columbia area metropolitan planning organization

44
Columbia Area Metropolitan Planning Organization FY 2009 Annual Listing of Obligated Projects October 1, 2008 September 30, 2009 Approved by the CMCOG Board June 24, 2010 The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the State Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation.

Upload: others

Post on 12-Sep-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Columbia Area Metropolitan Planning Organization

Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects 

 October 1, 2008 – September 30, 2009

  

Approved by the CMCOG Board 

June 24, 2010 

The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the State Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation.

Page 2: Columbia Area Metropolitan Planning Organization
Page 3: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 3

COLUMBIA AREA METROPOLITAN PLANNING ORGANIZATION FY 2009 Annual Listing of Obligated Projects

TABLE OF CONTENTS

Central Midlands Council of Governments Overview ................................................................................ 7 Propose of this Report ................................................................................................................................. .8 Economic Stimulus Projects (ARRA) ........................................................................................................ .9 Resurfacing in Lexington & Richland .................................................................................... 11 Interstate Maintenance on I-20 & I-77 .................................................................................... 11 ITS in Lexington on I-26 & I-77 ............................................................................................. 11 Pavement Marking on I-20 & I-77 in Richland ...................................................................... 12 Safety Projects ......................................................................................................................... 12 Guideshare Projects….. .............................................................................................................................. 13

Northern Arterial (Clemson Road/Killian Road) (S-52) ......................................................... 15 Platt Springs Road (SC 602) ................................................................................................... 15 Two Notch Road (US 1) ......................................................................................................... 15 Edmunds Highway Extension (SC 302) .................................................................................. 16 S. Lake Drive (SC 6) ............................................................................................................... 16 S. Lake Drive (SC 6) ............................................................................................................... 16 Old Cherokee Road (S-485)/N. Lake Drive ............................................................................ 17 Platt Springs Road (SC 602) ................................................................................................... 17 Safety Projects ......................................................................................................................... 17 Signal System .......................................................................................................................... 18 Intersections ............................................................................................................................ 18 Congestion Management ......................................................................................................... 18 Exempt from Guideshare Projects .............................................................................................................. 19

N. Lake Drive SC 6 – Lake Murray Dam ............................................................................... 21 SC 6 PE ................................................................................................................................... 21 N. Lake Drive (SC 6) .............................................................................................................. 21 Lake Murray Blvd (SC 60) ..................................................................................................... 22 Airport Road S-378 / John Hardee Expressway ...................................................................... 22 Lower Richland Roads Phase 1 ............................................................................................... 22 Harden Street (S-10) ............................................................................................................... 23 Hardscrabble Road (S-83) ....................................................................................................... 23 North Main Street (US 21/321) Phase I .................................................................................. 23 North Main Street (US 21/321) Phase II ................................................................................. 24 Gibson Pond Park Trail ........................................................................................................... 24 Greene Street/Williams Street Connector ............................................................................... 24 I-26 @ Sunset Blvd US 378 Exit 110 ..................................................................................... 25 I-26 @ Airport Blvd SC 302 Exit 113 .................................................................................... 25 I-26 @ Augusta Highway US 1 Exit 111 ................................................................................ 25

Page 4: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 4

I-20 @ Broad River Road US 176 Exit 65 .............................................................................. 26 I-20 @ S Lake Drive SC 6 Exit 55 .......................................................................................... 26 Railroad Relocation Assembly Street SC 48 ........................................................................... 26 I-20/I-26/1-126 Connector Exit 107 & 108 ............................................................................. 27 I-20 I-77 to Spears Creek Road ............................................................................................... 27 Harden Street S-10 Ph II ......................................................................................................... 27 Enhancement Projects ................................................................................................................................. 29 Meeting Street/State Street Streetscape Phase 3 & 4 .............................................................. 31 Historic Marker Expansion ..................................................................................................... 31 East Gervais Street Streetscape ............................................................................................... 31 Lexington Avenue Sidewalks ................................................................................................. 31 Friarsgate Boulevard Sidewalks ............................................................................................. .32 Klapman Boulevard Streetscape (12th Ph I) ............................................................................ 32 Triangle City Ph I, II, III Streetscape ...................................................................................... 32 State Street/ Marble Street Streetscape (Meeting Street Ph III) .............................................. 32 Marble Street/ Augusta Road Streetscape (Meeting Street Ph IV) ......................................... 33 State Street Streetscape Phase I ............................................................................................... 33 Harmon Street/Azalea Drive (S-254) Sidewalks .................................................................... 33 Platt Springs Road Beautification ........................................................................................... 33 Platt Springs Road Pedestrian Lighting .................................................................................. 34 Two Notch Road (US 1) Phase I ............................................................................................. 34 Two Notch Road (US 1) Phase II............................................................................................ 34 Elmwood Park Core Neighborhood ........................................................................................ 34 Five Points – Harden Street Streetscape Phase 3 .................................................................... 35 Beautification of Downtown Chapin ....................................................................................... 35 Park Road (S-127) Sidewalks Phase I ..................................................................................... 35 Riverwalk Expansion at Riverland Park Phase III .................................................................. 36 Carlisle Street Sidewalks ......................................................................................................... 36 St. Andrews Road (S-36) Sidewalks ....................................................................................... 36 Alexander Street Sidewalks .................................................................................................... 36 Carlisle Street Ph II ................................................................................................................. 37 State Street Streetscape SC 2 Ph III ........................................................................................ 37 Shopper Walk (St Andrews Rd S-36) ..................................................................................... 37 Main Street US 1 Sidewalk ..................................................................................................... 37 Highway 1 (US 1) Meeting Street Lighting ............................................................................ 38 Platt Springs Road SC 602 Pedestrian Lighting Ph II ............................................................. 38 Transit Projects ...... ... ................................................................................................................................. 39 Operating, Capital & Facilities - CMRTA .............................................................................. 41 Dial-A-Ride (DART) - CMRTA ............................................................................................. 41 Transit Enhancements @ New Facility…….. ......................................................................... 41 Transit Enhancements @ Two Notch Road (US 1) ................................................................ 42 Rehab/Renovate Transit Center .............................................................................................. 42 CMRTA Planning & Support .................................................................................................. 42 CMRTA Facility Development & Construction ..................................................................... 43 Mental Illness Recovery Center .............................................................................................. 43 Senior Resources Inc ............................................................................................................... 43 Capital Senior Center (Five Points) ........................................................................................ 43

