BEST PRACTICE GUIDES

SECTION 3 SUPERSTRUCTURE

Page 2: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.1 STRUCTURALFRAMEAND/ORLOADBEARINGWALLS

3.2 EXTERNALENVELOPE

3.3 CAVITIESANDINSULATION

3.4 DPC’S&TRAYS

3.5 CHIMNEYSANDFLUES

3.6 INTERMEDIATEFLOORSTRUCTURE

3.7 LINTELS,BEAMS&OTHERSTRUCTURALELEMENTS

3.8 BALCONIESINCLUDINGFIXINGS&WEATHERPROOFING

3.9 FIRESTOPPING&SOUNDPROOFING

ThisisoneofthelargersectionsofthePrideintheJobmarkingsheetandcoversallaspectsofthesuperstructurebuildaboveground.Structure,brickwork,blockwork,timberframe,weatherproofingandaestheticfinishareallconsideredhere.

SECTION 3 SUPERSTRUCTURE

Our series of Best Practice Guides will take you through what the Pride in the Job judges look for at each stage of construction and when considering the site manager’s overall organisation and management skills.

ThePrideintheJobmarkingsheetusedbyourjudgeshas44markinglinessplitacross9sections.Thejudgeswillgiveascoreforeachline–wherethereisnoworktomark,thatlinewillbeleftblankandnomarkgiven.Amarkof4indicatescompliancewithNHBCStandardsandwithBuildingRegulations.Amarkof5indicatesextraattentiontodetailoverandabovecompliancestandards.Amarkof6wouldindicatethatmuchofwhatthejudgeshaveseencannotbeimprovedupon.Amarklessthan4wouldindicatevaryingissuesrelatingtoworkmanshipandnon-compliancewithNHBC’sStandards–thegreatertheissueornumberofthesameissue,thelowerthemark.Thefinalscorewillbeallthemarksawardedexpressedasapercentage.

TheseGuidessetoutwhatthejudgesarelookingforwithclearhintsandtipsonthesortofpracticethatwillleadtohighermarks.

Clearlyitisimpossibleintheseshortguidestocovereverysinglepointofconstruction–wetryheretocoverthemainissuesthataretakenintoaccountwhenconsideringamarkforeachscoreline.

Whenlookingatthephotographs,considereachoneinthecontextofthescorelineheading–don’tbedistractedbysomethingelsethatisn’tasgood–thatwillbemarkedaccordinglyelsewhere.

BEST PRACTICE GUIDES

BESTPRACTICEGUIDES-SECTION3

PAGE20F25

Page 3: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.1 - 1 3.1 - 2 3.1 - 3

3.1 STRUCTURAL FRAME AND LOAD BEARING WALLS

BESTPRACTICEGUIDES-SECTION3

PAGE30F25

Page 4: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.1 STRUCTURAL FRAME AND LOAD BEARING WALLS

Thisscorelinerelatestothequalityofbuildoftheinnerleafoftheexternalwall(eitherblockworkortimber)andanyinternalload-bearingpartitionorseparatingwalls.

Images 1, 2 and 3:Theformingofopeningsinthewallforwindowsanddoorsandthebuilding-inoffloorjoistswiththeblockinginbetweenareallconsideredbythejudges.Image1showsasimpleexampleofwherethegaugingoftheblockworkhasyieldedafulldepthblockunderthebearingpointofthelintel–theuseofcutblocksorbricketteswouldbemarkeddown.

Separatingwallsshouldreceiveparticularattentiontoavoidsoundtransmittanceandintimberframeconstruction,thepositionofthewallstudsandthefixingofthepanelswillbetakenintoaccount.Image2showsblockworktightuptothejoists–excellentbeam-fillingwheretherehasbeenclearcareandattentionbythebricklayers.Goodworkwiththesealanttoo,whichmayhavebeenrequiredforRobustDetailsandsoundinsulation.

