP 5 - DELIVERY CHELLAN AND MATERIAL INSPECTION REPORT VERFICATION
STEP 6 - RUNNING BILL PREPARATION & SUBMISSION
STEP 7 - PAYMENT FOLLOWUP
STEP 8 - RECONCILIATION STATEMENT
STEP 9 - CONTINOUS CO ORDIANTION WITH PURCHASE AND PROJECT TEAM
STEP 10 – NON TENDER ITEM APPROVAL / CASH INFLOW PLAN
CRESCON PROJECTS & SERVICES PVT LTD
THANK YOU !