Download - CM6969BC.desbloqueado
-
8/18/2019 CM6969BC.desbloqueado
1/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
**** **** *******
* * * * *
* * *
**** * *
* * *
* * * * *
**** **** *
S U B S E C R E T A R I A D E I N F R A E S T R U C T U R A
D I R E C C I O N G E N E R A L D E C A R R E T E R A S F E D E R A L E S
D I R E C C I O N D E P R O Y E C T O D E C A R R E T E R A S
S U B D I R E C C I O N D E F O T O G R A M E T R I A Y P R O C E S O D E D A T O S
P R O Y E C T O D E T E R R A C E R I A S (23)
CAMINO : 6969 NUMERO DE TRABAJO : CM6969BC
TRAMO : BC PROYECTO :
ALTERNATIVA : FECHA DE PROCESO : 03-29-2016
ORIGEN : HORA DE PROCESO : 22:37:59
VELOCIDAD DE PROYECTO : 0
KILOMETRO INICIAL : 0+160.00 KILOMETRO FINAL : 1+920.00
ARCHIVO : CM6969BC
ALINEAMIENTO VERTICAL No. : 1
PROCESADO CON CUNETA : Definitiva
ESPESOR DE REVESTIMIENTO : 0.20
ESPESOR DE PAVIMENTO : 0.20
-
8/18/2019 CM6969BC.desbloqueado
2/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ALINEAMIENTO VERTICAL Hoja No : 2
-----------------------------------------------------------------------------------------------------------------------------
ALINEAMIENTO No 1
PCV PIV PTV L. CURVA PENDIENTE TV LIBRE
CAD/ELV CAD/ELV CAD/ELV DE SALIDA
150.000 150.00 150.000
503.75 503.75 503.75 0.00 3.32 % 60.00
210.000 210.00 210.000
505.74 505.74 505.74 0.00 2.49 % 60.00
270.000 295.00 320.000
507.24 507.86 509.98 50.00 8.50 % 33.00
353.000 373.00 393.000
512.79 514.49 514.67 40.00 0.90 % 57.00
450.000 450.00 450.000
515.18 515.18 515.18 0.00 1.05 % 55.00
505.000 505.00 505.000
515.76 515.76 515.76 0.00 2.22 % 55.00
560.000 560.00 560.000
516.98 516.98 516.98 0.00 0.14 % 64.00
624.000 634.00 644.000
517.07 517.08 516.56 20.00 -5.16 % 1.00
645.000 665.00 685.000
516.51 515.48 515.54 40.00 0.32 % 20.00
705.000 725.00 745.000
515.61 515.67 516.57 40.00 4.52 % 5.00
750.000 765.00 780.000
516.80 517.48 517.57 30.00 0.61 % 70.00
850.000 850.00 850.000
518.00 518.00 518.00 0.00 -0.28 % 50.00
900.000 900.00 900.000
517.86 517.86 517.86 0.00 -0.08 % 105.00
-
8/18/2019 CM6969BC.desbloqueado
3/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
1900.000 1920.00 1940.000
544.98 546.68 546.68
NOTA: EL DESMONTE Y EL DESPALME SE LLEVARAN A CABO EXCLUSIVAMENTE ENTRE LOS CEROS --- PUNTOS E DE ESTE LISTADO ---
-
8/18/2019 CM6969BC.desbloqueado
4/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 3
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 160.00 504.19 -0.11 3.81 3.81 3.81 1-3 4.14 4.50 4.66
504.08 -0.08 -0.38 -0.08 -0.08 -0.20 0.27
504.01 503.71 504.01 504.00 503.88 504.36
ÿ 160.00 504.19 -0.11 3.81 3.81 3.81 1-3 4.14 4.50 4.66
504.08 -0.08 -0.38 -0.08 -0.08 -0.20 0.27
504.01 503.71 504.01 504.00 503.88 504.36
ÿ 180.00 504.67 0.07 4.11 4.11 3.81 1-3 4.14 4.50 4.70
504.74 -0.27 -0.38 -0.08 -0.08 -0.20 0.42 504.47 504.36 504.67 504.66 504.54 505.16
ÿ 182.70 504.89 -0.06 3.91 3.91 3.81 1-3 4.14 4.50 4.75
504.83 -0.14 -0.38 -0.08 -0.08 -0.20 0.56
504.69 504.46 504.76 504.75 504.63 505.39
ÿ 200.00 505.32 0.09 3.91 3.91 3.81 1-1 3.81 4.12 4.12
505.41 -0.14 -0.38 -0.08 -0.08 -0.38 -0.29
505.27 505.03 505.33 505.33 505.03 505.12
ÿ 209.00 505.59 0.12 4.07 4.07 3.81 1-1 3.81 3.93 3.93
505.71 -0.25 -0.38 -0.08 -0.08 -0.38 -0.16
505.46 505.33 505.63 505.63 505.33 505.55
ÿ 211.50 505.84 -0.06 4.61 4.50 4.14 3-3 4.14 4.50 4.65
505.78 0.14 -0.20 -0.08 -0.08 -0.20 0.25
505.92 505.57 505.69 505.69 505.57 506.03ÿ 220.00 506.06 -0.07 3.89 3.89 3.81 1-1 3.81 4.00 4.00
505.99 -0.13 -0.38 -0.08 -0.08 -0.38 -0.20
505.86 505.61 505.91 505.91 505.61 505.78
ÿ 240.00 506.52 -0.03 3.92 3.92 3.81 1-1 3.81 3.95 3.95
506.49 -0.15 -0.38 -0.08 -0.08 -0.38 -0.17
506.34 506.11 506.41 506.41 506.11 506.32
ÿ 260.00 506.93 0.06 3.90 3.90 3.81 1-1 3.81 4.08 4.08
506.99 -0.14 -0.38 -0.08 -0.08 -0.38 -0.26
506.85 506.61 506.91 506.91 506.61 506.73
ÿ 280.00 507.44 0.11 4.00 4.00 3.81 1-1 3.81 3.85 3.85
507.55 -0.21 -0.38 -0.08 -0.08 -0.38 -0.11
507.34 507.17 507.47 507.47 507.17 507.44
ÿ 289.20 507.92 0.02 3.96 3.96 3.81 1-1 3.81 3.81 3.81
507.94 -0.18 -0.38 -0.08 -0.08 -0.38 -0.08
507.76 507.56 507.86 507.86 507.56 507.86
ÿ 300.00 508.50 0.03 3.96 3.96 3.81 1-1 3.81 3.93 3.93
508.53 -0.18 -0.38 -0.08 -0.08 -0.38 -0.16
-
8/18/2019 CM6969BC.desbloqueado
5/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 4
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 380.00 514.16 0.23 4.03 4.03 3.81 1-1 3.81 3.88 3.88
514.39 -0.22 -0.38 -0.08 -0.08 -0.38 -0.12
514.17 514.01 514.32 514.32 514.01 514.27
ÿ 384.62 514.26 0.27 4.08 4.08 3.80 1-3 4.14 4.50 4.69
514.53 -0.19 -0.30 0.00 -0.08 -0.20 0.37
514.34 514.23 514.53 514.44 514.32 514.90
ÿ 400.00 514.61 0.12 4.11 4.11 3.77 1-3 5.40 5.60 7.41
514.73 0.08 0.04 0.31 -0.44 -0.51 4.99 514.81 514.77 515.04 514.29 514.22 519.72
ÿ 406.00 514.71 0.08 4.04 4.04 3.77 1-3 5.40 5.60 7.43
514.79 0.13 0.03 0.31 -0.44 -0.51 5.03
514.91 514.82 515.09 514.34 514.28 519.82
ÿ 414.52 514.86 0.00 3.91 3.91 3.78 1-3 4.99 5.27 6.35
514.86 0.13 -0.08 0.22 -0.29 -0.38 2.89
514.99 514.79 515.08 514.58 514.48 517.75
ÿ 420.00 514.96 -0.05 3.82 3.82 3.78 1-3 4.69 5.01 5.64
514.91 0.12 -0.15 0.14 -0.18 -0.29 1.62
515.03 514.76 515.06 514.73 514.62 516.53
ÿ 421.72 514.97 -0.04 3.80 3.80 3.79 1-3 4.60 4.93 5.51
514.93 0.11 -0.18 0.12 -0.15 -0.26 1.48
515.04 514.75 515.05 514.78 514.67 516.40ÿ 426.52 515.00 -0.03 4.03 4.03 3.79 1-3 4.35 4.71 5.15
514.97 -0.10 -0.24 0.06 -0.09 -0.21 1.12
514.87 514.73 515.03 514.88 514.76 516.09
ÿ 431.32 515.04 -0.03 3.99 3.99 3.80 1-3 4.14 4.50 4.84
515.01 -0.13 -0.30 -0.00 -0.08 -0.20 0.83
514.88 514.71 515.01 514.93 514.81 515.85
ÿ 440.00 515.10 -0.01 3.98 3.98 3.81 1-1 3.80 3.89 3.89
515.09 -0.19 -0.38 -0.08 -0.03 -0.33 -0.09
514.90 514.71 515.01 515.06 514.76 515.00
ÿ 444.51 515.14 -0.01 4.00 4.00 3.91 1-1 3.80 3.81 3.81
515.13 -0.14 -0.38 -0.08 0.03 -0.27 0.02
514.99 514.75 515.05 515.16 514.86 515.15
ÿ 448.26 515.18 -0.02 4.12 4.12 4.10 1-3 4.07 4.50 4.79
515.16 -0.09 -0.38 -0.08 0.08 -0.06 0.82
515.07 514.78 515.08 515.24 515.10 515.98
ÿ 452.01 515.21 -0.01 5.11 4.98 4.64 3-3 4.05 4.50 4.80
515.20 0.14 -0.26 -0.15 0.13 -0.02 0.89
-
8/18/2019 CM6969BC.desbloqueado
6/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 5
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 500.00 515.71 -0.00 5.69 4.27 3.81 1-1 3.80 3.94 3.94
515.71 -1.33 -0.39 -0.08 -0.02 -0.32 -0.11
514.38 515.32 515.63 515.69 515.39 515.60
ÿ 520.00 516.12 -0.03 3.95 3.95 3.81 1-1 3.81 3.96 3.96
516.09 -0.17 -0.38 -0.08 -0.08 -0.38 -0.17
515.92 515.71 516.02 516.02 515.71 515.92
ÿ 529.40 516.34 -0.04 3.94 3.94 3.81 1-3 3.76 4.38 4.38
516.30 -0.16 -0.38 -0.08 -0.08 -0.56 -0.56 516.14 515.92 516.23 516.23 515.74 515.74
ÿ 540.00 516.50 0.04 3.84 3.84 3.81 1-1 3.81 3.95 3.95
516.54 -0.10 -0.38 -0.08 -0.08 -0.38 -0.17
516.44 516.16 516.46 516.46 516.16 516.37
ÿ 546.36 516.64 0.04 3.91 3.91 3.81 1-3 4.13 4.50 4.88
516.68 -0.14 -0.38 -0.08 -0.06 -0.18 0.98
516.54 516.30 516.60 516.62 516.50 517.66
ÿ 559.70 516.94 0.03 3.94 3.94 3.83 1-3 4.10 4.50 5.55
516.97 -0.15 -0.38 -0.08 0.00 -0.13 3.06
516.82 516.59 516.90 516.98 516.84 520.04
ÿ 560.00 516.95 0.03 3.94 3.94 3.83 1-3 4.10 4.50 5.56
516.98 -0.15 -0.38 -0.08 0.01 -0.13 3.09
516.83 516.60 516.90 516.99 516.85 520.07ÿ 573.03 517.02 -0.02 4.18 4.18 4.07 1-3 4.07 4.50 5.53
517.00 -0.15 -0.38 -0.08 0.07 -0.08 3.05
516.85 516.61 516.92 517.06 516.92 520.05
ÿ 579.70 517.05 -0.04 4.21 4.21 4.19 1-3 4.06 4.50 5.34
517.01 -0.11 -0.40 -0.10 0.10 -0.05 2.49
516.90 516.61 516.91 517.10 516.96 519.50
ÿ 580.00 517.05 -0.04 4.21 4.21 4.20 1-3 4.06 4.50 5.32
517.01 -0.11 -0.40 -0.10 0.10 -0.05 2.43
516.90 516.61 516.91 517.11 516.96 519.44
ÿ 600.00 516.96 0.07 4.90 4.89 4.53 3-1 3.79 3.82 3.82
517.03 -0.19 -0.23 -0.11 0.09 -0.21 0.07
516.85 516.81 516.92 517.13 516.83 517.10
ÿ 600.31 516.96 0.07 4.89 4.88 4.53 3-1 3.79 3.81 3.81
517.03 -0.19 -0.23 -0.11 0.09 -0.21 0.08
516.85 516.81 516.93 517.12 516.83 517.11
ÿ 606.97 517.04 0.00 4.22 4.22 4.07 1-1 3.79 3.88 3.88
517.04 -0.18 -0.38 -0.08 0.08 -0.22 0.01
-
8/18/2019 CM6969BC.desbloqueado
7/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 6
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 665.00 515.54 0.21 5.00 5.00 4.73 1-1 3.77 3.79 3.79
515.75 -0.50 -0.64 -0.32 0.26 -0.04 0.25
515.25 515.11 515.43 516.01 515.71 516.00
ÿ 665.26 515.54 0.21 4.95 4.95 4.74 1-1 3.77 3.79 3.79
515.75 -0.47 -0.64 -0.33 0.26 -0.04 0.25
515.28 515.11 515.42 516.01 515.71 515.99
ÿ 668.00 515.51 0.18 5.01 5.01 4.84 1-1 3.77 4.17 5.02
515.69 -0.48 -0.68 -0.37 0.29 0.02 -0.54 515.20 515.01 515.32 515.97 515.70 515.14
