bidding for - not only set review - sioux city, iowa

13
REVIEW SET ONLY - NOT FOR BIDDING

Upload: others

Post on 16-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

REVIEW SET ONLY

- NOT FOR BID

DING

Page 2: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping_G

_Specs.dw

g Layout N

am

e: IN

DEX Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:30:17 AM

Last edit on: 1/12/2018 11:12 AM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

IN

DE

X, A

BB

RE

VIA

TIO

NS

, A

ND

N

OT

ES

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

G02

2 13

DESIGNED BY:

CONST PROJ:

SCALE:

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

INDEX

SHEET NO. DRAWING NO. DESCRIPTION

1 G01 COVER

2 G02

INDEX, ABBREVIATIONS, AND NOTES

3 G03

CONSTRUCTION NOTES AND SPECIFICATIONS

(1 OF 2)

4 G04

CONSTRUCTION NOTES AND SPECIFICATIONS

(2 OF 2)

5 C21

TEMPORARY PUMP AND PIPING PLAN (1 OF 2)

6 C22

TEMPORARY PUMP AND PIPING PLAN (2 OF 2)

7 D11 EXISTING RAS PIPING PLAN AND SECTION

8 D12 CORRECTED RAS PIPING PLAN AND SECTION

9 D21 EXISTING RAS PIPING SECTIONS

10 D22 CORRECTED RAS PIPING SECTIONS

11 D31 RAS METER VAULT ENLARGED PLAN

12 D41 AIR PIPING MODIFICATIONS

13 D91 PHOTOS

4" RW (1)

PIPE SIZE PIPE MATERIAL TYPE

USE

SECTION NUMBER

DRAWING ON WHICH

NUMBER DESCRIPTION SPEC. SECTION

SECTION APPEARS

FIRST LETTER

MEASURED OR INITIATING VARIABLE MODIFIER

SUCCEEDING-LETTERS

READOUT OR PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

ISA TABLE 1 - IDENTIFICATION LETTERS

ANALYSIS ALARM

BURNER, COMBUSTION

USER'S CHOICE USER'S CHOICE USER'S CHOICE

USER'S CHOICE CONTROL

USER'S CHOICE DIFFERENTIAL

VOLTAGE

SENSOR (PRIMARY ELEMENT)

FLOW RATE

RATIO (FRACTION)

USER'S CHOICE

GLASS, VIEWING DEVICE

HAND HIGH

CURRENT (ELECTRICAL)

INDICATE

POWER SCAN

TIME, TIME SCHEDULE

TIME RATE OF CHANGE CONTROL STATION

LEVEL LIGHT LOW

MOMENT, TORQUE

MOMENTARY

MIDDLE, INTERMEDIATE

USER'S CHOICE USER'S CHOICE USER'S CHOICE USER'S CHOICE

OPERATING, ON ORIFICE, RESTRICTION

PRESSURE, VACUUM POINT (TEST) CONNECTION

QUANTITY INTEGRATE, TOTALIZE

RADIATION RECORD

SPEED, FREQUENCY

SAFETY SWITCH

TEMPERATURE TRANSMIT

MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION

VIBRATION, MECHANICAL ANALYSIS VALVE, DAMPER, LOUVER

WEIGHT FORCE WELL

UNCLASSIFIED X AXIS UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED

EVENT, STATE OR PRESENCE

Y AXIS

RELAY, COMPUTE, CONVERT

POSITION, DIMENSION

Z AXIS

DRIVER, ACTUATOR, UNCLASSIFIED FINAL CONTROL ELEMENT

ABBREVIATIONS PIPE MATERIAL TYPES

PIPE DESIGNATION SYSTEM

SECTION & DETAIL REFERENCE SYSTEM

EQUIPMENT TAG ABBREVIATIONS

PIPE MATERIALS NOTES:

BFV - BUTTERFLY VALVE

GV - GATE VALVE

KGV - KNIFE GATE VALVE

PA - PROCESS ANALYZER

M - FLOW METER

FD - CHEMICAL FEEDER

HSP - HIGH SERVICE PUMP

CV - CHECK VALVE

BV - BALL VALVE

PV - PLUG VALVE

ME - MISC. EQUIPMENT

SV or SOV - SOLENOID VALVE

VFD - VARIABLE FREQUENCY DRIVE

HV - HAND VALVE

DP - DIAPHRAGM PUMP

AV - ACTUATED VALVE

1.

2.

3.

4.

4D.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

DUCTILE IRON

WELDED STEEL, CEMENT LINED

PLASTIC PVC AWWA C900/C905

PLASTIC, PVC SCH. 80

PLASTIC, PVC SCH. 80 DOUBLE-WALL

PLASTIC, PVC DWV

PLASTIC, PVC CLASS 160 (SDR 26)

STAINLESS STEEL (<3" DIAMETER)

PVC GRAVITY SEWER PIPE

BLACK STEEL, SCH. 80 (<3" DIAMETER)

GALVANIZED IRON, SCH. 40 (<3" DIAMETER)

COPPER, TYPE 'L' OR 'K'

PLASTIC, CPVC SCH. 80

CORRUGATED METAL (CULVERT)

CAST IRON SOIL PIPE

POLYPROPYLENE PIPE

ASBESTOS CEMENT

316 STAINLESS STEEL

304 STAINLESS STEEL

CORRUGATED PE, PERFORATED DRAIN

CORRUGATED PE, NON-PERFORATED DRAIN

BLACK STEEL, SCH. 40

POLYETHYLENE TUBING*

NYLON REINFORCED RUBBER

402040

402066

402092

402090/402091

NOT USED

221316

402092

402076

333100

231126

NOT USED

221116

402094

NOT USED

221116

NOT USED

NOT USED

402076

402076

SEE PLANS

SEE PLANS

231126

SEE EQUIPMENT SPEC

SEE EQUIPMENT SPEC

1. ALL PIPE MATERIALS LISTED MAY NOT BE USED ON THIS PROJECT.

2. STAINLESS STEEL PIPE CAN BE USED AS AN ALTERNATE TO DIP AT INTERIOR LOCATIONS.

BURIED PIPE SHALL REMAIN DIP, UNLESS OTHERWISE INDICATED ON THE DRAWINGS.

* INSTALL POLYETHYLENE TUBING IN SCH 80 PVC CARRIER PIPE.