Page 5: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 5

Irmo Chapin Recreation Center............................................................................................... 44 Capital Senior Center (Northeast Wheels) .............................................................................. 44 Lowman Home ........................................................................................................................ 44

Page 6: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 6

This page has been intentionally left blank.

Page 7: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 7

About CMCOG The Central Midlands Council of Governments (CMCOG) is the designated Metropolitan Planning Organization (MPO) responsible for carrying out the urban transportation planning process for the Columbia Area Transportation Study (COATS). The COATS MPO study area boundary, includes large portions of Richland and Lexington Counties and small portions of Calhoun and Kershaw Counties. The primary responsibilities of any MPO are to: 1) develop a Long Range Transportation Plan, which is the 30-year transportation vision for the metropolitan area; 2) develop a Transportation Improvement Program, which is the agreed-upon list of specific projects for which federal funds are anticipated; and 3) develop a Unified Planning Work Program (UPWP), which identifies in a single document the annual transportation planning activities that are to be undertaken in support of the goals, objectives and actions established in the Long-Range Transportation Plan. As the MPO, CMCOG provides the forum for cooperative decision making in developing regional transportation plans and programs to meet changing needs. It is composed of elected and appointed officials representing local, state and federal governments or agencies having interest or responsibility in comprehensive transportation planning.  

CMCOG Member Jurisdictions MPO Municipalities: Non-MPO Municipalities: Counties: City of Cayce Town of Batesburg-Leesville Fairfield County City of Columbia City of Newberry Lexington County City of Forest Acres Town of Winnsboro Newberry County Town of Irmo Richland County Town of Lexington Town of Springdale Other: City of West Columbia Kershaw County

(MPO Member Only)

About COATS

The Columbia Area Transportation Study or COATS, is the cooperative effort by the participating member governments, transportation providers, and many other interested parties to develop a long-range transportation plan for the metropolitan area.

The preparation and publication of this document was financed in part by federal funds provided by the U.S. Department of Transportation through the Federal Highway Administration, Federal Transit Administration and the South Carolina Department of Transportation.

COATS STUDY AREA

South Carolina

                Study Area

Page 8: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 8

Purpose of this Report As revised by the SAFETEA-LU, 23 U.S.C. 134(j)(7)(B), 23 U.S.C. 135(g)(4)(B), 49 U.S.C. 5303(j)(7)(B), and 49 U.S.C. 5304(g)(4)(B) require “…an Annual Listing of projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds have been obligated in the preceding year shall be published or otherwise made available by the cooperative effort of the State, transit operator, and metropolitan planning organization for public review. The listing shall be consistent with the funding categories identified in each metropolitan transportation improvement program (TIP).” This provision is intended to increase the transparency of government spending on transportation projects and strategies in metropolitan areas to State and local officials, and to the public at large. Realizing this objective involves promoting accuracy and responsiveness in financial planning and adoption of a proactive approach to sharing information with the public in a meaningful way, at an appropriate time, and in a user-friendly format. This report responds to the directive. It lists all transportation projects in the Columbia Area Transportation Study Boundary that were obligated in federal fiscal year 2009 (October 1, 2008 – September 30, 2009). The Federal Highway Administration (FHWA) defines obligation as the Federal government’s legal commitment (promise) to pay or reimburse the States or other entities for the Federal share of a project’s eligible costs. An obligated project is one that has been approved by the federal government for reimbursement. These projects may or may not have been started or completed in this year. The obligated project cost reflected in this report also may not be equal to the final project cost.

Page 9: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 9

EconomicStimulus Projects

Page 10: Columbia Area Metropolitan Planning Organization
Page 11: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 11

Pin #: Total Cost to Date: $

Project Name: Resurfacing in Lexington & Richland Fund Obligated in Previous Year: $

County: Lexington & Richland Amount Expended to Date: $

From: Various locations Let Date:

To: Various locations Funds needed to complete

Work Type: Mill and resurface Funds remaining (if complete) $

Comments: Funding Category: ARRA

Estimated Completion Date:

Pin #: Total Cost to Date: $

Project Name: Interstate Maintenance on East bound lanes of I-20 and I-77 in Lexington & Richland

Fund Obligated in Previous Year: $

County: Lexington & Richland Amount Expended to Date: $

From: Various locations Let Date:

To: Various locations Funds needed to complete

Work Type: Mill and resurface Funds remaining (if complete) $

Comments: Funding Category: ARRA

Estimated Completion Date:

Pin #: Total Cost to Date: $

Project Name: ITS in Lexington on I-26 & I-77 Fund Obligated in Previous Year: $

County: Lexington Amount Expended to Date: $

From: Various locations Let Date:

To: Various locations Funds needed to complete

Work Type: Adding cameras and radars Funds remaining (if complete) $

Comments: Funding Category: ARRA

Estimated Completion Date:

