A) Some of the bidders had raised queries in the published tender specification. The Clarifications issued by BHEL are furnished below:
No Reference clause Existing provision Bidder’s query BHEL’s clarification
1) Techno commercial bid, Volume – I Book – I, Notice Inviting Tender Clause no 1.0 (v)
Extension of due date for offer submission
Please extend the date of submission of Bid by ten days
Extension of due date for offer submission could not be granted due to project requirement.
2) Technical Conditions of Contract (TCC) Volume IA, Part-I Chapter –V clause 1.5.11
The contractor at his cost shall arrange for grouting of anchor points of T & Ps issued to him. Necessary grout materials are to be arranged by the contractor at his cost.
Kindly clarify the type of grout material like GP1, GP2, Epoxy or Cement etc.
Grouting materials in line with Clause nos 1.12.9, 2.2.1.2 Sl no 5 and 2.2.2.3 Sl no 6 of TCC
3) TCC Volume IA, Part-I Chapter-XII clause 1.12.7
The contractor shall arrange for grouting of foundation bolt holes …….. .. ………. ……… ……….. ………. ……. ………. to take note of this aspect and quote accordingly.
Kindly clarify whether grouting of equipment is in Piping contractor scope.
Grouting of all equipments under the scope of this contract is to be arranged by the agency within quoted rates.
Corrigendum 2 dated Oct 13, 2016 to Tender Specification BHEL PSSR SCT 1640 Page 2 of 135
No Reference clause Existing provision Bidder’s query BHEL’s clarification
4) TCC Volume IA, Part-I Chapter-XV clause 1.14.2.50
Wherever drawings indicate site routing and site fabrication, such pipes (in general equal to and less than 2" dia) will be issued in running meters as straight length
Kindly Provide the size wise Pipe Length, Thickness and material specification and NDT percentage
These shall be as per drawings issued at site from time to time
5) TCC Volume IA, Part-I
The following PGMA has been referred:-
PGMA-80-307, 80-324, 80-336, 80-340, 80-341, 80-342, 80-343, 80- 344, 80-352, 80-355, 80-385, 80-395, 80-407, 80-419, 80-434, 80-449, 80-452, 80-454, 80-455, 80-463, 80-471, 80-477, 80-478, 80-480, 80-495, 80-545, 80-610, 80-612, 80-614, 80-604, 80-673, 80-816, 80-830, 80-901, 80-920, 80-921, 80-922, 80-928, 80-930, 80-933, 80-941, 80-942, 80-943, 80-992, 80-XXX
Field Weld Details are not available. Kindly provide the same.
Field / Erection Welding Schedule published in the TCC booklet stands deleted. However, Field / Erection Welding Schedule enclosed with this corrigendum is applicable.
EWS of PGMAs as given by the Manufacturing Unit is enclosed with this corrigendum.
6) TCC Volume IA, Part-II Chapter –I Sl.No. 2 Clause no 1.9.2
Modes of deposit of EMD i) Cash deposit as permissible under
Income Tax Act (before tender opening),
ii) Electronic Fund Transfer credited in BHEL account (before tender opening),
Kindly provide BHEL Bank Account details, for Electronic Fund Transfer.
Bank Name : State Bank of India, Saidapet Branch
Account No : 10610819499
IFS Code : SBIN0000912
Corrigendum 2 dated Oct 13, 2016 to Tender Specification BHEL PSSR SCT 1640 Page 3 of 135
No Reference clause Existing provision Bidder’s query BHEL’s clarification
7)
TCC Volume IA, Part-II chapter 3 Field / Erection Welding Schedule
PGMA 80-320 SI.No. 3, OD 965, Total No of Joints are 38 nos. and Thk. Is 22.23, 25, & 27 mm.
SI.No. 5, OD 965, Total No of Joints are 8 nos. and Thk. ls 42 & 50 mm.
Kindly provide the Joints details individual thickness wise.
For Pipes with same OD and different thickness, the estimated value of weld groove depth is indicated in the “Type of Weld” column. Bidder to calculate joint details accordingly. Approximate quantity of Electrodes required also has been indicated for each OD. Please note that Field / Erection Welding Schedule published in the TCC booklet stands deleted. However, Field / Erection Welding Schedule enclosed with this corrigendum is applicable.