AB ANCHOR BOLT

AC ASPHALTIC CONCRETE

AFF ABOVE FINISH FLOOR

AFF AGGREGATE

AL ALUMINUM

APPROX APPROXIMATE

ARV AIR RELEASE VALVE

AVRV AIR/VACUUM RELIEF VALVE

BETW BETWEEN

BF BLIND FLANGE

BFV BUTTERFLY VALVE

BLDG BUILDING

BLK BLOCK

BSP BLACK STEEL PIPE

BTM BOTTOM

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFS CUBIC FEET PER SECOND

CIP CAST IRON PIPE, CLEAN IN PLACE

CISP CAST IRON SOIL PIPE

CL CLASS

C CENTER LINE

CLR CLEAR

CMLC-STL CEMENT MORTAR LINED AND

COATED STEEL

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONT CONTINUOUS

CORP CORPORATION

CPLG COUPLING

CSP CORRUGATED STEEL PIPE

CTR CENTER

DIP DUCTILE IRON PIPE

DIA DIAMETER

DIM DIMENSION

DISCH DISCHARGE

DN DOWN

DR DRAIN

DT DOUBLE TEE PRECAST CONCRETE

ROOF PANEL

DTL DETAIL

DWG DRAWING

EA EACH

E.C. ELECTRICAL CONTRACTOR

ECC ECCENTRIC

EF EACH FACE

EJ EXPANSION JOINT

ELEV ELEVATION

ELB ELBOW

ELC-STL EPOXY LINED & COATED STEEL

ELEC ELECTRIC

ENC ENCASEMENT

EP EDGE OF PAYMENT

EW EACH WAY

EXIST EXISTING

EXP EXPANSION

FAB FABRICATE

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDR FEEDER

FDN FOUNDATION

FDP FEED PUMP

FE FLANGE END

FF FINISH FLOOR

FG FINISH GRADE

FH FIRE HYDRANT

FIG FIGURE

FL FLOWLINE

FLG FLANGE

FPM FEET PER MINUTE

FS FAR SIDE

FT FEET, FLOW TRANSMITTER,

FITTING

FTG FOOTING

FUT FUTURE

GA GAUGE

GAL GALLON

GALV GALVANIZED

GB GRADE BREAK

G.C. GENERAL CONTRACTOR

GIP GALVANIZED IRON PIPE

GPM GALLONS PER MINUTE

GR GRADE

GRTG GRATING

GRVD GROOVED END

HB HOSE BIBB

HGT HEIGHT

HOA HAND-OFF-AUTOMATIC

HORIZ HORIZONTAL

HP HORSEPOWER

HPHB HIGH PRESSURE HOSE BIBB

HSP HIGH SERVICE PUMP

HWL HIGHWATER LEVEL

ID INSIDE DIAMETER

IN INCHES

INT INTERIOR

INV INVERT

IPS IRON PIPE SIZE

JT JOINT

L LITER

LB POUND

LSP LOW SERVICE PUMP

LT LEFT

LWL LOW WATER LEVEL

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

M.C. MECHANICAL CONTRACTOR

MFR MANUFACTURER

MG MILLIGRAM

MGD MILLION GALLONS PER DAY

MH MANHOLE

MIN MINIMUM

MJ MECHANICAL JOINT

MTR MOTOR

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER, NORMALLY OPEN

NOM NOMINAL

NPT NATIONAL PIPE THREAD

NS NEAR SIDE

NTS NOT TO SCALE

NWL NORMAL WATER LEVEL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

PL PROPERTY LINE

PE PLAIN END

PL PLATE

PI POINT OF INTERSECTION /

PRESSURE INDICATOR

PRFV PRESSURE RELIEF VALVE

PRV PRESSURE REDUCING VALVE

PSIG (PSI) POUNDS PER SQUARE INCH

GAUGE

PT PRESSURE TRANSMITTER

PVC POLYVINYLCHLORIDE

PVMT PAVEMENT

R RADIUS

RCP REINFORCED CONCRETE PIPE

RD ROUND

RECM RECOMMEND

RELOC RELOCATE

REQD REQUIRED

RJ RESTRAINED JOINT

RO REVERSE OSMOSIS

RT RIGHT

RPBP REDUCED PRESSURE BACKFLOW

PREVENTER

R/W RIGHT OF WAY

SCH SCHEDULE

SECT SECTION

SHT SHEET

SIM SIMILAR

SL SLOPE

SLG SLUDGE

SOV SOLENOID VALVE

SP SPACE, SPOOL, SAMPLE POINT

SPEC SPECIFICATION

SQ SQUARE

SST STAINLESS STEEL

STA STATION

STD STANDARD

STL STEEL

SYMM SYMMETRICAL

TB TURBIDIMETER

T&B TOP & BOTTOM

TC THRUST COLLAR

TEMP TEMPERATURE

TF TOP OF FOOTING

THD THREAD

THK THICK

THKNS THICKNESS

TOC TOP OF CONCRETE OR CURB

TOP TOP OF PIPE

TOT TOTAL

TOS TOP OF SLAB

TOW TOP OF WALL

TYP TYPICAL

UF ULTRA-FILTRATION

UG UNDERGROUND

V VALVE

VB VALVE BOX

VERT VERTICAL

VTR VENT THROUGH ROOF

W/ WITH

W/O WITH OUT

WCO WALL CLEANOUT

WS WATER STOP

WT WEIGHT

WTR WATER

WWF WELDED WIRE FABRIC

PROCESS PIPE IDENTIFICATION

AIR AERATION AIR

ABE AERATION BASIN EFFLUENT

ABI AERATION BASIN INFLUENT

AQA AQUA AMMONIA

BWW BACKWASH WATER SUPPLY

C CONDENSATE PIPING

CA COMPRESSED AIR

CW COLD WATER, CITY WATER

D, DR DRAIN LINE

DF DIESEL FUEL

DG DIGESTER GAS

DS DIGESTED SLUDGE

DW DOMESTIC WATER

DWRSL 18% THICKENED SLUDGE

EFF EFFLUENT

EW EMERGENCY WATER

EX EXHAUST

FCE FINAL CLARIFIER EFFLUENT

FCI FINAL CLARIFIER INFLUENT

FDW FLOATED WATER CHEMICAL

FILL FILL LINE

FINW FINISHED WATER (POST STORAGE TANK)

FLW FILTERED WATER

FM FORCEMAIN

FR FLOATED RESIDUALS

FTW FILTER TO WASTE

FW FINISHED WATER

GS GAS

GTSY GRIT SLURRY

HW HOT WATER

HWS HOT WATER SUPPLY

INF INFLUENT

IRR IRRIGATION

LPA LOW PRESSURE AIR (FROM BLOWERS)

LS LIME SLURRY

MLSS MIXED LIQUOR SUSPENDED SOLIDS

NG NATURAL GAS

NPW NON-POTABLE WATER

OC ODOR CONTROL

OF, OVF OVERFLOW

OG OFF GAS

OZ OZONE

PCE PRIMARY CLARIFIER EFFLUENT

PLY POLYMER

POT POTABLE

PW PROTECTED WATER

RAR REDUCING AGENT RETURN

RAS RETURN ACTIVATED SLUDGE

RAW, RW RAW WATER

RAW-BYP RAW WATER BYPASS

RBP RESIDUAL BYPASS

REC RECYCLE

RL RAIN WATER LEADER

SA SUPPLEMENTAL AIR

SAM SAMPLE

SAN, SSW SANITARY SEWER

SAS SODA ASH SOLUTION

SBI SODIUM BISULPHITE

SBIS SODIUM BISULPHITE SOLUTION

SC, SM SCUM

SHC SODIUM HYPOCHLORITE

SHCS SODIUM HYPOCHLORITE SOLUTION

SHD SODIUM HYDROXIDE

SLD SLUDGE DRAIN

SLG SLUDGE

SMP SCUM PUMP DISCHARGE

SMW SOLUTION MAKE-UP WATER

SNT SUPERNATANT

SPL SAMPLE LINE

SPT SEPTAGE

SRCW SATURATED RECYCLE WATER

STW STORM WATER

SW SPECIAL WASTE

SUC SUCTION

TDS, TKSL THICKENED DIGESTED SLUDGE

TIW TRUCKED IN WASTE

TKD TANK DRAIN

TRD THICKENED RESIDUALS DISCHARGE

TSO THICKENED SLUDGE OUTLET

V, VNT VENT

WAW WASHWATER

WAS WASTE ACTIVATED SLUDGE

WBW WASTE BACKWASH

WT WASTE

WWR WASHWATER RECYCLE

NOTE:

ALL PIPE ABBREVIATIONS LISTED MAY NOT BE USED ON THIS PROJECT.

D21

B

GENERAL PROCESS NOTES

1. FLOORS, WALLS, DOORS, WINDOWS, ETC., SHOWN IN PROCESS

DRAWINGS ARE FOR REFERENCE ONLY. FIELD VERIFY FOR SPECIFIC

LOCATIONS.

2. DIMENSIONS AND ELEVATIONS ARE FOR BIDDING PURPOSES.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATIONS OF

DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION.

3. NOT ALL PIPE SUPPORTS, HANGERS, TAPS, AND EQUIPMENT ARE

SHOWN ON THE DRAWINGS. CONTRACTOR SHALL COORDINATE

LOCATION AND MODIFY IN ACCORDANCE WITH SPECIFICATIONS

AND DETAILS.

PIPE JOINTS

FLG FLANGE

PE PLAIN END

MJ MECHANICAL JOINT

BUILDING DESIGNATIONS (AREA NUMBER)

AB AERATION BASINS

AD ANAEROBIC DIGESTERS

ADW ANAEROBIC DIGESTER WEST COMPLEX

AM ADMINISTRATION BUILDING

BB BLOWER BUILDING

CC SODIUM HYPOCHLORITE BUILDING

FC FINAL CLARIFIERS

HD HEADWORKS BUILDING

PC PRIMARY CLARIFIERS

O ODOR CONTROL

HD-SLG-123

INDIVIDUAL EQUIPMENT OR

LOOP NUMBER

EQUIPMENT TYPE DESIGNATION

BUILDING / FACILITY LOCATION

(I.E. HEADWORKS BUILDING)

EQUIPMENT TAG

HD-BFV-123

INDIVIDUAL VALVE OR LOOP

NUMBER

VALVE TYPE

(I.E. BUTTERFLY VALVE)

BUILDING / FACILITY LOCATION

(I.E. HEADWORKS BUILDING)

VALVE TAG

6" - DS - DIGL - FC5

PIPE MATERIAL

PIPE SERVICE

PIPE SIZE

PIPE DESIGNATION

STRUCTURE

REVIEW SET ONLY

- NOT FOR BID

DING

Page 3: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: W

:\Proj\18000\18291\18291.002\AutoCad\RAS Piping Plan Set\Plan Set\RAS Piping_G

_Specs.dw

g Layout N

am

e: SPECS Plotted By: D

LZ00974 Plotted on: 1/17/2018 2:52:14 PM

Last edit on: 1/17/2018 2:50 PM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

CO

NS

TR

UC

TIO

N N

OT

ES

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

G03

3 13

DESIGNED BY:

CONST PROJ:

SCALE:

AN

D S

PE

CIF

IC

AT

IO

NS

(1

O

F 2

)

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

THESE ABBREVIATED SPECIFICATIONS WORK IN CONJUNCTION WITH THE FRONT END

DOCUMENTS ASSOCIATED WITH THIS PROJECT.

MEASUREMENT AND PAYMENT

1. METHODS OF MEASUREMENTS AND BASIS FOR PAYMENTS.

A. All work to be performed under this contract shall be paid for at the lump sum prices

stated in the Bid Form. Lump sum payments will be based upon completed and

accepted items in accordance with its description in this section and as related to the

work specified and as shown on the Drawings.

B. Payment for the items set forth herein, as further specified herein, shall include full

compensation to be received by the Contractor for furnishing all tools, equipment,

supplies, and manufactured articles, and for all labor, mobilization and demobilization,

utilities, coordination, taxes, materials, commissions, transportation and handling,

traffic control, barricades, signs, lights, and other traffic control devices, bonds, permit

fees, insurance, overhead and profit, incidentals appurtenant to the items of work

being described and performing all operations as necessary to complete the various

items of the work all in accordance with the requirements of the Contract Documents,

including all appurtenances thereto, and including all costs of compliance with the

regulations of public agencies having jurisdiction, including Safety and Health

Requirements of the Occupational Safety and Health Administration of the U.S.

Department of Labor (OSHA). Such compensation shall also include payment for

any loss or damages arising directly or indirectly from the work, or from any

unforeseen difficulties, which may be encountered during the prosecution of the work

until the final acceptance by the Owner. Any material, equipment or operation not

specifically mentioned shall be considered to be incidental to the lump sum prices.

Final payment will only be made for completed and accepted work.

2. PAYMENT ITEMS

A. Mobilization / Demobilization - Bid Item No. 1

Payment will be made at the lump sum price bid for mobilization / demobilization,

which price shall be deemed full compensation for furnishing and installing all

materials, equipment, transportation, and labor required for mobilization /

demobilization on the project. This price shall include the contractor's field office, all

insurance and bonding for the project, and any other items incidental to the

completion of the overall project.