Economic Stimulus Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 12: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 12

Pin #: Total Cost to Date: $

Project Name: Pavement Markings on I-20 & I-77 in Richland

Fund Obligated in Previous Year: $

County: Richland Amount Expended to Date: $

From: Various locations Let Date:

To: Various locations Funds needed to complete

Work Type: Pavement marking Funds remaining (if complete) $

Comments: Funding Category: ARRA

Estimated Completion Date:

Pin #: Total Cost to Date: $

Project Name: Safety Projects Fund Obligated in Previous Year: $

County: Richland Amount Expended to Date: $

From: Various locations Let Date:

To: Various locations Funds needed to complete

Work Type: Traffic signal upgrades & guardrail on US 21 in Richland , turn lanes for

Funds remaining (if complete) $

Fish Hatchery Rd @ Church St in Funding Category: ARRA

Lexington Estimated Completion Date: Comments:

Economic Stimulus Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 13: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 13

Guideshare Projects

Page 14: Columbia Area Metropolitan Planning Organization
Page 15: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 15

Pin #: 16867 Total Cost to Date: 14,751,621

Project Name: Northern Arterial Ph II (Clemson Rd) Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 14,181,554

From: Winslow Way Let Date: 5/11/04

To: I 77 Funds needed to complete 0

Work Type: Widen to 5 lane facility and new Funds remaining (if complete)

location for part over RR tracks to I 77, Funding Category: STP

includes sidewalks Estimated Completion Date: Complete

Comments: Project not closed pending final contractor payments and right of way settlements

Pin #: 1912 Total Cost to Date: 27,924,746

Project Name: Platt Springs Road SC 602 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 27,924,746

From: Charleston Highway US 21, 176 Let Date: 5/8/01

To: Emmanuel Church Road S-168 Funds needed to complete 0

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: STP

Comments: Project closed Estimated Completion Date: Complete

Final Voucher 2/4/09

Pin #: 22871 Total Cost to Date: 16,835,468

Project Name: Two Notch Road US 1 Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 12,853,368

From: Taylor Street SC 12 Let Date: 9/9/03

To: Beltline Blvd SC 16 Funds needed to complete

Work Type: Widen for narrow 4 lanes to standard 4 Funds remaining (if complete)

lanes with sidewalks. Funding Category: STP

Comments: Project not closed pending final Estimated Completion Date: Complete

contractor payments 0

Guideshare Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 16: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 16

Pin #: 22879 Total Cost to Date: 10,012,828

Project Name: Edmund Hwy SC 302 Extension Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 10,012,828

From: Church Street S-415 Let Date: 3/8/05

To: Gator Road S-647 Funds needed to complete 0

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: STP

Estimated Completion Date: Complete

Comments: Project closed

Final Voucher 9/21/09

Pin #: 22548 Total Cost to Date: 4,675,254

Project Name: S Lake Drive SC 6 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 2,995,831

From: I 20 Let Date: 7/10/07

To: Platt Springs Road SC 602 & part of SC 602 to White Knoll HS & Old Orangeburg Rd S-1459

Funds needed to complete 0

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: STP

Comments: PE for Pin 26215 Estimated Completion Date: 2010

Pin #: 26215 Total Cost to Date: 20,448,111

Project Name: S Lake Drive SC 6 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 17,127,522

From: I 20 Let Date: 7/10/07

To: Platt Springs Road SC 602 & part of SC 602 to White Knoll HS & Old Orangeburg Rd S-1459

Funds needed to complete 3,320,589

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: STP

Comments: Estimated Completion Date: 2011

Guideshare Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 17: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 17

Pin #: 36308RD01 Total Cost to Date: 5,123,600

Project Name: Old Cherokee Rd S-485/N Lake Dr Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 2,506,455

From: Sunset Blvd US 378 Let Date: Late 2008

To: N Lake Dr SC 6 Funds needed to complete 2,617,455

Work Type: Two to five Lane Widening Funds remaining (if complete)

Comments: Funding Category: STP

Estimated Completion Date: Fall 2010

Pin #: 22875 Total Cost to Date: 9,193,883

Project Name: Platt Springs Road SC 602 Fund Obligated in Previous Year:

County: Lexington Amount Expended to Date: 8,425,458

From: Emmanuel Church Road S-168 Let Date: 10/2009

To: Old Orangeburg Rd S-1459 Funds needed to complete 768,425

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: STP

Comments: Estimated Completion Date: 2012

Pin #: Total Cost to Date: 100,000

Project Name: Safety Projects Fund Obligated in Previous Year: 0

County: Lexington & Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Safety Projects Funds remaining (if complete)

Comments: Funding Category: Guideshare

Estimated Completion Date:

Guideshare Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 18: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 18

Pin #: 26962 Total Cost to Date: 4,536,924

Project Name: Signal System Fund Obligated in Previous Year: 0

County: Lexington & Richland Amount Expended to Date: 3,928,161

From: Let Date:

To: Funds needed to complete

Work Type: Signal System upgrades by Columbia Funds remaining (if complete)

and SCDOT Funding Category: Guideshare

Comments: Estimated Completion Date:

Pin #: 99111 Total Cost to Date: 660,000

Project Name: Intersections Fund Obligated in Previous Year: 0

County: Lexington & Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Intersections improvements Funds remaining (if complete)

Comments: Funding Category: Guideshare

Estimated Completion Date:

Pin #: 18630 Total Cost to Date: 1,442,424

Project Name: Congestion Management Fund Obligated in Previous Year: 0

County: Lexington & Richland Amount Expended to Date: 1,442,424

From: Let Date:

