builders bulletininmates, including programs for education and job training. ... this bill would...

44
MARCH 05, 2018 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business Bidding This Week... Builders Bulletin CLEAN USED BRICK - PAVERS CARMEL STONE GRANITE ROCKS FIREWOOD TIMBERS CYPRESS ADOBE BLOCKS FIXTURES APPLIANCES CABINETS BARN WOOD NEW & USED LUMBER METAL GATES CONSTRUCTION & BUILDING SUPPLIES ROOF TILES We’re Not The Best Because We’re the Oldest… We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place Salinas, CA 93901 Salinas (831) 422-3667 Monterey (831) 375-3667 Fax (831) 422-1061 Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road Sunnyvale, CA 94089 Tel (408) 734-8010 Fax (408) 734-3728 Lic. #215098 3/6/18 Palo Alto Peers Park Dog Park 3:00 PM 3/6/18 San Jose Rfq Boiler Room Floor Sealant 3:00 PM 3/6/18 Campbell John D. Morgan Park Improvements Project (18-Qq) 3:00 PM 3/6/18 Davenport Davenport Communication Tower Installation Project 2:30 PM 3/6/18 King City Rfq - 2018 Citywide Street Re-Striping 2:00 PM 3/6/18 * Santa Clara Glue Lam Beam Repair & Exterior Painting Dmv 2:00 PM 3/7/18 * San Luis Obispo San Luis Obispo Campus - Track Improvements 10:00 AM 3/7/18 San Jose Piedmont Middle School & Ruskin Elementary School Flexible Instructional Space (Fis) Alterations - Berryessa Union School District 2:00 PM 3/7/18 Mountain View 2016-17 Concrete Sidewalk & Curb Repairs 2:00 PM 3/7/18 Milpitas Rfq Elmwood Overhead Door Replacement 3:00 PM 3/7/18 Watsonville Watsonville Health Center, 1430 Freedom Boulevard, Suite C Remodel Project 2:30 PM 3/7/18 Monterey North Fremont Bike And Pedestrian Access And Safety Improvements 2:00 PM 3/7/18 San Jose Jc Penney Interior Renovation Escalator- Eastridge Mall 12:00 PM 3/7/18 Monterey Safe Place Shelter - Phase 2 11:00 AM 3/7/18 Monterey County New Septic System & Septic Repairs At Elkhorn Slough National Estuarine Research Reserve 2:00 PM 3/8/18 Monterey Dot 05-1c9904 Contrasting Surface Treatment, Guardrail And Widened Shoulder Area 2:00 PM 3/8/18 Seaside Seaside High School Increment 2 Modular Classrooms 2:00 PM 3/8/18 Los Altos Montclaire Elementary School Modernization Phase 3 And Site Work 1:00 PM 3/8/18 San Luis Obispo Spanos Stadium Sound System Replacement 3:00 PM 3/8/18 San Luis Obispo Health - Behavioral Health - Slo - Construct Phf Sallyport Entry 3:00 PM 3/8/18 San Jose 8786-Sanitary Sewer Condition Assessment 2017-2018 Package 1 3:00 PM 3/8/18 San Jose 8756-2018 Arterial Resurfacing Project 3:00 PM 3/8/18 Los Gatos Annual Street Repair & Resurfacing 2:00 PM 3/8/18 Los Gatos Annual Curb, Gutter, & Sidewalk Maintenance (Ramp Upgrades) & Croswalk Improvements 2:00 PM 3/8/18 Santa Cruz Hvac Maintenance For Various Sites For Information Services Department 2:00 PM 3/8/18 Monterey County New Standby Generator Elkhorn Slough National Estuarine Research Reserve 2:00 PM 3/9/18 San Luis Obispo Bellevue Santa Fe Charter School Phase 1 - New Construction & Portables 2:00 PM 3/9/18 San Luis Obispo Bellevue Santa Fe Charter School Phase 2 - Modernization 2:00 PM 3/9/18 San Luis Obispo Rfq - Campus Landscape Master Plan 3:00 PM 3/9/18 Big Sur Pfeiffer Big Sur Hazard Tree Removal 3:00 PM 3/9/18 Sunnyvale Rfp Professional Design Services Associated With Golf Buildings Renovations At Sunken Gardens Golf Course 3:00 PM 3/9/18 Gilroy Henry Coe State Park Kickham Ranch Water System Improvements 3:00 PM 3/9/18 San Luis Obispo Sslocsd Digester No. 1 Rehabilitation Project 2:00 PM

Upload: others

Post on 11-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

MARCH 05, 2018

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

Bidding This Week...

Builders Bulletin

CLEAN USED BRICK - PAVERS CARMEL STONE GRANITE ROCKS

FIREWOOD TIMBERS CYPRESS

ADOBE BLOCKS

FIXTURES APPLIANCES

CABINETS

BARN WOOD NEW & USED

LUMBER METAL GATES

CONSTRUCTION & BUILDING

SUPPLIES ROOF TILES

“We’re Not The Best Because We’re the Oldest…

We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098

Bid Time Project Name Location Bid Date

3/6/18 Palo Alto Peers Park Dog Park 3:00 PM

3/6/18 San Jose Rfq Boiler Room Floor Sealant 3:00 PM

3/6/18 Campbell John D. Morgan Park Improvements Project (18-Qq) 3:00 PM

3/6/18 Davenport Davenport Communication Tower Installation Project 2:30 PM

3/6/18 King City Rfq - 2018 Citywide Street Re-Striping 2:00 PM

3/6/18 * Santa Clara Glue Lam Beam Repair & Exterior Painting Dmv 2:00 PM

3/7/18 * San Luis Obispo San Luis Obispo Campus - Track Improvements 10:00 AM

3/7/18 San Jose Piedmont Middle School & Ruskin Elementary School Flexible Instructional Space (Fis) Alterations - Berryessa Union School District

2:00 PM

3/7/18 Mountain View 2016-17 Concrete Sidewalk & Curb Repairs 2:00 PM

3/7/18 Milpitas Rfq Elmwood Overhead Door Replacement 3:00 PM

3/7/18 Watsonville Watsonville Health Center, 1430 Freedom Boulevard, Suite C Remodel Project

2:30 PM

3/7/18 Monterey North Fremont Bike And Pedestrian Access And Safety Improvements 2:00 PM

3/7/18 San Jose Jc Penney Interior Renovation Escalator- Eastridge Mall 12:00 PM

3/7/18 Monterey Safe Place Shelter - Phase 2 11:00 AM

3/7/18 Monterey County New Septic System & Septic Repairs At Elkhorn Slough National Estuarine Research Reserve

2:00 PM

3/8/18 Monterey Dot 05-1c9904 Contrasting Surface Treatment, Guardrail And Widened Shoulder Area

2:00 PM

3/8/18 Seaside Seaside High School Increment 2 Modular Classrooms 2:00 PM

3/8/18 Los Altos Montclaire Elementary School Modernization Phase 3 And Site Work 1:00 PM

3/8/18 San Luis Obispo Spanos Stadium Sound System Replacement 3:00 PM

3/8/18 San Luis Obispo Health - Behavioral Health - Slo - Construct Phf Sallyport Entry 3:00 PM

3/8/18 San Jose 8786-Sanitary Sewer Condition Assessment 2017-2018 Package 1 3:00 PM

3/8/18 San Jose 8756-2018 Arterial Resurfacing Project 3:00 PM

3/8/18 Los Gatos Annual Street Repair & Resurfacing 2:00 PM

3/8/18 Los Gatos Annual Curb, Gutter, & Sidewalk Maintenance (Ramp Upgrades) & Croswalk Improvements

2:00 PM

3/8/18 Santa Cruz Hvac Maintenance For Various Sites For Information Services Department

2:00 PM

3/8/18 Monterey County New Standby Generator Elkhorn Slough National Estuarine Research Reserve

2:00 PM

3/9/18 San Luis Obispo Bellevue Santa Fe Charter School Phase 1 - New Construction & Portables

2:00 PM

3/9/18 San Luis Obispo Bellevue Santa Fe Charter School Phase 2 - Modernization 2:00 PM

3/9/18 San Luis Obispo Rfq - Campus Landscape Master Plan 3:00 PM

3/9/18 Big Sur Pfeiffer Big Sur Hazard Tree Removal 3:00 PM NEW

3/9/18 Sunnyvale Rfp Professional Design Services Associated With Golf Buildings Renovations At Sunken Gardens Golf Course

3:00 PM

3/9/18 Gilroy Henry Coe State Park Kickham Ranch Water System Improvements 3:00 PM

3/9/18 San Luis Obispo Sslocsd Digester No. 1 Rehabilitation Project 2:00 PM

Page 2: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Central Coast Builders Association

242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey

(831) 758-6203 Fax

[email protected]

Board of Directors

President: Clifford Fasnacht, Dougherty Pump & Drill Brian Kenny, Hayward Lumber

Vice President: Kevin McIntosh, Blach Constuction Anka Hepper, WM. B Saleh Painting

Secretary/Treasurer: Kate Rueter, AON Risk Services

Past President: Kristine O’Dell, Absolute HR Edwin Sargenti, PSC

Gabriel Torres, CCRB/CHISPA

Miguel Bustos, MIG Electric

CCBA STAFFChristie Cromeenes

Executive Director

Amanda Young FInance Shelly Verba SR. Planroom Coordinator

Rikki Montejano Public Relations Coordinator

DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of

all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that

you do not share this information

Page 3: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

02/28/2018 BUSINESS UPDATES SB 825 State prisons: preapprenticeship program SB 825, as amended, Beall. State prisons: preapprenticeship program. (1) Existing law establishes a system of state prisons under the jurisdiction of the Department of Corrections and Rehabilitation. Existing law authorizes the department to institute various programs for inmates, including programs for education and job training. This bill would state the intent of the Legislature to enact legislation that would create a preapprenticeship program in the California state prisons. require the department to develop guidelines for inmate participation in preapprenticeship training programs, as specified. The bill would also require the department to coordinate with local state-approved apprenticeship programs and local building trade councils so that inmates who complete an inmate preapprenticeship program have a pathway to employment upon release. (2) Existing law authorizes the Department of General Services, the Department of Corrections and Rehabilitation, and various local agencies to use the design-build procurement process for specified public works under different laws. This bill would authorize the Department of Corrections and Rehabilitation to award contracts for construction projects over $500,000 using the design-build contracting process or construction manager at-risk contracts, as defined, if, on or before September 30,b2019, the department enters into a 10-year community workforce agreement with the State Building and Construction Trades Council of California that applies to all construction contracts over $500,000. The bill would require the community workforce agreement to include provisions to encourage work opportunities for previously incarcerated individuals who have completed an inmate preapprenticeship program and that support hiring opportunities for women and military service veterans. The bill would authorize the Secretary of the Department of Corrections and Rehabilitation to renew or modify the agreement for 5-year terms. AB 3222 Public works: prevailing wages AB 3222, as introduced, O'Donnell. Public works: prevailing wages. Existing law defines “public works,” for the purposes of regulating public works contracts, as, among other things, construction, alteration, demolition, installation, or repair work done under contract and paid for, in whole or in part, out of public funds. Existing law further requires that, except as specified, not less than the general prevailing rate of per diem wages be paid to workers employed on public works and imposes misdemeanor penalties for a willful violation of this requirement. This bill would expand the definition of “public works,” for the purposes of provisions relating to the prevailing rate of per diem wages, to also include any construction, alteration, demolition, installation, or repair work done under private contract on a project for a charter school, as defined, when the project is paid for, in whole or in part, with the proceeds of conduit revenue bonds, as defined, that were issued on or after January 1, 2019. Because the willful violation of prevailing wage requirements when engaged in these public works projects would result in the imposition of misdemeanor penalties, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.

Page 4: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Would you like to learn how to utilize our Online Planroom from one of the experts?

BRING a lunch, and learn how to get the most bang for your buck during this lunchtime lesson in our classroom on our new 60” monitor!

Join us for this COMPLIMENTARY Class Bring your own

March 7, 2018

11:30am—1:00pm

Special ONE TIME discount will be offered to any members who are not yet signed up for the Online Planroom! Don’t miss out!

