bindaree beef new hydrant system concept plan
TRANSCRIPT
BUILDING AREASRENDER BUILDING 1440m²MAP BUILDING 1990m²OPEN YARD 19880m²
BCA REVIEW BCA PART E1.3 A HYDRANT SYSTEM MUST BE PROVIDED IF BUILDING FLOOR AREA IS >500m² AND A FIRE BRIGADE CAN ATTEND. INVERELL HAS A NSW FIRE AND RESCUE FIRE BRIGADE. HENCE, HYDRANT SYSTEM IS REQUIRED FOR THE RENDER BUILDING AND THE MAP BUILDING. BUILDING NOT A CLASS 8 ELECTRICITY SUBSTATION SO SYSTEM TO BE IN ACCORDANCE WITH AS2419.1. NOTE: REFERENCED VERSION OF AS2419.1 IS 2005.
AS2419.1 REVIEW TABLE 2.1 - NUMBER OF HYDRANTS REQUIRED TO BE OPERATING IS DEPENDENT ON BUILDING CLASSIFICATION. THE BUILDINGS ARE CLASS 8. FOR CLASS 6, 7 AND 8 BUILDINGS OF 500m² - 5000m², NUMBER OF HYDRANTS = 2. FOR OPEN YARD PROTECTION OF 20,000m², NUMBER OF HYDRANTS = 3. EACH HYDRANT VALVE TO FLOW 10L/s. TOTAL FLOW = 30L/s MAXIMUM PRESSURE DROP THROUGH SYSTEM AT 30L/s AND 700kPa IS 150kPa. THE SITE HAS NO TOWN WATER SUPPLY, SO WATER IS TO BE PROVIDED FROM ON SITE STORAGE. PRESSURE AND FLOW REQUIREMENTS ARE TO BE PROVIDED BY ONSITE PUMPS. FLOW PROVIDED WITHOUT A FIRE BRIGADE APPLIANCE TO BE 5L/s AS PER TABLE 2.3 PRESSURE REQUIREMENT FOR AN ATTACK HYDRANT TO BE 700kPa AS PER TABLE 2.3. WATER STORAGE CAPACITY MUST BE FOR 4 HOURS AT 30L/s = 432kL. WATER STORAGE SHALL BE SUPPLIED SUCH THAT 50% IS AVAILABLE DURING MAINTENANCE ACTIVITIES - IE 2 TANKS OF EQUAL CAPACITY
CALCULATIONSTHE PIPE SIZES SHOWN GIVE A CALCULATED PRESSURE LOSS THROUGH THE SYSTEM WITH OPERATIONAL HYDRANTS 1, 2 AND 3 AT 10L/s EACH (30L/sTOTAL) OF 125kPa. THE ALLOWANCE IN AS2419.1 IS 150kPa
HYDRANT COVERAGE NOTES COVERAGE IS SHOWN TO BUILDINGS BUT HAS NOT CONFIRMED DETAILED COVERAGE OF ALL ROOMS WITHIN THE BUILDINGS COVERAGE HAS BEEN SHOWN TO THE OPEN YARD AREA WITH SPECIAL ATTENTION PAID TO THE AREA AROUND THE BIOGAS STORAGE DOME. COVERAGE IS PROVIDED BASED ON ONLY HYDRANTS WHICH ARE NO LESS THAN 10m AWAY FROM THE STRUCTURE. HYDRANTS CLOSER THAN 10m
HAVE NOT BEEN USED TO ASSESS COVERAGE TO THE STRUCTURE THEY ARE CLOSE TO. NEAR THE DOME, 2 HYDRANTS EACH WITH 2 LANDING VALVES HAVE BEEN LOCATED SO THAT THE HYDRANT ITSELF IS OUTSIDE THE LINES SHOWN
AS 4.7kW/m² FOR EVENT SCENARIO 1 AND 5.0kW/m² FOR EVENT SCENARIO 2 IN THE HAZARD AND RISK ASSESSMENT REPORT. FROM THESE POINTS, THE DOME IS WITHIN THE AS2419 ALLOWANCE OF 60m OF HOSE AND 10m OF WATER SPRAY FOR AN EXTERNAL ATTACK
HYDRANT. ALSO SHOWN IS A POSSIBLE TRUCK LOCATION THAT WOULD BE LIKELY IF THE HYDRANTS WERE TO BE USED AS FEED HYDRANTS. IT IS SHOWN
THAT THE TRUCKS COULD BE NO CLOSER THAN 25m TO THE DOME AND ACHIEVE COVERAGE IN ACCORDANCE WITH AS2419.