B. Bypass Pumping System Installation and Removal, Complete - Bid Item No. 2:

This item includes the furnishing and installation of all materials, equipment, labor,

testing, startup, operation, coordination with Owner's staff, removal or equipment and

materials, and all elements and appurtenances required for the temporary bypass

pumping system, and all other items of work necessary for a complete operational

system as described in and in accordance with the Contract Documents.

C. RAS Discharge Header Piping Modifications, Complete - Bid Item No. 3:

Included in this item is the complete furnishing and installation of all materials, labor

and equipment for the modifications to the RAS pumping system discharge header,

installation of additional pipe supports, and all other items of work necessary to

complete the work in accordance with the Contract Documents. The restrained

flange coupling adapters and pipe gaskets required for the completion of the work

shall be provided as part of the Owner Furnished Equipment as specified on Sheet 3

of the Contract Drawings.

D. Knife Gate Valve Replacement, Complete - Bid Item No. 4:

Included in this item is the complete furnishing and installation of all materials, labor

and equipment for the installation of four (4) knife gate valves, and all other items of

work necessary to complete the work in accordance with the Contract Documents.

The knife gate valves, flange gaskets, and flange coupling adapters required for the

completion of the work shall be provided as part of the Owner Furnished Equipment

as specified on Sheet 3 of the Contract Drawings. All piping required for the

completion of the work shall be provided by the Contractor.

E. Air Piping Removal, Complete - Bid Item No. 5:

Included in this item is the complete furnishing of all materials, labor and equipment

for the demolition and abandonment of the 4-inch ductile iron air piping, and all other

items of work necessary to complete the work in accordance with the Contract

Documents.

SUMMARY OF WORK

1. The work to be performed under this Contract shall consist of furnishing all equipment,

materials, supplies, and manufactured articles and for furnishing all transportation and

services, including fuel, power, water, and essential communications, and for the

performance of all labor, work, or other operations required for the fulfillment of the

Contract in strict accordance with the Contract Documents. The Work shall be complete,

and all work, materials, and services not expressly shown or called for in the Contract

Documents which may be necessary for the complete and proper construction of the

Work in good faith shall be performed, furnished, and installed by the Contractor as

though originally so specified or shown, at no increase in cost to the Owner.

2. The Owner is furnishing materials and equipment for portions of the Project as specified

in the Owner Furnished Equipment section.

3. Wherever the Contract Documents address a third party, i.e. subcontractor, manufacturer,

supplier or vendor, it is to be considered as the Contractor through a third party.

4. Wherever a reference to number of days is noted, it shall be construed to mean working

days.

SEQUENCE OF CONSTRUCTION

1. The facilities will be maintained in continuous operation by the Owner during the entire

construction period of this contract. Work under this Contract shall be so scheduled and

coordinated by the Contractor that such work will not impede the wastewater treatment

plant operation or cause odor or other nuisance. In performing the work shown and

specified, the Contractor shall plan and schedule his work to meet the operating

requirements and all additional restrictions.

2. The following sequence of construction describes simplistically, the major events required

to complete the work in the preferred order of completion.

3. The order of events is designed to minimize disruption to the ongoing operation of the

existing treatment facility. Any proposed deviation from the schedule order must be

submitted in writing to the Engineer and approved by the Engineer.

A. Installation, testing, and approval of the temporary bypass pumping system .

B. RAS discharge piping modifications.

C. RAS discharge piping testing and approval. (three day operational test).

D. Demobilization of the temporary bypass pumping system.

E. Isolation of knife gate valves serving final clarifiers 3 and 4 from flow. This item shall

be coordinated with City staff. It is not anticipated that temporary bypass pumping

will be required for this portion of the Work. It is estimated that isolation from flow will

take approximately 2 days to accomplish.

F. Installation of the isolated knife gate valve (total of 2).

G. Isolation of knife gate valves serving final clarifiers 1 and 2. This item shall be

coordinated with City staff. It is not anticipated that temporary bypass pumping will

be required for this portion of the Work. It is estimated that isolation from flow will

take approximately 3 to 7 days to accomplish depending on the operating condition

of the WWTP.

H. Installation of the isolated knife gate valve (total of 2).

4. Coordination with Owner Personnel. The Contractor shall notify the Owner before

commencing work involving removing or placing in operation existing or new facilities.

A. Only the Owner can authorize the shutdown of any portions of the facility or system.

The Contractor shall, under no circumstances, interfere with any existing component

without the Owner's authorization.

OWNER USE OF THE PROJECT SITE

1. The Owner may utilize all or part of the existing facilities during the entire period of

construction for the conduct of the Owner's normal operations. The Contractor shall

cooperate with the Owner to minimize interference with the Contractor's operations and to

facilitate the Owner's operations.

PROJECT MEETINGS

1. Preconstruction Conference: Prior to the commencement of work at the site, a

preconstruction conference will be held at a mutually agreed time and place which shall

be attended by the Contractor, its superintendent, and its subcontractors as appropriate.

Other attendees will be:

A. Engineer.

B. Representatives of Owner.

C. Others as requested by Contractor, Owner, or Engineer.

2. Unless previously submitted to the Engineer, the Contractor shall bring to the conference

one copy each of the following:

A. Preliminary schedule.

B. Preliminary Shop Drawing/Sample/Substitute or “Or Equal” submittal schedule.

3. Progress Meetings: The Engineer shall schedule and hold regular on-site progress

meetings at least daily and at other times as requested by Engineer. The Contractor,

Engineer, and all subcontractors active on the site shall be represented at each meeting.

Contractor may at its discretion request attendance by representatives of its suppliers,

manufacturers, and other subcontractors. At a minimum, the Contractors Superintendent

shall be present at each meeting. The Contractor's Project Manager shall be required to

attend the meetings if so requested by the Engineer.

4. The purpose of the meetings will be to review the progress of the Work, maintain

coordination of efforts, discuss changes in scheduling, and resolve other problems, which

may develop.

DIMENSIONS OF EXISTING STRUCTURES

1. Where the dimensions and locations of existing structures are of critical importance in the

installation or connection of new work, the Contractor shall verify such dimensions and

locations in the field before the fabrication of any materials or equipment which is

dependent on the correctness of such information.

SUBMITTALS

1. This section specifies the means of all submittals. All submittals, whether their final

destination is to the Owner, Engineer, architect, electrical engineer, landscape architect

or other representative of the Owner, shall be submitted to the Engineer. A general

summary of the types of submittals and the number of copies required is as follows:

Copies to

Engineer Type of Submittal Submittal Format

1 Construction schedule Electronic PDF, excel or other readable

scheduling file format

1 Shop drawings Electronic PDF

2 Warranties Original Paper

The construction schedule shall be prepared in the form of a horizontal bar chart showing in

detail the proposed sequence of the work and identifying construction activities for each major

component, structure or facility. The schedule shall be time scaled, identifying the first day of

each week, with the estimated date of starting and completion of each stage of the work in order

to complete the project within the Contract time. An electronic copy of the schedule shall be

submitted at the Pre-Construction meeting.

SHOP DRAWINGS

1. General: The Contractor shall submit for review shop drawings for concrete

reinforcement, structural details, piping layout and appurtenances, wiring, color selection

charts, all equipment, fabricated items and materials, materials and equipment fabricated

especially for this Contract, and materials and equipment for which such Drawings are

specified or specifically requested by the Engineer. Shop Drawing submittals shall

include, but not be limited to:

A. Restrained flange adapters provided by the Contractor.

B. Ductile iron pipe and fittings.

C. Temporary bypass pumping system. (See Temporary Bypass Pumping System for

additional submittal requirements associated with this item of Work.

D. Pipe supports.

E. Paint (if paint system and manufacturer differ from that specified).

F. Any appurtenant items associated with the project (bolts, hardware, ect.).

2. Shop drawings shall show performance characteristics, the principal dimensions, weight,

structural and operating features, space required, clearances, dimensions needed for

installation and correlation with other equipment and materials, external connections,

anchorages, supports required, type and/or brand of finish or shop coat, grease fittings,

etc. depending on the subject of the Drawings.

3. The Contractor shall be responsible for the prompt submittal of all shop drawings so that

there shall be no delay to the Work due to the absence of such Drawings. The Engineer

will review the shop drawings within 24 hours of receipt of such Drawings. This review

time will commence starting the next working day following receipt of the shop drawing.

4. Time delays caused by rejection of submittals are not cause for extra charges to the

Owner or time extensions.

5. All deviations from the Contract Documents shall be identified on each submittal and shall

be tabulated in Contractor's letter of transmittal. Such submittals shall, as pertinent to the

deviation, indicate essential details of all changes proposed by Contractor (including

modifications to other facilities that may be a result of the deviation) and all required

piping and wiring diagrams.

6. The Contractor shall not proceed with any portion of the Work for which the design and

details are dependent upon the design and details of equipment for which submittal

review has not been completed.

OWNER FURNISHED EQUIPMENT

1. The Contractor shall furnish all the necessary materials, equipment, supervision, tools

and labor required to unload all Owner furnished equipment from common carriers or load

from the Owner's storage area, transport to site of installation, set on the foundations

and/or anchor bolts, shim, grout, align, connect piping and electrical connections, and in

general, mount and install equipment so as to be tested and ready for operation.

2. The Contractor shall provide new gaskets, bolts, nuts, washers, and any additional

hardware required for proper installation of the equipment.

3. The equipment to be provided by the Owner under this section shall include the following:

A. Four (4) 16-inch diameter knife gate valves

B. Three (3) 16-inch diameter Romac RFCA Restrained Flange Coupling Adapter

C. Eleven (11) Victaulic Style 31 grooved end pipe joint gaskets for us in correcting the

RAS discharge piping in 16, 24, and 30-inch diameters.

