cost estimate

27
Cost Estimate Page 1 Description Qty Price UM Draw Me Total 1 IMPORTANT: BE SURE TO INCLUDE 2 SALES TAX AND DELIVERY CHARGES 3 4 LAND 5 • Lot Price 0.00 0.00 0.00 6 • Closing Costs on Lot 0.00 0.00 7 • Interest On Lot 0.00 0.00 8 0.00 0.00 9 TOTAL LAND (LINES 5-8) 0.00 0.00 0.00 10 LAND 11 DESIGN 12 * Architecture 0.00 0.00 13 • Engineering 0.00 0.00 14 • Blueprints 0.00 0.00 15 0.00 0.00 16 TOTAL DESIGN (LINES 12-15) 0.00 0.00 0.00 17 18 CONSTRUCTION LOAN 19 • Appraisal 0.00 0.00 20 • Point(s) 0.00 0.00 21 • Closing Costs 0.00 0.00 22 • Interest 0.00 0.00 23 • Builder's Risk Insurance 0.00 0.00 24 • Initial Survey 0.00 0.00 25 0.00 0.00 26 TOTAL LOAN (LINES 19-24) 0.00 0.00 0.00 27 28 PERMITS 29 • Septic Tank 0.00 0.00 30 • Building 0.00 0.00 31 • Electrical (usually included in electrician's quote) 0.00 0.00 32 • Mechanical (HVAC) (usually included in heating quote) 0.00 0.00 33 • Plumbing (usually included in plumber's quote) 0.00 0.00 34 • Tree Removal 0.00 0.00 35 • Curb Cut 0.00 0.00 36 0.00 0.00 37 TOTAL PERMITS (LINES 29-37) 0.00 0.00 0.00 38 39 UTILITIES 40 • Underground Electric Service 0.00 0.00 41 • Water Tap and Meter 0.00 0.00 42 • Sewer Tap and Connect Fee 0.00 0.00 43 • Temporary Electric Power 0.00 0.00 44 0.00 0.00 45 TOTAL UTILITIES (LINES 40-44) 0.00 0.00 0.00 46 47 48 49 PAGE TOTALS (LINES 9, 16, 26, 37, 45) 0.00 0.00 0.00 50 UM = Unit Measure (ea, sq ft, etc.) © 1990-2012 Home Building Answers amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Upload: mohammad-fifin-joviza

Post on 07-Jul-2016

252 views

Category:

Documents


4 download

DESCRIPTION

.

TRANSCRIPT

Page 1: Cost Estimate

Cost Estimate Page 1

Description Qty Price UM Draw Me Total1 IMPORTANT: BE SURE TO INCLUDE2 SALES TAX AND DELIVERY CHARGES34 LAND5 • Lot Price 0.00 0.00 0.006 • Closing Costs on Lot 0.00 0.007 • Interest On Lot 0.00 0.008 0.00 0.009 TOTAL LAND (LINES 5-8) 0.00 0.00 0.0010 LAND11 DESIGN12 * Architecture 0.00 0.0013 • Engineering 0.00 0.0014 • Blueprints 0.00 0.0015 0.00 0.0016 TOTAL DESIGN (LINES 12-15) 0.00 0.00 0.001718 CONSTRUCTION LOAN19 • Appraisal 0.00 0.0020 • Point(s) 0.00 0.0021 • Closing Costs 0.00 0.0022 • Interest 0.00 0.0023 • Builder's Risk Insurance 0.00 0.0024 • Initial Survey 0.00 0.0025 0.00 0.0026 TOTAL LOAN (LINES 19-24) 0.00 0.00 0.002728 PERMITS29 • Septic Tank 0.00 0.0030 • Building 0.00 0.0031 • Electrical (usually included in electrician's quote) 0.00 0.0032 • Mechanical (HVAC) (usually included in heating quote) 0.00 0.0033 • Plumbing (usually included in plumber's quote) 0.00 0.0034 • Tree Removal 0.00 0.0035 • Curb Cut 0.00 0.0036 0.00 0.0037 TOTAL PERMITS (LINES 29-37) 0.00 0.00 0.003839 UTILITIES40 • Underground Electric Service 0.00 0.0041 • Water Tap and Meter 0.00 0.0042 • Sewer Tap and Connect Fee 0.00 0.0043 • Temporary Electric Power 0.00 0.0044 0.00 0.0045 TOTAL UTILITIES (LINES 40-44) 0.00 0.00 0.0046474849 PAGE TOTALS (LINES 9, 16, 26, 37, 45) 0.00 0.00 0.0050