NOTETHIS REVIEW DOES NOT INCLUDE ALLOWANCES FOR EXTRA HYDRANT PROTECTION TO SPECIFIC AREAS THAT MAY BE REQUIRED IF A FIRE ENGINEEREDSOLUTION IS UNDERTAKEN OR IF A FIRE SAFETY REVIEW IS COMPLETED BY FIRE AND RESCUE NSW.
BINDAREE BEEFNEW HYDRANT SYSTEM CONCEPT PLAN
1. THIS PLAN IS A CONCEPT PLAN AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES
2. THIS PLAN IS GENERALLY IN ACCORDANCE WITH AS 3500 AND AS2419.1.
3. THIS PLAN SHALL BE READ IN CONJUNCTION WITH APPROVED MRF DESIGNS AND PLANS.
4. PIPEWORK MATERIALS SHALL BE AS FOLLOWS;
UPVC CLASS 18 PIPEWORK AND FITTINGS FOR BELOW GROUND HYDRANT PIPE WORK GALVANISED STEEL PIPEWORK AND FITTINGS FOR ABOVE GROUND HYDRANT PIPE WORK.
5. THE BCA EVALUATION AND REVIEW OF APPLICABLE CODES IS INCLUDED ON THIS PAGE TO ASSIST INTHE UNDERSTANDING OF THE DESIGN CHOICES SHOWN
6. A CHOICE IS REQUIRED REGARDING THE ARRANGEMENT OF THE PUMP DRIVERS. A REPORT HASBEEN PREPARED THAT OUTLINES SOME OF THE OPTIONS AND THE FEATURES OF THE VARIOUSOPTIONS. THESE PLANS SHOULD BE READ IN CONJUNCTION WITH THIS REPORT.
B14037 H01 FIRE SERVICES - LEGEND, NOTES, LOCALITY PLAN AND DRAWING SCHEDULEB14037 H02 FIRE SERVICES - FULL SITE PLAN AND HYDRANT COVERAGE PLANB14037 H03 FIRE SERVICES - PART SITE PLAN AND HYDRANT COVERAGE PLAN - SHEET 1 OF 4B14037 H04 FIRE SERVICES - SITE PLAN AND HYDRANT COVERAGE PLAN - SHEET 2 OF 4B14037 H05 FIRE SERVICES - SITE PLAN AND HYDRANT COVERAGE PLAN - SHEET 3 OF 4B14037 H06 FIRE SERVICES - SITE PLAN AND HYDRANT COVERAGE PLAN - SHEET 4 OF 4B14037 H07 FIRE SERVICES - DETAILS
FIRE SERVICES
HYDRANT VALVE
DUAL FIRE HYDRANT
DUAL PUMPSET
STORMWATER DRAINAGE
SWP WITH GRATED LID
SITE SURFACES
HARD STAND AREAS
PIPEWORK LEGEND
FIRE SERVICE
WATER SYMBOLS
VALVE
SINGLE CHECK VALVE
DOUBLE CHECK VALVE
PUMP
GENERAL SYMBOLS
CAP OFF
FLOW DIRECTION
CONNECTION TO EXISTING SERVICE
PIPE PENETRATING
PIPE NOT PENETRATING
OFFSET PENTRATING
OFFSET NOT PENTRATING
GENERAL METER
12/03/14 BH
01 PRELIMINARY ISSUE 12/03/14 BH02 UPDATE 1 13/03/14 BHA FINAL CONCEPT PLAN 19/03/14 BH
LEGEND, LOCALITY PLAN ANDDRAWING SCHEDULE
FIRE SERVICES
A
BINDAREE BEEFNEW HYDRANT CONCEPT PLANS
A1
QUALITY ASSURANCE DOCUMENT CONTROL
QUALITY ASSURANCE DOCUMENT CONTROL
95% PRE-TENDERDESIGN DEVELOPMENTSCHEME DESIGN
TENDER ISSUECONSTRUCTION ISSUE
© COPYRIGHT. THIS DOCUMENT AND DESIGN REMAIN THECOPYRIGHT OF CLARENCE CONSULTANTS PTY LTD ANDCANNOT BE REPRODUCED IN ANY WAY WITHOUT PRIORWRITTEN CONSENT.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELSON SITE AS THIS IS NOT A WORKSHOP DRAWING.THE CONTRACTOR SHALL REFER ANY DISCREPANCIES TO THEENGINEER BEFORE PROCEEDING WITH THE WORK.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHERDRAWINGS IN THE SET AND PROJECT SPECIFICATION.