ÿ 680.00 515.64 -0.10 5.60 5.50 5.28 3-3 3.99 4.50 5.02
515.54 -0.17 -0.48 -0.40 0.30 0.13 1.70
515.38 515.07 515.14 515.85 515.68 517.25
ÿ 686.13 515.59 -0.04 5.56 5.41 5.17 3-3 4.00 4.50 5.12
515.55 0.02 -0.44 -0.36 0.28 0.11 1.98
515.56 515.11 515.19 515.82 515.66 517.53
ÿ 696.83 515.57 0.01 4.31 4.31 4.29 1-1 3.78 3.89 3.89
515.58 -0.17 -0.45 -0.15 0.14 -0.16 0.07
515.41 515.13 515.43 515.72 515.42 515.65
ÿ 700.00 515.57 0.02 4.28 4.28 4.15 1-1 3.79 4.11 4.11
515.59 -0.19 -0.41 -0.11 0.10 -0.19 -0.12
515.40 515.18 515.48 515.69 515.40 515.47ÿ 706.13 515.61 0.00 4.04 4.04 3.90 1-1 3.80 4.07 4.07
515.61 -0.17 -0.38 -0.08 0.03 -0.27 -0.16
515.44 515.23 515.53 515.64 515.34 515.45
ÿ 708.40 515.63 -0.01 3.95 3.95 3.81 1-1 3.80 4.06 4.06
515.62 -0.17 -0.38 -0.08 -0.00 -0.30 -0.18
515.46 515.24 515.55 515.62 515.32 515.45
ÿ 715.43 515.67 0.03 3.93 3.93 3.81 1-3 4.14 4.50 5.37
515.70 -0.16 -0.38 -0.08 -0.08 -0.20 2.42
515.54 515.32 515.62 515.61 515.49 518.12
ÿ 720.00 515.70 0.07 3.97 3.97 3.81 1-3 4.14 4.50 5.46
515.77 -0.18 -0.38 -0.08 -0.08 -0.20 2.71
515.59 515.39 515.70 515.69 515.57 518.48
ÿ 728.58 515.96 0.01 3.85 3.85 3.80 1-3 4.17 4.53 5.32
515.97 -0.03 -0.29 0.01 -0.08 -0.20 2.20
515.95 515.68 515.98 515.89 515.77 518.17
ÿ 733.58 516.12 0.01 3.84 3.84 3.79 1-3 4.42 4.78 5.51
516.13 0.03 -0.23 0.07 -0.09 -0.21 2.00
-
8/18/2019 CM6969BC.desbloqueado
8/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
-
8/18/2019 CM6969BC.desbloqueado
9/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 7
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
770.00 seccion insuficiente lado derecho
ÿ 770.00 517.55 -0.10 4.89 4.15 3.76 1-3 5.95 6.10 6.51
517.45 -0.39 0.10 0.36 -0.58 -0.63 0.60
517.06 517.55 517.81 516.87 516.82 518.05
780.00 seccion insuficiente lado derecho
ÿ 780.00 517.65 -0.08 7.62 4.16 3.76 1-0
517.57 -2.24 0.07 0.34
515.34 517.64 517.91
783.16 seccion insuficiente lado derecho
ÿ 783.16 517.64 -0.05 7.65 4.17 3.77 1-3 5.58 5.80 6.23
517.59 -2.29 0.03 0.30 -0.44 -0.51 0.81
515.30 517.62 517.89 517.15 517.08 518.40
ÿ 788.50 517.64 -0.02 7.55 4.19 3.77 1-3 5.24 5.50 5.88
517.62 -2.29 -0.05 0.23 -0.32 -0.41 0.75
515.33 517.58 517.85 517.31 517.22 518.37ÿ 790.00 517.64 -0.01 7.39 4.19 3.78 1-3 5.14 5.42 5.77
517.63 -2.20 -0.07 0.21 -0.29 -0.38 0.68
515.43 517.57 517.84 517.35 517.25 518.32
ÿ 798.16 517.63 0.05 5.01 4.22 3.79 1-1 4.29 4.37 4.37
517.68 -0.71 -0.18 0.11 -0.12 -0.42 -0.18
516.97 517.50 517.79 517.56 517.26 517.51
ÿ 800.00 517.63 0.06 4.83 4.23 3.79 1-1 4.18 4.28 4.28
517.69 -0.61 -0.20 0.09 -0.09 -0.40 -0.16
517.09 517.49 517.78 517.60 517.30 517.53
ÿ 803.16 517.66 0.05 4.45 4.23 3.79 1-1 4.01 4.07 4.07
517.71 -0.36 -0.22 0.08 -0.08 -0.38 -0.12
517.35 517.50 517.79 517.63 517.33 517.59
ÿ 808.16 517.71 0.03 4.12 4.12 3.79 1-1 3.81 3.88 3.88
517.74 -0.14 -0.22 0.08 -0.08 -0.38 -0.12
517.60 517.53 517.82 517.67 517.37 517.62
ÿ 811.57 517.75 0.01 4.13 4.13 3.79 1-1 3.81 3.81 3.81
517.76 -0.15 -0.22 0.08 -0.08 -0.38 -0.08
-
8/18/2019 CM6969BC.desbloqueado
10/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 8
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 920.00 517.85 -0.01 3.86 3.86 3.79 1-3 4.67 5.00 5.36
517.84 0.08 -0.17 0.12 -0.15 -0.27 0.82
517.92 517.67 517.97 517.69 517.58 518.66
ÿ 940.00 517.81 0.02 3.88 3.88 3.79 1-3 4.67 5.00 5.51
517.83 0.06 -0.17 0.12 -0.15 -0.27 1.29
517.89 517.65 517.95 517.67 517.56 519.12
ÿ 960.00 517.70 0.11 4.02 4.02 3.79 1-3 4.67 5.00 5.40
517.81 -0.03 -0.17 0.12 -0.15 -0.27 0.95 517.78 517.64 517.93 517.66 517.54 518.76
ÿ 980.00 517.87 -0.08 3.89 3.89 3.79 1-3 4.67 5.00 5.19
517.79 0.06 -0.17 0.12 -0.15 -0.27 0.32
517.85 517.62 517.92 517.64 517.53 518.11
ÿ 995.89 517.86 -0.08 3.89 3.89 3.79 1-3 4.63 4.97 5.42
517.78 0.04 -0.18 0.12 -0.14 -0.26 1.14
517.82 517.60 517.90 517.64 517.52 518.92
ÿ 1000.00 517.86 -0.08 3.87 3.87 3.79 1-3 4.46 4.82 5.34
517.78 0.03 -0.22 0.08 -0.10 -0.22 1.34
517.80 517.56 517.86 517.68 517.56 519.12
ÿ 1002.56 517.83 -0.06 3.86 3.86 3.79 1-3 4.37 4.73 5.20
517.77 0.01 -0.24 0.06 -0.09 -0.21 1.22
517.79 517.53 517.83 517.69 517.57 518.99ÿ 1015.89 517.68 0.03 4.65 4.50 4.13 3-3 4.14 4.50 4.75
517.71 0.27 -0.18 -0.06 -0.08 -0.20 0.54
517.98 517.53 517.65 517.63 517.51 518.25
ÿ 1020.00 517.63 0.03 3.82 3.82 3.81 1-1 3.81 3.89 3.89
517.66 -0.08 -0.38 -0.08 -0.06 -0.36 -0.12
517.58 517.28 517.58 517.60 517.30 517.54
ÿ 1029.22 517.48 0.01 4.71 4.57 4.21 3-3 4.09 4.50 4.74
517.49 0.22 -0.20 -0.08 0.02 -0.12 0.61
517.71 517.29 517.41 517.51 517.38 518.11
ÿ 1029.41 517.48 0.01 4.72 4.58 4.22 3-3 4.09 4.50 4.74
517.49 0.22 -0.20 -0.08 0.02 -0.11 0.62
517.71 517.28 517.40 517.51 517.37 518.11
ÿ 1030.07 517.47 0.00 4.74 4.60 4.24 3-3 4.09 4.50 4.75
517.47 0.22 -0.21 -0.08 0.03 -0.11 0.65
517.69 517.27 517.39 517.50 517.36 518.12
ÿ 1030.74 517.46 -0.00 4.77 4.63 4.26 3-3 4.09 4.50 4.76
517.46 0.22 -0.21 -0.09 0.03 -0.10 0.67
-
8/18/2019 CM6969BC.desbloqueado
11/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 9
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 1080.82 516.46 -0.15 3.95 3.95 3.83 1-1 3.80 4.14 4.14
516.31 -0.16 -0.38 -0.08 0.01 -0.29 -0.22
516.15 515.93 516.23 516.31 516.01 516.09
ÿ 1094.16 516.51 -0.06 4.05 4.05 3.81 1-1 3.81 4.16 4.16
516.45 -0.24 -0.38 -0.08 -0.07 -0.38 -0.30
516.21 516.07 516.37 516.38 516.07 516.15
ÿ 1100.00 516.53 0.08 4.26 4.26 3.81 1-1 3.81 3.88 3.88
516.61 -0.38 -0.39 -0.08 -0.08 -0.38 -0.12 516.23 516.22 516.53 516.53 516.23 516.48
ÿ 1113.60 517.10 0.09 4.14 4.14 3.81 1-1 3.81 3.96 3.96
517.19 -0.27 -0.35 -0.04 -0.08 -0.38 -0.18
516.93 516.85 517.15 517.12 516.82 517.02
ÿ 1120.00 517.37 0.21 3.86 3.86 3.80 1-1 3.81 4.11 4.11
517.58 -0.06 -0.32 -0.02 -0.08 -0.38 -0.27
517.52 517.26 517.56 517.50 517.20 517.31
ÿ 1126.93 518.03 0.04 3.91 3.91 3.80 1-1 3.82 4.22 4.22
518.07 -0.07 -0.30 0.00 -0.08 -0.38 -0.34
518.00 517.78 518.08 518.00 517.69 517.73
ÿ 1140.00 519.28 -0.07 4.71 4.50 4.08 3-3 4.33 4.69 4.87
519.21 0.54 -0.09 0.05 -0.09 -0.21 0.32
519.75 519.12 519.26 519.12 519.00 519.53ÿ 1140.27 519.30 -0.07 4.71 4.50 4.08 3-3 4.33 4.70 4.87
519.23 0.54 -0.09 0.05 -0.09 -0.21 0.31
519.77 519.14 519.28 519.14 519.02 519.54
ÿ 1146.93 519.85 -0.05 4.69 4.50 4.07 3-1 4.10 4.15 4.15
519.80 0.52 -0.07 0.08 -0.08 -0.38 -0.12
520.32 519.73 519.87 519.71 519.41 519.68
ÿ 1160.00 520.94 -0.17 4.68 4.50 4.07 3-1 4.11 4.18 4.18
520.77 0.48 -0.06 0.08 -0.08 -0.38 -0.13
521.25 520.71 520.85 520.69 520.39 520.64
ÿ 1180.00 521.84 0.06 3.93 3.93 3.79 1-1 4.11 4.30 4.30
521.90 -0.02 -0.22 0.08 -0.08 -0.39 -0.21
521.89 521.68 521.98 521.82 521.52 521.69
ÿ 1199.63 522.46 0.14 3.94 3.94 3.79 1-1 4.10 4.30 4.30
522.60 -0.02 -0.22 0.07 -0.08 -0.39 -0.22
522.58 522.37 522.67 522.52 522.21 522.38
ÿ 1200.00 522.47 0.14 3.94 3.94 3.79 1-1 4.09 4.30 4.30
522.61 -0.03 -0.23 0.07 -0.08 -0.39 -0.22
-
8/18/2019 CM6969BC.desbloqueado
12/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 10
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 1320.00 519.88 -0.25 4.70 4.50 4.14 3-1 3.81 4.08 4.08
519.63 0.41 -0.20 -0.08 -0.08 -0.38 -0.26
520.04 519.43 519.55 519.56 519.25 519.38
ÿ 1340.00 519.59 0.37 6.70 4.27 3.81 1-1 3.81 4.27 5.32
519.96 -2.00 -0.39 -0.08 -0.08 -0.39 -1.08
517.96 519.57 519.88 519.88 519.57 518.88
ÿ 1347.94 519.78 0.57 9.95 4.27 3.81 1-1 3.81 4.27 6.51
520.35 -4.17 -0.39 -0.08 -0.08 -0.39 -1.88
516.18 519.97 520.27 520.27 519.97 518.47
ÿ 1360.00 521.02 0.22 3.89 3.89 3.81 1-1 3.81 4.05 4.05
521.24 -0.13 -0.38 -0.08 -0.06 -0.36 -0.22
521.11 520.86 521.16 521.18 520.87 521.02
ÿ 1365.40 521.65 0.10 3.82 3.82 3.81 1-1 3.81 3.85 3.85
521.75 -0.09 -0.38 -0.08 -0.04 -0.34 -0.07
521.66 521.37 521.67 521.70 521.40 521.67
ÿ 1378.73 523.20 0.06 4.30 4.29 3.82 1-1 3.80 4.12 4.12
523.26 -0.39 -0.39 -0.08 0.00 -0.30 -0.21
522.87 522.88 523.18 523.26 522.96 523.05
ÿ 1380.00 523.35 0.06 4.39 4.31 3.84 1-1 3.80 4.12 4.12
523.41 -0.44 -0.39 -0.08 0.01 -0.29 -0.20
522.97 523.03 523.33 523.42 523.12 523.21ÿ 1392.07 524.87 -0.02 4.80 4.70 4.33 3-3 4.08 4.50 4.87
524.85 0.10 -0.21 -0.09 0.05 -0.09 1.02
524.95 524.64 524.76 524.90 524.76 525.87
ÿ 1398.73 525.72 -0.08 4.93 4.79 4.43 3-3 4.07 4.50 5.02
525.64 0.21 -0.21 -0.09 0.08 -0.07 1.51
525.85 525.43 525.55 525.72 525.57 527.15
ÿ 1400.00 525.87 -0.08 4.94 4.80 4.44 3-3 4.07 4.50 5.06
525.79 0.22 -0.21 -0.09 0.08 -0.06 1.64
526.01 525.58 525.70 525.87 525.73 527.43
ÿ 1420.00 528.12 -0.10 5.01 4.80 4.44 3-1 3.79 3.88 3.88
528.02 0.44 -0.21 -0.09 0.08 -0.22 0.02
528.46 527.82 527.94 528.10 527.80 528.04
ÿ 1440.00 529.71 0.07 4.22 4.22 4.11 1-1 3.79 3.83 3.83