D. 16-inch diameter Garlock style 300 FF 1/8-inch gaskets required to replace the knife

gate valves.

E. Eight (8) 16-inch diameter Megaflange flange coupling adapters required to replace

the knife gate valves.

4. The Contractor shall be responsible for reviewing and coordinating all equipment,

materials including lengths of wiring and cables, layout, dimensions and all other items

necessary for the proper installation and connections as shown on the Contract

Documents.

5. The equipment is to be completely installed as noted on the Drawings and/or as directed

by the Engineer.

PIPING, GENERAL

1. All piping shall be furnished and installed as indicated on the Drawings and as specified.

Each system shall be complete with all necessary fittings, hangers, supports, anchors,

expansion joints, flexible connectors, valves, accessories, lining and coating, testing,

disinfection, excavation, and backfill, to provide a functional installation.

2. All products shall be new and unused except as may be requested for testing and shall be

the product of a reputable manufacturer regularly engaged in the manufacture of the

product. Where two or more units of the same class are required, these units shall be

products of a single manufacturer; however, the component parts of equipment need not

be the products of the same manufacturer.

3. Flanges: Flanges shall conform to either ANSI/AWWA C115/A21.15 Class D or ANSI

B16.1 125-lb class, unless otherwise specified in the applicable piping sections. Flanges

shall have flat faces and shall be attached with bolt holes straddling the vertical axis of the

pipe unless otherwise shown. Attachment of the flanges to the pipe shall conform to the

applicable requirements of ANSI/AWWA C115/A21.15. Flanges for miscellaneous small

pipes shall be in accordance with the standards specified for these pipes.

4. Flange Bolts: If studs are required, they shall be in accordance with ASTM A 307,

Grade B, with heavy hex nuts. Machine bolts, nuts, washers used on all flanged

connections exposed to wastewater shall be AISI Type 304 stainless steel and shall

conform to the requirements of ASTM F593 and F594, respectively. All other flange bolts

and nuts shall be plain carbon steel and shall conform to ASTM A307. Nuts shall be

hexagonal, heavy semi finished pattern in accordance with ANSI/ASME B18.2.2. Flange

bolts and studs shall extend through the nuts a minimum of 1/4-inch.

5. Flange Gaskets: Gaskets for flanged joints shall be of materials as specified in

applicable piping sections. Blind flanges shall have gaskets covering the entire inside

face of the blind flange and shall be cemented to the blind flange. Ring gaskets shall not

be permitted.

6. The Contractor shall furnish all labor, tools, materials, and equipment necessary for

installation and jointing of the pipe. All piping shall be installed in accordance with the

Drawings in a neat workmanlike manner and shall be set for accurate line and elevation.

All piping shall be thoroughly cleaned before installation, and care shall be taken to keep

the piping clean throughout the installation.

7. The Contractor shall investigate all conditions affecting his work, arrange the work

accordingly, and have such fittings and accessories as required on hand to meet the

condition and provide a complete installation. The pipelines shall be installed by qualified

and competent workmen in strict accordance with the manufacturers instructions and

recommendations.

8. Aligning Pipe: Pipe runs intended to be straight shall be laid straight. When horizontal

or vertical deflections are required, the angular divergence of the axis of any two adjacent

lengths of pipe shall not exceed one-half of the manufacturer's recommended allowable

deflection.

9. Flanged joints shall be made up with full face gaskets as specified in the piping

paragraphs. Flange faces shall have a uniform bearing on the gaskets. Flanges shall be

drawn together uniformly until the joint is tight. The length of the bolts shall be uniform

and in accordance with the requirements specified herein. The bolt's maximum projection

beyond the end of the nut shall be ½-inch maximum and ¼-inch minimum

10. Grooved couplings shall be installed so that the coupling is firmly and completely seated

against the seating faces of the grooves. Expansion of the grooved coupling when

subjected to pressure shall not be permitted. The responsibility of repairing any damage

caused by the expansion of the grooved coupling shall be born by the Contactor.

11. In general, all valves and fittings shall be restrained in an acceptable manner such that

the unbalanced force developed at them shall be supported independent of the piping

system.

12. On all piping, where sleeve-type couplings and flanged adaptors are located near fittings

or valves, tie rods shall span across the coupling as specified herein to restrain

movements of the pipe along its axial direction. Such restraints can be deleted if both

ends of the pipe are anchored in a concrete structure with no fitting or valve occurring

within the span length, in the suction piping to a pump where the coupling is between the

pump and valve, or when the water pressure measured at the crown of the pipe is less

than five feet.

13. Where indicated on the Drawings, restrained flange adapters shall be used in lieu of

threaded, or welded, flanged spool pieces. Flange adapters shall be made of ductile iron

conforming to ASTM A536 and have flange bolt circles that are compatible with

ANSI/AWWA C110/A21.10.

A. Restraint for the flange adapter shall consist of set screws.

B. The flange adapter shall be shop coated with fusion bonded epoxy in accordance

with AWWA C213-01 and NSF 61.

C. The flange adapter shall be the Model 400 by Star Pipe Products, Inc., Series 1000

E-Z Flange by EBAA Iron Inc., or approved equal.

DUCTILE IRON PIPE

1. The Contractor shall furnish and install ductile iron pipe and all appurtenant work,

complete in place, all in accordance with the requirements of the Contract Documents.

2. All ductile-iron pipe shall conform to the requirements of ANSI/AWWA C151/A21.51. The

wall thickness and outside diameter of the pipe shall conform to Tables 51.4 and 51.5 of

AWWA C151. All ductile iron pipe shall be Thickness Class 53, except as noted

otherwise.

3. The thickness classes indicated herein are the minimum permitted unless otherwise

specified. Each pipe shall be cast with the year of manufacture, the class and the letters

"DI" for ductile iron.

4. Fittings for use with the ductile iron pipe specified herein, shall be ductile iron. Cast

ductile-iron fittings shall be pressure rated for at least 250 psi. All fittings with mechanical

joints, flange joints and push-on joints shall conform to ANSI/AWWA C110/A21.10. The

fitting manufacturer shall furnish the proper gaskets, nuts, bolts, glands, for each type of

joint. Compact fittings are not acceptable. All fittings shall be American made with

uniform flange/gland thickness.

5. Flanges shall be ductile iron conforming to ANSI/AWWA C115/A21.15, flat faced. The

use of hollowback or cavitated flanges will not be acceptable. Joint gaskets shall be full

face gaskets.

6. The interior of all ductile iron pipe and fittings shall be lined with polyethylene or coated

with Protecto 401 Ceramic Epoxy or Coropipe II WasteLiner as manufactured by Madison

Chemical Industries, Inc.

7. All ductile iron pipe and fittings shall be checked for dry film thickness (DFT) in

accordance with the SSPCA-PA2. Each pipe and fitting shall be marked with the date of

application of the lining system and with its numerical sequence of application on that

date. The pipe supplier shall furnish a certificate stating that the lining applicator has

complied with all specification requirements relative to the material, its application and

inspection.

8. All ductile iron pipe and fittings intended for interior use and for use above grade shall

receive a prime coat of universal primer as specified in the Painting Section that is

compatible with the specified coating system.

CONTINUED ON G04

REVIEW SET ONLY

- NOT FOR BID

DING

Page 4: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: W

:\Proj\18000\18291\18291.002\AutoCad\RAS Piping Plan Set\Plan Set\RAS Piping_G

_Specs.dw

g Layout N

am

e: SPECS (2) Plotted By: D

LZ00974 Plotted on: 1/17/2018 2:51:09 PM

Last edit on: 1/17/2018 2:50 PM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

CO

NS

TR

UC

TIO

N N

OT

ES

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

G04

4 13

DESIGNED BY:

CONST PROJ:

SCALE:

AN

D S

PE

CIF

IC

AT

IO

NS

(2

O

F 2

)

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

NO. PREPARATION

SERIE

S

MIN.

DFT

SERIE

S

MIN.

DFT

SERIE

S

DFT

1

INTERIOR PIPE AND

EQUIPMENT (1)

SSPC SP6, SEE NOTE 1 FOR DIP

135 5.0 - 6 N69

3.0 to

4.0

N69

3.0 to

4.0

Notes:

1. Surface prep shall be in compliance with Tnemec Technical Bulletin No.

07-52. If surface profile is less than 1.5 mils then brush-off blast clean, if

surface profile is more than 1.5 mils then hand or power tool clean. Shop

primed items to receive intermediate and final coats only.

CONTINUED ON G03

10. Restrained joints shall be made in accordance with the manufacturer's standards except

as otherwise specified herein. Joints between mechanical joint pipe and/or fittings shall

be made in accordance with the manufacturers recommendations, except that deflection

at joints shall not exceed one-half of the manufacturer's recommended allowable

deflection. Grooved joints shall be fully “extended” to eliminate expansion and pipe

movement .

11. Bolts and nuts in thrust restrained, mechanical and flanged joints shall be tightened in

accordance with the recommendations for the pipe manufacturer for a leak-free joint. The

mechanics shall exercise caution to prevent overstress. Torque wrenches shall be used

until, in the opinion of the Engineer, the mechanics have become accustomed to the

proper amount of pressure to apply on standard wrenches.

12. Cutting of the ductile iron pipe for inserting valves, and fittings shall be done by the

Contractor in a neat and workmanlike manner without damage to the pipe, the lining, or

the coating. Pipe 16 inches and larger in diameter shall be cut with a mechanical pipe

saw. After cutting the pipe, the plain end shall be beveled with a file or grinder to remove

all sharp edges.

13. Areas of loose or damaged lining associated with field cutting shall be replaced as

recommended by the pipe manufacturer and required by the Engineer. Repair methods

shall be as recommended by the manufacturer and shall be submitted to the Engineer for

approval.