Please Contact our office at (831) 758—1624 / [email protected] if you’d like to register for this class OR fill out this form and send it over to [email protected] or fax to (831) 758—6203

Company Name __________________________________ Phone _________________ Email _____________________________________________

Names of Attendees

_____________________________________________

_____________________________________________

_____________________________________________

_____________________________________________

_____________________________________________

*** Lunch will NOT be provided***

** Parking is limited, please carpool if possible!**

242 E. Romie Lane, Salinas, CA 93901

Page 5: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Respirable Crystalline Silica — New OSHA Rule 

Effective June 23, 2017   Establish and implement a written exposure control plan  Designate a competent person to implement the written exposure control plan  Restrict housekeeping practices that expose workers to silica  Offer medical exams  Train workers on work operations that result in silica exposure and ways to limit exposure  Keep records of workers’ silica exposure and medical exams 

Central Coast Builders Association 

242 E Romie Lane Salinas, CA   93901 Phone: 831‐758‐1624 www.ccbabuilds.com  

Training for supervisors and competent persons. A  focused class on the new requirements and how to establish and implement a written exposure control plan. Certificate of training will be issued. 

Wednesday, March 21st  English 9:00am—12:00pm  Spanish 1:00pm—4:00pm Cost: Members: $45.00 Non‐Members: $85.00 

RSVP:  [email protected] Or 831‐758‐1624 

Page 6: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

APRIL 18, 2018

Page 7: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Learn The Law!

Mechanic L iens

S top Not ices & Bond C laims Construction liens, stop notices and bonds are some of the murkiest areas of law for owners, contractors, sub contractors and suppliers. Handling construction   payment disputes can be a turbulent process, but armed with the necessary legal knowledge you can successfully position your company to collect the amounts due.  

Attend this seminar to learn strategies for tackling lien, stop notices and bond  

issues in private and public projects! 

May 9, 2018

12pm—1pm

Bring your lunch!

IT ’ S FREE!!

What you will learn: How to preserve your rights to file stop notices & make claim on payment bonds. How to prepare the liens, stop notices and bond claims. Where to file the liens. How to serve stop notices and bond claims. What you need to do once you are paid. The next steps to take if the lien/stop notice or bond claim does not result in payment.  

About your instructor: Anne K. Secker Anne is a Principle at Noland, Hammerly, Etienne & Hoss. A significant part of her practice includes representing contractors, subcontractors, material suppliers, owners, architects, engineers, and de‐sign professionals in construction‐related matters.  

242 E. Romie Lane        Salinas, CA 93901          

                  [email protected]     831‐758‐1624 

Page 8: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Wed

nesd

ay, M

ay 2

3, 2

018

1:00

PM

- 4:

00 P

M

Employers have a legal obligation to establish an effective injury and illness prevention program to promote health and safety in the workplace. Complying with safe and healthful work practices, includes first aid kits easily accessible to each work area, and training of at least one employee on each shift currently qualified to render first aid. Contractors are required, by law, to have an employee certified in CPR/First Aid on each job site. Sessions have limited space so register early. This course is designed to provide skills in CPR, First Aid & Automated External Defibrillation (AED). Students will learn adult CPR, rescue breathing and choke saving. Upon successful completion, students will receive the American Red Cross CPR & First Aid Certificate. Both CPR & First Aid Certificates are valid for 2 Years.

CPR & First Aid Training American Red Cross Certified

Cost: $70 members $85 non-members

Bi-Lingual Instructor: PEDRO ALFARO Mr. Alfaro has a Bachelor of Science degree in Nutrition and has been a Health Educator for over 20 years. He volunteered for the Los Angeles American Red Cross Chapter for CPR/First Aid for over 3 years. He was with the Monterey County Health Department for 12 years.

Attendees:_______________________________________________________________________________________________ Company:___________________________________________________Contact:_____________________________________ Email_______________________________________________________Phone:______________________________________

Paying by: □ □ Check: □ Total:__________________________ Card Card #_________________________________________________________Expiration Date________________________

Class will be held at 242 E. ROMIE LANE, SALINAS

PLEASE MAIL, FAX OR EMAIL FORM TO: Central Coast Builders Association

242 E. Romie Lane Salinas, Ca 93901

Phone 831-758-1624 Fax 831-758-6203 Email: [email protected]

***fee will be applied for a “no show” ONLY 15 SPOTS AVAILABLE! RESERVE YOUR SPOT NOW!

Certified CPR/First Aid Training Sponsored by the Central Coast Builders Association

Page 9: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidWeekly Projects Bidding 3/1/2018

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Plan Issuer:

King City

The City of King is requesting Formal Quotations to provide citywide street re-striping.Unit costs provided in the bid document below are for the fiscal year 2017/18. All work is to be scheduled and completed before June15, 2018.

Questions: Fernando SuarezEmail: [email protected]

18-00489

0

2:00 PM3/6/18

Addenda:RFQ - 2018 CITYWIDE STREET RE-STRIPING

2018-003

City of King City 831-385-3281 831-386-6887

Bidders:

Plan Issuer:

Monterey $7,554,531

In general, the work consists of, but is not limited to: demolition of existing improvements, construction of Class IV bike lanes, sidewalk,median modifications, shared bicycle/bus lane, ADA upgrades, signal modifications, and conforming new improvements to existing siteconditions onNorth Fremont Boulevard.

Project Contact: Andrea RennyEmail: [email protected]

2/6 @ 10am- Council Chambers, City Hall, Monterey

18-00233

5

2:00 PM3/7/18

Addenda:NORTH FREMONT BIKE AND PEDESTRIAN ACCESS AND SAFETY IMPROVEMENTS

Prebid Conf:

City of Monterey-Traffic Engineering Division [email protected] 831-646-3473 831-646-3474

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 925-621-5799Office: 925-621-5703Teichert Construction

Bidders:

Plan Issuer:

Monterey $250,000

BID LOCATION: CITY HALL OF MONTEREY, 580 PACIFIC ST., MONTEREY CA.

TENANT IMPROVEMENTRemodel downstairs bathroom for ADA compliance, including enlarging door, remodel upstairs and downstairs kitchen with newcounter-tops, sink and faucets, and new exhaust hood at first floor with new cabinet, replace stair handrails at two exit stairs, oneinterior and one exterior, replace (2) two windows with anodized flush fin retrofit casement windows, remove asbestos containing itemsas noted in report by S-Tech Consulting dated November 28th, 2017, which concluded that all demolition is to be performed undercontainment, remodel and enlarge upstairs bathroom and add a shower, install a monitored fire alarm system, install fire sprinklersystem, remove existing chimney and match finishes as close as possible, remove and replace existing ceiling systems as needed toinstall fire sprinkler systems.Trades Requesting bids for: Demolition/Abatement - Rough Finish Carpentry - Drywall - Acoustical Ceiling - Fry Toilet Accessories -Counter Tops - Doors and Hardware - Glazing - Painting - Flooring - Plumbing - Electrical - Fire Sprinkler Systems

This project is federally funded by the Community Development Block Grant Program.PREVAILING WAGEDVBE

Construction Manager: Murrer ConstructionPhone: 831-521-0131Plans & Specs available for review at 1219 Forest Ave. Ste H, Pacific Grove, CA

MAND 2/14 @ 11am- site

18-00284

1

11:00 AM3/7/18

Addenda:SAFE PLACE SHELTER - PHASE 2

Prebid Conf:

Murrer Construction, Inc. [email protected] 831-521-0131 831-372-1644

General Contractor Fax: 831-275-4188Office: 831-275-2103California Premier Restoration

Deadline for submission of materials for our Bulletin is end of day Wednesday each week.

Page 10: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To Bid Name Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Monterey County $20,000

New septic sewer system, repair an existing septic sewer system and other miscellaneous work.

Project Contact: Scott Murata 916-445-3765Email: [email protected]

MAND 2/21 at 2PM

18-00298

0

2:00 PM3/7/18

Addenda:NEW SEPTIC SYSTEM & SEPTIC REPAIRS AT ELKHORN SLOUGH NATIONAL ESTUARINE RESEARCHRESERVE

P1799040

Prebid Conf:

State of CA Dept of Fish & Game 916-323-1587

Bidders:

Plan Issuer:

Seaside

Project consists of: Site Demo; Concrete; Structural Steel-General; Cold-Formed Metal Framing & Joists; Rough Carpentry; FinishCarpentry; Custom Casework; Thermal & Moisture Protection; Doors and Windows; Cement Plastering; Gypsum Board; Specialties;Roller Window Shades; Entrance Floor Mats; Prefabricated Modula Building; Mechanical General; Plumbing; HVAC; Electrical;Structured Cabling; Fire Alarm System Existing; Earthwork; Exterior Improvements; Utilities.

PREVAILING WAGE

Project Contact: Tom MillmanEmail: [email protected]

MAND 2/8 @ 10:30am- site

18-00213

0

2:00 PM3/8/18

Addenda:SEASIDE HIGH SCHOOL INCREMENT 2 MODULAR CLASSROOMS

Prebid Conf:

RGM & Associates [email protected] 925-671-7717 925-671-7788

Concrete/Masonry Contractor Office: 831-902-9773Evcon Dba San Benito Supply

Electrical Contractor Office: 831-524-8507Mig Electric

General Contractor Fax: 209-334-4726Office: 209-334-4637Meehleis Modular Buildings, Inc.

General Contractor Fax: 831-274-2519Office: 831-274-2518Silcon, Inc./Silverie Properties

Plumbing & Piping Contractor Fax: 831-821-9249Office: 831-821-9249Jd's Plumbing

Plan Issuer:

Monterey County $45,000

Install a new 25 kV generator, propane storage tank, gas and electrical connections, pressure testing gas lines, testing genset andtransfer switches and miscellaneous work.

Project Contact: Scott Murata 916-445-3765Email: [email protected]

MAND 2/21 & 2/22 at 10AM

18-00296

2

2:00 PM3/8/18

Addenda:NEW STANDBY GENERATOR ELKHORN SLOUGH NATIONAL ESTUARINE RESEARCH RESERVE

P1799080

Prebid Conf:

State of CA Dept of Fish & Game 916-323-1587

Bidders:

Monterey $2,600,000

Contrasting Surface Treatment, Guardrail and widened shoulder area In Monterey County Near Monterey At Various Locations FromCarmel Valley Road To 0.3 Mile North Of Fremont Boulevard And On Route 68 At 0.1 Mile East Of Route 1The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12.

18-00082

1

2:00 PM3/8/18

Addenda:DOT 05-1C9904 CONTRASTING SURFACE TREATMENT, GUARDRAIL AND WIDENED SHOULDERAREA

05-Mon-1,68-72.9/R81.0,R4.0

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Page 11: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To Bid Name Bid Date Time Contract # EstimateLocationOPR#

Big Sur $25,000 $35,000

The contractor shall furnish all labor, materials, equipment, tools and all applicable taxes and expenses and equipment necessary tocut down of specific hazardous trees, including stump grinding and shrub chipping, in designated areas of Pfeiffer Big Sur State Park,Big Sur, CA.

PREVAILING WAGE

Project Contact: Rima TonkunasEmail: [email protected]

18-00552

0

3:00 PM3/9/18

Addenda:PFEIFFER BIG SUR HAZARD TREE REMOVAL

C1764032 to

NEW

Bidders:

Pacific Grove $450,000 $602,628

Furnish labor, materials, tools and equipment necessary to: repair wooden decks, balconies and stairs at the John Carl Warnecke-designed Surf & Sand Complex and View Crescent Complex located at the Asilomar Conference Grounds.

Project Contact: Rima TonkunasEmail: [email protected]

MAND 2/13 @ 9:30am- 800 Asilomar Blvd, Pacific Grove

18-00276

0

3:00 PM3/13/18

Addenda:ASILOMAR DECK REPAIRS - WARNECKE BUILDING

C1764021 to

Prebid Conf:

General Contractor Fax: 831-372-1644Office: 831-521-0131Murrer Construction, Inc.

Bidders:

Plan Issuer:

Greenfield

KZ Miller Construction is seeking all sub trades for the Carl's Jr in Greenfield, CA.

