Asset Mapping – Journey towards SCE’s SmartGrid realization Authors: David Gasso Sr. Program/Project Manager, T&D, Southern California Edison Jaishankar Jayaraman Sr. Program Manager, Utilities Practice, Cyient Inc. Southern California Edison 1

Upload: david-gasso

Post on 13-Apr-2017

142 views

Category:

Documents


1 download

TRANSCRIPT

Asset Mapping – Journey towards SCE’s SmartGrid realization

Authors:

David Gasso

Sr. Program/Project Manager, T&D, Southern California Edison

Jaishankar Jayaraman

Sr. Program Manager, Utilities Practice, Cyient Inc.

Southern California Edison1

About SCE

Southern California Edison2

• Who We Serve:‒ 15 million people

‒ 180 incorporated cities

‒ 15 counties

‒ 5,000 large businesses

‒ 280,000 small businesses

• How We Do It:‒ 12,782 miles of transmission lines

‒ 90,401 miles of distribution lines

‒ 1,433,336 electric poles

‒ 720,800 distribution transformers

‒ 2,959 substation transformers

‒ 15,500 employees with over a century of utility experience

SCE is California’s second largest investor-owned electric utility company in a 50,000 square mile service territory that spans Central and Southern California.

2

About the Paper

• SCE’s vision of a smart grid is to develop and deploy a more reliable, secure, economic, efficient, safe and environmentally-friendly electric system

• SCE is a leader in fostering the development of advanced grid technologies and the adoption of technology to create a smarter grid

• SCE continues to invest in solutions to overcome challenges in operating the grid operate the grid in a safe and reliable manner

• SCE’s major programs in GIS and CMS will support Smart Grid Initiatives

• Share SCE’s GIS experience that will enable “Smarter” Grid vision

Southern California Edison3

Topics Covered

• Journey towards comprehensive GIS Implementation (cGIS)

• Solution implementation guiding factors

• Data consolidation and acceptance journey

• Business Solution integration

• Challenges and change management experiences

• Enabler to SmartGrid implementation

Southern California Edison4

cGIS Implementation Journey

• Implemented in a phased manner

• Piloting and evaluation

• Stakeholder engagement was central

• Major Interfaces and data are live

Southern California Edison5

Program Stakeholder Approval

<2010>

Phase 1 Evaluation: Bulk Transmission

Network <2011>

Phase 2 Initiation: Substation, Distribution and Secondary

Network <2012-2013>

Data and Systems Pilot

<2012>

cGIS Data roll-out

<2013-2015>

GIS Interfaces and Integration Interface Releases & Training

<2013 – 2015>

Data Maintenance back-log posting <3rd

Qtr. of 2014 onwards

cGIS Implementation Architecture -Guiding Principles

Single source of truth for Electrical and Structural

Network Assets

Minimize impacts to existing operational system

Minimum disruption to existing Circuit Mapping

system and views

Support multiple data models

Align with ongoing technology investment(s)

Incorporate standards-based interfaces

Key data and technology foundation

Southern California Edison6

cGIS Foundation: Data Consolidation

CONFIDENTIAL7 Southern California Edison

Bulk Transmission

LiDAR Data Sanders Map

P&P DrawingsTower Data SLD

SAP

Substation, Sub transmission, Distribution and

Secondary Network

FIM Circuit

CSS Tower Data SAP

SLD Vegetation LiDAR Data

Landbase

SCE Easements

and edits

Thomas Brothers ETAK

Other Third Party

and Legacy

source

OLD

SCE – Multi-source Data Consolidation Framework

Consolidation Specification

Consolidation Network Assets Source Matrix

Consolidation Target Michael Baker Landbase

Network Assets Acceptance Criteria

Network Consolidation Processes and Tools

Central Landbase

Transmission Network

Substation

Distribution and Street

Light Network

SCE – cGIS – Electrical and Structural Network

ESRI

AutoCAD/

Others

Imagery

Tabular/

Other digital formats

GESW

SCE cGIS Consolidation: Network Data Acceptance Journey• Matured validation process and tools enabled data acceptance

• Business stakeholders were strongly engaged during the process

• Acceptance process was mostly automated

• Acceptance quality was benchmarked at 98%

• Numerous source data issues surface for further review(s)

Southern California Edison8

Data Acceptance Parameter

AQL Examples of Quality Checks conducted Nature of checks

Network Connectivity (Geometrical)

100% 1. Physical connectivity in Circuits2. Logical connectivity in Structures3. Logical connectivity relationship

100% Automation checks

Data Model Compliance 100% 1. Relationship validation2. Mandatory field validation3. Business rules validations

100% automation checks

Feature Capture and placement, attributes capture, Cartography and Annotations

98% 1. Feature existence validation2. Feature placement rules validation3. Annotation placement rules validation4. White space validation5. Attributes capture rules and validation

Mix of automated, semi-automated and manual validations based on source type

Completeness check 100% 1. Validate feature capture for sampled locations Random sampling

cGIS Interfaces: Business Integration Views

CONFIDENTIAL9 Southern California Edison9

SCE

GeoView

AutoCAD

Map3D

Workflow

Manager

Landbase

Structure Network

Transmission

Distribution

SOLO

Substation

• Enhances the IPSEC workflow• Integrates Enterprise Asset, Customer Information and Circuit Mapping Systems• Enables Electrical, Structural and Land base Maintenance• Supports key functions: – Work order posting and FSA functions

• Web based consolidated view• Enables Reporting functions

• Work order assignment and approvals• Streamlines the work order assignments

SCE GeoView – Key Business Support Tool

CONFIDENTIAL10 Southern California Edison

Visibility to work orders

in progress

FEATURES

All electrical asset data

from Transmission to

Meter – in one place

Multiple tools, reports

and widgets to make

better decisions,

quicker

SCE and MB land base

data for all of our

service territory

cGIS Interfaces: SCE-GeoView – Enabler for Planning

Southern California Edison11

SCE-GeoView

Interface

Review Work

order polygons

11

Import Design

in Map3D

Analyze Work

Area

Define Work order

Polygon

Export and Design

in AUD

cGIS Consolidation – Key Challenges

• Achieve business owner data buy-in

• Align two separate data systems (structural and electrical)

• Build a data system minimizing user change while protecting operational systems

• Enable IT (system) and business (data) alignment during development

• Assure ability to transition a current set of data upon final system cut-over

CONFIDENTIAL12 Southern California Edison

Change Management challenges and opportunities

Southern California Edison13

Change Management Area

Challenges Methods toaddress challenges

Management • Lead the need for change• Align the business to achieve the optimal

results• Support adoption of new systems

Align solution to need

Business • Enhance organizational productivity • Gain confidence in the component additions

to the systems o New Landbase o Integration of previously isolated data

Sufficient time in review and testing; hear and address concerns

IT • Support new processes associated with data management

• Gain confidence in the external code development

Leverage current processes – both sides grow together

SCE cGIS – Enables GRID Modernization Investments

• Enabler for planning, grid operations, metering, distributed generation management, situational awareness, and outage management

• Key to data quality improvements – Transformer-Meter connectivity; Critical-to-Outage management operations

• Establishes the framework for single instance of truth to enabling structural and electric functionality into single applications

• Drive grid modernization technology through new network channels

Southern California Edison14

Thank you