Capacity for Rail Roadmaps to 2050 FFE (Madrid, Spain) – 21 September 2017 Vijay Ramdas SP5 Task Leader

Upload: others

Post on 23-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Capacity for Rail

Roadmaps to 2050FFE (Madrid, Spain) – 21 September 2017

Vijay RamdasSP5 Task Leader

Page 2: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

European Rail Journey

2

2020

2030

2050

• Framework for multi-modal transport information management & payment system

• Transfer from roads - 30% of freight on >300km journeys• EU wide multi-modal TEN-T core network

• Transfer from roads - 50% of freight on >300km journeys

• Rail share: 50% of medium distance passenger traffic

• All core networks connected to airports• High quality/ High Capacity rail network

Page 3: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

C4R - Vision for European Rail

3

Rail as the mode of choice for transport

for Passengers &

Freight

Page 4: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Affordability related targets

4

Economic

Mean access charges No increase

Mean ops costs - 50%

Inf maintenance - 50%

Environmental

CO2 Emissions - 30% -50%

Energy consumption - 50%

Noise levels Eliminate problem zones

Safety

Equivalent fatalities -50%

2020 2030 2040 2050

Page 5: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Adaptability related targets

5

Interoperability

Cross-border movements

Unrestricted, Seamless

Bundling of Freight RS Fully interoperable

Standard Freight containers

No restrictions

Service Demands

Freight demand Meets requirements

Passenger over-crowding

Less than 10% at peak times

Climate Change

New rail infrastructure All adapted to cope

with 50 -year forecastNew Rolling Stock

2020 2030 2040 2050

Page 6: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Resilience related targets

6

Extreme Weather

Train delays - EW - 40% - 80%

Train Cancellations -EW

- 30% - 60%

Accessibility

Core TEN-T Accessible by all new RS

ComprehensiveTEN-T

Accessible by all new RS

Infrastructure Failure

Train delays - IF -40% -80%

Train cancellations -IF

-30% -60%

2020 2030 2040 2050

Page 7: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Automation related targets

7

Signalling & Communications

ERTMS Level 2 Implemented across entire rail network

Intelligent Transport System

Multi-modal information, management and payment system

Framework in place

EU-wide standard Completed

Intelligent Monitoring and Diagnostic Systems

Rolling Stock All new Rolling Stock equipped

Infrastructure Maximised on all new inf.

2020 2030 2040 2050

Page 8: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

High-Capacity Targets

8

Railway Network

High-speed network > 300%

Core TEN-T Completed

All TEN-T Completed

Intermodality

High-speed rail links to core airports

Completed

Rail freight links to core sea ports

Completed

Modal Shift (road to rail)

Freight: >300km by rail 30% shift 50% shift

Passengers:medium distance

At least 50% by rail

2020 2030 2040 2050

Page 9: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

C4R – Paving the way for the 2030/50 Railway

9

• Infrastructure • Modular Track Design• Switches & Crossings

• Rolling Stock – Guidelines for development & deployment• Freight Wagon Designs

• Maximising useable length, increasing flexibility• Automatic couplers• Interchanges and Terminals

• Operations• Faster recovery from extreme weather events• Faster & responsive time-tabling• Common data architecture• Decision support tool – Capacity Investment Options

• Advanced Monitoring• Low cost, low energy, close to market sensors

Page 10: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Affordability R&D – Route to 2050

10

O

Infrastructure & Rolling Stock

Cost effective infrastructure (D&C) ………………………………

Cost effective RS (D&C) …………………………….

Optimised insp. & maint. ……………………………………………..

Decision Support Tools

Whole Systems Approach(Databases, WLCM, Trade-offs)

…………….

Safety analysis model …………………………….

Noise measurement & mapping ……………………

Documentation / Guidelines

Metrics, Operating protocols,Specifications, Standard, Certifications etc

………………………………………………….

2025 2035 20452020

Key: R&D ; Demo ; Legislation ; Implementation

Page 11: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Adaptability R&D – Route to 2050

11

O

Infrastructure & Rolling Stock

Inf: Standardised interfaces ………………………………

RS: High-speed / flexible …………………………….

Operations

Command, Control & Comms …………….

Bottlenecks / Borders …………………………….