UM = Unit Measure (ea, sq ft, etc.) © 1990-2012 Home Building AnswersNote: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 2: Cost Estimate

Cost Estimate Page 2

Description Qty Price UM Draw Me Total51 SITE PREPARATION52 • Rough Stake 0.00 0.0053 • Clearing, Grading, Hauling 0.00 0.0054 • Fill Dirt 0.00 0.0055 • Locate Corners 0.00 0.0056 0.00 0.0057 TOTAL SITE PREP (LINES 52-55) 0.00 0.00 0.005859 FOOTINGS60 • Layout, Dig, and Pour 0.00 0.0061 • Steel 0.00 0.0062 • Concrete 0.00 0.0063 • Drains 0.00 0.0064 TOTAL FOOTINGS (LINES 60-63) 0.00 0.00 0.006566 FOUNDATIONS67 • Concrete 0.00 0.0068 • Brick 0.00 0.0069 • Block 0.00 0.0070 • Mortar 0.00 0.0071 • Sand 0.00 0.0072 • Steel 0.00 0.0073 • Vents 0.00 0.0074 • Damp Proofing 0.00 0.0075 • Backfill 0.00 0.0076 • Labor 0.00 0.0077 • Foundation Survey 0.00 0.0078 0.00 0.0079 TOTAL FOUNDATIONS (LINES 67-77) 0.00 0.00 0.00808182838485 PAGE TOTALS (LINES 57, 64, 79) 0.00 0.00 0.008687888990919293949596979899

100UM = Unit Measure (ea, sq ft, etc.) © 1990-2012 Home Building AnswersNote: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

B C D E F G H I J

2

3456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354

55

Page 3: Cost Estimate

Cost Estimate Page 3

Description Qty Price UM Draw Me Total101 SLAB (IF APPLICABLE)102 • Fill Dirt 0.00 0.00103 • Sand 0.00 0.00104 • Backfill Labor 0.00 0.00105 • Polyethelene 0.00 0.00106 • Wire Mesh 0.00 0.00107 • Styrofoam (Perimeter Insulation) 0.00 0.00108 • Steel 0.00 0.00109 • Grade Stakes 0.00 0.00110 • Form Materials 0.00 0.00111 • Concrete 0.00 0.00112 • Set Up and Finishing 0.00 0.00113 0.00 0.00114 TOTAL SLAB (LINES 102-112) 0.00 0.00 0.00115

116 SOIL TREATMENT FOR TERMITES 0.00 0.00117118 FRAMING - FLOORS119 • Sills 0.00 0.00120 • Steel Posts 0.00 0.00121 • Steel Beams 0.00 0.00122 • Microlams 0.00 0.00123 • Joists 0.00 0.00124 • Hangers 0.00 0.00125 • Cross Bracing 0.00 0.00126 • Floor Decking 0.00 0.00127 • Glue 0.00 0.00128 0.00 0.00129 FRAMING - WALLS130 • Base Plates 0.00 0.00131 • Studs 0.00 0.00132 • Top Plates 0.00 0.00133 • Header Materials 0.00 0.00134 • Corner Bracing 0.00 0.00135 • Sills, Jacks, and Cripples 0.00 0.00136 • Back Out Materials 0.00 0.00137 • Insulated Sheathing 0.00 0.00138 • Chimney Framing Materials 0.00 0.00139 • Bracing Materials 0.00 0.00140 0.00 0.00141 0.00 0.00142 0.00 0.00143 TOTAL FLOOR AND WALL FRAMING (LINES 119-139) 0.00 0.00 0.00144145