Questions: Leah Petzen [email protected] or Marty Miller [email protected]

18-00531

0

4:00 PM3/13/18

Addenda:NEW GROUND UP CARL’S JR

KZ Miller Construction 619-587-4560 619-584-2850

NEW

General Contractor Office: 000-000-0000!!!There May Be Other Gc's Bidding ThisProject That We Are Unaware Of

General Contractor Fax: 619-584-2850Office: 619-587-4560Kz Miller Construction

Bidders:

Plan Issuer:

Salinas

PERFORMING ARTS BUILDING ADDITION, AND REMOVAL AND UPGRADE OF (E) FINISHES AS DESCRIBED IN THECONSTRUCTION DOCUMENTS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING:PROVIDE TICKET-BOOTHPROVIDE SUN SHADE (MEMBRANE STRUCTURE) AT (E) COURTYARDEXTERIOR BUILDING UPGRADES INCLUDING, BUT NOT LIMITED TO:- REMOVE (E) NON-STRUCTURAL FACADE PANELS AND PROVIDE ALUMINUM FACADE PANELS- REMOVE (E) ENTRY STORE-FRONT AND PROVIDE STORE-FRONT- RENOVATION OF NON-ADA RESTROOMS INCLUDING FINISHES AND FIXTURES.- REMOVE (E) FLOOR FINISHES AT ENTRANCE LOBBY AND REPLACE IN KIND.

Project Contact: Joseph ReyesEmail: [email protected]

MAND 3/2 @ 10am- site

18-00400

0

2:00 PM3/16/18

Addenda:BUILDING K REMODEL - MAIN CAMPUS

Prebid Conf:

Hartnell College - Planning & Construciton [email protected]

831-755-6950 831-759-6024

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Page 12: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Greenfield

The project will consist of but not be limited to the sitework, utilities and coordination of the installation of 6 temporary classrooms atGreenfield High School over the 2018 summer break.

PREVAILING WAGE

Questions: [email protected]

MAND 2/28 & 3/7 @ 10am- site

18-00482

0

2:00 PM3/21/18

Addenda:GREENFIELD HIGH SCHOOL 6 ADDED CLASSROOMS

Prebid Conf:

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

Soledad $500,000

The work includes the construction of curb bulbouts at the intersections of Walker Drive and Metz Road, Belle Street and Metz Road,and just west of Third Street and Metz Road. The construction of the curb bulbouts will include replacement/construction of concretecurb and gutter, valley gutter, sidewalk, and curb ramps. In addition, the work will also include asphalt concrete repair, crack filling,slurry seal, and roadway striping.

PREVAILING WAGE

Questions: Jason Watts at 559-244-3123

18-00542

0

11:00 AM3/21/18

Addenda:METZ ROAD TRAFFIC CALMINGNEW

Plan Issuer:

Monterey $1,500,000

In general, the work consists of, but is not limited to, the furnishing of all labor, materials, equipment, and services necessary for, andreasonably incidental to, providing and installing complete fire protection systems, and other work as shown or indicated in thedrawings and specifications.

Project Contact: Thomas KormanEmail: [email protected]

3/12 @ 1:30pm- 250 Figueroa St., Monterey

18-00521

0

2:00 PM3/27/18

Addenda:WHARF II FIRE PROTECTION SYSTEM REPLACEMENT

Prebid Conf:

City of Monterey 831-646-3997 831-646-5686

NEW

Monterey County $3,350,000

Polyester concrete overlay, Methacrylate deck seal, joint seal In Monterey County At Various Locations From Willow Creek Bridge ToGarrapata Creek BridgeThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12, C-61D06.

18-00122

0

2:00 PM3/28/18

Addenda:DOT 05-1H6604 POLYESTER CONCRETE OVERLAY, METHACRYLATE DECK SEAL, JOINT SEAL

05-Mon-1-11.7/63.0

NEW

Page 13: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Salinas

ALISAL IMPROVEMENTS:GENERAL PROJECT SCOPE INVOLVES INSTALLATION OF OVERHANGING NETTING AT THE BASEBALL BACKSTOPS.IMPROVEMENTS SHALL ALSO INCLUDE REMOVAL OF EXISTING FENCE, INSTALLATION OF NEW BACKSTOP EXTENSION,FENCING AND NECESSARY REPAIRS TO EXISTING CONCRETE.EVERETT ALVAREZ IMPROVEMENTS:GENERAL PROJECT SCOPE INVOLVES INSTALLATION OF OVERHANGING NETTING AT THE BASEBALL BACKSTOPS.IMPROVEMENTS SHALL ALSO INCLUDE INSTALLATION OF NEW NETTING POSTS AND NECESSARY REPAIRS TO EXISTINGCONCRETE.

PREVAILING WAGE

Project Contact: Liz OrtizEmail: [email protected]

MAND 3/12 @ 10am- 777 Williams Road, Salinas

18-00397

0

2:00 PM4/4/18

Addenda:ALISAL HIGH AND EVERETT ALVAREZ HIGH BASEBALL BACKSTOP NETTING

18002

Prebid Conf:

San Benito County

Plan Issuer:

Hollister

The City of Hollister’s Development Services Department is currently seeking to retain an engineering firm for on-call services.Anticipated services are for project design, and construction activities and may include but are not limited to: General Consulting; PeerReview; Civil Engineering; Planning, Grant Writing, Staff Augmentation, Master plan Preparation, Special Studies, Traffic Engineering,Environmental CEQA/NEPA assistance, Environmental reconnaissance and other tasks associated with Engineering and Planningdesign and construction support. These services will provide preliminary engineering, environmental, engineering design andconstruction support services for various City Capital Improvements Projects (CIP’s).

RFP/RFQ Contact: Bryan SwansonTel:(831) 636-4340 x21

18-00520

0

12:00 PM3/23/18

Addenda:ON-CALL CONSULTANTS FOR CIVIL ENGINEERING AND PROJECT MANAGEMENT SERVICES

City of Hollister 831-636-4340 831-636-4913

NEW

San Luis Obispo County

Plan Issuer:

San Luis Obispo

1) Removal and replacement of existing damaged section of track and~ 2) Miscellaneous Minor Track Repairs; 3) Resurfacing and re-striping the entire track.

PREVAILING WAGE

Project Contact: Kathi RobinsonEmail: [email protected]

2/7 @ 9am- Track Parking Lot

18-00270

2

10:00 AM3/7/18

Addenda:SAN LUIS OBISPO CAMPUS - TRACK IMPROVEMENTS

Prebid Conf:

Blach Construction [email protected] 408-869-8366

Bidders:

Plan Issuer:

San Luis Obispo $111,250

CONSTRUCTING A NEW 262 SQUARE FOOT SALLYPORT BUILDING, AND ASSOCIATED WORK AS SHOWN IN THE PLANSAND AS SPECIFIED IN THE CONTRACT DOCUMENTS.

Bid Contact: JR Beard(805) [email protected]

2/22 @ 9am- site

18-00392

1

3:00 PM3/8/18

Addenda:HEALTH - BEHAVIORAL HEALTH - SLO - CONSTRUCT PHF SALLYPORT ENTRY

320079

Prebid Conf:

County of San Luis Obispo [email protected] 805-781-4073

Testing & Inspection Services Fax: 661-393-9002Office: 661-393-9001Dc Inspections, Inc

Page 14: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo

In general, the work consists of, but is not limited to, providing all labor, products, equipment and services required for the SpanosStadium Speaker Replacement, on the California Polytechnic State University campus in San Luis Obispo, California.

*** CONTACT THE CENTRAL COAST BUILDERS EXCHANGE FOR THE AS-BUILT DRAWINGS.

Bid Contact: Jeanette Paolucci(805) [email protected]

2/22 @ 10am- Building 70 Room 109

18-00460

2

3:00 PM3/8/18

Addenda:SPANOS STADIUM SOUND SYSTEM REPLACEMENT

MIN17-SR5868

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

Plan Issuer:

San Luis Obispo

Removal of the existing interior coating, resurfacing the interior walls, repair of an active leak on the interior (prior to coating),preparation of surfaces to be coated per specification & manufacurer's recommendations, application of new interior coating, spotrepair of portions of the exterior coating, spot repair of exterior concrete, replacement of all interior fasteners with 316 stainless steel,disassembly, surface preparation, coating, and reassembly of digester water seal.

PREVAILING WAGE

MAND 2/21 & 2/28 @ 2 pm @ 1600 Aloha Place, Oceano

18-00325

1

2:00 PM3/9/18

Addenda:SSLOCSD DIGESTER NO. 1 REHABILITATION PROJECT

Prebid Conf:

South San Luis Obispo County Sanitation District 805-489-6666

Plan Issuer:

San Luis Obispo

California Polytechnic State University, San Luis Obispo (University), a campus of the California State University (CSU) system, isrequesting qualification statements from firms (Service Provider) that provide professional planning and design services with verifiableexperience developing Landscape Master Plans for higher education institutions.In general, the scope of services, as outlined in Section 4, is to develop a Campus Landscape Master Plan.

Bid Contact: Chris Overby(805) [email protected]

2/20 @ 9am- Building 70, Room 109, 1 Grand Ave, San Luis Obispo

18-00365

1

3:00 PM3/9/18

Addenda:RFQ - CAMPUS LANDSCAPE MASTER PLAN

2000014378

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

Bidders:

Plan Issuer:

San Luis Obispo $2,400,000

Phase 1: New Construction- Removal of Four (4) existing relocatable classrooms and One (1) relocatable restroom building includingexisting utilities. Site prep for Three (3) New Portable Classroom Buildings and One (1) Restroom Building. Site prep includes fill toraise the finish floor to the new buildings above the base flood elevation. Coordination with modular manufacturer who will constructbuildings, foundations and install the buildings. Replacement of the Existing Fire Alarm System Campus-wide. Repowering the exitingcampus with new transformer and new main switchgear.• Demolition, pipe and tube railings, joint sealants, signage, electrical, fire alarm and detection systems, earthwork, site clearing,grading, excavation, trenching, fill, landscaping and irrigation, aggregate base course, asphalt paving, parking bumpers, pavementmarkings, tactile warning surfacing, utilities: water line, fire line, sanitary sewer, storm drainage, electrical and low-voltage.

Project Contact: Will FerraroPhone: (805) 466-1038

2/20 @ 3pm- site

18-00430

0

2:00 PM3/9/18

Addenda:BELLEVUE SANTA FE CHARTER SCHOOL PHASE 1 - NEW CONSTRUCTION & PORTABLES

Prebid Conf:

Wysong Construction [email protected] 805-466-1038 805-466-5176

Testing & Inspection Services Fax: 661-393-9002Office: 661-393-9001Dc Inspections, Inc

Page 15: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Luis Obispo $2,400,000

Phase 2: Modernization- Modernization of Three (3) existing buildings: A-Library, Multipurpose Room, Two (2) Classrooms andRestroom (#10); B & C. Interior & Exterior finishes, new door hardware, new casework and reconfigured restroom. Reconstruction ofpaved walkways for Accessible Path of Travel and new modular classroom ramps (B&C). Additive Alternates: #1- All work at StaffToilet (#12), #2- Replace roof SSMR B&C, #3- Interior & Exterior finishes on Building B and #4- Concrete Ball Wall (S001).• Demolition, Abatement, rebar, concrete polishing, pipe and tube railings, rough and finish carpentry, casework, solid surfaces,weather barriers, fiber cement siding, 80 mil Single Ply PVC roofing (A), sheet metal flashing and trim, hardware, gypsum board,ceramic tile, carpet, sheet vinyl acoustical ceilings and tile, tack board, markerboards, painting, signage, toilet compartments andaccessories, assistive listening equipment, plumbing, electrical, communications, aggregatebase, asphalt paving, tactile warning surfaces, modular ramps, landscaping and irrigation.

Project Contact: Will FerraroPhone: (805) 466-1038

2/20 @ 3pm- site

18-00431

0

2:00 PM3/9/18

Addenda:BELLEVUE SANTA FE CHARTER SCHOOL PHASE 2 - MODERNIZATION

Prebid Conf:

Wysong Construction [email protected] 805-466-1038 805-466-5176

Asbestos Abatement /Hazardous Materials Contract

Fax: 805-222-2372Office: 661-203-5924Alliance Environmental Group

Testing & Inspection Services Fax: 661-393-9002Office: 661-393-9001Dc Inspections, Inc

Plan Issuer:

Avila Beach

Port San Luis Harbor District (District) is requesting sealed bids to repave approximately 4,300 square feet and seal coat an additional22,500 square feet of the Harford Landing parking lot in Avila Beach, CA.

