June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing center, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn, submitted by the Brooklyn Navy Yard Development Corporation, represented by exhibits 6063-EV, EW, EX & EY of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that (1) the building will be left unpainted; (2) more information will be provided about the window frame replacement, including (a) elevations indicating which window frames need to be replaced, (b) an estimate of what percentage of the overall windows this constitutes, and (c) photographs showing the conditions that necessitate the replacements; (3) given the funds saved by eliminating the painting, the Brooklyn Navy Yard Development Corporation will explore installing copper window frames to match the existing frames, in lieu of aluminum; and (4) if copper frames are not feasible, the aluminum frames will (a) be painted to match the existing weathered steel fac;ade, and (b) include thin profiles to match the existing. 0 Printed Preliminary approval is conditioned upon submission of this project for final review and approval before June 4, 2014. A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012. v"''-'"'"' Snyder Executive Director post -consumer materiaL

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24462

RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing center, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn, submitted by the Brooklyn Navy Yard Development Corporation, represented by exhibits 6063-EV, EW, EX & EY of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that (1) the building will be left unpainted; (2) more information will be provided about the window frame replacement, including (a) elevations indicating which window frames need to be replaced, (b) an estimate of what percentage of the overall windows this constitutes, and (c) photographs showing the conditions that necessitate the replacements; (3) given the funds saved by eliminating the painting, the Brooklyn Navy Yard Development Corporation will explore installing copper window frames to match the existing frames, in lieu of aluminum; and (4) if copper frames are not feasible, the aluminum frames will (a) be painted to match the existing weathered steel fac;ade, and (b) include thin profiles to match the existing.

0 Printed

Preliminary approval is conditioned upon submission of this project for final review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

v"''-'"'"' Snyder Executive Director

post -consumer materiaL

Page 2: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

II¥CDESI

June 4, 2012

CERTIFICATE 24463

RESOLVED That the Design Commission, having considered designs for the construction of two pavilions, Native Plant Garden, New York Botanical Garden, 2900 Southern Boulevard, Bronx, submitted by the Department of Cultural Affairs and the Department of Parks & Recreation, represented by exhibits 1950-KP, KQ, KR & KS of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Snyder Executive Director

0 Printed on paper containing

Page 3: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

NVCD

June 4, 2012

CERTIFICATE 24464

RESOLVED That the Design Commission, having considered a proposal for the installation of an artwork by Matthew Geller, Myrtle Avenue Plaza, Myrtle Avenue between Hall Street and Emerson Place, Brooklyn, submitted by the Department of Cultural Affairs' Percent for Art Program, the Department of Design and Construction, and the Department of Transportation, represented by exhibits 6606-1, J & V of record in this matter, hereby gives to the same unanimous conceptual approval noting that, while this may be a welcome departure for the artist, the artwork will be a public statement of his work in New York City, and therefore must retain the fundamentals of the found object, which is essential to his work, and couple the elegance of the form with the rawness of the materials. Approval is given with the understanding that (1) the work will read more as an inverted manhole cover than a rose window; (2) the glass palette will be rich and not generic; {3) the colors will be distributed unevenly (contrary to the renderings), noting the importance of choosing a fabrication process that allows for idiosyncrasies in the glass form; (4) the shape of the top of the piece, including the glass, will be designed, so it does not trap water or debris such as leaves; and (5) rougher materials (cast iron and Cor-ten) will be used.

Conceptual approval is conditioned upon submission of this project for preliminary review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Page 4: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24465

RESOLVED That the Design Commission, having considered a proposal for installation of an artwork by Xu Bing, Forsyth Plaza, Canal Street, Forsyth Street, and the Manhattan Bridge approach ramp, Manhattan, submitted by the Department of Cultural Affairs' Percent for Art Program, the Department of Design and Construction, and the Department of Transportation, represented by exhibits 3557 -AG, AH, AI & AJ of record in this matter, hereby gives to the same unanimous conceptual approval and commends the artwork.

Conceptual approval is conditioned upon submission of this project for preliminary review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

t!i on

Page 5: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24466

RESOLVED That the Design Commission, having considered designs for the reconstruction of Forsyth Plaza, Canal Street, Forsyth Street and the Manhattan Bridge approach ramp, Manhattan, submitted by the Department of Design and Construction and the Department of Transportation, represented by exhibits 3557 -AC, AD, AE & AK of record in this matter, hereby gives to the same unanimous preliminary approval with ramp Option 1.

