Weekly Progress SlideshowWeekly Progress SlideshowDecember 24, 2010,
Metal Siding DeliveredMetal Siding Delivered
Site Grading Around AuditoriumSite Grading Around Auditorium
Building Tented for Temporary HHeat
Roofing Materials StagedRoofing Materials Staged
Academic Wing West WindowsAcademic Wing West Windows
Electrical WorkElectrical Work
Duct Staged and InstalledDuct Staged and Installed
Masonry AuditoriumMasonry Auditorium
Brick Academic WingBrick Academic Wing
Topping Walls Admin WingTopping Walls Admin Wing
Gas Line Piped & Heaters StagedGas Line Piped & Heaters Staged
Cleaning Up In All AreasCleaning Up In All Areas
Academic Wing Carpentry C iContinues
CHILI COOK-OFF!CHILI COOK OFF!
Massaro CM will be challenging the other primes on the Bethelthe other primes on the Bethel
Park Job to a chili cook off January 12th. For details contact y
Chuck [email protected]@
412-831-1024
Scheduled Work for Next Few Weeks:Scheduled Work for Next Few Weeks:• Roof Curbs (Areas D, E, F, & G)• Installing Interior and Exterior Metal Studs• Window & Door Framing• Masonry Block Walls• Punch Windows (Area B)
B i k V E t i W ll (A A B & C)• Brick Veneer Exterior Walls (Areas A, B & C)• Ext. Sheathing & Spray Foam Insulation (Area H)
Fireproofing Str ct ral Steel• Fireproofing Structural Steel• Aluminum Roofing Panels (Area E)• MEP Rough in’s across the site• MEP Rough-in s across the site.