529.78 -0.15 -0.38 -0.08 0.08 -0.22 0.05
529.62 529.39 529.69 529.85 529.55 529.83
ÿ 1444.23 530.02 0.06 4.27 4.27 4.09 1-1 3.79 3.94 3.94
530.08 -0.20 -0.39 -0.08 0.07 -0.23 -0.03
-
8/18/2019 CM6969BC.desbloqueado
13/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 11
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 1530.00 531.59 0.00 3.98 3.98 3.77 1-3 5.18 5.43 6.11
531.59 0.11 -0.04 0.25 -0.34 -0.42 1.63
531.70 531.55 531.84 531.26 531.17 533.23
ÿ 1540.00 530.90 0.09 3.93 3.93 3.79 1-3 4.65 4.98 5.33
530.99 0.03 -0.17 0.13 -0.15 -0.27 0.78
531.02 530.82 531.12 530.84 530.73 531.78
ÿ 1557.37 530.01 0.06 3.97 3.97 3.81 1-1 3.81 3.94 3.94
530.07 -0.18 -0.38 -0.08 -0.07 -0.37 -0.15
529.89 529.69 530.00 530.00 529.70 529.92
ÿ 1560.00 529.87 0.08 4.01 4.01 3.81 1-1 3.80 4.00 4.00
529.95 -0.21 -0.38 -0.08 -0.04 -0.34 -0.17
529.74 529.57 529.88 529.92 529.62 529.79
ÿ 1565.37 529.70 0.03 4.04 4.04 3.92 1-1 3.80 3.91 3.91
529.73 -0.16 -0.38 -0.08 0.03 -0.27 -0.05
529.57 529.35 529.65 529.76 529.46 529.68
ÿ 1573.37 529.45 -0.01 5.01 4.95 4.62 3-1 3.79 3.82 3.82
529.44 -0.09 -0.27 -0.16 0.13 -0.17 0.10
529.36 529.18 529.29 529.57 529.27 529.55
ÿ 1580.00 529.23 0.01 5.26 5.24 4.95 3-1 3.78 3.90 3.90
529.24 -0.28 -0.37 -0.27 0.21 -0.09 0.13
528.96 528.88 528.97 529.45 529.16 529.37ÿ 1585.37 529.10 -0.00 5.58 5.47 5.23 3-1 3.77 4.02 4.02
529.10 -0.12 -0.45 -0.38 0.27 -0.01 0.10
528.98 528.64 528.72 529.37 529.09 529.20
ÿ 1600.00 528.73 0.00 5.74 5.46 4.94 1-1 3.77 4.03 4.03
528.73 -0.94 -0.75 -0.41 0.31 0.03 0.13
527.79 527.98 528.33 529.04 528.76 528.86
ÿ 1608.04 528.62 -0.03 4.81 4.81 4.81 1-1 3.77 4.15 4.15
528.59 -0.35 -0.65 -0.35 0.27 -0.00 0.02
528.25 527.95 528.25 528.87 528.59 528.61
ÿ 1620.00 528.43 0.04 6.74 4.76 4.29 1-1 3.79 4.05 4.05
528.47 -1.79 -0.47 -0.15 0.13 -0.16 -0.05
526.69 528.00 528.32 528.60 528.31 528.42
ÿ 1620.04 528.43 0.04 6.74 4.76 4.28 1-1 3.79 4.05 4.05
528.47 -1.78 -0.47 -0.15 0.13 -0.16 -0.04
526.69 528.00 528.32 528.60 528.31 528.43
ÿ 1628.04 528.39 0.03 4.44 4.40 3.94 1-1 3.80 4.01 4.01
528.42 -0.41 -0.39 -0.08 0.04 -0.26 -0.11
-
8/18/2019 CM6969BC.desbloqueado
14/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 12
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 1710.00 528.79 -0.20 6.07 5.29 4.80 1-3 4.02 4.50 4.54
528.59 -1.09 -0.57 -0.25 0.21 0.05 0.18
527.50 528.02 528.34 528.80 528.64 528.77
ÿ 1719.50 527.61 1.38 8.75 5.90 5.39 1-1 3.77 4.17 6.86
528.99 -2.68 -0.78 -0.44 0.31 0.04 -1.76
526.31 528.21 528.55 529.29 529.03 527.23
ÿ 1720.00 527.55 1.46 8.77 5.93 5.42 1-1 3.77 4.17 6.85
529.01 -2.68 -0.79 -0.45 0.31 0.05 -1.74
526.33 528.22 528.56 529.32 529.06 527.27
ÿ 1730.00 528.25 1.32 9.00 6.28 5.75 1-1 3.76 4.15 5.88
529.57 -2.74 -0.93 -0.58 0.38 0.12 -1.04
526.83 528.64 528.99 529.95 529.68 528.53
ÿ 1740.00 529.53 0.73 8.64 6.28 5.75 1-1 3.76 4.15 4.81
530.26 -2.50 -0.93 -0.58 0.38 0.12 -0.32
527.75 529.33 529.68 530.63 530.37 529.93
ÿ 1746.33 530.46 0.30 5.36 5.36 5.22 1-1 3.77 4.17 4.17
530.76 -0.48 -0.69 -0.38 0.27 0.00 0.01
530.29 530.07 530.38 531.04 530.76 530.77
ÿ 1760.00 532.21 -0.18 4.31 4.31 4.00 1-1 3.80 3.97 3.97
532.03 -0.29 -0.39 -0.08 0.04 -0.26 -0.08
531.74 531.65 531.95 532.07 531.77 531.95ÿ 1762.33 532.42 -0.16 4.12 4.12 3.81 1-3 4.10 4.50 4.98
532.26 -0.28 -0.38 -0.08 -0.00 -0.14 1.32
531.98 531.88 532.19 532.26 532.13 533.59
ÿ 1766.33 532.80 -0.14 4.07 4.07 3.81 1-3 4.14 4.50 5.29
532.66 -0.25 -0.38 -0.08 -0.08 -0.20 2.21
532.41 532.28 532.59 532.59 532.46 534.87
ÿ 1770.33 533.18 -0.12 4.08 4.08 3.80 1-3 4.14 4.50 5.58
533.06 -0.19 -0.31 -0.01 -0.08 -0.20 3.08
532.87 532.75 533.05 532.98 532.86 536.15
ÿ 1774.85 533.61 -0.09 4.09 4.09 3.79 1-3 4.38 4.74 6.23
533.52 -0.13 -0.23 0.07 -0.09 -0.21 4.29
533.39 533.29 533.58 533.43 533.31 537.81
ÿ 1775.25 533.64 -0.08 4.10 4.10 3.79 1-3 4.40 4.77 6.28
533.56 -0.13 -0.22 0.07 -0.09 -0.21 4.39
533.43 533.34 533.63 533.47 533.35 537.95
ÿ 1775.65 533.68 -0.08 4.10 4.10 3.79 1-3 4.43 4.79 6.35
533.60 -0.13 -0.21 0.08 -0.10 -0.22 4.50
-
8/18/2019 CM6969BC.desbloqueado
15/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DEL SECCIONAMIENTO DE CONSTRUCCION
Hoja No : 13
-----------------------------------------------------------------------------------------------------------------------------
ESTACION EL-TN H LADO IZQUIERDO FRM LADO DERECHO
EL-SB E D C' C B A SEC A B C C' D E
-----------------------------------------------------------------------------------------------------------------------------
ÿ 1888.61 544.27 -0.26 3.92 3.92 3.78 1-3 4.69 5.01 5.43
544.01 0.05 -0.15 0.14 -0.18 -0.29 0.99
544.07 543.86 544.16 543.83 543.73 545.01
ÿ 1892.61 544.53 -0.18 3.97 3.97 3.79 1-3 4.49 4.84 5.14
544.35 -0.02 -0.20 0.10 -0.11 -0.23 0.67
544.33 544.15 544.45 544.24 544.12 545.02
ÿ 1896.61 544.79 -0.10 4.01 4.01 3.79 1-3 4.31 4.67 4.85
544.69 -0.09 -0.25 0.05 -0.09 -0.21 0.34
544.60 544.44 544.74 544.61 544.49 545.03
ÿ 1900.00 545.01 -0.03 5.85 4.25 3.80 1-1 3.84 4.05 4.05
544.98 -1.36 -0.29 0.01 -0.08 -0.38 -0.22
543.62 544.69 544.99 544.90 544.60 544.76
ÿ 1919.99 546.18 0.07 4.76 4.27 3.81 1-1 3.81 3.82 3.82
546.25 -0.71 -0.39 -0.08 -0.08 -0.38 -0.09
545.54 545.87 546.18 546.18 545.88 546.17
NOTA: EL DESMONTE Y EL DESPALME SE LLEVARAN A CABO EXCLUSIVAMENTE ENTRE LOS CEROS --- PUNTOS E DE ESTE LISTADO ---
Secciones Utilizadas en el proceso
Secci¢n Tipo : 1
Secci¢n Tipo : 3
-
8/18/2019 CM6969BC.desbloqueado
16/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
AREAS DE LAS SECCIONES DE CONSTRUCCION Hoja No : 1
-----------------------------------------------------------------------------------------------------------------------------
DESP. CORTE ESTRATO RELLENO CAJA Ex.Ac.Te.Co. C.C.C. DESP CUERPO SBY SBR CORTE CAJA
ESTACION CORTE 2 3 95% 100% 95% 100% 95% 100% TERR TERR TERR TERR C.T.N 2 3
160.00 1.7 1.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.4 0.0
160.00 1.7 1.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.4 0.0
180.00 1.0 0.4 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.3 0.0 0.7 0.0
182.70 1.7 0.8 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 1.4 0.0
200.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.1 0.0 2.4 0.3 0.1 0.0
209.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.4 0.1 0.6 0.0
211.50 1.9 1.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 1.4 0.0
220.00 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 1.6 0.0
240.00 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 1.4 0.0
260.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.4 0.0 0.9 0.0
280.00 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.0 2.3 0.0 0.5 0.0
289.20 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.3 0.0 0.8 0.0
300.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.1 0.0 2.4 0.3 0.5 0.0
320.00 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.1 0.0 2.4 0.3 0.2 0.0
340.00 1.4 0.4 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.2 0.0 0.0 2.1 0.0 1.2 0.0
351.45 1.9 5.4 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
358.46 1.9 7.0 0.0 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
360.00 1.7 2.3 0.0 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.0 0.0
367.82 0.7 0.4 0.0 0.0 0.3 0.0 0.0 0.0 0.0 1.1 1.1 0.0 2.2 0.5 0.4 0.0
372.62 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 1.4 0.0 2.4 0.6 0.2 0.0
377.42 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 1.1 0.0 2.4 0.7 0.1 0.0
380.00 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.6 0.0 2.4 0.7 0.1 0.0
384.62 0.3 0.4 0.0 0.0 0.2 0.0 0.0 0.0 0.0 1.4 1.1 0.0 2.3 0.7 0.1 0.0400.00 1.2 7.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 1.1 0.4 0.0 1.8 0.5 0.1 0.0
406.00 1.2 7.3 0.0 0.0 1.1 0.0 0.0 0.0 0.0 1.1 0.2 0.0 1.8 0.4 0.1 0.0
414.52 1.2 2.5 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.9 0.0 0.0 2.1 0.0 0.6 0.0
420.00 1.4 1.9 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.4 0.0 0.0 2.1 0.0 0.8 0.0
421.72 1.4 1.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.5 0.0 0.0 2.1 0.0 0.8 0.0
426.52 1.4 0.9 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.5 0.0 0.0 2.2 0.0 0.8 0.0
431.32 1.3 0.6 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.5 0.0 0.0 2.3 0.0 1.0 0.0
440.00 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.3 0.0 0.9 0.0
444.51 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 2.3 0.0 1.1 0.0
448.26 1.2 0.5 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.3 0.0 1.2 0.0
452.01 1.5 1.6 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.5 0.0 0.0 1.7 0.0 0.8 0.0
