cn railway temp. shooflycn railway temp. shoofly t s s t a 1 0 1 + 0 0. 0 0 s c s t a 1 0 1 + 4 0. 0...

1
CN RAILWAY TEMP. SHOOFLY TS St a 101+00. 00 SC St a 101+40. 00 CS St a 101+90. 97 PI St a 101+65. 49 ST St a 102+30. 97 TS St a 104+09. 07 SC St a 104+49. 07 105 CS St a 105+95. 49 PI St a 105+22. 42 ST St a 106+35. 49 ~ = 5° 03' 25.36" (LT) ~ = 10° 46' 54.36" (RT) PT SW St a 108+96. 42 TS St a 101+00. 00 SC St a 101+40. 00 CS St a 101+84. 32 PI St a 101+62. 16 ST St a 102+24. 32 TS St a 104+36. 40 SC St a 104+76. 40 105 CS St a 106+16. 18 PI St a 105+46. 42 ST St a 106+56. 18 PT SW St a 109+19. 79 Curve Data Elevation = 1/2" D = 6° 00' 00" (Chord Definition) R = 955.37 L = 44.32 Ls = 40.00 Design Speed = 20 MPH Elevation = 1/2" D = 6° 00' 00" (Chord Definition) R = 955.37 L = 139.78 Ls = 40.00 Design Speed = 20 MPH Curve Data Elevation = 1/2" D = 6° 00' 00" (Chord Definition) R = 955.37 L = 50.97 Ls = 40.00 Design Speed = 20 MPH ~ = 5° 27' 20.25" (RT) Curve Data Elevation = 1/2" D = 6° 00' 00" (Chord Definition) R = 955.37 L = 146.42 Ls = 40.00 Design Speed = 20 MPH ~ = 11° 10' 49.25" (LT) (U.A.C.) (U.A.C.) (U.A.C.) (U.A.C.) US 63 LOGAN AVE C E N TE R S T E D WA R D S S T C N TE M P S HOO F L Y NO R T H C N TE M P S HOO F L Y S OU T H Construction on Wood Ties Begin Shoofly Track Sta. 101+00 Construction on Wood Ties Begin Shoofly Track Sta. 101+00 Install No. 10 RH HTTO End Track Construction Sta. 109+19.79 Install No. 10 LH HTTO End Track Construction Sta. 108+96.42 S U LL I VAN M E M O R I A L P A R K HDR\Iowa DOT BLACK HAWK 1 NHSX-063-6(75)-3H-07 CONSTRUCT SHOOFLY NORTH TEMPORARY EASEMENT TO CONSTRUCT SHOOFLY SOUTH TEMPORARY EASEMENT TO Curve Data 10 ' 20 ' 20 ' 20 ' 10 ' 20' 20 ' 20 ' NORTH SHOOFLY TEMPORARY SHORING SOUTH SHOOFLY TEMPORARY SHORING DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY ENGLISH IOWA DOT C O O 50 FEET

Upload: others

Post on 27-Dec-2019

12 views

Category:

Documents


0 download

TRANSCRIPT

CN RAILWAY TEMP. SHOOFLY

TS

Sta 101

+00.00

SC

Sta 101

+40.00

CS

Sta 101

+90.97

PI

Sta 101

+65.49

ST

Sta 102

+30.97

TS

Sta 104

+09.07

SC

Sta 104

+49.07

105

CS

Sta 105

+95.49

PI

Sta 105

+22.42

ST

Sta 106

+35.49

~ = 5° 03' 25.36" (LT)

~ = 10° 46' 54.36" (RT)

PT

SW

Sta 108

+96.42

TS

Sta 101

+00.00

SC

Sta 101

+40.00

CS

Sta 101

+84.32

PI

Sta 101

+62.16

ST

Sta 102

+24.32

TS

Sta 104

+36.40

SC

Sta 104

+76.40

105

CS

Sta 106

+16.18

PI

Sta 105

+46.42

ST

Sta 106

+56.18

PT

SW

Sta 109

+19.79

Curve Data

Elevation = 1/2"

D = 6° 00' 00" (Chord Definition)

R = 955.37

L = 44.32

Ls = 40.00

Design Speed = 20 MPH

Elevation = 1/2"

D = 6° 00' 00" (Chord Definition)

R = 955.37

L = 139.78

Ls = 40.00

Design Speed = 20 MPH

Curve Data

Elevation = 1/2"

D = 6° 00' 00" (Chord Definition)

R = 955.37

L = 50.97

Ls = 40.00

Design Speed = 20 MPH

~ = 5° 27' 20.25" (RT) Curve Data

Elevation = 1/2"

D = 6° 00' 00" (Chord Definition)

R = 955.37

L = 146.42

Ls = 40.00

Design Speed = 20 MPH

~ = 11° 10' 49.25" (LT)

(U.A.C.)

(U.A.C.) (U.A.C.)

(U.A.C.)

US 63

LO

GA

N

AVE

CENTER ST

ED

WARDS ST

CN TEMP SHOOFLY NORTH

CN TEMP SHOOFLY SOUTH

Construction on Wood Ties

Begin Shoofly Track

Sta. 101+00

Construction on Wood Ties

Begin Shoofly Track

Sta. 101+00

Install No. 10 RH HTTO

End Track Construction

Sta. 109+19.79

Install No. 10 LH HTTO

End Track Construction

Sta. 108+96.42

SULLIVAN MEMORIAL PARK

HDR\Iowa DOT BLACK HAWK 1NHSX-063-6(75)-3H-07

CONSTRUCT SHOOFLY NORTH

TEMPORARY EASEMENT TO

CONSTRUCT SHOOFLY SOUTH

TEMPORARY EASEMENT TO

Curve Data

10'

20'

20' 20'

10'

20'

20'20'

NORTH SHOOFLY

TEMPORARY SHORING

SOUTH SHOOFLY

TEMPORARY SHORING

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISH IOWA DOTC

OO 50

FEET