Purpose
The purpose of this presentation is to:
➢ Outline the MILCON program project to renovate and create a 21st Century Learning Environment for the students served by Bechtel ES.
➢ Present the decision as to where and how to temporarily house Bechtel Elementary school students for the duration of the military construction project has significant community ramifications.
➢ Decisions were made jointly with US Army Corps of Engineers, Marine Corps Installations – Pacific and the DoDEA Pacific South district
We are pleased to share with you our way forward!
3
Introduction
▪ Problem:
▪ Major military construction project to transform Bechtel
Elementary School (BES) into a 21st Century School.
Timing is dictated by the Fiscal Year for which the funding
is allocated. The project start cannot be postponed.
▪ Demolition / construction work is so extensive that
students & staff will have to relocate to a temporary
location for the duration of the project. Safety is a critical
concern
▪ How do we provide a learning environment that will
support teaching and learning for the Bechtel ES
community and retain its identity as a school.
4
Current Bechtel Elementary School
5
Bechtel ES Changes
Demolition of existing building 4,066 sq.m. or 43,766 sq.ft.
New Construction – 7,525 sq.m. or 70,493 sq.ft. Net increase = 37,234 sq.ft.
Renovation for 70,493 sq. ft. Total Area of New/Renovated School = 107, 727 sq.ft.
• The 21st century teaching and learning model of studios and learning neighborhoods is created along with group learning areas, on-to-one teaching spaces and staff collaboration areas.
• The Commons / Multipurpose Room increases the cafeteria capabilities of the school to support a population of 850 students.
• A new Information Center.
• Adds room for specialists, Special Education service providers and conference rooms.
• All covered passage within the facility is provided.
• There is covered main entry and a bridged entry from bus drop off and loading areas.
6
What is Gained with this Project?
7
What Will the New/Renovated Bechtel ES Look Like?
Front Entrance
8
Commons Area
9
Outdoor & Garden Area
10
Learning Neighborhood
11
Information Center / Library
12
13
Bechtel ES - Second Floor
14
Third Floor Plan
15
Construction Schedule
16
How Will the Necessary Swing
Space be Created?
▪ Location: By Using the Existing Ryukyu MS Facility to have
the Bechtel ES students & staff
▪ Ryukyu MS has a functional capacity of 1150 students. This
will hold the 800+ Bechtel ES students and approximately 250
to 280 middle school students, to include the students who
currently come from Camps McTureous and Courtney
▪ Ryukyu MS has adequate facilities to support the population
to include classrooms, information center, cafeteria, art, music
and physical education facilities.
▪ Bechtel ES and Ryukyu MS administrators have developed a
plan for the use of the building to provide an effective
educational environment for all of the students.
17
Logistical / Facility Requirements
Requirements to Utilize RMS:
▪ Some restroom modifications for Kindergarten,
Preschool Services for Children with Disabilities (PSCD),
and Sure Start Students
▪ Additional buses to transport students
▪ Playground items
▪ Relocation of existing, right sized, furniture and
equipment for the Bechtel ES students
18
Questions?