Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013. Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad. Contents. CGIS Project Data Management Data Update Devices Project Expected Benefit Challenges. CGIS Project. About TNB. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/1.jpg)
Asia Geospatial Forum, PWTC, Kuala Lumpur25th September 2013
![Page 2: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/2.jpg)
CGIS ProjectData ManagementData Update Devices ProjectExpected BenefitChallenges
![Page 3: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/3.jpg)
![Page 4: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/4.jpg)
Largest electricity utility company in Malaysia
~87 billion worth in assetsCore businesses ; Generation,
Transmission and Distribution of electricity
Non Core businesses; ICT, Corporate Services, Planning
![Page 5: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/5.jpg)
CGIS stands for Corporate Geospatial Information System
Implemented by ICT jointly with Generation, Transmission, Distribution, Planning & Corporate Services
Project implementation is based on the TNB’s Top Management approved 10-year CGIS Master Plan (2009-2019)
To improve the organization efficiency and reduce operational costs
![Page 6: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/6.jpg)
• Project Planning (a.k.a Project Development)
• Plant Operation Performance
• Asset Tagging
• Load Forecasting•Generation Development (a.k.a Generation & Grid Planning)•Area Network & Grid Planning
• Land & Wayleave Mgmt
• Document Mgmt Interface
• Outage Mgmt (Planned)
• Maintenance Strategy & Plan
• Equipment Performance / Condition Monitoring
• Vegetation Mgmt• Workforce Mgmt• Route Analysis• Asset Tagging• Asset Mgmt
• Load Forecasting & Segregation
• Area Network Planning
• Construction Projects• Operation Control &
Network Mgmt• Maintenance Work
Order Mgmt• Workforce Mgmt• Route Analysis
(maintenance)• Asset Tagging• Asset Mgmt• Customer Service
Support• Supply New
Connection• Reconnection• Project Planning• Wayleave Mgmt &
Land Mgmt• Outage Mgmt
• Technical Planning• Project Planning• Construction Projects• Breakdown Mgmt• Operation Control &
Network Mgmt• Route Analysis
(Maintenance)• Asset Tagging• Asset Mgmt• Equipment
Performance / Condition Monitoring
• Customer Service Support
• Workforce Mgmt
• Route Analysis (Emergency Response Team)
• Asset Identification• Construction Project• Document Mgmt &
Archiving• Building Mgmt (incl
M&E)• Customer Service
Support (for Property Maintenance)
• GenSet Services Mgmt
• Land & Property Mgmt
GENERATION(3)
PLANNING(3)
TRANSMISSION(10)
DISTRIBUTION(15)
ICT(11)
CORPORATE SERVICES(8)
![Page 7: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/7.jpg)
![Page 8: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/8.jpg)
Generation: 17 Power Stations (Thermal & Hydro), 18 Mini Hydros
Distribution : ~8.3 million customer points/meter ~75,000 substations & associated equipment
~200,000 feeder pillars ~300,000 km of UG cables
Transmission: 460 Main Intake Substations (132kv and above) 20,000 km of OH lines 2,000 km of UG cables
Corporate Services: 25,000 land parcels (Gen, PMU, PPU, Offices)
~60,000 PE land parcels ~7,600 buildings
ICT: ~14,000 km of fiber optics cables 480 comm rooms 1000 km of Last Mile Fiber
![Page 9: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/9.jpg)
![Page 10: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/10.jpg)
• Stands for Data Update Device (Mobile CGIS)
• Phase I (Nov 2012 – Dec 2013)• 30 selected users (Distribution
Division)• Simple and seamless data update
solution• Automate the data updating processes
from field to CGIS Database
![Page 11: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/11.jpg)
![Page 12: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/12.jpg)
![Page 13: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/13.jpg)
![Page 14: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/14.jpg)
![Page 15: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/15.jpg)
Time savings and cost reduction Improve work productivity and
efficiency Increase data reliability and quality
![Page 16: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/16.jpg)
Stakeholder’s buy inComplex Data Model
![Page 17: Data Update Devices ( DUDe ) for TNB’s CGIS Project Ahmad Hafifi Yusof, Tenaga Nasional Berhad](https://reader036.vdocuments.site/reader036/viewer/2022062301/56814296550346895daec498/html5/thumbnails/17.jpg)