city of springfield office of public works street & sewer infrastructure analysis 1 mayor j. michael...

Download City of Springfield Office of Public Works Street & Sewer Infrastructure Analysis 1 Mayor J. Michael Houston Mark Mahoney, Director

If you can't read please download the document

Upload: christina-barrett

Post on 17-Jan-2018

226 views

Category:

Documents


0 download

DESCRIPTION

Road Conditions 3

TRANSCRIPT

City of Springfield Office of Public Works Street & Sewer Infrastructure Analysis 1 Mayor J. Michael Houston Mark Mahoney, Director Street Needs Estimate $44 Million Needed Annually Road Maintenance i.e. Bituminous Overlay, Concrete Patching, Oil & Chip, and Sidewalk Repair Road Modernization i.e. Curb, Storm Sewer, and Sidewalk Installation Road Expansion i.e. Constructing a New Street or Widening an Existing Street to Support Increased Traffic 2 Road Conditions 3 Asphalt Road Ratings 4 Better Worse Contributing Factors to Deteriorating Infrastructure Construction costs have more than doubled in last 10 years In 1997 the City owned 497 miles, now the City owns 625 miles Federal Funding for maintenance has vanished. In 2007 a FAU Overlay in the amount of $1.7 million was completed, funding for overlays has been non-existent since. MFT Funding has been decreasing since 2007 due in part to more fuel efficient cars Preventative Maintenance has been neglected 5 Asphalt & Concrete Costs 6 Municipality Size Comparison 7 FY14 Infrastructure Funding Federal funds/grants (i.e. ITEP & STU) and TIF funds could be utilized to help fund infrastructure improvements. The Department will be applying for these funds. Gambling revenue is a potential source of funding. 8 MFT Funds Contractual Services (i.e. Concrete Patching, Seal Coat and Crack Fill) Maintenance Materials (i.e. Salt, Asphalt, Rock, and Sign Materials) Engineering & Construction (i.e. Major Road, Bridge, Signal and IDOT Projects) 9 FY14 Infrastructure Improvements 10 Fund 95 Improvements Overlays FY 11 2.6 miles = $1.25 million ($481 k/mile) FY 12 4.0 miles = $2.57 million ($642 k/mile) FY 13 15 miles = $6.02 million ($400 k/mile) FY 14 15 miles = $6 million (proposed) Sidewalk FY 11 8,000 s.f. (0.4 miles) = $51 k FY 12 102,000 s.f. (4.8 miles) = $738 k FY 13 156,000 s.f. (7.4 miles) = $1.03 million FY 14 155,000 s.f. = $1 million (proposed) 11 Implemented Maintenance Measures Overlay Program 15 miles Concrete Patching Increased by 30% Seal Coat Increased by 30% Crackfill Doubled program Sidewalk Program Increased by 30% 12 What should we be spending? 13 How to stop the decline Complete 135 miles of overlay the next 3 years and perform 24 miles of overlay per year thereafter Substantially increase preventative pavement maintenance (i.e. Cape Seals, Microsurfacing, CIR, Chip Seals and Crackfilling) Nearly triple the amount of sidewalk installation Remain at the recently increased concrete patching levels and start sealing and undersealing joints Repair failing brick streets Start performing preventative storm sewer maintenance Five times more maintenance required for traffic signals and striping 14 Necessary 3 Year Plan Asphalt Overlay (135 miles) $57.6 million Cape/Microsurfacing (50 miles) $4.5 million Concrete Patching (15 miles) $3 million Crackfilling (100 miles) $1 million Oil & Chip (150 miles) $3 million Sidewalk (1.2 million s.f.) $9 million Brick Streets (2 miles) $3 million Traffic Signals and Striping $1 million Storm Sewer $4.5 million TOTAL $86.6 million 15 Annual Maintenance Plan Program (proposed amount) CurrentProposed Overlay (24 miles per year) $4.5 million $12 million Sidewalk (400,000 s.f. per year)$1 million$3 million Cape/Micro(30 miles per year) -$2.5 million Concrete Patch (5 miles per year) $1 million $1 million Concrete Seal (20 miles per year) -$200,000 Seal Coat (50 miles per year) $600,000$1 million Crack Fill (60 miles per year) $150,000$600,000 Brick (.5 miles per year ) -$200,000 Storm Sewer $150,000 $1.5 million Traffic Signals & Striping $100,000$500,000 TOTAL $7.5 million $22.5million 16 Increase = $15 million Current Funding Level Projection 17 Current Funding Project only able to overlay 10 miles and 30 miles additional roads needing to be overlaid after 2013 Potential Long Term Savings The proposed increase will save the City approximately $21 million through 2018 Its anticipated, at the current spending rate, that 220 miles (over 60%) of our asphalt would have deteriorated and need to be overlaid or reconstructed by 2018 Additional savings will occur beyond 2018 due to utilizing preventative maintenance and extending the life of our roads 18 Sewer Infrastructure Analysis and Needs 19 Overview The City of Springfield established the Sewer Fund in 1956 to maintain the Combined Sewers and Separate Sanitary Sewers. The City owns approximately : 140 miles of Combined Sewers 355 miles of Separate Sanitary Sewers 200 miles of Separate Storm Sewers Separate Storm Sewers dedicated only for storm runoff are not maintained by this Fund. This Fund was established to pay for improvements recommended in the first study of the sewer system completed in The study recommended $8.2 million in improvements = $97 million today 20 Financial Summary Notes Operation and Maintenance costs increase yearly. Repair costs continually increasing due to increases in the number of repairs and construction cost increase. Increased Expenses reduce money available for improvement projects. Sewer Surplus maintains funds for required loan reserves, capitol projects, and long term expenditures. 