cm6969bc.desbloqueado

Upload: oaxacao

Post on 07-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 CM6969BC.desbloqueado

    1/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

     

    **** **** *******

      * * * * *

    * * *

    **** * *

    * * *

    * * * * *

    **** **** *

    S U B S E C R E T A R I A D E I N F R A E S T R U C T U R A

      D I R E C C I O N G E N E R A L D E C A R R E T E R A S F E D E R A L E S

      D I R E C C I O N D E P R O Y E C T O D E C A R R E T E R A S

      S U B D I R E C C I O N D E F O T O G R A M E T R I A Y P R O C E S O D E D A T O S

      P R O Y E C T O D E T E R R A C E R I A S (23)

      CAMINO : 6969 NUMERO DE TRABAJO : CM6969BC

    TRAMO : BC PROYECTO :

    ALTERNATIVA : FECHA DE PROCESO : 03-29-2016

    ORIGEN : HORA DE PROCESO : 22:37:59

    VELOCIDAD DE PROYECTO : 0

    KILOMETRO INICIAL : 0+160.00 KILOMETRO FINAL : 1+920.00

    ARCHIVO : CM6969BC

      ALINEAMIENTO VERTICAL No. : 1

      PROCESADO CON CUNETA : Definitiva

    ESPESOR DE REVESTIMIENTO : 0.20

      ESPESOR DE PAVIMENTO : 0.20

  • 8/18/2019 CM6969BC.desbloqueado

    2/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ALINEAMIENTO VERTICAL Hoja No : 2

      -----------------------------------------------------------------------------------------------------------------------------

      ALINEAMIENTO No 1

    PCV PIV PTV L. CURVA PENDIENTE TV LIBRE

      CAD/ELV CAD/ELV CAD/ELV DE SALIDA

      150.000 150.00 150.000

      503.75 503.75 503.75 0.00 3.32 % 60.00

      210.000 210.00 210.000

      505.74 505.74 505.74 0.00 2.49 % 60.00

      270.000 295.00 320.000

      507.24 507.86 509.98 50.00 8.50 % 33.00

      353.000 373.00 393.000

      512.79 514.49 514.67 40.00 0.90 % 57.00

      450.000 450.00 450.000

      515.18 515.18 515.18 0.00 1.05 % 55.00

      505.000 505.00 505.000

      515.76 515.76 515.76 0.00 2.22 % 55.00

      560.000 560.00 560.000

      516.98 516.98 516.98 0.00 0.14 % 64.00

      624.000 634.00 644.000

      517.07 517.08 516.56 20.00 -5.16 % 1.00

      645.000 665.00 685.000

      516.51 515.48 515.54 40.00 0.32 % 20.00

      705.000 725.00 745.000

      515.61 515.67 516.57 40.00 4.52 % 5.00

      750.000 765.00 780.000

      516.80 517.48 517.57 30.00 0.61 % 70.00

      850.000 850.00 850.000

      518.00 518.00 518.00 0.00 -0.28 % 50.00

      900.000 900.00 900.000

      517.86 517.86 517.86 0.00 -0.08 % 105.00

  • 8/18/2019 CM6969BC.desbloqueado

    3/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      1900.000 1920.00 1940.000

      544.98 546.68 546.68

      NOTA: EL DESMONTE Y EL DESPALME SE LLEVARAN A CABO EXCLUSIVAMENTE ENTRE LOS CEROS --- PUNTOS E DE ESTE LISTADO ---

  • 8/18/2019 CM6969BC.desbloqueado

    4/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 3

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 160.00 504.19 -0.11 3.81 3.81 3.81 1-3 4.14 4.50 4.66

      504.08 -0.08 -0.38 -0.08 -0.08 -0.20 0.27

      504.01 503.71 504.01 504.00 503.88 504.36

    ÿ 160.00 504.19 -0.11 3.81 3.81 3.81 1-3 4.14 4.50 4.66

      504.08 -0.08 -0.38 -0.08 -0.08 -0.20 0.27

      504.01 503.71 504.01 504.00 503.88 504.36

    ÿ 180.00 504.67 0.07 4.11 4.11 3.81 1-3 4.14 4.50 4.70

      504.74 -0.27 -0.38 -0.08 -0.08 -0.20 0.42  504.47 504.36 504.67 504.66 504.54 505.16

    ÿ 182.70 504.89 -0.06 3.91 3.91 3.81 1-3 4.14 4.50 4.75

      504.83 -0.14 -0.38 -0.08 -0.08 -0.20 0.56

      504.69 504.46 504.76 504.75 504.63 505.39

    ÿ 200.00 505.32 0.09 3.91 3.91 3.81 1-1 3.81 4.12 4.12

      505.41 -0.14 -0.38 -0.08 -0.08 -0.38 -0.29

      505.27 505.03 505.33 505.33 505.03 505.12

    ÿ 209.00 505.59 0.12 4.07 4.07 3.81 1-1 3.81 3.93 3.93

      505.71 -0.25 -0.38 -0.08 -0.08 -0.38 -0.16

      505.46 505.33 505.63 505.63 505.33 505.55

    ÿ 211.50 505.84 -0.06 4.61 4.50 4.14 3-3 4.14 4.50 4.65

      505.78 0.14 -0.20 -0.08 -0.08 -0.20 0.25

      505.92 505.57 505.69 505.69 505.57 506.03ÿ 220.00 506.06 -0.07 3.89 3.89 3.81 1-1 3.81 4.00 4.00

      505.99 -0.13 -0.38 -0.08 -0.08 -0.38 -0.20

      505.86 505.61 505.91 505.91 505.61 505.78

    ÿ 240.00 506.52 -0.03 3.92 3.92 3.81 1-1 3.81 3.95 3.95

      506.49 -0.15 -0.38 -0.08 -0.08 -0.38 -0.17

      506.34 506.11 506.41 506.41 506.11 506.32

    ÿ 260.00 506.93 0.06 3.90 3.90 3.81 1-1 3.81 4.08 4.08

      506.99 -0.14 -0.38 -0.08 -0.08 -0.38 -0.26

      506.85 506.61 506.91 506.91 506.61 506.73

    ÿ 280.00 507.44 0.11 4.00 4.00 3.81 1-1 3.81 3.85 3.85

      507.55 -0.21 -0.38 -0.08 -0.08 -0.38 -0.11

      507.34 507.17 507.47 507.47 507.17 507.44

    ÿ 289.20 507.92 0.02 3.96 3.96 3.81 1-1 3.81 3.81 3.81

      507.94 -0.18 -0.38 -0.08 -0.08 -0.38 -0.08

      507.76 507.56 507.86 507.86 507.56 507.86

    ÿ 300.00 508.50 0.03 3.96 3.96 3.81 1-1 3.81 3.93 3.93

      508.53 -0.18 -0.38 -0.08 -0.08 -0.38 -0.16

  • 8/18/2019 CM6969BC.desbloqueado

    5/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 4

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 380.00 514.16 0.23 4.03 4.03 3.81 1-1 3.81 3.88 3.88

      514.39 -0.22 -0.38 -0.08 -0.08 -0.38 -0.12

      514.17 514.01 514.32 514.32 514.01 514.27

    ÿ 384.62 514.26 0.27 4.08 4.08 3.80 1-3 4.14 4.50 4.69

      514.53 -0.19 -0.30 0.00 -0.08 -0.20 0.37

      514.34 514.23 514.53 514.44 514.32 514.90

    ÿ 400.00 514.61 0.12 4.11 4.11 3.77 1-3 5.40 5.60 7.41

      514.73 0.08 0.04 0.31 -0.44 -0.51 4.99  514.81 514.77 515.04 514.29 514.22 519.72

    ÿ 406.00 514.71 0.08 4.04 4.04 3.77 1-3 5.40 5.60 7.43

      514.79 0.13 0.03 0.31 -0.44 -0.51 5.03

      514.91 514.82 515.09 514.34 514.28 519.82

    ÿ 414.52 514.86 0.00 3.91 3.91 3.78 1-3 4.99 5.27 6.35

      514.86 0.13 -0.08 0.22 -0.29 -0.38 2.89

      514.99 514.79 515.08 514.58 514.48 517.75

    ÿ 420.00 514.96 -0.05 3.82 3.82 3.78 1-3 4.69 5.01 5.64

      514.91 0.12 -0.15 0.14 -0.18 -0.29 1.62

      515.03 514.76 515.06 514.73 514.62 516.53

    ÿ 421.72 514.97 -0.04 3.80 3.80 3.79 1-3 4.60 4.93 5.51

      514.93 0.11 -0.18 0.12 -0.15 -0.26 1.48

      515.04 514.75 515.05 514.78 514.67 516.40ÿ 426.52 515.00 -0.03 4.03 4.03 3.79 1-3 4.35 4.71 5.15

      514.97 -0.10 -0.24 0.06 -0.09 -0.21 1.12

      514.87 514.73 515.03 514.88 514.76 516.09

    ÿ 431.32 515.04 -0.03 3.99 3.99 3.80 1-3 4.14 4.50 4.84

      515.01 -0.13 -0.30 -0.00 -0.08 -0.20 0.83

      514.88 514.71 515.01 514.93 514.81 515.85

    ÿ 440.00 515.10 -0.01 3.98 3.98 3.81 1-1 3.80 3.89 3.89

      515.09 -0.19 -0.38 -0.08 -0.03 -0.33 -0.09

      514.90 514.71 515.01 515.06 514.76 515.00

    ÿ 444.51 515.14 -0.01 4.00 4.00 3.91 1-1 3.80 3.81 3.81

      515.13 -0.14 -0.38 -0.08 0.03 -0.27 0.02

      514.99 514.75 515.05 515.16 514.86 515.15

    ÿ 448.26 515.18 -0.02 4.12 4.12 4.10 1-3 4.07 4.50 4.79

      515.16 -0.09 -0.38 -0.08 0.08 -0.06 0.82

      515.07 514.78 515.08 515.24 515.10 515.98

    ÿ 452.01 515.21 -0.01 5.11 4.98 4.64 3-3 4.05 4.50 4.80

      515.20 0.14 -0.26 -0.15 0.13 -0.02 0.89

  • 8/18/2019 CM6969BC.desbloqueado

    6/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 5

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 500.00 515.71 -0.00 5.69 4.27 3.81 1-1 3.80 3.94 3.94

      515.71 -1.33 -0.39 -0.08 -0.02 -0.32 -0.11

      514.38 515.32 515.63 515.69 515.39 515.60

    ÿ 520.00 516.12 -0.03 3.95 3.95 3.81 1-1 3.81 3.96 3.96

      516.09 -0.17 -0.38 -0.08 -0.08 -0.38 -0.17

      515.92 515.71 516.02 516.02 515.71 515.92

    ÿ 529.40 516.34 -0.04 3.94 3.94 3.81 1-3 3.76 4.38 4.38

      516.30 -0.16 -0.38 -0.08 -0.08 -0.56 -0.56  516.14 515.92 516.23 516.23 515.74 515.74

    ÿ 540.00 516.50 0.04 3.84 3.84 3.81 1-1 3.81 3.95 3.95

      516.54 -0.10 -0.38 -0.08 -0.08 -0.38 -0.17

      516.44 516.16 516.46 516.46 516.16 516.37

    ÿ 546.36 516.64 0.04 3.91 3.91 3.81 1-3 4.13 4.50 4.88

      516.68 -0.14 -0.38 -0.08 -0.06 -0.18 0.98

      516.54 516.30 516.60 516.62 516.50 517.66

    ÿ 559.70 516.94 0.03 3.94 3.94 3.83 1-3 4.10 4.50 5.55

      516.97 -0.15 -0.38 -0.08 0.00 -0.13 3.06

      516.82 516.59 516.90 516.98 516.84 520.04

    ÿ 560.00 516.95 0.03 3.94 3.94 3.83 1-3 4.10 4.50 5.56

      516.98 -0.15 -0.38 -0.08 0.01 -0.13 3.09

      516.83 516.60 516.90 516.99 516.85 520.07ÿ 573.03 517.02 -0.02 4.18 4.18 4.07 1-3 4.07 4.50 5.53

