contested waterscapes in the mekong region: … · 2015-02-19 · contested waterscapes in the...

57
CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National University 18 August 2009

Upload: others

Post on 19-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

CONTESTED WATERSCAPES IN THE MEKONG  REGION: HYDROPOWER, LIVELIHOODS 

AND GOVERNANCE

Tira

ForanAustralian National University18 August 2009

Page 2: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Key Messages

The water resources of the Mekong region are increasingly contestedGovernments, companies, banks drive new investments; new financiers emergingroads, dams, irrigation schemes, navigation

These projects may provide benefits to wider society . . . but also pose multiple burdens and risks 

Millions of people depend on wetlands, floodplains and aquatic resourcesWe need to put infrastructure development in its place

Presenter
Presentation Notes
Notes: Mekong region = from the Irrawaddy and Nu-Salween in the west, across the Chao Phraya to the Lancang-Mekong and Red River in the east—
Page 3: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Contested Waterscapes: purpose and  themes

JustificationHow are large‐scale projects proposed, justified, and built? 

ContestationAre projects contested, and if so how? 

Governance regimesHow do specific governance regimes influence outcomes?

Presenter
Presentation Notes
Regimes: institutions, interests, discourses
Page 4: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Importance of narratives

Development policy is an attempt to make complex problems identifiable and uncertainty manageable.

Narratives = simple story lines of how a ‘problem’ has arisen and will unfold

hence what the necessary course of action should be

Development narratives are the ‘conventional wisdom’

deeply embedded; rarely challenged

Legitimise certain types of knowledge and action

Storytelling = how actors and institutions make claim to action and ownership over resources

Page 5: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Table of Contents

Page 6: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Introduction1

Presenter
Presentation Notes
Provides a short history of post-WWII river basin planning, focusing on the role of actors such as the USBR, US AID, and the Mekong Committee, which commissioned studies calling for large m/p dam projects on the mainstream and the tributaries This slide shows the massive Pa Mong, Kemarat, and Ban Koum projects on the mainstream (Pa Mong => 250,000 resettlement and was not built. However, many other projects on the tributaries WERE built beginning in the 1960s (Lam Pao, Nam Pong) and in succeeding decades (Pak Mun, Theun Hinboun, Nam Theun 2)
Page 8: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National
Presenter
Presentation Notes
Large dams were symbols of nation building & this was a popular vision w/wide *NEXT
Page 9: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

What is special about water resources development?

People are interconnectedPeople and ecosystems also are

Interventions in the hydrological cycle generate costs, benefits and risks

spread spatially and socially across the basin

Externalities are linked to changes in the water regime

in terms of quantity, quality, timing or sediment load

Page 10: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Old and new hydropower players in the Mekong Region

2

Presenter
Presentation Notes
Key messages:
Page 11: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Eleven hydropower schemes proposed on the lower Mekong

Credit: Thai CSOs

Page 12: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National
Presenter
Presentation Notes
However because of the Indochina war relatively few large dams were built This slide shows operating dams in RED, dams under construction in BLUE But the pace of developer interest is increasing again both 4 hydropower AND irrigation dams[*NEXT]
Page 13: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Nam Theun

2 dam (during construction)

Page 14: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Pak Mun

Dam: Perpetually Contested?3

Presenter
Presentation Notes
Pak Mun Dam = Thailand’s most controversial dam, involving disputes between state & civil society, between pro- and anti-dam villagers This chapter explores the history & politics of decision-making around this project Key messages: Pak Mun offers many lessons about decision making & democratization / - This dam, which was planned and implemented with low transparency and accountability, helped trigger an unfolding, emergent series of disputes. Disputes over Pak Mun helped democratize Thd. Decn making around what to do about Pak Mun, once it b/came disputed, has been directly influenced by a number of very basic policy argts, and indirectly influenced by the massive amount of knowledge generated by expert studies. One important example is the shifting justification of Pak Mun heard repeatedly over the years of the project. It took the form: ‘The project has already been approved . . . [or] ‘Construction has already started . . . [or] ‘The dam has already been built . . . so therefore the project must proceed.’ - Pak Mun shows that dependence on wild-capture aquatic resources persists. *would be nice to use a fisheries procession march image This important finding from relatively ‘modern’ Thailand implies hydropower development will lead to even stronger negative impacts for small farmers elsewhere in the Mekong region.
Page 15: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

During the “5 month, 9 day rally”Dec. 1994

After the “win-win”

opening solution, June 2004

Presenter
Presentation Notes
These two pictures encapsulate the history of struggle over PMD fairly well: Top picture: protest in late 1993, over compensation for loss of fisheries income during construction of the dam Bottom picture: open gates of PMD in 2004, outcome of successive rounds of mobilization
Page 16: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

The Nam Theun

2 Controversy and its Lessons for Laos

4

Presenter
Presentation Notes
This chapter is a mini-discussion or debate not just about NT2, but on the proper role of hydropower as a source of revenue to finance national economic development Key Messages:
Page 17: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Nam Theun

2 reservoir after impoundment

Page 18: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Damming the Salween

River5

Page 19: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Approximate location of proposed projects on Nu/Salween

Page 20: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Irrigation in the Lower Mekong Basin Countries: The Beginning of a New Era?