Project Contact: Chris MunsonEmail: [email protected]

MAND 3/5 @ 1pm- site

18-00413

0

1:30 PM3/13/18

Addenda:HARFORD LANDING PARKING LOT REPAVING AND SEAL COAT

Prebid Conf:

Port San Luis Harbor District 805-595-5400 805-595-5404

Plan Issuer:

Avila Beach

Port San Luis Harbor District is requesting sealed bids to provide hot asphalt based crack fill and seal coating for Lighthouse Road(Marlin Stebbins Road) which starts at Diablo Canyon Road and ends at the roundabout at the Point San Luis Lighthouse, which isalso included. The seal coating is to include all berms located along the road. The road is approximately 1.67 miles and 10 feet widefor the majority of the distance. The total square footage to be sealed is estimated at 100,000 square feet with an additional 5,000square feet for the roundabout and 650 square feet to be paved with 3 inches of asphalt with 6” grade 2 base next to the roundabout.The contractor will need to sweep and remove surface debris before the seal coat is applied. Curbs and berms are to be cleared ofvegetation as well. See Exhibit A for specifications.

Project Contact: Chris MunsonEmail: [email protected]

MAND 3/5 @ 1:30pm- 3950 Avila Beach Dr

18-00414

0

1:40 PM3/13/18

Addenda:POINT SAN LUIS LIGHTHOUSE ROAD SEAL COAT

Prebid Conf:

Port San Luis Harbor District 805-595-5400 805-595-5404

Plan Issuer:

Paso Robles $2,610,000

The work shall include but is not limited to, sewer pipeline installation, traffic signal, streetlights, curb, gutter, sidewalk, drive approachremoval and replacement, pavement restoration, pavement striping, and landscape plants and irrigation.

PREVAILING WAGE

Project Contact: Ditas EsperanzaEmail: [email protected]

18-00246

0

2:00 PM3/15/18

Addenda:SHERWOOD ROAD IMPROVEMENTS – CRESTON TO FONTANA

12-12I

City of Paso Robles 805-237-3861 805-237-3904

Page 16: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo $56,000

In general, the City is requesting proposals for the assembly and installation of 12 bus shelters at various City locations listed below.Bus shelter equipment has already been purchased.Locations:Prado Rd. at Elks Ln. (Prado Day Center)Madonna Rd. at Oceanaire Dr.Los Osos Valley Rd. at Laguna VillageLos Osos Valley Rd. at Froom Ranch WayS. Higuera St. at Hind Ln.S. Higuera St. at Margarita Ave.Laurel Ln. at Southwood Dr.Broad St. at Sweeney Ln.South St. at Parker St.Marsh St. at Johnson Ave.Orcutt Rd. at Laurel Ln.S. Higuera St. at Silver City

PREVAILING WAGE

Project Contact: Kathryn Stanley at (805) 781-7200

18-00517

0

2:00 PM3/15/18

Addenda:BUS SHELTER INSTALLATION 2018

91649

City of San Luis Obispo 805-781-7200 805-781-7198

NEW

Plan Issuer:

Pismo Beach

The City is interested in acquiring the services of a qualified firm or a joint venture of firms (Consultant) to provide ConstructionManagement, Inspection, Materials Testing, and Administration Services for the Shell Beach Road Streetscape Project.

*** Plans & Specs can be found in the project named "Shell Beach Road Streetscape".

Questions: Eric EldridgeEmail: [email protected]

18-00502

0

2:00 PM3/21/18

Addenda:RFP/Q - CONSTRUCTION MANAGEMENT, INSPECTION, MATERIALS TESTING, AND ADMINISTRATIONSERVICES

City of Pismo Beach . 805-773-4656 805-773-4684

NEW

Bidders:

Plan Issuer:

Palo Robles

Installation of waterlines, roadway grading and excavation, concrete work, placement of paving, striping, streetlights, and tree removalsand protection.

Project Contact: Ditas Esperanza

18-00303

0

2:00 PM3/22/18

Addenda:VINE STREET IMPROVEMENTS-32ND STREET TO CABALLO PLACE

12-12J-1

City of Paso Robles 805-237-3865 805-237-3904

Testing & Inspection Services Fax: 661-393-9002Office: 661-393-9001Dc Inspections, Inc

Bidders:

Plan Issuer:

Paso Robles

Demolition and excavation of existing Lift Station and equipment, trenching and installation of sewer mains, manholes and laterals,trench restoration and video testing, air test and mandrel test for final acceptance.

Project Contact: Ditas Esperanza

18-00304

0

2:00 PM3/22/18

Addenda:ALMENDRA SEWER IMPROVEMENTS

17-16

City of Paso Robles 805-237-3865 805-237-3904

Testing & Inspection Services Fax: 661-393-9002Office: 661-393-9001Dc Inspections, Inc

Page 17: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo $88,700

In general, the project corrects circulation design deficiencies in the Marsh Street parking garage through minor changes to curbs,railings, striping and signage.

PREVAILING WAGE

Project Manager: Violeta Esparza-Reniere at 805-781-7202

18-00408

0

2:00 PM3/22/18

Addenda:MARSH STREET PARKING GARAGE CIRCULATION IMPROVEMENTS

91381

City of San Luis Obispo 805-781-7200 805-781-7198

Plan Issuer:

Paso Robles

The provision of high quality street sweeping services on City streets removing litter, leaves, sand, dirt and other debris.

PREVAILING WAGE

18-00443

0

2:00 PM3/22/18

Addenda:CITYWIDE STREET SWEEPING SERVICES

DPW18-04

City of Paso Robles 805-237-3861 805-237-3904

Plan Issuer:

Pismo Beach $10,000,000

Reconstructing an 18 block section of roadway, adding a multi-use path, upgrading existing water infrastructure and undergroundingexisting overhead utilities.

PREVAILING WAGE

Project Contact: Erin OlsenEmail: [email protected]

18-00500

0

3:00 PM3/22/18

Addenda:SHELL BEACH ROAD STREETSCAPE

City of Pismo Beach . 805-773-4656 805-773-4684

NEW

Plan Issuer:

Pismo Beach

The City of Pismo Beach is requesting proposals from a qualified firm to provide Janitorial Services for City Facilities.

Questions: Cindy RansdellEmail: [email protected]

MAND 3/1 @ 9am- 760 Mattie Road, Pismo Beach

18-00503

0

2:00 PM3/22/18

Addenda:RFP FOR JANITORIAL SERVICES

Prebid Conf:

City of Pismo Beach . 805-773-4656 805-773-4684

NEW

Plan Issuer:

Pismo Beach

To provide a Parking Lot and limited Street Sweeping service to the City of Pismo Beach on a regularly scheduled basis, by removinglitter, leaves, sand, dirt, and debris from City owned parking lots and some streets and alleys. This program shall leave the streets witha presentable appearance and free from dust and debris.

Project Contact: Cindy RansdellEmail: [email protected]

18-00504

0

2:30 PM3/22/18

Addenda:PARKING LOT AND STREET SWEEPING

City of Pismo Beach . 805-773-4656 805-773-4684

NEW

Page 18: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Pismo Beach

The purpose of the Street Sweeping Contract is to provide a street sweeping service to the City of Pismo Beach on a regularlyscheduled basis, by removing litter, leaves, sand, dirt, and debris from City streets and alleys. This program shall leave the streets witha presentable appearance and free from dust created by traffic.

Project Contact: Cindy RansdellEmail: [email protected]

18-00505

0

2:00 PM3/22/18

Addenda:STREET SWEEPING IN THE CITY OF PISMO BEACH

City of Pismo Beach . 805-773-4656 805-773-4684

NEW

Plan Issuer:

San Luis Obispo

The intent of this RFP is to secure Design/Build services for improvements to the RTA transit center located in downtown San LuisObispo. This will include installing concrete pads, laying of pavers, excavation and running of conduits for electrical and dataconnections to connection point at the exterior of the County Public Works building, and installation of various transit amenities. This isa design/build project.

Project Contact: Michael Seden-Hansen(805) 781-4472 [email protected]

18-00553

0

12:00 PM3/29/18

Addenda:RFP - TRANSIT CENTER IMPROVEMENTS/DESIGN-BUILD

RFP#18-001

San Luis Obispo Regional Transit Authority 805-781-4472 805-781-1291

NEW

Santa Clara County

Plan Issuer:

Santa Clara

Glue Lam Beam Repair and Exterior Painting.

Project Contact: Melanie Pilliard 916-657-6975Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

MAND 1/25 at 11AM; Reschedule 2/13 at 11AM

18-00114

3

2:00 PM3/6/18

Addenda:GLUE LAM BEAM REPAIR & EXTERIOR PAINTING DMV

17-464

Prebid Conf:

DMV 916-657-8345

Plan Issuer:

Palo Alto

Furnish all tools,equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services,includingfuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for thefulfillment of the Contract.

Project Contact: Peter JensenEmail: [email protected]

2/21 at 11AM

18-00380

1

3:00 PM3/6/18

Addenda:PEERS PARK DOG PARK

171178

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

Campbell

Tree and site protection; removal and replacement of play structure components; site preparation; demolition and disposal of rubbersafety surfacing; furnish and installation of new play house structures, furnish and install manufactured wood safety surfacing;temporary construction fencing; signage; and miscellaneous touch-up painting.

Project Contact: Fredrick Ho,Email: [email protected]

MAND 2/22 at 1:30PM

18-00402

0

3:00 PM3/6/18

Addenda:JOHN D. MORGAN PARK IMPROVEMENTS PROJECT (18-QQ)

18-QQ

Prebid Conf:

City of Campbell [email protected] 408-866-2150 408-376-0958

Page 19: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Floor sealant replacement.

Project Contact: Leslie Harper

Hard copies also available for review at Santa Clara Builders Exchange

2/22 at 9AM

18-00456

1

3:00 PM3/6/18

Addenda:RFQ BOILER ROOM FLOOR SEALANT

RFQ-FAF-FY18-0174

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

Mountain View $700,000

Reconstruction of approximately 12,300 square feet of concrete sidewalk, 1,200 square feet of concrete driveway, 2,100 linear feet ofcurb, and 21 curb ramps.

Project Contact: Quan TranEmail: [email protected]

18-00328

0

2:00 PM3/7/18

Addenda:2016-17 CONCRETE SIDEWALK & CURB REPAIRS

17-06 to

City Of Mountain View, DPW 650-903-6311

Bidders:

Plan Issuer:

San Jose

Alterations and related modernization at Piedmont Middle School & Ruskin Elementary School.

2/7 &2/13 at 2:30PM (1376 Piedmont Rd, San Jose)

18-00382

0

2:00 PM3/7/18

Addenda:PIEDMONT MIDDLE SCHOOL & RUSKIN ELEMENTARY SCHOOL FLEXIBLE INSTRUCTIONAL SPACE(FIS) ALTERATIONS - BERRYESSA UNION SCHOOL DISTRICT

#B-04-2017-18

Prebid Conf:

Berryessa Union School District-Purchasing 408-923-1871

Electrical Contractor Fax: 408-434-6615Office: 408-434-6601Elco Electric

General Contractor Fax: 831-466-9597Office: 831-426-0743Crw Industries, Inc

Bidders:

Plan Issuer:

San Jose

Interior renovation

18-00440

2

12:00 PM3/7/18

Addenda:JC PENNEY INTERIOR RENOVATION ESCALATOR- EASTRIDGE MALL

1923

Tri-North Builders 760-804-1838 760-804-1878

General Contractor Fax: 760-804-1878Office: 760-804-1838Tri-North Builders

Plan Issuer:

Milpitas

Replace the overhead steel rolling door at Elmwood Correctional Facility.

Project Contact: Lesllie HarperEmail: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange.

2/27 at 9AM

18-00455

0

3:00 PM3/7/18

Addenda:RFQ ELMWOOD OVERHEAD DOOR REPLACEMENT

RFQ-FAF-FY18-0163

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

Los Gatos

Grinding of existing pavement, placement of leveling course, hot mix asphalt, and rubberized hot mix asphalt, digout repairs,replacement of traffic signal loops, adjustment of manholes, valves, boxes, and monument covers, and placement of new pavementstripes and markings.

18-00323

1

2:00 PM3/8/18

Addenda:ANNUAL STREET REPAIR & RESURFACING

#17-811-9901

Town of Los Gatos - DPW 408-399-5770

Page 20: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Los Gatos

Installation of curb ramps, median islands, and associated work.