      517.00 -0.15 -0.38 -0.08 0.07 -0.08 3.05

      516.85 516.61 516.92 517.06 516.92 520.05

    ÿ 579.70 517.05 -0.04 4.21 4.21 4.19 1-3 4.06 4.50 5.34

      517.01 -0.11 -0.40 -0.10 0.10 -0.05 2.49

      516.90 516.61 516.91 517.10 516.96 519.50

    ÿ 580.00 517.05 -0.04 4.21 4.21 4.20 1-3 4.06 4.50 5.32

      517.01 -0.11 -0.40 -0.10 0.10 -0.05 2.43

      516.90 516.61 516.91 517.11 516.96 519.44

    ÿ 600.00 516.96 0.07 4.90 4.89 4.53 3-1 3.79 3.82 3.82

      517.03 -0.19 -0.23 -0.11 0.09 -0.21 0.07

      516.85 516.81 516.92 517.13 516.83 517.10

    ÿ 600.31 516.96 0.07 4.89 4.88 4.53 3-1 3.79 3.81 3.81

      517.03 -0.19 -0.23 -0.11 0.09 -0.21 0.08

      516.85 516.81 516.93 517.12 516.83 517.11

    ÿ 606.97 517.04 0.00 4.22 4.22 4.07 1-1 3.79 3.88 3.88

      517.04 -0.18 -0.38 -0.08 0.08 -0.22 0.01

  • 8/18/2019 CM6969BC.desbloqueado

    7/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 6

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 665.00 515.54 0.21 5.00 5.00 4.73 1-1 3.77 3.79 3.79

      515.75 -0.50 -0.64 -0.32 0.26 -0.04 0.25

      515.25 515.11 515.43 516.01 515.71 516.00

    ÿ 665.26 515.54 0.21 4.95 4.95 4.74 1-1 3.77 3.79 3.79

      515.75 -0.47 -0.64 -0.33 0.26 -0.04 0.25

      515.28 515.11 515.42 516.01 515.71 515.99

    ÿ 668.00 515.51 0.18 5.01 5.01 4.84 1-1 3.77 4.17 5.02

      515.69 -0.48 -0.68 -0.37 0.29 0.02 -0.54  515.20 515.01 515.32 515.97 515.70 515.14

    ÿ 680.00 515.64 -0.10 5.60 5.50 5.28 3-3 3.99 4.50 5.02

      515.54 -0.17 -0.48 -0.40 0.30 0.13 1.70

      515.38 515.07 515.14 515.85 515.68 517.25

    ÿ 686.13 515.59 -0.04 5.56 5.41 5.17 3-3 4.00 4.50 5.12

      515.55 0.02 -0.44 -0.36 0.28 0.11 1.98

      515.56 515.11 515.19 515.82 515.66 517.53

    ÿ 696.83 515.57 0.01 4.31 4.31 4.29 1-1 3.78 3.89 3.89

      515.58 -0.17 -0.45 -0.15 0.14 -0.16 0.07

      515.41 515.13 515.43 515.72 515.42 515.65

    ÿ 700.00 515.57 0.02 4.28 4.28 4.15 1-1 3.79 4.11 4.11

      515.59 -0.19 -0.41 -0.11 0.10 -0.19 -0.12

      515.40 515.18 515.48 515.69 515.40 515.47ÿ 706.13 515.61 0.00 4.04 4.04 3.90 1-1 3.80 4.07 4.07

      515.61 -0.17 -0.38 -0.08 0.03 -0.27 -0.16

      515.44 515.23 515.53 515.64 515.34 515.45

    ÿ 708.40 515.63 -0.01 3.95 3.95 3.81 1-1 3.80 4.06 4.06

      515.62 -0.17 -0.38 -0.08 -0.00 -0.30 -0.18

      515.46 515.24 515.55 515.62 515.32 515.45

    ÿ 715.43 515.67 0.03 3.93 3.93 3.81 1-3 4.14 4.50 5.37

      515.70 -0.16 -0.38 -0.08 -0.08 -0.20 2.42

      515.54 515.32 515.62 515.61 515.49 518.12

    ÿ 720.00 515.70 0.07 3.97 3.97 3.81 1-3 4.14 4.50 5.46

      515.77 -0.18 -0.38 -0.08 -0.08 -0.20 2.71

      515.59 515.39 515.70 515.69 515.57 518.48

    ÿ 728.58 515.96 0.01 3.85 3.85 3.80 1-3 4.17 4.53 5.32

      515.97 -0.03 -0.29 0.01 -0.08 -0.20 2.20

      515.95 515.68 515.98 515.89 515.77 518.17

    ÿ 733.58 516.12 0.01 3.84 3.84 3.79 1-3 4.42 4.78 5.51

      516.13 0.03 -0.23 0.07 -0.09 -0.21 2.00

  • 8/18/2019 CM6969BC.desbloqueado

    8/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

  • 8/18/2019 CM6969BC.desbloqueado

    9/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 7

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    770.00 seccion insuficiente lado derecho

     

    ÿ 770.00 517.55 -0.10 4.89 4.15 3.76 1-3 5.95 6.10 6.51

      517.45 -0.39 0.10 0.36 -0.58 -0.63 0.60

      517.06 517.55 517.81 516.87 516.82 518.05

     

    780.00 seccion insuficiente lado derecho 

    ÿ 780.00 517.65 -0.08 7.62 4.16 3.76 1-0

      517.57 -2.24 0.07 0.34

    515.34 517.64 517.91

    783.16 seccion insuficiente lado derecho

     

    ÿ 783.16 517.64 -0.05 7.65 4.17 3.77 1-3 5.58 5.80 6.23

      517.59 -2.29 0.03 0.30 -0.44 -0.51 0.81

      515.30 517.62 517.89 517.15 517.08 518.40

    ÿ 788.50 517.64 -0.02 7.55 4.19 3.77 1-3 5.24 5.50 5.88

      517.62 -2.29 -0.05 0.23 -0.32 -0.41 0.75

      515.33 517.58 517.85 517.31 517.22 518.37ÿ 790.00 517.64 -0.01 7.39 4.19 3.78 1-3 5.14 5.42 5.77

      517.63 -2.20 -0.07 0.21 -0.29 -0.38 0.68

      515.43 517.57 517.84 517.35 517.25 518.32

    ÿ 798.16 517.63 0.05 5.01 4.22 3.79 1-1 4.29 4.37 4.37

      517.68 -0.71 -0.18 0.11 -0.12 -0.42 -0.18

      516.97 517.50 517.79 517.56 517.26 517.51

    ÿ 800.00 517.63 0.06 4.83 4.23 3.79 1-1 4.18 4.28 4.28

      517.69 -0.61 -0.20 0.09 -0.09 -0.40 -0.16

      517.09 517.49 517.78 517.60 517.30 517.53

    ÿ 803.16 517.66 0.05 4.45 4.23 3.79 1-1 4.01 4.07 4.07

      517.71 -0.36 -0.22 0.08 -0.08 -0.38 -0.12

      517.35 517.50 517.79 517.63 517.33 517.59

    ÿ 808.16 517.71 0.03 4.12 4.12 3.79 1-1 3.81 3.88 3.88

      517.74 -0.14 -0.22 0.08 -0.08 -0.38 -0.12

      517.60 517.53 517.82 517.67 517.37 517.62

    ÿ 811.57 517.75 0.01 4.13 4.13 3.79 1-1 3.81 3.81 3.81

      517.76 -0.15 -0.22 0.08 -0.08 -0.38 -0.08

  • 8/18/2019 CM6969BC.desbloqueado

    10/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 8

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 920.00 517.85 -0.01 3.86 3.86 3.79 1-3 4.67 5.00 5.36

      517.84 0.08 -0.17 0.12 -0.15 -0.27 0.82

      517.92 517.67 517.97 517.69 517.58 518.66

    ÿ 940.00 517.81 0.02 3.88 3.88 3.79 1-3 4.67 5.00 5.51

      517.83 0.06 -0.17 0.12 -0.15 -0.27 1.29

      517.89 517.65 517.95 517.67 517.56 519.12

    ÿ 960.00 517.70 0.11 4.02 4.02 3.79 1-3 4.67 5.00 5.40

      517.81 -0.03 -0.17 0.12 -0.15 -0.27 0.95  517.78 517.64 517.93 517.66 517.54 518.76

    ÿ 980.00 517.87 -0.08 3.89 3.89 3.79 1-3 4.67 5.00 5.19

      517.79 0.06 -0.17 0.12 -0.15 -0.27 0.32

      517.85 517.62 517.92 517.64 517.53 518.11

    ÿ 995.89 517.86 -0.08 3.89 3.89 3.79 1-3 4.63 4.97 5.42

      517.78 0.04 -0.18 0.12 -0.14 -0.26 1.14

      517.82 517.60 517.90 517.64 517.52 518.92

    ÿ 1000.00 517.86 -0.08 3.87 3.87 3.79 1-3 4.46 4.82 5.34

      517.78 0.03 -0.22 0.08 -0.10 -0.22 1.34

      517.80 517.56 517.86 517.68 517.56 519.12

    ÿ 1002.56 517.83 -0.06 3.86 3.86 3.79 1-3 4.37 4.73 5.20

      517.77 0.01 -0.24 0.06 -0.09 -0.21 1.22

      517.79 517.53 517.83 517.69 517.57 518.99ÿ 1015.89 517.68 0.03 4.65 4.50 4.13 3-3 4.14 4.50 4.75

      517.71 0.27 -0.18 -0.06 -0.08 -0.20 0.54

      517.98 517.53 517.65 517.63 517.51 518.25

    ÿ 1020.00 517.63 0.03 3.82 3.82 3.81 1-1 3.81 3.89 3.89

      517.66 -0.08 -0.38 -0.08 -0.06 -0.36 -0.12

      517.58 517.28 517.58 517.60 517.30 517.54

    ÿ 1029.22 517.48 0.01 4.71 4.57 4.21 3-3 4.09 4.50 4.74

      517.49 0.22 -0.20 -0.08 0.02 -0.12 0.61

      517.71 517.29 517.41 517.51 517.38 518.11

    ÿ 1029.41 517.48 0.01 4.72 4.58 4.22 3-3 4.09 4.50 4.74

      517.49 0.22 -0.20 -0.08 0.02 -0.11 0.62

      517.71 517.28 517.40 517.51 517.37 518.11

    ÿ 1030.07 517.47 0.00 4.74 4.60 4.24 3-3 4.09 4.50 4.75

      517.47 0.22 -0.21 -0.08 0.03 -0.11 0.65

      517.69 517.27 517.39 517.50 517.36 518.12

    ÿ 1030.74 517.46 -0.00 4.77 4.63 4.26 3-3 4.09 4.50 4.76

      517.46 0.22 -0.21 -0.09 0.03 -0.10 0.67

  • 8/18/2019 CM6969BC.desbloqueado

    11/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 9

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 1080.82 516.46 -0.15 3.95 3.95 3.83 1-1 3.80 4.14 4.14

      516.31 -0.16 -0.38 -0.08 0.01 -0.29 -0.22

      516.15 515.93 516.23 516.31 516.01 516.09

    ÿ 1094.16 516.51 -0.06 4.05 4.05 3.81 1-1 3.81 4.16 4.16

      516.45 -0.24 -0.38 -0.08 -0.07 -0.38 -0.30

      516.21 516.07 516.37 516.38 516.07 516.15

    ÿ 1100.00 516.53 0.08 4.26 4.26 3.81 1-1 3.81 3.88 3.88

      516.61 -0.38 -0.39 -0.08 -0.08 -0.38 -0.12  516.23 516.22 516.53 516.53 516.23 516.48

