crescon projects & services pvt...
TRANSCRIPT
C O N T A C T :Prasath. V ( Managing Director)Mobile : +91 98400 40758E - Mail : [email protected]
[email protected] No : +91 044 – 23664945Fax No : 044-23664950
M/S CRESCON PROJECTS AND SERVICES PVT LTD
A COMPLETE MEP SERVICE PROVIDER
CRESCON PROJECTS & SERVICES PVT LTDVALUE ENGINEERING – CLIENT FOCUS – TEAMWORK – SAFETY
CRESCON PROJECTS & SERVICES PVT LTD
Crescon Projects is an Engineering Construction Company established in the year 2011, specialized in Industrial MEP works, Mechanical, Electrical, HVAC Utility, Process & Firefighting works, Civil & PEB works.The company is dedicated to hardcore Commitment to Client, Quality, Health, Safety & Environmental policies that will always ensure that its products and services fully meet the requirements of the customers.
To become one of the leading Industrial Engineering Procurement and Construction (EPC) company all over Asia. To enhance this company as Crescon Group of Companies and to enter different verticals of businesses such as Manufacturing, Hospitality, Chain Restaurants, Educational Institutions & Engineering Consultancy Services.
Our Strategy is to have close co-ordination with consultants and the clients to understand their requirements clearly and accomplish them on time with prime focus on Quality and Safety
CRESCON PROJECTS & SERVICES PVT LTD
Our Mission
We mainly aim at reaching our customer’s expectation with consistent efforts and hard work
Our expert team ensures to work with complete dedication in order to gain the trust factor from our customers. We believe in establishing long-term relationship with the stakeholders
Our Vision
To reach No. 1 position among Industrial Construction Companies of Asia
CRESCON PROJECTS & SERVICES PVT LTD
TIME MANAGEMENT
Conscious control over time for maximizing productivity
QUALITY CONTROL
Deliver Quality results through Quality assurance and Quality Control procedures
COST CONTROL
Cash flow projections for better control over budget
PLANNING
Plan ahead with a sound exit strategy
RISK MANAGEMENT
Provide crucial protection for your business
HEALTH, SAFETY and ENVIRONMENT QUALITY MANAGEMENT
Ensure workers Health, safety and good working environment
CRESCON PROJECTS & SERVICES PVT LTD
5
R. Vaikunth possesses the rich experience of about 35 years in the field of General Management and Internal audits. He got relieved as the Managing Director – Commercial of the reputed Saud Bhawan Group in the year May 2012. This company is well versed in various industrial sectors such as Automotive, Allied Business, Heavy Vehicles, Construction Equipment, Oil & Gas, Turnkey Project and much more since 40 years.
V. Prasath is a skilled Mechanical Engineer possessing more than 15 years of Technical Expertise. He had worked in India and South East countries handling plenty of Electro-Mechanical projects. Apart from this, he had also served Saud Bahwan Group as an efficient Project Manager. Later he returned to India to commence business. Coming from a village-background family, he had proved to be the most energetic and dynamic leader with the positive mentality. Most importantly his dedication in starting the business in India is highlighted when he personally influenced his work at Muscat.
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS & SERVICES PVT LTD
Most prominently, our quality policy states that the eminence of our products and services are 100% assuredas per the customer requirements. This objective has helped us to earn our customer satisfaction.
We significantly believe in a working environment which supports the mutual contribution from the bothclient as well as contractor. As a result, the policy statements can be completely fulfilled along with theconsistent efforts in improving the service quality. We have structured 3 basic principles upon which all ourquality policy is based on.
Ensure to identify and conform to the customer needs.
Understand the right way of doing any job for the first time.
Identification of errors at the earliest and take necessary steps to eliminate.
The company staffs are solely responsible for accomplishing the customer requirements by following thestrict set of rules and procedures.
We frame the list of objectives needed to meet the customer expectations. Additionally, these objectivesinclude the set of points required to maintain the service quality and monitored regularly.
We maintain the transparent environment among the staff members which allows the easy reach of qualitypolicy principles and objectives. Along with this, the training is provided as an integral part of policystatements.
The quality of the services are consistently reviewed and improved which portrays the perfection in whichthe task has been completed in the most economical way. Also the delivery of services is supposed to bewithin the stipulated period of time.
As a whole, we proclaim to implement all the policy statements efficiently in a duty-bound manner.
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS AND SERVICES PVT LTD (CPS) establish EHS policy throughout the entire organization, the concept is that people and property are our most important company assets, and the protection thereof has management's highest priority.
