Page 1: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Chris Greacen19 June 2009

From remote villages to government boardrooms: some notes on efforts to

leverage change using renewable energy

Palang Thai

Page 2: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 3: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Palang Thai พลั�งไท

• Thailand NGO• Objective:

– To ensure that the transformations that occur in the region's energy sector: augment, rather than undermine, social and environmental justice and sustainability.

• Key approaches:– We teach hands-on energy technology– We draft / comment on policies– We work to empower citizens to look critically at

government and industry projects and plans– We advocate structural reform

พลั�ง (palang): n 1. Power. 2. Empowerment. ไท (thai): adj. 1. Independence. 2. Self-reliance

Page 4: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Outline• hands-on village scale

– solar electricity for medical clinics in Karen-controlled Burma

– village micro-hydropower – Thailand

• energy politics and policy– Very Small Power Producer (VSPP) program– Bo Nok / Hin Krud – stopping silly big power plants

• institutional aikido

Page 5: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

•Conflict area

•Little/no rural electrification

•Joint effort:

•TOPS (Taiwan),

•Palang Thai (Thailand),

•SunEnergy Power (USA)

• Green Empowerment (USA)

Page 6: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Border Green Energy Team

Solar electricity for 40 medical clinics for internally displaced inside Burma

Page 7: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Up to 2 million internally displaced people in Burma

Page 8: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 9: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Ruggedized solar electric systems built by medics in 3-5 day hands-on trainings

• 9 trainings (2003-2009)• >90 medics trained• 40 clinics

Page 10: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 11: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 12: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 13: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 14: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 15: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Community micro-hydro (12 villages)

Page 16: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Micro-hydroelectricity

Source: Inversin, A. R. (1986). Micro-Hydropower Sourcebook.

Page 17: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Kre Khi village, Tak Province1 kW for school, clinic, churchCost: <$3,500

(turbine $250)Head: 10 metersFlow: 15 lit/sec

Page 18: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 19: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 20: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 21: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Laos – low head micro-hydro orgy

Page 22: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Mae Wei – ‘pump as turbine’ off-grid induction

Page 23: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Video… Mae Wei

Page 24: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Border Green Energy Team

Refugee camp trainings

Page 25: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 26: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

So far:Solar PVMicro-hydroHydraulic ram pumpSolar cooking7 hybrid solar/diesel systemsBiogas

Page 27: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Solar/diesel hybrid systems for computer training centers in 7

refugee camps

Page 28: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Border Green Energy Team

Maintenance & repair trainings for > 14,000 Thai solar home systems

Page 29: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Thai government solar home program

203,000 solar home systemsUS$200 millionNo maintenance plan23% failure rate within 20 months

Page 30: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

“The Service & Support Department is like the guy in the parade who walks behind the elephant with a broom and a big bucket”

Page 31: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Thai SHS in Tak province

DEEP CY CLEEBB 125

3K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3K

SH-1210M

เครื่��องควบคมการื่ปรื่ะจุแบตเตอรื่��และแปลงกรื่ะแสไ ฟฟ�าส�า หรื่�บรื่ะบบพล�งงานแสงอาทิ�ตย์!

เป"ด / ป"ดปล�$กไ ฟฟ�ากรื่ะแสสล�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

แบต์เต์อร�� แผงร�บพลั�งงานแสงอาท�ต์ย์�

ไ ฟฟ�ากระแสสลั�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

FORTHSOLAR PRODUCT

สาย์ดิ�น

NL

แผงพล�งงานแสงอาทิ�ตย์!

ปานกลาง

ต��า

โหลด / เก�นพ�ก�ดโหลด

เต'ม

สภาวะการื่ทิ�า งาน

สภาวะแบตเตอรื่��

ปรื่ะจุแบตเตอรื่��

SH-1210M

เครื่��องควบคมการื่ปรื่ะจุแบตเตอรื่��และแปลงกรื่ะแสไ ฟฟ�าส�า หรื่�บรื่ะบบพล�งงานแสงอาทิ�ตย์!

