charlotte convention center development study

31
Charlotte Convention Center Development Study Presentation to Charlotte City Council September 12, 2016 1

Upload: others

Post on 28-Jun-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Charlotte Convention Center Development Study

Charlotte Convention Center

Development Study

Presentation to

Charlotte City Council

September 12, 2016

1

Page 2: Charlotte Convention Center Development Study

Today’s Presentation

• Update on CRVA work concerning the future of the

Charlotte Convention Center

• Share recommendations concerning Convention

Center development

• Collaborate with Council and Staff on next steps

2

Page 3: Charlotte Convention Center Development Study

About CRVA• Mission: “…lead the effort in maximizing the region’s

economic potential through visitor spending; to creating

jobs and opportunities for our community.”

• Responsibilities– Visit Charlotte

– Ovens Auditorium & Bojangles’ Coliseum

– Charlotte Convention Center

– NASCAR Hall of Fame

– Time Warner Cable Arena

3

Page 4: Charlotte Convention Center Development Study

4

Page 5: Charlotte Convention Center Development Study

CRVA Strategic Objectives:

Charlotte Convention Center

• Lead in Destination Visitor Experience

• Lead in Destination Asset Development

• Create a “Convention Center Neighborhood”

• Advocate the Value of Hospitality and Tourism

5

Page 6: Charlotte Convention Center Development Study

Charlotte Region’s Visitor Economy

• $6,523,720,000 total spending- #1 Visitor Economy in NC

- $5.0B spent in Mecklenburg County

- Wake County, #2 at $2.1B

• 123,600 Hospitality Jobs- (1 in 9 of jobs in market)

6

Page 7: Charlotte Convention Center Development Study

Convention Center Current State• Convention Center is 21 years old

• Market has evolved

– Hotels less reliant on convention events

• Meetings industry has evolved

– Less exhibit focused

– More meeting focused

– Higher emphasis on attendee experience

7

Page 8: Charlotte Convention Center Development Study

CRVA Planning Approach• Start with objective, customer-focused research

• Engaged Jones Lang LaSalle (JLL) Destination Planning

Services

– Survey market

– Develop recommendations

• JLL Staff formerly Strategic Advisory Group (SAG)

– Destination Charlotte 1.0 Study (2000)

– Advisor on Westin Hotel Development (2003)

8

Page 9: Charlotte Convention Center Development Study

JLL Methodology• Survey responses from 176 Meeting Planners

• Meeting Planner Focus Groups

• One on One Interviews

• Competitive Destination Site Visits & Research

– Indianapolis, Nashville, Austin, Baltimore,

Louisville, Tampa

• Technology Expert Interviews

• Convention Center Design Expert Interviews

9

Page 10: Charlotte Convention Center Development Study

JLL Recommendations

• Plan for Convention Center Expansion

• Maximize the Impact of “One CRVA”

• Enhance the Meeting Experience

• Increase the Amount of Breakout Space

• Create Pedestrian Friendly Connections between

CCC & Center City

• Develop a Competitive Technology Plan

10

Page 11: Charlotte Convention Center Development Study

CRVA Response to JLL Study• Continue “One CRVA” evolution

• Re-negotiate Wi-Fi agreement to offer free service

with expanded coverage and bandwidth

• Engaged TVS to develop Convention Center

improvement design concepts

– Meeting Experience

– Breakout Space

– Connections to Center City

11

Page 12: Charlotte Convention Center Development Study

Uptown Charlotte Growth

Map produced by Charlotte Center City Partners 2016

12

Page 13: Charlotte Convention Center Development Study

1

3

6

MASTER PLAN

EXPANSION/RENOVATION AREAS

Stonewall Expansion

Pedestrian Connection

Ballroom Terrace Expansion

Richardson Ballroom Divisions

Flex Hall | Hall C Renovation

Renovation Under Light Rail

Hall A & B Entrance.