To: Funds needed to complete

Work Type: Intelligent Transportation System (ITS) Funds remaining (if complete)

and Bikeways Funding Category: Guideshare

Comments: Estimated Completion Date: Complete

Guideshare Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 19: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 19

Projects Exempt from Guideshare

Page 20: Columbia Area Metropolitan Planning Organization
Page 21: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 21

Pin #: LEXSIB0001 Total Cost to Date: 59,000,000

Project Name: N Lake Dr SC 6 – Lake Murray Dam Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date:

From: Lake Murray Blvd SC 60 Let Date:

To: Corley Mill Road S-68 Funds needed to complete 0

Work Type: Dam Construction Funds remaining (if complete)

Comments: Funding Category: SIB Bonds

Estimated Completion Date: Complete

Pin #: 23968 Total Cost to Date: 3,997,328

Project Name: SC 6 PE Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 3,997,328

From: Corley Mill Road S-68 Let Date: 10/12/04

To: Sunset Blvd US 378 Funds needed to complete 0

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: HP Demo

Comments: PE for Pin 26231 and 26235 Estimated Completion Date: Complete

Pin #: 26231 Total Cost to Date: 43,291,812

Project Name: N Lake Drive SC 6 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 40,866,588

From: Corley Mill Road S-68 Let Date: 10/12/04

To: Sunset Blvd US 378 Funds needed to complete 0

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: SIB Bonds

Comments: Project not closed pending final Estimated Completion Date: Complete

contractor payments and right of way

settlements

Projects Exempt from Guideshare FY 2009 (October 1, 2008 to September 30, 2009)

Page 22: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 22

Pin #: 26235 Total Cost to Date: 21,910,617

Project Name: Lake Murray Blvd SC 60 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 19,834,543

From: Lake Murray Dam Let Date:

To: Irmo Drive S-36 / St Andrews Rd Funds needed to complete 0

Work Type: Widen to 5 lanes with sidewalks, wide Funds remaining (if complete)

outside shoulders for bicyclists Funding Category: SIB Bonds

Comments: Estimated Completion Date: Complete

Pin #: 24110 Total Cost to Date: 11,092,818

Project Name: Airport Rd Ext John Hardee Expressway Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 11,044,884

From: Airport Blvd SC 302 Let Date: Not set

To: I 26 Funds needed to complete 47,934

Work Type: New 4 lane expressway to connect Funds remaining (if complete)

Airport Blvd with I 26 Funding Category: NHS

Comments: Total cost & funds to complete only Estimated Completion Date: unknown

includes PE & ROW costs. Construction

funds have not been identified for this

project.

Pin #: 36225PE 01 Total Cost to Date: 1,560,000

Project Name: Lower Richland Roads Ph 1 Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 1,560,000

From: Shop Rd @ Pineview Rd Let Date:

To: Garners Ferry Rd US 76/378 Funds needed to complete 0

Work Type: PE Funds remaining (if complete)

Funding Category: Earmark

Comments: Total Cost and Cost to complete only Estimated Completion Date: Complete

reflects available Earmark funding

Project closed Final voucher 10/28/2009

Projects Exempt from Guideshare FY 2009 (October 1, 2008 to September 30, 2009)

Page 23: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 23

Pin #: 29798 Total Cost to Date: 5,998,563

Project Name: Harden St S-10 Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 5,941,062

From: Blossom St Let Date:

To: Gervais St Funds needed to complete 57,501

Work Type: Specific improvements will include: Funds remaining (if complete)

modern traffic control signals, Funding Category: Earmark

intersection, improved street lighting Estimated Completion Date: Complete

driveways, etc

Comments: Total Cost and Cost to Complete reflect available Earmark funding and required match. The project remains open for pending reimbursements to City of Columbia.

Pin #: 36614 RD01 Total Cost to Date: 160,000

Project Name: Hardscrabble Rd S-83 Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date:

From: 350 ft. S of Summit Ridge Let Date: 4/08/08

To: 2090 ft N. of Summit Ridge Funds needed to complete 0

Work Type: Intersection Improvement Funds remaining (if complete)

Comments: Inactive Funding Category: Earmark

Estimated Completion Date: 08/08

Pin #: 24169 Total Cost to Date: 12,014,683

Project Name: North Main Street US 21/321 Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 5,913,321

From: Elmwood Avenue Let Date: 12/07

To: Anthony Avenue Funds needed to complete 6,101,362

Work Type: Streetscape, Intersection Improvements, Funds remaining (if complete)

Bus shelters, landscaping, improved Funding Category: Earmark

street lighting, underground utilities Estimated Completion Date: 04/10

Comments: Phase I of Project. Total Cost and Cost to Complete reflect available Earmark

funding and required match.

Projects Exempt from Guideshare FY 2009 (October 1, 2008 to September 30, 2009)

Page 24: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 24

Pin #: 36650 RD01 Total Cost to Date: 7,411,340

Project Name: North Main Street US 21/321 Ph II Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Anthony Avenue Let Date: 2/10

To: Fairfield Road Funds needed to complete 7,411,340

Work Type: Streetscape, Intersection Improvements, Funds remaining (if complete)

Bus shelters, landscaping, improved Funding Category: Earmark

street lighting, underground utilities Estimated Completion Date:

Comments: Phase II of Project. Total Cost and Cost to Complete reflect available Earmark

funding and required match.