เป"ด / ป"ดปล�$กไ ฟฟ�ากรื่ะแสสล�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

แบต์เต์อร�� แผงร�บพลั�งงานแสงอาท�ต์ย์�

ไ ฟฟ�ากระแสสลั�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

FORTHSOLAR PRODUCT

FORTHFORTHSOLAR PRODUCT

สาย์ดิ�น

NL

แผงพล�งงานแสงอาทิ�ตย์!

ปานกลาง

ต��า

โหลด / เก�นพ�ก�ดโหลด

เต'ม

สภาวะการื่ทิ�า งาน

สภาวะแบตเตอรื่��

ปรื่ะจุแบตเตอรื่��

ปานกลาง

ต��า

โหลด / เก�นพ�ก�ดโหลด

เต'ม

สภาวะการื่ทิ�า งาน

สภาวะแบตเตอรื่��

ปรื่ะจุแบตเตอรื่��

HaCo

HaCo

10A

~ON

HaCo

HaCo

10A

~~ON

Rated 120 peak Watt single crystalline PV

module

Rated 150 W, 50 Hz, 230 V Inverter / 10 A Charge controller

12 V, 125 Ah deep cycle lead-acid

battery

Two 10 W tube fluorescent

lights with electronic ballasts

AC outlet for TV or other appliances

Page 32: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Ministry of Interior

PEA

Installation company

End users

$

$

SHS

Existing linkages

warranty

Tax payers

$

Page 33: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Ministry of Interior

PEA

Installation company

End users

$

$

SHS

Missing linkages

warranty

What happens when systems fail? There is no feedback loop from the end users to

installation company, PEA, government or taxpayers

Tax payers

$

Page 34: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Warranty awareness Self-help: local technicians

+ user training

Ministry of Interior

PEA

Installation company

End users

$

$

SHS

Missing linkages

warranty

Tax payers

$

Feedback on status of systems, failure

modes, successful interventions

Page 35: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

SHS WarrantyWarranty periods

– Complete system: 2 years– Solar panel: 5 years– Charge controller/Inverter: 3 years– Battery: 2 years– Light/Ballast: 2 years

The system warranty is expiring within a few months

Very few villagers informed that there is a warranty

DEEP CY CLEEBB 125

3K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3KDEEP CY CLE

EBB 1253K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED

3K

SH-1210M

เครื่��องควบคมการื่ปรื่ะจุแบตเตอรื่��และแปลงกรื่ะแสไ ฟฟ�าส�า หรื่�บรื่ะบบพล�งงานแสงอาทิ�ตย์!

เป"ด / ป"ดปล�$กไ ฟฟ�ากรื่ะแสสล�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

แบต์เต์อร�� แผงร�บพลั�งงานแสงอาท�ต์ย์�

ไ ฟฟ�ากระแสสลั�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

FORTHSOLAR PRODUCT

สาย์ดิ�น

NL

แผงพล�งงานแสงอาทิ�ตย์!

ปานกลาง

ต��า

โหลด / เก�นพ�ก�ดโหลด

เต'ม

สภาวะการื่ทิ�า งาน

สภาวะแบตเตอรื่��

ปรื่ะจุ แบตเตอรื่��

SH-1210M

เครื่��องควบคมการื่ปรื่ะจุแบตเตอรื่��และแปลงกรื่ะแสไ ฟฟ�าส�า หรื่�บรื่ะบบพล�งงานแสงอาทิ�ตย์!

เป"ด / ป"ดปล�$กไ ฟฟ�ากรื่ะแสสล�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

แบต์เต์อร�� แผงร�บพลั�งงานแสงอาท�ต์ย์�

ไ ฟฟ�ากระแสสลั�บ220 โ วลัต์� 50 เฮิ�รต์ซ์�

FORTHSOLAR PRODUCT

FORTHFORTHSOLAR PRODUCT

สาย์ดิ�น

NL

แผงพล�งงานแสงอาทิ�ตย์!