CPS acknowledges and accepts its responsibility to provide a safe and healthy working environment for its employees. CPS endorses the concept that this responsibility cannot be discharged passively but requires the active effort and support of every level of management through constant training and supervision of its employees and through continued review of its construction methods.
Specifically, it is the policy of the CPS to: Provide the organizational set up to achieve this. Comply with all the requirements of International and local standards as they pertain to safe
and healthy working conditions on the construction sites. Provide employees with necessary and approved personal protective equipment and enforce their use.
Establish and maintain a system for continual awareness of safety habits and techniques through trainings, periodic meetings and constant supervision.
Promptly respond to any proposed recommendation with respect to safety or fire protection.
Periodically assessing the actual performances.
CRESCON PROJECTS & SERVICES PVT LTD
Name Designation Years of Experience
Abroad India Crescon
V. Prasath Managing Director 14 7 7
M. Janakiraman MEP Coordinator 12 12 7
S. Sankaranarayanan HVAC Manager - Execution 8 6 6
N. Kathirvelu MEP Manager - Execution 6 7 7
K.S.A.Karthick MEP Manager - Execution - 15 4
R. Arunkumar Mechanical Manager - Coordination 2 6 4
P. Mathavan MEP- Planning & Coordination - 6 6
S. Syed Abdul Rahman Procurement Head - 15 3
R. Jayakumar Manager - MEP Estimation 7 8 5
D. Vikram Design Manager - Mechanical 3 6 5
A. Sameeullah Design Manager - HVAC - 12 5
AR Khan Design Manager - FPS 4 10 3
A. Prasath Manager - Process Division - 6 6
S. Koteeswaran Safety Lead - 8 4
R. Prem Anand QA/QC Incharge - 7 3
K. Srivijayavelrajan Finance Manager - 7 4
CRESCON PROJECTS & SERVICES PVT LTD
Name Designation Years of Experience
Abroad India Crescon
V. Anil Kumar Project Manager - Mechanical - 17 0.8
S. Rajasekar HR Manager - 17 0.6
C. Selvakumar Design Coordinator - 10 0.3
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS & SERVICES PVT LTD
S. No Consultant Projects
1 M/s. Tebodin Consultants, Chennai 1. M/s. DFE Pharma, Cuddalore
2 M/s. NNE Pharma 1. RAS Life Scienses2. M/s. Clariant Medical Specialities3. Novozymes South Asia
3 M/s. Tata Consultants Engineers 1. M/s. Toshiba JSW Power System 2. M/s. Saint Gobain India Pvt Ltd
4 M/s. C.R. Narayana Rao Consultants 1. M/s. Colgate Palmolive India2. M/s. Haworth India3. M/s. Saint Gobain Research India
5 M/s. ATP Architects, Germany 1. M/s. Ball Beverage Packaging
6 M/s. Lead Consultancy & Engineering, 1. ITC Limited – ICML Division, Trichy
7 M/s. MJ Associates 1. Ashirvad Pipes Pvt Ltd
8 M/s. Jacobs 1. Godrej Consumer products, Baddi2. M/s. Tata Chemicals Ltd
9 M/s. VMS Consultants, Gujarat 1. Volt-beko Home Appliances
10 M/s. Scube 1. ITC Trichy & ITC Kapurthala
11 M/s. Archetype 1. Pepsico
12 M/s. AECOM 1. ITC -Rajarhat
13 M/s. FABS Consultant 1. TATA Smart Foodz
CRESCON PROJECTS & SERVICES PVT LTD
MAJOR INDUSTRIAL PROJECTS COMPLETED as on MAY 2019
S. No Client & Nature of Work ConsultantValue
(Millions)Duration(Months)
Completion Date
1M/s. ITC Ltd., TrichyMEP – HVAC, ELT, FPS, FAS, ELV
M/s Lead Consultancy & Engineering Services
520 24 Mar – 2019
2M/s. Thermax LimitedMEP & Test Bay Structural Erection
M/s. CR Narayana Rao Architects
150 9 Feb – 2019
3M/s. Salcomp Manufacturing IndiaChiller ,HVAC, Civil, PEB
Crescon – Design Build 55 5 Feb – 2019
4M/s. Mubea Automative Components –Mechanical, Utility
Internal 13 5 Jan – 2019