18-00324

0

2:00 PM3/8/18

Addenda:ANNUAL CURB, GUTTER, & SIDEWALK MAINTENANCE (RAMP UPGRADES) & CROSWALKIMPROVEMENTS

#17-813-9921 & #17-812-0126

Town of Los Gatos - DPW 408-399-5770

Plan Issuer:

San Jose $680,270

Clean and assess the existing sanitary sewer system in the several areas.

Project Contact: Amanda Lei

18-00423

0

3:00 PM3/8/18

Addenda:8786-SANITARY SEWER CONDITION ASSESSMENT 2017-2018 PACKAGE 1

8786

City of San Jose - DPW 408-535-8300

Bidders:

Plan Issuer:

San Jose $10,461,891

Pavement rehabilitation, removal and replacement of existing curb, gutter, driveways, sidewalks, and wheelchair ramps; removal andreplacement of the traffic signal detector loops.

Project Contact: Emil Collado 408-794-1961

18-00424

3

3:00 PM3/8/18

Addenda:8756-2018 ARTERIAL RESURFACING PROJECT

8756

City of San Jose - DPW 408-535-8300

General Contractor Fax: 707-585-1601Office: 707-585-1221Ghilotti Construction Company, Inc.

Bidders:

Plan Issuer:

Los Altos

The Project consists of: The completion of a larger modernization project. Upgrades to classrooms including carpet, paint, tackablewall panels, casework and countertops; new fire alarm system; ADA upgrades; site work improvements associated with ADAaccessibility; replacement of some exterior doors; and replacement of noncompliant drinking fountains. Note that Buildings A, C and Dhave been completed.

This work consists of Building B (minus the warming kitchen, which is also complete), unfinished site work and renovations to fourportable classrooms. Work related to this bid will be clearly demonstrated on the prebid walk.

MAND 2/26 at 3:30PM

18-00434

0

1:00 PM3/8/18

Addenda:MONTCLAIRE ELEMENTARY SCHOOL MODERNIZATION PHASE 3 AND SITE WORK

19-B02-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

General Contractor Fax: 650-557-1239Office: 650-557-1238Cal Pacific Construction

Plan Issuer:

Gilroy $80,000

Drill and construct a replacement well at Henry W. Coe State Park's Kickham Ranch.

Project Contact: Carlos VAllinEmail: [email protected]

MAND 2/9 at 10AM

18-00209

1

3:00 PM3/9/18

Addenda:HENRY COE STATE PARK KICKHAM RANCH WATER SYSTEM IMPROVEMENTS

C1764039

Prebid Conf:

Department of Parks & Recreation [email protected] 831-649-2806

Page 21: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Sunnyvale

Provide professional services for design and preparation of bid documents and construction support for the Golf BuildingsRenovations.

Project Contact: Husam Aburabi 408-730-7627Email: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

Recommended 3/1 at 10:30AM (Pro Shop)

18-00457

0

3:00 PM3/9/18

Addenda:RFP PROFESSIONAL DESIGN SERVICES ASSOCIATED WITH GOLF BUILDINGS RENOVATIONS ATSUNKEN GARDENS GOLF COURSE

F18-188

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

Bidders:

Plan Issuer:

San Jose

NEW BLDG. T.I. WORK: Concrete & Finishes, Structural & Misc. Steel, Metal Decking, Rough Framing, Fin. Carp. & Millwork,Countertops, Laminates, Insulation, Caulking & Sealants, Waterproofing, Doors & Hardware, Interior Glass & Glazing, Metal Studs &Drywall, Interior Architectural Finishes (All Types), Accessories, Acoustic & Wood Veneer Plank Ceiling, Floor Finishes, Ceramic Tile,Painting, FRP, Toilet Partitions & Accs., Lockers, Gym & Pool Equipment, Fire Sprinklers, Alarm, & Extinguishers, Plumbing, HVAC,Electrical, Communication, TV Systems, Voice/Data, Fire Alarm.

18-00541

0

2:00 PM3/12/18

Addenda:CITY SPORTS - MONTEREY PLAZA

Moorefield Construction, Inc. [email protected] 916-614-7888 916-419-8870

NEW

General Contractor Fax: 916-419-8870Office: 916-614-7888Moorefield Construction, Inc.

Supplier Fax: 209-547-0554Office: 209-547-1937Armor Fire Extinguisher Company

Bidders:

Plan Issuer:

Morgan Hill $1,100,000

The Project sites are located at the following locations:· Lift Station J: 16035 Jackson Oaks Drive; Morgan Hill, CA· Lift Station W: 15505 Watsonville Road; Morgan Hill, CA

The Project’s Scope of Work is described as follows, but not limited to: Furnishing all labor, materials, equipment, fuel, andtransportation required to:o Replace the existing wet well’s pumps, piping, fittings, and mounting equipment with new equipment and coat wet well interiors withbiological corrosion protection.o Replace the existing valve vaults, all existing discharge isolation gate and check valving with new equipment and install new bypasspump connections.o Replace existing downstream force main piping with new piping.o Install new electrical power pedestal and control equipment, conduits and equipment for PG&E service meter relocation, and newstationary back-up generator.o Install new site lighting and overhead canopies for the new power pedestals.o Restore surrounding surface pavement and other disturbed improvements.o Maintain sewer service at all times during the pump station improvement work.o Complete all other work related to the above items as shown on the Plans and as detailed in these Specifications

Project Contact: Vicky A Rossi 408-310-4182Email: [email protected]

18-00474

0

2:30 PM3/13/18

Addenda:SANITARY SEWER LIFT STATIONS J & W REHABILITATION PROJECT

City of Morgan Hill, DPW 408-778-6480

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Page 22: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Clara

Clearing and grubbing of a 10-acre site and installation of four synthetic turf youth soccer fields, including underground drainagesystems; one natural turf youth soccer field; a playground; a CMU perimeter wall and perimeter fencing; safety netting; gathering andviewing areas; flatwork and circulation paving; site lighting including sports lighting; utility upgrades and improvements; two parking lotswith electrical vehicle stalls, ADA stalls, and compact stalls; biofiltration areas; a custom signage fence; a community building featuringconcessions, restrooms, storage, office, electrical and a community room; a maintenance building; dog park restrooms andimprovements; and traffic signal modifications and signing and striping. Work shall also include coordination to allow access andproviding adequate staging areas for the synthetic turf materials and installation.

Project Contact: Benison Tran 408-615-3016Email: [email protected]

Encouraged 2/21 at 10AM (1500 Warburton Ave, Santa Clara)

18-00461

0

3:00 PM3/14/18

Addenda:REED STREET - GRANT STREET SPORTS PARK PROJECT

CE 16-17-13

Prebid Conf:

City of Santa Clara - DPW 408-615-3000 408-985-7936

General Contractor Fax: 510-526-0990Office: 510-526-3424Oc Jones And Sons

Manufacturer Fax: 408-291-8888Office: 408-799-8888Universal Precast Concrete, Inc

Bidders:

Plan Issuer:

Los Altos $1,300,000

The Project scope includes, but is not limited to, modifications to: interior walls, doors, ceilings, and finishes; compliance with currentlife safety codes; modification to building systems (HVAC, Electrical, Lighting,) and relocation of fire sprinkler heads; Mechanicalsystem upgrade to an existing building with architectural modifications to support this upgrade; Roof replacement and exterior painting;Contractor will be responsible for prepping all areas of new scope of work including patching and repairing existing conditions whereeffected by any and all demolition work.

Questions: Gina Bailey at (650) 949-6165, or by email at: [email protected]

MAND 2/20 at 10AM (Plant Services, D160 Conf Rm)

18-00398

1

2:00 PM3/15/18

Addenda:BUILDING 1500 RENOVATION FOOTHILL COLLEGE

#1783R

Prebid Conf:

Foothill - DeAnza Community College District 408-864-5888

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Electrical Contractor Fax: 408-434-6615Office: 408-434-6601Elco Electric

General Contractor Fax: 415-358-8460Office: 415-850-0857Argo Construction, Inc.

General Contractor Fax: 510-351-9575Office: 510-351-3048B Bros. Construction Inc.

General Contractor Fax: 415-769-5790Office: 415-769-5770Cumiskey Construction Corporation

General Contractor Fax: 415-524-8349Office: 415-524-8351E F Brett & Co

General Contractor Fax: 408-733-6657Office: 408-733-6656Icc General Contractors

General Contractor Fax: 510-791-1639Office: 510-792-6515James R. Griffin

General Contractor Fax: 408-295-0626Office: 408-295-2182Oc Mc Donald Co. Inc.

General Contractor Fax: 650-685-2491Office: 650-685-2490Omni Construction Services Inc.

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

General Contractor Fax: 510-579-7382Office: 510-579-7382S&H Construction Inc.

General Contractor Fax: 650-877-0747Office: 650-877-0717Southwest Construction

General Contractor Fax: 415-901-0466Office: 415-850-1308Svala Construction

Sub-Contractor/SpecialtyContractor

Fax: 510-777-1102Office: 510-777-1100Andy's Roofing Co., Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-866-0566Office: 408-821-7168California Plus Engineering

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Page 23: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Clara County

Alll General Contractors (GC) on the Main Jail North and Elmwood Correctional Facility ADA Accessibility and Suicide Resistant CellsImprovements Projects must be prequalified prior to submitting bids on the Projects.

Project Contact: Kim HuynhEmail: [email protected]

18-00495

0

3:00 PM3/15/18

Addenda:PREQUALIFICATION PACKAGE FOR GENERAL CONTRACTORS SEEKING TO BID ON MAIN JAILNORTH & ELMWOOD CORRECTIONAL FACILITY IMPROVEMENTS

RFS-FAF-FY18-0181

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

San Jose $7,907,942

Cracks sealing, application of microsurfacing, striping, markings.

Project Contact: Octavio Duran, Jr. 408-794-1986

18-00501

0

3:00 PM3/15/18

Addenda:8759-2018 STREET SEALING PROJECT

8759

City of San Jose - DPW 408-535-8300

NEW

Bidders:

Plan Issuer:

Palo Alto

Roadway modifications and streetscape improvements to a continuous segment of E Charleston Road

Project Contact: Holly BoydEmail: [email protected]

MAND 3/2 at 2PM (250 Hamilton Ave., Palo Alto)

18-00530

0

3:00 PM3/16/18

Addenda:CHARLESTON-ARASTRADERO CORRIDOR PROJECT - PHASE 2

171392

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

NEW

General Contractor Fax: 408-279-2286Office: 408-279-2277Robert A. Bothman, Inc

Plan Issuer:

Santa Clara County

Landscape replacement planting and irrigation on a State-owned highway in Santa Clara County along Interstate 880 at the StevensCreek Boulevard intersection, and a 3-year Plant Establishment Period (PEP) for landscape maintenance.

Project Contact:Ehab AzabEmail: [email protected]

2/27 at 10AM (3331 N. First St, Bldg A, San Jose)

18-00469

1

2:00 PM3/19/18

Addenda:I-880/STEVENS CREEK BOULEVARD INTERSECTION LANDSCAPING - SCVTA

C17297F

Prebid Conf:

SCVTA -Santa Clara Valley Transportation Authority 408-321-7189

Plan Issuer:

Los Altos

Remove and replace the roof system on the Police Department building.

MAND 3/6 at 10AM

18-00462

0

2:00 PM3/20/18

Addenda:POLICE DEPARTMENT BUILDING ROOF REPLACEMENT

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Page 24: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Palo Alto

1) Remove existing base assemblies of all roof-mounted HVAC equipment and install crickets/drainage swales towards the roofgutters.2) Remove existing corroded exhaust vents and replace with galvanized metal vent of same size, type, etc.3) Remove all existing galvedge metal perimeter flashing with new and paint to match trim color.4) Remove existing tar and gravel roof system down to existing plywood and replace with Tremco modified bituminous membrane roofover fiberboard over R19 tapered rigid insulation and finished with Acrylic title 24 and CRRC Approved white or light coating throughout the roof areas.

Project Contact: Jimmy Chen 650-496-6920

MAND 3/6 at 11AM

18-00543

0

3:00 PM3/20/18

Addenda:VENTURA COMMUNITY CENTER UNITS 1, 2, & 3 RE-ROOF PROJECT

170383

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

NEW

HVAC Contractor Fax: 209-931-0883Office: 209-931-2100Lovotti, Inc.