ปานกลาง

ต��า

โหลด / เก�นพ�ก�ดโหลด

เต'ม

สภาวะการื่ทิ�า งาน

สภาวะแบตเตอรื่��

ปรื่ะจุ แบตเตอรื่��

ปานกลาง

ต��า

โหลด / เก�นพ�ก�ดโหลด

เต'ม

สภาวะการื่ทิ�า งาน

สภาวะแบตเตอรื่��

ปรื่ะจุ แบตเตอรื่��

HaCo

HaCo

10A

~ON

HaCo

HaCo

10A

~~ON

Page 36: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

SHS WarrantyPostcards with

warranty and maintenance information could be distributed by Tambons

Idea presented at meeting with DLA (Department of Local Administration)

Page 37: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

BGET on TV

Goals: TV-broadcast

discussion of SHS sustainability, need for more local capacity

Inform public of warranty

Page 38: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

BGET SHS trainings in Tak province

Page 39: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Failed inverter/charge controller (~10% of all systems surveyed).

Observed failure modes - inverter

Solartron and PEA provided 15 replacement inverters for the first 2 trainings

Page 40: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Ballast failure ~9% of systems surveyed

Observed failure modes - ballast

Page 41: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Observed failure modes –battery battery failure in ~6% of systems

surveyed

healthy, without sulfation

sulfated plates

Page 42: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Installation error: Battery failure caused by solar panel installation in shady location

14:00 Saw Kre Ka village, Tha Song Yang District

Problems found during training/surveys

Page 43: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

Installation error: Bad panel locations

Problems found during training surveys

Page 44: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

User error: bypassed controller battery overcharge

1. Villager bypasses broken controller and charges battery directly from PV

2. Battery over-charged. Electrolyte level drops and plates are exposed to air. Battery fails.

1

2

Observed failure modes – (cascading component failure)

Page 45: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

BG E T

BORDER GREEN ENERGY TEAM

BG E TBG E T

BORDER GREEN ENERGY TEAM

User error: Controller bypass leads to burned diode

1

2

Observed failure modes – (cascading component failure)

1. Villager bypasses broken controller and charges battery directly from PV

2. One mistake of reverse battery polarity blows up bypass diode in PV junction box, melting junction box.

Page 46: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

policy & planning level…

Page 47: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Very Small Power Producer (VSPP) regulations

Page 48: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Can’t we hook it up and sell power back?

Page 49: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

VSPP meetings…

Page 50: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

• Uses waste water from cassava to make methane

• Produces gas for all factory heat (30 MW thermal) + 3 MW of electricity

• 3 x 1 MW gas generators

Korat Waste to Energy – biogas… an early VSPP project

Page 51: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Biogas from Pig Farms

Reduces air and water pollution

Produces fertilizer

Produces electricity

8 x 70 kW generator

Ratchaburi

Page 52: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Biogas from Pig Farms

Page 53: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Bangkok Solar 1 MW PV

• Project size: 1 MW• Uses self-manufactured a-Si

Page 54: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

ap

plie

d

pe

rmis

sio

n

selli

ng

biodiesel

hydro

windbiogas

municipal wasteother biomass (saw dust, palm)

rice huskbagasse

solar

0

100

200

300

400

500

600

700

800

900

1000

MW

VSPP summary

June 2008

Page 55: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Thailand

VSPP

Tanzania

?

Cambodia

?

?

?

Page 56: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Next project… community built, community-owned, profitable VSPP

micro-hydro

Page 57: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 58: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 59: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 60: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

http://www.soho-properties.com/condobangkok-leraffine31/

Unlimited living?