146 PAGE TOTAL (LINES 114, 116, 143) 0.00 0.00 0.00147148149

150

UM = Unit Measure (ea, sq ft, etc.) © 1990-2012 Home Building Answers

Click "Page 4" below

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 4: Cost Estimate

Cost Estimate Page 4

Description Qty Price UM Draw Me Total151 FRAMING - CEILINGS152 • Beams 0.00153 • Ceiling Joists 0.00 0.00154 • Headers and Trimmers 0.00 0.00155 0.00 0.00156 FRAMING - ROOF157 • Truss Package 0.00 0.00158 • Bracing Materials 0.00159 • Ridge Board 0.00 0.00160 • Ridge Rafter 0.00 0.00161 • Valley Rafter 0.00 0.00162 • Rafters 0.00 0.00163 • Lookout Material 0.00 0.00164 • Barge Rafter 0.00 0.00165 • Dormer Materials 0.00 0.00166 • Cricket Materials 0.00 0.00167 • Roof Decking 0.00 0.00168 • Roof Clips 0.00 0.00169 • 15# Felt 0.00 0.00170 • Gable Vents 0.00 0.00171 • Strong Ties 0.00 0.00172 • Framing Labor 0.00 0.00173 0.00 0.00174 CEILING AND ROOF FRAMING (152-172) 0.00 0.00 0.00175176 TOTAL FRAMING (LINES 143, 174) 0.00 0.00 0.00177178 MASONRY WALLS179 • Block 0.00 0.00180 • Sills 0.00 0.00181 • Lintels 0.00 0.00182 • Block Ties 0.00 0.00183 • Sand 0.00 0.00184 • Mortar 0.00 0.00185 • Steel 0.00 0.00186 • Concrete 0.00 0.00187 • Masonry Labor 0.00 0.00188 0.00 0.00189 TOTAL MASONRY WALLS (LINES 179-187) 0.00 0.00 0.00190191192193 PAGE TOTAL (LINES 174, 189) 0.00 0.00 0.00194195196197198199

200

UM = Unit Measure (ea, sq ft, etc.)

Click "Page 5" below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 5: Cost Estimate

Cost Estimate Page 5

Description Qty Price UM Draw Me Total201 ROOF202 • Roofing Shingles 0.00 0.00203 • Eave Drip 0.00 0.00204 • Flashing 0.00 0.00205 • Ridge Vents 0.00 0.00206 • Roof Ventilators 0.00 0.00207 • Nails 0.00 0.00208 • Roofing Labor 0.00 0.00209 0.00 0.00210 TOTAL ROOFING (LINES 202-208) 0.00 0.00 0.00211212213 WINDOWS 0.00 0.00214215 EXTERIOR DOORS216 • Exterior Doors 0.00 0.00217 • Garage Door 0.00 0.00218 0.00 0.00219 TOTAL EXTERIOR DOORS (LINES 216, 217) 0.00 0.00 0.00220221 CORNICE, VENEER, & EXTERIOR TRIM222 • Siding 0.00 0.00223 • Masonry Veneer 0.00 0.00224 • Brick 0.00 0.00225 • Stone 0.00 0.00226 • Sand 0.00 0.00227 • Mortar 0.00 0.00228 • Ties 0.00 0.00229 • Lintel 0.00 0.00230 • Masonry Labor 0.00 0.00231 • Stucco (Including Materials) 0.00 0.00232 • Cornice Materials 0.00 0.00233 • Sub Fascia 0.00 0.00234 • Fascia 0.00 0.00235 • Soffit 0.00 0.00236 • Soffit Vents 0.00 0.00237 • Frieze Board 0.00 0.00238 • Shingle Mould 0.00 0.00239 • Dental Mould 0.00 0.00240 • Crown Moulding 0.00 0.00241 • Corner Trim 0.00 0.00242 • Window Trim/Mould 0.00 0.00243 • Door Trim and Mould 0.00 0.00244 • Flashing 0.00 0.00245 0.00246 CORNICE, VENEER, EXTERIOR TRIM CONTINUED ON NEXT PAGE247248 PAGE TOTAL* (LINES 210, 213, 219, 220) 0.00 0.00 0.00249

250 "Page Total" on this page excludes lines222-245. Totals for these lines are included on line 264UM = Unit Measure (ea, sq ft, etc.)