    ÿ 1113.60 517.10 0.09 4.14 4.14 3.81 1-1 3.81 3.96 3.96

      517.19 -0.27 -0.35 -0.04 -0.08 -0.38 -0.18

      516.93 516.85 517.15 517.12 516.82 517.02

    ÿ 1120.00 517.37 0.21 3.86 3.86 3.80 1-1 3.81 4.11 4.11

      517.58 -0.06 -0.32 -0.02 -0.08 -0.38 -0.27

      517.52 517.26 517.56 517.50 517.20 517.31

    ÿ 1126.93 518.03 0.04 3.91 3.91 3.80 1-1 3.82 4.22 4.22

      518.07 -0.07 -0.30 0.00 -0.08 -0.38 -0.34

      518.00 517.78 518.08 518.00 517.69 517.73

    ÿ 1140.00 519.28 -0.07 4.71 4.50 4.08 3-3 4.33 4.69 4.87

      519.21 0.54 -0.09 0.05 -0.09 -0.21 0.32

      519.75 519.12 519.26 519.12 519.00 519.53ÿ 1140.27 519.30 -0.07 4.71 4.50 4.08 3-3 4.33 4.70 4.87

      519.23 0.54 -0.09 0.05 -0.09 -0.21 0.31

      519.77 519.14 519.28 519.14 519.02 519.54

    ÿ 1146.93 519.85 -0.05 4.69 4.50 4.07 3-1 4.10 4.15 4.15

      519.80 0.52 -0.07 0.08 -0.08 -0.38 -0.12

      520.32 519.73 519.87 519.71 519.41 519.68

    ÿ 1160.00 520.94 -0.17 4.68 4.50 4.07 3-1 4.11 4.18 4.18

      520.77 0.48 -0.06 0.08 -0.08 -0.38 -0.13

      521.25 520.71 520.85 520.69 520.39 520.64

    ÿ 1180.00 521.84 0.06 3.93 3.93 3.79 1-1 4.11 4.30 4.30

      521.90 -0.02 -0.22 0.08 -0.08 -0.39 -0.21

      521.89 521.68 521.98 521.82 521.52 521.69

    ÿ 1199.63 522.46 0.14 3.94 3.94 3.79 1-1 4.10 4.30 4.30

      522.60 -0.02 -0.22 0.07 -0.08 -0.39 -0.22

      522.58 522.37 522.67 522.52 522.21 522.38

    ÿ 1200.00 522.47 0.14 3.94 3.94 3.79 1-1 4.09 4.30 4.30

      522.61 -0.03 -0.23 0.07 -0.08 -0.39 -0.22

  • 8/18/2019 CM6969BC.desbloqueado

    12/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 10

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 1320.00 519.88 -0.25 4.70 4.50 4.14 3-1 3.81 4.08 4.08

      519.63 0.41 -0.20 -0.08 -0.08 -0.38 -0.26

      520.04 519.43 519.55 519.56 519.25 519.38

    ÿ 1340.00 519.59 0.37 6.70 4.27 3.81 1-1 3.81 4.27 5.32

      519.96 -2.00 -0.39 -0.08 -0.08 -0.39 -1.08

      517.96 519.57 519.88 519.88 519.57 518.88

    ÿ 1347.94 519.78 0.57 9.95 4.27 3.81 1-1 3.81 4.27 6.51

      520.35 -4.17 -0.39 -0.08 -0.08 -0.39 -1.88

      516.18 519.97 520.27 520.27 519.97 518.47

    ÿ 1360.00 521.02 0.22 3.89 3.89 3.81 1-1 3.81 4.05 4.05

      521.24 -0.13 -0.38 -0.08 -0.06 -0.36 -0.22

      521.11 520.86 521.16 521.18 520.87 521.02

    ÿ 1365.40 521.65 0.10 3.82 3.82 3.81 1-1 3.81 3.85 3.85

      521.75 -0.09 -0.38 -0.08 -0.04 -0.34 -0.07

      521.66 521.37 521.67 521.70 521.40 521.67

    ÿ 1378.73 523.20 0.06 4.30 4.29 3.82 1-1 3.80 4.12 4.12

      523.26 -0.39 -0.39 -0.08 0.00 -0.30 -0.21

      522.87 522.88 523.18 523.26 522.96 523.05

    ÿ 1380.00 523.35 0.06 4.39 4.31 3.84 1-1 3.80 4.12 4.12

      523.41 -0.44 -0.39 -0.08 0.01 -0.29 -0.20

      522.97 523.03 523.33 523.42 523.12 523.21ÿ 1392.07 524.87 -0.02 4.80 4.70 4.33 3-3 4.08 4.50 4.87

      524.85 0.10 -0.21 -0.09 0.05 -0.09 1.02

      524.95 524.64 524.76 524.90 524.76 525.87

    ÿ 1398.73 525.72 -0.08 4.93 4.79 4.43 3-3 4.07 4.50 5.02

      525.64 0.21 -0.21 -0.09 0.08 -0.07 1.51

      525.85 525.43 525.55 525.72 525.57 527.15

    ÿ 1400.00 525.87 -0.08 4.94 4.80 4.44 3-3 4.07 4.50 5.06

      525.79 0.22 -0.21 -0.09 0.08 -0.06 1.64

      526.01 525.58 525.70 525.87 525.73 527.43

    ÿ 1420.00 528.12 -0.10 5.01 4.80 4.44 3-1 3.79 3.88 3.88

      528.02 0.44 -0.21 -0.09 0.08 -0.22 0.02

      528.46 527.82 527.94 528.10 527.80 528.04

    ÿ 1440.00 529.71 0.07 4.22 4.22 4.11 1-1 3.79 3.83 3.83

      529.78 -0.15 -0.38 -0.08 0.08 -0.22 0.05

      529.62 529.39 529.69 529.85 529.55 529.83

    ÿ 1444.23 530.02 0.06 4.27 4.27 4.09 1-1 3.79 3.94 3.94

      530.08 -0.20 -0.39 -0.08 0.07 -0.23 -0.03

  • 8/18/2019 CM6969BC.desbloqueado

    13/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 11

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 1530.00 531.59 0.00 3.98 3.98 3.77 1-3 5.18 5.43 6.11

      531.59 0.11 -0.04 0.25 -0.34 -0.42 1.63

      531.70 531.55 531.84 531.26 531.17 533.23

    ÿ 1540.00 530.90 0.09 3.93 3.93 3.79 1-3 4.65 4.98 5.33

      530.99 0.03 -0.17 0.13 -0.15 -0.27 0.78

      531.02 530.82 531.12 530.84 530.73 531.78

    ÿ 1557.37 530.01 0.06 3.97 3.97 3.81 1-1 3.81 3.94 3.94

      530.07 -0.18 -0.38 -0.08 -0.07 -0.37 -0.15

      529.89 529.69 530.00 530.00 529.70 529.92

    ÿ 1560.00 529.87 0.08 4.01 4.01 3.81 1-1 3.80 4.00 4.00

      529.95 -0.21 -0.38 -0.08 -0.04 -0.34 -0.17

      529.74 529.57 529.88 529.92 529.62 529.79

    ÿ 1565.37 529.70 0.03 4.04 4.04 3.92 1-1 3.80 3.91 3.91

      529.73 -0.16 -0.38 -0.08 0.03 -0.27 -0.05

      529.57 529.35 529.65 529.76 529.46 529.68

    ÿ 1573.37 529.45 -0.01 5.01 4.95 4.62 3-1 3.79 3.82 3.82

      529.44 -0.09 -0.27 -0.16 0.13 -0.17 0.10

      529.36 529.18 529.29 529.57 529.27 529.55

    ÿ 1580.00 529.23 0.01 5.26 5.24 4.95 3-1 3.78 3.90 3.90

      529.24 -0.28 -0.37 -0.27 0.21 -0.09 0.13

      528.96 528.88 528.97 529.45 529.16 529.37ÿ 1585.37 529.10 -0.00 5.58 5.47 5.23 3-1 3.77 4.02 4.02

      529.10 -0.12 -0.45 -0.38 0.27 -0.01 0.10

      528.98 528.64 528.72 529.37 529.09 529.20

    ÿ 1600.00 528.73 0.00 5.74 5.46 4.94 1-1 3.77 4.03 4.03

      528.73 -0.94 -0.75 -0.41 0.31 0.03 0.13

      527.79 527.98 528.33 529.04 528.76 528.86

    ÿ 1608.04 528.62 -0.03 4.81 4.81 4.81 1-1 3.77 4.15 4.15

      528.59 -0.35 -0.65 -0.35 0.27 -0.00 0.02

      528.25 527.95 528.25 528.87 528.59 528.61

    ÿ 1620.00 528.43 0.04 6.74 4.76 4.29 1-1 3.79 4.05 4.05

      528.47 -1.79 -0.47 -0.15 0.13 -0.16 -0.05

      526.69 528.00 528.32 528.60 528.31 528.42

    ÿ 1620.04 528.43 0.04 6.74 4.76 4.28 1-1 3.79 4.05 4.05

      528.47 -1.78 -0.47 -0.15 0.13 -0.16 -0.04

      526.69 528.00 528.32 528.60 528.31 528.43

    ÿ 1628.04 528.39 0.03 4.44 4.40 3.94 1-1 3.80 4.01 4.01

      528.42 -0.41 -0.39 -0.08 0.04 -0.26 -0.11

  • 8/18/2019 CM6969BC.desbloqueado

    14/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 12

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 1710.00 528.79 -0.20 6.07 5.29 4.80 1-3 4.02 4.50 4.54

      528.59 -1.09 -0.57 -0.25 0.21 0.05 0.18

      527.50 528.02 528.34 528.80 528.64 528.77

    ÿ 1719.50 527.61 1.38 8.75 5.90 5.39 1-1 3.77 4.17 6.86

      528.99 -2.68 -0.78 -0.44 0.31 0.04 -1.76

      526.31 528.21 528.55 529.29 529.03 527.23

    ÿ 1720.00 527.55 1.46 8.77 5.93 5.42 1-1 3.77 4.17 6.85

      529.01 -2.68 -0.79 -0.45 0.31 0.05 -1.74

      526.33 528.22 528.56 529.32 529.06 527.27

    ÿ 1730.00 528.25 1.32 9.00 6.28 5.75 1-1 3.76 4.15 5.88

      529.57 -2.74 -0.93 -0.58 0.38 0.12 -1.04

      526.83 528.64 528.99 529.95 529.68 528.53

    ÿ 1740.00 529.53 0.73 8.64 6.28 5.75 1-1 3.76 4.15 4.81

      530.26 -2.50 -0.93 -0.58 0.38 0.12 -0.32

      527.75 529.33 529.68 530.63 530.37 529.93

    ÿ 1746.33 530.46 0.30 5.36 5.36 5.22 1-1 3.77 4.17 4.17

      530.76 -0.48 -0.69 -0.38 0.27 0.00 0.01

      530.29 530.07 530.38 531.04 530.76 530.77

    ÿ 1760.00 532.21 -0.18 4.31 4.31 4.00 1-1 3.80 3.97 3.97

      532.03 -0.29 -0.39 -0.08 0.04 -0.26 -0.08

      531.74 531.65 531.95 532.07 531.77 531.95ÿ 1762.33 532.42 -0.16 4.12 4.12 3.81 1-3 4.10 4.50 4.98

      532.26 -0.28 -0.38 -0.08 -0.00 -0.14 1.32

      531.98 531.88 532.19 532.26 532.13 533.59

    ÿ 1766.33 532.80 -0.14 4.07 4.07 3.81 1-3 4.14 4.50 5.29

      532.66 -0.25 -0.38 -0.08 -0.08 -0.20 2.21

      532.41 532.28 532.59 532.59 532.46 534.87

    ÿ 1770.33 533.18 -0.12 4.08 4.08 3.80 1-3 4.14 4.50 5.58

      533.06 -0.19 -0.31 -0.01 -0.08 -0.20 3.08

      532.87 532.75 533.05 532.98 532.86 536.15

    ÿ 1774.85 533.61 -0.09 4.09 4.09 3.79 1-3 4.38 4.74 6.23

      533.52 -0.13 -0.23 0.07 -0.09 -0.21 4.29

      533.39 533.29 533.58 533.43 533.31 537.81

    ÿ 1775.25 533.64 -0.08 4.10 4.10 3.79 1-3 4.40 4.77 6.28

      533.56 -0.13 -0.22 0.07 -0.09 -0.21 4.39

      533.43 533.34 533.63 533.47 533.35 537.95

    ÿ 1775.65 533.68 -0.08 4.10 4.10 3.79 1-3 4.43 4.79 6.35

      533.60 -0.13 -0.21 0.08 -0.10 -0.22 4.50

  • 8/18/2019 CM6969BC.desbloqueado

    15/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION

      Hoja No : 13

      -----------------------------------------------------------------------------------------------------------------------------

      ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO

      EL-SB E D C' C B A SEC A B C C' D E

      -----------------------------------------------------------------------------------------------------------------------------

     

    ÿ 1888.61 544.27 -0.26 3.92 3.92 3.78 1-3 4.69 5.01 5.43

      544.01 0.05 -0.15 0.14 -0.18 -0.29 0.99

      544.07 543.86 544.16 543.83 543.73 545.01

    ÿ 1892.61 544.53 -0.18 3.97 3.97 3.79 1-3 4.49 4.84 5.14

      544.35 -0.02 -0.20 0.10 -0.11 -0.23 0.67

      544.33 544.15 544.45 544.24 544.12 545.02

    ÿ 1896.61 544.79 -0.10 4.01 4.01 3.79 1-3 4.31 4.67 4.85

      544.69 -0.09 -0.25 0.05 -0.09 -0.21 0.34

      544.60 544.44 544.74 544.61 544.49 545.03

    ÿ 1900.00 545.01 -0.03 5.85 4.25 3.80 1-1 3.84 4.05 4.05

      544.98 -1.36 -0.29 0.01 -0.08 -0.38 -0.22

      543.62 544.69 544.99 544.90 544.60 544.76

    ÿ 1919.99 546.18 0.07 4.76 4.27 3.81 1-1 3.81 3.82 3.82

      546.25 -0.71 -0.39 -0.08 -0.08 -0.38 -0.09

      545.54 545.87 546.18 546.18 545.88 546.17

      NOTA: EL DESMONTE Y EL DESPALME SE LLEVARAN A CABO EXCLUSIVAMENTE ENTRE LOS CEROS --- PUNTOS E DE ESTE LISTADO ---

     

    Secciones Utilizadas en el proceso

      Secci¢n Tipo : 1

    Secci¢n Tipo : 3

  • 8/18/2019 CM6969BC.desbloqueado

    16/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      AREAS DE LAS SECCIONES DE CONSTRUCCION Hoja No : 1

      -----------------------------------------------------------------------------------------------------------------------------

      DESP. CORTE ESTRATO RELLENO CAJA Ex.Ac.Te.Co. C.C.C. DESP CUERPO SBY SBR CORTE CAJA

      ESTACION CORTE 2 3 95% 100% 95% 100% 95% 100% TERR TERR TERR TERR C.T.N 2 3

      160.00 1.7 1.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.4 0.0

    160.00 1.7 1.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.4 0.0

    180.00 1.0 0.4 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.3 0.0 0.7 0.0

    182.70 1.7 0.8 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 1.4 0.0

    200.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.1 0.0 2.4 0.3 0.1 0.0

    209.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.4 0.1 0.6 0.0

    211.50 1.9 1.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 1.4 0.0

    220.00 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 1.6 0.0

    240.00 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 1.4 0.0

    260.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.4 0.0 0.9 0.0

    280.00 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0 2.3 0.0 0.5 0.0

    289.20 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.3 0.0 0.8 0.0

    300.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.1 0.0 2.4 0.3 0.5 0.0

    320.00 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.1 0.0 2.4 0.3 0.2 0.0

    340.00 1.4 0.4 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.2 0.0 0.0 2.1 0.0 1.2 0.0

    351.45 1.9 5.4 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    358.46 1.9 7.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    360.00 1.7 2.3 0.0 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.0 0.0

    367.82 0.7 0.4 0.0 0.0 0.3 0.0 0.0 0.0 0.0 1.1 1.1 0.0 2.2 0.5 0.4 0.0

    372.62 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 1.4 0.0 2.4 0.6 0.2 0.0

    377.42 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 1.1 0.0 2.4 0.7 0.1 0.0

    380.00 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.6 0.0 2.4 0.7 0.1 0.0

    384.62 0.3 0.4 0.0 0.0 0.2 0.0 0.0 0.0 0.0 1.4 1.1 0.0 2.3 0.7 0.1 0.0400.00 1.2 7.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 1.1 0.4 0.0 1.8 0.5 0.1 0.0

    406.00 1.2 7.3 0.0 0.0 1.1 0.0 0.0 0.0 0.0 1.1 0.2 0.0 1.8 0.4 0.1 0.0

    414.52 1.2 2.5 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.9 0.0 0.0 2.1 0.0 0.6 0.0

    420.00 1.4 1.9 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.4 0.0 0.0 2.1 0.0 0.8 0.0

    421.72 1.4 1.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.5 0.0 0.0 2.1 0.0 0.8 0.0

    426.52 1.4 0.9 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.5 0.0 0.0 2.2 0.0 0.8 0.0

    431.32 1.3 0.6 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.5 0.0 0.0 2.3 0.0 1.0 0.0

    440.00 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.3 0.0 0.9 0.0

    444.51 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 2.3 0.0 1.1 0.0

    448.26 1.2 0.5 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.3 0.0 1.2 0.0

    452.01 1.5 1.6 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.5 0.0 0.0 1.7 0.0 0.8 0.0

    460.00 1.7 2.3 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.4 0.0 0.0 1.4 0.0 0.6 0.0

    460.26 1.7 2.4 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.4 0.0 0.0 1.4 0.0 0.7 0.0

    470.00 2.2 6.0 0.0 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.6 0.0

    477.67 2.1 5.7 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.8 0.0

    480.00 2.1 5.5 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.1 0.0 0.0 1.3 0.0 0.8 0.0

    485.92 1.7 2.9 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.2 0.0 0.0 1.9 0.0 1.1 0.0

  • 8/18/2019 CM6969BC.desbloqueado

    17/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      AREAS DE LAS SECCIONES DE CONSTRUCCION Hoja No : 2

      -----------------------------------------------------------------------------------------------------------------------------

      DESP. CORTE ESTRATO RELLENO CAJA Ex.Ac.Te.Co. C.C.C. DESP CUERPO SBY SBR CORTE CAJA

      ESTACION CORTE 2 3 95% 100% 95% 100% 95% 100% TERR TERR TERR TERR C.T.N 2 3

      680.00 2.1 3.2 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.7 0.0

    686.13 1.6 3.0 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.5 0.1 0.0 1.5 0.1 0.6 0.0

    696.83 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.7 0.0 2.5 0.3 0.9 0.0

    700.00 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.9 0.0 2.5 0.3 0.7 0.0

    706.13 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.7 0.0 2.4 0.3 0.7 0.0

    708.40 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.6 0.0 2.4 0.2 0.7 0.0

    715.43 1.3 1.9 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.2 0.0 0.9 0.0

    720.00 1.9 3.7 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.7 0.0

    728.58 1.8 2.8 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 1.2 0.0

    733.58 1.9 2.7 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.2 0.0

    738.58 1.3 2.7 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.1 0.0 0.9 0.0

    740.00 1.3 2.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.2 0.0 0.8 0.0

    743.58 2.0 5.6 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.8 0.0

    750.00 1.9 2.1 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.3 0.3 0.0 2.3 0.1 1.7 0.0

    753.58 1.8 2.4 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.7 2.2 0.0 2.1 0.3 1.3 0.0

    760.00 0.6 0.4 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.8 4.5 0.0 0.8 0.4 0.4 0.0

    770.00 1.9 3.3 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.4 0.4 0.0 1.6 0.2 0.9 0.0

    780.00 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 4.3 0.0 1.2 0.5 0.6 0.0

    783.16 1.8 1.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.9 4.7 0.0 2.4 0.5 1.5 0.0

    788.50 1.8 1.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.9 4.1 0.0 2.5 0.4 1.3 0.0

    790.00 1.8 0.6 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.8 2.8 0.0 2.5 0.4 1.1 0.0

    798.16 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.3 0.0 2.5 0.1 0.7 0.0

    800.00 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 2.5 0.0 0.6 0.0803.16 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 2.4 0.0 0.6 0.0

    808.16 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 2.4 0.0 0.7 0.0

    811.57 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 2.3 0.0 0.8 0.0

    820.00 1.6 0.8 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.1 0.0 0.0 2.2 0.0 1.0 0.0

    824.91 1.7 0.8 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.1 0.0

    838.24 1.8 2.4 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.9 0.0

    840.00 1.9 2.7 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.9 0.0

    844.91 1.4 2.8 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.4 0.0 0.0 1.9 0.0 0.6 0.0

    860.00 0.8 1.9 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.1 0.0 0.0 2.1 0.1 0.5 0.0

    880.00 1.0 0.6 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.3 0.0 0.7 0.0

    900.00 0.5 0.9 0.0 0.0 0.4 0.0 0.0 0.0 0.0 1.3 0.0 0.0 2.3 0.1 0.5 0.0

    920.00 0.9 2.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.9 0.0 0.0 1.9 0.0 0.6 0.0

    940.00 0.5 1.3 0.0 0.0 0.4 0.0 0.0 0.0 0.0 1.4 0.1 0.0 2.2 0.2 0.3 0.0

    960.00 0.4 0.9 0.0 0.0 0.3 0.0 0.0 0.0 0.0 1.5 0.2 0.0 2.3 0.7 0.1 0.0

    980.00 1.8 0.5 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 1.3 0.0

    995.89 1.9 2.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.2 0.0

    1000.00 1.8 2.2 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 1.2 0.0

  • 8/18/2019 CM6969BC.desbloqueado

    18/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      AREAS DE LAS SECCIONES DE CONSTRUCCION Hoja No : 3

      -----------------------------------------------------------------------------------------------------------------------------

      DESP. CORTE ESTRATO RELLENO CAJA Ex.Ac.Te.Co. C.C.C. DESP CUERPO SBY SBR CORTE CAJA

      ESTACION CORTE 2 3 95% 100% 95% 100% 95% 100% TERR TERR TERR TERR C.T.N 2 3

      1200.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 1.0 0.0 2.5 0.8 0.0 0.0

    1206.30 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 1.4 0.0 2.4 0.8 0.0 0.0

    1219.63 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 1.4 0.0 2.4 0.8 0.0 0.0

    1220.00 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 1.3 0.0 2.4 0.8 0.0 0.0

    1232.96 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.6 0.0 2.4 0.7 0.0 0.0

    1240.00 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 2.4 0.0 0.3 0.0

    1260.00 2.4 0.5 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 1.4 0.0

    1280.00 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.7 0.0 2.4 0.5 0.2 0.0

    1300.00 2.7 1.5 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.8 0.0

    1320.00 2.6 1.4 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 1.5 0.0

    1340.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 7.7 0.0 2.4 1.2 0.0 0.0

    1347.94 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.9 27.6 0.0 2.4 1.6 0.0 0.0

    1360.00 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.9 0.0 2.4 0.6 0.3 0.0

    1365.40 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.4 0.0 2.3 0.5 0.4 0.0

    1378.73 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.2 0.0 2.4 0.5 0.2 0.0

    1380.00 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.2 0.0 2.4 0.5 0.2 0.0

    1392.07 2.4 0.7 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.5 0.1 0.0 2.3 0.2 0.6 0.0

    1398.73 2.7 2.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.2 0.0 0.0 1.8 0.1 0.7 0.0

    1400.00 2.7 2.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 1.7 0.1 0.6 0.0

    1420.00 2.3 0.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.4 0.2 0.0 2.1 0.1 0.8 0.0

    1440.00 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.6 0.0 2.4 0.5 0.4 0.0

    1444.23 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.5 0.0 2.4 0.4 0.4 0.0

