Brief summary of project – Ghankun Steel Pvt. Ltd.[Expansion]
Ghankun Steel Private Ltd. at Plot No.: 78(P), Phase–2, SIltara Industrial Area and Khasara Nos.:
464/4, 464/5, 465/1, 466/1, 466/2, 464/2, 464/3, 522, 470/1-2-3, 469/1-2, 467/1-8, 465/2, 468/2,
468of Village: Sondra, PH No.: 99, RIC: – Dharsiwa - 1, Tehsil & District: Raipur, Chhattisgarh.
Existing plant does not have Environmental Clearance as it was in operation prior to September
2006 and obtained only Consent for Establishment from Chhattisgarh Environment Conservation
Board, Raipur.
Now As part of expansion, we are planning to enhance the capacity of Induction Furnace and
establish new unit of Pellet plant, Rolling mill and Ferro alloys. Following is production capacity and
plant configuration:
S.
No.
Unit Existing CFE awarded Proposed
Expansion
After
Expansion Implemented To be
commissioned
1. Pelletization unit --- --- 0.3 MTPA
(1 x 1000 TPD)
0.3 MTPA
(1 x 1000 TPD)
2. DRI Kilns
(Sponge Iron )
2 x 50 TPD &
1 x 150 TPD
= (75,000 TPA)
2 x 50 TPD &
1 x 150 TPD
= (75,000 TPA)
3. Induction Furnace with
concast (Billets / Ingots)
1 x 6 MT
= (30,000 TPA)
1 x 6 MT
= (30,000 TPA)
3 x 10 MT
= (90,000 TPA)
2 x 6 MT &
3 x 10 MT
= (150000 TPA)
4. Rolling Mill --- --- 1 x 500 TPD
= (150000 TPA)
1 x 500 TPD
= (150000 TPA)
5. Ferro alloys [2 x 9 MVA] --- --- 2 x 9 MVA 2 x 9 MVA
i. Ferro – Silicon --- --- 12600 TPA 12600 TPA
or or or
ii. Silico–Manganese --- --- 28400 TPA 28400 TPA
or or or
iii. Ferro–Manganese --- --- 37000 TPA 37000 TPA
6. Power WHRB based 1 MW 5 MW --- 6 MW
FBC based --- 2 MW --- 2 MW
Salient Features of the project:
27.19 acres of land is in possession of management and proposed expansion will be taken
up the existing plant premises.
Total project cost envisaged for the proposed project is Rs. 130.0 Crores.
There are no National Parks, Wildlife Sanctuary, Biosphere Reserve, Reserve forests within
10 Km. radius of the project site.
Kharun river & Kulhan nallah are flowing at distance of 3.2 Kms. & 9.0 Kms. from the project
site.
No forest area is involved in the proposed expansion project.
There are no court / violation cases pending against the project proponent.
Water required for the proposed expansion project will be 760 KLD. Water required will be
supplied by C.G. Ispat Bhumi Ltd.
Closed circuit system will be adopted in the proposed expansion project, hence no effluent will be
generated from the proposed project. Only waste water generated will be sanitary waste water
which will be treated in septic tank followed soak pit.
Ash generated from the Pellet plant will be recycled back into the process. Tar generated from
Producer gas will be given to coal tar distillation units. Slag generated from SMS will be crushed and
after iron recovery the inert material will be used in road construction/given to brick
manufacturers. Mills scales from Rolling mill will be reused in SMS. Slag from FeMn to be reused in
manufacture of Silico Manganese as it contains high MnO2 and Silicon. Slag from FeSi to be used in
cast iron foundries. Slag from SiMn to be used for road construction / slag cement manufacture
33% of total area will be designated for greenbelt.