Click "Page 6" below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 6: Cost Estimate

Cost Estimate Page 6

Description Qty Price UM Draw Me Total251 CORNICE, VENEER, EXT. TRIM CONTINUED252 • Shutters 0.00 0.00253 • Porch Columns 0.00 0.00254 • Pediment and Pilasters 0.00 0.00255 • Porch Materials 0.00 0.00256 • Flooring 0.00 0.00257 • Ceiling 0.00 0.00258 • Columns/Posts 0.00 0.00259 • Handrail 0.00 0.00260 • Trim 0.00 0.00261 • Nails 0.00 0.00262 • Siding and Trim Labor 0.00 0.00263 0.00 0.00264 TOTAL CORNICE, VENEER, EXTERIOR TRIM (222-262) 0.00 0.00 0.00265266 FIREPLACE267 • Face Brick 0.00 0.00268 • Fire Brick 0.00 0.00269 • Flue Liner 0.00 0.00270 • Mortar 0.00 0.00271 • Sand 0.00 0.00272 • Lintel 0.00 0.00273 • Damper 0.00 0.00274 • Ash Dump 0.00 0.00275 • Gas Lighter (Including Gas Line) 0.00 0.00276 • Masonry Labor 0.00 0.00277 • Prefab Fireplace 0.00 0.00278 • Chase Top 0.00 0.00279 • Hearth and Profile (Materials and Labor) 0.00 0.00280 0.00 0.00281 TOTAL FIREPLACE (LINES 267-279) 0.00 0.00 0.00282283 ELECTRICAL284 • Subcontract - Includes: Labor, Wire, Outlets, 0.00 0.00285 Switches, Boxes, Connectors, Meter, 0.00 0.00286 Service Entrance, Panel and Breakers, 0.00 0.00287 • Lighting Fixture (Allowance) Includes: Door Bell, 0.00 0.00288 and Smoke Detectors 0.00 0.00289 • Ceiling Fan 0.00 0.00290 • Whole House Fan 0.00 0.00291 0.00 0.00292 TOTAL ELECTRICAL (LINES 284-290) 0.00 0.00 0.00293294295296 PAGE TOTAL (LINES 264, 281, 292) 0.00 0.00 0.00297298299

300

UM = Unit Measure (ea, sq ft, etc.)

Click "Page 7" below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 7: Cost Estimate

Cost Estimate Page 7

Description Qty Price UM Draw Me Total301 APPLIANCES AND SPECIAL EQUIPMENT302 • Range 0.00 0.00303 • Range Hood 0.00 0.00304 • Cook Top 0.00 0.00305 • Oven 0.00 0.00306 • Microwave 0.00 0.00307 • Trash Compactor 0.00 0.00308 • Disposal 0.00 0.00309 • Refrigerator 0.00 0.00310 • Dishwasher 0.00 0.00311 • Electronic Air Filter 0.00 0.00312 • Intercom System 0.00 0.00313 • Built-In Vacuum System 0.00 0.00314 • Security System 0.00 0.00315 • Garage Door Opener 0.00 0.00316 0.00 0.00317 TOTAL APPLIANCES (LINES 302-315) 0.00 0.00 0.00318319 HVAC SYSTEM320 • Subcontract - Includes: Labor; Heating/Air 0.00 0.00321 Conditioning System; Humidifier and 0.00 0.00322 Dehumidifier; Ducts, Dampers, and Vents 0.00 0.00323 For Range Hood, Fireplace, Bath Fans, 0.00 0.00324 and Dryer. 0.00 0.00325 0.00 0.00326 TOTAL HVAC (LINE 320) 0.00 0.00 0.00327328 PLUMBING329 • Subcontract - Includes: Labor; Supply, 0.00 0.00330 Waste, and Vent Pipes, and Fittings; 0.00 0.00331 Bathtubs, Prefab Showers and Shower Pans, 0.00 0.00332 Sinks, Vanity Bowls, and Toilets; Shower 0.00 0.00333 Heads, Faucets, Sill Cocks; Water Heater; 0.00 0.00334 Gas Lines 0.00 0.00335 0.00 0.00336 TOTAL PLUMBING (LINE 329) 0.00 0.00 0.00337338 WELL 0.00 0.00339340 SEPTIC TANK 0.00 0.00341342 SOLAR SYSTEM (LABOR AND MTLS) 0.00 0.00343344345 PAGE TOTAL (LINES 317, 326, 336, 338, 340, 342) 0.00 0.00 0.00346347348349