PGMA 80-312 SI.No. 1, OD 660, Total No of Joints are 36 nos. and Thk. is 30 & 35 mm
PGMA 80-311 SI.No. 2, OD 762, Total No of Joints are 10 nos. and Thk. is 29 & 35 mm.
PGMA 80-310 SI.No. 2, OD 558, Total No of Joints are 38 nos. and Thk. is 22.7, 27 & 40 mm.
SI.No. 3, OD 762, Total No of Joints are 47 nos. and Thk. is 29, 45 & 32 mm.
SI.No. 4, OD 965, Total No of Joints are
23 nos. and Thk.is 35 & 42 mm
PGMA 80-304 SI.No. 1, OD 323.9, Total No of Joints are 33 nos. and Thk. Is 35 & 42 mm.
PGMA 80-301 SI.No. 1, OD 559, Total No of Joints are 30 nos. and Thk.8 is 54 & 60 mm.
SI.No. 2, OD 406.4, Total No of Joints are 14 nos. and Thk. Is 42, 45 & 50mm.
Corrigendum 2 dated Oct 13, 2016 to Tender Specification BHEL PSSR SCT 1640 Page 4 of 135
No Reference clause Existing provision Bidder’s query BHEL’s clarification
8) TCC Volume IA, Part-II chapter 3 Field / Erection Welding Schedule
PGMA 80-310 SI.no. 6, ID 800mm, and Thk. 43mm
As per your welding schedule Heat Treatment, NDT etc. not required. But Heat Treatment, NDT etc. is required. Kindly clarify.
Please refer EWS enclosed with this corrigendum, wherein the details are mentioned.
Please note that Field / Erection Welding Schedule published in the TCC booklet stands deleted. However, Field / Erection Welding Schedule enclosed with this corrigendum is applicable.
9) TCC Volume IA, Part-II chapter 4 Field / Erection Welding Schedule
PGMA 80-300 SI.no. 1, OD 368mm, and Thk. 32 mm
10) TCC Volume IA, Part-II chapter 5 Field / Erection Welding Schedule
PGMA 80-423 SI.no. 3, ID 300mm, and Thk. 100 mm
PGMA 80-424 SI.no. 2, ID 300mm, and Thk. 100 mm
All other conditions of the tender specification remain unchanged.
Bidders are requested to consider this corrigendum as part of tender specification and quote accordingly. -Sd- Sr.Manager / Subcontracts
CUST. NO:PGMA:CUST. DOC. NO.SYSTEM DESCRIPTION:
ID/OD TIGPart‐1 Part‐1 Size Qty (gms)Part‐2 Part‐2 mm mm Dia2.4 Dia2.5 Dia3.2 Dia4.0 in deg C in deg C
1‐80‐451‐21034
1‐80‐451‐21034
1‐80‐451‐21035
1‐80‐451‐21036
1‐80‐451‐21037
1‐80‐451‐21037
1‐80‐451‐21038
1‐80‐451‐21038
Rev.no. Date: Altered: Rev.no. Date: Altered:Approved: Approved:
REV. NO.DRAWING NO: SHEET NO:
4‐80‐451‐79632 01 OF 03
PIPE
FITTING
SA106GRC
SA234WPC
DESIGN/APPD. QA‐CHD./APPRD. DATE
7.11 TIG & ARC1003/REV03
ER70S‐A1
2332
E7018‐1
660 484 0
7.11
265 75 55 0
7.11
5 265 75 55 0
E7018‐1 1003/REV03
10% RT10
ER70S‐A1
10REFER NOTE‐3
NIL NIL(NIL)REFER NOTE‐
1
REFER NOTE‐3
REFER NOTE‐3
REFER NOTE‐3
NIL NIL(NIL)10% RT
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
10% RTREFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
NIL NIL(NIL)10% RT
REFER NOTE‐
1
REFER NOTE‐
1
S.ARUN SHARMA KONDAPA NAIDU R.SESHAGIRI
W.P.S no.