460.00 1.7 2.3 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.4 0.0 0.0 1.4 0.0 0.6 0.0
460.26 1.7 2.4 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.4 0.0 0.0 1.4 0.0 0.7 0.0
470.00 2.2 6.0 0.0 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.6 0.0
477.67 2.1 5.7 0.0 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.8 0.0
480.00 2.1 5.5 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.1 0.0 0.0 1.3 0.0 0.8 0.0
485.92 1.7 2.9 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.2 0.0 0.0 1.9 0.0 1.1 0.0
-
8/18/2019 CM6969BC.desbloqueado
17/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
AREAS DE LAS SECCIONES DE CONSTRUCCION Hoja No : 2
-----------------------------------------------------------------------------------------------------------------------------
DESP. CORTE ESTRATO RELLENO CAJA Ex.Ac.Te.Co. C.C.C. DESP CUERPO SBY SBR CORTE CAJA
ESTACION CORTE 2 3 95% 100% 95% 100% 95% 100% TERR TERR TERR TERR C.T.N 2 3
680.00 2.1 3.2 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.7 0.0
686.13 1.6 3.0 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.5 0.1 0.0 1.5 0.1 0.6 0.0
696.83 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.7 0.0 2.5 0.3 0.9 0.0
700.00 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.9 0.0 2.5 0.3 0.7 0.0
706.13 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.7 0.0 2.4 0.3 0.7 0.0
708.40 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.6 0.0 2.4 0.2 0.7 0.0
715.43 1.3 1.9 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.2 0.0 0.9 0.0
720.00 1.9 3.7 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.7 0.0
728.58 1.8 2.8 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 1.2 0.0
733.58 1.9 2.7 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.2 0.0
738.58 1.3 2.7 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.1 0.0 0.9 0.0
740.00 1.3 2.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.6 0.0 0.0 2.2 0.0 0.8 0.0
743.58 2.0 5.6 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.8 0.0
750.00 1.9 2.1 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.3 0.3 0.0 2.3 0.1 1.7 0.0
753.58 1.8 2.4 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.7 2.2 0.0 2.1 0.3 1.3 0.0
760.00 0.6 0.4 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.8 4.5 0.0 0.8 0.4 0.4 0.0
770.00 1.9 3.3 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.4 0.4 0.0 1.6 0.2 0.9 0.0
780.00 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 4.3 0.0 1.2 0.5 0.6 0.0
783.16 1.8 1.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.9 4.7 0.0 2.4 0.5 1.5 0.0
788.50 1.8 1.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.9 4.1 0.0 2.5 0.4 1.3 0.0
790.00 1.8 0.6 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.8 2.8 0.0 2.5 0.4 1.1 0.0
798.16 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.3 0.0 2.5 0.1 0.7 0.0
800.00 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 2.5 0.0 0.6 0.0803.16 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 2.4 0.0 0.6 0.0
808.16 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 2.4 0.0 0.7 0.0
811.57 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 2.3 0.0 0.8 0.0
820.00 1.6 0.8 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.1 0.0 0.0 2.2 0.0 1.0 0.0
824.91 1.7 0.8 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.1 0.0
838.24 1.8 2.4 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.9 0.0
840.00 1.9 2.7 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.9 0.0
844.91 1.4 2.8 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.4 0.0 0.0 1.9 0.0 0.6 0.0
860.00 0.8 1.9 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.1 0.0 0.0 2.1 0.1 0.5 0.0
880.00 1.0 0.6 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.8 0.0 0.0 2.3 0.0 0.7 0.0
900.00 0.5 0.9 0.0 0.0 0.4 0.0 0.0 0.0 0.0 1.3 0.0 0.0 2.3 0.1 0.5 0.0
920.00 0.9 2.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.9 0.0 0.0 1.9 0.0 0.6 0.0
940.00 0.5 1.3 0.0 0.0 0.4 0.0 0.0 0.0 0.0 1.4 0.1 0.0 2.2 0.2 0.3 0.0
960.00 0.4 0.9 0.0 0.0 0.3 0.0 0.0 0.0 0.0 1.5 0.2 0.0 2.3 0.7 0.1 0.0
980.00 1.8 0.5 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 1.3 0.0
995.89 1.9 2.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.2 0.0
1000.00 1.8 2.2 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 1.2 0.0
-
8/18/2019 CM6969BC.desbloqueado
18/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
AREAS DE LAS SECCIONES DE CONSTRUCCION Hoja No : 3
-----------------------------------------------------------------------------------------------------------------------------
DESP. CORTE ESTRATO RELLENO CAJA Ex.Ac.Te.Co. C.C.C. DESP CUERPO SBY SBR CORTE CAJA
ESTACION CORTE 2 3 95% 100% 95% 100% 95% 100% TERR TERR TERR TERR C.T.N 2 3
1200.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 1.0 0.0 2.5 0.8 0.0 0.0
1206.30 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.5 1.4 0.0 2.4 0.8 0.0 0.0
1219.63 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 1.4 0.0 2.4 0.8 0.0 0.0
1220.00 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 1.3 0.0 2.4 0.8 0.0 0.0
1232.96 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.6 0.0 2.4 0.7 0.0 0.0
1240.00 2.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 2.4 0.0 0.3 0.0
1260.00 2.4 0.5 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 1.4 0.0
1280.00 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.7 0.0 2.4 0.5 0.2 0.0
1300.00 2.7 1.5 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.8 0.0
1320.00 2.6 1.4 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 1.5 0.0
1340.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.6 7.7 0.0 2.4 1.2 0.0 0.0
1347.94 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.9 27.6 0.0 2.4 1.6 0.0 0.0
1360.00 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.9 0.0 2.4 0.6 0.3 0.0
1365.40 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.4 0.0 2.3 0.5 0.4 0.0
1378.73 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.2 0.0 2.4 0.5 0.2 0.0
1380.00 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.2 0.0 2.4 0.5 0.2 0.0
1392.07 2.4 0.7 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.5 0.1 0.0 2.3 0.2 0.6 0.0
1398.73 2.7 2.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.2 0.0 0.0 1.8 0.1 0.7 0.0
1400.00 2.7 2.2 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 1.7 0.1 0.6 0.0
1420.00 2.3 0.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.4 0.2 0.0 2.1 0.1 0.8 0.0
1440.00 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.6 0.0 2.4 0.5 0.4 0.0
1444.23 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.5 0.0 2.4 0.4 0.4 0.0
1450.90 1.8 0.5 0.0 0.0 0.2 0.0 0.0 0.0 0.0 1.0 0.2 0.0 2.3 0.3 0.4 0.01460.00 2.5 0.5 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.2 0.1 0.0 2.3 0.1 0.5 0.0
1464.23 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.2 0.0 2.4 0.3 0.2 0.0
1477.57 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.5 0.0 2.4 0.6 0.2 0.0
1480.00 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.4 0.0 2.4 0.6 0.1 0.0
1500.00 2.6 0.9 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.4 0.2 0.0 2.0 0.1 0.7 0.0
1510.00 3.1 2.5 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 0.8 0.0
1520.00 3.0 2.4 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.1 0.0
1530.00 2.8 2.7 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.2 0.0 0.0 2.1 0.1 0.4 0.0
1540.00 0.6 0.5 0.0 0.0 0.3 0.0 0.0 0.0 0.0 2.2 0.6 0.0 2.4 0.7 0.1 0.0
1557.37 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.3 0.0 2.4 0.5 0.2 0.0
1560.00 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.5 0.0 2.4 0.5 0.2 0.0
1565.37 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.3 0.0 2.4 0.4 0.3 0.0
1573.37 1.6 0.2 0.0 0.0 0.2 0.0 0.0 0.0 0.0 1.1 0.3 0.0 2.4 0.4 0.7 0.0
1580.00 1.5 0.6 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.2 0.5 0.0 2.2 0.4 0.5 0.0
1585.37 1.8 1.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 1.1 0.4 0.0 2.1 0.4 0.4 0.0
1600.00 1.7 0.4 0.0 0.0 0.3 0.0 0.0 0.0 0.0 1.2 0.2 0.0 2.4 0.4 0.5 0.0
1608.04 2.0 0.3 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.7 0.2 0.0 2.4 0.2 0.6 0.0
-
8/18/2019 CM6969BC.desbloqueado
19/87
-
8/18/2019 CM6969BC.desbloqueado
20/87
-
8/18/2019 CM6969BC.desbloqueado
21/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 2
-----------------------------------------------------------------------------------------------------------------------------
Estacion Inicial: 160.00 Estacion Final: 1919.99
HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO
Dist. Elev. ELEV-SBR Dist. Elev.