5M/s. Syngene – Biocon, BangaloreElectrical, HVAC, Civil
Internal 43 3 Jan – 2019
6 M/s. Gulf Oil India Ltd - Process Internal 16 4 Nov – 2018
7 M/s. ZTT Cable – HVAC M/s. Archivista Consutants 23 6 Nov – 2018
8M/s. Novozymes South Asia Pvt LtdFire Protection & Process Ventilation
M/s. NNE Pharma 80 9 Jul – 2018
9M/s. Godrej Consumer Products, Baddi, Himachal Pradesh – MEP
M/s. Jacobs 48 7 Jul – 2018
10M/s. TVS Infrastructure Pvt LtdBhubaneshwar - Elect & FF Works
TATA CONSULTING ENGINEERS
37 4 Jun – 2018
11M/s. TVS Infrastructure Pvt LtdHosur - Electrical Works
TATA CONSULTING ENGINEERS
27 3 Jun – 2018
CRESCON PROJECTS & SERVICES PVT LTD
S.N Client & Nature of Work ConsultantValue
(Millions)Duration(Months)
Completion Date
12M/s. Saint Gobain India Pvt LtdFire Protection, Process Ventilation & Ducting
Tata Consulting Engineers Ltd, Chennai
85 12 Jun – 2018
13M/s. ITC Ltd, Warehouse ChennaiMEP Turnkey – HVAC, ELT, FPS, FAS
M/s. CR Narayana Rao Architects
150 9 Mar – 2018
14M/s. Gulf Oil India Limited ChennaiLube Oil Process Piping
Excel Consultants 160 7 Feb – 2018
15M/s. TVS Infrastructure– Chakan PuneFire Fighting & Protection System
Crescon Projects 30 9 Aug – 2017
16
M/s. BALL Corporation, Sri CityRexam Beverage Can India Pvt Ltd. HVAC, ELT EHT, Safety, IBMS, & Mechanical
M/s, ATP Architects Engineers, Germany
550 9 July – 2017
17M/s. Clariant Medical Specialities India Ltd, MEP Turnkey – Utility Piping, FPS, Electrical
M/s. NNE Pharma 95 9 July – 2017
18M/s. ITC Limited, GunturPlumbing & Fire fighting System
Internal Team 14 4 Aug – 2017
19M/s. Renault Nissan India Pvt Ltd ChennaiSprinkler & Hydrant System
Internal Team 13 6 Aug – 2017
20M/s. Michelin India Pvt Ltd – ChennaiMechanical works – Utility Piping, Ducting
Internal Team 25 15 Dec – 2016
21 M/s. Isuzu Motors Pvt Ltd – Plumbing Works M/s. Shimzu Corporation 29 15 May –2016
22M/s. Ashirvad Pipes Pvt Ltd. – Bangalore Mechanical & Piping works
M/s. MI Associates, Bangalore 24 6 May– 2016
MAJOR INDUSTRIAL PROJECTS COMPLETED as on MAY 2019
CRESCON PROJECTS & SERVICES PVT LTD
S.N Client & Nature of Work ConsultantValue
(Millions)Duration(Months)
Completion Date
23 M/s. Saint Gobain India Pvt Ltd – MEP PackageM/s. C R Narayana Rao Architects, Chennai 100 9 Feb – 2016
24 M/s. MMD (India), Sri City – MEP Package Tata Consulting Engineers Ltd., 22 18 Mar – 2016
25M/s. Toshiba JSW power system– ChennaiGTB Cooling water & Tunnel Ventilation
Tata Consulting Engineers Ltd, Chennai
98 15 May – 2015
26M/s. Colgate Palmolive (India)Limited –Plumbing Works - Internal & External
M/s. C R Narayana Rao Architects, Chennai
29 15 May – 2015
27M/s. OBO BETTERMANN Electrical & Mechanical Package
M/s. Sumanam Electrical Consultants
15 10 Jan – 2015
28M/s. DFE Pharma India LLP. CuddaloreMEP Package – Utility Piping, FPS
Tebodin Consultants 41 3 Sep – 2013
Value of Completed Projects 2492
MAJOR INDUSTRIAL PROJECTS COMPLETED as on MAY 2019
CRESCON PROJECTS & SERVICES PVT LTD
MAJOR INDUSTRIAL ONGOING PROJECTS as on MAY 2019
S.N Client & Nature of Work Design / PMC ConsultantValue
(In Millions)Duration (Months)
Completion
1M/s. Thales Reliance Defence Systems Limited, Nagpur - MEP
M/s. Archetype Engineering & Industry Pvt Ltd.,
194 5 Oct 2019
2 M/s. Indus Coffee - Electrical Crescon 47 12 Apr 2020
3M/s. Syngene International – HVAC & Clean room Panel
M/s. NNE 38 4 Sep 2019
4 M/s. ITC Ltd. Trichy – FPS M/s.Scube 113 9 Sep 2019
5 M/s.Novozyme, Mumbai – FPS M/s. NNE 12 4 July 2019
6M/s. West Pharma, Sri City – FPS and Utility
M/s. NNE 11 4 July 2019
7M/s. Tata Chemicals ltd, MambattuElectrical, Mechanical, Utility Piping