Sl.No.Drg. No. for weld
location
Description of parts to be welded
Matl. Spec.
Thick
Process of
Welding
Qty
Type of weldDimensions
4 7.11 TIG & ARC7.11
8
ER70S‐A1
TIG & ARC7.11
1 NIL(NIL)10% RT
REFER NOTE‐
1
ER70S‐A1 E7018‐1 1003/REV03
10 NIL NIL(NIL)10% RT
REFER NOTE‐
1318
Notes:(1) Refers to NDE Manual no. PSQ‐NDEM‐COM‐2010/R01(2) Drain & vent piping: 100% RT upto the last root valve. Beyond the last root valve, 10% RT is applicable.(3)100% LPI on all Butt welds after PWHT for Non‐P91 piping. 100% MPI on all Butt welds after PWHT for P91 piping.
00PREPARED BY DESIGN/CHD.
2 7.11
1855 525
10% RTREFER NOTE‐
1
REFER NOTE‐
1
E7018‐1 1003/REV03
10
10REFER NOTE‐3
44NIL
REFER NOTE‐
1
1696 480 352 0
REFER NOTE‐
1
REFER NOTE‐
1
1003/REV03
10 NIL NIL(NIL)10% RT
32
ERECTION/FIELD WELDING SCHEDULE
NEYVELI NEW THERMAL POWER PROJECT (NNTPP)
NEW NEYVELI
PROJECT:
NAME OF THE CUSTOMER:
Electrode filler spec.
Arc specQty(nos)
Acc. Norm. Ref.
RemarksRef. Spec. No.
Heat Treatment
7232 & 723380‐451
Min pre heat temp. Temp.
Hold time per mm in minutes
NDT method/Quantum
BOILER DRAINS
TIG & ARC7.11 ER70S‐A1 E7018‐1
ER70S‐A1 E7018‐1
1590 450 330 0
6 7.11 TIG & ARC
5 7.11 TIG & ARC
7 7.11SA106GRC
SA234WPC10 NIL NIL(NIL)
7.11
30
385 0NIL NIL(NIL)
1003/REV03
101003/REV03
1003/REV03
1855 525 385 0
ER70S‐A1
3 7.11E7018‐1ER70S‐A17.11
TIG & ARC
PIPE
PIPE
PIPE
FITTING
6 06690
35
5
35
7.11 TIG & ARC7.11
E7018‐1
OD
168.3
168.3
OD
OD
168.3
OD
168.3
OD
PIPE
SA106GRC
SA106GRC
SA106GRC
SA234WPC
SA106GRC
SA234WPC
SA106GRC
SA234WPB
SA106GRC
SA106GRC
SA106GRC
SA106GRC
PIPE
FITTING
PIPE OD
168.3
168.3
OD
168.3
OD
168.3
PIPE
FITTING
PIPE
PIPE
PIPE
FITTING
CUST. NO:PGMA:CUST. DOC. NO.SYSTEM DESCRIPTION:
ID/OD TIGPart‐1 Part‐1 Size Qty (gms)Part‐2 Part‐2 mm mm Dia2.4 Dia2.5 Dia3.2 Dia4.0 in deg C in deg C
1‐80‐451‐21049
1‐80‐451‐21049
1‐80‐451‐21049
1‐80‐451‐21049
1‐80‐451‐21049
1‐80‐451‐21049
1‐80‐451‐21050
1‐80‐451‐21050
Rev.no. Date: Altered: Rev.no. Date: Altered:Approved: Approved:
REV. NO.DRAWING NO: SHEET NO:
4‐80‐451‐79632 02 OF 03
PIPE
FITTING
SA335P22
SA234WP22
DESIGN/APPD. QA‐CHD./APPRD. DATE
12.7 TIG & ARC1014/REV03
ER90S‐B3
1620
E9018‐B3
450 720 0
12.7
106 30 22 0
7.11
10 490 140 240 130
E9018‐B3 1014/REV03
100% RT3% HARDNESS
150ER90S‐B3
150REFER NOTE‐3
700±202.5(60
MINUTES MINIMUM)
REFER NOTE‐
1
REFER NOTE‐3
REFER NOTE‐3
REFER NOTE‐3
NIL NIL(NIL)100% RT
3% HARDNESS
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
100% RT3% HARDNESS
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
700±202.5(60
MINUTES MINIMUM)
100% RT3% HARDNESS
REFER NOTE‐
1
REFER NOTE‐
1
S.ARUN SHARMA KONDAPA NAIDU R.SESHAGIRI
W.P.S no.
