capstone power point final

21
Work:SPACE Personnel Administration System

Upload: joyousone1104

Post on 27-May-2015

146 views

Category:

Technology


2 download

DESCRIPTION

Capstone Presentation

TRANSCRIPT

Page 1: Capstone power point final

Work:SPACE

Personnel Administration System

Page 2: Capstone power point final

Chaz Knox, Project Manager

Brian Bookout, Facilitator

Karen Gomez, Project Coordinator

Project Team

Page 3: Capstone power point final

Work:SPACE was begun in 2014 by a group of friends that met in an academic atmosphere. They found a kinship in their passion for programming and database design. Since its creation, the main goal at Work:SPACE has been providing personnel systems that are reliable, secure, accurate, and easy to use. We strive to increase business productivity through our user friendly systems and their design.

Mission Statement

Page 4: Capstone power point final

Global Corp. has a deprecated system that needs upgrading for the following reasons: The current system is difficult to navigate for users thus

causing a loss in productivity resulting in wasted employee hours.

There is currently no way for convenient communication between managers, administrators, and employees.

The current system has a lack of security between users.

The Problem

Page 5: Capstone power point final

Our recommendation for Global Corp. is to take action in upgrading their current system with ours as soon as possible. Global Corp is at risk of fraud and loss of data with their current system.

Work:SPACE will increase security, efficiency, accuracy, and reliability. All with a simple and easy to use user interface.

The Solution

Page 6: Capstone power point final

Languages used:

C#, ASP.net, and HTMLWhy?

Easy to customize to client needs System is web based

Platform: Windows 8

Database generation used: MicroSoft SQL Server Compact 3.5 for .NET Framework

We chose this database because it was well suited for this project. We only needed a small amount of storage space to demonstrate the system operation.

Standards Development

Page 7: Capstone power point final

Developmental Costs

Salaries $80,000

Equipment (5 additional workstations to be placed in Employee accessible locations)

$5,000

Other (possible need to replace other workstations)

$7,500

Total $92,500

Program Cost

Page 8: Capstone power point final

Program Cost

Page 9: Capstone power point final

Program Revenue

Page 10: Capstone power point final

Scheduling system allows management to view/edit schedules Tracking system to produce a daily sales total Messaging system between employees, administrators, and

management Consistent back up of changes made in the system Log of changes made by administrators or management on to

the local server Require users to register a log in username and password

System Requirements

Page 11: Capstone power point final

System Requirements (cont.)

Assign employee ID’s to each person Payroll system must calculate wages based on hours worked and pay

rate, then accurately calculate employee paychecks On click response time to not exceed four seconds System must be online seven days a week System must support up to thirty users at the same time The operating system must allow for more than one administrator to

be logged in

Page 12: Capstone power point final

Technology Components

Page 13: Capstone power point final

Context Diagram

Page 14: Capstone power point final

Level 0 Diagram

Page 15: Capstone power point final

Level 3 Diagram

Page 16: Capstone power point final

Level 4 Diagram

Page 17: Capstone power point final

Level 7 Diagram

Page 18: Capstone power point final

 

Demo

Page 19: Capstone power point final

Lessons Learned

Problems encountered while building the system: Connecting the database to visual studios Compatibility issues

How were the problems solved? Tried using SQL Lite Tried using MySQL Finally moved on to MySQL Compact database

What worked well Building a compact database within Visual Studios 2008

What we highly recommend Make sure you use appropriate hardware to meet the system requirements

Page 20: Capstone power point final

Where do we go from here?

Add labor forecast to determine how many employees will be needed for each shift.

Multiple banner support to allow users to view other businesses within the company.

Take over the world!

Page 21: Capstone power point final

Questions?