4.10 515.08 448.26 4.07 515.24
515.16
4.64 515.05 452.01 4.05 515.33
515.20
5.11 514.98 460.00 4.01 515.53
515.29
5.13 514.97 460.26 4.01 515.53
515.29
5.60 514.90 470.00 3.97 515.74
515.39
5.18 515.14 477.67 4.00 515.73
515.47
5.06 515.21 480.00 4.01 515.73
515.50
4.38 515.39 485.92 4.04 515.71
515.56
4.20 515.49 489.67 4.06 515.71
515.60
4.03 515.56 493.42 4.07 515.70
515.64 3.81 515.63 500.00 3.80 515.69
515.71
3.81 516.02 520.00 3.81 516.02
516.09
3.81 516.23 529.40 3.76 516.23
516.30
3.81 516.46 540.00 3.81 516.46
516.54
3.81 516.60 546.36 4.13 516.62
516.68
3.83 516.90 559.70 4.10 516.98
516.97
3.83 516.90 560.00 4.10 516.99
516.98
4.07 516.92 573.03 4.07 517.06
517.00
4.19 516.91 579.70 4.06 517.10
-
8/18/2019 CM6969BC.desbloqueado
22/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 3
-----------------------------------------------------------------------------------------------------------------------------
Estacion Inicial: 160.00 Estacion Final: 1919.99
HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO
Dist. Elev. ELEV-SBR Dist. Elev.
4.74 515.42 665.26 3.77 516.01
515.75
4.84 515.32 668.00 3.77 515.97
515.69
5.28 515.14 680.00 3.99 515.85
515.54
5.17 515.19 686.13 4.00 515.82
515.55
4.29 515.43 696.83 3.78 515.72
515.58
4.15 515.48 700.00 3.79 515.69
515.59
3.90 515.53 706.13 3.80 515.64
515.61
3.81 515.55 708.40 3.80 515.62
515.62
3.81 515.62 715.43 4.14 515.61
515.70
3.81 515.70 720.00 4.14 515.69
515.77 3.80 515.98 728.58 4.17 515.89
515.97
3.79 516.19 733.58 4.42 516.04
516.13
3.79 516.43 738.58 4.71 516.15
516.31
3.78 516.50 740.00 4.79 516.18
516.36
3.78 516.70 743.58 5.00 516.27
516.51
3.77 517.06 750.00 5.39 516.43
516.80
3.77 517.26 753.58 5.60 516.51
516.95
3.76 517.55 760.00 0.00 517.26
517.19
3.76 517.81 770.00 5.95 516.87
-
8/18/2019 CM6969BC.desbloqueado
23/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 4
-----------------------------------------------------------------------------------------------------------------------------
Estacion Inicial: 160.00 Estacion Final: 1919.99
HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO
Dist. Elev. ELEV-SBR Dist. Elev.
3.79 518.09 844.91 4.64 517.82
517.97
3.79 518.10 860.00 4.67 517.82
517.97
3.79 518.04 880.00 4.67 517.76
517.92
3.79 517.98 900.00 4.67 517.71
517.86
3.79 517.97 920.00 4.67 517.69
517.84
3.79 517.95 940.00 4.67 517.67
517.83
3.79 517.93 960.00 4.67 517.66
517.81
3.79 517.92 980.00 4.67 517.64
517.79
3.79 517.90 995.89 4.63 517.64
517.78
3.79 517.86 1000.00 4.46 517.68
517.78 3.79 517.83 1002.56 4.37 517.69
517.77
4.13 517.65 1015.89 4.14 517.63
517.71
3.81 517.58 1020.00 3.81 517.60
517.66
4.21 517.41 1029.22 4.09 517.51
517.49
4.22 517.40 1029.41 4.09 517.51
517.49
4.24 517.39 1030.07 4.09 517.50
517.47
4.26 517.37 1030.74 4.09 517.49
517.46
4.28 517.36 1031.07 4.08 517.49
517.45
4.60 517.08 1040.00 4.05 517.33
-
8/18/2019 CM6969BC.desbloqueado
24/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 5
-----------------------------------------------------------------------------------------------------------------------------
Estacion Inicial: 160.00 Estacion Final: 1919.99
HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO
Dist. Elev. ELEV-SBR Dist. Elev.
4.07 519.87 1146.93 4.10 519.71
519.80
4.07 520.85 1160.00 4.11 520.69
520.77
3.79 521.98 1180.00 4.11 521.82
521.90
3.79 522.67 1199.63 4.10 522.52
522.60
3.79 522.68 1200.00 4.09 522.53
522.61
3.79 522.79 1206.30 4.00 522.66
522.74
3.80 522.89 1219.63 3.82 522.81
522.88
3.80 522.89 1220.00 3.82 522.81
522.88
3.81 522.79 1232.96 3.81 522.76
522.84
3.81 522.67 1240.00 3.81 522.66
522.73 3.81 522.08 1260.00 3.81 522.08
522.15
3.81 521.15 1280.00 3.81 521.15
521.22
4.14 520.17 1300.00 3.81 520.18
520.26
4.14 519.55 1320.00 3.81 519.56
519.63
3.81 519.88 1340.00 3.81 519.88
519.96
3.81 520.27 1347.94 3.81 520.27
520.35
3.81 521.16 1360.00 3.81 521.18
521.24
3.81 521.67 1365.40 3.81 521.70
521.75
3.82 523.18 1378.73 3.80 523.26
-
8/18/2019 CM6969BC.desbloqueado
25/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 6
-----------------------------------------------------------------------------------------------------------------------------
Estacion Inicial: 160.00 Estacion Final: 1919.99
HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO
Dist. Elev. ELEV-SBR Dist. Elev.
3.76 532.87 1510.00 5.63 532.01
532.52
3.76 532.50 1520.00 5.63 531.65
532.16
3.77 531.84 1530.00 5.18 531.26
531.59
3.79 531.12 1540.00 4.65 530.84
530.99
3.81 530.00 1557.37 3.81 530.00
530.07
3.81 529.88 1560.00 3.80 529.92
529.95
3.92 529.65 1565.37 3.80 529.76
529.73
4.62 529.29 1573.37 3.79 529.57
529.44
4.95 528.97 1580.00 3.78 529.45
529.24
5.23 528.72 1585.37 3.77 529.37
529.10 4.94 528.33 1600.00 3.77 529.04
528.73
4.81 528.25 1608.04 3.77 528.87
528.59
4.29 528.32 1620.00 3.79 528.60
528.47
4.28 528.32 1620.04 3.79 528.60
528.47
3.94 528.34 1628.04 3.80 528.46
528.42
4.14 528.29 1636.04 3.81 528.32
528.37
4.14 528.27 1640.00 3.81 528.27
528.35
4.14 528.15 1660.00 3.81 528.15
528.23
3.81 528.04 1680.00 4.14 528.03
-
8/18/2019 CM6969BC.desbloqueado
26/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
REFERENCIAS DE AFINAMIENTO A LA SUBRASANTE Hoja No : 7
-----------------------------------------------------------------------------------------------------------------------------
Estacion Inicial: 160.00 Estacion Final: 1919.99
HOMBRO IZQUIERDO ESTACION HOMBRO DERECHO
Dist. Elev. ELEV-SBR Dist. Elev.