DESCRIPTION
AMENDMENTS
CHK'DDATEREV
NOTES PROJECT DRAWING TITLE
STATUS DATE INITIALS ABN 561 695 437 63
Pty Ltd
Consulting Engineers
Electrical
Mechanical
Hydraulic
Power Infrastructure
Sustainability by Design
Level 1 53 Victoria St
Grafton 2460
ph: 02 6642 7239
Coffs Harbour 2450
ph: 02 6652 4855
NTS MAR 13 BH BH
B14037 H01
BCA AND AS2419 ASSESSMENTNOT TO SCALE
GUARD HOUSE
FLARE
DRYING
AREA
BIOGAS
STORAGE
DOME
DIGESTATE
STORAGE
DIGESTATE
STORAGE
CSTR
TANK
UASB
SUBSTRATE
TANKCSTR
TANK CSTR
TANK
USAB
TANKUSAB
TANK
GAS REFILL
APRON
O2
TANK
CO2
TANK
CARTON LOADING
APRON
18m
40m
25m
31m
60m
FIRE BRIGADE PUMPINGAPPLIANCE
FIRE BRIGADE PUMPINGAPPLIANCE
WATER TANKS
PUMP ROOM
FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GROUND CLASS 18 PVC FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø100 IN GR
OUND
CLA
SS 18
PVC
FH Ø100 IN GR
OUND
CLA
SS 18
PVC
KEY10m LINE FROM HYDRANT70m LINE FROM HYDRANT 60m HOSE AND 10m WATER SPRAY18m LINE FROM BIOGAS DOME HEAT FLUX ~ 10kW/m²40m LINE FROM BIOGAS DOME HEAT FLUX ~ 5kW/m²60m LINE FROM BIOGAS DOME HEAT FLUX ~ 2kW/m²
FULL SITE PLAN AND HYDRANTCOVERAGE PLAN
FIRE SERVICES
A
BINDAREE BEEFNEW HYDRANT CONCEPT PLANS
12/03/14 BH
01 PRELIMINARY ISSUE 12/03/14 BH02 UPDATE 1 13/03/14 BH03 PLOTTED IN COLOUR - KEY ADDED 14/03/14 BHA FINAL CONCEPT PLAN 19/03/14 BH
1.
A1
QUALITY ASSURANCE DOCUMENT CONTROL
QUALITY ASSURANCE DOCUMENT CONTROL
95% PRE-TENDERDESIGN DEVELOPMENTSCHEME DESIGN
TENDER ISSUECONSTRUCTION ISSUE
© COPYRIGHT. THIS DOCUMENT AND DESIGN REMAIN THECOPYRIGHT OF CLARENCE CONSULTANTS PTY LTD ANDCANNOT BE REPRODUCED IN ANY WAY WITHOUT PRIORWRITTEN CONSENT.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELSON SITE AS THIS IS NOT A WORKSHOP DRAWING.THE CONTRACTOR SHALL REFER ANY DISCREPANCIES TO THEENGINEER BEFORE PROCEEDING WITH THE WORK.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHERDRAWINGS IN THE SET AND PROJECT SPECIFICATION.
DESCRIPTION
AMENDMENTS
CHK'DDATEREV
NOTES PROJECT DRAWING TITLE
STATUS DATE INITIALS ABN 561 695 437 63
Pty Ltd
Consulting Engineers
Electrical
Mechanical
Hydraulic
Power Infrastructure
Sustainability by Design
Level 1 53 Victoria St
Grafton 2460
ph: 02 6642 7239
Coffs Harbour 2450
ph: 02 6652 4855
1:500 MAR 13 BH BH
B14037 H02
GUARD HOUSE
GAS REFILL
APRON
VENTVENTVENTVENT
O2
TANK
CO2
TANK
CARTON LOADING
APRON
B B
B
B
FH Ø150 IN GROUND CLASS 18 PVC
POSSIBLE TANK PIONEER MODEL XL40 3RTANK TO BE MOUNTED ON SAND BASE, COMPLETE WITH HEAVY DUTYTANK LINER AND FITTINGS TO COMPLY WITH AS2419.1
TOWN OR BORE WATERFILLING POINT
POSSIBLE CONNECTION TOROOF STORM WATER SYSTEMTO FILL TANKS
SEE DETAIL FOR MORE INFORMATIONREGARDING PUMP ROOM LAYOUT
FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
PART SITE PLAN AND HYDRANTCOVERAGE PLAN - SHEET 1 OF 4MAP FACILITY
FIRE SERVICES
A
BINDAREE BEEFNEW HYDRANT CONCEPT PLANS
12/03/14 BH
01 PRELIMINARY ISSUE 12/03/14 BH02 UPDATE 1 13/03/14 BH03 PLOTTED IN COLOUR - NO CHANGES 14/03/14 BHA FINAL CONCEPT PLAN 19/03/14 BH
1.