Blockworkshouldbekeptcleanandcutswellexecuted–especiallyforthoseawkwardangledcornerswheresometimes‘cutandstick’unitswouldworkverywell.

Constructionofmasonrywithinheightlimitationsoftheproductduringbuildisalsoimportant.Weseelotsofgablewallsbuilt7or8courseshighinblockworkwithoutbeingbackedupandsupportedwithbrickwork,thisisabreachoftheNHBCStandardsandareportableitem.

Extramarksmaybeawardedifthejudgesseethatthesitemanagerisgivingparticularfocustotheaccuracyofworkandanunderstandingofthestructuralprinciples.Inimage3,thoughthasbeengiventotheprecisepositioningofthepadstonehere.It’sattherightleveltoowithnopacking,otherthanadoublelayerofdpc.Intimberframedconstruction,thedesignandapplicationofeffectivecheckingsystemsforconnectionsdemonstratesagoodappreciationofthechallengesinvolved.Furthermoreneatnessofthebuildprocessshouldbeconsideredbythesitemanagerandtrades.

Theworkshownintheseimageswouldattractamarkof5.

BESTPRACTICEGUIDES-SECTION3

PAGE40F25

Page 5: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.2 EXTERNAL ENVELOPE

3.2 - 5 3.2 - 6

BESTPRACTICEGUIDES-SECTION3

PAGE50F25

3.2 - 4

Page 6: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.2 EXTERNAL ENVELOPE

3.2 - 7

BESTPRACTICEGUIDES-SECTION3

PAGE60F25

3.2 - 9 3.2 - 8

Page 7: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.2 EXTERNAL ENVELOPE

Images 4, 5, 6, 7, 8 and 9:Thejudgeswillmainlylookatthequalityoftheworkmanshipwhich,forbrickwork,shouldincludebonding,gaugeandwell-filledjointstopreventexcessivewaterpenetration.Thevisualimpactoftheconstructionisimportant.Theimageshereshowsuperlativecraftsmanshipintheexecutionofmainwalling,corbelsandcutbricksaroundarchways.Theworkshownherewouldallreceivefullmarks.

Thebricklayers’attentiontodetailandanyfeatureworksuchasarchesshouldcomplementtheconstruction.Correctlypositionedandformedmovementjoints,includingsealant,willalsobemarked.

Particularcareandattentionneedstobemadetointernaljointstomakesurethepointingisneatandeven;Image7showsalovelyexampleofaninternalcornertoabrickchimneywherethebondiscompletelyuninterruptedaroundtheinternalcorner.

Anypreformedfeaturepanelswithincladdingsystemsandtheirrespectivefixingswillalsobeconsidered.Theinstallationofcladdingshouldpreciselyfollowmanufacturers’instructionsandtherequirementsofBBAcertification.

Toreallydrivethehigheststandardsonsite,maintainingverticalperpendjointsonmasonrywithahighqualityofworkingeneralwillreapdividends,asbeautifullydemonstratedinImage8onablockofthreestoreyapartments.

Workmanshipshowninthese6imageswouldeasilyattractamarkof6fromthejudges.

BESTPRACTICEGUIDES-SECTION3

PAGE70F25

Page 8: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.3 CAVITIES AND INSULATION

3.3 - 10 3.3 - 11

BESTPRACTICEGUIDES-SECTION3

PAGE80F25

Page 9: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.3 CAVITIES AND INSULATION

3.3 - 12 3.3 - 13 3.3 - 14

8

BESTPRACTICEGUIDES-SECTION3

PAGE90F25

8 8

Page 10: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.3 CAVITIES AND INSULATION

Images 10 and 11:Cavitywalltiepositions,typeandnumber,spacingsandcleanlinessareimportantforstabilityandthepreventionofwaterpenetration.Aminimum50mmbeddinginoneachleafofsuperstructureshouldbeachieved.