    1450.90 1.8 0.5 0.0 0.0 0.2 0.0 0.0 0.0 0.0 1.0 0.2 0.0 2.3 0.3 0.4 0.01460.00 2.5 0.5 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.2 0.1 0.0 2.3 0.1 0.5 0.0

    1464.23 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.2 0.0 2.4 0.3 0.2 0.0

    1477.57 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.5 0.0 2.4 0.6 0.2 0.0

    1480.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.4 0.0 2.4 0.6 0.1 0.0

    1500.00 2.6 0.9 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.4 0.2 0.0 2.0 0.1 0.7 0.0

    1510.00 3.1 2.5 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.8 0.0

    1520.00 3.0 2.4 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.1 0.0

    1530.00 2.8 2.7 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.2 0.0 0.0 2.1 0.1 0.4 0.0

    1540.00 0.6 0.5 0.0 0.0 0.3 0.0 0.0 0.0 0.0 2.2 0.6 0.0 2.4 0.7 0.1 0.0

    1557.37 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.3 0.0 2.4 0.5 0.2 0.0

    1560.00 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.5 0.0 2.4 0.5 0.2 0.0

    1565.37 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.3 0.0 2.4 0.4 0.3 0.0

    1573.37 1.6 0.2 0.0 0.0 0.2 0.0 0.0 0.0 0.0 1.1 0.3 0.0 2.4 0.4 0.7 0.0

    1580.00 1.5 0.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.2 0.5 0.0 2.2 0.4 0.5 0.0

    1585.37 1.8 1.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 1.1 0.4 0.0 2.1 0.4 0.4 0.0

    1600.00 1.7 0.4 0.0 0.0 0.3 0.0 0.0 0.0 0.0 1.2 0.2 0.0 2.4 0.4 0.5 0.0

    1608.04 2.0 0.3 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.7 0.2 0.0 2.4 0.2 0.6 0.0

  • 8/18/2019 CM6969BC.desbloqueado

    19/87

  • 8/18/2019 CM6969BC.desbloqueado

    20/87

  • 8/18/2019 CM6969BC.desbloqueado

    21/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 2

      -----------------------------------------------------------------------------------------------------------------------------

     Estacion Inicial: 160.00 Estacion Final: 1919.99

     

    HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO

      Dist. Elev. ELEV-SBR Dist. Elev.

     

    4.10 515.08 448.26 4.07 515.24

      515.16

      4.64 515.05 452.01 4.05 515.33

      515.20

      5.11 514.98 460.00 4.01 515.53

      515.29

      5.13 514.97 460.26 4.01 515.53

      515.29

      5.60 514.90 470.00 3.97 515.74

      515.39

      5.18 515.14 477.67 4.00 515.73

      515.47

      5.06 515.21 480.00 4.01 515.73

      515.50

      4.38 515.39 485.92 4.04 515.71

      515.56

      4.20 515.49 489.67 4.06 515.71

      515.60

      4.03 515.56 493.42 4.07 515.70

      515.64  3.81 515.63 500.00 3.80 515.69

      515.71

      3.81 516.02 520.00 3.81 516.02

      516.09

      3.81 516.23 529.40 3.76 516.23

      516.30

      3.81 516.46 540.00 3.81 516.46

      516.54

      3.81 516.60 546.36 4.13 516.62

      516.68

      3.83 516.90 559.70 4.10 516.98

      516.97

      3.83 516.90 560.00 4.10 516.99

      516.98

      4.07 516.92 573.03 4.07 517.06

      517.00

      4.19 516.91 579.70 4.06 517.10

  • 8/18/2019 CM6969BC.desbloqueado

    22/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 3

      -----------------------------------------------------------------------------------------------------------------------------

     Estacion Inicial: 160.00 Estacion Final: 1919.99

     

    HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO

      Dist. Elev. ELEV-SBR Dist. Elev.

     

    4.74 515.42 665.26 3.77 516.01

      515.75

      4.84 515.32 668.00 3.77 515.97

      515.69

      5.28 515.14 680.00 3.99 515.85

      515.54

      5.17 515.19 686.13 4.00 515.82

      515.55

      4.29 515.43 696.83 3.78 515.72

      515.58

      4.15 515.48 700.00 3.79 515.69

      515.59

      3.90 515.53 706.13 3.80 515.64

      515.61

      3.81 515.55 708.40 3.80 515.62

      515.62

      3.81 515.62 715.43 4.14 515.61

      515.70

      3.81 515.70 720.00 4.14 515.69

      515.77  3.80 515.98 728.58 4.17 515.89

      515.97

      3.79 516.19 733.58 4.42 516.04

      516.13

      3.79 516.43 738.58 4.71 516.15

      516.31

      3.78 516.50 740.00 4.79 516.18

      516.36

      3.78 516.70 743.58 5.00 516.27

      516.51

      3.77 517.06 750.00 5.39 516.43

      516.80

      3.77 517.26 753.58 5.60 516.51

      516.95

      3.76 517.55 760.00 0.00 517.26

      517.19

      3.76 517.81 770.00 5.95 516.87

  • 8/18/2019 CM6969BC.desbloqueado

    23/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 4

      -----------------------------------------------------------------------------------------------------------------------------

     Estacion Inicial: 160.00 Estacion Final: 1919.99

     

    HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO

      Dist. Elev. ELEV-SBR Dist. Elev.

     

    3.79 518.09 844.91 4.64 517.82

      517.97

      3.79 518.10 860.00 4.67 517.82

      517.97

      3.79 518.04 880.00 4.67 517.76

      517.92

      3.79 517.98 900.00 4.67 517.71

      517.86

      3.79 517.97 920.00 4.67 517.69

      517.84

      3.79 517.95 940.00 4.67 517.67

      517.83

      3.79 517.93 960.00 4.67 517.66

      517.81

      3.79 517.92 980.00 4.67 517.64

      517.79

      3.79 517.90 995.89 4.63 517.64

      517.78

      3.79 517.86 1000.00 4.46 517.68

      517.78  3.79 517.83 1002.56 4.37 517.69

      517.77

      4.13 517.65 1015.89 4.14 517.63

      517.71

      3.81 517.58 1020.00 3.81 517.60

      517.66

      4.21 517.41 1029.22 4.09 517.51

      517.49

      4.22 517.40 1029.41 4.09 517.51

      517.49

      4.24 517.39 1030.07 4.09 517.50

      517.47

      4.26 517.37 1030.74 4.09 517.49

      517.46

      4.28 517.36 1031.07 4.08 517.49

      517.45

      4.60 517.08 1040.00 4.05 517.33

  • 8/18/2019 CM6969BC.desbloqueado

    24/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 5

      -----------------------------------------------------------------------------------------------------------------------------

     Estacion Inicial: 160.00 Estacion Final: 1919.99

     

    HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO

      Dist. Elev. ELEV-SBR Dist. Elev.

     

    4.07 519.87 1146.93 4.10 519.71

      519.80

      4.07 520.85 1160.00 4.11 520.69

      520.77

      3.79 521.98 1180.00 4.11 521.82

      521.90

      3.79 522.67 1199.63 4.10 522.52

      522.60

      3.79 522.68 1200.00 4.09 522.53

      522.61

      3.79 522.79 1206.30 4.00 522.66

      522.74

      3.80 522.89 1219.63 3.82 522.81

      522.88

      3.80 522.89 1220.00 3.82 522.81

      522.88

      3.81 522.79 1232.96 3.81 522.76

      522.84

      3.81 522.67 1240.00 3.81 522.66

      522.73  3.81 522.08 1260.00 3.81 522.08

      522.15

      3.81 521.15 1280.00 3.81 521.15

      521.22

      4.14 520.17 1300.00 3.81 520.18

      520.26

      4.14 519.55 1320.00 3.81 519.56

      519.63

      3.81 519.88 1340.00 3.81 519.88

      519.96

      3.81 520.27 1347.94 3.81 520.27

      520.35

      3.81 521.16 1360.00 3.81 521.18

      521.24

      3.81 521.67 1365.40 3.81 521.70

      521.75

      3.82 523.18 1378.73 3.80 523.26

  • 8/18/2019 CM6969BC.desbloqueado

    25/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 6

      -----------------------------------------------------------------------------------------------------------------------------

     Estacion Inicial: 160.00 Estacion Final: 1919.99

     

    HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO

      Dist. Elev. ELEV-SBR Dist. Elev.

     

    3.76 532.87 1510.00 5.63 532.01

      532.52

      3.76 532.50 1520.00 5.63 531.65

      532.16

      3.77 531.84 1530.00 5.18 531.26

      531.59

      3.79 531.12 1540.00 4.65 530.84

      530.99

      3.81 530.00 1557.37 3.81 530.00

      530.07

      3.81 529.88 1560.00 3.80 529.92

      529.95

      3.92 529.65 1565.37 3.80 529.76

      529.73

      4.62 529.29 1573.37 3.79 529.57

      529.44

      4.95 528.97 1580.00 3.78 529.45

      529.24

      5.23 528.72 1585.37 3.77 529.37

      529.10  4.94 528.33 1600.00 3.77 529.04

      528.73

      4.81 528.25 1608.04 3.77 528.87

      528.59

      4.29 528.32 1620.00 3.79 528.60

      528.47

      4.28 528.32 1620.04 3.79 528.60

      528.47

      3.94 528.34 1628.04 3.80 528.46

      528.42

      4.14 528.29 1636.04 3.81 528.32

      528.37

      4.14 528.27 1640.00 3.81 528.27

      528.35

      4.14 528.15 1660.00 3.81 528.15

      528.23

      3.81 528.04 1680.00 4.14 528.03

  • 8/18/2019 CM6969BC.desbloqueado

    26/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 7

      -----------------------------------------------------------------------------------------------------------------------------

     Estacion Inicial: 160.00 Estacion Final: 1919.99

     

    HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO

      Dist. Elev. ELEV-SBR Dist. Elev.

     

    3.80 533.05 1770.33 4.14 532.98

      533.06

      3.79 533.58 1774.85 4.38 533.43

      533.52

      3.79 533.63 1775.25 4.40 533.47

      533.56

      3.79 533.68 1775.65 4.43 533.50

      533.60

      3.79 533.75 1776.25 4.47 533.55

      533.66

      3.78 534.19 1780.00 4.74 533.83

      534.03

      3.77 536.34 1800.00 5.40 535.59

      536.03

      3.77 538.34 1820.00 5.40 537.59

      538.03

      3.77 540.19 1840.00 5.40 539.44

      539.88

      3.77 541.89 1860.00 5.40 541.14

      541.58  3.77 543.52 1880.00 5.11 542.95

      543.28

      3.78 543.72 1882.61 4.98 543.22

      543.50

      3.78 544.16 1888.61 4.69 543.83

      544.01

      3.79 544.45 1892.61 4.49 544.24

      544.35

      3.79 544.74 1896.61 4.31 544.61

      544.69

      3.80 544.99 1900.00 3.84 544.90

      544.98

      3.81 546.18 1919.99 3.81 546.18

      546.25

  • 8/18/2019 CM6969BC.desbloqueado

    27/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      VOLUMENES DE CONSTRUCCION Hoja No : 1

      -----------------------------------------------------------------------------------------------------------------------------

      DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co.  ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%