Bidders:

Plan Issuer:

Santa Clara

Major repairs to a 1,920 square feet restroom and concession building damaged by fire. The District intends to construct the Project byawarding multiple prime contracts to multiple prime contractors each who are in direct privity of contract with the District for a specificscope of Work.

02.01 Demolition (C21)03.01 Concrete (A,C8)06.01 Carpentry (B,C5)07.01 Roofing (C39)07.02 Flashing & Sheet Metal (C43)08.01 Doors (D28)09.01 Plastering (C35)09.02 Gypsum board (B,C9)09.03 Acoustical Ceilings (C2)09.04 Flooring (C15)09.05 Painting (C33)10.01 Specialty (C61 )21.01 Fire Suppression Systems (C16)22.01 Plumbing (C36)23.01 HVAC (C20)26.01 Electrical (C10)27.01 Low Voltage Wiring (C7)28.01 Fire Alarm (C10)32.01 Grading Concrete and Asphalt (A,C12)32.02 Fencing and Gates (C13)

Project Contact: Kevin, Strawin Construction 408-393-5056

MAND 2/8 & 3/8 at 2PM (3350 Brookdale Drive)

18-00225

2

2:00 PM3/22/18

Addenda:CONCESSION BUILDING FIRE DAMAGE REPAIR SANTA CLARA HIGH SCHOOL

1043

Prebid Conf:

Strawn Construction 408-286-1299 408-286-1288

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Supplier Fax: 000-000-0000Office: 800-375-3403Build.Com

Bidders:

Gilroy $370,000

Fill voids under pavement and repair eroded embankment slope In Santa Clara County In Gilroy At Southbound Monterey Road Off-rampThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-8.

18-00070

1

2:00 PM3/22/18

Addenda:DOT 04-2J4604 FILL VOIDS UNDER PAVEMENT AND REPAIR ERODED EMBANKMENT SLOPE

04-SCl-101-R 5.1

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 831-623-1002Office: 831-800-1602Precision Grade Inc.

Page 25: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Morgan Hill

Provide professional janitorial services at City Facilities.

Project Contact: Cynthia Iwanaga 408-776-7383Email: [email protected]

18-00341

0

2:30 PM3/26/18

Addenda:RFP FOR JANITORIAL SERVICES

City of Morgan Hill, DPW 408-778-6480

Plan Issuer:

Los Altos

Installation of irrigation backflow preventers in 62 existing waterline locations.

MAND 3/20 at 10AM (707 Fremont Ave, Los Altos)

18-00492

0

2:00 PM4/12/18

Addenda:BACKFLOW PREVENTER INSTALLATION

CF-01016

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Santa Cruz County

Plan Issuer:

Davenport

Please note Volume II (Bid Proposal packet) can only be obtained by purchasing plans/specs from General Services.

Construct a public safety communications tower at the former CEMEX plant in Davenport.

Project Contact: Mike Del Fava 831-454-2719

Required 2/20 at 1PM (701 Ocean St., Room 330, Santa Cruz)

18-00313

0

2:30 PM3/6/18

Addenda:DAVENPORT COMMUNICATION TOWER INSTALLATION PROJECT

#17C1-013

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

Bidders:

Plan Issuer:

Watsonville

Please note Volume II (Bid Proposal packet) can only be obtained by purchasing plans/specs from General Services.

Convert an existing office into new clinic exam rooms.

Project Contact: Scott Moats 831-454-5497

Required 2/21 at 10AM (1430 Freedom Blvd., Suite C, Watsonville)

18-00314

0

2:30 PM3/7/18

Addenda:WATSONVILLE HEALTH CENTER, 1430 FREEDOM BOULEVARD, SUITE C REMODEL PROJECT

#17C1-008

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Plan Issuer:

Santa Cruz

HVAC services for the Data Center HVAC systems located at 701 Ocean Street Room 010, Santa Cruz, CA and 1080 EmelineAvenue, Santa Cruz, and radio equipment located at various radio communication sites.

Project Contact: Phil SantaluceEmail: [email protected]

MAND 2/6 & 2/7 @ 9:15am- 701 Ocean Street, Rm 315

18-00241

2

2:00 PM3/8/18

Addenda:HVAC MAINTENANCE FOR VARIOUS SITES FOR INFORMATION SERVICES DEPARTMENT

IFB 17B2-002

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

Page 26: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Watsonville

Project consists of: Selective Demo; Concrete; Masonry; Structural Steel Framing; Pipe and Tube Railings; Cement Plastering;Dimensional Letter Signage; Plaza-Mounted Flagpoles; Earthwork; Exterior Improvements.

PREVAILING WAGE

Questions: Darrell DanielsEmail: [email protected]

MAND 2/6 @ 10:30am- site

18-00358

1

2:30 PM3/12/18

Addenda:RADCLIFF ELEMENTARY SCHOOL SAFETY FENCE & SITE IMPROVEMENTS

B-18-27-03-842-8390

Prebid Conf:

General Contractor Fax: 650-347-3099Office: 650-347-3090Onpoint Consruction

General Contractor Fax: 916-441-6138Office: 916-441-5113Otto Construction

General Contractor Fax: 831-641-0586Office: 831-641-0580Pueblo Construction

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

General Contractor Fax: 831-722-9360Office: 831-722-9949Selden & Son

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction

General Contractor Fax: 000-000-0000Office: 831-722-6626The Mark Rood Co.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Bidders:

Plan Issuer:

Watsonville

New Bus Loading Zone, Safety Fence & Site Improvements.

PREVAILING WAGE

Questions: Darrell DanielsEmail: [email protected]

MAND 2/7 10 am @ site

18-00326

2

10:00 AM3/13/18

Addenda:SAFETY FENCE & SITE IMPROVEMENT PROJECT

8340

Prebid Conf:

Pajaro Valley Unified School District 831-786-2100 831-728-0136

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 408-848-8778Office: 408-848-8700Mckim Corporation

General Contractor Fax: 650-347-3099Office: 650-347-3090Onpoint Construction

General Contractor Fax: 916-441-6138Office: 916-441-5113Otto Construction

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

General Contractor Fax: 831-722-9360Office: 831-722-9949Selden & Son

General Contractor Fax: 000-000-0000Office: 408-842-3355Sls Construction

General Contractor Fax: 000-000-0000Office: 831-722-6626The Mark Rood Co.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Painting and Coatings Fax: 650-347-3099Office: 650-347-3090Onpoint Consruction

Sub-Contractor/SpecialtyContractor

Fax: 831-763-1409Office: 831-763-1811Superior Hydroseeding

Page 27: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz

The extent of work includes but is not limited to: Removal and disposal of all existing galvanized water piping which requires demolitionof interior finishes. Installation of complete and operational copper water piping system which includes removal and replacementexisting fixtures. New fixtures, circulation pump, insulation and water heater shall be provided and all demolished interior finishes shallbe replaced in kind to match adjacent finishes. Exterior work will include replacement of existing underground main line from campusloop to main building including all necessary excavation and replacement of landscaping.

PREVAILING WAGE

Project Contact: Neal SellersEmail: [email protected]

MAND 2/22 @ 10am- site

18-00479

0

10:00 AM3/13/18

Addenda:SANTA CRUZ HIGH SCHOOL MAIN BUILDING DOMESTIC WATER PIPING REPLACEMENT

2018-07

Prebid Conf:

Bartos Architecture 650-340-1221 000-000-0000

Plan Issuer:

Santa Cruz

The proposed project will entail removal and replacement of approximately 11,000 sq.ft. of hardscape/landscape and associatedcomponents.

PREVAILING WAGE

Questions: [email protected]

MAND 3/1 @ 10am- site

18-00465

3

10:00 AM3/14/18

Addenda:FRONT LANDSCAPE IMPROVEMENTS AT MISSION HILL MIDDLE SCHOOL

2017-06

Prebid Conf:

Bartos Architecture 650-340-1221 000-000-0000

Bidders:

Watsonville

The Project consists of the installation 5 (five) new modular classroom buildings related site work, Grading & trenching. Installation ofbuildings is a turnkey installation that includes all Electrical, Fire alarm, Low voltage, Etc. as specified in the plans & Project Manual.Contractor will coordinate delivery and installation with building Manufacture.

PREVAILING WAGE

Project Contact: Block, RyanEmail: [email protected]

MAND 2/21 @ 10am- site

18-00483

0

2:30 PM3/14/18

Addenda:BRADLEY ELEMENTARY SCHOOL RELOCATABLE REPLACEMENT

B-18-14-03-833-8122

Prebid Conf:

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

Santa Cruz

The proposed project will entail removal and replacement of approximately 51,000 sq ft of roofing and associated components atHarbor High School. Work period from June 8 through August 10, 2018.

PREVAILING WAGE

Project Contact: Ismael MaganaEmail: [email protected]

MAND 2/22 @ 9am- site

18-00441

1

1:00 PM3/15/18

Addenda:CAMPUS RE-ROOFING AT HARBOR HIGH SCHOOL

2018-08

Prebid Conf:

Page 28: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Santa Cruz

The proposed project will entail removal and replacement of approximately 41,000 sq ft of roofing and associated components atBranciforte Middle School. Work period from June 8 through August 10, 2018.

PREVAILING WAGE

Project Contact: Ismael MaganaEmail: [email protected]

MAND 2/22 @ 7am- site

18-00442

1

10:00 AM3/15/18

Addenda:CAMPUS RE-ROOFING AT BRANCIFORTE MIDDLE SCHOOL

2018-08

Prebid Conf:

Bidders:

Plan Issuer:

Santa Cruz

Work required as part of this project consists, in general, of removal and replacement of sixty-five (65), 14” to 16” OD piles ranging inlength from 50 to 75 feet, pile guides and appurtenant hardware with cast concrete piles. Pile driving work will be accomplished with a1.5-inch diameter water jet pipe system, and then seated as necessary for embedment relative to geotechnical conditions using adynamic hammer. Work shall be performed in accordance with all permits, including, but not limited to completion of all work byNovember 30, 2018; deployment of silt booms for turbidity control prior to pile removal and installation; and a limit of 6 piles perworkday. Contractor shall retain biologist(s) for required pre-construction survey, training and on-site monitoring during construction.Access to portions of the work will require use of small boat(s) and a floating barge for workers and pile driving equipment.

PREVAILING WAGE

18-00529

0

10:00 AM3/16/18

Addenda:SANTA CRUZ HARBOR PILE REPAIR AND REPLACEMENT - PHASE 1 - 2018

Santa Cruz Port District [email protected] 831-475-6161 831-475-9558

NEW

General Contractor Fax: 619-233-3706Office: 619-233-0178R.E. Staite Engineering, Inc.

Bidders:

Aptos

The Project consists of: accessibility improvements in two (2) student restrooms and one (1) staff restroom, and related exteriorimprovements to the building entrance for the staff restroom. Construction will be done on an occupied campus while school is inoperation.

PREVAILING WAGE

Project Contact: Howard CohenEmail: [email protected]

MAND 2/28 @ 10:30am- site

18-00450

1

2:00 PM3/20/18

Addenda:VALENCIA ELEMENTARY SCHOOL CLASSROOM REPLACEMENT - PHASE 3 - RESTROOMACCESSIBILITY IMPROVEMENTS

B-18-20-03-846-8150

Prebid Conf:

Electrical Contractor Office: 831-524-8507Mig Electric

General Contractor Fax: 650-347-3099Office: 650-347-3090Onpoint Construction

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Page 29: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Scotts Valley

In general, the work to be done under this contract consists of, but not be limited to:• Construction of asphalt concrete pavement, asphalt roadway pavement widening, full depth reclamation, cold centralplant recycling, crack seal, type ll slurry seal, and pavement markers.• Other items or details not mentioned above, that are required by the Plans, Standard Specifications, or these SpecialProvisions, shall be performed, constructed or installed.• Bids are required for the entire Work described herein.• The contract time shall be 60 WORKING DAYS and completed by July 1.