Theinsulationshouldbeofthecorrecttypeandthicknessforthelocationofthebuilding,bearinginmindthatfullfillcavityinsulationcannotbeusedinseverelyexposedareasinaccordancewithNHBCStandards.Insulation,whetherpartialfillorfullfillshouldbeadequatelyrestrainedinplaceanditshouldbecontinuoustopreventcoldspots.Thereshouldbenomortardroppingsrestingontopoffullfillcavityinsulationbatts.

Whenusingpartialfillinsulation,cavitiesshouldmaintaintheminimumwidthof50mmandbefreeofdebristhroughoutitsentirety.Theinsulationshouldbetightupagainsttheinnerleafusingthecorrectwalltiesandclips.Onepointofconcernwithimage10isthattheblockworkisabithighwithoutbeingbackedup–morethan6courseswouldnotbeacceptable–sopossiblyalostpointhere;soeventhoughtheworkmanshipisveryneat,ifthisisamorewidespreadissue,itcouldwellbemarkedasa3.

Forextramarksahighstandardofdetailing,accuracy,alignmentandaparticularcleanlinessofwallties,DPCtraysandweepventsisneeded.Insulationshouldbenoticeablyclearofdebristhroughtheuseofprotectivemeasureswhilstworkingonthewall.Judgeswillbeimpressedwithinnovative,effectivesolutions.Image11isatextbookexampleofhowtokeepcavitiescleanwithflushedupbricksandspotlesswallties–afull6marksfromthejudgeshere.

Images 12, 13 and 14:Incontrasttotheabove,thisisdefinitelynotwhatthejudgeswanttosee:

■ superstructuresthatdemonstrateamixtureofbothexcessivemortardebrisinthecavityorbrickworkandblockworkwithjointswhichremainunfilled

■ blockworkthatisn`tbondedcorrectlyinthecornersandcreatesstepswheremortarcanbecomelodged

■ off-cutsoftimberjoistsandbricksthatcanbecomepresentespeciallywhereBuildingRegulationsarenowencouragingwidercavitywidthstomeetwiththerequirementsofPartL.

Goodaestheticstotheexternalcomponentofsuperstructurescoupledwithclean,clearcavitieswillputyouontherightroadtogainingaboveaveragemarksinthissection.Allthesephotoswouldmeritamarkof3atbest–possiblyloweriftheseissueswereseenasamoresite-wideissue.

BESTPRACTICEGUIDES-SECTION3

PAGE100F25

Page 11: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.4 DAMP PROOF COURSES AND CAVITY TRAYS

3.4 - 15

BESTPRACTICEGUIDES-SECTION3

PAGE110F25

3.4 - 16 3.4 - 17

Page 12: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.4 DAMP PROOF COURSES AND CAVITY TRAYS

Images 15, 16 and 17:DPCsandcavitytraysshouldbeinstalledatthecorrectlevelwithstopendsandcorrectlypositionedweepholeswherenecessary.

VerticalDPCsshouldbeinstalledtoopeningsinthebrickworktopreventwateringressoccurring.Image15showstheverticaldampproofcourseisinstalledaboveboxbaywindowtopreventwatertrackingacrossthebrickworkbycapillaryactionandintotheinternalspace.Image16showsanalternativepreformedverticaldpcthatallowsforthebondingtocontinuethrough,ratherthantreatingitasamovementjointasinimage15.Youshouldbemindfulofanysimilarareaswheredampproofcoursesshouldbeinstalled.

Preformedplasticcavitytraysshouldbeusedonanyroofabutments.TheyneedtobeadequatelysetouttotakeaccountoftheinstallationoftheroofbattenandtilewhilstalsoallowingtheminimumupstandinaccordancewithNHBCStandards.Theseshouldbefreeofmortardebrisandaweepholeshouldbeplacedonthelowesttraytoallowforwateregress.Preformedsteppedcavitytrays(image16)aretobecarefullysetoutusingprofilesorapatternspar.

Forthebestmarkstheuseoftemplates,ahighstandardofdetailing,accuracy,alignmentandcleanlinessoftraysandweepholesisrequired.

