Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

16025 March 2005

CHAPTER V1 Backfi ll & Shell Fitout

Summary 2

Phillips & Phillips Addition 3Wilson Dey 10 Fluids Lab (not included in this mailing) 11

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Summary16125 March 2005

Hire Date

Hire Room # NSF Cost Hire Room # NSF Cost Hire Room # NSF Cost Hire Room # NSF Cost Hire Room # NSF Cost Hire Room # NSF Cost Hire Room # NSF Cost

05-06P-1 expt P138,140 674 Reno

PA built 06-07WD built P-2 comp P100 481 As Is P-3 PA011 1,995 Shell Fit-out M-2 PA HEEL 4,500 Shell Fit-out M-1 Computing STC Office WD 257 1,472 Shell Fit-

out

C-0 Ramsey PA 032, 034, 050 4,170 Built Admin/ Ramsey Office PA L2 2,206 Built

P-3 Office PA 225 Temp Shell Fit-out M-1 Office C-1 WD 357, 357a, 355 1,493 As Is add

hoods

E-Beam PA B30 680 Shell Fit-out

WD 351 684 Shell Fit-out Analytical Suite PA 030 783 Built

C-1 Office Analytical Suite 2 Pa 011 1,320 Shell Fit-out

PA 225 1,100 Shell Fit-out

07-08P-4 expt P128 1,288 Reno P-5 PAB01 1,483 M-3 PA HEEL C-2 Clean Room 1 PA L1 512 Shell Fit-out

P-5 Office PA 225 Clean Room 2,3 PA L1 1,725 Shell Fit-out

Temp 464 Reno

08-09

NV Built 09-10 P-6 expt PA329, 331,

330, 332

555 As Is P-3 Office PA325, 327, 328 522 As Is M-4 PA 425, 427, 428 522 As Is M-9 PA 449, 451,

450

552 As Is C-3 2,753 As Is

PA L3, 4 Avlb. P-8 theory PA 337, 339,

340

555 As Is P-5 Office PA 349, 351, 350 522 As Is M-5 PA429,431, 430,

432

555 As Is M-1 Office PA 435b 184 As Is

Zhou Decomp 2,139 As Is P-7 PA333, 335, 334,

336

555 As Is M-6 PA 433,435a,

436, 434

555 As Is C-3 Office PA 225

M-7 PA441, 443, 442,

444

555 As Is C-4 PA 401,402,

03,405, 404a,

404b,404c

3,350 As Is

PA L3 East 3,356 As Is PA L3 West 3,358 As Is PA 414 593 As Is

C-3 Office PA 225

M-8 PA445, 447, 446,

448

555 As Is

PA 435c, 440 371 As Is

ATN Avlb. 10-11P-9 expt 555 As Is M Shared ATN 6,419 Reno

P-10 expt PA 345, 347,

348, 346

555 As Is

ATN 1,903 Reno

Total above: 12,061 Total above: 8,435 Total above: 14,625 Total above: 736 Total above: 1,472 Total above: 12,450 Total above: 8,790

Physics re-use: (4,582) Physics IAM re-use: 0 Math Re-use: 0 Math IAM Re-use: 0 Chem Re-use: 0 Chem Re-use: 0 Chem Re-use: 0

Physics Demo: (230) Physics IAM Demo: 0 Math Demo: (230) Math IAM Demo: 0 Chem Demo: 0 Chem Demo: 0 Chem Demo: 0

Total Increase: 7,249 Total Increase: 8,435 Total Increase: 14,395 Total Increase: 736 Total Increase: 1,472 Total Increase: 12,450 Total Increase: 8,790

8,435 736 12,450 8,790Total IAM: 30,411

Growth Allocation: 6,890 Growth Allocation: 14,395 Growth Allocation: 0 Growth Allocation: 30,044

Over/(Under): 359 Over/(Under): 0 Over/(Under): 0 Over/(Under): 367

Notes: Assumes Brauer Library Stays in Phillips

Assumes Fume Hoods Possible in ATN Space (ATN space available 8,552 NSF- 230 demo )

Hi Bay Space 1,400 sf available to assign as needed

PA 243 temp,

Moves to L4 in

2009

Shared w/ C-1

Temp

C-2 Office

PA 225 or WD

Unassigned/

Visitor

PA 225 or WD

Unassigned/

Visitor

Physics IAM Admin/ SharedPhysics IAM Math Math IAM Chem IAMChem

Unassignedoffice

PA 413, 412,

411,415, 415b,

415c

PA 341, 343,

342

P175, 157, 161

Unassigned labs ComplexMaterials

IAM Office Swing Space

CAMS

Suite, PA

L1

Shell Fit-out

Unassigned labs

Clean Room 4

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition16225 March 2005

Level 452’

