Benefits of Implementing Primavera P6 R8.1 and Integration to Oracle

Carol C. Johnson, MBA, PMP, CMQ/OE

Vice President, Enterprise Applications

DRS Defense Solutions

Tamim Kulaly, PMP

Vice President, PPM Division

Project Partners

Session 10638, 4/23 at 3:45 to 4:45 PM

DRS Defense Solutions

• Wholly Owned Subsidiary of DRS Technologies

• Created in 2008 when DRS was acquired by Finmeccanica (Italy)

• Focus on defense programs, engineering and manufacturing

• $1.3 billion annual rev, approx 3,000 employees

• Headquartered in Rockville, MD

• Five primary Business Units

DRS History with Primavera

• Use of Primavera since 2000 at several

DRS Divisions

• Use of the Application:

– For all Projects Planning Management

– Recourse Management

– Budget & Forecast tracking

– EVM in Limited fashion

• Integration to EBS via OP3

Outline

• New Initiative to Upgrade

– EBS, Primavera & Integration

• Corporate Challenges and Benefits

• Upgrade of Primavera and EBS and

Impacts

• Benefits going Forward

• How our Lessons Changed our Approach

New Initiative to Upgrade • Migration of business units to R12

– Change from Project Costing to Project Management Model

– Change the Resource Structure in EBS

– Change the to WorkPlan/Financial Plan Model

• Upgrade of Primavera version 7 to Primavera P6 R8.1

• Upgrade Integration Platform (P6 R8.1 to R12) via

OP3

• Timeline April 2011 to Aug 2011

Corporate Challenges • No consistent program management practices,

data, reporting, or visibility across programs would remain

• Decided to implement to other locations after this one – How to accomplish a design usable at other sites

without affecting current implementation schedule

– Proposed Solution – Keep the global team involved and updated, any changes to the system at the site should go through that team

– Consequence – knew there would be items still left to review, but at least we would have a global framework we could implement on and refine.

Corporate Challenges

• Units using different tools: MS Project, Excel, Primavera, MPM, and don’t like change

• How do you solve the problem of lots of entrenched tools and processes but go global

– Proposed Solution – Involve representatives from across the units and different functions to help identify gaps and requirements, and solutions

– Consequence – Do not mandate use of the tool up front until solutions can be shown

– Excel and reporting still remain, but original team has grown and is in tact

Other Benefits

• “Primavera is a critical tool for our business and management of our programs”

• Linking multiple schedules together easily

• Multiple baselines

• Portfolio View

• Resource Capacity Planning

• Linkage to EBS

Impact of Primavera

Upgrade and R12 Upgrade

Together

Implementation Approach

Focus on one Division

• Upgrade P6 R7 to P6 R8.1

• Upgrade EBS 11.5.10 (Project Costing Model) to

R12 (Oracle Project Management Model)

• Focus on one division as a Pilot

• Implementation Team

– DS Project Management

– Vendor 1 – EBS Upgrade

– Vendor 2 – Primavera and Integration Upgrade

– Tight timeline

Implementation Challenges • P6 Upgrade to Web Platform:

– Harder to Transition to Web Platform. UI differences

impacted adoption

– Had to still provide P6 R8.1 client to limited users

– IT involvement to maintain and support a global

Platform

• Migration of Projects (Not as Simple):

– Changes to the Configuration impacted the

migration effort - (EPS, OBS, Codes, Recourses, etc

were all changed.

– Project Budgets had to be migrated from the old

Resources Model to New Resources Model

Implementation Challenges • Oracle Project Management vs Oracle Project

Costing

– Business Users did not have a good

understanding of the differences

– Changes to the Budgeting Process

– Changes to the Resource Planning Structures

– Understand differences between Work Plan

and Financial Plan

– Migration of Projects (Not as Simple):

Impact on Integration

Prima

P6 V7

Project Header Sync

WBS/Tasks/Dates

(Structure)

Budget Update at

Resource Assignment

and WBS Log Level

(Cost)

Actual Financial Costs &

Effort

Scheduled Progress

Classification Codes

Global Resources &

Rates

EBS

R12.1.1

Proj

Mgmt

Primavera P6 R8.1

Activity Coded to DFF

Current Data Flow

OP3 Upgrade

• OP3 Needed to be tested and certified

quickly on 8.1 and R12 to make the

deadline

• Changes made in what would be linked

and synchronized between EBS and P6

– Actual Costs

– Some customizations were removed

Overall Challenges • Underestimated the impact of EBS upgrade

on data flow

• Underestimated the migration effort

• Coordination between teams was not as expected. – This included between EBS and Primavera, but

also Primavera and the technical team.

• Testing suffered (CRP/UAT) was not fully flushed as some data was always missing.