3.80 533.05 1770.33 4.14 532.98
533.06
3.79 533.58 1774.85 4.38 533.43
533.52
3.79 533.63 1775.25 4.40 533.47
533.56
3.79 533.68 1775.65 4.43 533.50
533.60
3.79 533.75 1776.25 4.47 533.55
533.66
3.78 534.19 1780.00 4.74 533.83
534.03
3.77 536.34 1800.00 5.40 535.59
536.03
3.77 538.34 1820.00 5.40 537.59
538.03
3.77 540.19 1840.00 5.40 539.44
539.88
3.77 541.89 1860.00 5.40 541.14
541.58 3.77 543.52 1880.00 5.11 542.95
543.28
3.78 543.72 1882.61 4.98 543.22
543.50
3.78 544.16 1888.61 4.69 543.83
544.01
3.79 544.45 1892.61 4.49 544.24
544.35
3.79 544.74 1896.61 4.31 544.61
544.69
3.80 544.99 1900.00 3.84 544.90
544.98
3.81 546.18 1919.99 3.81 546.18
546.25
-
8/18/2019 CM6969BC.desbloqueado
27/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
VOLUMENES DE CONSTRUCCION Hoja No : 1
-----------------------------------------------------------------------------------------------------------------------------
DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co. ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%
160.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
160.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180.00 27 8 15 0 21 0 0 0 0 0 0 39 0 11 0 0
182.70 4 1 2 0 3 0 0 0 0 0 0 6 0 1 0 0
200.00 15 14 7 0 13 0 2 0 0 1 0 38 0 4 0 0
209.00 4 11 0 0 3 0 2 0 0 0 0 21 0 0 0 0
211.50 3 1 1 0 3 0 0 0 0 0 0 5 0 1 0 0
220.00 15 0 4 0 13 0 0 0 0 0 0 18 0 4 0 0
240.00 32 0 0 0 29 0 0 0 0 0 0 47 0 0 0 0
260.00 24 8 0 0 22 0 0 0 0 0 0 47 0 0 0 0
280.00 11 21 0 0 14 0 0 0 0 0 0 47 0 0 0 0
289.20 5 10 0 0 6 0 0 0 0 0 0 21 0 0 0 0
300.00 9 8 0 0 7 0 1 0 0 0 0 25 0 0 0 0
320.00 8 24 0 0 8 0 6 0 0 1 0 47 0 0 0 0
340.00 15 18 4 0 14 0 3 0 0 1 0 45 0 3 0 0
351.45 19 1 33 0 7 0 0 0 0 0 0 12 0 17 0 0
358.46 13 0 43 0 0 0 0 0 0 0 0 0 0 19 0 0
360.00 3 0 7 0 1 0 0 0 0 0 0 1 0 3 0 0
367.82 10 4 11 0 6 0 2 0 0 4 0 14 0 6 0 0
372.62 2 6 1 0 2 0 3 0 0 6 0 11 0 1 0 0
377.42 1 7 0 0 1 0 3 0 0 6 0 11 0 0 0 0
380.00 1 4 0 0 0 0 2 0 0 2 0 6 0 0 0 0
384.62 1 6 1 0 1 0 3 0 0 4 0 11 0 1 0 0 400.00 12 20 57 0 1 0 9 0 0 11 0 31 0 10 0 0
406.00 7 7 43 0 1 0 3 0 0 2 0 11 0 6 0 0
414.52 10 8 42 0 3 0 2 0 0 1 0 16 0 7 0 0
420.00 7 4 12 0 4 0 0 0 0 0 0 11 0 3 0 0
421.72 2 1 3 0 1 0 0 0 0 0 0 4 0 1 0 0
426.52 7 2 6 0 4 0 0 0 0 0 0 10 0 2 0 0
431.32 6 2 4 0 4 0 0 0 0 0 0 11 0 1 0 0
440.00 10 5 2 0 8 0 0 0 0 0 0 20 0 1 0 0
444.51 4 3 0 0 5 0 0 0 0 0 0 11 0 0 0 0
448.26 4 2 1 0 4 0 0 0 0 0 0 9 0 0 0 0
452.01 5 2 4 0 4 0 0 0 0 0 0 8 0 2 0 0
460.00 13 4 15 0 6 0 0 0 0 0 0 13 0 10 0 0
460.26 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 470.00 19 2 41 0 6 0 0 0 0 0 0 12 0 17 0 0
477.67 17 0 45 0 5 0 0 0 0 0 0 8 0 15 0 0
480.00 5 0 13 0 2 0 0 0 0 0 0 3 0 4 0 0
485.92 11 1 25 0 6 0 0 0 0 0 0 10 0 7 0 0
-
8/18/2019 CM6969BC.desbloqueado
28/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
VOLUMENES DE CONSTRUCCION Hoja No : 2
-----------------------------------------------------------------------------------------------------------------------------
DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co. ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%
665.26 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
668.00 2 3 0 0 2 0 1 0 0 4 0 7 0 0 0 0
680.00 18 7 19 0 9 0 3 0 0 15 0 24 0 10 0 0
686.13 11 2 19 0 4 0 0 0 0 0 0 9 0 9 0 0
696.83 13 7 16 0 8 0 2 0 0 4 0 21 0 7 0 0
700.00 3 3 0 0 2 0 1 0 0 3 0 8 0 0 0 0
706.13 5 5 0 0 4 0 2 0 0 5 0 15 0 0 0 0
708.40 2 2 0 0 2 0 1 0 0 1 0 5 0 0 0 0
715.43 7 5 7 0 6 0 1 0 0 2 0 16 0 1 0 0
720.00 7 1 13 0 4 0 0 0 0 0 0 9 0 2 0 0
728.58 16 0 28 0 8 0 0 0 0 0 0 17 0 4 0 0
733.58 9 0 14 0 6 0 0 0 0 0 0 10 0 2 0 0
738.58 8 2 14 0 5 0 0 0 0 0 0 11 0 3 0 0
740.00 2 1 4 0 1 0 0 0 0 0 0 3 0 1 0 0
743.58 6 1 15 0 3 0 0 0 0 0 0 6 0 3 0 0
750.00 12 1 25 0 8 0 0 0 0 1 0 12 0 6 0 0
753.58 7 2 8 0 5 0 1 0 0 4 0 8 0 3 0 0
760.00 8 5 9 0 6 0 2 0 0 21 0 9 0 4 0 0
770.00 13 6 18 0 6 0 3 0 0 24 0 12 0 9 0 0
780.00 13 6 16 0 7 0 3 0 0 23 0 14 0 7 0 0
783.16 4 3 2 0 3 0 1 0 0 14 0 6 0 1 0 0
788.50 10 5 7 0 7 0 2 0 0 24 0 13 0 2 0 0
790.00 3 1 1 0 2 0 1 0 0 5 0 4 0 0 0 0 798.16 9 9 3 0 7 0 2 0 0 12 0 21 0 1 0 0
800.00 1 3 0 0 1 0 0 0 0 0 0 5 0 0 0 0
803.16 1 4 0 0 2 0 0 0 0 0 0 8 0 0 0 0
808.16 3 5 0 0 3 0 0 0 0 0 0 12 0 0 0 0
811.57 3 2 0 0 3 0 0 0 0 0 0 8 0 0 0 0
820.00 11 3 3 0 8 0 0 0 0 0 0 19 0 1 0 0
824.91 8 0 4 0 5 0 0 0 0 0 0 11 0 2 0 0
838.24 24 0 22 0 13 0 0 0 0 0 0 27 0 7 0 0
840.00 3 0 5 0 2 0 0 0 0 0 0 3 0 1 0 0
844.91 8 1 14 0 4 0 0 0 0 0 0 9 0 4 0 0
860.00 17 11 36 0 9 0 1 0 0 0 0 30 0 10 0 0
880.00 19 18 26 0 13 0 1 0 0 0 0 44 0 9 0 0
900.00 16 21 15 0 12 0 1 0 0 0 0 46 0 7 0 0 920.00 15 22 30 0 11 0 1 0 0 0 0 41 0 11 0 0
940.00 14 23 34 0 9 0 2 0 0 1 0 41 0 12 0 0
960.00 8 29 21 0 4 0 9 0 0 3 0 46 0 7 0 0
980.00 22 15 14 0 14 0 7 0 0 2 0 46 0 7 0 0
-
8/18/2019 CM6969BC.desbloqueado
29/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
VOLUMENES DE CONSTRUCCION Hoja No : 3
-----------------------------------------------------------------------------------------------------------------------------
DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co. ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%
1113.60 2 31 0 0 0 0 10 0 0 6 0 32 0 0 0 0
1120.00 0 15 0 0 0 0 5 0 0 6 0 15 0 0 0 0
1126.93 6 11 0 0 1 0 4 0 0 5 0 16 0 0 0 0
1140.00 30 5 7 0 10 0 2 0 0 0 0 28 0 5 0 0
1140.27 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
1146.93 18 0 5 0 8 0 0 0 0 0 0 14 0 4 0 0
1160.00 35 0 10 0 17 0 0 0 0 0 0 26 0 7 0 0
1180.00 30 21 10 0 14 0 7 0 0 6 0 43 0 7 0 0
1199.63 3 45 0 0 0 0 15 0 0 16 0 48 0 0 0 0
1200.00 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0
1206.30 0 16 0 0 0 0 5 0 0 8 0 15 0 0 0 0
1219.63 1 33 0 0 0 0 11 0 0 19 0 32 0 0 0 0
1220.00 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0
1232.96 3 29 0 0 0 0 10 0 0 13 0 31 0 0 0 0
1240.00 9 8 0 0 1 0 3 0 0 2 0 17 0 0 0 0
1260.00 47 1 5 0 16 0 0 0 0 0 0 42 0 5 0 0
1280.00 38 15 5 0 16 0 5 0 0 7 0 43 0 5 0 0
1300.00 40 15 15 0 10 0 5 0 0 7 0 45 0 4 0 0
1320.00 53 0 28 0 23 0 0 0 0 0 0 37 0 12 0 0
1340.00 26 36 14 0 15 0 12 0 0 77 0 41 0 8 0 0
1347.94 0 34 0 0 0 0 11 0 0 140 0 19 0 0 0 0
1360.00 4 40 0 0 2 0 13 0 0 172 0 29 0 0 0 0
1365.40 4 9 0 0 2 0 3 0 0 3 0 13 0 0 0 0 1378.73 12 20 0 0 4 0 7 0 0 4 0 31 0 0 0 0
1380.00 1 2 0 0 0 0 1 0 0 0 0 3 0 0 0 0
1392.07 22 11 4 0 5 0 4 0 0 2 0 29 0 2 0 0
1398.73 17 2 9 0 4 0 1 0 0 0 0 14 0 4 0 0
1400.00 3 0 3 0 1 0 0 0 0 0 0 2 0 1 0 0
1420.00 50 7 28 0 15 0 2 0 0 2 0 38 0 15 0 0
1440.00 33 18 6 0 12 0 6 0 0 8 0 45 0 5 0 0
1444.23 5 6 0 0 2 0 2 0 0 2 0 10 0 0 0 0
1450.90 10 8 2 0 3 0 3 0 0 2 0 16 0 1 0 0
1460.00 19 5 5 0 4 0 2 0 0 1 0 21 0 2 0 0
1464.23 9 2 1 0 2 0 1 0 0 1 0 10 0 0 0 0
1477.57 16 17 0 0 3 0 6 0 0 5 0 32 0 0 0 0
1480.00 2 4 0 0 0 0 1 0 0 1 0 6 0 0 0 0 1500.00 34 21 9 0 9 0 7 0 0 7 0 44 0 8 0 0
1510.00 29 2 17 0 8 0 1 0 0 1 0 17 0 12 0 0
1520.00 31 0 24 0 10 0 0 0 0 0 0 17 0 11 0 0
1530.00 29 1 25 0 7 0 0 0 0 0 0 21 0 7 0 0
-
8/18/2019 CM6969BC.desbloqueado
30/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
VOLUMENES DE CONSTRUCCION Hoja No : 4
-----------------------------------------------------------------------------------------------------------------------------
DESP DESP CORTE ESTRATO CORTE CAJA C.C.C. CUERPO SBY SBR RELLENO CAJA Ex.Ac.Te.Co. ESTACION CORTE TERR 2 3 2 3 C.T.N. 95% 100% TERR TERR TERR 95% 100% 95% 100%
1740.00 2 41 0 0 1 0 14 0 0 126 0 30 0 0 0 0
1746.33 3 19 0 0 1 0 6 0 0 31 0 18 0 0 0 0
1760.00 21 15 3 0 10 0 5 0 0 17 0 33 0 2 0 0
1762.33 6 0 2 0 3 0 0 0 0 0 0 5 0 1 0 0
1766.33 11 0 8 0 4 0 0 0 0 0 0 7 0 3 0 0
1770.33 11 0 11 0 3 0 0 0 0 0 0 7 0 3 0 0
1774.85 12 1 17 0 3 0 0 0 0 0 0 8 0 4 0 0
1775.25 1 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0
1775.65 1 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0
1776.25 2 0 3 0 0 0 0 0 0 0 0 1 0 1 0 0
1780.00 11 1 23 0 2 0 0 0 0 0 0 6 0 4 0 0
1800.00 39 26 95 0 7 0 9 0 0 26 0 40 0 15 0 0
1820.00 21 45 31 0 3 0 15 0 0 49 0 49 0 8 0 0
1840.00 45 22 108 0 7 0 7 0 0 24 0 31 0 26 0 0