14. Any work within the pipe shall be performed with care to prevent damage to the lining.

NO cable, lifting arms or other devices shall be inserted into the pipe. All lifting, pulling or

pushing mechanisms shall be applied to the exterior of the pipe barrel.

TEMPORARY BYPASS PUMPING SYSTEM

1. Contractor is required to furnish all materials, labor, equipment, power, and maintenance

to install and properly operate a temporary pumping system while performing the

following work:

A. RAS piping header realignment

2. The temporary pumping system will divert the existing sewage flow around the work area.

3. The design, installation, and operation of the temporary pumping system shall be the

Contractor's responsibility. The temporary pumping system shall comply with the

requirements of all codes and regulatory agencies having jurisdiction. Contractor shall

employ the services of a vendor regularly engaged in the design and operation of

temporary bypass pumping systems.

4. The Contractor shall coordinate closely with City and WWTP operational staff to operate

the bypass system. Control of RAS flow will require constant attention and flow

adjustment to properly distribute flow to six separate locations through two separate

distribution systems. The Contractor shall provide personnel continuously at the bypass

pumping site seven days a week, 24 hours a day for the duration of the bypass pumping

operation.

A BYPASS PUMPING CONTRACTOR

1. The Owner may request the following from the apparent low bidder:

A. Documentation of experience of the firm performing the temporary bypass pumping.

Documentation shall include: 1) a summary of projects similar in size and complexity

in which the firm has successfully completed wastewater bypass pumping, 2) a

summary of the experience of operations staff on wastewater bypass pumping

projects, and 3) a summary of the experience of maintenance staff on wastewater

bypass pumping projects.

B SUBMITTALS

1. Contractor shall submit detailed plans and descriptions outlining all provisions and

precautions to be taken by Contractor regarding the handling of existing wastewater flows

to Engineer. This plan must be specific and complete, including such items as schedules,

locations, elevations, capacities of equipment, material and all other incidental item as

necessary and/or required to ensure proper protection of the facilities. No construction

shall begin until all provisions and requirements have been reviewed and approved by

Engineer. The plan shall include but not be limited to details of the following:

A. Staging areas for pumps.

B. Sewer plugging method(s), if required, types of plugs used, and proposed method of

bracing the plugs. The head capacity of the plug and the maximum head possible at

the plug location.

C. Number, size. material, location and method of installation of discharge piping.

D. Diversion pump sizes, capacity, number of each size to be on site, and fuel

requirements.

E. Calculations of static lift, friction losses, NPSHa, and flow velocity.

F. Manufacturer's pump performance curves for all pumping equipment.

G. Required fuel source and location.

H. Discharge plan.

I. Thrust and restraint block sizes and locations.

J. Method of noise control for each pump and/or generator.

K. Any temporary pipe supports and anchoring required.

L. Design plans and computation for access to diversion pumping locations indicated on

the Drawings.

M. Calculations for selection of diversion pumping pipe size.

N. Schedule for installation of and maintenance of diversion pumping lines.

O. Plan indicating selected location of diversion pumping line and air valve locations.

P. Overflow control contingency plan.

C QUALITY ASSURANCE

1. The design, installation, and operation of the temporary pumping system shall be

Contractor's responsibility. The diversion system shall meet the requirements of all codes

and regulatory agencies having jurisdiction. Contractor shall be responsible for any

spillage of raw sewage that results in civil or criminal charges from any local, state, or

federal agency and will bear all costs for these charges and any restoration required.

D OPERATION AND MAINTENANCE

1. Operation: Contractor shall insure that the flow diversion pumping system is properly

operated and shall provide responsible personnel (Operators) for the diversion pumping

system at all times. One operator shall be on duty at the pumping site at all times, 24

hours a day, 7 days a week for the entire duration of the bypass pumping operation.

2. Maintenance Service: Contractor shall insure that the flow diversion pumping system is

properly maintained and shall provide responsible personnel (Mechanics) for the diversion

pumping system at all times. Resume(s) shall be submitted to Engineer prior to the start

of work. One Mechanic shall be on duty at each flow diversion pumping or disinfection

site at all times.

3. Pumping System Extra Materials: Spare parts for pumps and piping shall be kept on site

at all times. Spare parts shall include, but not be limited to, the following: one (1) spare

pump(s) identical to the operating pumps, 20 feet of extra pipe for each pipe size in use,

and a fusion weld machine. For each diversion discharge line installed, including backup

lines, Contractor shall have available at the site repair clamps or necessary fittings for the

pipe system being used.

4. Adequate hoisting equipment for each pump and accessories shall be maintained on the

site.

E DESIGN REQUIREMENTS

1. Contractor shall provide all pipeline plugs, pumps of adequate size to handle peak flow,

and temporary discharge piping, to ensure that influent flows up to 10.8 MGD can be

safely diverted around the RAS pumping station. Diversion pumping system shall be

operated 24 hours per day 7 days per week, including holidays, for the duration of the

Work.

2. Contractor shall install as many pumps as needed to divert flow from the RAS pumps and

discharge piping. All pumps shall be of equal size and have a minimum capacity of 2500

GPM. At least one (1) standby pump(s) shall be provided for immediate use in the event

of an emergency or breakdown. Pump pipelines shall be readily isolated by individual

valves.

3. Contractor shall furnish and maintain portable lighting systems as needed, for his

activities at the bypass pumping site(s).

F PERFORMANCE REQUIREMENTS

1. It is essential to the operation of the existing treatment system that there be no

interruption in the flow of sewage throughout the duration of the Project. Contractor shall

provide, maintain, and operate all temporary facilities such as plugs, pumping equipment

(both primary and backup units as required), conduits, all necessary power or fuel source,

and all other labor and equipment necessary to handle the sewage by-pass flow.

2. The design installation and operation of the flow diversion pumping system shall be

Contractor's responsibility. The diversion system shall meet the requirements of all codes

and regulatory agencies having jurisdiction.

3. Contractor shall provide all necessary means to safely convey the sewage past the work

area. Contractor shall not stop or impede flows under any circumstances.

4. Contractor shall maintain sewage flow around the work area in a manner that will not

cause surcharging of sewers, damage to sewers, and that will protect public and private

property from damage and flooding.

5. Contractor shall protect water resources, wetlands, and other natural resources.

G DIVERSION PIPING MATERIALS

1. All discharge piping systems shall be constructed of rigid high-density polyethylene

(HDPE) pipe with fused or flanged leak proof connections. Discharge hose or PVC pipe

will not be accepted.

2. Pump suction piping: Each bypass pump shall have its own independent 12-inch Suction

pipeline. The suction piping shall be SDR 17 HDPE pipe with fused on flange leak-proof

connections and/or flanged heavy-duty suction hose rated for full vacuum. Hoses must be

vulcanized to the flange connections.

3. Pump discharge piping: Each pump shall have an independent HDPE discharge pipeline,

a flanged flapper check valve on the pump's discharge, and a second check valve and a

gate valve at the end of the discharge pipeline.

4. Manifold piping shall be used to connect pairs of pumps to the discharge piping. Each

manifold shall be constructed of rigid pipe with positive, restrained joints, with flanges for

discharge piping. Manifold piping shall be Godwin "QD" steel pipe as manufactured by

Godwin Pumps of America. Inc, or approved equal.

5. Discharge piping shall be HDPE pipelines. The discharge piping will convey the flow to

the locations shown on the Drawings. Each discharge pipeline will have a shutoff valves

where the pipelines connect to the main headers. The HDPE piping shall have

combination air and vacuum vents at each high point on the pipeline.

H EQUIPMENT

1. All pumps shall be centrifugal, end suction, fully automatic self-priming units that do not

require the use of foot-valves, diaphragm pumps, or vacuum pumps in the priming

system. The pumps must be diesel powered. Hydraulic submersible type and electric

submersible type pumps will not be acceptable for temporary bypass pumps. All pumps

shall be constructed to allow dry running for long periods of time to accommodate the

cyclical nature of sewage flows.

2. Contractor shall provide the necessary stop/start controls and a visual alarm indicating a

pump malfunction for each pump. Each pump shall have a 0-30 inch Hg vacuum gauge

on the inlet and a 0-30 PSI pressure gauge on the outlet.

3. All pumps shall be Godwin "Dri-Prime" automatic self-priming pumps as manufactured by

Godwin Pumps of America, Inc., GST Series by Global Pump, or approved equal.

4. Contractor shall incorporate noise prevention measures for any and all equipment used to

insure minimum noise impact on the surrounding areas. Such measures shall include but

not be limited to:

A. Hospital grade silencers or mufflers.

B. Equipment modifications.

I PREPARATION

1. Contractor is responsible for locating any conflicts in the area Contractor selects to locate

the diversion pipelines. The diversion pipelines shall be located to minimize any

disturbance to existing operations, utilities, traffic, and the Contractor shall obtain approval

of the pipeline locations from the Owner and Engineer prior to installation.

J INSTALLATION

1. Plugging or blocking of sewage flows shall incorporate primary and secondary plugging

devices. Plugging devices shall be braced and/or designed such that they are capable of

retaining the maximum head that could be produced at the plug location during maximum

surcharging of the sewer system. When plugging or blocking is no longer needed for

performance and acceptance of work, the plugs or blocks shall be removed in a manner

that permits the sewage flow to slowly return to normal, to prevent surcharging or causing

other major disturbances downstream.

2. When working inside structures, Contractor shall exercise caution and comply with OSHA

requirements when working in the presence of sewer gases, combustible

oxygen-deficient atmospheres, and confined spaces.

3. Contractor shall protect the diversion lines from damage in the areas of construction

operations. Protection shall be by either concrete Jersey Barriers or wood timbers.