Page 61: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 62: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Electricity productionand consumption(GWh)

1700 families relocated

Loss of livelihood for > 6200 families

Loss of 116

fish species 44( %)

Fishery yield down 80%

65MaeHongSong

Sou

rce: M

EA

, EG

AT, S

earin

, Gra

ph

ic: Gre

en

World

Fou

nd

atio

n

Dams Malls Province

Pak

Mun

Impacts of Pak Mun Dam alone

Page 63: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 64: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 65: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 66: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Bonok-Ban Krud story

Page 67: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Bonok Bankrud

Page 68: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Power Demand: Projections vs. Actual 1992 - 2008

8,000

12,000

16,000

20,000

24,000

28,000

32,000

36,000

40,000

44,000

48,000

1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020

มิ�.ย์.-93

ธ.ค.-94

ต์.ค.-95

เมิ.ย์.-96

ต์.ค.-96

มิ�.ย์.-97

ก.ย์.-97

Sep-98(MER)

ก.พ.-01

ส.ค.-02

Jan-04(LEG)

Jan-04(MEG)

Apr-06 (MEG)

มิ�.ค.-07

ACTUAL

ธ.ค.-08

MW

Page 69: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Linear versus exponential extrapolation

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

1985

1987

1989

1991

1993

1995

1997

1999

2001

2003

2005

2007

2009

2011

2013

2015

2017

2019

2021

Pea

k d

eman

d (

MW

)

2007 Forecast Historic peak demand trend

24 power plants

Page 70: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Fuel mix in power generation - power development plan 2007GWh

Import

NukeRE

Gas

Coal

LigniteHydro

Page 71: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Thai – Pacific Northwest power planning exchange

Page 72: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 73: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai
Page 74: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Leveraging changeActivity Leverage

Medical clinic PV in Burma •40 clinics serve 100,000+•“It’s hard to do amputations with a flashlight”

Micro-hydro * inexpensive(<$2per W)•Intuitive & local

Refugee camp trainings * If peace comes and repatriation can happen, refugees are returning to a ‘blank slate’

VSPP * Renewables becomes viable grid-connected business.* “Power plant” redefined.

Power sector planning reform •Transparency•Accounability•public participation•End to “too much generation capacity” and “wrong kinds”.

Page 75: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Principles

• Commit

• Be flexible and open to opportunities for equilibrium-shifting change

• Take time for reflection… stay real

• Document and release

• “Many hands make light work”

Page 76: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

For more informationChom and Chris Greacen

Palang Thai

[email protected]

[email protected]

Skype: chrisgreacen

www.palangthai.org

Page 77: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Thailand in context

• Constitutional monarchy with a parliamentary system (similar to England)

• Size: about 4/5 of California• Population: 66 million (2x that of CA)• GDP (PPP): $553 billion (1/3 of CA’s)• GDP per capita: $8,500 (1/6 of CA’s)• Energy consumption: 57 million BTU

(1/4 of CA’s)• Peak power demand: 23 GW (<half of

CA’s)• 99.8% of villages are electrified

ISSUED DATE : JANUARY 2007

ELECTRICITY GENERATING AUTHORITY OF THAILAND

ELECTRIC POWER SYSTEM OF THAILAND

DWG. NO. EPS 2002

SYSTEM PLANNING DIVISION

TRANSMISSION SYSTEM PLANNING DEPARTMENT

Page 78: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

78

North Koreavillage wind farm 1999 -- 2001

Page 79: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

79

Page 80: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

80

Powerhouse under construction

Page 81: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

81

Interphase with DPRK grid

Page 82: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

82

Farm manager starts windturbine

Page 83: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

83

Page 84: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

5:00

6:00

7:00

8:00

9:00

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

19:0

0

20:0

0

21:0

0

22:0

0

23:0

0

1985

1988

1991

1994

1997

2000

0

1000

2000

3000

4000

5000

6000

7000

Watts

Time of day

Year

Hourly load curve, by year from 1985 to 2000. Graph based on an appliance usage survey of 35 families in Mae Kam Pong village, April

and June 2001.

Page 85: Chris Greacen 19 June 2009 From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai

Contribution to evening maximum peak demand by appliance, for the years 1985 – 2001.

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001

Wa

tts

other

water boiler

rice cooker

iron

fridge

TV

lights