350

UM = Unit Measure (ea, sq ft, etc.)

Click "Page 8" below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 8: Cost Estimate

Cost EstimateDescription Qty Price UM Draw

351 INSULATION - Materials and Subcontract 0.00352353 DRYWALL - Materials and Subcontract 0.00354355 INTERIOR DOORS AND TRIM356 • Doors 0.00357 • Base Moulding 0.00358 • Base Cap 0.00359 • Casing 0.00360 • Crown Moulding 0.00361 • Chair Rail 0.00362 • Shoe Mould 0.00363 • Shelving 0.00364 • Closet Rods 0.00365 • Rod Cups 0.00366 • Shelf and Rod Brackets 0.00367 • Shelf Cleating 0.00368 • Stairs 0.00369 • Stringers 0.00370 • Treads 0.00371 • Risers 0.00372 • Handrail & Fittings 0.00373 • Newells 0.00374 • Balusters 0.00375 • Skirt Board 0.00376 • Pre-Fab Unit 0.00377 • Panelling 0.00378 • Plywood 0.00379 • Picture Mould 0.00380 • Panel Mould 0.00381 • 1x Materials 0.00382 • Window Trim 0.00383 • Stool 0.00384 • Mull 0.00385 • Stop 0.00386 • Apron 0.00387 • Drop Ceiling Mtls. 0.00388 • Disappearing Stairs 0.00389 • Nails 0.00390 • Glue 0.00391 • Trim Labor Incl Shoe Mould and Undercut Doors 0.00392 0.00393 TOTAL INTERIOR DOORS AND TRIM (LINES 356 -391) 0.00394395396 PAGE TOTALS (LINES 351, 353, 393) 0.00

Page 9: Cost Estimate

397398399

400

UM = Unit Measure (ea, sq ft, etc.)

Click "Page 9" below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 10: Cost Estimate

Cost Estimate Page 8

Me Total0.00

0.00

INTERIOR DOORS AND TRIM0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

0.00 0.00

0.00 0.00

Page 11: Cost Estimate

Click "Page 9" below

1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and

Page 12: Cost Estimate

Cost EstimateDescription Qty Price UM Draw

401 HARDWARE402 • Entry Lockset 0.00403 • Bedroom Locksets 0.00404 • Bathroom Locksets 0.00405 • Passage Doorsets 0.00406 • Dummy Locksets 0.00407 • Deadbolts 0.00408 • Window Locks And Sash Lifts 0.00409 • Door Stops (Base Board) 0.00410 • Door Stops (Hinge Type) 0.00411 • Bath Accessories 0.00412 • Towel Holders 0.00413 • Soap Dish 0.00414 • Toothbrush Holder 0.00415 • Tumbler Holder 0.00416 • Medicine Cabinet 0.00417 • Shower Curtain Rod 0.00418 • Glass Fireplace Door 0.00419 • Hardware Labor 0.00420 0.00421 TOTAL HARDWARE (LINES 402-419) 0.00422423 CABINETS AND VANITIES424 • Wall Cabinets, Base Cabinets, and Vanities 0.00425 Including Installation 0.00426 • "Cultured" Marble Vanity Tops 0.00427 0.00428 TOTAL CABINETS AND VANITIES (PAGES 424-426) 0.00429430 PAINTING (Mtls and Labor) 0.00431432 WALLPAPER433 • Wallpaper 0.00434 • Labor Including Sizing And Paste 0.00435 0.00436 TOTAL WALLPAPER (LINES 433, 434) 0.00437438 WROUGHT IRON (Mtls and Labor) 0.00439440 GLASS441 • Mirror 0.00442 • Tub Enclosure 0.00443 • Shower Enclosure 0.00444 • Installation Of Glass Products 0.00445 0.00446 TOTAL GLASS (LINES 441-444) 0.00