A1
QUALITY ASSURANCE DOCUMENT CONTROL
QUALITY ASSURANCE DOCUMENT CONTROL
95% PRE-TENDERDESIGN DEVELOPMENTSCHEME DESIGN
TENDER ISSUECONSTRUCTION ISSUE
© COPYRIGHT. THIS DOCUMENT AND DESIGN REMAIN THECOPYRIGHT OF CLARENCE CONSULTANTS PTY LTD ANDCANNOT BE REPRODUCED IN ANY WAY WITHOUT PRIORWRITTEN CONSENT.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELSON SITE AS THIS IS NOT A WORKSHOP DRAWING.THE CONTRACTOR SHALL REFER ANY DISCREPANCIES TO THEENGINEER BEFORE PROCEEDING WITH THE WORK.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHERDRAWINGS IN THE SET AND PROJECT SPECIFICATION.
DESCRIPTION
AMENDMENTS
CHK'DDATEREV
NOTES PROJECT DRAWING TITLE
STATUS DATE INITIALS ABN 561 695 437 63
Pty Ltd
Consulting Engineers
Electrical
Mechanical
Hydraulic
Power Infrastructure
Sustainability by Design
Level 1 53 Victoria St
Grafton 2460
ph: 02 6642 7239
Coffs Harbour 2450
ph: 02 6652 4855
1:200 MAR 13 BH BH
B14037 H03
2070
FH Ø150 IN GROUND CLASS 18 PVC FH Ø150 IN GROUND CLASS 18 PVC FH Ø150 IN GROUND CLASS 18 PVC
FH Ø100 IN GR
OUND
CLA
SS 18
PVC
FH Ø10
0 IN GR
OUND C
LASS 18
PVC
FH Ø100 IN GROUND CLASS 18 PVC
PART SITE PLAN AND HYDRANTCOVERAGE PLAN - SHEET 1 OF 4RENDER PLANT AND BIOFILTER
FIRE SERVICES
A
BINDAREE BEEFNEW HYDRANT CONCEPT PLANS
12/03/14 BH
01 PRELIMINARY ISSUE 12/03/14 BH02 UPDATE 1 13/03/14 BH03 PLOTTED IN COLOUR - NO CHANGES 14/03/14 BHA FINAL CONCEPT PLAN 19/03/14 BH
1.
A1
QUALITY ASSURANCE DOCUMENT CONTROL
QUALITY ASSURANCE DOCUMENT CONTROL
95% PRE-TENDERDESIGN DEVELOPMENTSCHEME DESIGN
TENDER ISSUECONSTRUCTION ISSUE
© COPYRIGHT. THIS DOCUMENT AND DESIGN REMAIN THECOPYRIGHT OF CLARENCE CONSULTANTS PTY LTD ANDCANNOT BE REPRODUCED IN ANY WAY WITHOUT PRIORWRITTEN CONSENT.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELSON SITE AS THIS IS NOT A WORKSHOP DRAWING.THE CONTRACTOR SHALL REFER ANY DISCREPANCIES TO THEENGINEER BEFORE PROCEEDING WITH THE WORK.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHERDRAWINGS IN THE SET AND PROJECT SPECIFICATION.