Sl.No.Drg. No. for weld
location
Description of parts to be welded
Matl. Spec.
Thick
Process of
Welding
Qty
Type of weldDimensions
12 8.6 TIG & ARC8.6
16
ER90S‐B3
TIG & ARC12.7
92.5(60
MINUTES MINIMUM)
100% RT3% HARDNESS
REFER NOTE‐
1
ER90S‐B3 E9018‐B3 1014/REV03
150 700±202.5(60
MINUTES MINIMUM)
100% RT3% HARDNESS
REFER NOTE‐
1432
Notes:(1) Refers to NDE Manual no. PSQ‐NDEM‐COM‐2010/R01(2) Drain & vent piping: 100% RT upto the last root valve. Beyond the last root valve, 10% RT is applicable.(3)100% LPI on all Butt welds after PWHT for Non‐P91 piping. 100% MPI on all Butt welds after PWHT for P91 piping.
00PREPARED BY DESIGN/CHD.
10 12.7
152 66
100% RT3% HARDNESS
REFER NOTE‐
1
REFER NOTE‐
1
E9018‐B3 1014/REV03
150
150REFER NOTE‐3
30700±20
REFER NOTE‐
1
750 225 435 0
REFER NOTE‐
1
REFER NOTE‐
1
1014/REV03
150 700±202.5(60
MINUTES MINIMUM)
100% RT3% HARDNESS
15
ERECTION/FIELD WELDING SCHEDULE
NEYVELI NEW THERMAL POWER PROJECT (NNTPP)
NEW NEYVELI
PROJECT:
NAME OF THE CUSTOMER:
Electrode filler spec.
Arc specQty(nos)
Acc. Norm. Ref.
RemarksRef. Spec. No.
Heat Treatment
7232 & 723380‐451
Min pre heat temp. Temp.
Hold time per mm in minutes
NDT method/Quantum
BOILER DRAINS
TIG & ARC21.95 ER90S‐B3 E9018‐B3
ER90S‐B3 E9018‐B3
108 30 48 0
14 7.11 TIG & ARC
13 12.7 TIG & ARC
15 21.95SA335P22
SA234WP22150 700±20
2.5(60 MINUTES MINIMUM)
12.7
2
54 0700±20
2.5(60 MINUTES MINIMUM)
1013/REV02
1501014/REV03
1014/REV03
1225 350 600 325
ER90S‐B3
11 12E9018‐B3ER90S‐B312
TIG & ARC
PIPE
PIPE
PIPE
FITTING
8 0192120
6
2
25
21.95 TIG & ARC21.95
E9018‐B3
OD
141.3
141.3
OD
OD
141.3
OD
114.3
OD
PIPE
SA335P22
SA335P22
SA335P22
SA234WP22
SA335P22
SA234WP22
SA335P22
SA234WP22
SA335P22
SA234WP22
SA335P22
SA335P22
PIPE
FITTING
PIPE OD
168.3
141.3
OD
168.3
OD
168.3
PIPE
FITTING
PIPE
FITTING
PIPE
FITTING
CUST. NO:PGMA:CUST. DOC. NO.SYSTEM DESCRIPTION:
ID/OD TIGPart‐1 Part‐1 Size Qty (gms)Part‐2 Part‐2 mm mm Dia2.4 Dia2.5 Dia3.2 Dia4.0 in deg C in deg C
1‐80‐451‐21050
1‐80‐451‐21050
1‐80‐451‐21094
1‐80‐451‐21094
1‐80‐451‐21114
1‐80‐451‐21114
1‐80‐451‐21116
1‐80‐451‐21116
Rev.no. Date: Altered: Rev.no. Date: Altered:Approved: Approved:
REV. NO.