1860.00 52 18 271 0 5 0 6 0 0 32 0 21 0 36 0 0
1880.00 51 18 237 0 4 0 6 0 0 32 0 20 0 36 0 0
1882.61 8 0 15 0 1 0 0 0 0 0 0 1 0 6 0 0
1888.61 17 0 22 0 6 0 0 0 0 0 0 7 0 9 0 0
1892.61 11 0 7 0 6 0 0 0 0 0 0 8 0 3 0 0
1896.61 11 0 4 0 5 0 0 0 0 0 0 8 0 2 0 0
1900.00 10 0 1 0 3 0 0 0 0 0 0 8 0 1 0 0
1919.99 44 11 0 0 13 0 4 0 0 6 0 48 0 0 0 0
-------------------------------------------------------------------------------------------------------------------------- S U M A S D E L K I L O M E T R O 1000.00 A L K I L O M E T R O 1919.99
1509 1065 1242 0 456 0 349 0 0 1249 0 1971 0 369 0 0
material A 0 material B 1358 material C 340
--------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------
TOTALES 2495 1603 2392 0 1089 0 466 0 0 1497 0 3697 0 767 0 0
material A 892 material B 2250 material C 340
--------------------------------------------------------------------------------------------------------------------------
TP| 0| 0|13.57|
-
8/18/2019 CM6969BC.desbloqueado
31/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ORDENADA DE CURVA MASA Hoja No : 1
-----------------------------------------------------------------------------------------------------------------------------
E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4
160.00 0 0
0 0 1.00 0 0 0 0.00 0 0 0 0 0 0
160.00 0 0 0 0
15 21 1.00 36 0 0 0.00 0 36 0 0 50 0
180.00 36 0 0 0
2 3 1.00 5 0 0 0.00 0 5 0 0 7 0
182.70 41 0 0 0
7 13 1.00 20 0 0 0.00 0 20 1 0 42 0
200.00 61 0 0 0
0 3 1.00 3 0 0 0.00 0 3 0 0 21 0
209.00 64 0 0 0
1 3 1.00 4 0 0 0.00 0 4 0 0 6 0
211.50 68 0 0 0
4 13 1.00 17 0 0 0.00 0 17 0 0 22 0
220.00 85 0 0 0
0 29 1.00 29 0 0 0.00 0 29 0 0 47 0
240.00 114 0 0 0
0 22 1.00 22 0 0 0.00 0 22 0 0 47 0
260.00 136 0 0 0
0 14 1.00 14 0 0 0.00 0 14 0 0 47 0
280.00 150 0 0 0
0 6 1.00 6 0 0 0.00 0 6 0 0 21 0
289.20 156 0 0 0 0 7 1.00 7 0 0 0.00 0 7 0 0 25 0
300.00 163 0 0 0
0 8 1.00 8 0 0 0.00 0 8 1 0 47 0
320.00 171 0 0 0
4 14 1.00 18 0 0 0.00 0 18 1 0 48 0
340.00 189 0 0 0
33 7 1.00 40 0 0 0.00 0 40 0 0 29 0
351.45 229 0 0 0
43 0 1.00 43 0 0 0.00 0 43 0 0 19 0
358.46 272 0 0 0
7 1 1.00 8 0 0 0.00 0 8 0 0 4 0
360.00 280 0 0 0
11 6 1.00 17 0 0 0.00 0 17 4 0 20 0 367.82 297 0 0 0
1 2 1.00 3 0 0 0.00 0 3 6 0 12 0
372.62 300 0 0 0
0 1 1.00 1 0 0 0.00 0 1 6 0 11 0
-
8/18/2019 CM6969BC.desbloqueado
32/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ORDENADA DE CURVA MASA Hoja No : 2
-----------------------------------------------------------------------------------------------------------------------------
E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4
15 6 1.00 21 0 0 0.00 0 21 0 0 23 0
460.00 537 0 0 0
1 0 1.00 1 0 0 0.00 0 1 0 0 0 0
460.26 538 0 0 0
41 6 1.00 47 0 0 0.00 0 47 0 0 29 0
470.00 585 0 0 0
45 5 1.00 50 0 0 0.00 0 50 0 0 23 0
477.67 635 0 0 0
13 2 1.00 15 0 0 0.00 0 15 0 0 7 0
480.00 650 0 0 0
25 6 1.00 31 0 0 0.00 0 31 0 0 17 0
485.92 681 0 0 0
9 4 1.00 13 0 0 0.00 0 13 0 0 9 0
489.67 694 0 0 0
6 3 1.00 9 0 0 0.00 0 9 0 0 10 0
493.42 703 0 0 0
5 4 1.00 9 0 0 0.00 0 9 3 0 16 0
500.00 712 0 0 0
4 18 1.00 22 0 0 0.00 0 22 8 0 48 0
520.00 734 0 0 0
3 11 1.00 14 0 0 0.00 0 14 0 0 22 0
529.40 748 0 0 0 3 12 1.00 15 0 0 0.00 0 15 0 0 25 0
540.00 763 0 0 0
5 6 1.00 11 0 0 0.00 0 11 0 0 15 0
546.36 774 0 0 0
31 12 1.00 43 0 0 0.00 0 43 0 0 33 0
559.70 817 0 0 0
1 0 1.00 1 0 0 0.00 0 1 0 0 1 0
560.00 818 0 0 0
37 14 1.00 51 0 0 0.00 0 51 0 0 33 0
573.03 869 0 0 0
14 9 1.00 23 0 0 0.00 0 23 0 0 17 0
579.70 892 0 0 0
1 0 1.00 1 0 0 0.00 0 1 0 0 1 0 580.00 893 0 0 0
19 22 1.00 41 0 0 0.00 0 41 0 0 51 0
600.00 934 0 0 0
0 0 1.00 0 0 0 0.00 0 0 0 0 1 0
-
8/18/2019 CM6969BC.desbloqueado
33/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ORDENADA DE CURVA MASA Hoja No : 3
-----------------------------------------------------------------------------------------------------------------------------
E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4
19 4 1.00 23 0 0 0.00 0 23 0 0 18 0
686.13 1092 0 0 0
16 8 1.00 24 0 0 0.00 0 24 4 0 28 0
696.83 1116 0 0 0
0 2 1.00 2 0 0 0.00 0 2 3 0 8 0
700.00 1118 0 0 0
0 4 1.00 4 0 0 0.00 0 4 5 0 15 0
706.13 1122 0 0 0
0 2 1.00 2 0 0 0.00 0 2 1 0 5 0
708.40 1124 0 0 0
7 6 1.00 13 0 0 0.00 0 13 2 0 17 0
715.43 1137 0 0 0
13 4 1.00 17 0 0 0.00 0 17 0 0 11 0
720.00 1154 0 0 0
28 8 1.00 36 0 0 0.00 0 36 0 0 21 0
728.58 1190 0 0 0
14 6 1.00 20 0 0 0.00 0 20 0 0 12 0
733.58 1210 0 0 0
14 5 1.00 19 0 0 0.00 0 19 0 0 14 0
738.58 1229 0 0 0
4 1 1.00 5 0 0 0.00 0 5 0 0 4 0
740.00 1234 0 0 0
15 3 1.00 18 0 0 0.00 0 18 0 0 9 0
743.58 1252 0 0 0
25 8 1.00 33 0 0 0.00 0 33 1 0 18 0
750.00 1285 0 0 0
8 5 1.00 13 0 0 0.00 0 13 4 0 11 0
753.58 1298 0 0 0
9 6 1.00 15 0 0 0.00 0 15 21 0 13 0
760.00 1313 0 0 0
18 6 1.00 24 0 0 0.00 0 24 24 0 21 0
770.00 1337 0 0 0
16 7 1.00 23 0 0 0.00 0 23 23 0 21 0
780.00 1360 0 0 0
2 3 1.00 5 0 0 0.00 0 5 14 0 7 0 783.16 1365 0 0 0
7 7 1.00 14 0 0 0.00 0 14 24 0 15 0
788.50 1379 0 0 0
1 2 1.00 3 0 0 0.00 0 3 5 0 4 0
-
8/18/2019 CM6969BC.desbloqueado
34/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ORDENADA DE CURVA MASA Hoja No : 4
-----------------------------------------------------------------------------------------------------------------------------
E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4
30 11 1.00 41 0 0 0.00 0 41 0 0 52 0
920.00 1633 0 0 0
34 9 1.00 43 0 0 0.00 0 43 1 0 53 0
940.00 1676 0 0 0
21 4 1.00 25 0 0 0.00 0 25 3 0 53 0
960.00 1701 0 0 0
14 14 1.00 28 0 0 0.00 0 28 2 0 53 0
980.00 1729 0 0 0
20 20 1.00 40 0 0 0.00 0 40 0 0 42 0
995.89 1769 0 0 0
9 5 1.00 14 0 0 0.00 0 14 0 0 10 0
1000.00 1783 0 0 0
5 3 1.00 8 0 0 0.00 0 8 0 0 6 0
1002.56 1791 0 0 0
22 13 1.00 35 0 0 0.00 0 35 0 0 35 0
1015.89 1826 0 0 0
3 3 1.00 6 0 0 0.00 0 6 0 0 10 0
1020.00 1832 0 0 0
4 6 1.00 10 0 0 0.00 0 10 0 0 23 0
1029.22 1842 0 0 0
0 0 1.00 0 0 0 0.00 0 0 0 0 0 0
1029.41 1842 0 0 0
1 0 1.00 1 0 0 0.00 0 1 0 0 1 0
1030.07 1843 0 0 0
1 0 1.00 1 0 0 0.00 0 1 0 0 1 0
1030.74 1844 0 0 0
0 0 1.00 0 0 0 0.00 0 0 0 0 1 0
1031.07 1844 0 0 0
11 5 1.00 16 0 0 0.00 0 16 0 0 25 0
1040.00 1860 0 0 0
16 6 1.00 22 0 0 0.00 0 22 4 0 39 0
1060.00 1882 0 0 0
0 0 1.00 0 0 0 0.00 0 0 0 0 1 0
1060.82 1882 0 0 0
1 1 1.00 2 0 0 0.00 0 2 2 0 11 0 1065.00 1884 0 0 0
0 0 1.00 0 0 0 0.00 0 0 1 0 6 0
1067.49 1884 0 0 0
0 9 1.00 9 0 0 0.00 0 9 1 0 30 0
-
8/18/2019 CM6969BC.desbloqueado
35/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ORDENADA DE CURVA MASA Hoja No : 5
-----------------------------------------------------------------------------------------------------------------------------
E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4
0 0 1.00 0 0 0 0.00 0 0 8 0 15 0
1206.30 1992 0 0 0
0 0 1.00 0 0 0 0.00 0 0 19 0 32 0
1219.63 1992 0 0 0
0 0 1.00 0 0 0 0.00 0 0 1 0 1 0
1220.00 1992 0 0 0
0 0 1.00 0 0 0 0.00 0 0 13 0 31 0
1232.96 1992 0 0 0
0 1 1.00 1 0 0 0.00 0 1 2 0 17 0
1240.00 1993 0 0 0
5 16 1.00 21 0 0 0.00 0 21 0 0 47 0
1260.00 2014 0 0 0
5 16 1.00 21 0 0 0.00 0 21 7 0 48 0
1280.00 2035 0 0 0
15 10 1.00 25 0 0 0.00 0 25 7 0 49 0
1300.00 2060 0 0 0
28 23 1.00 51 0 0 0.00 0 51 0 0 49 0
1320.00 2111 0 0 0
14 15 1.00 29 0 0 0.00 0 29 77 0 49 0
1340.00 2140 0 0 0
0 0 1.00 0 0 0 0.00 0 0 140 0 19 0
1347.94 2140 0 0 0
0 2 1.00 2 0 0 0.00 0 2 172 0 29 0
1360.00 2142 0 0 0
0 2 1.00 2 0 0 0.00 0 2 3 0 13 0
1365.40 2144 0 0 0
0 4 1.00 4 0 0 0.00 0 4 4 0 31 0
1378.73 2148 0 0 0
0 0 1.00 0 0 0 0.00 0 0 0 0 3 0
1380.00 2148 0 0 0
4 5 1.00 9 0 0 0.00 0 9 2 0 31 0
1392.07 2157 0 0 0
9 4 1.00 13 0 0 0.00 0 13 0 0 18 0
1398.73 2170 0 0 0
3 1 1.00 4 0 0 0.00 0 4 0 0 3 0 1400.00 2174 0 0 0
28 15 1.00 43 0 0 0.00 0 43 2 0 53 0
1420.00 2217 0 0 0
6 12 1.00 18 0 0 0.00 0 18 8 0 50 0
-
8/18/2019 CM6969BC.desbloqueado
36/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ORDENADA DE CURVA MASA Hoja No : 6
-----------------------------------------------------------------------------------------------------------------------------
E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4