4. Contractor shall confine the diversion pipelines to the limits of Work as defined by the

contract documents during diversion operations. Concrete barriers or timber deadman

posts may be used to confine the movement of the diversion pipeline during relocation.

5. The temporary pumping system shall be placed in operation a minimum of 24 hours

before any other work in the areas being bypassed may begin.

K FIELD QUALITY CONTROL

1. Contractor shall perform a hydrostatic pressure test for each section of discharge piping

using a pressure equal to 1.5 times the maximum operating pressure of the system to

ensure that there are no leaks in the discharge piping prior to actual operation. Engineer

shall witness the test.

2. The Operator shall inspect the diversion pumping system every 2 hours the diversion

system is in operation or on a schedule approved by Owner. An inspection log shall be

kept at the pumping site. Each inspection log shall be marked with a time clock stamp to

ensure the required maintenance and inspections are performed. Failure to perform these

inspections will result in immediate removal of the Operator from the site and Contractor

shall be assessed liquidated damages of $1,000.00 for each occurrence. Copies of the

maintenance and inspection logs shall be submitted to Engineer on a daily basis or as

directed by Engineer.

L BYPASS PUMPING OPERATION CLOSEOUT

1. The temporary pumping system shall remain operable for at least 72 hours after the work

in the area being bypassed is completed. Its removal shall be approved by Engineer in

writing. Once written permission is granted, Contractor shall remove all components of

the temporary pumping system.

2. Disturbed Areas: On completion of the diversion pumping operation, Contractor shall

clean all areas disturbed by these operations and restore all areas to equal or better

conditions that existed prior to the start of work.

Painting

1. All piping, couplings, hardware, and fittings provided by the Contractor shall be painted in

accordance with these requirements. Paints listed in the Application Schedule are

manufactured by Tnemec Company, Inc. Approved equal items of other manufacturers

may be furnished.

2. All paint used for intermediate and finish coats shall be guaranteed by the paint

manufacturer to be fume-proof and suitable for sewage plant atmosphere containing

hydrogen sulfide. Any paint that cannot be so guaranteed shall not be used. Paint shall

be lead-free and mercury-free if available, but in no case shall the lead or mercury

content cause discoloration in sewage plant atmosphere.

3. Contractor shall paint the following items as part of the project:

A. Valves and couplings provided by the Owner as listed in the Owner Furnished

Equipment Section.

B. Piping and couplings provided by the Contractor.

C. New pipe supports.

D. Any existing coating systems damaged by the Contractors Work. Existing piping

shall not be repainted unless the coating system has been damaged by the

Contractor.

A COLORS

1. Match existing color(s)

B FACTORY OR SHOP_PAINTED ITEMS

1. Surfaces of items finish_painted by the manufacturer, or specified to be finish_painted

under other sections of the specifications, are exempted from the requirements for

surface preparation and painting. Shop_primed items shall receive surface preparation

and finish painting as required by this section.

2. All factory prime painting shall be touched up for elimination of all abraded and scratched

areas, rendering surfaces suitable for finish painting. All factory finish painting shall be

touched up to provide acceptable finish painting. Mismatching of touch_up color and

surface or equipment painted with non_desirable colors shall be repainted.

3. Operating parts not to be painted include moving parts of operating equipment, such as

the following:

A. Valve and damper operators.

B. Linkages.

C. Packing glands and other adjustable parts of mechanical equipment.

C CLEANING

1. The Contractor shall protect at all times, in areas where painting is being done, floors,

materials of other crafts, equipment, vehicles, fixtures, and finished surfaces adjacent to

the paint work. Cover all electrical plates, surface hardware, nameplates, gauge glasses,

etc., before start of painting work.

2. Touch up and restore finish where damaged.

3. Remove spilled, splashed or splattered paint from all surfaces.

4. All damaged hardware and other items shall be replaced.

5. Cloths, cotton waste and other debris that might constitute a fire hazard shall be placed in

closed metal containers and removed at the end of each day. Upon completion of the

work, staging scaffolding and containers shall be removed from the site or destroyed in an

approved manner. Paint and other deposits upon adjacent surfaces shall be removed

and the entire job left clean and acceptable.

D PROTECTION OF MACHINERY, FLOORS AND EQUIPMENT

Drop cloths shall be used to protect machinery, finished floors and equipment.

THESE ABBREVIATED SPECIFICATIONS WORK IN CONJUNCTION WITH THE FRONT END

DOCUMENTS ASSOCIATED WITH THIS PROJECT.REVIEW SET ONLY

- NOT FOR BID

DING

Page 5: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Tem

p Pum

ping.dw

g Layout N

am

e: AERIAL 1 Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:30:41 AM

Last edit on: 1/10/2018 4:04 PM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

TE

MP

OR

AR

Y P

UM

P A

ND

P

IP

IN

G

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

C21

5 13

DESIGNED BY:

CONST PROJ:

SCALE:

PL

AN

(1

O

F 2

)

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

BYPASS 2:

DESIGN FLOW 7,500 GPM

LOCATE ISOLATION /

CONTROL VALVE

ADJACENT TO TEE AT

EACH DISTRIBUTION

LINE CONNECTION

POINT

BYPASS PUMP

STAGING AREA, SEE

DRAWING C22

BLOWER BUILDING

NORTH AERATION

BASINS

SOUTH AERATION

BASINS

1. SEE G03 FOR BYPASS PUMPING REQUIREMENTS.

2. PIPING LOCATIONS APPROXIMATE, CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

ROUTING OF BYPASS PIPING.

TEMPORARY BYPASS PUMP AND PIPING NOTES:

TOTAL BYPASS

CAPACITY = 7,500 GPM

(10.8 MGD)

2,500 GPM 2,500 GPM 2,500 GPM

2,500 GPM5,000 GPM

7,500 GPM

7,500 GPM

2,500 GPM

5,000 GPM

2,500 GPM

2,500 GPM

2,500 GPM

BYPASS 1:

DESIGN FLOW 7,500 GPM

REVIEW SET ONLY

- NOT FOR BID

DING

Page 6: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Tem

p Pum

ping.dw

g Layout N

am

e: AERIAL 3 Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:30:46 AM

Last edit on: 1/10/2018 4:04 PM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

TE

MP

OR

AR

Y P

UM

P A

ND

P

IP

IN

G

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

C22

6 13

DESIGNED BY:

CONST PROJ:

SCALE:

PL

AN

(2

O

F 2

)

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

INSTALL SUCTION PIPING THROUGH

ACCESS HATCH (3'x3') AND

VENTILATION DUCTS

BLOWER BUILDING

PRIMARY EFFLUENT

LIFT STATION

NORTH AERATION

BASINS

LOADING DOCK

HEIGHT CHANGE IN

CONCRETE GRADE.

PUMP, VALVE AND

DISCHARGE STAGING

AREA TOTAL BYPASS

CAPACITY = 7,500

GPM (10.8 MGD)

NO PUMPS, VALVES, OR EQUIPMENT

SHALL BE INSTALLED ON RAISED

CONCRETE AREA (APPROX. 4' HIGH)

/ WETWELL, ONLY PIPING SHALL BE

ALLOWED.

BYPASS 1:

DESIGN FLOW 7,500 GPM

BYPASS 2:

DESIGN FLOW 7,500 GPM

2,500 GPM 2,500 GPM

LOCATE ISOLATION /

CONTROL VALVE

ADJACENT TO TEE AT

EACH DISTRIBUTION

LINE CONNECTION

POINT

REVIEW SET ONLY

- NOT FOR BID

DING

Page 7: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

A A

C

C

D

D

B

B

E

E

RAS-P-771

RAS PUMP NO. 1

RAS-P-772

RAS PUMP NO. 2

RAS-P-773

RAS PUMP NO. 3

RAS-SCV-011

16" ∅ CHECK VALVE

RAS-SCV-012

16" ∅ CHECK VALVE

RAS-SCV-013

16" ∅ CHECK VALVE

24"x16" DI REDUCING 90° BEND 24"x16" DI REDUCING TEE 30" ∅ 90° DI BEND

30"x16" DI REDUCING TEE

30"x24" DI CONCENTRIC REDUCER

EXISTING

PIPE HANGER

EXISTING

PIPE HANGER

EXISTING

PIPE HANGER

24"x16" GRVDxGRVD DI

REDUCING 90° BEND

24"x16" GRVDxGRVD DI

REDUCING TEE

30"∅ 90° GRVDxGRVD DI BEND

30"x16" GRVDxGRVD DI REDUCING TEE

30"x24" GRVDxGRVD DI CONCENTRIC

REDUCER

30" ∅ 90° DI BEND

16" ∅ 90° FLANGED DI, BASE

RAS-PV-013

16" ∅ PLUG VALVE

16" ∅ RESTRAINED FLANGE

COUPLING ADAPTER

16" ∅ DI SPOOL (GRVDxPE)

RAS-PV-012

16" ∅ PLUG VALVE

RAS-PV-011

16" ∅ PLUG VALVE

EXISTING

PIPE HANGER

TO REMAIN

EXISTING

PIPE HANGER

TO REMAIN

EXISTING PIPE HANGER

TO REMAIN

SCALE: 1/4"=1'-0"

EXISTING RAS PIPING PLAN VIEW

SCALE: 1/4"=1'-0"

EXISTING RAS PIPING SECTION

-

A

MATERIAL LIST:

REFERENCE NOTES:

GENERAL NOTES:

1. PIPE, FITTINGS, VALVES, EQUIPMENT, ETC TAGS AND

LABELS ARE PROVIDED AS A COURTESY FOR THE

CONTRACTOR. IT IS NOT THE INTENT OF THESE CALL

OUTS, LABELS, AND TAGS TO BE A BILL OF MATERIALS

LIST. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

ITEMS EITHER CALLED OUT OR SHOWN IN THE

DRAWINGS.