Phillips Addition Level B

Tunn

el t

o N

ew

Vena

ble

2006

ASS

IGN

ED A

S N

EED

ED1,

400

sf

hi-b

ay

SHA

RED

INST

RUM

ENT

680

sf

IAM

FLU

IDS

LAB

MAY

NEE

D F

UM

E H

OO

D

AC

CES

S, PO

SSIB

LY S

HA

RED

IN

RO

OM

B13

4,50

0 sf

M-2

M-3

2008

-09

EXPE

RIM

ENTA

L1,

483

sf

P-5

Mat

h &

Mar

ine

Scie

nce

Func

tions

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition16325 March 2005

Level 467’

Phillips Data Vault Level

Phillips Addition Level G

EXIS

TIN

GR

AM

SEY

4,17

0 sf

C-0

EXIS

TIN

G S

HA

RED

IN

STRU

MEN

T78

3 sf

IAM06

-07

IAM

EX

PER

IMEN

TAL

1,99

5 sf

P-3

06-0

7 SH

AR

ED

INST

RUM

ENT

1,32

0 sf

IAM

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition16425 March 2005

Level 482’

Phillips Level B

Phillips Addition Level 1

CLE

AN

RO

OM

2,

700

sf t

otal

IAM

23

4

SHA

RED

EX

PER

IMEN

T S

PAC

E 6,

419

sf

M-?

P-10

LON

G T

ERM

U

SE?

Ass

umes

Rem

ove

Wal

l

2010

-11

1,90

3 sf

PIT

HVA

C /

ELEC

Toile

ts

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition16525 March 2005

Level 497’

Phillips Level 1

Phillips Addition Level 2

ZH

OU

DEC

OM

PRES

SIO

N20

06 -

200

9+

2,13

9 sf

06-0

7R

EPLA

CEM

ENT

EXPE

RIM

ENTA

L C

ON

FIR

M V

AC

AN

T67

4 sf

VAC

AN

T 2

006

REN

O 2

007

1,28

8 sf

P-1P-

4

P-2

06-0

748

1 sf

IAM

SW

ING

OFF

ICE

P-3

(06

-07)

P-5

(07

-08)

C-1

(06-

07)

C-2

(07-

08)

C-3

(09-

10)

C-4

(09-

10)

06-0

7T

EMP

OFF

ICE.

M

OV

E T

O P

A 4

35B

09-1

0

M-1

EXIS

ING

R

AM

SEY

/ AD

MIN

1,83

8 sf

IAM

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition16625 March 2005

Level 512’

Phillips Level 2

Phillips Addition Level 3

P-3

P-6

P-7

P-8

P-9

P-10

P-5

IAM

LABS

BEL

OW

IAM

LA

BS B

ELO

W

IAM

PH

YSI

CS

ASS

UM

ES 1

/2 F

LOO

R3,

358

sf

IAM

PHY

SIC

SA

SSU

MES

1/2

FLO

OR

3,35

6 sf

DEC

OM

PRES

SIO

N

McN

EIL

2

WA

SHBU

RN

1FA

LVO

1SU

PER

FIN

E 2

WU

4Q

IN

1.

5

11.5

M

NEW

HIR

EP-

?

OR

LABS

IN A

TN

SP

AC

E20

10-2

011

Ava

ilabl

e 20

09-1

0 a

fter

Mar

ine

Scie

nce

Vaca

tes

to N

ew V

enab

le

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition16725 March 2005

ASS

UM

ES L

IBR

ARY

STA

YS

1,87

4 sf

1,53

7 sf

Level 527’

Phillips Level 3

Phillips Addition Level 4

M-4

M-5

M-6

M-7

M-8

M-9

09-1

0LT

SY

NT

HET

IC C

HEM

IST

3,35

0 SF

C-4

5 H

OO

DS

6 H

OO

DS

09-1

0LT

SY

NT

HET

IC C

HEM

IST

2,

753

sf

C-3

09-1

0C

OM

PLEX

MAT

ERIA

LS59

3 sf

M-?

