US Army Corps of Engineers

BUILDING STRONG®

JOINT BASE LEWIS/MCHORD

MILITARY CONSTRUCTION ARMY (MCA)

PROGRAM

Victor M Ramos, PMP MCA Program Manager

Seattle District

October 10, 2012

Page 2: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

AGENDA

Acquisition Strategy

Facilities Under Design

Facilities Getting Ready to Advertise (Pre-Award)

Facilities under Construction

Page 3: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Acquisition Strategy Regional Multiple Award Task Order

Contracts (MATOC)

►Will only be used on a few FY13 Projects

Local MATOCs

►To be used were it makes sense

►$10 Million Limit per Task Order

Local Competitive Contracts

►To be used to the extent possible

►Small Business consideration will be

evaluated on all acquisitions

Page 4: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Facilities in Design Location Project Description Solicitation No. P2 Number PROG

Program

Amt ($K)

Current Est

($K)

Yakima Barracks/DFAC (53-0041) 373170 ARNG 18,500 18,500

Yakima Automated Multipurpose Machine Gun Range (54106) 152479 MCA 8,400 8,400

JBLM Aviation Unit Complex, Ph 2B, Fire Station (76776) 368632 MCA 35,000 10,000

JBLM

Aviation Unit Complex, Ph 2B, Air Traffic Control Tower

(76776) 368632 MCA 10,000

JBLM

Aviation Unit Complex Ph 2B, Regional Flight Center

(76776) 368632 MCA 10,000

JBLM Aviation Unit Compelx, Ph 2B, RSU (76776) 368632 MCA 5,000

JBLM Aviation Unit Complex, Ph 2A, Large Hangar (76777) 368630 MCA 84,000 40,000

JBLM Aviation Unit Complex, Ph 2A, TEMF (76777) 368630 MCA 40,000

JBLM Aviation Unit Compelx, Ph 2A, RSU (76777) 368630 MCA 4,000

JBLM Aviation Unit Complex, Ph 2C, COF (78196) 368628 MCA 27,000 15,000

JBLM Aviation Unit Complex, Ph 2C, BNHQ (78196) 368628 MCA 12,000

JBLM FY15 BCT Complex Phase 3 Project (64285) 151191 MCA 79,000 0

JBLM BCT Complex Phase 3 (UEPH) (64285) 151191 MCA 32,000

JBLM BCT Complex Ph 3, TEMFs (64285) 151191 MCA 20,000

JBLM BCT Complex Ph 3, COFs (64285) 151191 MCA 15,000

JBLM Road and Infrustructure (Ph3) (64285) 151191 MCA 12,000

16 Contracts (6 projects) with estimated Value (Programmed Amount) of

$252Million

Page 5: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Facilities in Pre-Award Location Project Description Solicitation No. P2 Number PROG

Current

Working

Estimate ($K)

Construction Acq

Strategy

JBLM Information Operations Readiness Center (Peer) (530015) 338184 ARNG 35,000

DBB - Unrestricted - BV

RFP

JBLM SOF Battalion Operations Facility (Peer) (69445) 332669 SOF 46,000

DB - Unrestricted -

BVRFP

JBLM SOF Military Working Dog Kennel Complex (Peer) (69257) 156068 SOF 3,912

DB - SB MATOC -

BVRFP

JBLM Wastewater Treatment Plant, Phase 1 (75165) 354622 MCA 91,000 DB - Unrestricted

Yakima Convoy Live Fire Range P (?) (67545) 354777 MCA 5,000 DBB - NWS MATOC

JBLM Battalion Complex (Ph3), UEPH (64456) 323309 MCA 35,000 DB - Competitive

JBLM Battalion Complex (Ph3), BNHQs (64456) 323309 MCA 12,000 DBB - SAS MATOC

JBLM Battalion Complex (Ph3), DFAC (64456) 323309 MCA 12,000

DBB - Competitive Small

Business

JBLM Road and Infrastructure (P2) (64456) 323309 MCA 13,000

DB - Competitive Small

Business

JBLM FY10 Joint Base Lewis/McChord Joint Access (74408) 329989 MCA 9,000 DB SB MATOC

JBLM FY09 Chemical Battalion Complex, 1CO COF (65184) 140516 MCA 8,000 DB - SAS MATOC

JBLM Infrastructure, Phase 1 - Package C (66206) 151190 MCA 6,332 NWS Low Bid DBB

JBLM Electrical Upgrades - Package B (66206) 151190 MCA 8,524 DB - MATOC

JBLM 14th St Infrastructure/Expansion, South (66206) 151190 MCA 5,000 Directed 8A

JBLM Miller Hill Road/Infrastructure, 22nd St Extension (66206) 151190 MCA 1,000 MATOC

