320 North Halstead Street Pasadena, California 91107

www.pathwaysedu.org

Construction Buildout & Renovation

REQUEST FOR PROPOSAL

Tommie Joe Chief Operations Officer

Pathways Management Group [email protected]

(626) 204-2514

Page 2: Construction Buildout & Renovation

Table of Contents

INTRODUCTION Company Background & Objective Learning Center Locations

REQUEST FOR PROPOSAL

Purpose Objective Scope of Service Calendar of Events Limitation of Liability

RFP RESPONSES

Notice of Intent to Bid Formal Bid Proposal Submission

RFP FORMAT ATTACHMENTS Attachment A: Project Schedule Attachment B: Sample Reports Attachment C: Sample Layout Attachment D: Material Specifications Attachment E: Cost Calculation Worksheets

Page 3: Construction Buildout & Renovation

Introduction Company Background & Objective

Pathways In Education (PIE) is a non-profit organization that partners with public schools and other organizations to provide dropout recovery and prevention programs, including:

• Schools utilizing a blended learning model, combining independent study and small group instruction

• College tours and workshops • Multi-day, cultural immersion trips • Experiential programs and activities that help students learn teamwork, resiliency,

leadership, self-confidence, and communication Pathways In Education is managed by Pathways Management Group which manages over 30 schools in California, Arizona, Idaho, Tennessee, Illinois, Louisiana and South Carolina. The education model that Pathways uses has been in operation in California since 1987. Pathways Founders have dedicated their lives to helping at-risk students. Simply put, we are singularly focused on teenagers who are in danger of dropping out of school through our education model and other student programs. The PIE schools’ governance requires that all spending be approved by the PIE boards. Board meetings occur once every quarter.

Page 4: Construction Buildout & Renovation

Learning Center Locations

PMG Corporate Office | 320 N. Halstead Street, Pasadena, CA 91107

Pathways In Education Charter Schools & Respective Learning Centers

PIE – Arizona

• Phoenix | 2226 N 7th St. Phoenix, AZ 85006

PIE – Illinois • Ashburn | 3284 W 87th St. Chicago, IL 60652 • Avondale | 3100 W Belmont Ave. Chicago, IL 60618 • Brighton Park | 3214 W 47th St. Chicago, IL 60632

PIE – Tennessee

• Frayser | 3156 N Thomas St. Memphis, TN 38127 • Whitehaven | 47001 Elvis Presley Blvd. Memphis, TN 38116

PIE – Idaho

• Nampa | 104 Holly St, Ste 124, Nampa, ID 83686

PIE – South Carolina • TBD | TBD

Page 5: Construction Buildout & Renovation

Request for Proposal Purpose

Pathways Management Group (PMG) is requesting proposals from Construction Companies (“Vendors”) for commercial construction Tenant Improvement (TI) projects. PMG intends to enter into a one year agreement with an option of a subsequent three year extension with a single construction company for the TI projects of the Pathways in Education charter schools it manages.

Objective

PMG is looking for a comprehensive TI project solution for the charter schools it manages. Due to the continual influx of TI projects for Pathways in Education (PIE), PMG no longer has the capacity or the expertise to manage contractors and sub-contractors, the permitting process, hire architectural designers, and see that the job is completed on schedule and within budget. PMG is looking to hire a Vendor to manage all aspects of construction TI projects for a one year period with an option of a three year extension for the PIE schools.

The PIE centers that require construction services are currently located in the states of Arizona, Idaho, Illinois, Tennessee and South Carolina. The Vendor must have connections and/or offices already established near the learning center locations and be willing to travel to these regions to service and support the various learning center locations when needed.

Scope of Service

All responses should be structured to address how the organization will meet the following objectives and scope:

PMG is looking for a Vendor to provide a comprehensive construction solution for the TI Projects of PIE schools. A typical TI Project is for renovations for new learning centers. In an average year, PIE has approximately three TI Projects.

An example of the typical TI Project building specifications can be found in Attachment B; and material specifications in Attachment C. The Vendor would be responsible for the entirety of each construction project annually – typically consisting of demolition, framing, drywall, MEP’s and OMB’s, paint, flooring and T-Bar ceiling install. Please see Attachment A for a typical PIE project schedule. The Vendor can choose to adjust their per square foot quote based on a sliding scale of total TI Project square footage (see Attachment D for an example). However, learning centers typically range from 4,000-8,000 square feet.

Page 6: Construction Buildout & Renovation

Calendar of Events

The following calendar of events is our best guess as to the timeline and milestones for the appropriate actions and decisions. PMG reserves the right to alter or modify this calendar without cause or notice.