Note:TheNHBC3DviewerAppwhichisavailableforfreeoniPhoneandAndroidisagreatpictorialassetinassistingyouwithhighlydetailedandcriticalareasofconstruction.

BESTPRACTICEGUIDES-SECTION3

PAGE120F25

Page 13: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.5 CHIMNEYS AND FLUES

3.5 - 19

BESTPRACTICEGUIDES-SECTION3

PAGE130F25

3.5 - 18

Page 14: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.5 CHIMNEYS AND FLUES

3.5 - 20 3.5 - 21

BESTPRACTICEGUIDES-SECTION3

PAGE140F25

Page 15: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.5 CHIMNEYS AND FLUES

Images 18, 19, 20 and 21: Flueblocksorliners,iftheyarebeingused,mustbeinstalledthecorrectwayuprelativetotheirclassificationandshouldbebondedinorsupportedfortheirfullheight.

Testingofthefluebyuseofsmokebombsorotheralternativemeanscanbeconcludedandconfirmedatthispoint.Image19showsthatthissitemanagermakesanoteonthechimneybreastaspartofhisqualitymanagementsystem.Havinggoodcontrolsystemslikethiswillscorewellinsection9.5.Anappropriateformationofacavityaroundafluemustbeinstalledwherenecessary.

Neatandcompliantinstallationoffactory-madechimneysandtheirstructuralsupportandfirestoppingisveryimportant.These`dummy`chimneysastheyareoftencalledshouldbeassembled,erected,anchoredandprotectedinaccordancewiththemanufacturers’instructions.Theseshouldbeaccessibleonsiteforreference.

Thereisveryhighpotentialforwaterpenetrationthroughtheroofwherechimneysexitclosetotheeavesofapitchedrooforthroughaflatroofsoitisimperativethetraysandflashingsareinstalledinthechimneyandarecontinuoussothatalldamppenetrationisprevented.TheseleadflashingsintheexternalchimneyconstructionshouldbeappropriateandcomplywithNHBCStandards.Leadworktochimneyscouldbemarkedhere,orinSection4.5.

Note:TheNHBC3DviewerAppwhichisavailableforfreeoniPhoneandAndroidisagreatpictorialassetinassistingyouwithhighlydetailedandcriticalareasofconstruction.

BESTPRACTICEGUIDES-SECTION3

PAGE150F25

Page 16: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.6 INTERMEDIATE FLOOR STRUCTURE

3.6 - 22 3.6 - 23

BESTPRACTICEGUIDES-SECTION3

PAGE160F25

3.6 - 24

Page 17: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.6 INTERMEDIATE FLOOR STRUCTURE

Images 22, 23 and 24:Thejudgeswillbelookingatthestructuralfloor,whethertimber,steel,pre-castorin-situconcrete.Allrequiredstraps,nogginsandstruttingshouldbefixedinpositioncorrectly,whichincludesbearingonfullblocks,notonjoints.Restraintstrapsneedtobefullysupportedbynoggings–withtheendofthestrapturneddownsoastopreventitvibratingtotheundersideofthefloorstructure.Theworkshownhereisagood4marks,possiblya5.Certainlyifanextranoggingwasinstalledtosupporttheflyingendofthestrap,thatwouldmeritastrong5orperhapsevena6.Image23showsthatsomethoughthasbeenputintoensuringthatthestrappullsonafullblock;thesurroundingmasonryonthiscoursecanbeadaptedtofit.

Correctwallinterfacesmustbeusedi.e.hangersorbuildinginofjoistsandbeamsmustbecompliantwiththeNHBCStandards.Thequalityofworkmanshipisvitalforthiselementofconstruction,particularlyregardingseparatingwallsandtherequirementtoavoidsoundtransmittance.Thebuildinginofjoistsintoloadbearingwallsmustbedoneinaneatandtidyfashion,forexampleasshowninimage24wherefullblockshavebeenusedtofillthegapsbetweenthejoistswithnofuss–cleansharpwork.