Informal Collaboration

2

3

34

5

6

7

8

9

Event Space Above Light Rail

13

Page 14: Charlotte Convention Center Development Study

STONEWALL EXISTING

EXISTING STREET VIEW

14

Page 15: Charlotte Convention Center Development Study

PROPOSED SECTION

PROPOSED STREET VIEW

STONEWALL EXPANSION

STONEWALL STREET EXPANSION15

Page 16: Charlotte Convention Center Development Study

STONEWALL EXISTING

STONEWALL STREET EXPANSION

MEETING ROOM LEVEL

EL.744

16

Page 17: Charlotte Convention Center Development Study

STONEWALL PROPOSED

INFORMAL

COLLABORATION

INFORMAL

COLLABORATION

1 2 3 4 5 9 10 11 12 13

2400 2600 1830 1870 1830 1830 1870 1830 2600 2400

STONEWALL STREET EXPANSION

6

1650

7

2380

8

2380

14

1280

15

940

MEETING ROOM LEVEL

EL.744• Level 744- 76,000 SF total new construction includes 26,090 SF of total

meeting room area (net area),

17

Page 18: Charlotte Convention Center Development Study

PEDESTRIAN CONNECTION 2

18

Page 19: Charlotte Convention Center Development Study

PEDESTRIAN CONNECTION

BRIDGE TO LIGHT RAIL

STOP AND MIX- USE

PLAZA

POTENTIAL CONNECTION TO

CHARLOTTE RAIL TRAIL

PEDESTRIAN CONNECTION

19

Page 20: Charlotte Convention Center Development Study

20

Page 21: Charlotte Convention Center Development Study

BALLROOM TERRACE EXPANSION 3

21

Page 22: Charlotte Convention Center Development Study

PROPOSED PLAN

• Three additional meeting

rooms

• 6,010 SF of added meeting

space

• 2200 SF leasable space

catered to Starbucks

BALLROOM TERRACE EXPANSION

1

2255

3

2255

2

BALLROOM TERRACE EXPANSION

15002200

22

Page 23: Charlotte Convention Center Development Study

BALLROOM PREFUNCTION

PARTITIONS CLOSED

PARTITIONS OPEN

PARTITIONS OPENING

BALLROOM TERRACE EXPANSION23

Page 24: Charlotte Convention Center Development Study

EXISTING

RICHARDSON

BALLROOM

RICHARDSON BALLROOM DIVISIONS

1

24

Page 25: Charlotte Convention Center Development Study

PROPOSED PLAN LEVEL 704EXISTING PLAN LEVEL 704

7

5

MASTER PLAN

EXHIBITION LEVEL EL. 704 EXHIBITION LEVEL EL. 704

25

Page 26: Charlotte Convention Center Development Study

PROPOSED FLEX HALL PLAN

WITH 12 DIVISIONS

PROPOSED FLEX HALL

1

2800

2

2700

3

2600

4

3100

5

2900

6

2800

7

3100

8

2900

9

2800

10

2800

1

12700

12

FLEX HALL | HALL C RENOVATION

2600

26

Page 27: Charlotte Convention Center Development Study

FLEX HALL OPERABLE CEILING

FLEX HALL | HALL C RENOVATION27

Page 28: Charlotte Convention Center Development Study

Improving Competitiveness

• Addresses the need for more meeting space

• Increases the flexibility of the Convention Center

• Improves the connection to Charlotte’s developing urban

core

• Improves the customer experience

• Addresses risk of market share erosion

28

Page 29: Charlotte Convention Center Development Study

Project Cost

• Total Estimated Cost: $100M+

• Investment made between FY2017 and FY2023

– Improve venue over time

– Continue to operate

– Mirrors Stonewall Street Development

• Continue to consider expansion options beyond current

footprint

29

Page 30: Charlotte Convention Center Development Study

Next Steps

• City/CRVA Dialogue and Collaboration

• Continue Dialogue with Envision Charlotte

– Potential location for Smart Cities Center for Excellence

• Refine Plans and Cost Estimates

• Consider Approval of Phase 1 in upcoming FY2018 budget

• Begin improvements: FY2018

30

Page 31: Charlotte Convention Center Development Study

Questions/Comments

31