Changing and Expanding Risks for LNG Carriers

- Is our perception updated? -

Makoto Hoshi

Page 3: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

AGENDA

• Introduction• Recent Growth of LNG Carriers• LNG Carriers’ Hazard• Changing Context• Conclusion

Page 4: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Introduction

• What is LNG?– Liquefied Form of Natural Gas– Natural Gas cooled to -161 C– 625m3 of GNG = 1 m3

• LNG Carrier– Unique cargo containment technology– Moss Spherical Type and Membrane Types– High Value

Page 5: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

LNGC developmentNumber of LNGC in operation

(Incl.Orderbook)

0

50

100

150

200

250

300

350

199119

9419

9619

9820

0020

0220

0420

0620

08

MossMembraneTotal

Page 6: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

LNGC developmentNumber of New Buildings

(Incl.Orderbook)

0

10

20

30

40

50

60

199019

9219

9419

9619

9820

0020

0220

0420

0620

08

MembraneMoss

Page 7: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

LNGC developmentNumber of LNGC in operation

(Incl.Orderbook)

0

50

100

150

200

250

300

350

199119

9419

9619

9820

0020

0220

0420

0620

08

MossMembraneTotal

Page 8: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Review of Tank Structure

Moss Spherical Membrane

Page 9: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Membrane Tank StructureGTT Mark III

Primary Barrier: Corrugated Stainless-steel

Insulation

Inner Hull PlateSecondary Barrier Triplex

Page 10: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Membrane Tank StructureGTT No. 96

Primary Barrier- Invar

Secondary Barrier -Invar

Insulation

Inner Hull Plate

Page 11: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

LNGC Hazards and Risk Assessment

LNG Vessels can be involved in accidents :• Grounding • Striking a fixed object • Collision • Unloading/Loading

Sudden pull-away and damage of loading / discharging arms

Cracking of ship hull due to super cold shock (-161C)• Cargo containment (cargo sloshing) and cargo

machinery • Other usual hull/machinery accidents• Terrorism

Page 12: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Moss Type1980, grounding off Tobata, Japan→No Tank Damage→ 2,300 tons steel work, 4 months repairs

Membrane Type1979, grounding off Gibraltar→Tank Damage→2,500 Tons steel work, 18months repairs

2004, grounding off Korea→Tank Damage →Few hundred steel work, 8 months repairs

“GROUNDING”

LNGC Hazards and Risk Assessment

Page 13: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Review of Tank Structure

Moss Spherical Membrane

Page 14: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

• What is cargo sloshing?

LNGC Hazards and Risk Assessment

“CARGO SLOSHING”

Page 15: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

LNGC Hazards and Risk Assessment

“Example of CARGO SLOSHING”

Buckled Primary

Membrane

Broken Primary

Membrane

Page 16: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

• Loading restriction and certain change in design seemed to have provided a solution

However…….• 2006, cargo sloshing damage found, in a LNGC

fully complied with loading restriction.• Following the incident, loading restriction

recommendation revised.►Still an Ongoing Problem!

LNGC Hazards and Risk Assessment

“CARGO SLOSHING”• What is cargo sloshing?

Page 17: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

LNGC Risks Looking Future New Technology

• LNGC have been long dominated by Steam Turbine.• Totally new propulsion systems being introduced

▪Dual Fuel Diesel + Electric Motor▪Diesel + Reliquefaction plant

• Steam Turbine is regarded as “proven technology”

► Deviation from “proven-tech” = Adds Unknown Factor

Page 18: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

LNGC Risks Looking FutureBuilder Quality Issue

• Number of shipyards joining LNGC building.• Very large demand seems to put pressure

on the adequacy of experienced shipyard workers.

0

10

20

30

40

50

60

199019

9219

9419

9619

9820

0020

0220

0420

0620

08

MembraneMoss

• Number of shipyards joining LNGC building.• Very large demand seems to put pressure

on the adequacy of experienced shipyard workers.

► Recent incidents, not only under construction but incidents materialized after delivery, strengthen above concern.

Page 19: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

• At year 2000, the number of LNGC were 130, at year 2005, it increased to about 180 and there is further 130 on order

In addition, many new buildings imply most experienced staff get diverted to ship construction superintendants

LNGC Risks Looking FutureDemands for Experienced Crew

LNGC require high quality crew with special expertise. Assuming 6 senior officers with 6 back up:

1500

2200

3700

0500

1000150020002500300035004000

2000 2005 2010

250%

in 10 YearsNumber of Crew

Year

Page 20: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

• Spot Trade come into existence– emergence of non “take or pay” supply– softening of resale restriction

• More Tramper Type Transportation– Participation of New Operators– Voyage to un-familiarized ports

LNGC Risks Looking FutureChange of Trading Pattern

Page 21: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Concluding Remarks

• Each type of LNG containment system poses quite different risk implication to underwriters.

• Changing context, LNG trade pattern, crewing situation and etc is changing risk implication as well.

• “Risk Assessment and Loss Prevention-a Common Goal”

Page 22: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

Is our perception of LNGC adequately updated?

Page 23: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

QUESTIONS ?

Page 24: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

THANK YOU!

Page 25: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

References

De Regt (2004), “Safety & Risk Aspects of LNG”Pitblado etal (2004), “Consequences of LNG Marine Incidents”Itoyama (2005), “LNG sen ga wakaruhon”NYK Line Operation Research Committee (2006) “LNG Ships

Operations”Various articles from Trade WindsEnergy Information Administration

Images from:

Gaztransport and Technigaz Naval engineering brochuresMark III SystemNo. 96 SystemCS 1 System

Moss Systems engineering brochures

Page 26: Changing and Expanding Risks - IUMI · Membrane Tank Structure GTT Mark III Primary Barrier: Corrugated Stainless-steel Insulation Inner Hull Plate Secondary Barrier Triplex. Membrane

• The information contained herein is based on sources what I believe reliable and should be understood for general information only. Mitsui Sumitomo Insurance makes no representations or warranties, expressed or implied, concerning the accuracy of information contained herein.