Page 13: Cost Estimate

447448449 PAGE TOTAL (LINES 421, 428, 430, 436, 438, 446) 0.00450

UM = Unit Measure (ea, sq ft, etc.)

Click "Page 10" below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 14: Cost Estimate

Cost Estimate Page 9

Me TotalHARDWARE

0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

0.00 0.00

CABINETS AND VANITIES0.000.000.000.00

0.00 0.00

0.00

WALLPAPER0.000.000.00

0.00 0.00

0.00

GLASS0.000.000.000.000.00

0.00 0.00

Page 15: Cost Estimate

0.00 0.00

Click "Page 10" below

1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and

Page 16: Cost Estimate

Cost EstimateDescription Qty Price UM Draw

451 CERAMIC TILE - Materials and Labor452453 FLOORS AND FLOOR COVERINGS454 • Carpet Including Pads and Installation 0.00455 • Vinyl Tile Including Installation 0.00456 • Wood Floors Including Installation 0.00457 0.00458 TOTAL FLOOR COVERING (LINES 454-456) 0.00459460 SCREEN PORCH461 • Framing And Ceiling Materials 0.00462 • Screening 0.00463 • Screen Mould 0.00464 • Screen Door 0.00465 • Screen Door Hardware 0.00466 • Labor 0.00467 0.00468 TOTAL SCREEN PORCH (LINES 461-466) 0.00469470 DECK471 • Concrete (Footings) 0.00472 • Framing Materials 0.00473 • Decking 0.00474 • Handrail Materials 0.00475 • Nails 0.00476 • Labor 0.00477 0.00478 TOTAL DECK (LINES 471-476) 0.00479480 WALKS, DRIVES, AND PATIOS481 • Form Materials and Stakes 0.00482 • Wire Mesh 0.00483 • Joint Materials 0.00484 • Concrete 0.00485 • Labor 0.00486 • River Rock Or Other Special Finishes - Materials 0.00487 and Subcontract 0.00488 0.00489 TOTAL WALKS, DRIVES, PATIOS (LINES 481-487) 0.00490491492493494 PAGE TOTAL (LINES 451, 458, 468, 478, 489) 0.00495496

Page 17: Cost Estimate

497498499

500

UM = Unit Measure (ea, sq ft, etc.)

Click "Page 11" below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 18: Cost Estimate

Cost Estimate Page 10

Me Total

FLOORS AND FLOOR COVERINGS0.000.000.000.00

0.00 0.00

SCREEN PORCH0.000.000.000.000.000.000.00

0.00 0.00

DECK0.000.000.000.000.000.000.00

0.00 0.00

WALKS, DRIVES, AND PATIOS0.000.000.000.000.000.000.000.00

0.00 0.00

0.00 0.00

Page 19: Cost Estimate

Click "Page 11" below

1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and

Page 20: Cost Estimate

Cost EstimateDescription Qty Price UM Draw

501 LANDSCAPING502 • Subcontract - Includes: Finish Grading, 0.00503 Seeding, Sodding, Shrubs, Ground 0.00504 Covers, and Trees. 0.00505 • Other Landscape Construction (Retaining Walls, 0.00506 Steps, Etc.) Including Materials and Labor 0.00507 0.00508 TOTAL LANDSCAPING (502-506) 0.00509510 GUTTERS AND DOWNSPOUTS 0.00511512 CLEANING513 • Site Clean Up - Haul Trash 0.00514 • Clean Out House During Construction 0.00515 • Final House Cleaning Incl. Windows 0.00516 • Cleaning Brick and Concrete Surfaces 0.00517 0.00518 TOTAL CLEANING (LINES 513-516) 0.00519520 EQUIPMENT RENTAL 0.00521522 INSPECTIONS 0.00523524 SUPERINTENDING 0.00525526 CONTINGENCY 0.00527528529 PAGE TOTALS (LINES 508, 510, 518, 520, 522, 524, 526) 0.00530531532533534