      160.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

      160.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

      180.00 27 8 15 0 21 0 0 0 0 0 0 39 0 11 0 0

      182.70 4 1 2 0 3 0 0 0 0 0 0 6 0 1 0 0

      200.00 15 14 7 0 13 0 2 0 0 1 0 38 0 4 0 0

      209.00 4 11 0 0 3 0 2 0 0 0 0 21 0 0 0 0

      211.50 3 1 1 0 3 0 0 0 0 0 0 5 0 1 0 0

      220.00 15 0 4 0 13 0 0 0 0 0 0 18 0 4 0 0

      240.00 32 0 0 0 29 0 0 0 0 0 0 47 0 0 0 0

      260.00 24 8 0 0 22 0 0 0 0 0 0 47 0 0 0 0

      280.00 11 21 0 0 14 0 0 0 0 0 0 47 0 0 0 0

      289.20 5 10 0 0 6 0 0 0 0 0 0 21 0 0 0 0

      300.00 9 8 0 0 7 0 1 0 0 0 0 25 0 0 0 0

      320.00 8 24 0 0 8 0 6 0 0 1 0 47 0 0 0 0

      340.00 15 18 4 0 14 0 3 0 0 1 0 45 0 3 0 0

      351.45 19 1 33 0 7 0 0 0 0 0 0 12 0 17 0 0

      358.46 13 0 43 0 0 0 0 0 0 0 0 0 0 19 0 0

      360.00 3 0 7 0 1 0 0 0 0 0 0 1 0 3 0 0

      367.82 10 4 11 0 6 0 2 0 0 4 0 14 0 6 0 0

      372.62 2 6 1 0 2 0 3 0 0 6 0 11 0 1 0 0

      377.42 1 7 0 0 1 0 3 0 0 6 0 11 0 0 0 0

      380.00 1 4 0 0 0 0 2 0 0 2 0 6 0 0 0 0

      384.62 1 6 1 0 1 0 3 0 0 4 0 11 0 1 0 0  400.00 12 20 57 0 1 0 9 0 0 11 0 31 0 10 0 0

      406.00 7 7 43 0 1 0 3 0 0 2 0 11 0 6 0 0

      414.52 10 8 42 0 3 0 2 0 0 1 0 16 0 7 0 0

      420.00 7 4 12 0 4 0 0 0 0 0 0 11 0 3 0 0

      421.72 2 1 3 0 1 0 0 0 0 0 0 4 0 1 0 0

      426.52 7 2 6 0 4 0 0 0 0 0 0 10 0 2 0 0

      431.32 6 2 4 0 4 0 0 0 0 0 0 11 0 1 0 0

      440.00 10 5 2 0 8 0 0 0 0 0 0 20 0 1 0 0

      444.51 4 3 0 0 5 0 0 0 0 0 0 11 0 0 0 0

      448.26 4 2 1 0 4 0 0 0 0 0 0 9 0 0 0 0

      452.01 5 2 4 0 4 0 0 0 0 0 0 8 0 2 0 0

      460.00 13 4 15 0 6 0 0 0 0 0 0 13 0 10 0 0

      460.26 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0  470.00 19 2 41 0 6 0 0 0 0 0 0 12 0 17 0 0

      477.67 17 0 45 0 5 0 0 0 0 0 0 8 0 15 0 0

      480.00 5 0 13 0 2 0 0 0 0 0 0 3 0 4 0 0

      485.92 11 1 25 0 6 0 0 0 0 0 0 10 0 7 0 0

  • 8/18/2019 CM6969BC.desbloqueado

    28/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      VOLUMENES DE CONSTRUCCION Hoja No : 2

      -----------------------------------------------------------------------------------------------------------------------------

      DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co.  ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%

      665.26 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0

      668.00 2 3 0 0 2 0 1 0 0 4 0 7 0 0 0 0

      680.00 18 7 19 0 9 0 3 0 0 15 0 24 0 10 0 0

      686.13 11 2 19 0 4 0 0 0 0 0 0 9 0 9 0 0

      696.83 13 7 16 0 8 0 2 0 0 4 0 21 0 7 0 0

      700.00 3 3 0 0 2 0 1 0 0 3 0 8 0 0 0 0

      706.13 5 5 0 0 4 0 2 0 0 5 0 15 0 0 0 0

      708.40 2 2 0 0 2 0 1 0 0 1 0 5 0 0 0 0

      715.43 7 5 7 0 6 0 1 0 0 2 0 16 0 1 0 0

      720.00 7 1 13 0 4 0 0 0 0 0 0 9 0 2 0 0

      728.58 16 0 28 0 8 0 0 0 0 0 0 17 0 4 0 0

      733.58 9 0 14 0 6 0 0 0 0 0 0 10 0 2 0 0

      738.58 8 2 14 0 5 0 0 0 0 0 0 11 0 3 0 0

      740.00 2 1 4 0 1 0 0 0 0 0 0 3 0 1 0 0

      743.58 6 1 15 0 3 0 0 0 0 0 0 6 0 3 0 0

      750.00 12 1 25 0 8 0 0 0 0 1 0 12 0 6 0 0

      753.58 7 2 8 0 5 0 1 0 0 4 0 8 0 3 0 0

      760.00 8 5 9 0 6 0 2 0 0 21 0 9 0 4 0 0

      770.00 13 6 18 0 6 0 3 0 0 24 0 12 0 9 0 0

      780.00 13 6 16 0 7 0 3 0 0 23 0 14 0 7 0 0

      783.16 4 3 2 0 3 0 1 0 0 14 0 6 0 1 0 0

      788.50 10 5 7 0 7 0 2 0 0 24 0 13 0 2 0 0

      790.00 3 1 1 0 2 0 1 0 0 5 0 4 0 0 0 0  798.16 9 9 3 0 7 0 2 0 0 12 0 21 0 1 0 0

      800.00 1 3 0 0 1 0 0 0 0 0 0 5 0 0 0 0

      803.16 1 4 0 0 2 0 0 0 0 0 0 8 0 0 0 0

      808.16 3 5 0 0 3 0 0 0 0 0 0 12 0 0 0 0

      811.57 3 2 0 0 3 0 0 0 0 0 0 8 0 0 0 0

      820.00 11 3 3 0 8 0 0 0 0 0 0 19 0 1 0 0

      824.91 8 0 4 0 5 0 0 0 0 0 0 11 0 2 0 0

      838.24 24 0 22 0 13 0 0 0 0 0 0 27 0 7 0 0

      840.00 3 0 5 0 2 0 0 0 0 0 0 3 0 1 0 0

      844.91 8 1 14 0 4 0 0 0 0 0 0 9 0 4 0 0

      860.00 17 11 36 0 9 0 1 0 0 0 0 30 0 10 0 0

      880.00 19 18 26 0 13 0 1 0 0 0 0 44 0 9 0 0

      900.00 16 21 15 0 12 0 1 0 0 0 0 46 0 7 0 0  920.00 15 22 30 0 11 0 1 0 0 0 0 41 0 11 0 0

      940.00 14 23 34 0 9 0 2 0 0 1 0 41 0 12 0 0

      960.00 8 29 21 0 4 0 9 0 0 3 0 46 0 7 0 0

      980.00 22 15 14 0 14 0 7 0 0 2 0 46 0 7 0 0

  • 8/18/2019 CM6969BC.desbloqueado

    29/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      VOLUMENES DE CONSTRUCCION Hoja No : 3

      -----------------------------------------------------------------------------------------------------------------------------

      DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co.  ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%

      1113.60 2 31 0 0 0 0 10 0 0 6 0 32 0 0 0 0

      1120.00 0 15 0 0 0 0 5 0 0 6 0 15 0 0 0 0

      1126.93 6 11 0 0 1 0 4 0 0 5 0 16 0 0 0 0

      1140.00 30 5 7 0 10 0 2 0 0 0 0 28 0 5 0 0

      1140.27 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0

      1146.93 18 0 5 0 8 0 0 0 0 0 0 14 0 4 0 0

      1160.00 35 0 10 0 17 0 0 0 0 0 0 26 0 7 0 0

      1180.00 30 21 10 0 14 0 7 0 0 6 0 43 0 7 0 0

      1199.63 3 45 0 0 0 0 15 0 0 16 0 48 0 0 0 0

      1200.00 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0

      1206.30 0 16 0 0 0 0 5 0 0 8 0 15 0 0 0 0

      1219.63 1 33 0 0 0 0 11 0 0 19 0 32 0 0 0 0

      1220.00 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0

      1232.96 3 29 0 0 0 0 10 0 0 13 0 31 0 0 0 0

      1240.00 9 8 0 0 1 0 3 0 0 2 0 17 0 0 0 0

      1260.00 47 1 5 0 16 0 0 0 0 0 0 42 0 5 0 0

      1280.00 38 15 5 0 16 0 5 0 0 7 0 43 0 5 0 0

      1300.00 40 15 15 0 10 0 5 0 0 7 0 45 0 4 0 0

      1320.00 53 0 28 0 23 0 0 0 0 0 0 37 0 12 0 0

      1340.00 26 36 14 0 15 0 12 0 0 77 0 41 0 8 0 0

      1347.94 0 34 0 0 0 0 11 0 0 140 0 19 0 0 0 0

      1360.00 4 40 0 0 2 0 13 0 0 172 0 29 0 0 0 0

      1365.40 4 9 0 0 2 0 3 0 0 3 0 13 0 0 0 0  1378.73 12 20 0 0 4 0 7 0 0 4 0 31 0 0 0 0

      1380.00 1 2 0 0 0 0 1 0 0 0 0 3 0 0 0 0

      1392.07 22 11 4 0 5 0 4 0 0 2 0 29 0 2 0 0

      1398.73 17 2 9 0 4 0 1 0 0 0 0 14 0 4 0 0

      1400.00 3 0 3 0 1 0 0 0 0 0 0 2 0 1 0 0

      1420.00 50 7 28 0 15 0 2 0 0 2 0 38 0 15 0 0

      1440.00 33 18 6 0 12 0 6 0 0 8 0 45 0 5 0 0

      1444.23 5 6 0 0 2 0 2 0 0 2 0 10 0 0 0 0

      1450.90 10 8 2 0 3 0 3 0 0 2 0 16 0 1 0 0

      1460.00 19 5 5 0 4 0 2 0 0 1 0 21 0 2 0 0

      1464.23 9 2 1 0 2 0 1 0 0 1 0 10 0 0 0 0

      1477.57 16 17 0 0 3 0 6 0 0 5 0 32 0 0 0 0

      1480.00 2 4 0 0 0 0 1 0 0 1 0 6 0 0 0 0  1500.00 34 21 9 0 9 0 7 0 0 7 0 44 0 8 0 0

      1510.00 29 2 17 0 8 0 1 0 0 1 0 17 0 12 0 0

      1520.00 31 0 24 0 10 0 0 0 0 0 0 17 0 11 0 0

      1530.00 29 1 25 0 7 0 0 0 0 0 0 21 0 7 0 0

  • 8/18/2019 CM6969BC.desbloqueado

    30/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      VOLUMENES DE CONSTRUCCION Hoja No : 4

      -----------------------------------------------------------------------------------------------------------------------------

      DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co.  ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%

      1740.00 2 41 0 0 1 0 14 0 0 126 0 30 0 0 0 0

      1746.33 3 19 0 0 1 0 6 0 0 31 0 18 0 0 0 0

      1760.00 21 15 3 0 10 0 5 0 0 17 0 33 0 2 0 0

      1762.33 6 0 2 0 3 0 0 0 0 0 0 5 0 1 0 0

      1766.33 11 0 8 0 4 0 0 0 0 0 0 7 0 3 0 0

      1770.33 11 0 11 0 3 0 0 0 0 0 0 7 0 3 0 0

      1774.85 12 1 17 0 3 0 0 0 0 0 0 8 0 4 0 0

      1775.25 1 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0

      1775.65 1 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0

      1776.25 2 0 3 0 0 0 0 0 0 0 0 1 0 1 0 0

      1780.00 11 1 23 0 2 0 0 0 0 0 0 6 0 4 0 0

      1800.00 39 26 95 0 7 0 9 0 0 26 0 40 0 15 0 0

      1820.00 21 45 31 0 3 0 15 0 0 49 0 49 0 8 0 0

      1840.00 45 22 108 0 7 0 7 0 0 24 0 31 0 26 0 0

      1860.00 52 18 271 0 5 0 6 0 0 32 0 21 0 36 0 0

      1880.00 51 18 237 0 4 0 6 0 0 32 0 20 0 36 0 0

      1882.61 8 0 15 0 1 0 0 0 0 0 0 1 0 6 0 0

      1888.61 17 0 22 0 6 0 0 0 0 0 0 7 0 9 0 0

      1892.61 11 0 7 0 6 0 0 0 0 0 0 8 0 3 0 0

      1896.61 11 0 4 0 5 0 0 0 0 0 0 8 0 2 0 0

      1900.00 10 0 1 0 3 0 0 0 0 0 0 8 0 1 0 0

      1919.99 44 11 0 0 13 0 4 0 0 6 0 48 0 0 0 0

      --------------------------------------------------------------------------------------------------------------------------  S U M A S D E L K I L O M E T R O 1000.00 A L K I L O M E T R O 1919.99