Preliminary approval is conditioned upon submission of this project for preliminary review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Page 6: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24467

RESOLVED That the Design Commission, having considered designs for the construction of an addition, East Elmhurst (formerly North Beach) Community Library, 95-08 Astoria Boulevard, Queens, submitted by the Department of Design and Construction, represented by exhibits 6215-0, P, Q & R of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Oh

Page 7: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24468

RESOLVED That the Design Commission, having considered designs for the installation of rooftop photovoltaic panels, Engine Company 320, 36-18 Francis Lewis Boulevard, Queens, submitted by the Department of Design and Construction, represented by exhibits 6979-F, G, H & I of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

post +consumer

Page 8: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24469

RESOLVED That the Design Commission, having considered designs for the installation of rooftop mechanical equipment, Dormitory K, Anna M. Kross Center, 18-18 Hazen Street, Rikers Island, Bronx, submitted by the Department of Design and Construction, represented by exhibits 1554-NN, NO, NP, NQ & NR of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Page 9: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24471

RESOLVED That the Design Commission, having considered designs for the construction of a greenway, New Springville, Richmond Avenue, Travis Avenue and Park Drive North between Arthur Kill Road and Signs Road, adjacent to LaTourette Park, Fresh Kills Park and the William T. Davis Wildlife Refuge, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 1606-CW, CX & CY of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on containing

Page 10: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24472

RESOLVED That the Design Commission, having considered a proposal for the relocation of the 9/11 Eternal Flame from the Eisenhower Mall to the south lawn across from the Steps of Remembrance, Battery Park, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 1371-KF, KG & KH of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on materiaL

Page 11: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

IWCDESI

0 Printed

June 4, 2012

CERTIFICATE 24473

RESOLVED That the Design Commission, having considered designs for the restoration of the grotto, steps and paths, Alpine Garden, Fort Tryon Park, adjacent to the Cloisters Museum, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 2026-BD, BE, BF, BG, BH & Bl of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Page 12: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24474

RESOLVED That the Design Commission, having considered designs for the installation of adult exercise equipment, John Jay Park, Cherokee Place between East 76th Street and East 78th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 709-AU, AV, AW, AX & AY of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on

Page 13: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24475

RESOLVED That the Design Commission, having considered designs for the site preparation for the construction of High Line Park (formerly elevated rail line), Phase lilA, West 30th Street between 1oth Avenue and 12th Avenue, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 6640-BY, BZ, CA & CB of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on

Page 14: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24476

RESOLVED That the Design Commission, having considered designs for the reconstruction of the West 681

h Street (Tots) Playground, Central Park West between West 671h Street and West

681h Street, Central Park, Manhattan, submitted by the Central Park Conservancy and the

Department of Parks & Recreation, represented by exhibits 3702-R, S, T & U of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on paper containtng

Page 15: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

0

June 4, 2012

CERTIFICATE 24477

RESOLVED That the Design Commission, having considered designs for the construction of a studio lot, including two gates and a guard booth, Kaufman-Astoria Studios, 36th Street between 34th Avenue and 35th Avenue, Queens, submitted by the Economic Development Corporation, represented by exhibits 6339-N, 0, V & W of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

30% post-consumer material.

Page 16: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24478

RESOLVED That the Design Commission, having considered designs for the installation of three donor plaques, Hell Gate Pathway North, Hell Gate Pathway South, and Sunken Meadow Pathway, Randall's Island Park, Manhattan, submitted by the Economic Development Corporation and the Department of Parks & Recreation, represented by exhibits 5914-CF, CG & Cl of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that this is an interim solution to address the requirement for donor plaques until the Randall's Island Park Alliance implements its wayfinding program, which was approved in July 2006.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Page 17: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

lfiiCOESI

June 4, 2012

CERTIFICATE 24479

RESOLVED That the Design Commission, having considered designs for the reconstruction of Fox Square, Flatbush Avenue and Fulton Street, Brooklyn, submitted by the Economic Development Corporation, represented by exhibits 5587 -ES, ET, EU, EV & EW of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the domestic Oconee granite specified for the curb will be continued along Flatbush Avenue, including between Fulton Street and Hanson Place (which was approved on November 17, 2008 as part of the larger Flatbush Avenue reconstruction, but not undertaken), as funding is identified. The Commission expresses its concern that the Brian Toile artwork, which won a Design Award and was part of the same Flatbush Avenue project, is not fully funded and currently on hold, and encourages the agencies to consider using the $500,000 allocated for Percent for Art in the BAM Cultural District. Commissioner Nielsen recused herself.