21 Sewer Rates 22 Meter ChargeConsumptionTotal City Sewer Rate$3.10$6.30$9.40 *Sanitary District Rate$3.57$14.90$18.47 Total$27.87 Current City Sewer Rates were established in The City does not set the Sanitary District Rates. Customers pay a base meter charge and a rate based on consumption. Rate paid for a typical residential customer using 10 units of water. Average Customer Basis (meter charge + 10 units of water consumption) City Rate$ (($0.35 x 3) + ($0.75 x 7)) = $9.40 District Rate$ ($1.49 x 10) = $18.47 Total $ = $27.87 * SMSD has scheduled rate increases thru 2016 Sewer Rate Comparison 23 1)Rates based on 10 units = 1,000 c.f. = 7500 gallons of water usage. 2)Rates do not include Sanitary District Fees. Projects - FY13 Projects - FY13 Bancroft Branch Relocation completed summer 2012 Citys cost approximately $285, Mayden Street Sewer Replacement completed summer 2012 Cost approximately $200,000 Dirksen Parkway Sewer Lining - Ridge Street to Elm Street To be completed February 2013 Cost approximately $140,000 Total $625,000 Planned FY14 Project Areas Northeast and Grandview Sewer District - Flow monitoring Estimated cost $100,000 Cook Street Sewer District - Physical Inspection Pasfield Sewer Abandonment - Project Design 25 Westchester Trunk Sewer Upsizing Anticipated June 2013 completion Trenchless pipe bursting construction Estimated cost $615,000 Increasing Regulatory Concerns Increasing Regulatory Concerns - Collection System operation is regulated by the EPA. - The EPA is successful in rendering Administrative Orders and Consent Decrees against operators not maintaining their systems or complying with Federal Regulations. - The City is in the Administrative Order process with the USEPA at this time. We expect the order to be finalized soon. - The City will be required to complete an analysis of and fund projects to eliminate all Sanitary Sewer Overflows (SSO). - The USEPA will review and approve a timeline for completion. - This will have a significant impact on the Sewer Fund. 26 Metropolitan St. Louis Sewer District (MSD) 27 In August 2011, the Department of Justice filed a settlement, or consent decree, requiring MSD to spend a minimum $4.7 billion over the next 23 years to address the issue of overflows and other sewer system improvements. What do we need? 28 City Project History 29 Amount available for projects will reach $0 in only a few years. Decreased maintenance spending now results in increased future replacement costs. 10 Year Capital Improvement Plan $55 million in projects already identified Sewer Division currently funds less than $1 million per year in projects. Several areas (Cook Street Sewer District, Harvard Park Area, Northeast Sewer District) will require studies to determine needs, this work will modify and add projects to the Long Range CIP. 10 Year Completion Goal not possible at current funding levels. USEPA Mandates are not accounted for in the current Long Range Plan. 30 FY13 Project Spending - $625,000 Minimum $5.5 million per year needed to complete CIP in 10 year time frame. Conclusion The City of Springfields infrastructure is in decline. Long term increased costs of neglect will mean spending more by necessity or by regulatory order at some point in the future. Proposal to stop the decline: 3 Year- $86.6 million on streets, sidewalks, storm sewers, and traffic signals. Annual Maintenance Plan (effective FY2016)- $22.5 million on streets, sidewalks, storm sewers, and traffic signals 10 Year Sanitary Sewer Capital Improvement Plan- $55 million ($5.5 million annually) 31 Addendum 32 Population (1) Prop Tax Rate Home Rule Sales Tax Combined Sales Tax Rate (2) Food & Beverage Tax Vehicle Use Tax Telecomm Tax Liquor Tax Gas Tax Hotel Tax Bloomington 76, %7.75%2.00%0.75%3.50%4.00%06.0% Champaign 81, %8.75%0.50%0.00%6.00%0.00%45.0% Decatur 76, %9.00%2.00%0.00%6.00%0.00%06.0% Normal52, %7.75%2.00%0.75%6.00%4.00%06.0% Peoria115, %8.25%2.00%0.00%6.00%0.00%26.0% Springfield 116, %8.00%0.00%1.00%4.00%0.00%06.0% Urbana41, %8.75%0.50%0.00%6.00%1.00%46.0% (1)IDOR certified 12/10(2) Some cites have public safety and/or school sales taxes passed by referendum Revenue Comparison 33