2. CONTRACTOR SHALL LEAK TEST OR PRESSURE TEST ALL

PIPES PLACED BENEATH CONCRETE SLABS / BASINS,

PRIOR TO PLACING CONCRETE. TESTS SHALL BE

WITNESSED BY OWNERS REPRESENTATIVE. SEE

SPECIFICATION SECTION 400515 FOR LEAK TEST AND

PRESSURE TEST REQUIREMENT.

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Plan Sheets.dw

g Layout N

am

e: PLAN

Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:30:52 AM

Last edit on: 1/12/2018 11:22 AM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

EX

IS

TIN

G R

AS

P

IP

IN

G

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

D11

7 13

DESIGNED BY:

CONST PROJ:

SCALE:

PL

AN

A

ND

S

EC

TIO

N

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

5

PHOTO

8

PHOTO

9

PHOTO

REVIEW SET ONLY

- NOT FOR BID

DING

AutoCAD SHX Text
D11
AutoCAD SHX Text
D11
AutoCAD SHX Text
D21
AutoCAD SHX Text
D21
AutoCAD SHX Text
D21
AutoCAD SHX Text
D21
AutoCAD SHX Text
D21
AutoCAD SHX Text
D21
AutoCAD SHX Text
D21
AutoCAD SHX Text
D21
AutoCAD SHX Text
D91
AutoCAD SHX Text
D91
AutoCAD SHX Text
D91
Page 8: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

A A

C

C

D

D

B

B

ROTATE EXISTING 30" ∅ 90° DI

BENDS TO ACHIEVE THE

CORRECTED HEADER

ALIGNMENT SHOWN

RAS-P-771

RAS PUMP NO. 1

RAS-P-772

RAS PUMP NO. 2

RAS-P-773

RAS PUMP NO. 3

RAS-SCV-011

16" ∅ CHECK VALVE

RAS-SCV-012

16" ∅ CHECK VALVE

RAS-SCV-013

16" ∅ CHECK VALVE

EXISTING

PIPE HANGER

EXISTING

PIPE HANGER

EXISTING

PIPE HANGER

ROTATE EXISTING 30" ∅ 90° DI

BENDS TO ACHIEVE THE

CORRECTED HEADER

ALIGNMENT SHOWN

RAS-PV-013

16" ∅ PLUG VALVE

RAS-PV-012

16" ∅ PLUG VALVE

RAS-PV-011

16" ∅ PLUG VALVE

EXISTING

PIPE HANGER

TO REMAIN

EXISTING

PIPE HANGER

TO REMAIN

EXISTING

PIPE HANGER

TO REMAIN

SCALE: 1/4"=1'-0"

CORRECTED RAS PIPING PLAN VIEW

SCALE: 1/4"=1'-0"

CORRECTED RAS PIPING SECTION

-

A

MATERIAL LIST:

REFERENCE NOTES:

ALL HEADER PIPING TO BE REUSED. ALL FITTINGS

ARE GRVDxGRVD DUCTILE IRON.

EXISTING PIPING AND VALVES TO REMAIN IN PLACE.

GENERAL NOTES:

1. PIPE, FITTINGS, VALVES, EQUIPMENT, ETC TAGS AND

LABELS ARE PROVIDED AS A COURTESY FOR THE

CONTRACTOR. IT IS NOT THE INTENT OF THESE CALL

OUTS, LABELS, AND TAGS TO BE A BILL OF MATERIALS

LIST. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

ITEMS EITHER CALLED OUT OR SHOWN IN THE

DRAWINGS.

2. CONTRACTOR SHALL LEAK TEST OR PRESSURE TEST ALL

PIPES PLACED BENEATH CONCRETE SLABS / BASINS,

PRIOR TO PLACING CONCRETE. TESTS SHALL BE

WITNESSED BY OWNERS REPRESENTATIVE. SEE

SPECIFICATION SECTION 400515 FOR LEAK TEST AND

PRESSURE TEST REQUIREMENT.

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Plan Sheets.dw

g Layout N

am

e: N

EW

PLAN

Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:30:55 AM

Last edit on: 1/12/2018 11:22 AM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

CO

RR

EC

TE

D R

AS

P

IP

IN

G

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

D12

8 13

DESIGNED BY:

CONST PROJ:

SCALE:

PL

AN

A

ND

S

EC

TIO

N

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

NEW GRVDxGRVD JOINT GASKETS TO BE FURNISHED

BY OWNER, TYP OF 11.

NEW 16" ∅ ROMAC RFCA, RESTRAINED FLANGED

COUPLING ADAPTER, FURNISHED BY OWNER,

INSTALLED BY CONTRACTOR

CONTRACTOR SHALL FIELD VERIFY IF SPOOL NEEDS

REPLACING OR SHORTENING DUE TO PIPING

RE-ALIGNMENT.

NEW PIPE SUPPORT SEE DETAIL 1/D22

REVIEW SET ONLY

- NOT FOR BID

DING

AutoCAD SHX Text
D12
AutoCAD SHX Text
D12
AutoCAD SHX Text
D22
AutoCAD SHX Text
D22
AutoCAD SHX Text
D22
AutoCAD SHX Text
D22
AutoCAD SHX Text
D22
AutoCAD SHX Text
D22
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
6
Page 9: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

RAS-SCV-011

16" ∅ CHECK VALVE

16" ∅ 90° FLANGED DI, BASE

RAS-PV-011

16" ∅ PLUG VALVE

24"x16" GRVDxGRVD DI

REDUCING 90° BEND

RAS-P-711

RAS PUMP NO.1

16" ∅ DI SPOOL (GRVDxPE)

16" ∅ RESTRAINED FLANGE

COUPLING ADAPTER

16" ∅ 90° FLANGED DI, BASE

24"x16" GRVDxGRVD DI

REDUCING TEE

RAS-SCV-012

16" ∅ CHECK VALVE

RAS-PV-012

16" ∅ PLUG VALVE

RAS-P-712

RAS PUMP NO.2

16" ∅ DI SPOOL (GRVDxPE)

16" ∅ RESTRAINED FLANGE

COUPLING ADAPTER

16" ∅ 90° FLANGED DI, BASE

30"x16" GRVDxGRVD DI

REDUCING TEE

RAS-SCV-013

16" ∅ CHECK VALVE

RAS-PV-013

16" ∅ PLUG VALVE

RAS-P-713

RAS PUMP NO.3

16" ∅ DI SPOOL (GRVDxPE)

16" ∅ RESTRAINED FLANGE

COUPLING ADAPTER

SCALE: 1/4"=1'-0"

EXISTING RAS PIPING SECTION

-

B

SCALE: 1/4"=1'-0"

EXISTING RAS PIPING SECTION

-

D

SCALE: 1/4"=1'-0"

EXISTING RAS PIPING SECTION

-

C

SCALE: 1/4"=1'-0"

EXISTING RAS PIPING SECTION

-

E

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Plan Sheets.dw

g Layout N

am

e: SECTIO

NS Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:31:00 AM

Last edit on: 1/12/2018 11:22 AM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

EX

IS

TIN

G R

AS

P

IP

IN

G

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

D21

9 13

DESIGNED BY:

CONST PROJ:

SCALE:

SE

CT

IO

NS

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

REVIEW SET ONLY

- NOT FOR BID

DING

Page 10: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

NEW 16" ∅ ROMAC RFCA,

RESTRAINED FLANGED

COUPLING ADAPTER.

FURNISHED BY OWNER,

INSTALLED BY CONTRACTOR.

CONTRACTOR SHALL FIELD

VERIFY IF SPOOL NEEDS

REPLACING OR SHORTENING

DUE TO PIPING RE-ALIGNMENT

NEW 16" ∅ ROMAC RFCA,

RESTRAINED FLANGED

COUPLING ADAPTER.

FURNISHED BY OWNER,

INSTALLED BY CONTRACTOR.

CONTRACTOR SHALL FIELD

VERIFY IF SPOOL NEEDS

REPLACING OR SHORTENING

DUE TO PIPING RE-ALIGNMENT

NEW 16" ∅ ROMAC RFCA,

RESTRAINED FLANGED

COUPLING ADAPTER.

FURNISHED BY OWNER,

INSTALLED BY CONTRACTOR.

CONTRACTOR SHALL FIELD

VERIFY IF SPOOL NEEDS

REPLACING OR SHORTENING

DUE TO PIPING RE-ALIGNMENT

SCALE: 1/4"=1'-0"

CORRECTED RAS PIPING SECTION

-

B

SCALE: 1/4"=1'-0"

CORRECTED RAS PIPING SECTION

-

D

SCALE: 1/4"=1'-0"

CORRECTED RAS PIPING SECTION

-

C

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Plan Sheets.dw

g Layout N

am

e: N

EW

SECTIO

NS Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:31:05 AM

Last edit on: 1/12/2018 11:22 AM

by: D

LZ00974

1"BAR IS ONE INCH ON OFFICIAL DRAWINGS. IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

CO

RR

EC

TE

D R

AS

P

IP

IN

G

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

D22

10 13

DESIGNED BY:

CONST PROJ:

SCALE:

SE

CT

IO

NS

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

EXISTING CONCRETE

FLOOR SLAB

1" NON-SHRINK

GROUT

HSS 14" x 0.625"

1/2" FOR MOUNTING

PIPE STANCHION. COORDINATE

W/PROCESS DRAWINGS

1"x2'-0"x1'-4"

3/16"

TYP

3/16"

ADJUSTABLE PIPE SADDLE

WITH U-BOLT. ANVIL FIG.

265, ZINC PLATED, OR

APPROVED EQUAL

3/8" DIAM. WEEP HOLE

NOTE:

LATERAL LOAD NOT TO EXCEED 1650 LBS.