6

Presenter
Presentation Notes
All LMB countries have ambitious plans & schemes to expand irrgn, For example Thailand : plan to build underground pipeline that would divert water from the Mekong River to Isaan (Bangkok Post, 2008) was included by the government in the ‘top-priority’ mega-projects, with a total value of at least 500 billion baht (about US$15 billion). Cambodia: recent spike in food and fuel prices interest from outside actors but they face a number of problems, beginning w/ technical & economic problems:   Technical – in controlling water Economic problems: States want to reduce management costs . . . . . . But farmers’ incentives to take over schemes are a function of: Profitability of agriculture (which depends on other input costs / other opportunity costs / other uses of their labor)   (2) Institutional problems exist – there are challenges with respect to:   Genuine participation (vs. top-down design and water allocation) Capacity of farmers’ associations Coordination among agencies (e.g., Cambodia) Corruption   (3) Many reforms needed if want demand-driven, user-responsive systems
Page 21: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Irrigation canals: Attapeu, Southern Laos

Page 22: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Landscape transformations and new approaches to wetlands management in the Songkhram

River Basin7

Page 23: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Songkhram: changing waterscapes 

Blake 2008

Page 24: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Rich or poor: NR dependent  livelihoods

Page 25: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

The Delta Machine: Water Management in the Vietnamese Mekong Delta in Historical and Contem-

porary

Perspective

8

Page 26: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Mekong delta: “a work without end”

Biggs et al. / Kahonen

2008

Page 27: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Irrigation canal, Bac

Lieu, Mekong Delta

Page 28: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Delta farmers: intensification and differentiation

Page 29: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Hydropower in the Mekong Region: What are the Likely Impacts on Fisheries?

9

Presenter
Presentation Notes
Page 30: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

The ‘Greening of Isaan’: Politics, Ideology and Irrigation Development in the Northeast of Thailand10

Page 31: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Proposed Khong-Chi-Mun

project, late 1980s: 3 stages, 42 years, 800,000 ha

Page 32: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Proposed Water Grid project, 2003 (5 years , +16.5 million ha)

Page 33: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

The Promise of Flood Protection: Dikes and Dams, Drains and Diversions

11

Page 34: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National
Page 35: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Songs of the doomed: The Continuing Neglect of Capture Fisheries in Hydropower Development in the Mekong

12

Page 36: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National
Page 37: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

De-marginalizing the Mekong River Commission

14

Page 38: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

MRC organizational chart

Page 39: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

MRC Basin Development Plan Programme

(BDP) policy narrative:

“Sustainable development can be planned using IWRM principles”

IWRM principles:Participatory, pro-poor multi-stakeholder dialogueMulti-level and cross-sectoral collaborationMRC can build (via NMCs and line agencies) capacity to do so

Source: adapted from BDP 2009

Presenter
Presentation Notes
Page 40: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

The Anti-Politics of Mekong Knowledge Production

13

“The role of the MRC as a knowledge production agency . . . should not be to pretend to take the politics out of decision-making, but rather to foster a political dialogue between and within riparian countries that is informed by a better understanding of the implications of particular decisions . . . "

Page 41: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Contested Waterscapes: Where to Next? 15

Page 42: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Themes

Page 43: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

How are large‐scale projects  proposed, justified, and built?

Past: appeals to national securityGrand narratives of modernizationPresent: many old projects are being dusted off

rhetoric of mitigation, tradeoffs, and best practicesalso, argument that more investment in water infrastructure  povery alleviation‘development is inevitable’; ‘development cannot wait’existing benefits not recognized or downplayed Simplistic and unrealistic assumptions made in project feasibility studies; many examples of poor EIAs

Cases: Irrigation in NE Thailand & Vietnam Delta; Mekong mainstream dams cascade; Nam Theun 2

Page 44: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Justifications: our analysis

There is nothing “inevitable” about development . . . except serious negative impacts

Dominant justifications are simplistic

More balanced outcomes largely result from various forms of contestation

Small‐scale development is more sustainable

Need pro‐development fisheries narratives

Presenter
Presentation Notes
Promises of profitable cash crop production often amount to wishful thinking: assume farmers have ability to pay more for water; to grow cash crops requiring more inputs Assume labor inputs exis Assume marketing problems can be solved by contract farming during slack season
Page 45: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Are projects contested, and if so  how?