      1509 1065 1242 0 456 0 349 0 0 1249 0 1971 0 369 0 0

      material A 0 material B 1358 material C 340

      --------------------------------------------------------------------------------------------------------------------------

      --------------------------------------------------------------------------------------------------------------------------

      TOTALES 2495 1603 2392 0 1089 0 466 0 0 1497 0 3697 0 767 0 0

      material A 892 material B 2250 material C 340

      --------------------------------------------------------------------------------------------------------------------------

      TP| 0| 0|13.57|

  • 8/18/2019 CM6969BC.desbloqueado

    31/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ORDENADA DE CURVA MASA Hoja No : 1

      -----------------------------------------------------------------------------------------------------------------------------

      E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL  ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4

      160.00 0 0

      0 0 1.00 0 0 0 0.00 0 0 0 0 0 0

      160.00 0 0 0 0

      15 21 1.00 36 0 0 0.00 0 36 0 0 50 0

      180.00 36 0 0 0

      2 3 1.00 5 0 0 0.00 0 5 0 0 7 0

      182.70 41 0 0 0

      7 13 1.00 20 0 0 0.00 0 20 1 0 42 0

      200.00 61 0 0 0

      0 3 1.00 3 0 0 0.00 0 3 0 0 21 0

      209.00 64 0 0 0

      1 3 1.00 4 0 0 0.00 0 4 0 0 6 0

      211.50 68 0 0 0

      4 13 1.00 17 0 0 0.00 0 17 0 0 22 0

      220.00 85 0 0 0

      0 29 1.00 29 0 0 0.00 0 29 0 0 47 0

      240.00 114 0 0 0

      0 22 1.00 22 0 0 0.00 0 22 0 0 47 0

      260.00 136 0 0 0

      0 14 1.00 14 0 0 0.00 0 14 0 0 47 0

      280.00 150 0 0 0

      0 6 1.00 6 0 0 0.00 0 6 0 0 21 0

      289.20 156 0 0 0  0 7 1.00 7 0 0 0.00 0 7 0 0 25 0

      300.00 163 0 0 0

      0 8 1.00 8 0 0 0.00 0 8 1 0 47 0

      320.00 171 0 0 0

      4 14 1.00 18 0 0 0.00 0 18 1 0 48 0

      340.00 189 0 0 0

      33 7 1.00 40 0 0 0.00 0 40 0 0 29 0

      351.45 229 0 0 0

      43 0 1.00 43 0 0 0.00 0 43 0 0 19 0

      358.46 272 0 0 0

      7 1 1.00 8 0 0 0.00 0 8 0 0 4 0

      360.00 280 0 0 0

      11 6 1.00 17 0 0 0.00 0 17 4 0 20 0  367.82 297 0 0 0

      1 2 1.00 3 0 0 0.00 0 3 6 0 12 0

      372.62 300 0 0 0

      0 1 1.00 1 0 0 0.00 0 1 6 0 11 0

  • 8/18/2019 CM6969BC.desbloqueado

    32/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ORDENADA DE CURVA MASA Hoja No : 2

      -----------------------------------------------------------------------------------------------------------------------------

      E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL  ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4

      15 6 1.00 21 0 0 0.00 0 21 0 0 23 0

      460.00 537 0 0 0

      1 0 1.00 1 0 0 0.00 0 1 0 0 0 0

      460.26 538 0 0 0

      41 6 1.00 47 0 0 0.00 0 47 0 0 29 0

      470.00 585 0 0 0

      45 5 1.00 50 0 0 0.00 0 50 0 0 23 0

      477.67 635 0 0 0

      13 2 1.00 15 0 0 0.00 0 15 0 0 7 0

      480.00 650 0 0 0

      25 6 1.00 31 0 0 0.00 0 31 0 0 17 0

      485.92 681 0 0 0

      9 4 1.00 13 0 0 0.00 0 13 0 0 9 0

      489.67 694 0 0 0

      6 3 1.00 9 0 0 0.00 0 9 0 0 10 0

      493.42 703 0 0 0

      5 4 1.00 9 0 0 0.00 0 9 3 0 16 0

      500.00 712 0 0 0

      4 18 1.00 22 0 0 0.00 0 22 8 0 48 0

      520.00 734 0 0 0

      3 11 1.00 14 0 0 0.00 0 14 0 0 22 0

      529.40 748 0 0 0  3 12 1.00 15 0 0 0.00 0 15 0 0 25 0

      540.00 763 0 0 0

      5 6 1.00 11 0 0 0.00 0 11 0 0 15 0

      546.36 774 0 0 0

      31 12 1.00 43 0 0 0.00 0 43 0 0 33 0

      559.70 817 0 0 0

      1 0 1.00 1 0 0 0.00 0 1 0 0 1 0

      560.00 818 0 0 0

      37 14 1.00 51 0 0 0.00 0 51 0 0 33 0

      573.03 869 0 0 0

      14 9 1.00 23 0 0 0.00 0 23 0 0 17 0

      579.70 892 0 0 0

      1 0 1.00 1 0 0 0.00 0 1 0 0 1 0  580.00 893 0 0 0

      19 22 1.00 41 0 0 0.00 0 41 0 0 51 0

      600.00 934 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 0 0 1 0

  • 8/18/2019 CM6969BC.desbloqueado

    33/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ORDENADA DE CURVA MASA Hoja No : 3

      -----------------------------------------------------------------------------------------------------------------------------

      E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL  ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4

      19 4 1.00 23 0 0 0.00 0 23 0 0 18 0

      686.13 1092 0 0 0

      16 8 1.00 24 0 0 0.00 0 24 4 0 28 0

      696.83 1116 0 0 0

      0 2 1.00 2 0 0 0.00 0 2 3 0 8 0

      700.00 1118 0 0 0

      0 4 1.00 4 0 0 0.00 0 4 5 0 15 0

      706.13 1122 0 0 0

      0 2 1.00 2 0 0 0.00 0 2 1 0 5 0

      708.40 1124 0 0 0

      7 6 1.00 13 0 0 0.00 0 13 2 0 17 0

      715.43 1137 0 0 0

      13 4 1.00 17 0 0 0.00 0 17 0 0 11 0

      720.00 1154 0 0 0

      28 8 1.00 36 0 0 0.00 0 36 0 0 21 0

      728.58 1190 0 0 0

      14 6 1.00 20 0 0 0.00 0 20 0 0 12 0

      733.58 1210 0 0 0

      14 5 1.00 19 0 0 0.00 0 19 0 0 14 0

      738.58 1229 0 0 0

      4 1 1.00 5 0 0 0.00 0 5 0 0 4 0

      740.00 1234 0 0 0

      15 3 1.00 18 0 0 0.00 0 18 0 0 9 0

      743.58 1252 0 0 0

      25 8 1.00 33 0 0 0.00 0 33 1 0 18 0

      750.00 1285 0 0 0

      8 5 1.00 13 0 0 0.00 0 13 4 0 11 0

      753.58 1298 0 0 0

      9 6 1.00 15 0 0 0.00 0 15 21 0 13 0

      760.00 1313 0 0 0

      18 6 1.00 24 0 0 0.00 0 24 24 0 21 0

      770.00 1337 0 0 0

      16 7 1.00 23 0 0 0.00 0 23 23 0 21 0

      780.00 1360 0 0 0

      2 3 1.00 5 0 0 0.00 0 5 14 0 7 0  783.16 1365 0 0 0

      7 7 1.00 14 0 0 0.00 0 14 24 0 15 0

      788.50 1379 0 0 0

      1 2 1.00 3 0 0 0.00 0 3 5 0 4 0

  • 8/18/2019 CM6969BC.desbloqueado

    34/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ORDENADA DE CURVA MASA Hoja No : 4

      -----------------------------------------------------------------------------------------------------------------------------

      E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL  ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4

      30 11 1.00 41 0 0 0.00 0 41 0 0 52 0

      920.00 1633 0 0 0

      34 9 1.00 43 0 0 0.00 0 43 1 0 53 0

      940.00 1676 0 0 0

      21 4 1.00 25 0 0 0.00 0 25 3 0 53 0

      960.00 1701 0 0 0

      14 14 1.00 28 0 0 0.00 0 28 2 0 53 0

      980.00 1729 0 0 0

      20 20 1.00 40 0 0 0.00 0 40 0 0 42 0

      995.89 1769 0 0 0

      9 5 1.00 14 0 0 0.00 0 14 0 0 10 0

      1000.00 1783 0 0 0

      5 3 1.00 8 0 0 0.00 0 8 0 0 6 0

      1002.56 1791 0 0 0

      22 13 1.00 35 0 0 0.00 0 35 0 0 35 0

      1015.89 1826 0 0 0

      3 3 1.00 6 0 0 0.00 0 6 0 0 10 0

      1020.00 1832 0 0 0

      4 6 1.00 10 0 0 0.00 0 10 0 0 23 0

      1029.22 1842 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 0 0 0 0

      1029.41 1842 0 0 0

      1 0 1.00 1 0 0 0.00 0 1 0 0 1 0

      1030.07 1843 0 0 0

      1 0 1.00 1 0 0 0.00 0 1 0 0 1 0

      1030.74 1844 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 0 0 1 0

      1031.07 1844 0 0 0

      11 5 1.00 16 0 0 0.00 0 16 0 0 25 0

      1040.00 1860 0 0 0

      16 6 1.00 22 0 0 0.00 0 22 4 0 39 0

      1060.00 1882 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 0 0 1 0

      1060.82 1882 0 0 0

      1 1 1.00 2 0 0 0.00 0 2 2 0 11 0  1065.00 1884 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 1 0 6 0

      1067.49 1884 0 0 0

      0 9 1.00 9 0 0 0.00 0 9 1 0 30 0

  • 8/18/2019 CM6969BC.desbloqueado

    35/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ORDENADA DE CURVA MASA Hoja No : 5

      -----------------------------------------------------------------------------------------------------------------------------

      E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL  ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4

      0 0 1.00 0 0 0 0.00 0 0 8 0 15 0

      1206.30 1992 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 19 0 32 0

      1219.63 1992 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 1 0 1 0

      1220.00 1992 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 13 0 31 0

      1232.96 1992 0 0 0

      0 1 1.00 1 0 0 0.00 0 1 2 0 17 0

      1240.00 1993 0 0 0

      5 16 1.00 21 0 0 0.00 0 21 0 0 47 0

      1260.00 2014 0 0 0

      5 16 1.00 21 0 0 0.00 0 21 7 0 48 0

      1280.00 2035 0 0 0

      15 10 1.00 25 0 0 0.00 0 25 7 0 49 0

      1300.00 2060 0 0 0

      28 23 1.00 51 0 0 0.00 0 51 0 0 49 0

      1320.00 2111 0 0 0

      14 15 1.00 29 0 0 0.00 0 29 77 0 49 0

      1340.00 2140 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 140 0 19 0

      1347.94 2140 0 0 0

      0 2 1.00 2 0 0 0.00 0 2 172 0 29 0

      1360.00 2142 0 0 0

      0 2 1.00 2 0 0 0.00 0 2 3 0 13 0

      1365.40 2144 0 0 0

      0 4 1.00 4 0 0 0.00 0 4 4 0 31 0

      1378.73 2148 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 0 0 3 0

      1380.00 2148 0 0 0

      4 5 1.00 9 0 0 0.00 0 9 2 0 31 0

      1392.07 2157 0 0 0

      9 4 1.00 13 0 0 0.00 0 13 0 0 18 0

      1398.73 2170 0 0 0

      3 1 1.00 4 0 0 0.00 0 4 0 0 3 0  1400.00 2174 0 0 0

      28 15 1.00 43 0 0 0.00 0 43 2 0 53 0

      1420.00 2217 0 0 0

      6 12 1.00 18 0 0 0.00 0 18 8 0 50 0

  • 8/18/2019 CM6969BC.desbloqueado

    36/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ORDENADA DE CURVA MASA Hoja No : 6

