Page 1: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex
Page 2: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

BIM Case Studies: James Kearney , O’Hare & Mc Govern Ltd

Page 3: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

O’Hare & McGovern Ltd are an established Main Contractor withover 40 years’ experience in delivering high quality projectsacross the UK and Ireland with a turnover in excess of £100m.

We deliver award winning construction projects for our clientsacross a range of sectors; and are recognised as an Industryleader in Innovation and construction excellence with a particularemphasis on Building Information Modelling and SustainableConstruction Development.

Page 4: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Project Details:Project: Wellcome-Wolfson Institute for Experimental MedicineMain Contractor: O’Hare & McGovern (OHMG)Client: Queen’s University Belfast (QUB)Completed: 2015Construction Value: £18.7mProgramme: 2 Years

Northern Ireland’s Largest BIM project:BIM Level 2 deliverablesCOBie dataAsset Information model for FM

Awards Details:RICS Awards 2016 – Overall WinnerRICS Awards 2016 – Design through InnovationConsiderate Constructors Scheme 2016 – Silver AwardCEF Excellence Award 2015 – Overall WinnerCEF Excellence Award 2015 – Education Winner

Page 5: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Building Introduction

The Wellcome-Wolfson Institute for Experimental Medicine(WWIEM) is an innovative biomedical research anddevelopment facility located on the Belfast City Hospital sitefor Queen’s University. With an internal floor area of 9000m2,it accommodates 330 staff specialising in medical researchinto finding cures for eye disease & diabetes, and thedevelopment of a global programme to aid genetics ofcomplex chronic diseases.

In accordance with the design concept, laboratories arearranged around a central atrium to encouraged collaborativeworking, with transparency through the building and betweenresearch spaces. The idea was to maintain a clear adaptablefloor plate, free from service risers. This was achieved byrouting essential ductwork vertically on the building perimeterwithin an energy efficient double skin façade. BIM wassuccessfully used as a tool for the design development,fabrication, installation and operation of the facility.

Page 6: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Site Context

The site, surrounded by a fully operational Belfast Health Trustfacility is also home to a number Queen’s University buildings,where they form the joint health-sciences campus.

Initial works required the demolition of the ‘old Nurses home’building to make way for the new facility. The site entranceshared the same road as the emergency blue light route usedby the Belfast City Hospital which required high levelstakeholder engagement, particularly during the constructionphase.

The WWIEM building also abuts the existing cancer researchbuilding, creating a single location for advanced biomedicalresearch.

Page 7: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Design Concept

Page 8: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Site Layout Plan

Page 9: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Design Concept – Collaboration Zone

Page 10: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Design Concept – Write up & Offices

Page 11: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Design Concept – Primary & Secondary Labs

Page 12: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Design Concept – Environmental Wall

Page 13: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Project Drivers for BIM

The Client on the project was Queens University, Belfast, who’sasset portfolio is managed by their Estates Directorate. QUB’sdesign team were already experienced in delivering complexbuildings at BIM level 2 and OHMG was a BIM ready contractor.

Facilities Management was the key driver in the implementation of BIM within the project for post tender operations.

The use of BIM was seen as a pathfinder project for OHMG on theWWIEM and for future projects across the QUB estate, which weare currently now delivering.

The WWIEM project broke new ground for OHMG and QUB as thiswas our first BIM project together. The lessons learnt on theWWIEM have directly influenced both our internal BIM processesand QUB’s Estates department’s direction towards being aninformed Client with aspirations towards creating a ‘smartcampus’.

Page 14: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

OHMG BIM Objectives

Adopt and deliver BIM in accordance with GSL (GovernmentSoft Landings).

Develop PAS 1192-2:2013 compliant documentation – BIMExecution Plan & Master Information Delivery Plan.

Develop a BIM ready supply chain.

Provide data in COBie format for Client FM

Maximise feedback in BIM reviews with Client, Design Teamand end users through the use of 3D models.

Use BIM to co-ordinate the distribution of M+E services withinthe building fabric and structure and provide a BIM modeloutputs to inform O+M documents.

Page 15: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

In line with the EIR and in compliancewith the PAS 1192-2:2013 specification;OHMG undertook the roles of:

• Project Information Manager

• Project Delivery Manager

Facilitating and managing the project CDE(common data environment).

Managing and approving BIM deliverablesfrom supply chain.

Co-ordinating information received fromthe Design Team and other specialists intothe PIM (project Information model).

Clash detection and delivery of an AssetInformation Model for FM.

OHMG Role in the BIM Process

Page 16: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Accurate Works Information throughconsistency of drawings and reports.

Collaboration and Integrated teamworking achieved by building commongoals and managing communicationthrough the CDE .

Clash Avoidance & Detection toeliminate interface and co-ordinationchallenges using Navisworks.

Lean Techniques to minimise wasteddesign and construction effort.

3D Simulation to demonstrate safemethods of working, constructionlogistics, planning and movement

OHMG BIM Implementation Goals

Page 17: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

The most complex Contractor designedelement was the external envelope

OHMG appointed:

• Architectural Design Validator

• Structural Design Validators

• M+E Design Validator

Design & Technical Workshops held todevelop twin wall interfaces and toensure continuous collaboration withthe Client’s Design Team.

BIM visualisation and clash detectionwere used to aid the integration ofbuilding services within the twin wallsystem.

OHMG Design Development Challenges

Twin wall Installation Twin wall Complete

Page 18: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Energy Savings achieved by the twinskin acting as a solar collector.