Precautionsagainstdisproportionatecollapse–whateverthesystemofbuild–mustbecorrectlyinstalled;theseareusuallythetwistedlateralrestraintstrapsweseeaffixedtothelowerchordofthejoist–notthestandardlateralrestraintstrapsorsupportstrapsastheyareotherwiseknown.

BESTPRACTICEGUIDES-SECTION3

PAGE170F25

Page 18: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.7 LINTELS, BEAMS AND OTHER STRUCTURAL ELEMENTS

3.7 - 25 3.7 - 26

BESTPRACTICEGUIDES-SECTION3

PAGE180F25

Page 19: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.7 LINTELS, BEAMS AND OTHER STRUCTURAL ELEMENTS

3.7 - 27 3.7 - 28 3.7 - 29

8

BESTPRACTICEGUIDES-SECTION3

PAGE190F25

8 8

Page 20: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.7 LINTELS, BEAMS AND OTHER STRUCTURAL ELEMENTS

Images 25 and 26:Thecorrectlengthandbeddingoflintelbearingsareimportanttoensurefulldistributionoftheload.

Padstonesshouldbeoftherequiredsizeandpositionedcentrallybelowthebeamorlintelinordertoevenlydistributetheload.Inblockworkwalls,fullblocksshouldbeusedforlintelbearingswithcorrectlybondedblocksbelow.Girdertrussbearingsarealsoconsideredunderthisheadingandassuch,shouldbeconsidered.MildsteelbeamsorRSJ`sshouldbepaintedtoensuredurabilityinaccordancewithNHBCStandards.It’snotclearfromthisphoto,butifthisistwobeamsthatneedtobeconnectedtogether,thetighteningoftheboltsmustbedonebeforeanyloadingisapplied.

Theworkshownherewouldbemarkedata4,orpossiblyamarginal5.

Images 27, 28 and 29:Whenconsideringtheplacement,bearingandlocationoflintelsyoushouldavoidthefollowingissues.

■ lintelsthataretoobigfortheopeningandencroachingintoortravellingfullyacrossthecavity

■ mixingofmaterials,forexample,facebricksoverlintelsorinadequatebearingonahalfofabrickwhichisfurtherunderstressbycarryingtheweightofthefirstfloorjoists.Considertheoverallareaofconstructionandtheimplicationsofnotgettingitrightfirsttime

■ poorbondingofmasonrythatleadstopooralignmentofperpends

■ inadequatepadstoneswithinadequatesizing–builtasanafterthoughtandoutofinappropriatematerials

Withimage29,whilstbluebricksmightjustworkasapadstone,themoreseriouserrorherearethestraightjointsinthemasonrybelowwhichsignificantlyweakensthewallunderthatload.

Theworkshowninimages27,28and29ispoorandwouldonlygeta2ora3–remedialworkwillberequiredtoresolvetheissues.

Ourbestadviceishaveapictureinyourmindofhowtheconstructionisgoingtolook.Howareyougoingtointerpretthetechnicalinformationonthedrawingintothehousethatyouarebuilding?Isitgoingtobecompliant?Isitgoingtolookasgoodasitpossiblycanbeorareyoujustgoingtoletthetradesoffertheirinterpretationandbemarkedaccordingly?

BESTPRACTICEGUIDES-SECTION3

PAGE200F25

Page 21: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.8 BALCONIES INCLUDING THEIR FIXINGS AND WEATHER PROOFING

3.8 - 30 3.8 - 31

BESTPRACTICEGUIDES-SECTION3

PAGE210F25

Page 22: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.8 BALCONIES INCLUDING THEIR FIXINGS AND WEATHER PROOFING

Images 30 and 31:Balconiesmustbeaccuratelyaligned,installedandcorrectlyfixedbacktothemainframeofthebuilding.Thejudgeswilllookforcorrectbalconyguardingmaterialsandgaps(iebenon-climbableandbeoftherightheight).CorrectdrainageforthebalconydesignismostimportantandshouldbeinaccordancewithapproveddrawingsandmeetNHBCminimumrequirements.Image30showsbalconiespartlycomplete–glassbalustradinghasyettobeinstalled.However,theworksofarlooksverycompetentandwouldmeritascoreofatleasta5.