AB

C

M-1 Una

ssig

ned

371

NSF

Ava

ilabl

e 20

09-1

0 a

fter

Mar

ine

Scie

nce

Vaca

tes

to N

ew V

enab

le

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition16825 March 2005

Phillips Attic

Phillips Addition PH1

Level 537’

ASS

UM

ES L

IBR

ARY

STA

YS

1,92

0 sf

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Wilson Dey16925 March 2005

Level 482’Level 497’

2006

-07

1,47

2 sf

STC

06-0

72,

177

sf

C-1

07-0

8

C-2

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition17025 March 2005

Fluids Lab

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition17125 March 2005

Fluids Lab Criteria Sheet

Architectural Finishes

Wall material:

Floor Material:

Ceiling Height:

Ceiling Material:

Other Comments:

M-R Gyp

Painted Concrete

No Ceiling

Absorbtive panels mastic applied tounderside of slab

Moisture Resistent

Room Type:

General Room Information

LabRoom Name:

Room Number: 4,000Net Square Feet:

Description ofActivities:

FunctionalRelationships andAdjacencies:

Albert, McLaughin, Camassa

FacultyRepresentative:Department:

Fluids Lab

6.0 - 001

- Wave Tanks w. Video- Computational- Laser- 15 People steady staff

Mathematics

Furniture:

Furniture and Equipment

(1) Conference table(6) Workstations - 5 GF workstations, - 1 PC workstation

Equipment:

LF of Lab Bench:

Lab Bench Notes:

Casework

8'

LF of Countertop:

LF of Shelving:

Casework Notes:

Fire Protection

Normal Wet Sprinkler:

Dry Preaction System:

Yes

No

Other FireProtection System:

Notes:Notes:

200 #/sf

Acoustic Requirements:

Design Floor Loading:

E.M. Shielding:

Vibration Requirements:

Acoustical, Structural, Vibration

None

On Grade

SG-1: Type Locations

Hand Sink:

Pipe in Contr:

w/ eyewash:

SG-2: Type Locations

Cup Sink:

Pipe in Contr:Floor Drain: 1/ Module, 7 Total

SG-3: Type Locations Pipe in Contr:

Natural Gas:

OFOI CFCILocal Water Polisher:

Plumbing

Potable Hot: House Compressed Air:Potable Cold:

House Vacuum:YesPurified Water:

House Nitrogen:Peak: L/day/outlet

Average: L/day/outlet Depth:

Lab Hot: Lab Cold: Pressure:

Explosion Relief: N/A

200-300 CFM Fresh AirNotes:

Steam:

HVAC

Temperature (F)/Humidity 40 %<x<60% RH

Recirc. Allowed: Yes

Dust Control: N/A

95%Supply Filtration:

55 F

Process Cooling:

Temp: 2.2GPM:

Equal Positive NegativeRelative Pressure:

5-10T:

Footcandles:

Special (UV, Amber):

Direct Direct/Indirect BothLighting:

Lighting

Type M: 3 Data/ 1 Voice

Other Power: 208 3 p 60 A for Laser

Wall quads are 4 per module, Raceway Quads are 2 permodule

Notes:

Power Shut-Off Shunt:

Public Address/Intercom:

SecurityHood Audible

Hood VisualHigh/Low Temp.

Alarms:

Duplex (Qty)

28Quad (Qty)

154Raceway (LF) 154

Spacing ("OC)

Equipment Watts/SF:

Other Tel Data:

Voltage 110v 208v 460 Bus Stndby UPSPhase 3p

Possibly Share HoodNormal Sash Opening:

Snorkle Ducts: QTY 7 / 4" For enlargerSize

BSC Size: No

Canopy Size/Material:

100% 70% 30% 0%BSC Exhaust:

Fume Hoods and Safety Cabinets

Number Fume Hoods:

3'0" 4'0" 5'0" 6'0" 7'0" 8'0"

Cabinets:

Bench

WalkIn

Future

Qty:

Cabinet Notes:

Vented QTY / LF

/

/

Acid/Base

Flammable

Chemical /

Vacuum Pump /

SG-4: Type Locations

Safety Stations: Yes

Purified water Capped in SpaceNotes:

/Hood /Bench Position

/Hood /Bench Position

1 /Hood /Bench Position1

/Hood /Bench Position

Pressure:

Pressure

Pipe in Contr:

W:S:

Type T: 15 Data

Type O: Video/ Hi Speed

Type R: 8 Data

Type S: Hi End Multi Media

Electrical Tel Data

Wilson Architects/ Affi liated Engineers

University of North Carolina - Chapel HillScience Complex Phase II

VI - Phillips and Phillips Addition17225 March 2005

Fluids Lab Equipment List

Item # Description:

q p

Manufacturer Model Size Qty Extg. Location

001 Wave Tank 1 120' 1'8" 3' 1x x

002 Wave Tank 2 45' 1'8" 3' 1x x

003 Low Reynolds Complex 1x x

004 Recirc Water Tunnel 1x x

005 6 W AR Laser 6' 3' 1x x

006 Stratified Jet Station 3' 3' 6' 2x x

007 Stratified Flow Drag Station 3' 3' 6' 2x x

008 Rotating Tank 6' 6" 6' 4" 1x x

009 55 Gallon Salt Water Mixing 16x x

010 Brine Tank 8' 1x x

011 Fume Hood 6' 3' 2" 1x x