DESCRIPTION
AMENDMENTS
CHK'DDATEREV
NOTES PROJECT DRAWING TITLE
STATUS DATE INITIALS ABN 561 695 437 63
Pty Ltd
Consulting Engineers
Electrical
Mechanical
Hydraulic
Power Infrastructure
Sustainability by Design
Level 1 53 Victoria St
Grafton 2460
ph: 02 6642 7239
Coffs Harbour 2450
ph: 02 6652 4855
1:200 MAR 13 BH BH
B14037 H04
DRYING
AREA
BIOGAS
CSTR
TANK
UASB
SUBSTRATE
TANKCSTR
TANK CSTR
TANK
B
B
B
B
2070
6669
0
1175 2032 BB
FIRE BRIGADE PUMPING APPLIANCE #2LOCATION AND SPACE ALLOWANCE
FIRE BRIGADE PUMPING APPLIANCE #1LOCATION AND SPACE ALLOWANCE
R10000
25m
31m
OPERATIONAL HYDRANT #1
OPERATIONAL HYDRANT #2
FH Ø150 IN GROUND CLASS 18 PVC FH Ø150 IN GROUND CLASS 18 PVC FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GROUND CLASS 18 PVC FH Ø150 IN GROUND CLASS 18 PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø100 IN GR
OUND
CLA
SS 18
PVC
FH Ø100 IN GR
OUND
CLA
SS 18
PVC
FH Ø100 IN GROUND CLASS 18 PVC
PART SITE PLAN AND HYDRANTCOVERAGE PLAN - SHEET 1 OF 4STORAGE TANK AREA
FIRE SERVICES
A
BINDAREE BEEFNEW HYDRANT CONCEPT PLANS
12/03/14 BH
01 PRELIMINARY ISSUE 12/03/14 BH02 UPDATE 1 13/03/14 BH03 PLOTTED IN COLOUR - NO CHANGES 14/03/14 BHA FINAL CONCEPT PLAN 19/03/14 BH
1.
A1
QUALITY ASSURANCE DOCUMENT CONTROL
QUALITY ASSURANCE DOCUMENT CONTROL
95% PRE-TENDERDESIGN DEVELOPMENTSCHEME DESIGN
TENDER ISSUECONSTRUCTION ISSUE
© COPYRIGHT. THIS DOCUMENT AND DESIGN REMAIN THECOPYRIGHT OF CLARENCE CONSULTANTS PTY LTD ANDCANNOT BE REPRODUCED IN ANY WAY WITHOUT PRIORWRITTEN CONSENT.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELSON SITE AS THIS IS NOT A WORKSHOP DRAWING.THE CONTRACTOR SHALL REFER ANY DISCREPANCIES TO THEENGINEER BEFORE PROCEEDING WITH THE WORK.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHERDRAWINGS IN THE SET AND PROJECT SPECIFICATION.
DESCRIPTION
AMENDMENTS
CHK'DDATEREV
NOTES PROJECT DRAWING TITLE
STATUS DATE INITIALS ABN 561 695 437 63
Pty Ltd
Consulting Engineers
Electrical
Mechanical
Hydraulic
Power Infrastructure
Sustainability by Design
Level 1 53 Victoria St
Grafton 2460
ph: 02 6642 7239
Coffs Harbour 2450
ph: 02 6652 4855
1:200 MAR 13 BH BH
B14037 H05
FLARE
DRYING
AREA
BIOGAS
STORAGE
DOME
DIGESTATE
STORAGE
DIGESTATE
STORAGE
CSTR
TANK CSTR
TANK
B
B
BB
18m
40m
FIRE BRIGADE PUMPING APPLIANCE #2LOCATION AND SPACE ALLOWANCE
FIRE BRIGADE PUMPING APPLIANCE #1LOCATION AND SPACE ALLOWANCE
25m
31m
60m
OPERATIONAL HYDRANT #3
OPERATIONAL HYDRANT #1
OPERATIONAL HYDRANT #2
FH Ø150 IN GROUND CLASS 18 PVCFH
Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø150 IN GR
OUND
CLA
SS 18
PVC
FH Ø100 IN GR
OUND
CLA
SS 18
PVC
FH Ø100 IN GROUND CLASS 18 PVC
FH Ø100 IN GROUND CLASS 18 PVC
PART SITE PLAN AND HYDRANTCOVERAGE PLAN - SHEET 1 OF 4BIOGAS DOME AND FLARE
FIRE SERVICES
A
BINDAREE BEEFNEW HYDRANT CONCEPT PLANS
12/03/14 BH
01 PRELIMINARY ISSUE 12/03/14 BH02 UPDATE 1 13/03/14 BH03 PLOTTED IN COLOUR - NO CHANGES 14/03/14 BHA FINAL CONCEPT PLAN 19/03/14 BH
1.