(4) 5/8" DIA. SIMPSON

STRONG-TIE TORQ-CUT WITH 8"

MIN. EMBEDMENT.

PIPE SUPPORT W/ U-BOLT DETAIL

NOT TO SCALE

-

1

6" DIA. PIPE STANCHION ANVIL FIG.

63, TYPE T, PLAIN FINISH, OR

APPROVED EQUAL.

(2) LAYERS OF NON-

NEOPRENE FELT

REVIEW SET ONLY

- NOT FOR BID

DING

AutoCAD SHX Text
FOR MOUNTING
AutoCAD SHX Text
1"x2'-0"x1'-4"
Page 11: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: W

:\Proj\18000\18291\18291.002\AutoCad\RAS Piping Plan Set\Plan Set\RAS Piping Knife Valve Sheets.dw

g Layout N

am

e: KG

V Sheet Plotted By: D

LZ00974 Plotted on: 1/17/2018 1:52:52 PM

Last edit on: 1/17/2018 1:51 PM

by: D

LZ00974

1"

BAR IS ONE INCH ON OFFICIAL DRAWINGS.

IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

RA

S M

ET

ER

V

AU

LT

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

D31

11 13

DESIGNED BY:

CONST PROJ:

SCALE:

EN

LA

RG

ED

P

LA

N

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

DETAIL - PLAN VIEW

NOT TO SCALE

-

1

DETAIL - PLAN VIEW

NOT TO SCALE

-

2

1 2

NEW 16"∅ DI SPOOL (FLGxPE), WITH INTERIOR

EPOXY COATING TYPICAL OF 4.

MATERIAL LIST:

REFERENCE NOTES:

INSTALL OWNER FURNISHED KNIFE GATE VALVES.

CONTRACTOR TO REMOVE AND DISPOSE OF

EXISTING BUTTERFLY VALVES, SPOOLS, FLANGES,

ETC.

GENERAL NOTES:

1. PIPE, FITTINGS, VALVES, EQUIPMENT, ETC TAGS AND

LABELS ARE PROVIDED AS A COURTESY FOR THE

CONTRACTOR. IT IS NOT THE INTENT OF THESE CALL

OUTS, LABELS, AND TAGS TO BE A BILL OF MATERIALS

LIST. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

ITEMS EITHER CALLED OUT OR SHOWN IN THE

DRAWINGS.

2. CONTRACTOR SHALL COORDINATE WITH CITY

PERSONNEL TO ISOLATE THE WORK FROM PLANT

FLOWS. SEE NOTES ON DRAWING G02.

NEW 16"∅ DI FLANGE ADAPTER, MEGALUG EZ 1000

OR STAR MODEL 400, TYPICAL OF 4

CONTRACTOR TO REPAINT EXISTING DI PIPE AND

FITTINGS IN THIS AREA, DO NOT PAINT EXISTING

VALVES.

RAS-KGV-011RAS-KGV-010 RAS-KGV-013RAS-KGV-012

1 2 3 4

EXISTING FITTINGS, TO REMAIN

VALVE REPLACEMENT SEQUENCING

CONTRACTOR SHALL COORDINATE WITH THE SIOUX

CITY WASTE WATER TREATMENT FACILITY

MANAGEMENT ABOUT TIMING AND SEQUENCING OF

REPLACING THE OWNER SUPPLIED KNIFE GATE VALVES.

THE INITIAL PLAN IS TO INSTALL VALVES RAS-KGV-010

AND RAS-KGV-011. THEN COORDINATE THE

INSTALLMENT OF RAS-KGV-012 AND RAS-KGV-013.

PHOTO PHOTO PHOTO PHOTO

3.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ALL FITTINGS, GASKETS, AND ALL HARDWARE

REQUIRED FOR INSTALLATION OF OWNER FURNISHED

VALVES AND CONTRACTOR FURNISHED FITTINGS.

RAS METER VAULT ENLARGED PLAN

NOT TO SCALE

REVIEW SET ONLY

- NOT FOR BID

DING

AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
D91
AutoCAD SHX Text
D91
AutoCAD SHX Text
D91
AutoCAD SHX Text
D91
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
Page 12: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Knife Valve Sheets.dw

g Layout N

am

e: Layout1 Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:31:27 AM

Last edit on: 1/12/2018 11:24 AM

by: D

LZ00974

1"

BAR IS ONE INCH ON OFFICIAL DRAWINGS.

IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

AIR

P

IP

IN

G M

OD

IF

IC

AT

IO

NS

DLZ

DLZ

BLH

18291.002

----

AS NOTED

JAN 2018

D41

12 13

DESIGNED BY:

CONST PROJ:

SCALE:

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

6

7

NEW 4"∅ BLIND FLANGE

MATERIAL LIST:

REFERENCE NOTES:

CONTRACTOR TO REMOVE AND DISPOSE OF

EXISTING 4" DUCTILE IRON AIR PIPING AND

SUPPORTS FROM RAS PUMP STATION WETWELL, SEE

PHOTO 7/D91, TO TEE CONNECTION BY BLOWERS,

SEE PHOTO 6/D91.

GENERAL NOTES:

1. PIPE, FITTINGS, VALVES, EQUIPMENT, ETC TAGS AND

LABELS ARE PROVIDED AS A COURTESY FOR THE

CONTRACTOR. IT IS NOT THE INTENT OF THESE CALL

OUTS, LABELS, AND TAGS TO BE A BILL OF MATERIALS

LIST. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

ITEMS EITHER CALLED OUT OR SHOWN IN THE

DRAWINGS.

APPROXIMATELY 50' OF 4" STEEL AIR PIPING TO BE

REMOVED.

PHOTO

PHOTO

AIR PIPING MODIFICAITONS

NOT TO SCALE

REVIEW SET ONLY

- NOT FOR BID

DING

AutoCAD SHX Text
D91
AutoCAD SHX Text
D91
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
Page 13: BIDDING FOR - NOT ONLY SET REVIEW - Sioux City, Iowa

DATE

DESCRIPTIO

N

ALL RIG

HTS RESERVED

. ALL BARTLETT &

W

EST PLAN

S, SPECIFICATIO

NS AN

D D

RAW

IN

GS ARE PRO

TECTED

U

ND

ER CO

PYRIG

HT LAW

, AN

D N

O PART M

AY BE CO

PIED

, REPRO

DU

CED

, D

ISPLAYED

PU

BLICLY, U

SED

TO

CREATE D

ERIVATIVES, D

ISTRIBU

TED

, STO

RED

IN

A RETRIEVAL SYSTEM

O

R TRAN

SM

ITTED

IN

AN

Y FO

RM

BY AN

Y M

EAN

S W

ITH

OU

T PRIO

R W

RITTEN

PERM

ISSIO

N O

F BARTLETT &

W

EST.

BY

#

DRAWING NO:

APPROVED BY:

DRAWN BY:

DESIGN PROJ:

DATE:

SHEET NO:

of

Draw

ing N

am

e: w

:\Proj\18000\18291\18291.002\AutoCad\ras piping plan set\Plan Set\RAS Piping Knife Valve Sheets.dw

g Layout N

am

e: KG

V Photos Plotted By: D

LZ00974 Plotted on: 1/12/2018 11:31:30 AM

Last edit on: 1/12/2018 11:24 AM

by: D

LZ00974

1"

BAR IS ONE INCH ON OFFICIAL DRAWINGS.

IF NOT ONE INCH, ADJUST SCALE ACCORDINGLY.0

ww

w.b

artl

ettw

est.

com

PH

OT

OS

DLZ

BLH

BLH

18291.002

----

AS NOTED

JAN 2018

D91

13 13

DESIGNED BY:

CONST PROJ:

SCALE:

SIO

UX

C

IT

Y W

WT

P

RA

S P

UM

P D

IS

CH

AR

GE

E

ME

RG

EN

CY

P

IP

E R

EP

AIR

P

RO

JE

CT

WO

OD

BU

RY

C

OU

NT

Y | S

IO

UX

C

IT

Y, IO

WA

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y N

O. 0

0016

7

5900

S W

ES

TE

RN

AV

E, S

UIT

E 1

01 -

SIO

UX

FA

LLS

, SD

571

08P

HO

NE

888

.200

.646

4 - 6

05.2

74.7

415

PHOTO

NOT TO SCALE

-

1

MATERIAL LIST:

REFERENCE NOTES:

GENERAL NOTES:

1. PIPE, FITTINGS, VALVES, EQUIPMENT, ETC TAGS AND

LABELS ARE PROVIDED AS A COURTESY FOR THE

CONTRACTOR. IT IS NOT THE INTENT OF THESE CALL

OUTS, LABELS, AND TAGS TO BE A BILL OF MATERIALS

LIST. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

ITEMS EITHER CALLED OUT OR SHOWN IN THE

DRAWINGS.

PHOTO

NOT TO SCALE

-

2

PHOTO

NOT TO SCALE

-

4

PHOTO

NOT TO SCALE

-

3

PHOTO

NOT TO SCALE

-

7

PHOTO

NOT TO SCALE

-

6

NEW 4"∅ BLIND FLANGE

APPROXIMATELY 18' OF AIR PIPING TO BE REMOVED

FROM EDGE OF CONCRETE TO THE HEADER

CONNECTION.

PHOTO

NOT TO SCALE

-

5

PHOTO

NOT TO SCALE

-

8

PHOTO

NOT TO SCALE

-

9

CONTRACTOR TO REMOVE AND DISPOSE OF

EXISTING 4" DUCTILE IRON AIR PIPING AND

SUPPORTS FROM RAS PUMP STATION WETWELL, SEE

PHOTO 7/D91, TO TEE CONNECTION BY BLOWERS,

SEE PHOTO 6/D91.

REVIEW SET ONLY

- NOT FOR BID

DING

AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
2