Community water management: The key to unlocking the produc7on poten7al of the polder ecosystems in Bangladesh Manoranjan Mondal Elizabeth Humphreys T P Tuong SCL

DESCRIPTION

By Manoranjan Mondal, Elizabeth Humphreys, TP Tuong Revitalizing the Ganges Coastal Zone Conference 21-23 October 2014, Dhaka, Bangladesh http://waterandfood.org/ganges-conference/

TRANSCRIPT

Page 1: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Community  water  management:  The  key  to  unlocking  the  produc7on  poten7al  of  the  polder  ecosystems  in  Bangladesh  

 Manoranjan  Mondal    Elizabeth  Humphreys  

T  P  Tuong  

SCL  

Page 2: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

M   J   J   A   S   O   N   D   J   F   M   A   M   J  

         T.  Aman  (140-­‐160  d)          

         Rabi  (130-­‐140  d)          

Deep  flooding  at  the  beginning  of  rainy  season  constrains  the  establishment  of  aman  rice  and  adop6on  of  modern  HYV  rice  

Prolonged  water  logging  at  the  end  of  rainy  season  delay  establishment    and  risky  harvest  of  rabi  crop  

Beginning  of  cyclone  period  

Crop  &  water  management-­‐causes  of  low  produc6vity  

0  

10  

20  

30  

40  

End-­‐Jan  

Mid-­‐Feb

 

End-­‐Feb  

Mid-­‐M

ar  

End-­‐Mar  

Mid-­‐Apr  

End-­‐Ap

r  

Mid-­‐M

ay  

End-­‐May  

Soil  moisture  (%

)  

PWP  

FC  

Page 3: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Sesame  seeds  were  broadcast  during  14-­‐28  February  2013  

Page 4: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Damaged  sesame  field  in  pilot  watershed  on  25  May  2013  

Page 5: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Major  Ac6vi6es  

Page 6: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Selec7on  of  the  water  management  unit  

6  

Sluice  gate  

Page 7: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

River

Sluicegate

Road

Rural  road

Canal(khal)

Drainage  canal

Outlet

6  ha  pilot  water  management  unit  on  polder  30  

7  

•  Obtain  the  agreement  to  create  a  hydrologically  separate  watershed    &  operate  the  sluice  gate  systema6cally  

 

Page 8: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Construction of drainage outlet and drainage canals

•  Constructed  internal  drains/bunds  to  separate    high  and  low  land.  

•  Constructed  drains  along  the  perimeter  of  the  watershed.  

•  Constructed  drainage  outlet  .        

Page 9: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

•  Obtained  the  agreement  of  the  farmers  to  grow  – HYV  rice    – High  value  and  tradi7onal  rabi  crops  

 in  the  watershed  area  •  Provided  seed  &  training  

in  recommended  management  for  rice  and  rabi  crops  

•  Provided  year-­‐round  coaching      

 

What  we  have  done  to  improve  produc7vity  of  coastal  BD?  

9  

Page 10: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Major  Achievements  

Page 11: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Rice  submerged  twice  in  2012  

Page 12: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

•  Farmers  operated  the  sluice  gate  systema6cally  to  quickly  drain  out  excess  water  during  the  rainy  season  

•  BUT  couldn’t  drain  on  6me  for  rabi  establishment  because  of  late  maturing  tradi6onal  varie6es  

 

Drainage  during  aman  season  

Page 13: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

13  

Tradi7onal  varie7es  mature  late  (photoperiod  sensi7ve)  

HYV  –  ready  for  harvest  

Tradi7onal  (local)  

Page 14: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

0  20  40  60  80  

100  120  140  160  180  200  220  240  

Rainfall  &  W

ater  dep

th  (m

m)   Target  drainage  6me  –  but  irriga6on!  

because    local  variety  late  maturing  

Transplan6ng  

Surface  water  gone  but  weather  cold,  foggy,  soil  too  wet  for  6llage  

Late  drainage  at  the  end  of  wet  season    soil  too  wet  for  early  rabi  crop  establishment  

Page 15: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Sunflower  established  on  1st  January  2013,  harvested  before  cyclone  (yield  =  1.5  t/ha)    

Page 16: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Maize  established  on  24  February  2013  was  in  late  grain  filling  at  6me  of  rains  &  farmer  harvested  5  t/ha  (~  1/2  fer6liser  

rate!)  