M/s. Jacobs 360 9 May 2019
8M/s. Volt-beko Home Appliances, Sanand,Gujarat – MEP
M/s. VMS Consultants 210 4 July 2019
9 M/s. ITC Ltd., Kolkata – HVAC, HSD Aecom Consultants 157 12 Jun 2019
10M/s. Hero Motocorp LtdFPS & Utility
Crescon – Design Build 200 6 Jun 2019
MAJOR INDUSTRIAL ONGOING PROJECTS as on MAY 2019
S.N Client & Nature of Work Design / PMC ConsultantValue
(In Millions)Duration (Months)
Completion
11M/s ITC Ltd. Kapurthala – Fire Protection System
Crescon – Design Build 100 12 Mar 2020
12M/s. Advanex India Pvt LtdCivil, HVAC, Electrical
Crescon – Design Build 43 6 Apr 2019
13M/s. Berger Paints – Electrical, Mechanical
Internal 30 5 Mar 2019
14M/s. Electromotive – Electrical, Mechanical
Knight Frank 26 5 Mar 2019
15 M/s. USG Boral, Sri City – Electrical Internal 44 3 May 2019
16M/s. Tata Smart Foods, Sri City –Electrical
Fabs Consultants 31 3 May 2019
17 M/s. Pepsico India Ltd Archetype 35 4 July 2019
TOTAL 1651
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION & APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION & APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION
& APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION & APPRECIATION
CERTIFICATE OF COMPLETION & APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION & APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION & APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION & APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS & SERVICES PVT LTD
One Million Safe Hours Celebration - Ball (Rexam MEP Projects)
CRESCON PROJECTS & SERVICES PVT LTD
TATA Chemicals
MD’s SAFETY AWARD
CRESCON PROJECTS & SERVICES PVT LTD
EHS APPRECIATION FROM SGRI
CRESCON PROJECTS & SERVICES PVT LTD
EHS APPRECIATION FROM SGRI
CRESCON PROJECTS & SERVICES PVT LTD
APPRECIATION FROM TVS
CRESCON PROJECTS & SERVICES PVT LTD
APPRECIATION FROM THERMAX
CRESCON PROJECTS & SERVICES PVT LTD
CERTIFICATE OF COMPLETION & APPRECIATION
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON STRENGTH
1. EHS Department
2. Quality Assurance & Control Department
3. Estimation Department
4. Procurement Department
5. Design & Engineering Department
6. Accounts and Finance Department
7. Planning Department
8. Human Resource & Admin Department
9. Execution Co ordination Department
10. Commercial Department
CRESCON PROJECTS & SERVICES PVT LTD
EHS DEPARTMENT
ORGANIZATION CHARTEHS DEPARTMENT
KOTEESWARAN
R. SURESH
C. SAKTHI
S. SURESH
MANIKANDAN
S. SANAL
S. SATHISH
SANTHOSH
DURAI ARUNG. SRIGURU
P SHANMUGAM
SR. SAFETY OFFICERR. VINOTH
SR. SAFETY OFFICERA. SAJIL KUMARSR. SAFETY OFFICER
S. SARAVANANSR. SAFETY OFFICER
EHS HEAD
V.PRASATH
MANAGING DIRECTOR
CRESCON PROJECTS & SERVICES PVT LTDEHS MANANGEMENT SYSTEM
SYSTEM FOLLOWED TO ACHIEVE SAFETY ENVIRONMENT
1. POLICY AWARENESS
2. PLAN
3. IMPLEMENTATION AND OPERATION
4. REVIEW AND MEASURE
5. AUDITS
6. IMPROVE
QUALITY ASSURANCE
QUALITY CONTROL (QA/QC)
DEPARTMENT
CRESCON PROJECTS & SERVICES PVT LTD
Quality Head
QUALITY ENGINEER
( MECHANICAL )
6 Paxs
QUALITY ENGINEER
( ELECTRICAL)
3 Paxs
QUALITY ENGINEER
( FAPA )
2 Paxs
QUALITY ENGINEER
( HVAC )
2 Paxs
QA /QC DEPARTMENT
Quality management at M/s. CRESCON PROJECTS & SERVICES PVTLTD begins with a company-wide drive to improve customer satisfaction by supportingthe customers' business goals. Effective processes are developed for every project fromEstimation, Planning, Procurement, Execution , Testing and commissioning of theSystem. The objective is to create high-quality system, services and implementingongoing improvements that will meet or exceeds Project needs.