0 1 1.00 1 0 0 0.00 0 1 2 0 13 0
1565.37 2394 0 0 0
1 4 1.00 5 0 0 0.00 0 5 3 0 20 0
1573.37 2399 0 0 0
3 4 1.00 7 0 0 0.00 0 7 3 0 17 0
1580.00 2406 0 0 0
4 3 1.00 7 0 0 0.00 0 7 2 0 15 0
1585.37 2413 0 0 0
10 7 1.00 17 0 0 0.00 0 17 4 0 40 0
1600.00 2430 0 0 0
3 5 1.00 8 0 0 0.00 0 8 1 0 21 0
1608.04 2438 0 0 0
2 5 1.00 7 0 0 0.00 0 7 14 0 30 0
1620.00 2445 0 0 0
0 0 1.00 0 0 0 0.00 0 0 0 0 0 0
1620.04 2445 0 0 0
0 2 1.00 2 0 0 0.00 0 2 10 0 20 0
1628.04 2447 0 0 0
1 2 1.00 3 0 0 0.00 0 3 2 0 20 0
1636.04 2450 0 0 0
1 1 1.00 2 0 0 0.00 0 2 0 0 10 0
1640.00 2452 0 0 0
9 11 1.00 20 0 0 0.00 0 20 1 0 50 0
1660.00 2472 0 0 0
12 16 1.00 28 0 0 0.00 0 28 0 0 50 0
1680.00 2500 0 0 0
5 6 1.00 11 0 0 0.00 0 11 18 0 38 0
1695.50 2511 0 0 0
0 0 1.00 0 0 0 0.00 0 0 12 0 10 0
1699.50 2511 0 0 0
0 0 1.00 0 0 0 0.00 0 0 2 0 1 0
1700.00 2511 0 0 0
0 0 1.00 0 0 0 0.00 0 0 9 0 9 0
1703.50 2511 0 0 0
5 4 1.00 9 0 0 0.00 0 9 5 0 17 0 1710.00 2520 0 0 0
7 5 1.00 12 0 0 0.00 0 12 83 0 27 0
1719.50 2532 0 0 0
0 0 1.00 0 0 0 0.00 0 0 9 0 1 0
-
8/18/2019 CM6969BC.desbloqueado
37/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
ORDENADA DE CURVA MASA Hoja No : 7
-----------------------------------------------------------------------------------------------------------------------------
E S T R A T O 2 E S T R A T O 3 CORTE VOLUM VOLUM VOLUM TRRPL ESTACION VLM-G Escom CVV VLM-A VLM-G Escom CVV VLM-A COMPS TR-90 TR-95 TR-100 COMPS CM-1 CM-2 CM-3 CM-4
31 3 1.00 34 0 0 0.00 0 34 49 0 57 0
1820.00 2766 0 0 0
108 7 1.00 115 0 0 0.00 0 115 24 0 57 0
1840.00 2881 0 0 0
271 5 1.00 276 0 0 0.00 0 276 32 0 57 0
1860.00 3157 0 0 0
237 4 1.00 241 0 0 0.00 0 241 32 0 56 0
1880.00 3398 0 0 0
15 1 1.00 16 0 0 0.00 0 16 0 0 7 0
1882.61 3414 0 0 0
22 6 1.00 28 0 0 0.00 0 28 0 0 16 0
1888.61 3442 0 0 0
7 6 1.00 13 0 0 0.00 0 13 0 0 11 0
1892.61 3455 0 0 0
4 5 1.00 9 0 0 0.00 0 9 0 0 10 0
1896.61 3464 0 0 0
1 3 1.00 4 0 0 0.00 0 4 0 0 9 0
1900.00 3468 0 0 0
0 13 1.00 13 0 0 0.00 0 13 6 0 48 0
1919.99 3481 0 0 0
---------------------------------------------------------------------------------------------------------------------------------------
SUMAS : 696 53 749 0 0 0 749 143 0 328 0
---------------------------------------------------------------------------------------------------------------------------------------
TOTALES : 3481 0
-
8/18/2019 CM6969BC.desbloqueado
38/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
-
8/18/2019 CM6969BC.desbloqueado
39/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE
Hoja No : 3
----------------------------------------------------------------------------------------------------------------------------- LADO IZQUIERDO ESP-SBR LADO DERECHO
ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5
---------------------------------------------------------------------------------------------------------------------
160.00 -3.81 -0.41 4.44
-0.38 0.00 -0.39
160.00 -3.81 -0.41 4.44
-0.38 0.00 -0.39
180.00 -4.11 -0.23 4.44
-0.38 0.00 -0.39
182.70 -3.91 -0.36 4.44
-0.38 0.00 -0.39
200.00 -3.91 -0.21 4.12
-0.38 0.00 -0.38
209.00 -4.07 -0.18 3.93
-0.38 0.00 -0.38
211.50 -4.44 -0.36 4.44
-0.39 0.00 -0.39
220.00 -3.89 -0.37 4.00
-0.38 0.00 -0.38
240.00 -3.92 -0.33 3.95
-0.38 0.00 -0.38
260.00 -3.90 -0.24 4.08
-0.38 0.00 -0.38
280.00 -4.00 -0.19 3.85
-0.38 0.00 -0.38
289.20 -3.96 -0.28 3.81
-0.38 0.00 -0.38
300.00 -3.96 -0.27 3.93
-0.38 0.00 -0.38
320.00 -4.02 -0.17 4.06
-0.38 0.00 -0.38
340.00 -3.82 -0.26 4.44
-0.38 0.00 -0.39
351.45 -4.44 -0.63 4.44
-0.39 0.00 -0.39
358.46 -4.44 -0.85 4.44
-0.39 0.00 -0.39
360.00 -4.00 -0.47 4.44-0.38 0.00 -0.39
367.82 -4.27 -0.22 4.44
-0.39 0.00 -0.39
372.62 -4.27 -0.13 3.84
-
8/18/2019 CM6969BC.desbloqueado
40/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE
Hoja No : 4
----------------------------------------------------------------------------------------------------------------------------- LADO IZQUIERDO ESP-SBR LADO DERECHO
ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5
---------------------------------------------------------------------------------------------------------------------
380.00 -4.03 -0.07 3.88
-0.38 0.00 -0.38
384.62 -4.08 -0.03 4.44
-0.30 0.00 -0.39
400.00 -4.11 -0.18 5.52
0.04 0.00 -0.75
406.00 -4.04 -0.22 5.52
0.03 0.00 -0.75
414.52 -3.91 -0.30 5.20
-0.08 0.00 -0.60
420.00 -3.82 -0.35 4.95
-0.15 0.00 -0.49
421.72 -3.80 -0.34 4.87
-0.18 0.00 -0.46
426.52 -4.03 -0.33 4.65
-0.24 0.00 -0.39
431.32 -3.99 -0.33 4.44
-0.30 0.00 -0.39
440.00 -3.98 -0.31 3.89
-0.38 0.00 -0.33
444.51 -4.00 -0.31 3.81
-0.38 0.00 -0.27
448.26 -4.12 -0.32 4.45
-0.38 0.00 -0.21
452.01 -4.91 -0.31 4.46
-0.46 0.00 -0.15
460.00 -5.31 -0.31 4.46
-0.62 0.00 -0.03
460.26 -5.32 -0.31 4.46
-0.63 0.00 -0.03
470.00 -5.70 -0.32 4.47
-0.80 0.00 0.10
477.67 -5.36 -0.32 4.47
-0.65 0.00 -0.01
480.00 -5.26 -0.32 4.46-0.60 0.00 -0.05
485.92 -4.39 -0.32 4.46
-0.47 0.00 -0.13
489.67 -4.32 -0.31 4.45
-
8/18/2019 CM6969BC.desbloqueado
41/87
-
8/18/2019 CM6969BC.desbloqueado
42/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE
Hoja No : 6
----------------------------------------------------------------------------------------------------------------------------- LADO IZQUIERDO ESP-SBR LADO DERECHO
ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5
---------------------------------------------------------------------------------------------------------------------
665.00 -5.00 -0.09 3.79
-0.64 0.00 -0.04
665.26 -4.95 -0.09 3.79
-0.64 0.00 -0.04
668.00 -5.01 -0.12 4.17
-0.68 0.00 0.02
680.00 -5.42 -0.40 4.47
-0.71 0.00 0.04
686.13 -5.33 -0.34 4.47
-0.67 0.00 0.01
696.83 -4.31 -0.29 3.89
-0.45 0.00 -0.16
700.00 -4.28 -0.28 4.11
-0.41 0.00 -0.19
706.13 -4.04 -0.30 4.07
-0.38 0.00 -0.27
708.40 -3.95 -0.31 4.06
-0.38 0.00 -0.30
715.43 -3.93 -0.27 4.44
-0.38 0.00 -0.39
720.00 -3.97 -0.23 4.44
-0.38 0.00 -0.39
728.58 -3.85 -0.29 4.47
-0.29 0.00 -0.39
733.58 -3.84 -0.29 4.72
-0.23 0.00 -0.39
738.58 -3.89 -0.26 4.98
-0.17 0.00 -0.46
740.00 -3.92 -0.25 5.05
-0.15 0.00 -0.49
743.58 -3.92 -0.29 5.23
-0.11 0.00 -0.55
750.00 -4.18 -0.39 5.56
-0.01 0.00 -0.68
-
8/18/2019 CM6969BC.desbloqueado
43/87
-
8/18/2019 CM6969BC.desbloqueado
44/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE
Hoja No : 8
----------------------------------------------------------------------------------------------------------------------------- LADO IZQUIERDO ESP-SBR LADO DERECHO
ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5
---------------------------------------------------------------------------------------------------------------------
920.00 -3.86 -0.31 4.93
-0.17 0.00 -0.46
940.00 -3.88 -0.28 4.93
-0.17 0.00 -0.46
960.00 -4.02 -0.19 4.93
-0.17 0.00 -0.46
980.00 -3.89 -0.38 4.93
-0.17 0.00 -0.46
995.89 -3.89 -0.38 4.90
-0.18 0.00 -0.451000.00 -3.87 -0.38 4.76
-0.22 0.00 -0.40
1002.56 -3.86 -0.36 4.67
-0.24 0.00 -0.39
1015.89 -4.44 -0.27 4.44
-0.37 0.00 -0.39
1020.00 -3.82 -0.27 3.89
-0.38 0.00 -0.36
1029.22 -4.51 -0.29 4.45
-0.39 0.00 -0.28
1029.41 -4.52 -0.29 4.45
-0.39 0.00 -0.28
1030.07 -4.54 -0.30 4.45
-0.39 0.00 -0.27
1030.74 -4.56 -0.30 4.45
-0.39 0.00 -0.26
1031.07 -4.58 -0.30 4.45
-0.39 0.00 -0.26
1040.00 -4.88 -0.39 4.45
-0.44 0.00 -0.17
1060.00 0.00 3.93
0.00 -0.171060.82 -4.91 -0.27 3.93
-0.45 0.00 -0.18
1065.00 -4.39 -0.28 3.89
-0.41 0.00 -0.20
-
8/18/2019 CM6969BC.desbloqueado
45/87
SCT DIRECCION GENERAL DE CARRETERASCamino : 6969
Tramo : BC
Subtramo :
Alternat. :
Origen :
Proyectista :
Archivo : CM6969BC
Fecha : Martes 29 de Marzo de 2016 22:37:57
No Contrato : 0
No Control : 0+160- 1+920-6969BC-160329223757
GEOMETRIA DE LAS CAPAS SUBRASANTE Y SUBYACENTE
Hoja No : 9
----------------------------------------------------------------------------------------------------------------------------- LADO IZQUIERDO ESP-SBR LADO DERECHO
ESTACION B5 B4 B3 B2 B1 A1 ESP-SBY A1 B1 B2 B3 B4 B5
-----------------------------------------------------------------------------------