535 GRAND TOTALS (FROM PAGE TOTALS) #REF!536537538539540541542543544545546

Page 21: Cost Estimate

547548549

550

UM = Unit Measure (ea, sq ft, etc.)

Click "Summary " below

© 1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and Summary Page Totals.

Page 22: Cost Estimate

Cost Estimate Page 11

Me TotalLANDSCAPING

0.000.000.000.000.000.00

0.00 0.00

0.00

CLEANING0.000.000.000.000.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00

#REF! #REF!

Page 23: Cost Estimate

Click "Summary " below

1990-2012 Home Building Answers

Note: For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the Price Column. Excel will do all of the other calculations including what will be paid for each item from your construction loan draw, the total for each item, Section Totals, Page Totals, and

Page 24: Cost Estimate

Cost EstimateDescription Draw Me

1 LAND Line 9 0.00 0.002 DESIGN Line 16 0.00 0.003 CONSTRUCTION LOAN Line 26 0.00 0.004 PERMITS Line 37 0.00 0.005 UTILITIES Line 45 0.00 0.006 SITE PREPARATION Line 57 0.00 0.007 FOOTINGS Line 64 0.00 0.008 FOUNDATIONS Line 79 0.00 0.009 SLAB Line 114 0.00 0.0010 SOIL TREATMENT Line 116 0.0011 FRAMING Line 176 0.00 0.0012 MASONRY WALLS Line 189 0.00 0.0013 ROOFING Line 210 0.00 0.0014 WINDOWS Line 213 0.0015 EXTERIOR DOORS Line 219 0.00 0.0016 CORNICE, VENEER, & EXTERIOR TRIM Line 264 0.00 0.0017 FIREPLACE Line 281 0.00 0.0018 ELECTRICAL Line 292 0.00 0.0019 APPLIANCES AND SPECIAL EQUIPMENT Line 317 0.00 0.0020 HVAC SYSTEM Line 326 0.00 0.0021 PLUMBING Line 336 0.00 0.0022 WELL Line 338 0.0023 SEPTIC TANK Line 340 0.0024 SOLAR SYSTEM Line 342 0.0025 INSULATION Line 351 0.0026 DRYWALL Line 353 0.0027 INTERIOR DOORS AND TRIM Line 393 0.00 0.0028 HARDWARE Line 421 0.00 0.0029 CABINETS AND VANITIES Line 428 0.00 0.0030 PAINTING Line 430 0.0031 WALLPAPER Line 436 0.00 0.0032 WROUGHT IRON Line 438 0.0033 GLASS Line 446 0.00 0.0034 CERAMIC TILE Line 45135 FLOORS AND FLOOR COVERINGS Line 458 0.00 0.0036 SCREEN PORCH Line 468 0.00 0.0037 DECK Line 478 0.00 0.0038 WALKS, DRIVES, AND PATIOS Line 489 0.00 0.0039 LANDSCAPING Line 508 0.00 0.0040 GUTTERS AND DOWNSPOUTS Line 510 0.0041 CLEANING Line 518 0.00 0.0042 EQUIPMENT RENTAL Line 520 0.0043 INSPECTIONS Line 522 0.0044 SUPERINTEND Line 524 0.0045 CONTINGENCY Line 526 0.0046

Page 25: Cost Estimate

47 GRAND TOTAL 0.00 0.004849

50

UM = Unit Measure © 1990-2012 Home Building Answers

Page 26: Cost Estimate

Summary

Total0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

0.000.000.000.000.000.000.000.000.000.000.00

Page 27: Cost Estimate

0.00

1990-2012 Home Building Answers