Distribution of RFP Thursday, July 13, 2017 Confirmation of Intent to Bid email Monday, July 17, 2017 Question Deadline Tuesday, July 18, 2017 Completed RFP submission Friday, July 21, 2017 Identification of 3 to 4 final vendors Friday, July 28, 2017 Written recommendation submitted to Board Friday, August 4, 2017 Board Presentations and Vendor Selection September 2017

Limitation of Liability

PMG shall not be liable or responsible for any and all expenses incurred by any vendor in response to this RFP. This RFP does not constitute a billable engagement or a valid contract. This RFP shall be solely an invitation to participate in this evaluation of Property Management for PIE Learning Centers. PMG reserves the right to reject any and all proposals without liability.

Page 7: Construction Buildout & Renovation

RFP Responses PMG’s objective in receiving a response to this RFP from each Vendor is to evaluate the compatibility between PIE and the Vendor. PMG will evaluate each response it receives based on criteria it finds important and relevant to the request. Those criteria could range from cost, overall comprehensive solution, experience, key personnel, technical approach, efficacy, efficiency, or any other criteria the review staff deems important. PMG will be placing significant emphasis upon the proposal response format and content as well as the total cost summary. Please use this as your overview and roadmap through the RFP process. Notice of Intent to Bid

If there is an intent to bid after reviewing the RFP, please notify PMG’s Chief Operations Officer, Tommie Joe via email to formally notifying PMG of your intention to bid. The intent to bid must be received no later than 5:00pm (PST) on Monday, July 17, 2017.

Formal Bid Proposal Submittal

All proposals must be submitted no later than 5:00pm (PST) on Friday, July 21, 2017 to the office of Tommie Joe. Electronic copies must be sent via email to [email protected]. Hard copies can be mailed to: Attn: Tommie Joe, COO

320 N. Halstead St., Ste 220 Pasadena, California 91107

If additional information is needed, please submit all inquiries via email to Tommie Joe at [email protected]. Please include the subject line of “PIE Construction RFP”. All questions will be compiled and answers to all questions will be sent out to all bidders. All materials provided to PMG become the property of PMG and may be returned at its sole discretion. PMG reserves the right to disqualify or reject any proposal that does not completely fulfill the submission requirements. Acceptance of any proposal will be at PMG’s sole discretion, with or without cause. Furthermore, PMG reserves the right to negotiate all terms, conditions and compensation under this RFP. The contract, if any, shall be awarded to the Vendor whose proposal is most advantageous to PIE. PMG may at its sole discretion select the response that best fits its needs and may choose to cancel the RFP.

Page 8: Construction Buildout & Renovation

RFP Format Vendors must submit formal bid proposals in strict conformance with the format, headings and procedure as stated below:

1.1 Overall Goals and Objectives Provides a chance for the vendor to acknowledge PMG’s

goals and objectives of the RFP 1.2 Background Provides a summary of the vendor’s background 1.3 Terms and Conditions Provides a high-level summary of the proposed terms and

conditions for executing a contract (may include a copy of a proposed contract for consideration)

1.4 Processes Provide processes for Change Orders, Status Reports, Communication, WBS (Work Breakdown Structure)

2.1 Pricing Provides pricing per square foot

2.2 Cost Management Provide policies and sample calculations for Do Not Exceed, Risk Assessment, Contingency Funds

2.3 Payment Schedule Please provide a payment schedule (i.e., typical Draw schedule)

3.1 Vendor Capabilities Provides a discussion of the vendor's capabilities and indicates intention to sub-contract for various services

3.2 Delivery of Products and Services as Contracted

Vendor describes how it will fulfill the requirements as stated in the RFP

3.3 Industry Experience Vendor describes its experience with similar customer requirements and provides examples if possible

3.4 Sample Project Provides an example of a project with a similar scope. Include timeline estimates and actuals, estimated costs,

actual costs, etc. 4.1 Project Team Vendor provides names and biographies about the project

team members 4.2 Management Personnel Vendor provides names and biographies about project

leadership, as well as company leadership 4.3 Cultural Compatibility Vendor states how it will accommodate to customer

cultural issues, such as dress codes and working hours 4.4 Special Requirements Vendor provides any additional information regarding

special situations such as emergencies or if a situation arises that is outside of the scope of the contract.