Depot / Freight terminals Capacity/operating protocols

……………………

Planning systems for climate change adaptation

……………………………………

Documentation / Guidelines

Metrics, Operating protocols,Specifications, Standard, Certifications etc

………………………………………………….

2025 2035 20452020

Key: R&D ; Demo ; Legislation ; Implementation

Page 12: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Resilience R&D – Route to 2050

12

O

Infrastructure & Rolling Stock

Rail infrastructure designs (recovering from incidents)

………………………………

Rolling Stock designs for EW (recovering from incidents)

…………………………….

Decision Support Tools

Optimised management of degraded modes (timetabling, routing etc)

……………………….

Planning systems for recovery from incidents EW, IF)

…………………………….

Modelling and analysis of extreme weather events

…………………………………………

Documentation / Guidelines

Metrics, Operating protocols,Specifications, Standard, Certifications etc

………………………………………………….

2025 2035 20452020

Key: R&D ; Demo ; Legislation ; Implementation

Page 13: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Automated R&D – Route to 2050

13

O

Infrastructure & Rolling Stock

ERTMS L3 & higher ………………………

Intelligent infrastructure (embedded sensors etc)

…………………………….

Autonomous / driverless vehicles ……………………………………………..

Decision Support Tools

Automatic data collection, analysis & interpretation

…………….

Common data structures …………………………….

Integrated Infrastructure / vehicle Systems

……………………

Documentation / Guidelines

Metrics, Operating protocols,Specifications, Standard, Certifications etc

………………………………………………….

2025 2035 20452020

Key: R&D ; Demo ; Legislation ; Implementation

Page 14: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

High Capacity R&D – Route to 2050

14

O

Infrastructure & Rolling Stock

ERTMS L3 & higher ……………………….

Homogeneity – design, operations ……………………………..

Closer running of trains …………………………….

Higher levels of GoA …………………………………

Decision Support Tools

Operations – modelling & simulation

…………….

Whole system modelling …………………………….

Documentation / Guidelines

Metrics, Operating protocols,Specifications, Standard, Certifications etc

………………………………………………….

2025 2035 20452020

Key: R&D ; Demo ; Legislation ; Implementation

Page 15: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Passenger/Freight - Rail / Road

15

0

100

200

300

400

500

600

700

800

900

1000

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Scale

fo

r o

the

r m

od

es

Passen

ge

r C

ars

scale

EU-28 Performance by Mode for Passenger Transport1995 - 2013

billion passenger-kilometres

Passenger Cars Buses & Coaches AirRailways Powered 2-wheelers Tram & MetroSea

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

EU28 Performance by Mode for Freight Transport1995 - 2014

billion tonne-kilometres

Road Sea Rail Inland Waterway Oil Pipeline Air

Page 16: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Challenges – Technologies & Time

16Page ▪ 16

Autonomous vehiclesales > 21M p.a

Can rail overcome challenges from emerging automotive and aerospace technologies & offer better/more rapidly achievable

solutions?

ERTMS Level 2

First Major RouteERTMS Level 3 ?

Convoy Operation

2020 2030 2040 2050

Rail

Road

Air

Now

Rlat/iTBFM/Intelligent ApproachRollout

Trucks platoons Adoption rate(1%)

Connected & Autonomous Trains

??>>

Commercially available (50% adoption)

Increased Capacity, Reduced delays/cancellations, fuel burn & CO2 emissions Rlat Research 2010; Trials (2015); Implementation (UK-Canada: Nov 2016); lateral separation from 1 degree (60 NM) to ½ degree (30 NM)iTBFM: International Time Based Flow Management to optimise runway utilisation; reduced delay minutes in adverse weather conditions: 15 days of strong headwinds in Nov 2015, 25000 delay minutes saved

Roll-out of the European Rail Traffic Management System (ERTMS) has been ‘too slow’Target: Entire network to be equipped by 20304100 kilometres or less than two per cent of the EU rail network has been equipped by the end of 2016

Page 17: Capacity for RailC4R –Paving the way for the 2030/50 Railway 9 • Infrastructure • Modular Track Design • Switches & Crossings • Rolling Stock –Guidelines for development

Thank you for your kind attention

Vijay RamdasSP5 Task Leader

TRL [email protected]

2050 Railway

From

To

Vijay RamdasSP5 Task Leader