Preliminary approval is conditioned upon submission of this project for final review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

post -consumer

Page 18: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24480

RESOLVED That the Design Commission, having considered designs for the installation of an emergency generator, Engine Company 211, 16 Hooper Street, Brooklyn, submitted by the Fire Department, represented by exhibits 2406-L, M, N & 0 of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

0 Printed on paper containing

Page 19: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24482

RESOLVED That the Design Commission, having considered designs for the construction of a jogging trail and adjacent site work, Phase I, Jerome Park, Fort Independence Park and Old Fort Four Park, Sedgwick Avenue, Goulden Avenue and Reservoir Avenue, Bronx, submitted by the Department of Parks & Recreation and the Department of Environmental Protection, represented by exhibits 1537 -AM, AN & AO of record in this matter, hereby gives to the same unanimous final approval. The Commission notes that, while it appreciates the coordination between the two agencies that resulted in each tree being analyzed individually to retain the maximum number, this significant change should have been brought to the Commission's attention as soon as the Department of Environmental Protection understood that the tree removals would be required by the Department of Environmental Conservation.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Page 20: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24483

RESOLVED That the Design Commission, having considered designs for the reconstruction of Times Square, West 42nd Street to West 471h Street between Broadway and Seventh Avenue, Manhattan, submitted by the Department of Design and Construction and the Department of Transportation, represented by exhibits 529-CP, CX & CY of record in this matter, hereby gives to the same unanimous preliminary approval subject to the submission of a complete set of final drawings that include (1) specific details for the five moveable benches that clearly illustrate the aesthetic impact of making them moveable, if any; (2) the event infrastructure door detail; and (3) designs for skate deterrents for the benches. Approval is also given with the understanding that the agencies will undertake a performance test in Times Square to ensure the durability of the paving materials, per the request of the Times Square Alliance, which will maintain the new public space.

Preliminary approval is conditioned upon submission of this project for final review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on paper containing

Page 21: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24484

RESOLVED That the Design Commission, having considered the design of a wayfinding system for installation citywide, submitted by the Department of Transportation, represented by exhibits 6816-CX & CY of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the Department of Transportation will (1) continue to pursue how technology can and will be applied to the kiosks; (2) explore a more transparent base; (3) submit the graphics and final material selection for committee review; (4) remove existing signage as the new standard is installed; and (5) submit plans for the pilot installations in the five business improvement districts.

Preliminary approval is conditioned upon submission of this project for final review and approval before June 4, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

0 Printed paper containing

Page 22: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24489

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 1330 First Avenue, northeast corner of First Avenue and East 71 51

Street, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7065-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

0 Printed on 30% post-consumer materiaL

Page 23: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24485

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 5581 Broadway, northwest corner of Broadway and West 231 51 Street, Bronx, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 6412-E, F & G of record in this matter, hereby gives to the same unanimous preliminary and final approval to a 5' x 1 0' newsstand subject to the submission of a revised plan with the new dimensions.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on paper containing post-consumer materia!"

Page 24: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

N

June 4, 2012

CERTIFICATE 24486

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 290 West 125th Street, northeast corner West 1251h Street and Frederick Douglass Boulevard, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 6482-AX, AY & AZ of record in this matter, hereby gives to the same unanimous preliminary and final approval to a 5' x 1 0' newsstand subject to the submission of a revised plan with the new dimensions.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

on paper containing post ~consumer materia!.

Page 25: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

N

June 4, 2012

CERTIFICATE 24488

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 100 Church Street, northeast corner of West Broadway and Barclay Street, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 5693-H, I & J of record in this matter, hereby gives to the same unanimous preliminary and final approval to a 4' x 12' newsstand subject to the submission of a revised plan with the new dimensions.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

Page 26: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

lfti'CDESI

June 4, 2012

CERTIFICATE 24481

RESOLVED That the Design Commission, having considered the design of a prototypical automated material handler (AMH) canopy, Queens Library, Queens, submitted by the Queens Library, represented by exhibits 6688-N & 0 of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that a matte (but not dull) finish be specified.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director

o Printed on paper containing post~consumer material.

Page 27: CERTIFICATE 24462 · 2012. 6. 4. · June 4, 2012 CERTIFICATE 24462 RESOLVED That the Design Commission, having considered designs for the conversion of Building 269 into a fish processing

June 4, 2012

CERTIFICATE 24470

RESOLVED That the Design Commission, having considered the design of a prototypical water quality monitoring station (WQMS) for installation above City Water Tunnel 3, Manhattan, submitted by the Department of Environmental Protection, represented by exhibits 6816-CZ & BA of record in this matter, hereby gives to the same unanimous preliminary and final approval subject to the submission of shop drawings for review and approval prior to fabrication of the WQMS.

Final approval is conditioned upon commencement of work before June 4, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on June 4, 2012.

Jackie Snyder Executive Director