Page 9: Construction Buildout & Renovation

Attachment A

Attachment A: Project Schedule

Description Duration Need

Contractor To Pull Permit from the City Scheduling/Timeline for Carpet, Doors, Hardware, Glass Inserts,

Cabinets and new MEP Complete Architectural Drawings (See Attachment A2) Safe off existing Mechanical, Electrical, and Plumbing

Demolition Frame Walls

Rough Electrical Rough Plumbing

Drywall/Windows Doors

Tee-Bar, lighting and Ceiling Tiles ADA Concrete Ramp from Street to Center

Painting Carpet, Tile, Sheet Vinyl and Cove Base

Punch-Walk Completion and Substantial Completion Finishes

Safe off existing Mechanical, Electrical, and Plumbing Demolition and Concrete Saw Cutting

Interior Barricade & Temporary Shoring Wall (if needed) Frame Walls

Electrical ADA AC Paving and Signage

Tee-Bar, lighting and Ceiling Tiles Painting

Concrete Ramp Asphalt Scope of Work Punch-Walk Completion & Substantial Completion

Close-out package & Punch Walk Inspection

Page 10: Construction Buildout & Renovation

Attachment A2:

Description of Work as per Architectural Drawings Sheet # Description Duration Needed

T-1.0 Architectural Title Sheet T-1.1 Letter of Approval T-2.0 Commercial Accessibility T-2.1 Commercial Accessibility Notes T-3.0 ADA: Doors and Maneuvering T-3.1 ADA: Restrooms and Drinking Fountains T-3.2 ADA: Details for Signs A-1.0 Site Plan A-1.1 Enlarged ADA Complying Parking A-1.2 Enlarged ADA Ramp Plan A-2.0 As-Built/Demo Floor Plan A-2.1 As-Built/Demo Ceiling Plan A-3.0 Proposed Floor Plan A-3.1 Proposed Ceiling Plan A-3.2 Proposed Electrical Plan D-1.0 Details D.1.1 Details E-1.0 Electrical Notes & Symbols E-2.0 Single Line Diagram & Load Calc's E-3.0 Lighting Plan E-4.0 Power Plan E-5.0 Photometric Plan E-6.0 Title 24 Energy Calculations E-6.1 Title 24 Energy Calculations M-1 Mechanical General Notes M-2 Proposed Floor Plan- Duct Plan M-3 Proposed Floor Plan- Roof Plan M-4 Details P-1 Plumbing General Notes and Specifications P-2 Waste & Water Plan P-3 Cold Water & Hot Water Plan P-4 Waste and Water, Cold and Hot Water Riser Plans

Page 11: Construction Buildout & Renovation

Attachment B: Sample Reports

Page 12: Construction Buildout & Renovation

Page 1 of 1

ASSUMPTION AND CONSTRAINT LOG Project Title: Date Prepared:

ID Category Assumption/Constraint Responsible

Party Due Date Actions Status Comments

Page 13: Construction Buildout & Renovation

Page 1 of 1

CHANGE MANAGEMENT PLAN

Project Title: Date Prepared:

Change Management Approach:

Definitions of Change: Schedule change:

Budget change:

Scope change:

Project document changes:

Change Control Board: Name Role Responsibility Authority

Change Control Process: Change request submittal

Change request tracking

Change request review

Change request disposition

Attach relevant forms used in the change control process.

Page Date Version

Page 14: Construction Buildout & Renovation

Page 1 of 3

CHANGE REQUEST

Project Title: Date Prepared:

Person Requesting Change: Change Number: Category of Change:

Detailed Description of Proposed Change

Justification for Proposed Change

Impacts of Change

Scope

Description:

Grade

Description:

Scope

Cost

Quality

Schedule

Requirements

Documents

Increase Decrease Modify

Increase Decrease Modify

Page 15: Construction Buildout & Renovation

Page 2 of 3

CHANGE REQUEST

Requirements

Description:

Cost

Description:

Schedule

Description:

Stakeholder Impact

Description:

Project Documents

Comments

Increase Decrease Modify

Increase Decrease Modify

Increase Decrease Modify

High risk Low risk Medium risk

Page 16: Construction Buildout & Renovation

Page 3 of 3

CHANGE REQUEST Disposition

Justification

Change Control Board Signatures

Name Role Signature

Date:

Approve Defer Reject

Page 17: Construction Buildout & Renovation

Page 1 of 4

PROJECT PERFORMANCE REPORT

Project Title: Date Prepared:

Project Manager:

Sponsor:

Accomplishments for This Reporting Period

1.

2.

3.

4.

5.

6.

Accomplishments Planned but Not Completed This Reporting Period

1.

2.

3.

4.