JBLM Softball Fields (76767) 334098 MCA 4,000 MATOC

JBLM FY11 Regional Logistics Support Phase 1 (TEMF) (72854) 327173 MCA 33,000

DBB - Competitive Small

Business

17 Contracts with estimated value of $293 Million

Page 6: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Current Construction

Awarded 14 Contracts for a total of $156

Million in Fiscal Year 12

Turning over 5 facilities to JBLM in

October/November ($55 Million in

MILCON)

Most facilities will be LEED Silver

Certifiable (minimum)

Page 7: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Award for Fiscal Year 2012

Location Project Description P2

Number PROG

Program

Amt ($K)

Current

Est ($K)

Curr/Actual

Award

Award

Amount

Fairchild SERE HQ, Phase II (GJZ920012P2) 333229 MCAF 14,000 14,000 5-Jul-12 $11,724,000

McChord

Replace Fuel Distribution Facility W912DW-

12-C-0016 (DES1004) W912DW-12-R-0003 152027 DLA 14,000 13,500 2-Feb-12 $10,217,000

Fairchild Wing HQ (GJKZ860009) 333187 MCAF 13,600 14,000 25-Apr-12 $11,217,750

Fairchild Veterinary Clinic Replacement (080094) 397120 MEDC 1,600 1,600 29-Sep-12 $2,020,836

JBLM SOF Company Operations Facility (76363) 332667 SOF 21,000 21,000 30-Aug-12 $18,751,000

JBLM

Operational Readiness Training Cplx, Ph1

(Barracks) (58046) 103386 MCA 28,000 16,500 24-Sep-12 $16,416,000

JBLM Water Resevoirs - Package A (66206) 151190 MCA 64,000 11,227 29-Aug-12 $10,525,000

JBLM

14th St Infrastructure/Expansion, North

(66206) 151190 MCA 64,000 1,698 28-Sep-12 $1,979,415

JBLM Miller Hill Road/Infrastructure (66206) 151190 MCA 64,000 5,535 28-Sep-12 $4,980,322

JBLM BCT Complex, Phase 1, Barracks (76767) 334098 MCA 34,000 28,000 29-May-12 $24,162,000

JBLM Brigade Complex, Ph2 (TEMF) (53637) 111096 MCA 57,000 17,600 7-Jun-12 $19,374,564

JBLM Brigade Complex, (Barracks), Ph 2 (53637) 111096 MCA 57,000 13,000 14-Jun-12 $14,691,000

JBLM

ACS Complex Phase 2, Parking Apron

(76768) 334099 MCA 49,000 28,000 28-Sep-12 $12,950,400

JBLM

Battalion Complex (64014, Barracks)

(64014) 151187 MCA 59,000 23,000 28-Jun-12 $19,332,000

JBLM Battalion Complex (64014, TEMF) (64014) 151187 MCA 59,000 14,000 21-Sep-12 $14,649,000

JBLM

Air Support Operations Squadron W912DW-

12-T-8200 (60344) 151185 MCA 7,400 7,400 9-Mar-12 $7,511,891

Yakima FY11 Sniper Field Firing Range (65386) 152441 MCA 3,750 3,770 9-Apr-12 $3,610,997

14 Contracts for a total of $156 Million

Page 8: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Dining Facility

Project Year/Number: FY09/59555

Contract No: W91236-10-D-0034 0001

Contractor: Vet Industrial, Inc/Belay

Architecture

Award Amount: $12,398,651

Status:

•Facility has been turned over

•Will feed 1,300 soldiers

•LEED Gold Certified

•SAME 2012 Design Award Winner

Page 9: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Warrior in Transition Admin Bldg

Project Year/Number: FY09/69224

Contract No:

W9126-11-C-0015

Contractor:

Doyon Project Services LLC

Award Amount: $17,746,689

Status:

•To be turned over in Mid October

•To be a LEED Gold Facility

•Geothermal heating to be utilized

•Facility combines Battalion HQ,

Company Headquarters and

Soldier Family Assistance Center

(SFAC)

Page 10: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

3-2 SBCT Barracks

Project Year/Number: FY11/55198

Contract No:

W9126G-08-D-0045 0003

Contractor:

M.A. Mortenson

Award Amount: $17,979,000

Status:

•To be turned over in Mid October

•To be a LEED Silver Facility

•Garden style configuration (one

entrance to 4 rooms per level)

•To providing housing for 300

Soldiers

Page 11: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Road/Infrastructure Upgrade Project Year/Number:

FY11/64457

FY10/65935

Contract No:

W912DW-11-C-0017

Contractor:

Bristol Engineering

Award Amount: $26,255,999

Description/Status:

•Widen roads/upgrade

infrastructure to support MILCON

•To be completed July 2013

•Construction will Impact main

arterials (Pendleton Ave)

Page 12: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Points of Contact

Small Business Officer:

►Veronica (Ronni) Kammler

[email protected]

►206-316-3990

Army Program Manager

►Victor Ramos

[email protected]

►206-764-4478

Page 13: 2012 JBLM MILCON Tacoma Chamber of Commerce Oct2012

BUILDING STRONG®

Questions?

QUESTIONS?