M/s. CRESCON PROJECTS & SERVICES PVT LTD is committed tocontinuous improvement of its business processes by implementing globally acceptedstandards such as ASME, ASTM, NFPA, ASHRAC, IEC and ANSI. Our Company operatingprojects implement the appropriate quality policies that depend upon Customer, typesof System or services, provided and prevailing regulatory requirements.
QUALITY POLICY
CRESCON PROJECTS & SERVICES PVT LTD
Prepare Quality Assurance Plan Prepare Inspection Test Plan Prepare Work Methodology Prepare Welding Procedure Specification Conduct Welder Qualification Test Testing - Equipment's Calibration and Maintenance Prepare GRN & MRIR for the Inward Material. Inspect Material Installation and Prepare Checklist Conduct Testing and Commissioning for the individual System &
Equipments. Check and Approve As- Built Drawing. Project Handover Document Preparation
QUALITY RESPONSIBILITY
CRESCON PROJECTS & SERVICES PVT LTD
QUALITY INSTRUMENTS
Vernier CaliperScrew GaugeDFT MeterDPT KitHoliday DetectorLaser Distance SensorBoroscopic InstrumentMultimeterDigital MeggerClamp meterEarth TesterLux Meter
ELCB TesterPhase Sequence Meter PsychrometerRH meterAnemometerTachometerThermometerDB meterCO2 MeterPH MeterWater Flow MeterIR Thermometer
CRESCON PROJECTS & SERVICES PVT LTD
MECHANICAL TESTING
Fabrication InspectionBevel CheckingFit up Inspection
Dry Film Thickness InspectionHoliday Detector testLoad TestLiquid Penetrant TestRadiography TestHydro TestPneumatic TestBoroscopic Testing Tank Leak Test Pump Alignment Test Pump Performance Test Pump Commissioning Gas Suppression Test
QUALITY TESTING
CRESCON PROJECTS & SERVICES PVT LTD
HVAC TESTING
Duct Leak TestWater BalancingAir BalancingClean Room ValidationFan Coil Unit CommissioningCassette Unit CommissioningDX Unit CommissioningChiller CommissioningAHU Performance TestFresh air and Exhaust Fan Commissioning
QUALITY TESTING
CRESCON PROJECTS & SERVICES PVT LTD
FIRE ALARM AND PUBLIC ADDRESS TESTING
Local Scare Alarm Beam Detector Smoke Detector Heat Detector Fire Detector Manual Call Point Fire Alarm Flow Switch Duct Smoke Detector Fire Alarm Panel Public Address Testing & Commissioning
QUALITY TESTING
CRESCON PROJECTS & SERVICES PVT LTD
QUALITY TESTING
ELECTRICAL TESTING
Earth Resistance Testing Lux Testing ELCB testing Motor Testing
Insulation Resistance Test Winding Resistance Test Phase Sequence Testing
Transformers commissioning Testing Ratio test Magnetic balance test Magnetization current test Vector group test Mechanical protection testing Insulation resistance Test
Panel commissioning Testing Insulation Resistance Test Continuity Test Torque Test Phase sequence Test Current Transformer testing Potential Transformer testing
Coating thickness testing
CRESCON PROJECTS & SERVICES PVT LTD
CRESCON PROJECTS & SERVICES PVT LTD
ESTIMATION
DEPARTMENT
ORGANIZATION CHARTESTIMATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
M.JANAKIRAMAN
PROJECT COORDINATOR
KSA KARTHICKMEP EST.INCHARGE
A.PRASATH
R.JAYAKUMAR
K.PRADEEP P.SOLAIMANIHVAC MECHANICAL
K.SANGEETHAELECTRICAL
S ARIKRISHNANELECTRICAL
PROCESS FLOWESTIMATION DEPARTMENT
TENDER INVITATION
INITIATE TENDER PROCESS
TENDER STUDY
PREPARE PRE-BID QUERIES
FLOATING ENQUIRIES TO
VENDORS
ATTEND PREBID
MEETING