Multiple forms of contestation, reflecting overall development of civil society in the region: Resistance: weapons of the weak

E.g., Vietnam Delta ‐ reluctance to comply with state policy 

Analytical contestation (politics of knowledge)Contesting feasibility studies & IAsPromoting stronger standards

AdvocacyMedia campaignsCounter‐knowledge (Tai Baan)Civil disobedience

Cases: Pak Mun Dam, NT2 Dam, Rasi Salai, Hua Na

Presenter
Presentation Notes
A lot of politics revolves around how impacts are identified, framed, assessed, valued, mitigated and compensated. Social and environmental impacts are usually identified by (often mandatory) impact assessments. These studies are often not made available to the public, sometimes undertaken after construction has started, and premised upon an approach of mitigating impacts. Impact assessments are seen as a ‘bureaucratic ‘hoop’ to be jumped through in order to start construction, not as an authentic mechanism to decide whether or not the dam should be built’ (Friesen, 1999). States are often content to take impact assessments as just another perfunctory step towards project approval or completion. IMPORTANCE OF INTERESTS *Transition to governance regimes
Page 46: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Do specific governance regimes make a  difference to decision making?

General patternsPower highly concentrated among eliteRepression of civil society organizationsInterest‐driven decision makingLimited public dialogue

Pressure on lower levels of governmentThailand

Money politics  patronage & populist policies megaprojectsAd‐hoc decision making by the executive branch (vs. parliament)  many Cabinet resolutions, fewer laws

Page 47: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Five pathways to improving  governance

1 Produce knowledgeconventional science & alternative knowledge

2 Bridge different viewpoints by deliberationand negotiation

3 Establish rules, standards, and norms

4 Shift balance of power through advocacy

5 Promote transboundary management 

Presenter
Presentation Notes
Efforts at improving transboundary management of resources member countries have struggled to negotiate specific and meaningful rules for water utilization, project notification and the coordination of development plans (see chapter 14). For the most part members have successfully maintained a situation where they can pursue their own interests unfettered as much as possible by concerns of other states.
Page 48: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Acknowledgements

Photo credits: NASA (Siphandone); Khao

Sod Newspaper

(Pak Mun

protest); Buchita

(Pak Mun

protest 1994); Nu

river

advocates (Nu

river); MRC (1995 agreement); International

Rivers (NT2 and Lao fisher images); Book 2 contributors

Page 49: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

THANK YOU

Page 50: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

State-centered

governance

Society-centered

governance

participation

empowerment

Ma

CoSta

Shifting governance

Ma Co

Sta

• Deliberation• Advocacy• Norms• Knowledge production

• Institutions• Roles• Tools

G1G2

Page 51: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

(1) Engage in knowledge production

Few Mekong river fish were regarded as migratory in the 1960s (Hori, 2000)

vs.specialists now estimate ‘that over 70 percent of the total fish catch in the Lower Mekong Basin is dependent on long distance migrant species’

(Dugan, 2008).

• Modelling

• Scenarios

• Impact assessments

Page 52: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

(1) Engage in knowledge production

Narratives and counter narratives & the politics of knowledge

1.Documenting the impact of the Yali

Falls dam in Cambodia

2.Thai Baan research

3.Kaeng

Sua

Ten dam on the Yom River in upper northern Thailand ‘to protect Bangkok from flooding’

4.Fisheries as a doomed resource

5.Northeast Thailand as a desert waiting to bloom

Page 53: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

(2) Discussing and debating alternatives

"Deliberative democracy", social learning

1.‘Exploring Water Futures Together’

2006 dialogue

2.Watershed committees; participatory river basin management

3.MRC Hydropower Forum in 2008

Page 54: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

Participatory governance?

Page 55: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

(3) Promoting standards

Constraining/guiding powerful actors' behaviour

1.Integrated Resource Planning (IRP)2.World Bank and ADB code of conducts3.Voluntary codes of conduct for financial institutions: e.g., Equator principles, Carbon principles4.2009 Sustainability Assessment Protocol (International Hydropower Association)5.Guidelines for Chinese companies working abroad (developed by Global Environment Institute)6.Aarhus

Convention

Page 56: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

(4) Advocacy

Shifting the power balance, exposing unethical behaviours, promoting transparency, struggling for compensations, proposing alternatives, etc.

1.NGOs (TERRA, SEARIN, IR, etc)

2.The Assembly of the Poor

3.Academics

Page 57: CONTESTED WATERSCAPES IN THE MEKONG REGION: … · 2015-02-19 · CONTESTED WATERSCAPES IN THE MEKONG REGION: HYDROPOWER, LIVELIHOODS AND GOVERNANCE Tira Foran Australian National

(5) Transboundary

water management

Agreements, rules of conduct between riparian countries

1.Agreements between riparian countries

2.Increase transparency in decision-making

3.Preventing free-riding