Page 17: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Rainfall  at  Kismat  Fultola,  Ba7aghata,  Khulna  Rabi  season  2012-­‐13    

0  

10  

20  

30  

40  

50  

60  

70  

1-­‐Dec   1-­‐Jan   1-­‐Feb   1-­‐Mar   1-­‐Apr   1-­‐May   1-­‐Jun  

Rainfall  (m

m)  

Page 18: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Damaged  Sesame  field  in  pilot  watershed    

Page 19: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Damaged  mungbean  field  in  pilot  watershed  

Page 20: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Damaged  sunflower  field  in  pilot  watershed  on  31  May  2013  

Page 21: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

HYV  Rice  (Recommended  mngt)

Traditional  +  HYV  Rice  (Farmers’  mngt)

Stocked  FISH  in  6  ha  –both  areas

(Tilapia,  Mola)

Aman  2013:  Selected  1  ha  sub-­‐pilot  

21  

Page 22: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Aman  Rice  in  2013:  ~  5-­‐6  t/ha  from  HYV  

Page 23: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Early  establishment  of  rabi  crops  in  2013-­‐14  at  Kismat  Fultola,  Khulna    

Page 24: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Wheat  in  pilot  watershed  at  Kismat  Fultola,  Ba6aghata,  Khulna,  Rabi  season  2012-­‐13  

Page 25: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Good  growth  of  early  established  sunflower  in  rabi  season  2013-­‐14  

Page 26: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Yield  of  Maize  and  Sunflower  at  Kismat  Fultola,  Ba6aghata,  Khulna,  Rabi  season  2013-­‐14  

0  

1  

2  

3  

4  

5  

6  

Maize   Sunflower  

Yield  (t/ha)  

Page 27: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Rainfall  at  Kismat  Fultola,  Ba7aghata,  Khulna,    Rabi  season  2013-­‐14  

0  

20  

40  

60  

80  

100  

120  

140  

1-­‐Dec   1-­‐Jan   1-­‐Feb   1-­‐Mar   1-­‐Apr   1-­‐May   1-­‐Jun  

Rainfall  (m

m)  

Page 28: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Poor  growth  of  late  established  sesame  due  to  lack  of  soil  moisture  and  rainfall  in  rabi  season  2013-­‐14  

Page 29: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Challenges  

Page 30: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

•  Soil  drying  •  Tillage  equipments  •  Soil  cracking  •  Fer6lizer  applica6on  –  N  topdressing  •  Water  quality  

None  address  produc7on  issues  with  WUA??      

Major  Challenges  

Page 31: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Soil  drying  is  a  major  problem:  Perched  WT  is  high,  low  EV,  slow  internal  drainage  

0  5  

10  15  20  25  30  35  

Soil  moisture  (%

)  

PWP  

Field  Capacity  

Page 32: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

•  Land  was  ready  for  plowing  in  mid-­‐February  2013  •  But    

–  Small  tractor  owners  increased  price  (x2)  of  6llage  when  they  knew  the  farmers  wanted  to  prepare  the  land  early  &  quickly.  

–  Farmers  had  to  wait  for  more  than  a  week  for  big  tractor  to  come  down  from  further  north  (Jessore)  where  agriculture  is  intensified  for  land  prepara6on.  

Tillage  for  rabi  crop  cul7va7on  

Page 33: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

No  7ll  seems  good,  but  soil  cracked  -­‐  damaged  roots  and  ineffec7ve  N  topdressing  

Page 34: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

0  

5  

10  

15  

20  

25  Water  Salinity

 (dS/m)  

Saline  irriga7on  water  Canal  water  EC  at  Kismalultola,  Khulna  

Page 35: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Concluding  Remarks  

•  An  individual  cannot  successfully  modify  their  cropping  system  schedule  and  adopt  improved  agricultural  technologies  in  coastal  polders  due  to  the  prevailing  hydrology.        

•  Requires  community  coordina6on  at  a  range  of  scales  –  within  small  hydrological  units,  within  a  sub-­‐polder,  and  at  the  sub-­‐polder  scale.    – Many  considered  the  catchment  is  hydraulically  separated  

–  In  reality  it  is  not  in  polders  

Page 36: Community water management: the key to unlocking the production potential of the polder ecosystems in Bangaldesh

Concluding  Remarks  

•  Further  engagement  with  polder  communi6es  is  needed  to  determine    – how  to  empower  them  with  the  ability  to  adopt  improved  cropping  systems  selected  by  them  from  the  suite  of  available  op6ons    

– how  to  address  social  and  environmental  challenges  for  higher  produc6vity  and  farm  income  .  