Root Cause of Variances

Page 18: Construction Buildout & Renovation

Page 2 of 4

PROJECT PERFORMANCE REPORT

Impact to Upcoming Milestones or Project Due Date

Planned Corrective or Preventive Action

Funds Spent This Reporting Period

Root Cause of Variances

Page 19: Construction Buildout & Renovation

Page 3 of 4

PROJECT PERFORMANCE REPORT

Impact to Overall Budget or Contingency Funds

Planned Corrective or Preventive Action

Accomplishments Planned for Next Reporting Period

1.

2.

3.

4.

Costs Planned for Next Reporting Period

Page 20: Construction Buildout & Renovation

Page 4 of 4

PROJECT PERFORMANCE REPORT

New Risks Identified

Risk

Issues

Issue

Comments

Page 21: Construction Buildout & Renovation

Page 1 of 4

TEAM MEMBER STATUS REPORT

Project Title:

Date Prepared:

Team Member:

Role:

Activities Planned for This Reporting Period

1.

2.

3.

4.

5.

6.

Activities Accomplished This Reporting Period

1.

2.

3.

4.

5.

6.

Activities Planned but Not Accomplished This Reporting Period

1.

2.

3.

4.

Page 22: Construction Buildout & Renovation

Page 2 of 4

TEAM MEMBER STATUS REPORT Root Cause of Variances

Funds Spent This Reporting Period

Funds Planned to Be Spent This Reporting Period

Page 23: Construction Buildout & Renovation

Page 3 of 4

TEAM MEMBER STATUS REPORT Root Cause of Variances

Quality Variances Identified This Period

Planned Corrective or Preventive Action

Page 24: Construction Buildout & Renovation

Page 4 of 4

TEAM MEMBER STATUS REPORT Activities Planned for Next Reporting Period

1.

2.

3.

4.

5.

Costs Planned for Next Reporting Period

New Risks Identified

Risk

Issues

Issue

Comments

Page 25: Construction Buildout & Renovation

Page 1 of 2

VARIANCE ANALYSIS Project Title: Date Prepared:

Schedule Variance

Planned Result Actual Result Variance

Root Cause

Planned Response

Cost Variance

Planned Result Actual Result Variance

Page 26: Construction Buildout & Renovation

Page 2 of 2

VARIANCE ANALYSIS

Root Cause

Planned Response

Quality Variance

Planned Result Actual Result Variance

Root Cause

Planned Response

Page 27: Construction Buildout & Renovation

Attachment C

Page 28: Construction Buildout & Renovation

ATTACHMENT E Cost Calculation Worksheet

TypicalPIE TI Project

Quantity Sq Ft each Sq ft % of sq ft Three (3) SGI Rooms (450 sq. ft. each) 3 450 1350 19.3% One (1) Plumbed Lab (450 sq. ft) 1 450 450 6.4% One (1) Office (120 sq. ft.) 1 120 120 1.7% One (1) Conference Room (120 sq. ft.) 1 120 120 1.7% One (1) Break Room (150 sq. ft.) 1 150 150 2.1% One (1) IT/Storage Room (120 sq. ft.) 1 120 120 1.7% Two multi-fixture bathrooms (130 sq. ft. each)* 2 130 260 3.7% Classroom (Open) 1 Remainder 4430 63.3% Total Square Footage 7,000 100% EXCEPTIONS: (Sliding scale) Typical TI Project Cost per sq. ft. $_________________ Required

Typical TI Project (______% larger/ smaller) Cost per sq. ft. +/- $ ______________

Not required

Typical TI Project (______% larger/ smaller) Cost per sq. ft. +/- $ ______________

Not required

Typical TI Project (______% larger/ smaller) Cost per sq. ft. +/- $ ______________

Not required

Typical TI Project (______% larger/ smaller) Cost per sq. ft. +/- $ ______________

Not required

Typical TI Project (______% larger/ smaller) Cost per sq. ft. +/- $ ______________

Not required

Addition of CTE participation Cost per sq. ft. +/- $ ______________

Not required

EXCEPTIONS:

Each additional SGI Rooms (450 sq. ft.) Additional flat cost $_________________

Each additional Plumbed Lab (450 sq. ft) Additional flat cost $_________________

Each additional Office (120 sq. ft.) Additional flat cost $_________________

Each additional Conference Room (120 sq. ft.) Additional flat cost $_________________

Each additional Break Room (150 sq. ft.) Additional flat cost $_________________

Each additional IT/Storage Room (120 sq. ft.) Additional flat cost $_________________

Each additional multi-fixture bathrooms (130 sq. ft.) Additional flat cost $_________________