• Delay in Delivery of Project. (Over Budget/Schedule)

Post-Upgrade • After the upgrade, had to complete migration of unit’s

programs into P6

• 3 months to migrate, link, and work out any kinks

– WBS task order out of synch with EBS

– Templates not set up correctly in EBS

– Duplicated resources

– Performance issues

– Java client issues

– Bug in PSI number in EBS (remains an issue)

Benefits Going Forward

Global Framework

• Global Framework wasn’t completed during the

initial implementation

• PM Working Group defining common practices

now

• Primavera Working Group-Implementation Team

working to define gaps and solutions to meet

those requirements

• Global Design currently in motion

Resources • Global Resource Usage Capacity Planning

• Current: Department Only

• Future: Consistent Resource Lists at a mid/aggregated

level with Department, Speciality, Level, Location, Average

Rate

• This plan will span into other types of tools and reporting

Example Resource Map Old Title

HR Title

Pool title

Location

Avg Rate

Esc 1 Esc 2 Esc 3 Esc 4 Esc 5

Technical Engineer I

Technical Engineer JR

Dayton, OH

$50 $52 $55 $58 $63 $65

Technical Engineer II

Technical Engineer JR

Dayton, OH

$50 $52 $55 $58 $63 $65

Technical Engineer II

Technical Engineer JR

Cypress, CA

$70 $73 $78 $81 $84 $87

Technician Level 3

Technical Engineer III

Technical Engineer Mid

Cypress, CA

$80 $83 $86 $89 $91 $93

WBS/CBS Templates

• Set of templates that can be mixed and matched

by type of project and provide common reporting

• Current: No templates or Activity Codes are

implemented

• Future: Templates include Activity Codes to map

between required CBS and Program’s WBS

Example WBS / CBS CWBS Task name PM WBS Task Name

1 Program Management and Support 1 Program Management

1.1 Program Management 1.1 Program Planning

1.2 Program Support 1.2 Program Monitoring & Control

1.2.1 Developmental Quality Assurance 1.3 Customer Management Reviews

1.2.2 Project Training 1.4 Subcontract/ Material Management

1.2.3 Project Work Environment (if not capital) 1.5 Project Training

1.6 Project Closure

1.7 Project Work Environment

2 System Development 2 System Development

2.1 Technical Reviews and Management 2.1 System Requirements Definition (Requirements

Analysis)

2.2 Systems Engineering 2.2 System Architecture Design

2.3 Support Engineering

2.4 Internal Reviews/Meetings

2.5 Customer Technical Reviews

2.6 Program Support

3 Product Development 3 Product Engineering

3.1 CI #1 3.1 Configuration Item #1

3.2 CI #2 3.1 Configuration Item #2

4 System Test and Evaluation 4 System Integration and Test (Product Integration

Verification and Validation)

4.1 Integration, Verification, Validation 4.1 Test Plans & Procedures

4.2 Test Equipment

4.3 Integration Test

4.4 Risk Reduction Test / HALT

4.5 System Verification & Validation Tests - Internal

4.6 PIVV / Formal System Qualification

CBS WBS

Apply Activity Code

WBS turns to CBS View

Project and Activity Codes

• Sets of Consistent Project and Activity Codes to

use for global reporting

• Current: Not defined yet, only at unit level

• Future: Define sets of codes that will be

common and those that are optional

Operations Data

• Provide program managers the ability to

see key operations data and analyze

affect on the program

• Current: No link to Operations data, all

manual

• Future: Link to key summary data in

MRP/ASCP in EBS

Reports • Define the key set of reports needed for different

levels of users that are consistent so that ALL Program

Reporting comes out of Primavera as much as

possible

• Current: Only using the workbooks

• Future: Define required data sets from out of the box

as much as possible, but also using BIApps as needed

• This project intersects with a general ERP project to

globalize and consolidate ALL reporting in our systems

Other Plans

• Implement the Risks functionality in P6

– Look at Risk Module in future

• Define the best way to get ETCs into the

system from workers that is quick but

allows for discussion and collaboration

• Look at P6 Analytics in the Future

How our Lessons

Changed our Approach

Lessons and Changes • Vision

– Global Framework is the primary goal not schedule

– Communication of vision and approach occurs

constantly to all levels

– Vision is tool agnostic in many ways

• Sponsorship

– Vision comes from the highest levels of the company

so has teeth

– PM Working Group chaired by Senior Execs

Lessons and Changes • Teams

– Single project/program manager to coordinate across

aspects

– Oracle EBS and Primavera support team overlaps

Kept the Same

– Maintain the PM Working Group for requirements, but

the Implementation team is more hands on – with

overlap

– Teams should be cross-functional and cross unit

Lessons and Changes • Training

– Training is split into pieces so not all at once

• Just complete basic training on PMs for sandbox

• Will do 2-3 day trainings every 45 days or so

– Train key team individuals up front

– Work side by side with partners to learn the

system

Lessons and Changes • Technical

– Defined CM and Instance Management

Strategy

– Environment stable and in place with support

plan implemented

– Performance issues seem resolved

– Testing and piloting will be key to the process