PREVAILING WAGE

Questions: Trish McGrathEmail: [email protected]

18-00523

0

2:00 PM3/22/18

Addenda:GLEN CANYON AND GREEN HILLS ROAD BIKE LANE

City of Scotts Valley 831-438-5854 831-439-9748

NEW

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Plan Issuer:

Capitola

City of Capitola seeks qualified general contractors to work collaboratively with city representatives and design consultant team toprovide general construction contracting for the construction of a new branch library.The City has determined that general contractors who submit bids on this project must be prequalified. Prequalified contractors will berequired to have the following California contractor's license:GENERAL BUILDING CONTRACTOR, B

Questions: David TanzaEmail: [email protected]

18-00519

0

3:00 PM4/3/18

Addenda:PREQUALIFICATION FOR CAPITOLA BRANCH LIBRARY - GENERAL CONTRACTOR

City of Capitola 831-475-7300 831-479-8879

NEW

Plan Issuer:

Santa Cruz $1,302,000

1. Construction work for TIU Phase C project package 9098C includes, but is not limited to:a. Provision of new communications systems pathways, including conduit, cable trays, wire basket trays, J-hooks, and relatedmaterials.b. Trough penetrations sealant of openings.c. Provision of new communications racks and cabinets.d. At selected buildings, provision of new electrical receptacles to support the new racks and cabinets installed under the work of thisProject.e. Provision of new horizontal cabling and interior riser cabling.f. Provision of interior Wireless Access Point installation.g. Provision of exterior Wireless Access Point installation including any required enclosures and supporting cabling, including paintingand weatherproofing of penetrations.h. All required Outside Plant (OSP) cabling and wreck-out.Following the University’s transition to the new cabling infrastructure and systems, removal (wreck-out) of existing communicationscabling abandoned by the work of this Project.

Project Contact: Frank DickinsonEmail: [email protected]

MAND 2/28 @ 1pm- Barn G, PP&C Conference Room

18-00473

0

3:00 PM4/4/18

Addenda:TELECOMMUNICATIONS INFRASTRUCTURE UPRADE, PHASE C, COWELL & STEVENSON BUILDINGS

9098C

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

Page 30: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz

The Santa Cruz County Sanitation District is soliciting a Request for Qualifications from qualified consulting professionals to provide aMaster Plan for the D.A. Porath Facility.

Project Contact: Rene HernandezEmail: [email protected]

18-00471

0

5:00 PM4/13/18

Addenda:D.A PORATH FACILITY MASTER PLAN

County of Santa Cruz 831-454-2160 831-454-2385

G R A N I T E R O C K C O N S T R U C T I O N D I V I S I O N

CO

NS

TR

UC

TI

ON

D

IV

IS

IO

N

ALL OF YOUR CONSTRUCTION NEEDS - FROM DRIVEWAYS TO FREEWAYS • Asphalt and Concrete Driveways

• Parking Lots

• Site Work

• Seal Coating and Striping

• Underground Utilities (Water, Sewer, Storm Drain)

• Chip Sealing

• Culverts and Walls

• Golf Cart Path Work

• Concrete Curb and Gutters

• Concrete Flatwork

• Asphalt Grinding

• Subdivision Site Work Development

• Structures

General Engineering Contractor - LIC#22 • For an estimate call 831.768.2789 • Fax 831.768.2701

Page 31: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

G R A N I T E R O C K C O N S T R U C T I O N D I V I S I O N

CO

NS

TR

UC

TI

ON

D

IV

IS

IO

N

ALL OF YOUR CONSTRUCTION NEEDS - FROM DRIVEWAYS TO FREEWAYS • Asphalt and Concrete Driveways

• Parking Lots

• Site Work

• Seal Coating and Striping

• Underground Utilities (Water, Sewer, Storm Drain)

• Chip Sealing

• Culverts and Walls

• Golf Cart Path Work

• Concrete Curb and Gutters

• Concrete Flatwork

• Asphalt Grinding

• Subdivision Site Work Development

• Structures

General Engineering Contractor - LIC#22 • For an estimate call 831.768.2789 • Fax 831.768.2701

Page 32: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

National Joint Powers Alliance®

Invitation for Bid Indefinite Quantity Construction Contract

The National Joint Powers Alliance® (NJPA) issues this Invitation For Bid (IFB) on behalf of, and to provide Indefinite Quantity Construction Contracting (IQCC) services to all current and potential NJPA Members including all government agencies, education agencies to include colleges and universities, and non-profit agencies in the Imperial, San Diego, Southland, Central Coast, Central Valley, and Bay Areas in the State of California. It is the intention of NJPA to award multiple contracts for general building, general engineering, electrical, mechanical, roofing, and painting construction services in these areas. Each contract has an estimated annual value of $4,700,000 and the maximum term of the contract is four years.

IQCC is a construction contracting procurement system that provides facility owners’ access to competitively bid “on-call” general contractors to provide immediate construction services over an extended period of time.

Intending bidders are required to attend a pre-bid seminar which shall be conducted for the purpose of discussing the IQCC procurement system, the contract documents, and bid forms. Attendance at one of the seminars is a mandatory condition of bidding.

2/20/2018 10:00 A.M. San Diego Housing Commission, 4th Floor Conference Room 426 1122 Broadway, San Diego, CA. 92101

Attendees meet on 5th floor lobby to be escorted to CM 426

2/21/2018

10:00 A.M.

Riverside Centre, 1st Floor Business Centre 3403 10th St. Riverside, CA 92501

2/22/2018

10:00 A.M.

Fresno City Hall, Room CH 4N-4017 2600 Fresno St. Fresno, CA. 93721

2/23/2018

9:00 A.M.

Louden Nelson Community Center, Room 7 301 Center Street Santa Cruz, CA. 95060

Intending bidders can pre-register for the pre-bid seminar by visiting our website at www.NJPA.co/eziqc-pre-bid-registration.

An electronic (CD) copy of the IFB Documents which include the instructions for submitting a bid and the bid documents may be obtained by letter of request to Joseph Morgan, NJPA, 202 12th

Street NE, Staples, MN 56479, or by visiting our website at www.njpacoop.org/eziqc-bid- document-request selecting the desired bid documents from the drop down list and completing the requested information. All requests must include; mailing address, email address, contact name, phone number. Bids are due by 4:30 pm CST on March 06, 2018 and will be opened at 9:00 am CST on March 07, 2018. IFB Documents will be available until March 02, 2018.

Page 33: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

What’s better than getting a new driver’s license you can renew by mail? How about getting a waiver on testing to add new opportunity to your contractor license! These contractors learned that sometimes you can, and sometimes you can’t… Q: We currently have a “C-10” (Electrical) license. I am aware that we can do low voltage work with our current license, however some of our customer’s request that we have a “C-7” (Low Voltage) license in order to do telecommunications work. How difficult would it be to add that classification to our license? Would I have to take the test?

A: B&P Code section 7065.3 allows for Contractors to request a Waiver of the Trade Exam for some additional classifications - if the classification is closely related to your current license and is a significant portion of the work you perform. These Waiver requests are reviewed on a case-by-case basis and is dependent on your work experience and project background, but I believe you would have a pretty good chance of being approved to Waive the exam based on your “C-10” experience. Waiver requests need to be done in writing.

Q: I currently have an “A” (General Engineering) license in CA. While I know I can do concrete work with my “A” license, sometimes in order to do a foundation or a sidewalk, people want to see that we have the “C-8” (Concrete) classification on our license. How do I go about sitting for the exam and adding it to our license?

A: You will need to complete and submit the Application for Additional Classification. You will be required to show at least four years of full time work experience doing concrete work specifically. With regards to the exam, B&P Code Section 7065.3 allows the CSLB to consider a Waiver of the Trade exam for someone holding a closely related classification, if you can prove that concrete is a significant portion of your General Engineering work. Sweet! Waiver requests however are reviewed on a case-by-case basis and there is no assurance the CSLB will approve the request.

Q: In 2014 you helped one of our Officers replace the former owner of the company when he retired and he was able to Waive the exam based on his years of experience with the company. Now he wants to obtain his own license and so I have been designated to be the new Responsible Managing Officer (RMO). I have been with my company for over 15 years with various positions; Foreman, Supervisor, Project Manager, Estimator, and now hold the title of Vice President. Can you assist me with process of replacing the current RMO and asking for a Waiver of the Exams like you did for the current Qualifier a couple of years ago?

A: Yes and no. Let me clarify. We would be happy to assist you with the process of replacing your current Qualifier. It sounds like you have the requisite experience. Your current RMO requested a Waiver based on B&P Code Section 7065.1c, which allows for a Waiver of the Exam if you have worked for the company in a supervisory capacity for five out of the last seven years. Unfortunately, you will not qualify for the same Waiver of the Exams because 7065.1c further states that a company cannot make this request if they have requested a Waiver under that subdivision within the past five years.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

Page 34: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

City Building PermitsSalinas

Permit No. B17-0028 Permit Amount $334550.00 Owner(s) BMCH CALIFORNIA

1814 MARSALA WAY City SALINAS

Builder BENCHMARK COMMUNITIES Property Address SAME Permit Type RES

Permit No. B17-0679 Permit Amount $25000.00 Owner(s) BMN LLC

219 JOHN ST City SALINAS

Builder CORIE CONSTRUCTION Property Address SAME Permit Type RES ALT

Permit No. B18- 0023 Permit Amount $315670.00 Owner(s) BMCH CALIFORNIA

1809 MARSALA WAY City SALINAS

Builder BENCHMARK COMMUNITIES Property Address SAME Permit Type RES

Permit No. B18-0024 Permit Amount $344070.00 Owner(s) BMCH CALIFORNIA

1810 MARSALA WAY City SALINAS

Builder BENCHMARK COMMUNITIES Property Address SALINAS Permit Type RES

Permit No. B18-0025 Permit Amount $258355.00 Owner(s) BMCH CALIFORNIA

1811 MARSALA WAY City SALINAS

Builder BENCHMARK COMMUNITIES Property Address SAME Permit Type RES

Permit No. B18-0026 Permit Amount $215695.00 Owner(s) BMCH CALIFORNIA

1812 MARSALA WAY City SALINAS

Builder BENCHMARK COMMUNITIES Property Address SAME Permit Type RES

Permit No. B18-0027 Permit Amount $185580.00 Owner(s) BMCH CALIFORNIA

1813 MARSALA WAY City SALINAS

Builder BENCHMARK COMMUNITIES Property Address SAME Permit Type RES

Permit No. b18-0070 Permit Amount $42000.00 Owner(s) SLAMA KENNITH

726 LAGUARDIA ST # B City SALINAS

Builder RAYMOND HANDLING CONCEPT Property Address SAME Permit Type COM ALT

Permit No. B18-0105 Permit Amount $15722.00 Owner(s) HARDEN RANCH PLAZA

1710 N MAIN ST City SALINAS

Builder ASAP SIGNS & PRINTING Property Address SAME Permit Type COM

Permit No. R18-00987 Permit Amount $10200.00 Owner(s) LOPEZ JOSE

119 N FIRST ST City SALINAS

Builder PREMO ROOFING Property Address SAME Permit Type REROOF

Page 35: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Bid ResultsCity: SANTA CRUZ Date: 02/14/18

Project: CAMPUS RE-ROOFING AT NATURAL BRIDGES

WATER PROOFING ASSOC. $691,868.00 ROOFING & SOLAR CONSTRUCTION $965,000.00 LEGACY $1,142,847.00

City: FREEDOM Date: 02/15/18 Project: TREMBLEY LANE LIFT STATION PUMP REPLACEMENT/ RELOCATION

PACIFIC UNDERGROUND $845,480.00 ANDERSON PACIFICQ $883,830.00 SPIES CONSTRUCTION $1,195,350.00 City: SANTA CRUZ Date: 02/15/18 Project: HIDDEN BEACH WAY SEWER EXTENSION GRANITEROCK $157,545.00 PERCISION GRADE $160,337.00 ANDERSON PACIFIC $170,915.00

City: APTOS Date: 02/22/18 Project: MAIN BREAK ROAD REPAIRS AT VARIOUS LOCATION

EARTHWORKS PAVING CONTRACTORS $129,183.00 GRANITE CONSTRUCTION $185,058.80 City: COUNTY OF SANTA CRUZ Date: 02/22/18

Project: 2018 MEASURE D RESURFACING

O' GRADY PAVING $1,841,312.00 GRANITE CONSTRUCTION $1,868,888.00 AMERICAN PAVEMENT SYSTEMS $1,947,298.00

City: SEASIDE Date: 02/22/18 Project: LIFT STATION UPGRADES FOR DEL MONTE, ROSITA AND MILITARY LIFT STATION

MPE $2,972,000.00

City: MONTEREY Date: 02/22/18 Project: REPLACEMENT OF EXISTING STAIRWAY AT THE MONTEREY CO. FAIR

CA PREMIER RESTORATION $52,415.20

Page 36: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Notice of Completion