SA335P22
SA234WP22
PIPE
PIPE
PIPE OD
141.3
114.3
OD
114.3
OD
141.3
PIPE
FITTING
PIPE
PIPE
PIPE
PIPE
FITTING
SA106GRC
SA234WPC
SA335P22
SA335P22
SA335P22
SA335P22
SA106GRC
SA234WPC
SA106GRC
SA106GRC
OD
114.3
273
OD
OD
168.3
OD
168.3
OD
06040
3
3
6
16 TIG & ARC16
E7018‐1
19 34E9018‐B3ER90S‐B334
TIG & ARC
PIPE
FITTING
PIPE
PIPE
2
150 700±202.5(60
MINUTES MINIMUM)
6.02
42
72 39700±20
2.5(60 MINUTES MINIMUM)
1003/REV03
101003/REV03
1014/REV03
318 90 138 24
ER70S‐A1
TIG & ARC16 ER90S‐B3 E9018‐B3
ER70S‐A1 E7018‐1
1118 882 0 0
22 6.02 TIG & ARC
21 6.02 TIG & ARC
23 16SA335P22
SA335P22
ERECTION/FIELD WELDING SCHEDULE
NEYVELI NEW THERMAL POWER PROJECT (NNTPP)
NEW NEYVELI
PROJECT:
NAME OF THE CUSTOMER:
Electrode filler spec.
Arc specQty(nos)
Acc. Norm. Ref.
RemarksRef. Spec. No.
Heat Treatment
7232 & 723380‐451
Min pre heat temp. Temp.
Hold time per mm in minutes
NDT method/Quantum
BOILER DRAINS
8700±20
REFER NOTE‐
1
82 28 48 64
REFER NOTE‐
1
REFER NOTE‐
1
1014/REV03
150 700±202.5(60
MINUTES MINIMUM)
100% RT3% HARDNESS
2
147 42
100% RT3% HARDNESS
REFER NOTE‐
1
REFER NOTE‐
1
E9018‐B3 1014/REV03
150
150REFER NOTE‐3
2.5(60 MINUTES MINIMUM)
100% RT3% HARDNESS
REFER NOTE‐
1
ER70S‐A1 E7018‐1 1003/REV03
10 NIL NIL(NIL)10% RT
REFER NOTE‐
1174
Notes:(1) Refers to NDE Manual no. PSQ‐NDEM‐COM‐2010/R01(2) Drain & vent piping: 100% RT upto the last root valve. Beyond the last root valve, 10% RT is applicable.(3)100% LPI on all Butt welds after PWHT for Non‐P91 piping. 100% MPI on all Butt welds after PWHT for P91 piping.
00PREPARED BY DESIGN/CHD.
18 9.27
S.ARUN SHARMA KONDAPA NAIDU R.SESHAGIRI
W.P.S no.
Sl.No.Drg. No. for weld
location
Description of parts to be welded
Matl. Spec.
Thick
Process of
Welding
Qty
Type of weldDimensions
20 21.95 TIG & ARC21.95
24
ER90S‐B3
TIG & ARC9.27
17
REFER NOTE‐3
REFER NOTE‐3
REFER NOTE‐3
NIL NIL(NIL)10% RT
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
100% RT3% HARDNESS
REFER NOTE‐
1
REFER NOTE‐
1
REFER NOTE‐3
NIL NIL(NIL)10% RT
REFER NOTE‐
1
REFER NOTE‐
1
63 0 0
6.02
2 106 30 46 8
E9018‐B3 1014/REV03
100% RT3% HARDNESS
150ER90S‐B3
10REFER NOTE‐3
700±202.5(60
MINUTES MINIMUM)
REFER NOTE‐
1
DRAWING NO: SHEET NO:
4‐80‐451‐79632 03 OF 03
PIPE
FITTING
SA335P22
SA234WP22
DESIGN/APPD. QA‐CHD./APPRD. DATE
8.6 TIG & ARC1014/REV03
ER90S‐B3
202
E9018‐B3
88 72 0
8.6