CHECK PRODUCT COMPLIANCE
COMPARISION STATEMENT
TECHICAL & COMMERCIAL
NEGOTIATION WITH VENDORS
BUILD UP RATES
ADDING OVERHEADS
MANAGEMENT APPROVAL
SUBMITTING THE TENDER
REGRET TO TENDER
TO RECEIVE PRE-BID QUERIES
PROJECT TEAM
( SITE SIDE)
METHOD OF STATEMENT / MANPOWER /
EQUIPMENT / TOOLS & TACKLES
NO
MANAGEMENT DECISION
CRESCON PROJECTS & SERVICES PVT LTD
DESIGN ENGINEERING
DEPARTMENT
ORGANIZATION CHARTDESIGN DEPARTMENT
ABDUL RAHMAN
D.VIKRAM
SELVAKUMAR
FARHAN
MAHADEVAN
DIVAKAR
MARIRAJ
R.VINOTH
NAKEEF
K.DINESH
AKILAN
P.VINOTHS.VINOTH
DHARMA
ASKAR ALI
VENKATESAN
SURYA
M.DINESH
SALIM
HVACSAMEEULLAH
UTILITYRAJAPANDIAN
ELECTRICALALAGARSAMY
FPS & ELV
COORDINATION
DESIGN HEAD
PROCESS FLOWDESIGN & ENGINEETING DEPARTMENT
Design Build Tender Quantity-Build
DATA COLLECTION01
UNDERSTAND & ANALYZE02
CONCEPTUAL –COMPILING WITH STANDARDS / CODES
03
DETAIL DESIGN04
RFQ / ENGG. INPUTS01
PRE BID QUEIRIES / VISIT02
DESIGN REVIEW 03
BOQ FINALIZATION04
PERMITS & FEASIBILITY05
TECHNICAL VALIDATION01
PRELIMINERY & SCHEME02
SHOP DRAWINGS03
ADDITIONS / ALTERATIONS04
AS BUILT UPDATION05
CRESCON PROJECTS & SERVICES PVT LTD
PROCUREMENT
DEPARTMENT
ORGANIZATION CHARTPROCUREMENT DEPARTMENT
SYED ABDUL RAHUMAANPURCHASE HEAD
JUSTIN CHIRSTOPHER
ASST.MGR - MECHANICAL
CHANDRALEKHA VINOTH KUMAR
EBIN RAVI MANIVANNAN
MOHAMMED RIYAS
ASST.MGR - ELECTRICAL
S.SARASWATISR. EXECUTIVE
SUNDARSR. ENGINEER
M.ROHINISR. ENGINEER
B.VENKATRAMAN
ENGINEER
JOHN VICTOR
PROCESS FLOWPROCUREMENT DEPARTMENT
STEP 1 - PURCHASE REQUEST FROM EXECUTION
STEP 2 - MATERIAL DATA SHEET APPROVAL FROM CONSULTANT / CLIENT
STEP 3 - CHECKING AVAILABILITY @ CENTRAL STORE
STEP 4 - FLOATING THE ENQUIRY
STEP 5 - RECEIVING TECHNO COMMERCIAL OFFER
STEP 6 - PREPARATION OF COST COMPARISON WITH MULTIPLE VENDORS
STEP 7 - COMMITTEE APPROVAL
STEP 8 - PO PREPARATION
STEP 9 - DELIVERY FOLLOW-UP UPTO THE SITE
STEP 10 - SUPPORT FOR DOCUMENTS RELATED TO BILLING
FINANACE & ACCOUNTS
DEPARTMENT
CRESCON PROJECTS & SERVICES PVT LTD
ORGANIZATION CHARTFINANCE AND ACCOUNTS
SRI VIJAYAVELRAJAN
MANAGER FINANCE
R. SAROJAEXECUTIVE ACCOUNTS
S. SUMITRAEXECUTIVE ACCOUNTS
S. DIVYAEXECUTIVE ACCOUNTS
B. SUDHARANI
EXECUTIVE ACCOUNTS
CRESCON PROJECTS & SERVICES PVT LTD
TREASURY MANAGEMENT
VENDOR PAYMENTS & CREDIT
MANAGEMENT
BGS & LCS PROCESSING
RECEIVABLES MANAGMENT
STATUTORY RETURNS
MIS REPORTING
CRESCON PROJECTS & SERVICES PVT LTD
Financial Performance
0
200
400
600
800
1000
1200
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19
Turnover – Rs. In Millions
Turnover
CRESCON PROJECTS & SERVICES PVT LTD
FINANCIAL HIGHLIGHTS
OPERATIONAL PERFORMANCE Rs. In Millions
BALANCE SHEET SUMMARY Rs. In Millions
PARTICULARS 2014-15 2015-16 2016-17 2017-18 2018-19
TOTAL INCOME 146.96 307.79 706.45 946.49 1050.23
PROFIT BEFORE TAX 10.18 12.85 41.35 60.98IT Returns in
progress
PROFIT AFTER TAX 6.87 9.75 27.57 38.42 “
PARTICULARS 2014-15 2015-16 2016-17 2017-18 2018-19
EQUITY SHARE CAPITAL 1.00 10.00 10.00 10.00IT Returns in
progress
SHAREHOLDERS FUNDS 13.85 32.60 60.17 100.32 “
NON CURRENT LIABILITIES 0.00 28.00 16.24 10.72 “
CURRENT LIABILITIES 51.32 178.13 263.62 376.04 “
Non current Assets 1.83 5.26 9.62 13.69 “
Current Assets 63.33 233.48 330.41 473.38 “
CRESCON PROJECTS & SERVICES PVT LTD
CREDIT FACILITIES