Mechanic’s Liens

Release of Lien

Date: 02/22/18 CREDITOR: CLARENCE ELECTRIC CORPORATION DEBTOR: STEWART THOMAS AMOUNT: $4,290.75 Date: 02/22/18 CREDITOR: EDGES ELECTRICAL GROUP DEBTOR: STARWOOD RETAIL AMOUNT: $3,532.87 Date: 02/22/18 CREDITOR: EDGES ELECTRICAL GROUP DEBTOR: SALINAS COMMUNITY YMCA AMOUNT: $12,432.11 Date: 02/20/18 CREDITOR: JOHNSON R WAYNE DEBTOR: STEUCK GORDON AMOUNT: $634.00

Date: 02/20/18 GRANTOR: PFEIFFER FAMILY ELECTRIC GRANTEE: SOTIS DIANA LEE CITY: PEBBLE BEACH

Date: 02/23/18 GRANTOR: WC MARINA GRANTEE: SAME CITY: MARINA Date: 02/22/18 GRANTOR: ROGGE RD. SALINAS INC. GRANTEE: BLUE MOUNTAIN CONSTRUCTION SERVICES INC. CITY: SALINAS Date: 02/21/18 GRANTOR: SALINAS UNION HIGH SCHOOL DISTRICT GRANTEE: COLLINS ELECTRICAL COMPANY INC. CITY: SALINAS Date: 02/21/18 GRANTOR: County of Monterey GRANTEE: STAPLES CONSTRUCTION CITY: MONTEREY Date: 02/21/18 GRANTOR: COUNTY OF MONTEREY GRANTEE: STAPLES CONSTRUCTION CITY: SALINAS Date: 02/21/18 GRANTOR: COUNTY OF MONTEREY GRANTEE: STAPLES CONSTRUCTION CITY: PAJARO Date: 02/21/18 GRANTOR: COUNTY OF MONTEREY GRANTEE: AUSONIO INC CITY: MONTEREY Date: 02/21/18 GRANTOR: CITY OF MONTEREY GRANTEE: STAPLES CONSTRUCTION CITY: GREENFIELD Date: 02/21/18 GRANTOR: CITY OF MONTEREY GRANTEE: AUSONIO INC CITY: SALINAS Date: 02/21/18 GRANTOR: BMC EG GROVE GRANTEE: SAME CITY: EAST GARRISON Date: 02/21/18 GRANTOR: THE TRUSTEES OF CALIFORNIA STATE UNIVERSITY GRANTEE: TOMBLESON CITY: SEASIDE Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: EATON ONE LINE POWER SYSTEM CITY: MONTEREY Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: COLLINS ELECTRICAL COMPANY INC. CITY: MONTEREY Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: THE DON CHAPIN COMPANY CITY: MONTEREY Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: WILLIAM A THAYER CONSTRUCTION CITY: MONTEREY Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: VALS PLUMBING AND HEATING CITY: MONTEREY Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: WILLIAM A THAYER CONSTRUCTION CITY: MONTEREY Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: ALPHA FIRE & SECURITY ALARM CITY: MONTEREY Date: 02/20/18 GRANTOR: CITY OF MONTEREY GRANTEE: CALIFORNIA PREMIER RESTORATION CITY: Monterey Date: 02/20/18 GRANTOR: Soledad 93 GRANTEE: SAME CITY: SOLEDAD Date: 02/20/18 GRANTOR: ROGGE ROAD GRANTEE: BLUE MOUNTAIN CONSTRUCTION SERVICES CITY: SALINAS

Page 37: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating
Page 38: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

What's In It For You:How the homesphereprogram works:

bundle and earn more

[email protected] | (650) 793-8432CONTACT Lorri Lasley to enroll

CONNECT Choose from 80+ Preferred Partner brands across 23 product categories to earn rebates. Continue to purchase products locally.

TRACK Your local HomeSphere expert will help you efficiently track your closings by community, lot and block.

COLLECT HomeSphere bundles your rebate incentives together across all products and brands in a single check.

It’s Easy to Get Started! Set a 10-minute meeting with your local HomeSphere Expert who will walk you through:1. Your Builder Profile & Latest Closed Homes2. Your Enrollment Form3. Your W-9 Form

•Get access to Single-Familyand Multi-Family Rebates

•Bundle all your rebates intoone monthly check

•Continue to increase yourrebate check through HomeSphere’s network ofbuilding product manufacturers

Your cash back can grow. Tap in to HomeSphere's network of 80 manufacturers and brands to increase your rebate check, including:

Over 80+ Partners offer builder incentives exclusively through HomeSphere's national rebate program. Start collecting rebates on building essentials today!

Earn cash back on each productyou install

Page 39: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

What's In It For You:How the homesphereprogram works:

bundle and earn more

[email protected] | (650) 793-8432CONTACT Lorri Lasley to enroll

CONNECT Choose from 80+ Preferred Partner brands across 23 product categories to earn rebates. Continue to purchase products locally.

TRACK Your local HomeSphere expert will help you efficiently track your closings by community, lot and block.

COLLECT HomeSphere bundles your rebate incentives together across all products and brands in a single check.

It’s Easy to Get Started! Set a 10-minute meeting with your local HomeSphere Expert who will walk you through:1. Your Builder Profile & Latest Closed Homes2. Your Enrollment Form3. Your W-9 Form

•Get access to Single-Familyand Multi-Family Rebates

•Bundle all your rebates intoone monthly check

•Continue to increase yourrebate check through HomeSphere’s network ofbuilding product manufacturers

Your cash back can grow. Tap in to HomeSphere's network of 80 manufacturers and brands to increase your rebate check, including:

Over 80+ Partners offer builder incentives exclusively through HomeSphere's national rebate program. Start collecting rebates on building essentials today!

Earn cash back on each productyou install

www.inspiredexpos.com

dream • plan • build

why exhibit at inspired expos?CONNECT with 3,000 to 5,000

qualified clients in 2 days.

INCREASE brand recognition.

ACQUIRE leads and set appointments.

EDUCATE the community on your services.

Reserve Your Space TODAY805.772.4600 • 831.222.0772

MONTEREY EXPOSFall: Oct. 14 & 15, 2017 | Spring: April 21 & 22, 2018

Monterey Home & Garden Expo at the Monterey Fairgrounds

93%are building or

remodeling

14%are home & garden

professionals

7%are purchasing

a home

Page 40: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Employer Sponsored Options Products you can get through your employer. Enrolling is easy! Your company receives a single, consolidated bill and participating employees have the convenience of payment through payroll deductions. Both Group and Voluntary options are available.

Medical – All CA Carriers & Covered CA MetLife Dental – Group and Voluntary VSP Group Vision Anthem Blue View Voluntary Vision Landmark Chiropractic & Acupuncture MetLife Term Life - Group and Voluntary CADR+ Telemedicine - 24/7 Doctors on Call LifeLock Identity Theft Protection

Colonial Life Optional Benefits Accident Insurance Critical Illness Insurance Short Term Disability Insurance Hospital Confinement Insurance Whole Life with LTC Rider

LegalShield Pre-Paid Legal Services Legal Shield Identity Theft Shield

Build a Better Benefits Package!

Through the California Builders Exchanges (CBX), the Central Coast Builders Association now offers a highly competitive benefits program to our member firms and their employees.

Want More Information?

Go to www.cbxbenefits.com

Or contact our local Benefits Consultant!

Tina Nelson Q&A Insurance Marketing, CA Lic. 0B17048 Cecy Insurance Services, CA Lic. 0802215 (831) 477-1730 [email protected]

Individual Options Valuable products, services and discounts that your employees can get directly from one of our contracted providers because you are a member of the Association.

Health Insurance for Individuals and Families Nationwide Pet Insurance LifeLock Identity Theft Protection MetLife Home & Auto Insurance Working Advantage Employee Perks Program LegalShield Pre-Paid Legal Services LegalShield Identity Theft Shield

Great Voluntary Benefits!

No Minimum Participation Low Rates Consolidated Billing Guarantee Issue Options

Page 41: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Classified Ads

OFFICE SUITE FOR LEASE QUAIL RUN CIRLE, SALINAS

BEAUTIFUL OFFICE SPACE CONSISTING OF LOBBY/RECEPTIONIST AREA, MULTIPLE PRIVATE OFFICES, SERVER RM, STORAGE RM, 2 RESTROOMS. 6 DESIGNATED PARK-

ING SPACES WITH A POSSIBILITY OF ADDITIONAL SPACES. MOVE IN READY. $4,352.00 PER

MONTH (2232 SQ FT. @$1.95 SQ FT) WATER PAID BY LANDLORD, ALL OTHER UTILITIES BY TENANT.

CONTACT: ERICK OR JULIE 831-422-8213

Hydro Turf Inc. Employment Opportunity:

Delivery Driver/Counter Person for Irrigation and

Landscape Supply Co. Full time, some Part time hours during Winter.

Experience preferred, will train the right applicant. Current driver’s license and good driving record.

Please provide DMV printout. 750 Work St.

Salinas, Ca 93901 PH. 831-754-2020

M-F 7am-5pm.

Page 42: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Your Local Plan Room Just Got Better!! STATEWIDE ACCESS

Introducing the Golden State Plan Service

Single Statewide Plan Room - You choose the counties you want to see. No more searching multiple Plan Rooms for projects

Mobile Device Accessible - Take your plan room with you

Your local, community based Exchange has always been the best resource for the local con-struction industry. Now your local exchange just got BETTER and STRONGER. This new

plan room combines 14 of the best exchanges in the state, decades of local plan room experi-ence with our local relationship and resources to bring you the most comprehensive plan

room available. Our plans aren’t uploaded from one central location, rather each exchange cultivates its local relationships to bring the best projects from each region to our contractors.

LOCALLY GROUNDED - STATE POWERED

Keep the Plan Room You Know & Use Your company bidding history & saved projects are preserved Updated Plan Room Platform 2.0 - Increased functionality, ease of use & updated search options. You told us what you wanted - WE IMPROVED

More Private Projects- Our collaboration means more cultivation of private work

Page 43: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating

Safety Tip of the WeekACCIDENT FACTORS

Accidents on construction projects cause too many painful injuries and claim far too many lives. Our primary concern when we discuss the factors or causes behind an accident is to find a way to prevent a recurrence. The cause of an accident can be found in two areas -- Unsafe Acts and Unsafe Conditions.

As a construction worker you control the first cause, Unsafe Acts. For example: a worker uses equipment that is defective or damaged, or they may use good equipment in a careless or other unsafe manner. Other examples of unsafe acts include disregarding posted warning signs, failure to wear a hard hat, smoking near flammables or explosives, working too close to power lines, handling chemicals or other hazardous materials improperly, putting your body or any part of it onto or into shafts or openings and lifting material incorrectly. (Just a short reminder -- always lift with your legs while keeping your back straight.)

The second accident factor or cause is Unsafe Conditions which can be found on many construction sites. Examples include inadequate or improperly installed guard rails or a lack of any guarding at all which most certainly will lead to an accident. Insufficient illumination, poor ventilation, electrical grounding requirements not observed, too few fire extinguishers available, containers that are not labeled, careless disposal of waste or excess material -- these are just a few of many unsafe conditions that may be caused by co-workers, subcontractors, or the general contractor.

You can make a difference by taking the time to perform your work safely and reporting any unsafe condition you discover to your supervisor immediately.

When the cause behind the accident is found, you'll find that safety on the job plays a major part in preventing that accident from occurring again. If everyone on the job cooperates, injury and death statistics will be reduced and it will be much safer for you to do your job.

Accidents - Learn the cause - Find the solution. Ultimately the jobsite and your job will be safer.

Safety Recommendations:__________________________________________________________________________________

Job Specific Topics:_______________________________________________________________________________________

M.S.D.S Reviewed:_______________________________________________________________________________________

Attended By:

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_____________________________________________________________________________________________

Page 44: Builders Bulletininmates, including programs for education and job training. ... This bill would expand the definition of “public works,” for the purposes of provisions relating