Image31demonstratesaneatweatheringupstand.Anadequatesealingoffixingsshouldtheypenetratetheweatherprooffabricisvital.ThisisahighriskareaofconstructionsoitiscriticalthatbalconywaterproofingandthresholddetailsareapprovedbyNHBCpriortobeingconstructed.Thisimageshowsaneatlyconstructedsplashzonedetail,splashzoneheighttobeamin150mmabovedecking.Noteweepholesabovetraypositionedat450C/Cswithcoverflashingsealed.Simpleconstructionthathasbeenwellmanagedandwouldattractascoreofatleasta5–ifitwasonalargescalearoundabuildingandalltothisstandard,thena6wouldbemerited.

Furthermore,thecaretakentomakethesedistinctivestructureslookaestheticallypleasing,whateverthedesign,willcatchtheeyeofthejudges.Neatdetailsaroundfixingstothemainsuperstructureelementsalongwithcarefulconsiderationtotheprovisionandmaintenanceofbalconydrainageandoverflowsystemswillensureyoudemonstrateyourtechnicalexpertise.Effortsmadetocreateapleasingappearancetosoffitsanddeckingwillensurehighermarksareawardedbythejudges.

BESTPRACTICEGUIDES-SECTION3

PAGE220F25

Page 23: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

3.9 FIRE STOPPING AND SOUND PROOFING

3.9 - 32 3.9 - 33

BESTPRACTICEGUIDES-SECTION3

PAGE230F25

Page 24: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

SECTION 3 - SUPERSTRUCTURE

3.9 FIRE STOPPING AND SOUND PROOFING

Images 32 and 33:Firestoppingandsoundproofingarecriticalelementsrelatingtothesafefunctionofthebuilding.Thecorrectinstallationoffireandsound-resistingmaterialstowalls,ceilingsandcompartmentsisvitallyimportanttoachievetheirrequiredperformancestandards.

Careshouldbetakentoensurethatproductsareinstalledaccuratelyandpreciselytomeettheirperformancecapabilities.

Cataloguedphotographicrecordsofworkmanshippriortocoveringuparenowbecomingusualpracticeonsite,asisengagingtheservicesofaspecialisedfireengineeringcompanytoaddressthefirestoppingaswellasmaintaininganonlinedatabaseofrecords.

Thejudgeswillbelookingforaccurateplacementoffirebarriersandforthebarriermaterialtobeprotectedwhererequiredfromsubsequentconstructionprocesses.Thefirebarriersshouldbeastightaspossibletotheelementsofstructurewithinwhichitisbeingheld–sonogapstoallowtheinadvertentpassageofsmokeorflamesshouldbeevident.

Theworkshownhereisverygoodandwellworthamarkof5–possiblya6ifconsistentatthislevelacrossthesite.

BESTPRACTICEGUIDES-SECTION3

PAGE240F25

Page 25: BEST PRACTICE SECTION 3 GUIDES SUPERSTRUCTURE

GOOD LUCK!

BESTPRACTICEGUIDES-SECTION3

PAGE250F25

R387 02/21

Wehopeyouhavefoundthisbestpracticeguideusefulingainingabetterunderstandingofwhatthejudgesarelookingforateachstageofconstruction.

Remember,thesixcharacteristicsthejudgesarelookingforinasitemanagerare:

■ Consistency

■ Attentiontodetail

■ Technicalexpertise

■ Leadership

■ Interpretation

■ HealthandSafety

WewishyoualltheverybestinthePrideintheJobcompetitionasyoustriveeitherforyourveryfirstwinortorepeatorimproveonyourperformanceinpreviousyears.