      -----------------------------------------------------------------------------------------------------------------------------

      E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL  ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4

      0 1 1.00 1 0 0 0.00 0 1 2 0 13 0

      1565.37 2394 0 0 0

      1 4 1.00 5 0 0 0.00 0 5 3 0 20 0

      1573.37 2399 0 0 0

      3 4 1.00 7 0 0 0.00 0 7 3 0 17 0

      1580.00 2406 0 0 0

      4 3 1.00 7 0 0 0.00 0 7 2 0 15 0

      1585.37 2413 0 0 0

      10 7 1.00 17 0 0 0.00 0 17 4 0 40 0

      1600.00 2430 0 0 0

      3 5 1.00 8 0 0 0.00 0 8 1 0 21 0

      1608.04 2438 0 0 0

      2 5 1.00 7 0 0 0.00 0 7 14 0 30 0

      1620.00 2445 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 0 0 0 0

      1620.04 2445 0 0 0

      0 2 1.00 2 0 0 0.00 0 2 10 0 20 0

      1628.04 2447 0 0 0

      1 2 1.00 3 0 0 0.00 0 3 2 0 20 0

      1636.04 2450 0 0 0

      1 1 1.00 2 0 0 0.00 0 2 0 0 10 0

      1640.00 2452 0 0 0

      9 11 1.00 20 0 0 0.00 0 20 1 0 50 0

      1660.00 2472 0 0 0

      12 16 1.00 28 0 0 0.00 0 28 0 0 50 0

      1680.00 2500 0 0 0

      5 6 1.00 11 0 0 0.00 0 11 18 0 38 0

      1695.50 2511 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 12 0 10 0

      1699.50 2511 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 2 0 1 0

      1700.00 2511 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 9 0 9 0

      1703.50 2511 0 0 0

      5 4 1.00 9 0 0 0.00 0 9 5 0 17 0  1710.00 2520 0 0 0

      7 5 1.00 12 0 0 0.00 0 12 83 0 27 0

      1719.50 2532 0 0 0

      0 0 1.00 0 0 0 0.00 0 0 9 0 1 0

  • 8/18/2019 CM6969BC.desbloqueado

    37/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      ORDENADA DE CURVA MASA Hoja No : 7

      -----------------------------------------------------------------------------------------------------------------------------

      E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL  ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4

      31 3 1.00 34 0 0 0.00 0 34 49 0 57 0

      1820.00 2766 0 0 0

      108 7 1.00 115 0 0 0.00 0 115 24 0 57 0

      1840.00 2881 0 0 0

      271 5 1.00 276 0 0 0.00 0 276 32 0 57 0

      1860.00 3157 0 0 0

      237 4 1.00 241 0 0 0.00 0 241 32 0 56 0

      1880.00 3398 0 0 0

      15 1 1.00 16 0 0 0.00 0 16 0 0 7 0

      1882.61 3414 0 0 0

      22 6 1.00 28 0 0 0.00 0 28 0 0 16 0

      1888.61 3442 0 0 0

      7 6 1.00 13 0 0 0.00 0 13 0 0 11 0

      1892.61 3455 0 0 0

      4 5 1.00 9 0 0 0.00 0 9 0 0 10 0

      1896.61 3464 0 0 0

      1 3 1.00 4 0 0 0.00 0 4 0 0 9 0

      1900.00 3468 0 0 0

      0 13 1.00 13 0 0 0.00 0 13 6 0 48 0

      1919.99 3481 0 0 0

      ---------------------------------------------------------------------------------------------------------------------------------------

      SUMAS : 696 53 749 0 0 0 749 143 0 328 0

      ---------------------------------------------------------------------------------------------------------------------------------------

      TOTALES : 3481 0

  • 8/18/2019 CM6969BC.desbloqueado

    38/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

  • 8/18/2019 CM6969BC.desbloqueado

    39/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE

      Hoja No : 3

      -----------------------------------------------------------------------------------------------------------------------------  LADO IZQUIERDO ESP-SBR LADO DERECHO

      ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5

      ---------------------------------------------------------------------------------------------------------------------

      160.00 -3.81 -0.41 4.44

    -0.38 0.00 -0.39

    160.00 -3.81 -0.41 4.44

    -0.38 0.00 -0.39

    180.00 -4.11 -0.23 4.44

    -0.38 0.00 -0.39

    182.70 -3.91 -0.36 4.44

    -0.38 0.00 -0.39

    200.00 -3.91 -0.21 4.12

    -0.38 0.00 -0.38

    209.00 -4.07 -0.18 3.93

    -0.38 0.00 -0.38

    211.50 -4.44 -0.36 4.44

    -0.39 0.00 -0.39

    220.00 -3.89 -0.37 4.00

    -0.38 0.00 -0.38

    240.00 -3.92 -0.33 3.95

    -0.38 0.00 -0.38

    260.00 -3.90 -0.24 4.08

    -0.38 0.00 -0.38

    280.00 -4.00 -0.19 3.85

    -0.38 0.00 -0.38

    289.20 -3.96 -0.28 3.81

    -0.38 0.00 -0.38

    300.00 -3.96 -0.27 3.93

    -0.38 0.00 -0.38

    320.00 -4.02 -0.17 4.06

    -0.38 0.00 -0.38

    340.00 -3.82 -0.26 4.44

    -0.38 0.00 -0.39

    351.45 -4.44 -0.63 4.44

    -0.39 0.00 -0.39

    358.46 -4.44 -0.85 4.44

    -0.39 0.00 -0.39

    360.00 -4.00 -0.47 4.44-0.38 0.00 -0.39

    367.82 -4.27 -0.22 4.44

    -0.39 0.00 -0.39

    372.62 -4.27 -0.13 3.84

  • 8/18/2019 CM6969BC.desbloqueado

    40/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE

      Hoja No : 4

      -----------------------------------------------------------------------------------------------------------------------------  LADO IZQUIERDO ESP-SBR LADO DERECHO

      ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5

      ---------------------------------------------------------------------------------------------------------------------

      380.00 -4.03 -0.07 3.88

    -0.38 0.00 -0.38

    384.62 -4.08 -0.03 4.44

    -0.30 0.00 -0.39

    400.00 -4.11 -0.18 5.52

    0.04 0.00 -0.75

    406.00 -4.04 -0.22 5.52

    0.03 0.00 -0.75

    414.52 -3.91 -0.30 5.20

    -0.08 0.00 -0.60

    420.00 -3.82 -0.35 4.95

    -0.15 0.00 -0.49

    421.72 -3.80 -0.34 4.87

    -0.18 0.00 -0.46

    426.52 -4.03 -0.33 4.65

    -0.24 0.00 -0.39

    431.32 -3.99 -0.33 4.44

    -0.30 0.00 -0.39

    440.00 -3.98 -0.31 3.89

    -0.38 0.00 -0.33

    444.51 -4.00 -0.31 3.81

    -0.38 0.00 -0.27

    448.26 -4.12 -0.32 4.45

    -0.38 0.00 -0.21

    452.01 -4.91 -0.31 4.46

    -0.46 0.00 -0.15

    460.00 -5.31 -0.31 4.46

    -0.62 0.00 -0.03

    460.26 -5.32 -0.31 4.46

    -0.63 0.00 -0.03

    470.00 -5.70 -0.32 4.47

    -0.80 0.00 0.10

    477.67 -5.36 -0.32 4.47

    -0.65 0.00 -0.01

    480.00 -5.26 -0.32 4.46-0.60 0.00 -0.05

    485.92 -4.39 -0.32 4.46

    -0.47 0.00 -0.13

    489.67 -4.32 -0.31 4.45

  • 8/18/2019 CM6969BC.desbloqueado

    41/87

  • 8/18/2019 CM6969BC.desbloqueado

    42/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE

      Hoja No : 6

      -----------------------------------------------------------------------------------------------------------------------------  LADO IZQUIERDO ESP-SBR LADO DERECHO

      ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5

      ---------------------------------------------------------------------------------------------------------------------

      665.00 -5.00 -0.09 3.79

    -0.64 0.00 -0.04

    665.26 -4.95 -0.09 3.79

    -0.64 0.00 -0.04

    668.00 -5.01 -0.12 4.17

    -0.68 0.00 0.02

    680.00 -5.42 -0.40 4.47

    -0.71 0.00 0.04

    686.13 -5.33 -0.34 4.47

    -0.67 0.00 0.01

    696.83 -4.31 -0.29 3.89

    -0.45 0.00 -0.16

    700.00 -4.28 -0.28 4.11

    -0.41 0.00 -0.19

    706.13 -4.04 -0.30 4.07

    -0.38 0.00 -0.27

    708.40 -3.95 -0.31 4.06

    -0.38 0.00 -0.30

    715.43 -3.93 -0.27 4.44

    -0.38 0.00 -0.39

    720.00 -3.97 -0.23 4.44

    -0.38 0.00 -0.39

    728.58 -3.85 -0.29 4.47

    -0.29 0.00 -0.39

    733.58 -3.84 -0.29 4.72

    -0.23 0.00 -0.39

    738.58 -3.89 -0.26 4.98

    -0.17 0.00 -0.46

    740.00 -3.92 -0.25 5.05

    -0.15 0.00 -0.49

    743.58 -3.92 -0.29 5.23

    -0.11 0.00 -0.55

    750.00 -4.18 -0.39 5.56

    -0.01 0.00 -0.68

  • 8/18/2019 CM6969BC.desbloqueado

    43/87

  • 8/18/2019 CM6969BC.desbloqueado

    44/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE

      Hoja No : 8

      -----------------------------------------------------------------------------------------------------------------------------  LADO IZQUIERDO ESP-SBR LADO DERECHO

      ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5

      ---------------------------------------------------------------------------------------------------------------------

      920.00 -3.86 -0.31 4.93

    -0.17 0.00 -0.46

    940.00 -3.88 -0.28 4.93

    -0.17 0.00 -0.46

    960.00 -4.02 -0.19 4.93

    -0.17 0.00 -0.46

    980.00 -3.89 -0.38 4.93

    -0.17 0.00 -0.46

    995.89 -3.89 -0.38 4.90

    -0.18 0.00 -0.451000.00 -3.87 -0.38 4.76

    -0.22 0.00 -0.40

    1002.56 -3.86 -0.36 4.67

    -0.24 0.00 -0.39

    1015.89 -4.44 -0.27 4.44

    -0.37 0.00 -0.39

    1020.00 -3.82 -0.27 3.89

    -0.38 0.00 -0.36

    1029.22 -4.51 -0.29 4.45

    -0.39 0.00 -0.28

    1029.41 -4.52 -0.29 4.45

    -0.39 0.00 -0.28

    1030.07 -4.54 -0.30 4.45

    -0.39 0.00 -0.27

    1030.74 -4.56 -0.30 4.45

    -0.39 0.00 -0.26

    1031.07 -4.58 -0.30 4.45

    -0.39 0.00 -0.26

    1040.00 -4.88 -0.39 4.45

    -0.44 0.00 -0.17

    1060.00 0.00 3.93

    0.00 -0.171060.82 -4.91 -0.27 3.93

    -0.45 0.00 -0.18

    1065.00 -4.39 -0.28 3.89

    -0.41 0.00 -0.20

  • 8/18/2019 CM6969BC.desbloqueado

    45/87

    SCT DIRECCION GENERAL DE CARRETERASCamino : 6969

    Tramo : BC

    Subtramo :

    Alternat. :

    Origen :

    Proyectista :

    Archivo : CM6969BC

    Fecha : Martes 29 de Marzo de 2016 22:37:57

    No Contrato : 0

    No Control : 0+160- 1+920-6969BC-160329223757

      GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE

      Hoja No : 9

      -----------------------------------------------------------------------------------------------------------------------------  LADO IZQUIERDO ESP-SBR LADO DERECHO

      ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5

      -----------------------------------------------------------------------------------