Pin #: 2007004 Total Cost to Date: 103,523

Project Name: Gibson Pond Park Trail Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 103,523

From: n/a Let Date:

To: n/a Funds needed to complete 0

Work Type: New Trail Funds remaining (if complete) 0

Comments: Managed by SCPRT Funding Category: SCPRT

Estimated Completion Date: 3/30/09

Pin #: Total Cost to Date: 490,000

Project Name: Greene Street/Williams Street Connector Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Let Date: Not set

To: Funds needed to complete 490,000

Work Type: Preliminary Engineering Funds remaining (if complete)

Comments: Total Cost and Cost to complete only Funding Category: Earmark

reflects available Earmark funding Estimated Completion Date: unknown

Projects Exempt from Guideshare FY 2009 (October 1, 2008 to September 30, 2009)

Page 25: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 25

Pin #: 273/26656 Total Cost to Date: 24,795,113

Project Name: I 26 @ Sunset Blvd US 378 Exit 110 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 24,795,113

From: Let Date: 9/10/02

To: Funds needed to complete 0

Work Type: Interstate Interchange Funds remaining (if complete)

Comments: Funding Category: Interstate

Estimated Completion Date: Complete

Pin #: 12506 Total Cost to Date: 60,000,000

Project Name: I 26 @ Airport Blvd SC 302 Exit 113 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 6,045,113

From: Let Date: 2016

To: Funds needed to complete 53,954,887

Work Type: Interstate Interchange Funds remaining (if complete)

Comments: Total Cost reflects escalated construction Funding Category: Interstate

cost Estimated Completion Date: 2018

Pin #: 22408 Total Cost to Date: 81,000,000

Project Name: I 26 @ Augusta Hwy US 1 Exit 111 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 941,580

From: Let Date: 2018

To: Funds needed to complete 80,058,420

Work Type: Interstate Interchange Funds remaining (if complete)

Comments: Total Cost reflects escalated construction Funding Category: Interstate

cost Estimated Completion Date: 2020

Projects Exempt from Guideshare FY 2009 (October 1, 2008 to September 30, 2009)

Page 26: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 26

Pin #: 22406 Total Cost to Date: 2,603,545

Project Name: I 20 @ Broad River Rd US 176 Exit 65 Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 2,368,510

From: Let Date: 11/9/04

To: Funds needed to complete 0

Work Type: Improve Ramps Funds remaining (if complete)

Comments: Funding Category: Interstate

Estimated Completion Date: Complete

Pin #: 15092 Total Cost to Date: 21,857,073

Project Name: I 20 @ S Lake Drive SC 6 Exit 55 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 16,293,595

From: Let Date: 2/11/03

To: Funds needed to complete

Work Type: Widen and raise SC 6 bridge over I-20 Funds remaining (if complete)

improve ramps, add a loop to Columbia Funding Category: Interstate

Comments: Project not closed pending final Estimated Completion Date: Complete

contractor payments

Pin #: Total Cost to Date:

Project Name: Railroad Relocation Assembly St SC 48 Fund Obligated in Previous Year:

County: Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Railroad bridge over Assembly Street Funds remaining (if complete)

between Whaley & Heyward Streets Funding Category: Comments: Total Earmarks $7,358,300 Estimated Completion Date:

Projects Exempt from Guideshare FY 2009 (October 1, 2008 to September 30, 2009)

Page 27: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 27

Pin #: Total Cost to Date:

Project Name: I 20/I-26/I-126 Connector Exits 107,108 Fund Obligated in Previous Year:

County: Lexington & Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Improve interchange by increasing Funds remaining (if complete)

capacity of interchange and relocating Funding Category: Interstate

frontage roads. Estimated Completion Date:

Pin #: Total Cost to Date:

Project Name: I 20 I-77 to S-53 Spears Creek Road Fund Obligated in Previous Year:

County: Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Widen from four lanes to six lanes Funds remaining (if complete)

in existing median Funding Category: Interstate Comments: Estimated Completion Date:

Pin #: Total Cost to Date:

Project Name: Harden St S-10 Phase II Fund Obligated in Previous Year:

County: Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Specific improvements will include: Funds remaining (if complete)

modern traffic control signals, Funding Category: Earmark

intersection, improved street lighting Estimated Completion Date:

driveways, etc Comments: Earmark of $950,000 in FY 2009

Omnibus Bill of March 11, 2009

Projects Exempt from Guideshare FY 2009 (October 1, 2008 to September 30, 2009)

Page 28: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 28

This page has been intentionally left blank.

Page 29: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 29

Enhancement Projects

Page 30: Columbia Area Metropolitan Planning Organization
Page 31: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 31

Pin #: 30732 Total Cost to Date: 363,000

Project Name: Meeting St/State St Streetscape Ph 3,4 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Congaree River / Meeting Street Let Date: 1/04

To: State Street / Spring St S-188 Funds needed to complete

Work Type: Utility relocation and streetscaping Funds remaining (if complete) 363,000

Comments: No vouchers to date. Funding Category: Enhancement

No expenditures in FY 2009 Estimated Completion Date: 6/05

Pin #: 33456 Total Cost to Date: 55,000

Project Name: Historic Marker Expansion Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Let Date: 4/05

To: Funds needed to complete 55,000

Work Type: Install new historic markers, Funds remaining (if complete)

rehabilitation of existing markers Funding Category: Enhancement

Comments: Waiting for reimbursement request Estimated Completion Date: 12/08

Marketing complete, two signs installed

Extension request granted No expenditures in FY 2009

Pin #: 33455 Total Cost to Date: 242,000

Project Name: East Gervais Street Streetscape Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Millwood Avenue US 76/378 Let Date: 4/05

To: Trenholm Road S-31 Funds needed to complete 242,000

Work Type: Install planted median Funds remaining (if complete)

Comments: No vouchers to date. Funding Category: Enhancement

No expenditures in FY 2009 Estimated Completion Date: 10/06

Pin #: 33542 Total Cost to Date: 181,000

Project Name: Lexington Avenue Sidewalks Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 181,000