Air Tightness of the externalenvelope and twin wall skin was amajor factor in targeting a BREEAMrating of Excellent.

Weather Protected Service Zonecreates an enclosed weatherprotected zone with access toservices for maintenance.

Solar gain/ glare into the labs wascontrolled using automated louvresfitted within the twin wall system.

OHMG Sustainability Challenges

Page 19: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

Site Logistics

Heavily restricted by the constraints ofa live site, surrounded by sensitive andfully operational healthcare facilities,pre-planning and the promotion of offsite fabrication was essential in thedelivery of a high quality project.

Business Continuity

Existing buildings located in theimmediate vicinity of the site wereunaffected during construction andremained active, with research andtreatment able to take place duringnormal working hours.

Lean Construction

The use of 3D models during thedesign stage and prior to constructionfed into what was a very efficient, leanconstruction programme.

OHMG Construction Challenges

Page 20: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

OHMG Construction Challenges M&E Coordinator

Key role in the development of thefinal co-ordinated design to meet QUB& BIM requirements.

M+E Contract details

£7.5 Million.

48 Weeks installation time.

16 Weeks commissioning time.

M&E BIM Methodology

Develop the Design.

Discuss the Issues.

Detail the Fabrication.

Drive the Programme.

Deliver the Project.

Page 21: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

BIM - Advising Programme

This 2 year project was completedon time. Adopting the processes forBIM level 2 has been credited as oneof the key reasons in accomplishingthis demanding programme.

Accurate pre-construction co-ordination helped inform the 3DM+E services model which wasinteroperable with the fabrication ofthe ductwork.

The integration of BIM and 4Dconstruction scheduling helpedmaximise off-site fabrication whichdelivered the time benefitsexpected of a lean constructionproject.

Page 22: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

BIM - Ensuring Quality

The completed project benefittedgreatly from pre-construction clashavoidance and off-site fabrication.

The integration of our proven ISO9001 processes with BIM helpeddeliver award winning quality.

The project was the overall winnerin the NI Construction ExcellenceAwards 2015 and RICS Project of theYear for 2016. The use of BIM wascited by the judges as having amajor contribution to the highquality of the completed project.

Page 23: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

BIM - Monitoring Cost

The project was delivered onbudget. Reporting was consistentthroughout the construction period.

There were very few site changes oroutstanding RFI’s to throw theproject cost management off trackthrough use of BIM and ‘Getting itright first time’.

BIM Level 2 processes improvedpredictability of outcome andpositively influenced the successfulmanagement of project costs.

Page 24: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

BIM - Client & Supplier Engagement

OHMG and their supply chainproactively engaged in theapplication of BIM on the WWIEMproject as a pathfinder.

The drive has been from Directorlevel which was fundamental to theproject’s success.

Regular BIM co-ordination meetingsimproved day to day constructionmanagement and acted as a meansto work collaboratively.

Soft landings extended OHMG’sinvolvement in the project throughpost occupancy reviews and seasonalcommissioning.

Page 25: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

BIM - Facilities Management

The overarching aim was tointegrate the use of BIM within theoperation and maintenance of thenew facility.

The O+M manual was hyperlinked tothe Navisworks version of thefederated models.

3D Navisworks models combinedwith the extracted 2D DWF’s of thesheets were combined into a singleNavisworks file.

The QUB FM Team are now able toview 2D intelligent drawings andview the same component in 3D.

Page 26: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

BIM - Enhancing Collaboration

Design co-ordination meetings tookplace regularly throughout theconstruction period betweenOHMG, QUB, the design team andspecialist suppliers.

Conducted by the Architect at pre-construction, OHMG took on therole of chair during the constructionphase.

3D views were used to aidnavigation and help inform designchanges.

Coloured filters within Navisworkswere utilised to great effect fordistinguished M+E services bysystem type.

Page 27: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

QUB - BIM Lessons Learnt

The Client, having adopted the fundamentals of BIM,throughout the project, subsequently sought to formalise thisadoption and optimise the processes involved so as toimplement BIM Level 2 for all future projects.

Subsequent to a GAP analysis of the Estates Directorate’scapabilities, a ‘BIM Implementation Group’ was set up andtasked with sharing the knowledge gained and overseeing thewider scale of implementation of BIM processes across theQUB Estates Directorate.

Adopting the BIM spirit ‘Starting with the end in mind’ todevelop a clear set of organisational and asset informationrequirements.

Page 28: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

Wellcome-Wolfson Institute for Experimental MedicineO’Hare & McGovern Ltd

OHMG - BIM Lessons Learnt

OHMG now have internally developed BIM processes whichare being adopted for future BIM Level 2 projects.

Key members of our company regularly attend courses to upskill and provide training to others on key BIM roles such asthe Project Information Manager and Project Delivery Manager.OHMG are currently preparing for a 3rd party audit against PAS1192-2:2013 procedures.

Importance in developing a BIM Level 2 Ready Supply Chain.

We are continuously updating and improving our own inhouse document management system to become a fullycomplaint CDE (common data environment).

OHMG have proven processes and procedures in place,integrated within the company’s ISO 9001 QualityManagement System. These are in full compliance with therelevant government standards including BS 1192:2007 andPAS 1192-2:2013. These have been and will be furtherdeveloped by our company BIM Champions who will in turnachieve Level 2 Accredited Professional status.

Page 29: BIM Case Studies - Cita · COBie data Asset Information model for FM Awards Details: RICS Awards 2016 –Overall Winner ... design team were already experienced in delivering complex

James Kearney