A1
QUALITY ASSURANCE DOCUMENT CONTROL
QUALITY ASSURANCE DOCUMENT CONTROL
95% PRE-TENDERDESIGN DEVELOPMENTSCHEME DESIGN
TENDER ISSUECONSTRUCTION ISSUE
© COPYRIGHT. THIS DOCUMENT AND DESIGN REMAIN THECOPYRIGHT OF CLARENCE CONSULTANTS PTY LTD ANDCANNOT BE REPRODUCED IN ANY WAY WITHOUT PRIORWRITTEN CONSENT.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELSON SITE AS THIS IS NOT A WORKSHOP DRAWING.THE CONTRACTOR SHALL REFER ANY DISCREPANCIES TO THEENGINEER BEFORE PROCEEDING WITH THE WORK.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHERDRAWINGS IN THE SET AND PROJECT SPECIFICATION.
DESCRIPTION
AMENDMENTS
CHK'DDATEREV
NOTES PROJECT DRAWING TITLE
STATUS DATE INITIALS ABN 561 695 437 63
Pty Ltd
Consulting Engineers
Electrical
Mechanical
Hydraulic
Power Infrastructure
Sustainability by Design
Level 1 53 Victoria St
Grafton 2460
ph: 02 6642 7239
Coffs Harbour 2450
ph: 02 6652 4855
1:200 MAR 13 BH BH
B14037 H06
FIREPUMP 2
PUIMPROOM DETAIL
DRIVERLOCATION
CONTROLPANEL
150
FIREPUMP 1DRIVER
LOCATIONCONTROLPANEL
EXHAUST(IF DIESEL)PERFORATED ROLLER DOOR LARGE
ENOUGH TO REMOVE EITHERPUMP ON ITS SKIDS
600x600mm STORM WATERPIT TO BE CONNECTED TO
SITE STORM WATER SYSTEM
150
150
VENTILATION OPENINGS IN THISWALL TO PROVIDE CROSS VENTILATIONFOR ENGINES IF FITTED.MAY BE ACHIEVED WITH ANOTHERPERFORATED ROLLER DOOR.
CONTRACTOR TO ENGAGE ELECTRICIANTO PROVIDE LIGHTING TO PUMP SHED
TO AS1680.2.1
PUMP MOTORS CAN BE EITHER 2 DIESEL 1 DIESEL AND 1 ELECTRIC 2 ELECTRIC IF 1 IS FED FROM AN AUTOSTARTING EMERGENCY POWER GENERATOR SEE OPTIONS REPORT FOR MORE DETAILS
EXHAUST(IF DIESEL)
OUTLET
SUCTION
CONTROLPANEL
125 120
800
450mm x 450mm x 450mmCONCRETE SURROUND
FINISHED CONCRETE25mm ABOVE FINISHED
SURFACE LEVEL
Ø100 TEEØ100 RISER
FINISHED SURFACELEVEL
Ø65 HYDRANT VALVEWITH CHAIN AND CAP
100 x 65 REDUCER
TYPICAL EXTERNAL FREE STANDING FIRE HYDRANTN.T.S.
1200mm HIGH BOLLARDTO PROVIDE VEHICULAR
PROTECTION TOHYDRANTS
01 PRELIMINARY ISSUE 12/03/14 BH02 UPDATE 1 13/03/14 BHA FINAL CONCEPT PLAN 19/03/14 BH
12/03/14 BH
DETAILSFIRE SERVICES
A
A1
QUALITY ASSURANCE DOCUMENT CONTROL
QUALITY ASSURANCE DOCUMENT CONTROL
95% PRE-TENDERDESIGN DEVELOPMENTSCHEME DESIGN
TENDER ISSUECONSTRUCTION ISSUE
© COPYRIGHT. THIS DOCUMENT AND DESIGN REMAIN THECOPYRIGHT OF CLARENCE CONSULTANTS PTY LTD ANDCANNOT BE REPRODUCED IN ANY WAY WITHOUT PRIORWRITTEN CONSENT.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LEVELSON SITE AS THIS IS NOT A WORKSHOP DRAWING.THE CONTRACTOR SHALL REFER ANY DISCREPANCIES TO THEENGINEER BEFORE PROCEEDING WITH THE WORK.THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHERDRAWINGS IN THE SET AND PROJECT SPECIFICATION.
DESCRIPTION
AMENDMENTS
CHK'DDATEREV
NOTES PROJECT DRAWING TITLE
STATUS DATE INITIALS ABN 561 695 437 63
Pty Ltd
Consulting Engineers
Electrical
Mechanical
Hydraulic
Power Infrastructure
Sustainability by Design
Level 1 53 Victoria St
Grafton 2460
ph: 02 6642 7239
Coffs Harbour 2450
ph: 02 6652 4855
NTS MAR 13 BH BH
B14037 H07
BINDAREE BEEFNEW HYDRANT CONCEPT PLANS