From: Chapin Road US 76 Let Date: 6/05

To: Chapin Town limits (800 block) Funds needed to complete 0

Work Type: New sidewalks Funds remaining (if complete) 0

Comments: Closed Funding Category: Enhancement

Estimated Completion Date: 3/08

Enhancement Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 32: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 32

Pin #: 33541 Total Cost to Date: 152,000

Project Name: Friarsgate Boulevard Sidewalks Fund Obligated in Previous Year: $ 0

County: Lexington & Richland Amount Expended to Date: 152,000

From: Irmo Drive S-32-175 Let Date: 4/05

To: North Royal Tower Drive Funds needed to complete 0

Work Type: New sidewalks Funds remaining (if complete) 0

Comments: Closed Funding Category: Enhancement

Estimated Completion Date: 10/06

Pin #: 36349EH01 Total Cost to Date: 181,000

Project Name: Klapman Blvd Streetscape (12th St Ph 1) Fund Obligated in Previous Year: 2,000

County: Lexington Amount Expended to Date: 38,000

From: Jarvis Klapman Blvd SC 12 Let Date:

To: Augusta Street S-40 Funds needed to complete 143,000

Work Type: Install street lights, landscaping, Funds remaining (if complete)

sidewalks and curbs Funding Category: Enhancement

Comments: Last activity 7/29/08 Estimated Completion Date:

Pin #: 35420 Total Cost to Date: 544,000

Project Name: Triangle City Ph 1, II, III Streetscape & Beautification

Fund Obligated in Previous Year: 62,044

County: Lexington Amount Expended to Date: 171,044

From: Augusta Street US 1 Let Date:

To: D Avenue Funds needed to complete 372,956

Work Type: Install street lights, landscaping, Funds remaining (if complete)

sidewalks and park Funding Category: Enhancement

Comments: Last activity 12/12/07 Estimated Completion Date:

Pin #: 35983EH01 Total Cost to Date: 181,000

Project Name: State Street/Marble Street Streetscape (Meeting Street Ph 3)-Antique District

Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: State Street SC 2 Let Date:

To: Marble Street S-527 Funds needed to complete

Work Type: Install street lights, landscaping, Funds remaining (if complete)

sidewalks and park Funding Category: Enhancement

Comments: No signed agreement. Estimated Completion Date:

Enhancement Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 33: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 33

Pin #: Total Cost to Date: 181,000

Project Name: Marble Street/ Augusta Rd Streetscape (Meeting Street Ph IV)

Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Marble Street S-527 Let Date:

To: Augusta Street S-40 Funds needed to complete

Work Type: Install street lights, landscaping, Funds remaining (if complete)

sidewalks and park Funding Category: Enhancement

Comments: No signed agreement. Estimated Completion Date:

Pin #: Total Cost to Date: 177,000

Project Name: State Street Streetscape Ph I Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 177,000

From: Frink Street SC 2 Let Date:

To: Lexington Avenue S -184 Funds needed to complete 0

Work Type: Install street lights, landscaping, Funds remaining (if complete) 0

sidewalks , new curb and guttering Funding Category: Enhancement

& relocation of underground utilities Estimated Completion Date: 7/08

Comments: Final voucher pending

Pin #: 35160 Total Cost to Date: 89,000

Project Name: Harmon St/Azalea Dr S-254 Sidewalks Fund Obligated in Previous Year: 71,000

County: Lexington Amount Expended to Date: 89,000

From: E Main Street US 1/ Harmon St S-61 Let Date:

To: Dreher St S-325/ Lexington ES Funds needed to complete 0

Work Type: Install new sidewalks Funds remaining (if complete) 0

Comments: Complete – Final 7/17/09 Funding Category: Enhancement

Estimated Completion Date: 7/09

Pin #: 29066 Total Cost to Date: 133,000

Project Name: Platt Springs Road Beautification Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 118,852

From: Various locations Let Date:

To: Various locations Funds needed to complete

Work Type: Landscaping & beautification along Funds remaining (if complete) 14,148

Platt Springs Road SC 602 Funding Category: Enhancement

Comments: Closed Estimated Completion Date: 8/07

Enhancement Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 34: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 34

Pin #: 36348EH01 Total Cost to Date: 181,000

Project Name: Platt Springs Road Pedestrian Lighting Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Various locations Let Date:

To: Various locations Funds needed to complete

Work Type: Installation of Pedestrian lighting along Funds remaining (if complete)

Platt Springs Road SC 602 Funding Category: Enhancement

Comments: No expenditures in FY 2009 Estimated Completion Date:

Pin #: 33929 Total Cost to Date: 242,000

Project Name: Two Notch Road US Ph I Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Taylor St SC 12 Let Date:

To: Beltline Blvd SC 16 Funds needed to complete

Work Type: Landscaping, crosswalks & bus shelters Funds remaining (if complete)

on Two Notch Road US 1 Funding Category: Enhancement

Comments: No expenditures in FY 2009 Estimated Completion Date:

Pin #: 33930 Total Cost to Date: 242,000

Project Name: Two Notch Road US Ph II Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Taylor St SC 12 Let Date:

To: Beltline Blvd SC 16 Funds needed to complete

Work Type: Landscaping, crosswalks & bus shelters Funds remaining (if complete)

on Two Notch Road US 1 Funding Category: Enhancement

Comments: Estimated Completion Date:

Pin #: 36290EH01 Total Cost to Date: 242,000

Project Name: Elmwood Park Core Neighborhood Lighting Ph I

Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Elmwood Avenue / Park Street Let Date:

To: Gadsden Street / Chester Street Funds needed to complete

Work Type: Pedestrian lighting in Historic Elmwood Funds remaining (if complete)

