cleanliness of work surfaces within the iap room
TRANSCRIPT
![Page 1: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/1.jpg)
November 4th 2011
Cleanliness of Work surfaces within the IAP Room
Marija Juraleviciute
Irish Decontamination Institute Annual 2011 Conference
![Page 2: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/2.jpg)
HSE Recommended Practices Adequate regular cleaning of all work areas is
essential for the decontamination cycle to be effective. Written cleaning policies ,procedures, protocols
and guidelines
Work surfaces should be cleaned at the start of the working day, periodically during the working day and whenever necessary.
The cleaning should be monitored by regular
documented inspection and testing of the cleanliness of the environment
![Page 3: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/3.jpg)
Background
Routine Daily Cleaning Procedure Monitoring Procedure
Genie Swabs on surfaces weekly Done in AM Tests for ATP & results given as RLU’s
Pass level 0-14 Caution level 15-29 Fail level >29
Not repeated in PM
Samples Results are trended and are consistently low
![Page 4: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/4.jpg)
Project
Why chosen ? Study
3 workstation tested 3 times daily AM, Lunchtime, PM For 1 week
Results compiled in a table and analysis
Report & recommendations to manager
![Page 5: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/5.jpg)
Study Results Table 1
Mon Tues Wed Thurs Friday
AM 0 0 0 1 0
Lunch 10 15 31 4 18
PM 16 18 40 34 30
Table 2
Mon Tues Wed Thurs Friday
AM 1 0 0 1 2
Lunch 13 27 11 30 17
PM 19 33 28 35 30
Table 3
Mon Tues Wed Thurs Friday
AM 0 0 0 0 0
Lunch 24 15 11 32 19
PM 39 27 43 39 20
![Page 6: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/6.jpg)
Actions
Results shouldn’t be that high
Discussed with CDU Manager Concluded staff not adhering to procedure Action Plan agreed
![Page 7: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/7.jpg)
Implementing Improvement Plan
Staff Meeting Re-reading Procedures Re-training Alcohol wipes and alcohol gel made more
readily available Monitoring included in hygiene audit
![Page 8: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/8.jpg)
Evaluation of Improvement Plan
Testing of surfaces repeated 2 weeks after staff meeting
Testing done in same way Results complied in table
![Page 9: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/9.jpg)
Results after Improvement Plan Implemented
Test results significantly improved Staff meeting Presented new results Manager thanked all staff for
cooperation
![Page 10: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/10.jpg)
Results after Improvement Plan Implemented
Table 1
Mon Tues Wed Thurs Friday
AM 0 0 0 1 0
Lunch 10 4 16 4 2
PM 3 0 5 4 17
Table 2
Mon Tues Wed Thurs Friday
AM 1 0 0 1 2
Lunch 13 5 17 8 6
PM 11 3 7 5 4
Table 3
Mon Tues Wed Thurs Friday
AM 0 0 0 0 0
Lunch 17 8 11 4 19
PM 16 2 4 1 5
![Page 11: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/11.jpg)
Test results significantly improved Staff meeting Presented new results Manager thanked all staff for
cooperation
Genie test now done 3 times during the day once a week and results acted upon if indicated
![Page 12: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/12.jpg)
Conclusion
Genie test now done 3 times during the
day once a week and results trended and acted upon if indicated
The project demonstrated that cleaning should be monitored by regular documented inspection and testing of the cleanliness of the environment
![Page 13: Cleanliness of Work surfaces within the IAP Room](https://reader034.vdocuments.site/reader034/viewer/2022051406/627d802d21290f424941b82a/html5/thumbnails/13.jpg)
Thank you for your attention