OUR BANK: AXIS BANK, CBB BRANCH, CHENNAI
SECURED OVERDRAFT LIMIT RS. 400 LAKHS
BANK GUARANTEE RS. 3600 LAKHS
LETTER OF CREDIT(SUB-LIMIT OF BG)
RS. 800 LAKHS
TOTAL CREDIT LIMIT RS. 4000 LAKHS
CRESCON PROJECTS & SERVICES PVT LTD
HUMAN RESOURSES
&
ADMIN DEPARTMENT
ORGANIZATION CHARTHUMAN RESOURSE & ADMIN DEPARTMENT
Mr. RAJASEKARHR MANAGER
Mr. SIVA SHANKAR
SR. HR EXECUTIVE
Mr. PUNNIYAKOTIHR EXECUTIVE
Mr. KANNANHR EXECUTIVE
Ms. SANGEETHARECEPTIONIST
Mr. AJITH KUMAROFFICE ASSISTANT
Mr. PREM KUMARSYSTEM ADMIN
HR PROCESS FLOW
HR
Recruitment PayrollPerformance
Appraisal
StatutoryCompliance
Pre Recruitment Post Recruitment
ERP Module Staff Labour
Evaluation & KRA Appraisal
EPF & ESIC Site Audit
ADMIN PROCESS FLOW
ADMIN
Attendance Travel Desk MaintenanceSystem Admin
Bio-Metric Time Card
Bus / Train Flight
AMC & Service Break Down
New Requirements
CRESCON PROJECTS & SERVICES PVT LTD
PLANNING
DEPARTMENT
ORGANIZATION CHARTPLANNING DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
Mathavan V
MEP – Planning Head
Ram Mohan SundarElec. Executive Mech. Executive
PONRAJMech. Executive
KICK OFF Once award of Contract, conducting a inter-departmental Kick off meeting for sharing
the Bill of Quantities, Technical specification & List of make considerations and timelines. Preparation of documents and conducting the Site Kick off meeting with Client.
Organization Chart- Project Specific Escalation Matrix EHS Plan-Project Specific Logistic Plan Detailed Schedule of Work- Zero schedule Material Approval Schedule Drawing Approval Schedule Material Delivery Schedule Mobilization Schedule Erection Methodology Manpower Histogram Cash Flow Statement Statutory Requirements
CRESCON PROJECTS & SERVICES PVT LTDPLANNING DEPARTMENT PROCESS FLOW
WORK FLOW- PLANNING DEPARTMENT
BUDGET Allocation of budget for specific allotted project, as per timeline, requirements and
logistics.
TRACKING Preparation of Master schedule as the inputs from Site kick off meeting and circulating
the same to all departments and clients. Weekly tracking, updating and submitting the Drawing and Material approval schedule. Material delivery tracking from Purchase Order, Production, FAT, dispatch, transit and
Delivery to site. Tracking of Mobilization schedule up to the work start-ups
CRESCON PROJECTS & SERVICES PVT LTDPLANNING DEPARTMENT PROCESS FLOW
PROGRESS REPORTS
DPR- Preparation and submission of Daily progress report to client with comparing the Daily Plan vs. Actual works, with daily trade wise manpower and list of equipment available for work.
WPR- Preparation and submission of Weekly progress report to client with comparing the weekly planned versus Actual quantity completion and comparing the schedule manpower versus actual manpower.
MPR- Preparation and submission of Monthly progress reports to client with Comparing the Baseline schedule with the Actual progress, schedules material delivery status, Scheduled cash flow versus Actual Cash flow, Billing plan, site progress photograph comparisons and Milestone status.
CRESCON PROJECTS & SERVICES PVT LTDPLANNING DEPARTMENT PROCESS FLOW
CATCH UP PLAN
Identifying the Backlogs in Material delivery or Execution delay and preparation of Catch up schedule base on site condition and progress to meet the baseline schedule.