Park Neighborhood Funding Category: Enhancement

Comments: Completed - No vouchers to date. No expenditures in FY 2009

Estimated Completion Date:

Enhancement Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 35: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 35

Pin #: 36350EH01 Total Cost to Date: 242,000

Project Name: Five Points - Harden St Streetscape Ph 3 Fund Obligated in Previous Year: 0

County: Richland Amount Expended to Date: 0

From: Blossom Street US 76 Conn. Let Date:

To: Gervais Street US 76/378 Funds needed to complete

Work Type: Installation of sidewalks, landscaping, Funds remaining (if complete)

Lighting, underground utilities & Funding Category: Enhancement

street side amenities Estimated Completion Date:

Comments: Waiting for signed agreement

10/13/09 – forwarded to FHWA

Pin #: Total Cost to Date: 210,000

Project Name: Beautification of Downtown Chapin (Lexington Street)

Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Columbia Avenue S-48 Let Date:

To: Chapin Road US 76 Funds needed to complete

Work Type: New sidewalks, new curb & gutter, Funds remaining (if complete)

landscaping, lighting & Funding Category: Enhancement

relocation of utilities Estimated Completion Date:

Comments: Waiting for signed agreement.

Pin #: Total Cost to Date: 579,000

Project Name: Park Road S-127 Sidewalks (Phase I & II) Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: West Main Street US 1/378 Let Date:

To: 14 Mile Creek Bridge Funds needed to complete

Work Type: Installation of new sidewalks. Funds remaining (if complete)

Comments: Waiting for signed agreement. Funding Category: Enhancement

Combined with Palm Ct project Estimated Completion Date:

8/19/09 LPA requested SCDOT manage

Project.

Enhancement Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 36: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 36

Pin #: Total Cost to Date: 181,000

Project Name: Riverwalk Expansion at Riverland Park (Phase III)

Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Existing Riverland Park Trail Let Date:

To: Thomas Newman Boat Landing Funds needed to complete

Work Type: Extend the existing Riverland Trail Funds remaining (if complete)

approximately ½ mile. Funding Category: Enhancement

Comments: Environmental clearance needed; Estimated Completion Date:

No signed agreement.

Pin #: Total Cost to Date: 202,000

Project Name: Carlisle Street Sidewalks Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date:

From: Columbia Avenue Let Date:

To: Lexington Ave Funds needed to complete

Work Type: Installation of new sidewalks. Funds remaining (if complete)

Comments: Completed – awaiting remaining funds Funding Category: Enhancement

to be moved to another project Estimated Completion Date:

Pin #: Total Cost to Date: 85,000

Project Name: St Andrews Road S-36 Sidewalks Fund Obligated in Previous Year:

County: Lexington Amount Expended to Date:

From: Shoppers walk commercial district Let Date:

To: Irmo Post Office Funds needed to complete

Work Type: Installation of new sidewalks. Funds remaining (if complete)

Comments: Almost complete –funds from College Funding Category: Enhancement

Street project Estimated Completion Date:

Pin #: Total Cost to Date: 50,000

Project Name: Alexander Street Sidewalks Fund Obligated in Previous Year:

County: Lexington Amount Expended to Date:

From: Riverwalk Park Entrance Let Date:

To: South 925’ Funds needed to complete

Work Type: Installation of new sidewalks on east Funds remaining (if complete)

side. Funding Category: Enhancement

Comments: Estimated Completion Date:

Enhancement Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 37: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 37

Pin #: Total Cost to Date: 102,000

Project Name: Carlisle Street Ph II Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date:

From: Lexington Ave Let Date:

To: Lake Murray Blvd SC 60 Funds needed to complete

Work Type: Installation of new sidewalks on west side. Funds remaining (if complete)

Comments: Funds from unspent Carlisle St Ph I Funding Category: Enhancement

Estimated Completion Date:

Pin #: Total Cost to Date: 206,000

Project Name: State Street Streetscape SC 2 Ph 3 Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Poplar St S-471 Let Date:

To: Michaelmas Ave S-185 Funds needed to complete

Work Type: Installation of new sidewalks on west Funds remaining (if complete)

side. Funding Category: Enhancement

Comments: 6/6/09 LPA requested SCDOT manage project

Estimated Completion Date:

Pin #: Total Cost to Date: 249,000

Project Name: Shopper Walk (St Andrews Rd S-36) Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Cotton House Let Date:

To: Thames Valley Rd Funds needed to complete

Work Type: Installation of new sidewalks Funds remaining (if complete)

Comments: 9/4/09 LPA requested SCDOT manage project

Funding Category: Enhancement

Estimated Completion Date:

Pin #: Total Cost to Date: 118,000

Project Name: Main Street US 1 Sidewalk Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Columbia Ave US 378 S Lake Dr SC 6

Let Date:

To: Church St S-91 Taylor Dr S-251

Funds needed to complete

Work Type: Installation of new sidewalks and Funds remaining (if complete)

landscaping. Funding Category: Enhancement

Comments: Estimated Completion Date:

Enhancement Projects FY 2009(October 1, 2008 to September 30, 2009)

Page 38: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 38

Pin #: Total Cost to Date: 181,000

Project Name: Highway 1 (US 1) Meeting St Lighting Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: State Street SC 2 Let Date:

To: 12th Street SC 35 Funds needed to complete

Work Type: Installation of new street lighting Funds remaining (if complete)

Comments: 4/28/09 LPA requested SCDOT manage Funding Category: Enhancement

project. Estimated Completion Date:

Pin #: Total Cost to Date: 181,000

Project Name: Platt Springs Rd SC 602 Pedestrian Lighting Ph 2

Fund Obligated in Previous Year: 0

County: Lexington Amount Expended to Date: 0

From: Essex Drive Let Date:

To: Slightler Dr Funds needed to complete

Work Type: Installation of new lighting along Funds remaining (if complete)

public sidewalks Funding Category: Enhancement

Comments: Estimated Completion Date:

Enhancement Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 39: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 39

Transit Projects

Page 40: Columbia Area Metropolitan Planning Organization
Page 41: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 41

Pin #: Total Cost to Date: 2,165,709

Project Name: Operating, Capital & Facilities -CMRTA Fund Obligated in Previous Year:

County: Lexington & Richland Amount Expended to Date: 2,165,709

From: Let Date:

To: Funds needed to complete 0

Work Type: Operating, Capital & Facilities Funds remaining (if complete)

Comments: Completed as scheduled Funding Category: FTA 5307

Estimated Completion Date: 9/09

Pin #: Total Cost to Date:

Project Name: Dial A Ride (DART) - CMRTA Fund Obligated in Previous Year:

County: Lexington & Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Operating service for persons with Funds remaining (if complete)

disabilities Funding Category: FTA 5307

Comments: CMRTA does not use 5307 for DART. Recommend this section be dropped

Estimated Completion Date:

Pin #: Total Cost to Date: 213,576

Project Name: Transit enhancements @ New Facility CMRTA

Fund Obligated in Previous Year:

County: Richland Amount Expended to Date: 213,576

From: Let Date:

To: Funds needed to complete 0

Work Type: Provide enhancements to the new transit Funds remaining (if complete)

facility Funding Category: FTA 5307

Comments: Completed as scheduled Estimated Completion Date: 6/2008

Transit Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 42: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 42

Pin #: Total Cost to Date:

Project Name: Transit enhancements @ Two Notch Rd US 1 Corridor CMRTA

Fund Obligated in Previous Year:

County: Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: Provide enhancements to the new transit Funds remaining (if complete)

facility Funding Category:

Comments: No progress in 2008, funds will be Estimated Completion Date:

reprogrammed

These funds were reprogrammed during

the report period and were used to offset

the costs of vehicle and facility

maintenance

Pin #: Total Cost to Date: 20,190

Project Name: Rehab/Renovate Transit Center - CMRTA Fund Obligated in Previous Year:

County: Richland Amount Expended to Date: 20,190

From: Let Date:

To: Funds needed to complete 0

Work Type: Rehabilitate & renovate Transit Center Funds remaining (if complete)

on Sumter Street at Laurel Street Funding Category: FTA 5307 &

local/CMRTA

Comments: Completed as scheduled March 2007 Estimated Completion Date: 3/07

Pin #: Total Cost to Date: 43,000

Project Name: Planning & Support -CMRTA Fund Obligated in Previous Year:

County: Lexington & Richland Amount Expended to Date: 43,000

From: Let Date:

To: Funds needed to complete

Work Type: Planning & Support Funds remaining (if complete)

Comments: Completed September 30, 2009 Funding Category: FTA 5307

Estimated Completion Date: 6/08

Transit Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 43: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 43

Pin #: Total Cost to Date: 625,000

Project Name: Facility Development & Construction -CMRTA

Fund Obligated in Previous Year:

County: Richland Amount Expended to Date: 625,000

From: Let Date:

To: Funds needed to complete

Work Type: Planning & Support Funds remaining (if complete)

Comments: Ph 1 completed March 2008 Funding Category: FTA 5307 &

5309

Ph 2 is development of CNG fueling Estimated Completion Date:

station – this project will not be undertaken

until long term dedicated local funding is

Secured.

Pin #: Total Cost to Date: 57,000

Project Name: Mental Illness Recovery Center Fund Obligated in Previous Year: 37,711

County: Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: New vehicle Funds remaining (if complete)

Funding Category: FTA 5310

Estimated Completion Date: 6/30/09

Pin #: Total Cost to Date: 60,000

Project Name: Senior Resources Inc Fund Obligated in Previous Year:

County: Lexington & Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: New vehicle Funds remaining (if complete)

Funding Category: FTA 5310

Estimated Completion Date:

Pin #: Total Cost to Date: 50,000

Project Name: Capital Senior Center – Five Points Fund Obligated in Previous Year:

County: Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: New vehicle Funds remaining (if complete)

Funding Category: FTA 5310

Estimated Completion Date: 6/08

Transit Projects FY 2009 (October 1, 2008 to September 30, 2009)

Page 44: Columbia Area Metropolitan Planning Organization

FY 2009 Annual Listing of Obligated Projects

H:\2011 Certification Review\FY 2009 Annual Project Listing Final Report 6-24-10__.doc 44

Pin #: Total Cost to Date: 60,000

Project Name: Irmo Chapin Recreation Center Fund Obligated in Previous Year:

County: Lexington/Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: New vehicle Funds remaining (if complete)

Funding Category: FTA 5310

Estimated Completion Date:

Pin #: Total Cost to Date: 74,300

Project Name: Capital Senior Center – Northeast Wheels Fund Obligated in Previous Year:

County: Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: New vehicle & operating assistance Funds remaining (if complete)

Funding Category: FTA 5310

Estimated Completion Date:

Pin #: Total Cost to Date:

Project Name: Lowman Home Fund Obligated in Previous Year:

County: Lexington/Richland Amount Expended to Date:

From: Let Date:

To: Funds needed to complete

Work Type: New vehicle Funds remaining (if complete)

Comments: Not funded by SCDOT Funding Category: FTA 5310

Estimated Completion Date:

Transit Projects FY 2009 (October 1, 2008 to September 30, 2009)