PRODUCTIVITY TRACKING
Capitalizing the daily productivity of every technician with assigned works and comparing with the productivity chart.
EXPENSE TRACKING
Tracking of Inflow and outflow expenses specific to the project with allotted budget versus Expenses and cash flow.
CRESCON PROJECTS & SERVICES PVT LTDPLANNING DEPARTMENT PROCESS FLOW
HANDING OVER PLAN
Preparing and tracking of Testing and Commission plan for specific project with assigned team and user connection and completion of works
Preparation and Tracking of demobilization plan, for equipment and manpower
CRESCON PROJECTS & SERVICES PVT LTDPLANNING DEPARTMENT PROCESS FLOW
CRESCON PROJECTS & SERVICES PVT LTD
EXECUTION
CO-ORDINATION
DEPARTMENT
ORGANIZATION CHARTMECH. COORDINATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
ARS ARUN KUMAR
MECH. CO ORDINATOR
PONRAJ AJAYPLANNING ENGR PLANNING ENGR
PROJECT QUALITYENGINEER ENGINEER
SAFETYENGINEER
ADMIN/ STOREENGINEERS
PROCESS FLOWMECH. COORDINATION DEPARTMENT
STEP 1 - TENDER DOCUMENTS RECEIVED FROM ESTIMATION DEPT.
STEP 2 - STUDYING BOQ ALONG WITH CLIENT SCHEDULE OF WORK COMPLETION
STEP 3 - INITIATIVE TO PREPARE SHOP DRAWINGS / MATERIAL APPROVAL
STEP 4 - INITIATIVE SITE TEAM MOBILIZATION
STEP 5 - MOBILIZA MANPOWER/MACHINERIES TO PROJECT SITE
STEP 6 - ARRANGING MATERIALS TO SITE AS PER THE SCHEDULE
STEP 7 - CO ORDINATING WITH CLIENT / CONSIULTANT FOR WORT STARTUP
STEP 8 - ERECTION MEASUREMENT, INTIATIVE THE BILLING
STEP 9 - PREPARING PROJECT HANDOVER DOCUMENTS
STEP 10 – SUPPORTING TO CLIENT IN DLP PERIOD
ORGANIZATION CHARTELECTRICAL COORDINATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
SANJEEVI KUMAR M
ELECTRICAL CO-ORDINATOR
PLANNING ENGR1 PLANNING ENGR2
PROJECT QUALITYENGINEER ENGINEER
SAFETYENGINEER
ADMIN/ STOREENGINEERS
ORGANIZATION CHARTHVAC COORDINATION DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
SANKARANARAYANAN
HVAC CO ORDINATOR
PLANNING ENGR1 PLANNING ENGR2
PROJECT QUALITYENGINEER ENGINEER
SAFETYENGINEER
ADMIN/ STOREENGINEERS
CRESCON PROJECTS & SERVICES PVT LTD
COMMERCIAL
DEPARTMENT
ORGANIZATION CHARTCOMMERCIAL DEPARTMENT
V.PRASATH
MANAGING DIRECTOR
SRIVIJAYAVELRAJAN
FINANCE HEAD
V PRADEEPCOMMERCIAL INCHARGE
K.RAJASEKAR PRABAKARAN
PROCESS FLOWCOMMERCIAL DEPARTMENT
STEP 1 - PURCHASE ORDER & BILL OF QUANTITY VERIFICATION
STEP 2 - ADVANCE PAYMENT PROCESS – PI & ABG
STEP 3 - MATERIAL DELIVERY STATUS
STEP 4 - BILLING PLAN
STEP 5 - DELIVERY CHELLAN AND MATERIAL INSPECTION REPORT VERFICATION
STEP 6 - RUNNING BILL PREPARATION & SUBMISSION
STEP 7 - PAYMENT FOLLOWUP
STEP 8 - RECONCILIATION STATEMENT
STEP 9 - CONTINOUS CO ORDIANTION WITH PURCHASE AND PROJECT TEAM
STEP 10 – NON TENDER ITEM APPROVAL / CASH INFLOW PLAN
CRESCON PROJECTS & SERVICES PVT LTD
THANK YOU !
M/S CRESCON PROJECTS AND SERVICES PVT LTDNO: 70, SECOND FLOOR, 8TH STREETSECTOR NO : 2, KK NAGAR, CHENNAI – 600 078TAMIL NADU, INDIA
E - MAIL : [email protected] NO : +91 044 – 23664945FAX NO : 044-23664950